The Fire Station of Naples -...

2
3.11 Design of a seismic resistant fire station Mazzolani F., Italy DESIGN OF A SEISMIC RESISTANT FIRE STATION . Federico M. Mazzolani Action TU 904 Integrated Fire Engineering and Response Operative Center Headquarter Auditorium, canteen, officies Gymnasium The Fire Station of Naples (7 buildings made of steel) Building A: Garage, canteen, auditorium,offices Building B: Training school, guest rooms Building C: Workshop Building D: Scaffolding Building E: Thermo-electrical plant Building F: Operative center Building G: Headquarter, offices Building H: Gymnasium Garage Entrance 1 2 The first example of base isolation in Italy Building A ECCS award 1987 Motivation of the international jury : ” Due to its seismic safety, this building is the perfect demonstration of the possibility of steel. At the same time it is reach of expressive values and it demonstrates that the fire prevention authorities can overcome the objections, which somebody could sometime have against the use of constructional steelwork.” Building A 3 4 Building B The first example of passive control in Italy, by means of shock block transmitters Building C: Workshop 5 6

Transcript of The Fire Station of Naples -...

Page 1: The Fire Station of Naples - people.fsv.cvut.czpeople.fsv.cvut.cz/~wald/fire/ifer/2010-Workshop/prezentations/WG3/... · base isolation in Italy Building A ECCS award 1987 Motivation

3.11 Design of a seismic resistant fire station

Mazzolani F., Italy

DESIGN OF A SEISMIC RESISTANT

FIRE STATION.

Federico M. Mazzolani

Action TU 904Integrated Fire Engineering and Response

Operative Center

Headquarter

Auditorium, canteen, officies

Gymnasium

The Fire Station of Naples (7 buildings made of steel)

– Building A: Garage, canteen, auditorium,offices– Building B: Training school, guest rooms– Building C: Workshop– Building D: Scaffolding– Building E: Thermo-electrical plant– Building F: Operative center– Building G: Headquarter, offices– Building H: Gymnasium

GarageEntrance

1 2

The first example of base isolation in Italy

Building A ECCS award 1987

Motivation of the international jury :

” Due to its seismic safety, this building is the perfect demonstration of the possibility of steel.At the same time it is reach of expressive values and it demonstrates that the fire prevention authorities can overcome the objections,which somebody couldsometime have against the use of constructional steelwork.”

Building A

3 4

Building B

The first example of passive control in Italy,by means of shock

block transmitters

Building C: Workshop

5 6

Page 2: The Fire Station of Naples - people.fsv.cvut.czpeople.fsv.cvut.cz/~wald/fire/ifer/2010-Workshop/prezentations/WG3/... · base isolation in Italy Building A ECCS award 1987 Motivation

Building D : Scaffolding

Building H : Gymnasium

7 8

Building G : Headquarter, offices

27/07/2010 10

FIRE RESISTANCE

EARTHQUAKE PROTECTION

ARCHITECTURAL FEATURES

9 10