The Hydrolyst ™ Installation Procedure

69
The Hydrolyst™ Installation Procedure by

description

The Hydrolyst ™ Installation Procedure. by. As a safety precaution every installer is required to carry a vinegar spray bottle. It neutralizes the electrolyte solution found in the The Hydrolyst ™ cell if it were to be spilled on the ground or if it came into contact with skin. - PowerPoint PPT Presentation

Transcript of The Hydrolyst ™ Installation Procedure

Page 1: The Hydrolyst ™  Installation Procedure

The Hydrolyst™ Installation Procedure

by

Page 2: The Hydrolyst ™  Installation Procedure

Vinegar Spray Bottle

• As a safety precaution every installer is required to carry a vinegar spray bottle. It neutralizes the electrolyte solution found in the The Hydrolyst™ cell if it were to be spilled on the ground or if it came into contact with skin.

Page 3: The Hydrolyst ™  Installation Procedure

Cell Pressure Relief Valve

• The pressure relief valve found in the rear of the The Hydrolyst™ to the far right comes from the factory with a plug that must be removed before you carry on with anything else. Probably the most important procedure next to sloping the Hydroxy gas delivery line.

Page 4: The Hydrolyst ™  Installation Procedure

Pressure Relief Plug

• A close-up of the parts of the pressure relief fitting and the part that need to be removed.

Page 5: The Hydrolyst ™  Installation Procedure

Tools Necessary for Preinstall, Installation and Service.

• Quick Cable 303115 (Model BVA-300) Hand Held Battery and Electrical System Tester

• DC Amp Meter Clamp Style • Inter-cooler Pressure Tester• Magnetic Torpedo Level• Hand Angle Grinder c/w Metal Cutting Disks• Centre Punch, Hose Cutter, Soldering Gun or Iron, Wire Cutters• Wire Strippers, Crimp Tools, Heat Gun• Cordless Drill c/w assortment of screw bits and attachments• General Hand Tools: Sockets; Wrenches; Screwdrivers• Torque Wrenches; Vice Grips; Crescent Wrench and Pliers, Knife• High Speed Steel Drill Bit Set c/w ⅛” – ½” bits• ¼” NPT Tap c/w 7/16” Drill Bit• ½”x5’ HDPE Extension Pipe, 50 ft. Extension Cord• 500 ml Water Bottle & 18 Litre Bucket, ½” HDPE Tube

Extension

Page 6: The Hydrolyst ™  Installation Procedure
Page 7: The Hydrolyst ™  Installation Procedure
Page 8: The Hydrolyst ™  Installation Procedure
Page 9: The Hydrolyst ™  Installation Procedure

Different Types of Alternators and Layout of

• This is an example of a 2005 Volvo D12 alternator with two I-Terminals.

Page 10: The Hydrolyst ™  Installation Procedure
Page 11: The Hydrolyst ™  Installation Procedure
Page 12: The Hydrolyst ™  Installation Procedure
Page 13: The Hydrolyst ™  Installation Procedure
Page 14: The Hydrolyst ™  Installation Procedure

Test Customers Batteries Before Install

• We will have to demonstrate to the customer that the batteries are bad, marginal or good before preceding with the install.

• On some configurations you may be able to just remove a common rail to isolate the batteries and get a proper battery test done. This is very important for the installer to know.

Page 15: The Hydrolyst ™  Installation Procedure

Battery Connections

• This is a little different looking battery connection, but still the same concept for testing. Disconnect negative side to isolate each battery and test with tester.

Page 16: The Hydrolyst ™  Installation Procedure

Pictures of Important Information

• Always take pictures of key sources of information on all Pre-inspections and Installations and send them in a folder clearly identified with name of customer and serial number and type of Engine to Enviresol .

Page 17: The Hydrolyst ™  Installation Procedure

Example with Dash Showing Mileage

• This option on most trucks can be used for other information such as average fuel consumption, engine etc.

Page 18: The Hydrolyst ™  Installation Procedure

Pictures for Backup

• Always take a picture to record the serial number and model of the Engine and the The Hydrolyst serial number. You don’t want to drive back in some cases hours. You can look at the picture and you are done.

Page 19: The Hydrolyst ™  Installation Procedure
Page 20: The Hydrolyst ™  Installation Procedure
Page 21: The Hydrolyst ™  Installation Procedure

Turbo Pictures if Possible

• Inspect the Turbo and take pictures. If the Turbo looks damaged inform the customer and take pictures. We don’t want to be blamed for a damaged Turbo when it was already damaged.

Page 22: The Hydrolyst ™  Installation Procedure
Page 23: The Hydrolyst ™  Installation Procedure
Page 24: The Hydrolyst ™  Installation Procedure

Installation Issues

• This is an example of a truck that we had no other than this location to install the The Hydrolyst™. This required the fabrication of custom brackets to approve the install on this vehicle. Approval from EnvireSol is required.

Page 25: The Hydrolyst ™  Installation Procedure
Page 26: The Hydrolyst ™  Installation Procedure
Page 27: The Hydrolyst ™  Installation Procedure

Mounting the Brackets

• Mounting the brackets should go smoothly if the Pre-install inspection was done thoroughly in the first place. Learning to recognize potential issues and dealing with them helps towards having a headache free Installation.

Page 28: The Hydrolyst ™  Installation Procedure
Page 29: The Hydrolyst ™  Installation Procedure
Page 30: The Hydrolyst ™  Installation Procedure

Example of an Install in Single Enclosure

• This is an example of putting the The Hydrolyst™ in a single enclosure. This requires the relocation of LED indicators and fabrication of a custom bracket in this case by the customer.

Page 31: The Hydrolyst ™  Installation Procedure
Page 32: The Hydrolyst ™  Installation Procedure

Relocation of Electrical Box

• In some cases the electrical box may need to be relocated customized brackets.

Page 33: The Hydrolyst ™  Installation Procedure
Page 34: The Hydrolyst ™  Installation Procedure
Page 35: The Hydrolyst ™  Installation Procedure
Page 36: The Hydrolyst ™  Installation Procedure

Custom Install with Relocated Box

• Sometimes you need to get creative to make an install. Just remember, as long as you can slope the Hydroxy line uphill from the The Hydrolyst™ to the Point of Entry without creating any moisture traps you can do the install.

Page 37: The Hydrolyst ™  Installation Procedure

Typical Point of Entry Connection to Intake

• This a typical connection to a Volvo intake. Notice the compressor tube take off to the right. Point of Entry must be after the compressor tube or closer to turbo to avoid losing hydroxy gas to the compressor.

Page 38: The Hydrolyst ™  Installation Procedure

Point of Entry on a Cab Over Garbage Truck

• This type of install to the Point of Entry drops straight down to the frame and slopes back to the The Hydrolyst™ .

Page 39: The Hydrolyst ™  Installation Procedure

Example of Freightliner Point of Entry

• This is a Mercedes engine in a Freightliner sowing the best location for the Point of Entry.

Page 40: The Hydrolyst ™  Installation Procedure
Page 41: The Hydrolyst ™  Installation Procedure
Page 42: The Hydrolyst ™  Installation Procedure

Using a Steel Rod to Support the Hydroxy Line

You can use a steel rod to run the length of the truck from The Hydrolyst™ to where the line goes up to the Point of Entry, to support the Hydroxy line all the way along. This way the Hydroxy line will never sag and create moisture pockets.

Page 43: The Hydrolyst ™  Installation Procedure
Page 44: The Hydrolyst ™  Installation Procedure
Page 45: The Hydrolyst ™  Installation Procedure
Page 46: The Hydrolyst ™  Installation Procedure
Page 47: The Hydrolyst ™  Installation Procedure

Isolation From Vital Truck Parts

• Throughout the manual we talk about making sure The Hydrolyst™ parts don’t touch sharp edges, heat sources etc, and make sure the truck’s parts are not damaged by the components that we have added.

Page 48: The Hydrolyst ™  Installation Procedure
Page 49: The Hydrolyst ™  Installation Procedure

Hydroxy Delivery Line Supported by Rod

• Here you see a Hydroxy delivery line supported by a ⅜” rod with hangers from the underside of the truck body. NOTE: a minimum of 3 screws per hanger are required to support these hanger brackets.

Page 50: The Hydrolyst ™  Installation Procedure
Page 51: The Hydrolyst ™  Installation Procedure
Page 52: The Hydrolyst ™  Installation Procedure
Page 53: The Hydrolyst ™  Installation Procedure

Typical Bunk Storage Compartment

• On the trucks that have sleeper compartments the storage area under the bed is ideal for installing the remote refill reservoir.

Page 54: The Hydrolyst ™  Installation Procedure
Page 55: The Hydrolyst ™  Installation Procedure
Page 56: The Hydrolyst ™  Installation Procedure

Reservoir in Sleeper Storage

• This is an example of the refill reservoir in the storage compartment of a Freightliner during a pre-install inspection.

Page 57: The Hydrolyst ™  Installation Procedure

Refill Reservoir in Storage Bunk

• This example shows a refill reservoir completely installed in an storage area under sleeper bed.

Page 58: The Hydrolyst ™  Installation Procedure
Page 59: The Hydrolyst ™  Installation Procedure
Page 60: The Hydrolyst ™  Installation Procedure

Tying Wires

• There should never be loose or hanging wires. They should always be tied up securely. All wires should be loomed up all the way to their destination point. Run along existing truck harnesses for safety.

Page 61: The Hydrolyst ™  Installation Procedure
Page 62: The Hydrolyst ™  Installation Procedure
Page 63: The Hydrolyst ™  Installation Procedure
Page 64: The Hydrolyst ™  Installation Procedure

Start-up Procedure take pictures

• Record Amp meter readings • Also Cell & Truck Hour Meters

Page 65: The Hydrolyst ™  Installation Procedure
Page 66: The Hydrolyst ™  Installation Procedure
Page 67: The Hydrolyst ™  Installation Procedure
Page 68: The Hydrolyst ™  Installation Procedure
Page 69: The Hydrolyst ™  Installation Procedure