The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of...

16
The Huong River – the nature, climate, hydro-meteorological issues and the AWCI demonstration project National Centre for Hydro-Meteorological Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27, 2014, Tokyo

Transcript of The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of...

Page 1: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

The Huong River – the nature, climate, hydro-meteorological issues and the AWCI demonstration project

National Centre for Hydro-Meteorological Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh

7th GEOSS AP Symposium, the AWCI parallel session

May 27, 2014, Tokyo

Page 2: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

1. Briefing on the Huong river basin Total area of the Huong basin is 2830km2, representing 56% of the total area of the Thua Thien Hue province. The river forms a central part of the economic and social development of the province , with many people depending on it for their livelihood.. With the area 22,000 ha, the Tam Giang-Cau Hai Lagoon is recognized as a particularly valuable asset and an important part of the life of its many users. The main issues associated with the Huong River Basi are flooding in the rainy season and saline water intrusion in the dry season.

Page 3: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

Hydro-Meteorological Observation system 10 rain gauge stations and 6 water level measurement stations, some of local stations. In flood season available 6-hourly rainfall

and water level data from these stations, report 4 times/day. In flood situation: 1-hourly data from these stations.. There is no water quality observation at these stations.

Hydro-Meteorological Network in Thua Thien Hue Province

Page 4: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

Runoff in flood season from October to December consists of 70 – 75% total annual runoff, while

dry season lasting 9 months, including the period of early small floods in May – June, has only 25 – 30% total annual runoff

0

50

100

150

200

250

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

TaTrach River at ThuongNhat (1981-2007)

HuuTrach River at BinhDien (1976-2007)

Bo River at CoBi (1977-2007)

Observed monthly multi-years average discharge (m3/s)

Page 5: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

In the dry season, there are 2 driest period: from March to April and from July to August. The lowest monthly flow is April.

0

20

40

60

80

100

120

140

160

180

Jan Feb Mar Apr May Jun Jul Aug Sep

Ta Trach -Thuong Nhat

Bo - Co Bi

Huu Trach - Binh Dien

Monthly multi-year average runoff distribution in dry season on main rivers of the Huong river basin

W (

MC

M)

Page 6: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

At the present, to response to flooding and saline water intrusion, number of control structures has been constructed as reservoirs like Co Bi, Ta Luong, Truoi, Ta Trach, Huu Trach, A Luoi as

well as barriers to prevent saline water intrusion, the most notable of which is the Thao Long Barrage. These structures strongly have change hydrological regime of the Huong river basin.

A Luoi Reservoir

Page 7: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

2. The AWCI demonstration project Spatial distribution of TRRM

3000-3500 mm/yr, Rainy season: Oct-Nov

Page 8: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

Application of Satellite Data for the Vietnamese River Systems

Calibration of the DHM with satellite rainfall data at Kim Long St. – Huong River

0

400

800

1200

1600

10/1 10/7 10/13 10/19 10/25 10/31 11/62004

Stre

amflo

w [m

3 /s]

Raingauge Observed TRMM HRM GPV

Page 9: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

Application of Satellite Data for the Vietnamese River Systems 24-30 November Simulation

01000200030004000500060007000

23 24 25 26 27 28 29 30Nov, 2004

Disc

harg

e [m3 /s]

Gauge Obs TRMM HRM-6hr GPV

Difference due to overflow during Inundation

Page 10: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

Application of Satellite Data for the Vietnamese River Systems

0

500

1000

1500

2000

2500

3000

3500

9/26 9/28 9/30 10/2 10/4 10/6 10/8 10/10 10/12

2006

m3/s

At Kim Long Station – Huong River (Sour: University of Tokyo)

Page 11: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

Other activities of the Huong River Basin Demonstration Project + Joint Vietnam-Japan Workshops on Sustainable Water Management in Hue city, Vietnam, March 9-10, 2009 and in Tokyo, 2012 + Finished data uploading, verified for period from 2004 to 2010 + Simulated hydrograph for period Oct. 9 – Nov.5, 2008 and forecasted hydrograph for period Aug. 21 – Sep.5, 2009 using distributed model GBHM (Geomorphology-based Hydrological Model – University of Tokyo) and High Resolution Model (HRM, Vietnam): - Made some modification of GBHM in sources code for running from month to month, read HRM forecasted rainfall input file in ASCII format. + Improvement of warning flood forecasting system for the Huong river using DHM with satellite data and numerical weather forecasts, including reservoir operations. Dr. Oliver Saavedra and his team (Tokyo Institute of Technology + Climate change impact assessment to the Huong river water resources

Page 12: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

Observed and forecast hydrographs at Kim Long station(10/9/2008 - 11/05/2008)

0

500

1000

1500

2000

2500

3000

3500

4000

4500

1 24 47 70 93 116 139 162 185 208 231 254 277 300 323 346 369 392 415 438 461 484 507 530 553 576 599 622 645 668

ObserveOb RainfallHrm Rainfall

Page 13: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

Observed and forecast hydrographs at Kim Long station (08/21/2009 - 09/05/2009)

0

500

1000

1500

2000

2500

3000

3500

4000

1 7 13 19 25 31 37 43 49 55 61 67 73 79 85 91 97 103 109 115 121 127 133 139 145 151 157 163

forecast Observed

Page 14: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

Highest 20 Rank of Daily Discharge

0500

10001500200025003000350040004500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Dai

ly D

isch

arge

, m3 /s

Rank

Qrank GFDL (1981-2000)Qrank GFDL (2046-2065)

0500

1000150020002500300035004000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Dai

ly D

isch

arge

, m3 /s

Rank

Qrank GISS (1981-2000)Qrank GISS (2046-2065)

0500

100015002000250030003500400045005000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Dai

ly D

isch

arge

, m3 /s

Rank

Qrank MIROC_H (1981-2000)

0500

100015002000250030003500400045005000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Dai

ly D

isch

arge

, m3 /s

Rank

Qrank MIROC_M (1981-2000)Qrank MIROC_M (2046-2065)

0100020003000400050006000700080009000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Dai

ly D

isch

arge

, m3 /s

Rank

Qrank MIUB (1981-2000)Qrank MIUB (2046-2065)

Huong Preliminary Q Comparison 5 GCM Models from CMIP3

Page 15: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

Average Daily Discharge for each

month (Climatology)

0

100

200

300

400

500

600

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Dai

ly D

isch

arge

, m3 /s

GFDL (1981-2000)

0

100

200

300

400

500

600

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Dai

ly D

isch

arge

, m3 /s

GISS (1981-2000)

0

100

200

300

400

500

600

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Dai

ly D

isch

arge

, m3 /s

MIROC_H (1981-2000)

0

100

200

300

400

500

600

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECD

aily

Dis

char

ge, m

3 /s

MIROC_M (1981-2000)

0

100

200

300

400

500

600

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Dai

ly D

isch

arge

, m3 /s

MIUB (1981-2000)MIUB (2046-2065)

Page 16: The Huong River – the nature, climate, hydro-meteorological ......Forecasting (NCHMF), NHMS of Vietnam Dr.Dang Ngoc Tinh 7th GEOSS AP Symposium, the AWCI parallel session May 27,

Thank you for your kind attention!