The Freight and FV Group Presentation 2009

download The Freight and FV Group Presentation 2009

of 124

Transcript of The Freight and FV Group Presentation 2009

  • 8/4/2019 The Freight and FV Group Presentation 2009

    1/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    2/124

    ,

    Vietnam is a member of an international freight forwardingand logistics group under the holding company Four

    s on roup.

    The purpose of this presentation is to highlight theossibilit of combinin the international and domestic

    services of The Freight Co Ltd in conjunction with theremaining companies under the Four Vision Group, as

    each company within the Four Vision Group.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    3/124

    How to use this resentation?

    For easy use we have not automated this presentation.Instead, advance or return by using your mouse, keyboard

    right mouse click and follow Go.

    From the Index (next page) you can skip directly to thevar ous compan es w n our roup.

    By using the Button at the right bottom of each pageyou can skip instantly back to the Index Page.

    Click on each logo or on the website address on eachcompanys first page and you will connect to the

    2009 The Freight Co Ltd

    .

    Enjoy our presentation!

  • 8/4/2019 The Freight and FV Group Presentation 2009

    4/124

    Four Vision Group FOUR VISIONFOUR VISION

    The Freight Co Ltd THE FREIGHTTHE FREIGHT

    . . .

    Geo Global Co Ltd GEO GLOBALGEO GLOBAL

    . . .. . .

    Information on this presentation is confidential. Any usage or reproduction is onlyallowed with the written consent of Four Vision Group and affiliated companies

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    5/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    6/124

    The group focuses on business in the field oftransportation and logistics

    The Group presently employs around 100 staff inclusive 7

    expatriates

    China : Beijing

    Thailand: Ban kok, Ban kok Air ort,

    Laem Chabang

    Vietnam : Ho Chi Minh City

    Head Office Bangkok

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    7/124

    FOUR VISION Co Ltd

    Holding CompanyBeijing Office

    THE FREIGHT Co Ltd100%

    GEO GLOBAL Co Ltd

    THE FREIGHT CHINA

    100% THE FREIGHT VIETNAM

    I.L.S. Co Ltd50%

    Ho Chi Minh City Office

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    8/124

    oHolding Company

    THE FREIGHT Co LtdINTERNATIONAL FREIGHT FORWARDING

    AIR, SEA, ROAD, RAIL

    I.L.S. Co LtdLOGISTICS

    WAREHOUSINGDISTRIBUTION

    CUSTOMS BROKER PICK- AND PACK

    CROSS TRADE

    NICHE MARKETS/SPECIAL PRODUCTS

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    9/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    10/124

    , ,

    j.v. between Thailands Four Vision Group and a Swissbased forwarding company

    January 1, 2000: Four Vision Group takes over the foreignheld shares and becomes 100% shareholder

    , ,

    October 2006: Opening offices at the new BangkokInternational Airport and in Laem Chabang (Thailands

    largest port) May 2007: Opening in Beijing, China

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    11/124

    Provide Transport andog s c erv ces o e g es

    Quality in South East Asia

    Focus on Business with high

    v

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    12/124

    We blend westerntechnology withthe local mentalit

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    13/124

    Seafreight Turnkey Projects / Factory Relocations

    Export Packing

    Domestic / Regional Transport (Truck + Rail) Customs Broker (EDI online)

    Board of Investment Consulting and Clearing (Thailand

    Marine Cargo Insurance

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    14/124

    Individual consi nments orconsolidations

    Time definite products

    FREIGHTFREIGHT

    Worldwide door-to-door

    shipments

    Full export documentationBangkok Airport Office

    lead time, cost requirement and commodity

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    15/124

    -

    conference shipping lines Special equipment, open top and flat rack Containers

    Laem Chabang Office Bulk and Break Bulk shipments

    Ro/Ro services for rolling cargo arter vesse s, arges

    Worldwide door-to-door shipments

    Selecting direct sailings or the most efficient

    transshi ment ort de endin on customers re uirement

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    16/124

    Heavy Lift and oversized cargo transportation Barges, beach landing, Ro/Ro shipments

    Heavy duty modular hydraulic trailers

    Offloading and positioning by crane or jacking ands ng

    Cargo, tracking, tracing and status reporting

    Three key reasons why customers select our company:1) We understand the importance of keeping schedules

    2) Our group has an immaculate safety record

    2009 The Freight Co Ltd

    3) We manage to keep our pricing within budget

  • 8/4/2019 The Freight and FV Group Presentation 2009

    17/124

    THE FREIGHT CO LTD CHINA / THAILAND / VIETNAM

    Project Name Scope of Work Prime or Metric Freight Duration Origin max. ton max. dimension

    T L/E C B Subcontract Tons Tons in months per unit per unit (lxwxh)

    Hydro Power+Irrigation Project P 12,100 34,000 17 E 45

    Telecom+Satellite Stations P 800 2,400 9 E

    as eparat on ant , x . x .

    Splitter Plant S 8,500 36,500 21 K,U,S,J 165 45x6.5x6.5

    Particle Board Plant P 2,500 6,000 7 G,I 85 9.6x5.6x5.2

    Xeset Hydro Power P 5,300 11,200 17 218

    Communication Network P 3,450 8,200 14 W

    Steel Mill P 5,500 18,000 16 I,F 120 22.8x4.6x6.2

    Aromatics Plant P 45,000 150,000 28 K,U,E,J 465 84.5x6.8x6.8

    Bangkok Transit System P - 62,000 31 W 37 22x3.3x3.8

    Central Paper P 350 2,200 7 E 48

    Amata EG-CO Power Station P 5,300 14,400 19 E,U,IN 145 14x5.5x6.8

    PEA I-Shape Substations P 6,800 16,600 22 E,U,T 95

    Houay Ho Power Station P 2,200 5,400 16 E,U 46 5.1x3.3x3.9

    Pha Lay Power Station S 2,065 15,000 21 T 182

    Esso Olefins Project S 7,000 26,000 23 Export 68

    Bangkok Metro P 1,360 4,300 11 Export

    Quarry Relocation P 1,520 4,760 8 M

    MEA Bangkok P - - 5 F 151

    Alpha Power Relocation P 1,500 7,150 9 Export 104 13.35x5.72x5.28

    MRTA (Subway Bangkok) * P - - 3 E 38 22x3.3x3.8

    2009 The Freight Co Ltd

    Methanol Project S 4,700 11,000 11 Export 246 1514x1154x1962

    PTT Gas Compression Station P 3,900 10,200 11 Europe+Asia 138

  • 8/4/2019 The Freight and FV Group Presentation 2009

    18/124

    Heavy Lift and oversized cargo transportation Barges, beach landing, Ro/Ro shipments

    Heavy duty modular hydraulic trailers

    Offloading and positioning by crane or jacking ands ng

    Cargo, tracking, tracing and status reporting

    Three key reasons why customers select our company:1) We understand the importance of keeping schedules

    2) Our group has an immaculate safety record

    2009 The Freight Co Ltd

    3) We manage to keep our pricing within budget

  • 8/4/2019 The Freight and FV Group Presentation 2009

    19/124

    Scope of work definition Tailor-made proposals

    Commitment of using qualified personnel

    Commitment of using qualified equipment Commitment to highest possible service level

    Commitment to competitive pricing

    omm men aga ns cos over run Commitment to schedules

    -

    2009 The Freight Co Ltd

    manual for client approval prior to project start up

  • 8/4/2019 The Freight and FV Group Presentation 2009

    20/124

    PHASE I / PRELIMINARY SERVICES

    Cargo inspection Freight Ton / Volume estimation

    Freight cost budgeting and estimation

    Consultation on transport related matters

    Design / recommendation for packing, equipment,facilities, scheduling, routing and others

    resentat on o operat ona proce ure, sa ety manua ancheck list

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    21/124

    Setting up work plan Develop and set up stationery, forms and reports

    Setting up project teams at each location

    Contracting and preparing transport equipment, packingmater a , mars a ng yar an ware ouse ac t es

    Prepare general project shipping instructions

    ,

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    22/124

    Order follow up and expediting Regularly status reporting

    Cargo tracking (online or via Internet)

    Export packing (see separate packing section) Marking / labeling

    Assembly of containerized or break bulk lots

    oa ng a s e Transport / delivery to port

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    23/124

    Freight negotiations Provision of fully insured and suitably geared ships

    Checking port rotation and transit time of each ship

    Consolidation / containerization Port loading supervision = damage prevention

    Full scale handling of export documentation

    s r u on o ocumen s

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    24/124

    Preparing necessary handling and transportationequipment

    Preparing import customs formalities

    Preparing B.O.I. release letter uperv s on n port = amage prevent on

    Cargo inspection

    Site delivery

    Offloadin and ositionin

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    25/124

    Ocean and Air charter arrangements Procurement of used containers and other equipment

    3 point photographic reporting (photos taken at origin site

    while packing and loading, at the port of origin and during

    Door-to-door marine cargo insurance, inclusive in transitstora e

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    26/124

    Skytrain with a mock up Skytrain. Rolling off

    the first Skytrain for Bangkok from a Ro/RoShip under stringent control and supervision.

    Skytrain with a mock up Skytrain. Rolling off

    the first Skytrain for Bangkok from a Ro/RoShip under stringent control and supervision.

    Right: Moving the Skytrain on a Mafi

    Trailer to the laydown area. One lot of

    Right: Moving the Skytrain on a Mafi

    Trailer to the laydown area. One lot of

    Laem Chabang Port.

    Laem Chabang Port.

    Left: Preparing the Skytrain for the roll-over operationfrom Mafi Trailer to the modified hydraulic trailer.Removing all the lashing and securing material.

    Left: Preparing the Skytrain for the roll-over operationfrom Mafi Trailer to the modified hydraulic trailer.Removing all the lashing and securing material.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    27/124

    .rolling over the Skytrain from Mafi Trailer to the

    specially modified modular hydraulic trailer.

    .rolling over the Skytrain from Mafi Trailer to the

    specially modified modular hydraulic trailer.

    Right: A modified pick up truck with identicalheight as the Skytrain acts as the front safetyescort vehicle. Skytrain on the modified

    Right: A modified pick up truck with identicalheight as the Skytrain acts as the front safetyescort vehicle. Skytrain on the modifiedhydraulic trailer on its way to the Depot atMorchit in Bangkok.hydraulic trailer on its way to the Depot atMorchit in Bangkok.

    Left: Skytrain on the hydraulic trailer entersBangkok with police escort safety escort pick uptruck. The Skytrain has safely arrived at theDepot.

    Left: Skytrain on the hydraulic trailer entersBangkok with police escort safety escort pick uptruck. The Skytrain has safely arrived at theDepot.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    28/124

    Left: Our staff works day and night to assure that theLeft: Our staff works day and night to assure that the

    panels on the side) are safely discharged from the vessel

    panels on the side) are safely discharged from the vessel

    g : qua y mportant s t at t e esca ators are webalanced on the trailer, properly lashed and secured. Onewrong move and the escalator can break in two pieces!

    g : qua y mportant s t at t e esca ators are webalanced on the trailer, properly lashed and secured. Onewrong move and the escalator can break in two pieces!

    Left: Moving the escalators From alongsideship, to a temporary storage area awaitingrelease for delivery from the customer.

    Left: Moving the escalators From alongsideship, to a temporary storage area awaitingrelease for delivery from the customer.

    Right: Some of the escalators were shipped knocked downand were assembled at our warehouse in Bangkok. Finally,we delivered all escalators from 3 suppliers (Kone, Otisand Thyssen) to site and lifted them into position.

    Right: Some of the escalators were shipped knocked downand were assembled at our warehouse in Bangkok. Finally,we delivered all escalators from 3 suppliers (Kone, Otisand Thyssen) to site and lifted them into position.

    Skytrain Project: Full turnkey project, inclusive local warehousing and just-in-time delivery.Total approx. 62,000 FRT incl. 105trains, escalators, power supply and approx. 9,000 FRT rails.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    29/124

    Left: Preparing various equipment that was

    used for the construction of the Subwaytunnel for re-export to Taiwan and Singapore.

    Left: Preparing various equipment that was

    used for the construction of the Subwaytunnel for re-export to Taiwan and Singapore.

    Right: Carefully placing equipment into open topRight: Carefully placing equipment into open top, ,

    items., ,

    items.

    Left: Preparing rails to roll Muck Carsinto container. Load additional cargointo the Muck Cars to save transportexpenses. Push the Muck Cars into the

    Left: Preparing rails to roll Muck Carsinto container. Load additional cargointo the Muck Cars to save transportexpenses. Push the Muck Cars into thecon a ners, as , oc an secure em.con a ners, as , oc an secure em.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    30/124

    Above: Various equipment that was used for construction of the subway tunnel. Our scope of work wassorting, labeling, packing, loading, securing, export formalities and shipment to Taiwan and Singapore. Welooked for the most competitive solution and shipped some items in containers and some as break bulk.The items were carefully scrutinized and packed according to individual requirements. Some items werebundled and some packed in crates and cases. For some large items we built custom-made steel framessee also ackin section .

    Pictures showing sorting, packing, lashing, securing, bracing, transport to port and loading onto the ship.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    31/124

    Above: Antonov 124-100 arrives with the one out of 3 subway wagons on board, Subway inside theAbove: Antonov 124-100 arrives with the one out of 3 subway wagons on board, Subway inside theaircraft and the systems designed to roll the train down the aircrafts ramp onto the hydraulic road trailer.aircraft and the systems designed to roll the train down the aircrafts ramp onto the hydraulic road trailer.

    Left/right: The subwayLeft/right: The subway

    rolls out of the aircraft ontoa specially convertedhydraulic trailer observedby the customer and

    rolls out of the aircraft ontoa specially convertedhydraulic trailer observedby the customer and

    ..

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    32/124

    Clockwise from top left:1) Loading drilling rig for re-export to Taiwan.2) Loading 85-ton drilling rig for re-export in Ro/Ro Ship.

    3) Loading excavator with floating crane on break bulkvessel for ex ort to Indonesia.

    Clockwise from top left:1) Loading drilling rig for re-export to Taiwan.2) Loading 85-ton drilling rig for re-export in Ro/Ro Ship.

    3) Loading excavator with floating crane on break bulkvessel for ex ort to Indonesia.4) Loading lift truck for re-export.5) Loading Cement trailers in Phuket for Myanmar.6) Loading Hi-Boys for Shanghai7) Loading track laying equipment for re-export to Malaysia.8) Loading flat Railcar for re-export.

    4) Loading lift truck for re-export.5) Loading Cement trailers in Phuket for Myanmar.6) Loading Hi-Boys for Shanghai7) Loading track laying equipment for re-export to Malaysia.8) Loading flat Railcar for re-export.

    - . - .

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    33/124

    Above shows various pictures of Power Station Projects that we handled in the last 5 years. Wetransported Transformers with a weight range from 85 to 100 tons and Generators and Turbines up to 340tons. In the process of handling these turnkey projects, we utilized special equipment such as multi-axle

    Above shows various pictures of Power Station Projects that we handled in the last 5 years. Wetransported Transformers with a weight range from 85 to 100 tons and Generators and Turbines up to 340tons. In the process of handling these turnkey projects, we utilized special equipment such as multi-axlemo u ar y rau c ra ers, eavy mo e an craw er cranes, a op arges as we as ac ng an

    skidding equipment. In one project alone we delivered and positioned heavy equipment to 13 substationsin South Thailand, some sites as far as 850 km from the loading point. On various occasions we offloadedand positioned the heavy lifts onto foundations by jacking and skidding. We also delivered 100-tonTransformers to Samui Island by flat top barge and provided for a beach landing. On occasions like on the

    mo u ar y rau c ra ers, eavy mo e an craw er cranes, a op arges as we as ac ng an

    skidding equipment. In one project alone we delivered and positioned heavy equipment to 13 substationsin South Thailand, some sites as far as 850 km from the loading point. On various occasions we offloadedand positioned the heavy lifts onto foundations by jacking and skidding. We also delivered 100-tonTransformers to Samui Island by flat top barge and provided for a beach landing. On occasions like on thelast picture, we are surveying the structure and safety of a 4.35 meter high Diverter Damper beforeloading. The module was considered unsafe for transportation and necessary amendments to improvetransportation safety were made on the spot.

    last picture, we are surveying the structure and safety of a 4.35 meter high Diverter Damper beforeloading. The module was considered unsafe for transportation and necessary amendments to improvetransportation safety were made on the spot.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    34/124

    A 120-ton boiler upondelivery to jobsite

    A 120-ton boiler upondelivery to jobsite

    Delivery of a 215-ton column on multi-axle modular hydraulic trailer

    Delivery of a 215-ton column on multi-axle modular hydraulic trailer

    Discharge a 120-tonboiler with floating crane

    Discharge a 120-tonboiler with floating crane

    Delivery of a 165-ton column, 56meter long, 6.4 meter diameter

    Delivery of a 165-ton column, 56meter long, 6.4 meter diameter

    Delivery of a 465-ton column, 84.5meters long, 6.8 meters diameter

    Delivery of a 465-ton column, 84.5meters long, 6.8 meters diameter

    Discharging a 268-ton columnfor Thai Aromatics,

    Discharging a 268-ton columnfor Thai Aromatics,

    The Thai Aromatics Project alone consisted of 65 ultra heavy andextreme large sized items (mainly columns)

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    35/124

    unit 82-ton boilers from TIG

    sent to Singapore

    312-ton column leaving

    Map Ta Phut Port

    130-ton column for Lucky

    Engineering

    -Thailand

    oversized tanks

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    36/124

    A 174-ton module measuring 12.0x6.6x6.49 meters.The modules weight was initially given as 133 tons.As can be seen on the picture where the module isa ongs e s p, e ranspor rame a o e cu o

    reduce the weight as the ships crane capacity was160 tons only. Thanks to on-the spot decision makingand instant action the module could be shipped on asplanned.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    37/124

    Two 248-ton moduleswith measurements of1514x1154x1962 cm

    each coming from themanufacturing yard onthe way to the port. Thebalance of the module

    is constantly monitoredwith a plummet.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    38/124

    loaded onboard MV Stellaprima with a single cranelift. A 45-ton crane with a 50 meter boom and acherry picker was necessary to lift manpower up toattach steel ropes for tying down the module to

    secure it on the transport to Chile and to attach thelifting ropes to the top of the module.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    39/124

    We have a proven track record to deliver project cargo to remote areas. We emphasize the

    value of proper road surveys and field preparation. The above pictures show deliveries into

    -.

    of construction equipment to guarantee a safe passage during the monsoon season.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    40/124

    A180-foot flat top barge with power stationequipment from Surabaya, Indonesia

    A180-foot flat top barge with power stationequipment from Surabaya, Indonesia

    Loading two 98-ton Transformers on a flat top bargeat Laem Chabang Port

    Loading two 98-ton Transformers on a flat top bargeat Laem Chabang Port

    ,the Transformers can safely be rolled off.

    ,the Transformers can safely be rolled off.

    to discharge the 2x98-ton Transformers

    to discharge the 2x98-ton Transformers

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    41/124

    Offloading in remote LaosOffloading in remote LaosOffloading in a remote area with a80-ton and a 50-ton mobile craneOffloading in a remote area with a80-ton and a 50-ton mobile crane

    Using 600-ton modularhydraulic gantry craneUsing 600-ton modularhydraulic gantry crane

    Offloading a chiller unit for aOffloading a chiller unit for aLoading coated pipes with softLoading coated pipes with softOffloading sensitive material forOffloading sensitive material forfactory at the Laotian borderfactory at the Laotian borderslings to protect their coatingslings to protect their coatingthe BBC Radio Stationthe BBC Radio Station

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    42/124

    Preparing the skiddingrunway

    Preparing the skiddingrunway

    Placing the hydraulic jacks andinserting the skid beams

    Placing the hydraulic jacks andinserting the skid beams

    Skidding transformer usingwinches

    Skidding transformer usingwinches

    Continuous supervision during amust to for a safe job completionContinuous supervision during amust to for a safe job completion

    Halfway between thetrailer and the foundation

    Halfway between thetrailer and the foundation

    Fine tuning and positioningthe transformer

    Fine tuning and positioningthe transformer

    .Authority of Thailand we delivered 21 Transformers to rural Thailand. Some as far as 800 km away from

    Bangkok. All 21 Transformers mostly with a unit weight of 98 tons were safely and timely delivered.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    43/124

    We provide export packing at the Customers premises or when space is restricted, will pick up the cargo andpack at one of our warehouses. We provide custom made wooden cases, crates, steel crates, etc. After

    ackin the oods are carefull loaded lashed and secured. Ever ackin ob be ins with a car oinspection. Based on the inspection we will recommend the best suitable and economical packing method.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    44/124

  • 8/4/2019 The Freight and FV Group Presentation 2009

    45/124

  • 8/4/2019 The Freight and FV Group Presentation 2009

    46/124

  • 8/4/2019 The Freight and FV Group Presentation 2009

    47/124

    KEY STEPS OF A FACTORY RELOCATION

    Inspection and analysis of component separation of anintegrated plant into transportable units

    sman ng suppor e y compu er ze m process sc eme

    Draining of oil sumps to ensure the absence of residual oil

    during transportation, separation of switch gear and controlpanels, water proofing

    Match marking including color coding

    , ,

    Cargo tracking software

    Individual steps to be discussed and fine tuned with the

    2009 The Freight Co Ltd

    customer

  • 8/4/2019 The Freight and FV Group Presentation 2009

    48/124

    Custom made cases, crates, bundles, skids and frames Wood, steel and carton packaging

    Provision of shippers owned containers

    Fumigation Office and factory relocations

    Packing goods is often only part of our scope work. It goes without saying,, ,

    destination. Naturally, our partners overseas provide unpacking as well.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    49/124

    Pack according to international standards Use material of industry known brands and grades that

    conform to standards generally used industry-wide

    Workmanship in accordance with best commercial

    Emphasis on quality of material and workmanship

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    50/124

    Generally protect items from extreme moisture Special attention to protect fragile items

    Protect surfaces and openings from dirt, abrasion, etc.

    Items subject to corrosion, moisture and oxidation and notprotecte s a rece ve a t ona protect on

    Structural or surface protection by wrapping to eliminate

    Cushioning sensitive items to reduce shock or related loadforces

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    51/124

    Order Entry Receiving

    Packing Marking

    Checking

    Material Receipt

    Input in Software

    Release to Deliver Quantity/Quality Report

    Release to Pack

    Invoicing

    Inventory

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    52/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    53/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    54/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    55/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    56/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    57/124

    Transportation packaging must be conducted

    order to ensure that it meets all the demands

    of handling, storage and transportation.

    The manufacturers and shippers of goodsmust, at the very least, inform themselves

    packaging formats accordingly.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    58/124

    Stowing incompatible goods together isassoc a e w r s s

    Separate incompatible goods if they haveto be loaded together

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    59/124

    Do not pack odor- emitting goods together

    w o or- a sor en goo s

    Odor-contamination must be prevented

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    60/124

    Do not pack wet goods together

    with moisture - sensitive goods

    Do not load incompatible goods together

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    61/124

    Do not pack goods which produce dust together

    w us -sens ve goo s

    Do not pack dirty goods together withdirt-sensitive goods

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    62/124

    DO NOT load with excentric load distribution

    DO load with the center of gravity in the center of the container

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    63/124

    Do not pack "liquid cargoes" on top of "solid cargoes"...

    ... but do pack "solid cargoes" on top of "liquid cargoes"

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    64/124

    -

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    65/124

    Boxes with airbags: stowed for ready access

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    66/124

    Correct stowage suitable for handling with

    fork lift trucks in a box container

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    67/124

    Stackingmeans loading, packing or stowing packages in layers soa e e ges o e pac ages e us a ove eac o er.

    Corru ated board cartons stacked with and withouta hardboard anchor

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    68/124

    Stowage of socket pipes in layers andn a erna e or en a on w an o se

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    69/124

    Ceiling boards - loaded correctly, packed one above the other

    Ceiling boards - loaded in a staggered pattern and thus incorrectly

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    70/124

    Wooden barrels stowed with the bilge and cantline method

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    71/124

    Four-way pallet Arrangement of pallets

    Lattice used to secure the face of a load

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    72/124

    Example of partial cross-tie stowage of bags

    Pails stowed using offset stow in a 20' box container

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    73/124

    Incorrectly loaded pallets make load securing more difficult

    Alternately raising loads reduces the outlay for load securing

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    74/124

    Braiding of car tires in a 20' container

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    75/124

    Face stow of coils in a container

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    76/124

  • 8/4/2019 The Freight and FV Group Presentation 2009

    77/124

    Inadequately packed container section

    Safely packed container section

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    78/124

    Cross-border trucking services from and to Malaysia,Singapore and Laos

    Full trailer loads (FTL) or less than trailer loads (LTL)

    Express deliveries

    ons gnment trac ng

    Door-to-door services

    check points

    2009 The Freight Co Ltd

    and within mainland Malaysia as well as major cities in Laos

  • 8/4/2019 The Freight and FV Group Presentation 2009

    79/124

    - -

    Full Container Loads (FCL) and Less than ContainerLoads (LCL)

    Customs clearance at the border also provided

    The railwas is a safe, reliable and fast mean of transportation.

    The railway even weathers most storms, monsoon rains and floods.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    80/124

    Customs clearance on all major Airports, Ports and bordercrossings provided by our company

    Duty Drawback

    Temporary import and re-export formalities

    ntry an re-export un er arnet

    Blue Corner / Tax refund services (Thailand applicable

    Being online with the Thai Customs, we can provide customs formalitiesvirtually at any customs check point (air, sea, land) in Thailand. Customs

    2009 The Freight Co Ltd

    .

  • 8/4/2019 The Freight and FV Group Presentation 2009

    81/124

  • 8/4/2019 The Freight and FV Group Presentation 2009

    82/124

    Pangaea is a Freight Management System linkingForwarders and their agents with the customers

    It doubles as a Communication Platform andoperates/translates in 16 languages

    sers see up a e n orma on as e even s occur

    Pangaea removes double entries by various parties

    accessed by all parties 24 / 7 Updates real-time data automatically from more than

    2009 The Freight Co Ltd

    90% of airlines and more than 160 shipping lines

  • 8/4/2019 The Freight and FV Group Presentation 2009

    83/124

    Real-time visibility and monitoring orders frompurchase order level

    Full shipment history on one screen

    Line items, part number tracking

    Customizing reports can be e-mailed to customers

    Defined delivery milestones

    -

    Demurrage management reduces detention costs

    2009 The Freight Co Ltd

    partners

  • 8/4/2019 The Freight and FV Group Presentation 2009

    84/124

    CUSTOMER/IMPORTER FREIGHT FORWARDER

    Client creates order

    System creates order alert to all

    Can create orders

    System creates order alert to all

    Visibility

    Update orders

    CENTRAL

    Visibility

    Update orders

    SERVER

    Visibility

    Update order process

    FORWARDERS AGENT

    Project flights/voyages

    CUSTOMER/EXPORTER

    Can create orders

    Create orders

    Visibility

    2009 The Freight Co Ltd

    Give notice when cargo received System creates order alert to all

  • 8/4/2019 The Freight and FV Group Presentation 2009

    85/124

    Door-to-door coverage

    Competitive premium

    Assistance in claims handling

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    86/124

    Office Address: 15th Floor, Room 1503, Bangkok Business Center Building,29 Soi Ekamai, Sukhumvit 63 Road, Klongton Nua,

    Phone +66 2 714 2414Fax +66 2 714 2424 or +66 2 714 2423

    Wattana, Bangkok 10110 / Thailand

    E-mail [email protected] Export. [email protected] Import. [email protected]

    Sea Export.. [email protected] Import... [email protected] [email protected] -Customer Service.. [email protected].. [email protected]. [email protected]

    2009 The Freight Co Ltd

    . . pera ons. c au ow e- re g .comManagement... [email protected]

  • 8/4/2019 The Freight and FV Group Presentation 2009

    87/124

    Office Address: A310, Hong Yuan Tianzhu Logistics Centre,

    Phone +86 10 64565186

    . , , ,Shunyi District, Beijing 101312

    E-mail

    ax +

    Operations.. [email protected]

    Operations.. [email protected].. [email protected] -... .Management... [email protected]

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    88/124

    Office Address: 2-4-6 Dong Khoi St, Suite 210, District 1,

    Phone +84 83 827 4164-66

    Ho Chi Minh City, Vietnam

    E-mail

    O erations.. tran n the-frei ht.com

    ax +

    Customer Service.. [email protected].. [email protected] [email protected]

    ... - .

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    89/124

    ,network of Freight Forwarders specializing in the transport

    of heavy and/or oversized cargo for large scale turnkeypro ec s an ac ory re oca ons

    Member of the Global Logistics Network (GLN)

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    90/124

    Association) U.S.A.

    Agent for All-World Shipping

    Member of Customs and Transportation Association ofThailand

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    91/124

    qualified manpower

    Our group employs a blend of local staff and expatriates

    The expatriates bring along a wealth of experienceacquired on 5 continents

    information technology:

    ediEnterprise Freight Forwarding Software

    AITS Advanced Invoice Tracking System

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    92/124

    about our performance

    about our performance

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    93/124

    about our performance

    about our performance

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    94/124

    Above is the independent opinion of a London insurance broker upon inspecting ourwork methods and our approach to handling sensitive and valuable cargo.

    Above is the independent opinion of a London insurance broker upon inspecting ourwork methods and our approach to handling sensitive and valuable cargo.

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    95/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    96/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    97/124

    . . . . . ,distribution company focusing on Consumer Products

    Warehousing

    Provide Management, staff, infrastructure and equipmentfor third party logistics (3 PL) operation

    Distribution

    Fleet exceeding 1,600 unit (various types trucks/trailers)

    10 up-country depots for re-distribution

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    98/124

    eastern ring road next to the new Bangkok International

    Airport) Totally over 25000 m2 (270,000 sqft) indoor space

    Over 20,000 m2 (215,000 sqft) outdoor storage area

    , - Fully equipped with fork lift trucks and cranes

    Shelves and storage bins for over 3,000 SKUs

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    99/124

    Pictures from our terminal sites and from inside the warehouses

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    100/124

    -,

    Pick & Pack operation

    Repackaging, Sticker and Label service

    Line Haul & Nationwide Supply Chain Deliveries

    Various cross-docking points

    Heavy Duty cargo (own river jetty!)

    7-days / 24-hours standby service

    - ours secur y serv ce

    State of the art Warehouse Management System (WMS)

    2009 The Freight Co Ltd

    Warehouse Management System

  • 8/4/2019 The Freight and FV Group Presentation 2009

    101/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    102/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    103/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    104/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    105/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    106/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    107/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    108/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    109/124

    Consumer goods, dry, chilled and frozen products

    Guaranteed lead times

    Express and Standard Services

    Collection & Merchandising services

    Upcountry cross-docking and depot facilities in Pitsanulok, Chiang Mai, Korat, Khon Kaen, Udorn Thani, Ubon

    Rachathani, Chum orn, Surat Thani, Phuket, Haad Yai

    Advanced Invoice Tracking System (AITS)

    Dedicated fleet in customers livery

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    110/124

    -

    Six-Wheel Truck (Medium Size)

    Six-Wheel Truck (Jumbo Open Side)

    Six-Wheel Truck (Jumbo)

    Six-Wheel Truck (Tailgates)

    Six-Wheel Truck (Open Side and End Lift)

    Ten-wheel truck (Enclosure)

    en-w ee ruc a ga e

    Trailer with 40 Container

    2009 The Freight Co Ltd

    Chilled and frozen distribution vehicles

  • 8/4/2019 The Freight and FV Group Presentation 2009

    111/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    112/124

    internally developed SQL based track and trace system

    Tracking and tracing per truck and subsequent perinvoice, respectively shipment loaded

    Includes weight / volume and/or units

    Weekly / monthly KPI reports by client or delivery area

    Advanced Invoice Tracking Systems (AITS)

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    113/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    114/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    115/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    116/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    117/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    118/124

    2009 The Freight Co Ltd

    * Data Received * Daily Transaction

  • 8/4/2019 The Freight and FV Group Presentation 2009

    119/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    120/124

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    121/124

  • 8/4/2019 The Freight and FV Group Presentation 2009

    122/124

    2009 The Freight Co Ltd

    Excellent track record and references

  • 8/4/2019 The Freight and FV Group Presentation 2009

    123/124

    Excellent track record and references

    Offer the whole transport and logistics pallet

    Existing network and contacts in the region

    Over 100 years collective regional experience in theManagement of the following Services:

    Air, Sea, Road, Rail

    Turnkey Projects

    Warehousing

    Distribution

    Customs Clearance Packing

    2009 The Freight Co Ltd

  • 8/4/2019 The Freight and FV Group Presentation 2009

    124/124

    and logistics provider in South East Asia

    Expand our network and association with leaders in thetransportation and logistics industry

    Further strengthen our base in the region

    The Freight Company Limited

    2009 The Freight Co Ltd