The Importance of Water Detection in Risk-Based Flow Assurance Strategies: Examples from Egypt and Indonesia London, 26th of March 2015 Svein Erik Gregersen Manager Flow Metering Roxar Flow Measurements Copyright © 2015

Transcript of The Importance of Water Detection in Risk-Based Flow Assurance...

Page 1: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

The Importance of Water Detection in Risk-Based Flow Assurance Strategies: Examples from Egypt and Indonesia

London, 26th of March 2015Svein Erik Gregersen

Manager Flow MeteringRoxar Flow Measurements

Copyright © 2015

Page 2: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 2

Agenda Agenda Water Production and Flow Assurance Subsea Wetgas Metering Technology Case study 1: Burullus West Delta Deep

Marine Case study 2: Chevron Indonesia Deepwater

Development Summary

Copyright © 2015

Page 3: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 3

Formation Water BreakthroughFormation Water Breakthrough Reservoir management:

– Formation water production.– Coning of water.– Increasing recovery demands.

Onset of saline water can cause:– Corrosion.– Scaling.– Sand production.– Hydrates

Copyright © 2015

Page 4: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 4

Copyright © 2015

Hydrate Formation – The four critical stages of a plug formingHydrate Formation – The four critical stages of a plug forming

1. Water droplets emerge2. Hydrate nucleation, growth at the water-hydrocarbon interface3. Hydrate particles form large aggregates4. Jamming of large aggregates to suspend flow

Time / Risk / Cost of mitigation

Source: Luis E. Zerpa

CRITICALTIME WINDOW

Page 5: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 5

Hydrate Formation and MEG OptimizationHydrate Formation and MEG Optimization Continuous lean MEG injection is the current

main plan of attack.– Effectiveness of MEG distribution system is critical for

production– High cost of downtime.

Challenge– Optimize MEG system design based on risk based

injection strategies– Realtime information on hydrate formation triggers!

Copyright © 2015

Page 6: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 6

Roxar Subsea Wetgas TechnologyRoxar Subsea Wetgas Technology

– Specifically designed for wetgas applications

– Allowing accurate measurements and unique sensitivity to changes in water content• Optimized performance for early detection of water

breakthrough

Oil Water

Gas

Copyright © 2015

Page 7: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 7

Copyright © 2015

Roxar Subsea Wetgas TechnologyRoxar Subsea Wetgas Technology Main measurements

• Differential pressure (over cone)

• Microwave measurements• Gamma measurement• Pressure• Temperature• Salinity Measurement

Copyright © 2012

Based on Roxar’s 25 years experience using Microwave technology for high GVF applications.

Builds on the first generation wet gas meter launched in 2002 as part of a JIP to meet industry demands.

Installed base world wide– Approx 260 SubseaWGM– Approx 100 Topside WGM

First installed subsea 2004

Page 8: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 8

Unmatched Water Measurement Accuracy and SensitivityUnmatched Water Measurement Accuracy and Sensitivity

WVF Accuracy:

– GVF ~ 99%: ±0.02 abs. vol.%– GVF > 98%: ±0.1 abs. vol.%– GVF < 98%: ±0.2 abs. vol.%

Water Sensitivity: – < 0.00002 absolute volume%

(0,2ppm)

Copyright © 2015

Page 9: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 9

Copyright © 2015

Page 10: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 10

Copyright © 2015

New to the world: Accurate Salinity Measurement for Wetgas applicationsNew to the world: Accurate Salinity Measurement for Wetgas applications Dedicated salinity sensor for gas

applications. Fully integrated into the meter.

Outputs:SalinityConductivityFormation Water IndicatorFormation water flow rate

This:

...is more than enough. One droplet is detectable.

Page 11: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 11

51 Subsea meters delivered 34 meters in operation to date

• The Field: West Delta Deep Marine (Egypt)

• Operator: Burullus (JV BG, Petronas, EGPC)

Case study 1Case study 1

Copyright © 2015

Page 12: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 12

Copyright © 2015

Case study 1

Page 13: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 13

Copyright © 2015

Field Experience – an Example (WDDM)Water Breakthrough Detection by Using Roxar SWGM

Gas: 75 mmscfd

Water: 10 bpd

Page 14: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 14

Copyright © 2015

Gas: 75 mmscfd

Water: 10 bpd

Field Experience – an Example (WDDM)Water Breakthrough Detection by Using Roxar SWGM

Page 15: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 15

Copyright © 2015

Gas: 75 mmscfd

Water: 10 bpd

Field Experience – an Example (WDDM)Water Breakthrough Detection by Using Roxar SWGM

Page 16: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 16

Copyright © 2015

Gas: 75 mmscfd

Water: 10 bpd

Field Experience – an Example (WDDM)Water Breakthrough Detection by Using Roxar SWGM

Page 17: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 17

Copyright © 2015

Gas: 75 mmscfd

Water: 10 bpd

Field Experience – an Example (WDDM)Water Breakthrough Detection by Using Roxar SWGM

Page 18: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 18

Copyright © 2015

Gas: 75 mmscfd

Water: 10 bpd

Field Experience – an Example (WDDM)Water Breakthrough Detection by Using Roxar SWGM

Page 19: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 19

Case study 2: Chevron Indonesia Deepwater DevelopmentCase study 2: Chevron Indonesia Deepwater Development

Page 20: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 20

Copyright © 2015

Technology philosophy applied for IDDTechnology philosophy applied for IDD

Challenges for Chevron:Condensate measurement and production managementWater detection and flow assuranceComplex transients and critical point production profilesMaximum performance focus for life of field.

Solutions from Roxar:Next generation software packageFuture proof design to allow salinity measurement (Q1.2015)Gamma densitometer system

•Robustness against CGR uncertainty close to critical point.•The GVF measurements at low GVF’s (85 - 95%), will be less dependent of the internal PVT calculations.•Combined measured WVF (µw) and GVF (Ɣ) enables the SWGM to solve for the unknown CVF.•Added robustness against variation in the composition

Page 21: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 21

Copyright © 2015

SummarySummary The onset of produced formation water represents a

major risk to the subsea system and well production:– Flow Assurance

• Costly risk based preventive measures– Reservoir Management

• Loss of production• Loss of well

Wetgas metering technology:– Addressing specific needs of wetgas applications

• Accuracy• Sensitivity• Salinity Measurement

– Reducing risk («Well insurance»)– Reducing cost (capex/opex)

Page 22: The Importance of Water Detection in Risk-Based Flow Assurance …mcedd.com/wp-content/uploads/2014/04/03_Svein-Erik... · 2017-05-19 · Water detection and flow assurance Complex

[File Name or Event]Emerson Confidential27-Jun-01, Slide 22

Thank You For Your Attention!Thank You For Your Attention! Questions?

Contact details:– [email protected]– Office +47 51 81 89 86