THE INSTALLING INSTRUCTION FOR CONCEALED TANK G¡?U - TOTO · THE INSTALLING INSTRUCTION FOR...
Transcript of THE INSTALLING INSTRUCTION FOR CONCEALED TANK G¡?U - TOTO · THE INSTALLING INSTRUCTION FOR...
563288 13-1.1
NO.
1 4
1
1
22
2
1
1
1
1
1
1
1
2
3
4
5
6
7.1
7.2
8.18.28.3
9
10
Expansion bolt components
Clamp
Drainage pipe
Flush pipe
Drainage straight pipe components
Flush straight pipe components
Long bolt
Transparent long bolt shield
Long bolt components
Plug
To fix frame
To fix drainage pipe
To drain
To supply water to flush
To connect the bended pipes to toilet bowl
To fix toilet bowl
To shield long bolt To fix toilet bowl
To reserve space for straight pipes when laying bricks
NAME QTY FUNCTION
On-off For Filling WaterAngle valve
THE INSTALLING INSTRUCTION FOR CONCEALED TANK
FFL
Note:1.Please install the frame before paving the tiles. The dimensional unit is millimeter. 2.Please subject to the object as right if it is not in conformity with the components in picture.
FFL of finish face, all dimension is millimeter
Important remind:Please read through this Instructions carefully prior to installation, and our company shall not be responsible for any loss caused by not installating accrding with this Instructions. There are lubricantsin production for toilet bowl installation.Please confirm the FFL according to the overall indoor fitment method. Line out the FFL on the wall and always regard FFL as datum line of 0 height.
Accessories List:
1.
2.
3.80mm 300kgf Please confirm the wall is the main wall ,the thickness exceed 80mm and it can bear more than 300kgf strength when the strength act on the front of toilet bowl.
8
978.2
8.3
300kgf
FFL 0
main wall
Protection frameFor space reservation of push button plate when building the wall
To prevent sundries falling into the tank when fitmentProtection cover
Straight flush pipe of some products are offered with two kinds of seal gaskets A.B which can be selected according to toiletbowl type during installation.
A.B
B
A7.2
7.1
8.1
Please make sure W is between 70 to 130.130
1. Dimensions and Supply Pipe-laying
Top inlet
Back inlet
安装墙Main wall
Main wall
130
安装墙Main wall
500
FFL 0
1000
230180
1185
35
320
100
40(4
0~24
0)
G1/2
400-100
135(135~220)
110(110~195)
0~200
340
360
FFL 0
1000
1170
G1/2
400-100
135(135~220)
110(110~195)
0~200
1048
.5
Main wall
130
Please make sure W is between 70 to 130.130
°
80/100W
12
1Position1 W=60 /802Position2 W=80 /100
12
When excretory tube lean 45° it can only be fixed in Position 2(W=80/100).
45 2(W=80/100)
2.Drainage Pipe Installation
If necessary, adjust the clamp and drainage pipe location according to the bowl dimension. (Keep this clamp tightened to professionals!)
Remind: The function of drainage would be worse when the installation angle of drainage pipe exceed 45°
Install drainage pipe clamp.
1. 10X 502.3.4.5.3.
1.
4.
2.
5. 6.
10X 50
10mm
50mm
3.Drill on the main wall and floor 4.Install Expansion Bolts
As shown on picture:1.Drill 10*502. Insert expansion bolt 3. Tighten nut to strain bolt; 4. Unscrew nut;5.Hold screw and washer for later use.
“a” should be adjusted according to real location of drainage pipe.
1000
FFL0
360
340B
a
1170
A
100
998
101
102
1m
5. Install Wall-fixing bracket and adjust floor-fixing bracket
Wall-fixing bracket
Floor-fixing bracket
6. Adjust horizontally and vertically, and tighten bolt:
Please pre-tighten bolt, and tighten after bracket adjustment.
A
B
2
11
A
B
C
D
E
“Click” “Click”F
1
3 19
2
Install angle valve, connect it to inlet valve with hose.
Angle valve
Supply pipe
Flexible hose connecting inlet valve
20~60mm
7.Install Plug:
Sketch of installed frame
8.The thickness of fixed wall is 20~60mm(measured from the front of frame to the finished tile surface)
20~60
“Click”
Important remind: When the concealed tank fixed completely, it is important to test leaking with water upon 12 hours before fixing wall.
180230
For the fixing of the long screw, there are two groups of screw holes on the bracket which are of different distance. Please choose the right position according to the size of the toilet bowl.
9.Install toilet bowl:
d
L2L1
L1+6mm
L2+3mm
Set Straight Pipes into Flush Bend and Drain Bend properly, and marks lines.
Add lubricant onto the Rubber Gaskets of two Straight Pipes and set them into Bowl. Flush Pipe seal Gasket assembly see 3.1, 3.2 and 3.3 .
Mark lines as shows. L1 is the distance of two marks on Flush Straight Pipe, and L2 is that of two marks on Drainpipe Straight Pipe. Cut Straight Pipe just as shows.
Chamfer and trim the cutting edges on the shortened Straight pipes (as shows). Adjusting length for Bolt is d+25mm as shows.
First install Drain Straight Pipe into Drain Bend, and second install Flush Straight Pipe into Hole on Bowl. Install Bowl. Station Bowl properly.
1. 2. 3.
4. 5. 6.
7. 8. 9.
10. 11. 12.
Take out the sponge with silicon oil and smear it on connecting edges of Straight Pipe and Bends.
All data contained is based upon the last product information available at the time of publication. We reservesthe right to implement changes of product characteristics, packaging and availability at any time without further notice.
TOTO (CHINA) CO., LTD.After Service Free Tel: 800-820-9787Mobile telephone:400-820-9787
10.Installation of tank fittings:
The tank fittings have been installed before leaving factory. The above sketches are only for reference.
A
B
1
2
3
4
A
1
2 B
5
1
2
21
3.1 3.2 3.3