The Impact of IP on Technology Enabled Care (TEC) · CP “ABC Telecom” TDM Network BT UK IPX D S...
Transcript of The Impact of IP on Technology Enabled Care (TEC) · CP “ABC Telecom” TDM Network BT UK IPX D S...
TSA TSA TSA TSA
The Impact of IP on The Impact of IP on The Impact of IP on The Impact of IP on Technology Enabled CareTechnology Enabled CareTechnology Enabled CareTechnology Enabled Care(TEC)(TEC)(TEC)(TEC)
Steve Sadler, TSA Associate
& Chair of TSA Tech Advisory Group
Role of TSA’s Technical Advisory Group Role of TSA’s Technical Advisory Group Role of TSA’s Technical Advisory Group Role of TSA’s Technical Advisory Group
• How services can be developed, transformed and made more effective by
technology
• How members can make best use of TECS in the delivery of their services, and
how technology can be exploited to gain benefits for all stakeholders
• How the industry makes the move to a fully digital infrastructure such that it
does not disadvantage service providers and service users
• Creating a guide to relevant technical standards to support these objectives
• Advising and recommending the prioritisation and allocation of TSA resources
• Providing advice and guidance to the TSA Board on matters of technology as
may be required or delegated by the TSA Board
Extract from TSA TAG Terms of Reference
IP Readiness GuideIP Readiness GuideIP Readiness GuideIP Readiness Guide
Helping care services to understand the implications of procuring and operating in a digital environment.
Helping technology providers to understand the demands of TEC, when specifying, designing or integrating digital solutions.
IP Readiness IP Readiness IP Readiness IP Readiness –––– hot topicshot topicshot topicshot topics
• The change to IP introduces new network configurations and new failure
modes: Will voiceband alarm signalling still work reliably?
• How will back-up power supply be managed?
• How will services fund the switchover of technology?
• TEC has broadened from alarms to include other assistive technologies
• The changes offer the prospect of increasingly proactive care services
• Richer datasets will be accessible, raising questions of information security
• Consumer awareness of digitally-enabled services is growing
• Self-management of health and care (by users/carers) plays an increasing role
Real-time alarms will experience the greatest impact (social alarms, telecare).
Other forms of TEC are already IP-connected (telehealth, social inclusion).
5
• Telephone network is shifting to digital (IP)
• Huge number of call routing possibilities
• Tones used by telecare protocols pass through
networks less reliably
• Some protocols are more resilient than others
Analogue alarms may be transmitted less reliably
6
• Designed for modern networks
• Digital alarm data is much quicker to send
• Much more information can be communicated
• Devices are online – connected continuously
• Published interoperability protocols eg SCAIP & BS EN 50134-9
• Higher-value services enabled by a digital connection
Digital is the goal for alarm equipment
BUT, other digital TEC solutions need to be supported too
Barriers to take up of digital alarms
• Cost of replacing alarm devices and monitoring centre technology
• Long established analogue industry
• Digital not yet required by procurement
• Security concerns from IT departments
• Safety and reliability concerns e.g. power back-up, service availability,
quality of service under load
• Concerns about the connections in the home
…people are asking for Guidance
‘IP Readiness’ Guide
• How analogue alarms work
• How digital alarms work
• Drivers for changing to digital
• Benefits of digital alarms
• Considerations for choosing digital alarms
• Availability: Failover and redundancy
• Installation issuesor digital alarms
• Using broadband
• Using GSM
• Considerations for Alarm Receiving Centres
• Cyber security
Plan to be published before the end of November
ALLALLALLALL----IP TestingIP TestingIP TestingIP Testing
Which existing alarm systems are Which existing alarm systems are Which existing alarm systems are Which existing alarm systems are affected and to what degree?affected and to what degree?affected and to what degree?affected and to what degree?
Potential Impact of ALLPotential Impact of ALLPotential Impact of ALLPotential Impact of ALL----IP NetworksIP NetworksIP NetworksIP Networks
Characteristics of ALL-IP that potentially affect the operation of alarms include:
• No ‘line powering’
• No primary communication path in the event of local power failure
• Data discontinuities, which may occur due to:
o dynamic jitter buffering
o packet loss
o interconnections between communications sub-networks
o DTMF tone detection/re-generation
• End to end delays and synchronisation issues
ALLALLALLALL----IP Test Guidelines: Categories of TestingIP Test Guidelines: Categories of TestingIP Test Guidelines: Categories of TestingIP Test Guidelines: Categories of Testing
• Baseline Tests: end to end testing over a single communications network provider, employing
selected combinations of alarm and ARC equipment and protocol types across a TDM network.
• Network Combinations: different combinations of paired communications providers, varying
network performance characteristics, only selected combinations of alarm, ARC equipment
and protocol types.
• Alarm System Configurations: multiple combinations of alarm and ARC equipment types,
employing nominal network performance characteristics.
• Fault identification: communications are disconnected and the ability of the alarm system to
identify faults and recover is tested.
• Power Testing: loss of local power is simulated, alarm system response is tested.
08/11/2018 NICC Standards Limited
Internet
CPEAccess
network
H
H
H
H
BT TDM Voice
CP “ABC Telecom”
TDM Network
BT UK IPX
D
S
L
A
M
D
S
L
A
M
FV
Access
VPN
BT IP Core
BT Digital
Voice
SBC
SBCSBC
CP “ABC Telecom”
IP / IMS Network
MGW
MGW
SBC
ARC 1 ARC 2
MGW
ARC 3
ARC 4
MGW
MGW
SIP Trunk(s)
SIP Trunk(s)
ISDN30
ISDN30
ARC 6ARC 7
SIP Trunk(s)
SIP Soft-switchTDM PBXTDM PBX
SIP SoftswitchTDM PBX
TDM PBX
Data IoT, Smart Home
PSTN
Analogue
Via Adapter
IP Phone
IP Phone
PSTN
Telemetry Data
ARC 5
001Call flows
Industry All IP Event, Ofcom 23/3/18
08/11/2018 NICC Standards Limited
Internet
CPEAccess
network
H
H
H
H
BT TDM Voice
CP “ABC Telecom”
TDM Network
BT UK IPX
D
S
L
A
M
D
S
L
A
M
FV
Access
VPN
BT IP Core
BT Digital
Voice
SBC
SBCSBC
CP “ABC Telecom”
IP / IMS Network
MGW
MGW
SBC
ARC 1 ARC 2
MGW
ARC 3
ARC 4
MGW
MGW
SIP Trunk(s)
SIP Trunk(s)
ISDN30
ISDN30
ARC 6ARC 7
SIP Trunk(s)
SIP Soft-switchTDM PBXTDM PBX
SIP SoftswitchTDM PBX
TDM PBX
Data IoT, Smart Home
PSTN
Analogue
Via Adapter
IP Phone
IP Phone
PSTN
Telemetry Data
ARC 5
001Call flows
Industry All IP Event, Ofcom 23/3/18
08/11/2018 NICC Standards Limited
Internet
CPEAccess
network
H
H
H
H
BT TDM Voice
CP “ABC Telecom”
TDM Network
BT UK IPX
D
S
L
A
M
D
S
L
A
M
FV
Access
VPN
BT IP Core
BT Digital
Voice
SBC
SBCSBC
CP “ABC Telecom”
IP / IMS Network
MGW
MGW
SBC
ARC 1 ARC 2
MGW
ARC 3
ARC 4
MGW
MGW
SIP Trunk(s)
SIP Trunk(s)
ISDN30
ISDN30
ARC 6ARC 7
SIP Trunk(s)
SIP Soft-switchTDM PBXTDM PBX
SIP SoftswitchTDM PBX
TDM PBX
Data IoT, Smart Home
PSTN
Analogue
Via Adapter
IP Phone
IP Phone
PSTN
Telemetry Data
ARC 5
Contrast with “All-IP” solution – much simpler.
Industry All IP Event, Ofcom 23/3/18
Test Scenarios for different ‘Call Flows’ Test Scenarios for different ‘Call Flows’ Test Scenarios for different ‘Call Flows’ Test Scenarios for different ‘Call Flows’
Call Flow
no.
TCPE Connection ARC
Connection
Description and Variant Configuration
001 BT/TDM BT/TDM Baseline network test
002 BT/IP BT/TDM IP-TDM transcoding
003 BT/IP BT/IP SIP (IP) end to end
004 BT/IP BT/IP Media gateway transcodes to TDM at ARC
005 BT/TDM Virgin/TDM TDM interconnect
006 BT/TDM Virgin/IP TDM-IP transcoding, and SIP server at ARC
007 BT/TDM Virgin/IP TDM-IP transcode & transcode to TDM at ARC
008 BT/IP Virgin/TDM Via UK IPX or TDM interconnect
009 BT/IP Virgin/IP SIP (IP) end to end
010 BT/IP Virgin/IP Media gateway transcodes to TDM at ARC
011 BT/TDM TalkTalk/TDM TDM interconnect
012 BT/TDM TalkTalk /IP TDM-IP transcoding, and SIP server at ARC
013 BT/TDM TalkTalk /IP TDM-IP transcode & transcode to TDM at ARC
014 BT/IP TalkTalk /TDM Via UK IPX or TDM interconnect
015 BT/IP TalkTalk /IP SIP (IP) end to end
016 BT/IP TalkTalk /IP Media gateway transcodes to TDM at ARC
Etc Repeated for each major Communications Provider combination
Single comms
provider
multiple
providers
Status and Next Steps Status and Next Steps Status and Next Steps Status and Next Steps
- Technology suppliers already familiarising with BT test facilities, Technology suppliers already familiarising with BT test facilities, Technology suppliers already familiarising with BT test facilities, Technology suppliers already familiarising with BT test facilities, although full network combinations are not yet available.although full network combinations are not yet available.although full network combinations are not yet available.although full network combinations are not yet available.
- Part I of a common test specification has been drafted by TSA TAG, Part I of a common test specification has been drafted by TSA TAG, Part I of a common test specification has been drafted by TSA TAG, Part I of a common test specification has been drafted by TSA TAG, and is in review. This Part I deals with analogue connected devices and is in review. This Part I deals with analogue connected devices and is in review. This Part I deals with analogue connected devices and is in review. This Part I deals with analogue connected devices operating over IP and combination networks.operating over IP and combination networks.operating over IP and combination networks.operating over IP and combination networks.
- Part II, for IPPart II, for IPPart II, for IPPart II, for IP----connected devices is in preparation.connected devices is in preparation.connected devices is in preparation.connected devices is in preparation.
- Joint working proposed with NICC (Nov/Dec’18?), to create a joint Joint working proposed with NICC (Nov/Dec’18?), to create a joint Joint working proposed with NICC (Nov/Dec’18?), to create a joint Joint working proposed with NICC (Nov/Dec’18?), to create a joint test schedule for ALLtest schedule for ALLtest schedule for ALLtest schedule for ALL----IP.IP.IP.IP.
- TSA staying close to Ofcom and other communications providers to TSA staying close to Ofcom and other communications providers to TSA staying close to Ofcom and other communications providers to TSA staying close to Ofcom and other communications providers to establish links to other test facilities.establish links to other test facilities.establish links to other test facilities.establish links to other test facilities.
Mobile and Cellular GuideMobile and Cellular GuideMobile and Cellular GuideMobile and Cellular Guide
To assist an understanding of mobile and To assist an understanding of mobile and To assist an understanding of mobile and To assist an understanding of mobile and cellular as options for TEC connectivity, and to cellular as options for TEC connectivity, and to cellular as options for TEC connectivity, and to cellular as options for TEC connectivity, and to inform decision makinginform decision makinginform decision makinginform decision making
Mobile & Cellular GuideMobile & Cellular GuideMobile & Cellular GuideMobile & Cellular Guide
Topics include:Topics include:Topics include:Topics include:
- MultiMultiMultiMulti----NetworksNetworksNetworksNetworks
- Roaming SIMsRoaming SIMsRoaming SIMsRoaming SIMs
- Security Security Security Security –––– Public Fixed IP vs PrivatePublic Fixed IP vs PrivatePublic Fixed IP vs PrivatePublic Fixed IP vs Private
- System & Service AvailabilitySystem & Service AvailabilitySystem & Service AvailabilitySystem & Service Availability
- IOT IOT IOT IOT
- “Mobile Broadband” “Mobile Broadband” “Mobile Broadband” “Mobile Broadband”
Final draft in preparation by TAG subFinal draft in preparation by TAG subFinal draft in preparation by TAG subFinal draft in preparation by TAG sub----group.group.group.group.
TAG to review final draft shortly, with the aim of DecemberTAG to review final draft shortly, with the aim of DecemberTAG to review final draft shortly, with the aim of DecemberTAG to review final draft shortly, with the aim of December----18 18 18 18 release. release. release. release.
Questions?Questions?Questions?Questions?