© 2010 Bentley Systems, Incorporated The Fundamentals of Electronic Document Management Andrew Rhodes Regional Director – EMEA – AssetWise Solutions

Transcript of The Fundamentals of Electronic Document Management · • Adoption of Word Processing – Mid range...

© 2

010 B

entley S

yste

ms,

Incorp

ora

ted

The Fundamentals of Electronic Document Management Andrew Rhodes Regional Director – EMEA – AssetWise Solutions

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

2 | WWW.BENTLEY.COM

Agenda

• A Little Bit of History

• The Fundamentals of Electronic Document Management

• The Future – From Data Management to Information Management

• Summary and Close

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

3 | WWW.BENTLEY.COM

In the beginning ...

• All Information held on paper – or in the brains of employees

• Documents comprised handwritten text

• Data in Ledgers

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

4 | WWW.BENTLEY.COM

Progress

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

5 | WWW.BENTLEY.COM

The 1970’s

• Ledgers replaced by temporary digital storage – Still output to paper for safekeeping

• Advent of Computer Output Microfilm (COM)

– Secure archive format

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

6 | WWW.BENTLEY.COM

The 1980’s • Adoption of Word Processing

– Mid range computing (eg DEC All-in-One, WANG, Jacquard, UNIX – Fortune, Quadratron, Uniplex etc)

• The advent of Personal Computers – Seen as a productive way to produce paper documents – Paper remains the format of choice

• The introduction of Document Image Processing (DIP) – Electronic Filing Cabinets – Early Workflow Management

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

7 | WWW.BENTLEY.COM

Into the 1990’s • The first Electronic Document Management Systems

– The promise of the paperless office!

• Documents in a Repository – Files assigned index or metadata – Check-in, check-out, revision control

• Adopted by legal firms and pharmaceutical companies

• DIP and EDM merge – Search and Full Text Retrieval (FTR) integrated

• Records Management – Declaration – Classification – Disposition – PRO (TNA) – MoReq - MoReq2

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

8 | WWW.BENTLEY.COM

2000 and beyond • The World of Collaboration

– Groupware eg Lotus Notes • Scheduling, Online meetings • Group administration, Forms management • Content Sharing, Simple business processes/transactions

• Microsoft Office SharePoint Server

• EDRMS

• Enterprise Content Management – Document Management – Records Management – Web Content Management – Portal & Collaboration – Input, Management, Output

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

9 | WWW.BENTLEY.COM

The Fundamentals of Electronic Document Management

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

10 | WWW.BENTLEY.COM

• Controls the lifecycle of documents in the organization – How they are created, reviewed and published – Who they are created by – How they are disposed of or retained

What is Electronic Document Management?

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

11 | WWW.BENTLEY.COM

• Capture, classify and store information in any format

• Structure, organize, and relate information

• Provide rapid access anytime, anywhere

• Manage the change process, ensuring information integrity

• Communicate changes to all affected parties

• Provide complete audit and traceability

• Regulate access based on permissions

Primary Functions

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

12 | WWW.BENTLEY.COM

• Relational Database Management System Metadata, properties, attributes

• Repository Local, distributed, replicated

• Physical Locations Paper, microfilm, microfiche Fire-proof safe, warehouse, shelves/boxes

Information Storage

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

13 | WWW.BENTLEY.COM

• Classification of documents with associated Attributes

• The ability to use templates to save time • Storage options • Security • Customizable Workflow that drives documentation

through the creation review approval publication disposition phases

• Ability to Audit actions on documents • The ability to dispose of documentation appropriately

Elements of a Document Management System

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

14 | WWW.BENTLEY.COM

• Identify roles

• Analyze document usage

• Plan the organization of documents

• Plan how content moved between locations

• Plan content types

• Plan workflows

• Plan content control

• Plan policies

Planning for Document Management

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

15 | WWW.BENTLEY.COM

Identifying Roles

Author Reviewer

Approver

Document

Control

Drafter

Engineer

Vendor

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

16 | WWW.BENTLEY.COM

• Document Classes represent different kinds of documents, with different characteristics

• Documents group naturally into types – Grouping forms the basis of document

classes

Document classes

• Refine the groupings by considering:

• What is important about each document type

• How you want to search for documents

• Key aspects of documents that trigger business processes

• Initiation dates, completion dates , audit flag, etc.

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

17 | WWW.BENTLEY.COM

• Document types usually form a hierarchy

• The hierarchy depends on your organization

• Hierarchy can be deep or shallow – Use whatever works for your

document classes

• Group similar documents at the same hierarchical level

Document class hierarchy

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

18 | WWW.BENTLEY.COM

• Attributes can vary by document class

• Use attributes in searching

• Use attributes to record important document data

• Class hierarchy eases attribute assignment

Document Attributes

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

19 | WWW.BENTLEY.COM

Attribute types

Date

Number

Fixed Value

Character

Memo

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

20 | WWW.BENTLEY.COM

Document revisions

Documents move through the

document states

rev 0 rev 0 rev 0 rev 0

rev 1 rev 1

rev 0

Approve

Approve

New Revision

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

21 | WWW.BENTLEY.COM

Document Responsibilities

Document (A)

Person (1) Person (3) Person (2)

Approver Reviewer Author

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

22 | WWW.BENTLEY.COM

Document-to-Document links

referenced from

referenced to propagated to

propagated from

Document (A)

Document (B)

Document (C)

Document (A)

Revision (0)

Document (C)

Appendix A

Document (B)

Attachment 1

Parent document

Child document

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

23 | WWW.BENTLEY.COM

Projects and Documents

Document (A)

Document (B)

Document (C)

Project (X)

Document (D)

Owned Shared Owned Owned Owned

Project (Y)

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

24 | WWW.BENTLEY.COM

Document retention – File Plan

Document (A) Document (A)

retention schedule

Record Type (X)

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

25 | WWW.BENTLEY.COM

Document Locations

Document (A)

Copy (001)

Copy (002)

Location (A)

Shelf 2 Bin 6

Location (B)

Rack 6 Box 4

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

26 | WWW.BENTLEY.COM

The Future From Data Management to Information Management

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

27 | WWW.BENTLEY.COM

The Information Challenge

• Accurate information required to enable informed decisions

• Efficient and effective information management across the whole business lifecycle – Control of costs – Reduction of risk – Improve business performance – Effective communication – within and outwith organisation

• Manage Information as an Strategic Asset – Vast quantities of inter-dependent information

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

28 | WWW.BENTLEY.COM

Infrastructure projects carry risk... • Design and Build

– Cost over-run – Time over-run – Compromised quality – Reduced scope

• Operation and maintenance

– Unpredicted spend

– Unpredicted failures

– Unscheduled maintenance

– Ineffective maintenance work

– Poor resource scheduling

– Sub-standard availability

Higher costs, revenue damage, penalties!

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

29 | WWW.BENTLEY.COM

Some common causes... • Design and Build

– Difficulty locating data – Incomplete information – Incorrect version of data – Design changes / re-work – Late detection of clashes / anomalies – Difficult team co-ordination

• Operation & Maintenance – Ownership of asset data

– Incomplete / inaccessible data

– Physical

– Contextual

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

30 | WWW.BENTLEY.COM

Poor communications between people and systems wastes 30% of project costs

40% of engineering time is spent locating & validating information

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

31 | WWW.BENTLEY.COM

The challenge ... Design Requirements

“As Designed”

“As Built”

Design Information

Operational Configuration Information

Operating Maintenance

Training &

Procurement Information

Asset & Process Information

Must Conform

“As Maintained”

Physical Configuration

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

32 | WWW.BENTLEY.COM

Phase 1 Milestone 1.1

Phase N

Milestone 1.2 Milestone 1.3

Phase 1 Milestone 1.1

Phase N

Milestone 1.2 Milestone 1.3

Arch. Eng.

System A

Component A1 Comp A2 Comp A3

Comp A3.1 Comp A3.2

System N

P&IDs

System A Equipment #A1

Equipment #A2 Equipment #A3

Equipment #A3.1 Equipment #A3.2

System N

Specification

Inspection

Purchase Order

Work Instructions

Procedures

People

Contract

Standard

Fed Codes

Industry Regs

Ref. Docs

Standards Committee Regulatory Agency

Arch. Eng.

Owner Federal Org

Req. 1

Req. 1.1

Req. 1.2

Req. 1.3

Req. 1.3.1

Req. 1.3.2 Req. N

Sub Contractor

Sub Contractor

Sub Contractor

Sub Contractor

Sub Contractor

REQUIREMENTS

Req.1.2

KNOWLEDGE ITEM

PROJECT BUDGET

Milestone 1.1

PLANT DESIGN

Comp A2

System N

W B S

Milestone 1.1

Phase N

Equipment #A2

EQUIPMENT

What’s the issue?

32

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

33 | WWW.BENTLEY.COM

Phase 1 Milestone 1.1

Phase N

Milestone 1.2 Milestone 1.3

Phase 1 Milestone 1.1

Phase N

Milestone 1.2 Milestone 1.3

Arch. Eng.

System A Component A1

Comp A2 Comp A3

Comp A3.1 Comp A3.2

System N

P&IDs

System A Equipment #A1

Equipment #A2 Equipment #A3

Equipment #A3.1 Equipment #A3.2

System N

Specification

Inspection

Purchase Order

Work Instructions

Procedures

People

Contract

Standard

Fed Codes

Industry Reg

Ref. Docs

Standards Committee Regulatory Agency

Arch. Eng.

Owner Federal Org

Req. 1

Req. 1.1

Req. 1.2

Req. 1.3

Req. 1.3.1

Req. 1.3.2 Req. N

Sub Contractor

Sub Contractor

Sub Contractor

Sub Contractor

Sub Contractor

REQUIREMENTS

Req.1.2

KNOWLEDGE ITEM

PROJECT BUDGET

Milestone 1.1

PLANT DESIGN

Comp A2

System N

W B S

Milestone 1.1

Phase N

Equipment #A2

EQUIPMENT

Impact of Change

33

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

34 | WWW.BENTLEY.COM

Phase 1 Milestone 1.1

Phase N

Milestone 1.2 Milestone 1.3

Phase 1 Milestone 1.1

Phase N

Milestone 1.2 Milestone 1.3

Arch. Eng.

System A Component A1

Comp A2 Comp A3

Comp A3.1 Comp A3.2

System N

P&IDs

System A Equipment #A1

Equipment #A2 Equipment #A3

Equipment #A3.1 Equipment #A3.2

System N

Specification

Inspection

Purchase Order

Work Instructions

Procedures

People

Contract

Standard

Fed Codes

Industry Reg

Ref. Docs

Standards Committee Regulatory Agency

Arch. Eng.

Owner Federal Org

Req. 1

Req. 1.1

Req. 1.2

Req. 1.3

Req. 1.3.1

Req. 1.3.2 Req. N

Sub Contractor

Sub Contractor

Sub Contractor

Sub Contractor

Sub Contractor

REQUIREMENTS

Req.1.2

KNOWLEDGE ITEM

PROJECT BUDGET

Milestone 1.1

PLANT DESIGN

Comp A2

System N

W B S

Milestone 1.1

Phase N

Equipment #A2

EQUIPMENT

Impact of Change

34

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

35 | WWW.BENTLEY.COM

The challenge ... Design Requirements

“As Designed”

“As Built”

Design Information

Operational Configuration Information

Operating Maintenance

Training &

Procurement Information

Asset & Process Information

Must Conform

“As Maintained”

Physical Configuration

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

36 | WWW.BENTLEY.COM

How Big an Impact?

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

37 | WWW.BENTLEY.COM

“Undocumented changes to the blowout preventer that should have shut down BP PLC’s runaway Gulf well slowed efforts to stop the flow of oil…”

“…The controls that the robots were trying to use that were supposed to close the valves were actually connected to a testing device that couldn’t shut off the well…”

“…there appeared to be other changes made to the blowout preventer that BP hadn’t ordered, and … Transocean struggled to provide blueprints showing the device’s updated design…”

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

38 | WWW.BENTLEY.COM

Five Universal Questions of Information Management

• Do you know where your business critical information assets reside?

• Do you know the context of your information assets?

• Do you know the integrity/accuracy of your information assets?

• Are you managing your information assets through change?

• Is the information an asset or a liability to your business?

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

39 | WWW.BENTLEY.COM

• Identification

• Change

• Auditing

• Status

Principles of Information Management

Projects and/or Events

Associated with:

Locations

Where there are:

Systems

Facilities

Equipment

Processes

Described by:

Technical Manuals

Drawings

Procedures

Correspondence

Requirements

Managed and Controlled by:

People

Organizations

Specifies information & characteristics pertaining to:

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

40 | WWW.BENTLEY.COM

Information in Context

Document (Record)

Person

Organisation

Project

Workflow

Distribution

Change event

Location

File Plan

Document centric view ...

Physical item

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

41 | WWW.BENTLEY.COM

Information in Context

Document (Record)

Person

Organisation

Project

Workflow

Distribution

Change event

Location

File Plan

Person centric view ...

Physical item

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

42 | WWW.BENTLEY.COM

Information in Context

Document (Record)

Person

Organisation

Project

Workflow

Distribution

Change event

Location

File Plan

Product centric view ...

Physical item

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

43 | WWW.BENTLEY.COM

Information Modeling

• Manages much more than documents…

• Relates structured and unstructured information to enterprise

• Focuses on relationships

• Records events and activities

• Captures the what, but also the why, how and when

• Creates auditable sequences of how and why information changed

43 | WWW.BENTLEY.COM

Projects Location

Change Requirements

Organizations Documents

Distribution Order

People

Requirements

Drawing

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

44 | WWW.BENTLEY.COM

Best Practice Change Management

Document Management

Requirements Management

Item Management

Records Management

Closed Loop Change Process

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

45 | WWW.BENTLEY.COM

Assuring Information Trustworthiness • Identification and Classification

– What is it?

• Relationships/Links/Context – What is it for?

• Responsibility – Who owns/uses/needs it?

• Control of Change – Who can change what? Where are all copies?

– What is the impact, cost and scope of change?

– What/who/when changed?

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

46 | WWW.BENTLEY.COM

Case Study - Crossrail The Importance of Document Control

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

47 | WWW.BENTLEY.COM 47 | WWW.BENTLEY.COM

Heathrow Airport

The City 2012

Olympic Stadium

Maidenhead 50km Shenfield 21km twin tunnels 35km

Canary Wharf

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

48 | WWW.BENTLEY.COM

Crossrail - Statistics

90km of existing surface network

28 existing surface station upgrades

(11 major reconstructions)

21 km of new sub-surface twin-bore railway

9 new sub-surface stations

200 million passengers per year

Maximum depth of tunnels 30m

16 Major new bridges

1 Major new depot

1 Hi tech control centre

14,000 Construction jobs

£15Bn over 10 years

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

49 | WWW.BENTLEY.COM

• Protect public money

• Improve cost and time certainty

• Improve understanding of risks

• Maintain quality and environmental standards

• Increase the efficiency within the delivery supply chain

• Have transparent and controlled change management

• Minimise impact on members of the public

Crossrail – Business Challenges

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

50 | WWW.BENTLEY.COM

Example: Liverpool Street Station

(c) Crossrail Copyright

Crossrail – Integration Challenges

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

51 | WWW.BENTLEY.COM

Crossrail – Information Mobility Challenges

(c) Crossrail Copyright

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

52 | WWW.BENTLEY.COM

Deliver Best Practice in Lifecycle Information Management

• Provide effective management of all information assets throughout the lifecycle

• Create an integrated 3D information model, facilitating multidisciplinary collaboration through design, construction and on to operations and maintenance

• Enable effective handover of ‘valuable information’ to form the base of the operational asset management system

Crossrail – Information Strategy

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

53 | WWW.BENTLEY.COM

• Document Control – Transmittals – Master Deliverable Lists (MDL’s) – Correspondence Management – Reporting and Dashboards – Sharepoint integration – ProjectWise / eB integration

Effective Handover of ‘Valuable Information’

• Configuration Management & Change Control

(c) Crossrail Copyright

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

54 | WWW.BENTLEY.COM

• Configuration Management & Change Control

• Document Control – Transmittals – Master Deliverable Lists (MDL’s) – Correspondence Management – Reporting and Dashboards – Sharepoint integration – ProjectWise / eB integration

• Contracts Administration – NEC3 Contract Administration Processes – Contract Administration Dashboard

Effective Handover of ‘Valuable Information’

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

55 | WWW.BENTLEY.COM

Crossrail - Contract Administration

• Support for NEC3 Contract Administration Processes – Contract Data Risks – Early Warnings Notifications (EWN) – Notification of Compensation Events (NCE) – Project Manager Instructions (PMI) – Quotations – Project Manager Assessments (PMA) – Implementation of Compensation Events (ICE) – Communications

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

56 | WWW.BENTLEY.COM

Crossrail - Contract Administration Dashboard

(c) Crossrail Copyright

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

57 | WWW.BENTLEY.COM

CRL Core Business Systems

H&S

Finance Cost Management

Contract Management

Schedule Management

Risk Management

Document Control

Requirements

Asset Information Mgt.

Land & Property

Design Control

Stakeholder Management

Construction Applications

Integration

Feeder Systems

ReportingMS Excel Analysis

Area Directors Report

Programme Directors

Report

Sponsors Dashboard

Management Reporting

Presentation

Integrated Business

Intelligence

Bentley Maps Crossrail Connect

Industry Partner Data

Crossrail – Integrated IT Systems

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

58 | WWW.BENTLEY.COM

Summary

• Document Management is not just about the Document Repository – Not another silo of information

• Document Management / Document Control Strategies must form part of the overall Information Management Strategy

• Business centric NOT IT centric

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

59 | WWW.BENTLEY.COM

About Bentley

Bentley’s mission is to support the enterprises and professionals who

design, build and operate the worlds’ infrastructure—sustaining the global

economy and environment, for improved quality of life.

© 2

009 B

entley S

yste

ms,

Incorp

ora

ted

60 | WWW.BENTLEY.COM

About Bentley

Global Business:

• Nearly 3,000 colleagues in 45 countries

• $500 million in annual revenues

20 of the Top 20 in: General Building Transportation Power Manufacturing Water Sewer/Waste

19 of the Top 20 in: Industrial Process/Petroleum Telecommunications Hazardous Waste

47 of the Top 50 Designers in International

97 of the Top 100 Pure Design Firms

Bentley is the Global Leader in:

47 out of 50 U.S. State DOTs use Bentley

Road and Rail Bridges Water systems Structural analysis Process plant

operations

Generative design 3-D city GIS Construction

simulation Energy modeling Infrastructure

asset operations

Collaboration servers for project work-sharing

Bentley Subscribers are the ENR Top Design Firms: