FIRE DOORS IN THE GCCA Personal View
Jerry Quayle, Director, JPQ International Consultants Ltd
Jerry Quayle
First visited the GCC (Gulf Cooperation Council) & Middle East – 2003.Testing & Certification of fire doors (and other fire resistant construction products).Responsible for certificating more than 100 fire door manufacturers in the region.Consulting worldwide on fire doors.
The Middle East & GCC
• The region is complex• GCC
Middle East (UK definition)
RULES, APPROVALS AND STANDARDS USED
• The Rule by or help from; the British in the Region means that British Standards are respected and accepted.• Recently the ”North American” codes have been felt all over the region, despite political un-‐rest and resentment of the West.• European Standards don’t seem to be well understood.
• The Standards (in order of acceptance):
• BS476:22• ANSI UL10C/NFPA 252/UBC7-‐2• EN1634/EN13501-‐2
RULES, APPROVALS AND STANDARDS USED
STANDARDS BY COUNTRY• Egypt uses BS476 approval (just a test) for acceptance.• Israel all codes.• Lebanon BS476 especially, ANSI UL10C creeping in.• Jordan BS476 especially, ANSI UL10C creeping in.• Iran (own standard similar to BS476) BS476 plus ANSI UL10C• Kuwait, BS or EN or ANSU UL
• Qatar BS476 and ANSI UL10C• Saudi Arabia BS476 & ANSI UL10C• Oman BS476 especially, ANSI UL10C creeping in.• Bahrain BS476 & ANSI UL10C• UAE BS476 & ANSI UL10C• Syria, Libya, Afghanistan, Yemen, Iraq & Sudan (why go there!!)• Turkey BS or EN or ANSU UL
RULES & APPROVALS
BY COUNTRY• Egypt project by project approval: Certification best but testing only is OK.• Israel 3rd party Certification but testing only is OK.• Lebanon project by project approval Certification best but testing only is OK.• Jordan project by project approval Certification best but testing only is OK.• Iran very little importation, local producers to be controlled soon.• Kuwait, Fire Brigade List of approved companies, requires test but 3rd party certification sort after.
• Qatar must be approved by the Civil Defense.• Saudi Arabia 3rd party Certification but testing only is OK.• Oman approval of manufacturers by the Royal Oman Police.• Bahrain project by project approval: Certification best but testing only is OK.• UAE approval by UAE Civil Defense based on 3rd party certification form approved suppliers plus a test• Turkey project by project approval: Certification best but testing only is OK.
THE UAE – Fundamental changes(Sub-‐Title -‐ Torch to Furnace)
In 2003 the UAE Civil Defences tested wood fire doors with a blow lamp!
The Dubai Civil Defence took the lead due to the construction boom.A number of international figures helped the local Civil Defenses to see the light & furnace testing was brought in during 2004-‐5
Fire Door Testing GCC prior to 2004
BOOM TIME
DUBAI DOOMS – FIRES START
DUBAI DOOMS – FIRES START
Issues faced in the period 2003-‐2010
Every joinery shop made doors• In the UAE alone there where 400 joinery shops making wood doors.• 3rd Party certification was seen as a marketing tool, not a quality tool.• The frequent fire started to shape the future requirements.• Rumours of a UAE fire code started to appear.• Following the recession the number of “fire door” producers reduced.• BS476:22 tested products and the “Engineering assessments” used to provided extended scopes start to be quested following a range of fire in the UAE.
Issues faced in the period 2011-‐2016
Several high profile issues occurred bringing 3rd Party Approval and the control of certificate holders into sharp focus.(New Doha International Airport – Steel door as produced testing failures – serval companies involved).The GCC’s and maybe the ME region watched to see what was going to happen following these ‘failures’ of certificated products.Dubai/UAE started to question the Certification Bodies and decided that the Civil Defence should seek confirmation of construction – Mandatory Fire Door Testing and 3rd Part Certification Scheme ememebership.
Full modern furnace testing
What is happening now in the Region
• The Region is waking up to the risk of significant deaths from a fire.• This means more and more testing and licensing across the Region.• Stricter controls on the issuing of Trade Licenses for the manufacturers.• UAE has all but outlawed Engineering Opinion based on test results (Global assessments, extended field of applications etc). Greatly affects BS476:22 tested products
• Increased use of North American Codes and Listing –Only very small amounts of engineering judgements (EEV’s).• North American Codes are easy to understand, you get approved what was tested.• Interchangeability of ancillaries (hardware and glazing) for other approved items.
What is the difference between BS476:22/EN1634 and ANSI UL10C – The hose stream test
• The hose stream• Its intended to show impact resistance, falling ceilings etc.• The hose stream is fire from 6m away from the door and at 30PSi, for a
2.4m x 1m door leaf the jet is applied as follows:
• It has very little to do with fire fighting, as you have to be in the room to point the water at the burning door!!!
• Fire fighting is about cooling and oxygen starvation – neither is a solid jet of water!!
• The hose stream test affects wood/composite doors and glass, allegedly it was a creation of the steel door industry following disastrous results using a swinging leather bag filled with sand.
• Most specifiers have no idea about the hose stream and why its there.
Less than 60 minutes 14.4 seconds
Between 60 and 89 24 seconds
Between 90 and 179 minutes 38.4 seconds
What the hose stream is not
Why is the Region so attractive
Why is the Region so attractive
Why is the Region so attractive
• The GCC reported 9 completion of towers over 200m high in 2015.• 2009-‐2014 GCC completed 10 towers per year over 200m.• The total value of infrastructure and capital projects planned and underway in GCC countries in 2015 was valued at $172 billion -‐ the highest on record to date.• Due for completion between 2020 & 2030 are hundred of projects totaling $1.3 trn ($935bn-‐worth of works are currently in execution, $81bn of business is out to tender; $211bn-‐worth of works are in the design phase; and $136bn-‐worth of projects are in the study phase).• THEY ALL NEED FIRE DOORS!!