MONTHLY CONSTRUCTION UPDATE - OCTOBER 2019
K H A R A D I , P U N E
₹1.50 L 2 BHK - ₹1 LSuites
₹50 K
*T&C Apply
Call: +91 7620 974 974
Site Address: New Kharadi - Shivane Riverside Road, Behind Zensar IT Park, Kharadi, Pune 411 014 Maha RERA Registration No.: Riverdale Suites - P52100014163 | Riverdale Heights - P52100008035 | Riverdale Residences - P52100004692
Earn a Referral Reward
Now Is The Time To Invite Your Closest Friends To Be A Part Of Your Living Community
And these are exclusive rewards designed for our customers only
Use this opportunity to not just create your own
like-minded group but also get attractive referral rewards
Possession at Tower A & B scheduled to commence
Riverdale Heights
2 BHK - Tower A | B | C | D
Tower A and B
Tower - C
thTerrace Slab/15 Floor Toilet Water-proo�ng complete
thTerrace Slab/ 9 Floor Toilet Water-proo�ng complete
th th14 �oor Flooring/ 14 Toilet Wall Dado in progress
rdFlooring 3 Floor/staircase railingwork in progress
th14 Floor Toilet �ooring/th16 Floor Balcony Water-proo�ng
work-in-progress
th17 Floor Kitchen Platform/th18 Floor Kitchen Dado in progress
staircase railing in progress
st21 Floor Wall Gypsum Plaster/nd 22 Floor Internal Door Frame
Fixing in progress
External Texture Paint/Internal Wall Paint-Wall Putty in progress
Plumbing Work thCompleted up to 20 Floor
Tower - D
th15 Floor Wall Gypsum Plasters/th14 Floor Internal Door Frame
Fixing in progress
th th10 Floor Kitchen Dado/8 �oor Kitchen Platform in progress
Toilet wall Dado 6th Floor work in progress
Unitized Galls Curtain Walls installation work-in-progress
Passenger Lift installation work in progress
Tower - E
Terrace Slab/Over Head Water Tank RCC complete
Above Terrace Water-proo�ng/rdPlumbing 23 Floor, work-in-progress
rdAAC Block works 23 �oor/Water-proo�ng done up to 23rd �oor
rdDrainage piping 23 �oor/Electric cabling in progress
rd23 Floor Electrical Conduiting and chasing/rd23 Floor Wall Gypsum Plasters complete
st nd thFloor Tiling Flat Series 1 & 2 , 18 �oor/ th th th9 & 10 ,15 �oor in progress
rd23 �oor Dado Wall Tiling Kitchen/st21 Floor Dado Wall Tiling Toilets complete
Internal Door Frame Fixing/rd 23 Floor Kitchen Platform Fixing complete
Fire Staircase Railing/External Cement Plaster in progress
Lobby False Ceiling/Lift installations in progress
ODU Balcony Block Work, completed
Unitized Galls Curtain Walls preparation work-in-progress
Fire �ghting work complete
EXTERNAL WORKS
Clubhouse Interior �nishes (furniture, gaming zone, library, Gymnasium) in progress
Swimming Pool under testCurtain Wall (Facade) installation Tower A & B complete
Private Garden Plantation/Podium Green Landscape, in progress
Ramp Driveway/DG installations work �nished
Fire �ghting installations all parking levels
Step Garden Landscape Garden Soil �lling/ STP installation in progress
Main Entry Security Cabin with Green Landscape / Main Entry Bridge Paver complete
Double Height Reception Lobby finished
External Driveway Paver �xing Lobby Level Parking Paver �xing/ OWC, in progress
Electrical Transformer Room complete
Water Treatment Plant Equipment's under test
UGWT Pumps installed and Fire Panels Charged
Internal Road Being Constructed With Paver Blocks For The Residents Of Riverdale Heights Giving Them Easy Access To Their Home
Building external finishing being complete. Bronze fins being laid for ‘VERTICAL PLANTATION’ on TOWER A & B
Close ups of the wood �nish and bronze �ns on Tower A and Tower B
Internal Driveway being laid with paver blocks
Seating nests and island pods at the podium level of Riverdale Heights
Inside shot of the banquet hall being completed
External face of the banquet Hall within the club house adjacent to the swimming pool
Internal driveway leadingup to the lobby of Tower A and Tower B
Finishing Work at The Gymnasium Being Completed
Lobby Area of Tower A and B
Library section in view at the club house
Riverdale SuitesSuites
nd3 Floor Aluform shutter assembling,in progress
Plinth Level PCC, Complete
Riverdale Residences
thE3- 17 Floor slab completedth18 Floor commenced
thE2- 11 MIVAN (Aluform) assembling/nd thE2-2 & E3- 5 Floor Wall Gypsum in progress
st rdE2- 1 & E3- 3 Floor Toilet Waterproo�ng/ thE3- 4 Floor Concealed Plumbing in progress
E3- Fire Fighting line installation/ E2 & E3- Podium & Parking level RCC Parapet in progress
E2 & E3- Parking level Electrical and Panel Rooms block, in progress
E1 –Parking P2 Level part slab cast
E2 & E3- Scooter parking underground services in progress
Ramp and Underground Water Tank RCC/E2 & E3- Scooter Parking Floor concreting in progress
thE3- Drainage piping 9 �oor in progress
E2 – External Plaster work in progress