The Lake Comp

download The Lake Comp

of 2

Transcript of The Lake Comp

  • 8/12/2019 The Lake Comp

    1/2

    The Lake, the dam, the company

    The Lake Izvorul Muntelui, also known as Lake Bicaz, was created after the completion of a dam built on

    the Bistria River has - on average - a length of 35 km, a perimeter of 71 km, a surface area of 32.6 km

    and a maximum volume of 1,250 million cubic meters of water and is also - in size - the second artificial

    lake in Romania and the third in height . The powerhouse has four large generating units. Each unit hasa capacity of 130000 kW. The dam is located a few kilometers north of the town of Bicaz. The general

    direction of the lake is from northwest to southeast.The lake is a popular tourist destination in the

    region, especially in summertime, when visitors can take the ferryboat from the Bicaz port for a short

    trip on the lake, enjoying the magnificent view of Mount Ceahlu on the west shore.

    The dam was built between 1950 and 1960 and was used to generate hydroelectricity at the Bicaz-

    Stejaru hydro-plant until GEG S.A. bought it and upgrade it to a real hydroelectric plant.

    GEG.S.A. is a private company with a enviromental vision

    How it works

    The dam stores lots of water behind it in the reservoir. Near the bottom of the dam wall there is the

    water intake. Gravity causes it to fall through the penstock inside the dam. At the end of the penstock

    there is a turbine propeller, which is turned by the moving water. The shaft from the turbine goes up

    into the generator, which produces the power. Power lines are connected to the generator that carry

    electricity to your home and mine. The water continues past the propeller through the tailrace into the

    river past the dam.

    In the picture above we can see the power plant layout:Auxiliary devices and balance of

    plant;Transformer;Automation and protection; Generator; Turbines and MV/HV switchyard substation.

  • 8/12/2019 The Lake Comp

    2/2

    The staff

    The company :

    Board of Directors : Cirstica Adelin and Diaconescu Alexandru Razvan

    Managing director : Dejanu Ioan

    Secretary to MD : Luminita Anghel

    Technical and envision board: Capsa Marian( Board Chief/Enviromental visioneer), Dejanu Ioan

    (Managing visioneer), Luminita Anghel (Economic visioneer) and Frank Herbert (Engineering visioneer)

    The technical and envision board create plans for future development of the company.

    Hydroelectric plant :

    Executive director: Frank Herbert

    Senior manager / Assistant chief engineer: Intze Hongo

    Superintending engineer: Ficher John

    Executive engineer : Seifer Marc and Obeidat Andreea

    Assistant engineer : Branzeanu Luca, Farfurescu Iuliana and Nitescu Ghita

    A convincing scope of supply

    Turbines from leading manufacturers Generators, transformers,Turbine control Medium-voltage switchgear Excitation devices, voltage and efficiency factor regulators Machine automation Monitoring and control of the entire hydraulic system (dam, reservoir operation, weir system,

    residual water release)

    Safety devices

    Alarm signals and telephone alerts Remote control devices Remote data transfer Integrated power plant control systems Lighting, power installations, earthing and lightning protection Energy feed-in to the regional network Linking multiple plants