ERRA VIDEO TRAINING PROGRAM The EU Energy Market a general introduction Senior fellow Jacques de Jong

Transcript of The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO...

Page 1: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

E R R A V I D E O T R AI N I N G P R O G R AM

The EU Energy Marketa general introduction

Senior fellowJacques de Jong

Page 2: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

The Content

2

• Short introduction

• The EU framework

• Tariff regulation

• The ENTSO’s and the Codes

• The market

• The new challenges

• Where are we now?

Page 3: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Short Introdution

3

• Short introduction

• The EU framework

• Tariff regulation

• The ENTSO’s and the Codes

• The market

• The new challenges

• Where are we now?

Page 4: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

The Value Chains

4

Generation

TransmissionRegional

distribution

Supply(billing, customer services)

System operationProduction

Page 5: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Various models for competitive gas & power systems

5

Model 1Monopoly

Model 2Single buyer

Model 3Wholesalecompetition

Model 4Retailcompetition

Sector becomes more like any other commodity industryBut:• More complexity, regulation, IT infrastructure, etc• More structural change required

Page 6: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Discussion confused,mixed-up terminology

6

● Privatisation: Sale of public companies to private investors● Restructuring: Changing utilitystructure to create

competitors or to unbundle steps of the value chain● Open, non-discriminatory access: Enable all compani es to

use the essential facilities of transmission and di stribution● Deregulation: Ceasing to regulate parts of the sect or, such

as opening up of supply franchises● Liberalization: Allow “captive” customers to choose

supplier ● Re-regulation: Develop rules required for customer choice

in an effectively functioning competitive power ind ustry

Page 7: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

The EU framework

7

• Short introduction

• The EU framework

• Tariff regulation

• The ENTSO’s and the Codes

• The market

• The new challenges

• Where are we now?

Page 8: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Political drivers for energy liberalisation

8

● Rethinking & re-inventing government (‘80’s)[Reagan, Thatcher, Delors….]

• Why not for public services & utilties?

• Telecom, airports, railroads• Gas & electricity

Page 9: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

EU Liberalisation timeline

9

Page 10: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Energy Market liberalisation, the EU model

10

Directives 2009/72&73/EC,The Third Package: ● Mandatory market opening● PSO & consumer protection● TSO unbundling-options● DSO legal unbundling● RTPA for grids ● Independent NRA’s

Note: unbundling networks is key issue in order to secure

non-discriminatory third party access

National implementation: ● subsidiarity● limited role EU

CommissionRegulations:● Cross border trade

electricity● Gas grids● ACER

Page 11: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

NATIONAL / EU INTERACTION

11

Council of EUROPEAN

ministers

European Commission

Co-decision

1 27. . . . . .

EU

LEVEL

NATIONAL

LEVEL

NATIONAL REGULATORY AUTHORITIES

EUROPEAN

Parliament

National Implementation

ACER CEER

advice

Page 12: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

3rd Energy Market Package, Key elements(1)

12

Unbundling TSO, ● Not sufficient in 2nd package:● Choise between OU (ownership ), ISO (independent system

operator) and ITO (independent transmission operator)

● ITO:– Independent network operator, MS appoints– Full commercial and technical management TSO– Conformity programme & agent– Mgt-personnel not from commercial functions (3 year s before,

4 after)– Reg. approval all contracts ITO-VIC

So: ITO= legal unbundling 2nd directive, specified and detailed

Page 13: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Vertical unbundling

13

● What are the options?● Full OU of TSO

– No incentives to discriminate

– Externalities new power plant vs new network

● ISO– Split TO and SO– TO can stay at VIU– SO: ‚independent ‘

● ITO– “independent TSO”– detailed & complex

relation

TSO

GENCO

ISO

TO

GENCO

TSO

GENCO GENCO

TSO

TSO

GENCO GENCO

ITO

Regulated relation

Page 14: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

The TSO’s

14

Ongoing restructuring, incl. unbundling, cb-ownershi psMore CB-cooperation (auctions-CASC, operational secur ity-

Coresco, TSC)ENTSO-roles strengthening (?)On the way towards an EU-ISO?

Tennet (NL/FRG)Elia (B/FRG)Gasunie (NL/FRG)Ownership issues…..

Joint cooperations: • 17 TSO’s in gas,

coordinated CB auctioning

• 7 e-TSO’s in CASC• Coresco, TSC

Page 15: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

3rd Energy Market Package Key elements(2)

15

Consumer rights● Switching (<3 weeks)● Compensation schemes● Disputes/ombudsman● Transparency● Smart meters

Page 16: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

3rd Energy Market Package Key elements(3)

16

The NRA’s Designation of a single national regulatory authori ty

● Legally and functionally independent from any other public or private entity, budgetary autonomy…..

● Clear mandate to cooperate at European level

● Enhancing statutory duties and powers

• Ensure non-discrimination, effectivecompetition, efficient functioning, monitoring in particular…..

• Ex ante fixing/approving at leastmethodologies for network use, bothtechnical and financial

• Statutory powers: binding decisions, imposing penalties etc.

• Handle consumer complaints & dispute resolution

• Assure well-functioningcompetitive energy market

• Guarantee efficient management regulated (network) activities

Regulatory mandates & Mission

Best practice summary: CEER website

Page 17: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

The NRA’s

17

• Policy-making, evaluation• Prepare primary, secondary

legislation• Policy evaluation• Generic guidelines for regulator• EU-policies,

Regulators & governments

• Regulate ex ante tpa fornetworks

• Regulate system operation• Compliance, disputes,

arbitration• Monitor markets

• Advice ministry

• National Regulators & “the Agency”

ACER: • Focus on CB-issues

• Framework for national regulatory authorities to cooperate effectively

• Appropriate oversight of the cooperation between TSO’s

CEER: • Council of European Energy regulators• 27 EU-members + Norway, Iceland• NRA-initiative• Develop best practices

ACER, focus on CB -issues:● Assess & advise on proposed network codes● Idem on Infrastructure-plans● Supervise regional TSO-cooperation, new interconnec tors● Ensure compatibility bordering regulatory framework s● Settle conflicts in cross-border acces-issues

But: ● No clear mandate in setting the codes: EU-Commissio n● No clear mandates in regulating regional markets● Governance via a 27 member Regulatory Board

Page 18: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

EU Regulation & Competition

18

●Ex post●General oversight●Prohibition of cartels and

abuse of dominant position●Merger control●Rest: freedom for companies

EUROPEANCOMPETITION

NETWORK(ECN)

NATIONAL COMPETITION AUTHORITIES

DG COMPETITION

ACER, CEER

DG ENER

NATIONAL ENERGY

REGULATORYAUTHORITIES

• Ex ante• Sector specific• Monopoly tariffs based on

efficient cost• Licenses, monitoring, …• Frequent interaction with sector

Page 19: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Tariff regulation

19

• Short introduction

• The EU framework

• Tariff regulation

• The ENTSO’s and the Codes

• The market

• The new challenges

• Where are we now?

Page 20: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Tariffs & Prices: national rules, EU frame

20

Tariffs :● Regulated, NRA:● Network tariffs, efficiency = key

– RPI-X● HH-Consumers:

– Setting?– Monitoring?– EU-Directives assume no

regulation, but market-based pricing; however…..

Prices: ● Market-based, competition● Power

● Spot-based, merit order● PPA’s……

● Gas

● Oil price indexation● Spot pricing

Consumers are paying:• Energy component, leading in gas (80/20)• Network component, strong in power (30-40%)• Taxes, many national differences (energy, VAT)

Page 21: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Energy Price Breakdown

21

Page 22: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Transmission electricity, many differences in the MS’s, downward trends?

22

Downward trends in costs…… note some major regulatory charges

Page 23: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

EU household energy prices 2008-2012……

23

Different variabilitydevelopments…

Page 24: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Leading to gas price discussions….

24

…and gas market designs

Page 25: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

The ENTSO’s and the Codes

25

• Short introduction

• The EU framework

• Tariff regulation

• The ENTSO’s and the Codes

• The market

• The new challenges

• Where are we now?

Page 26: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

ENTSO’s:

26

European Network Transmission System Operators • GTE becomes ENTSO-G: formalised institution• ETSO becomes ENTSO-E: formalised institution• Develop binding network codes (interoperability,

operational procedures, emergencies)• Develop 10-yr infrastructure plan, incl. cross-border s

A pan-European vision on the future of the grid, no n-binding, complementing regional and national Plans. Coordina te investment, harmonise planning, resource optimisation. Input from national plans. ACER to give opinion and to monitor implementation with ENTSO. Financing of investments : mainly national

© Clingendael International Energy Programme www.clingendael.nl/ciep

Page 27: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

The Codes…….

27

● Network Codes for CB -flows in Gas & Electricity● Entso’s to draft, guided by Framework Guidelines. ● FG’s: ● cover main lines, technical/operational, market,

Infrastructures and tariffs● ACER to draft the FG’s, aftyer stakeholder consulta tion

● Commission to request ENTSO’s to draft the codes. ● ACER to verify compliance with FG’s, Commission to

decide via comitology● Codes become binding…..

Page 28: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Planning of Guidelines & codes

28

Page 29: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

The market

29

• Short introduction

• The EU framework

• Tariff regulation

• The ENTSO’s and the Codes

• The market

• The new challenges

• Where are we now?

Wholesale marketsRetail marketsMarket integration etc.

Page 30: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Market opening brought new opportunities

30

Page 31: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Market & price coupling in electricity: efficient competitive wholesale markets

31

● PCR becomes the rule of the game● Bringing (spot) price convergence● Enhancing effective cross-border trades

• The coupling of the CWE day-ahead market since Nove mber 2010 saw mostly smooth sailing, with prices converging 66% o f the time, on average, over the year, according to APX-Endex.

• “We’ve seen a general upward drift in volumes, pric ing is generally less volatile and we’re seeing quite high degrees of pri ce convergence,” says

Andrew Claxton from APX-Endex .

Page 32: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

The gas market issue is more complicated, partly due to the introduction of E/E zones (?)

32

Liquid hub

Hub-to-hub trade

Entry-Exit zone

Page 33: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Impressive growth of hub-traded gas volumes…..

33

Page 34: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

…lessening domination of oil-indexed price contracts

34

Page 35: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

…and contributing to lower average wholesale gas prices

35

But some say, it is not enough

Page 36: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Room for more competition in retail power markets ?

36

Retail-market competition lagging behind…..

Page 37: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Customer switching, large differences across the EU

37

Consumers to blame, or the suppliers….?

Page 38: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

The new challenges

38

• Short introduction

• The EU framework

• Tariff regulation

• The ENTSO’s and the Codes

• The market

• The new challenges

• Where are we now?

• 10YNDP’s• EU Infra Package• SoS, System adequacy • Road Map 2050

Page 39: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

New investments in Infrastructure

39

Needed: • for meeting bold RES-objectives• for enhancing further interconnections, for gas-

imports, for system adequacy, security of supply• But:

• Unbundling barriers?• Regulatory risks, Low ROI’s• Lack of international (regulatory?) coordination

Page 40: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

The ENTSO’s 10YNDP’s

40

Pipes FID Non-FID

Projects 62 97

10^6 € 13 711 58 556

The ENTSO-10YNDP’s

UGS FID Non-FID

Projects 26 22

10^6 € 4 260 2 593*

LNG FID Non-FID

Projects 11 20

10^6 € 3 570 6 614*

(*): some project sponsors have not submitted costs

> 100 projects, 51 500 km, approx. €104 bn of investments

+1.3% per year grid length development despite a major upcoming shift in generation mix to accommodate wider, stronger, more volatile power flows

The incentivisation of TSOs to deliver valued investments on time needs a European re-think

Some € 200 bn in investments

Page 41: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Security of Gas Supply

41

Securing Gas Supplies in 2050: how much is needed?

Page 42: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

42

Page 43: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

The Regional Grid Potentials

43

Page 44: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

The Internal Energy Market: Where are we now?

44

● Our Success?

● What needs more to be done

Page 45: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

45

● The legal case:● Market opening went fast● standardisation of industry

structures and rules ● strong support EU

Commission (directives, sector enquiry)

● The market case: ● increased (CB-) trading ● impressive labor

productivity gains● some price falls, price

convergencies

● The market● (gas) price divergencies● Continuing/increasing market power

● Social cost/benefit?● Consumers expecting lower prices

all over?● Profits energy firms contoinnuing● Unclear political impacts…..

● Remaining issues● Retail competition per se● Competition in the gas market● Security of supply agenda● Climate change policy; triple 20’s

impacts● Vulnerable consumers

Our successesChallenges to reform

Page 46: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Where to go now

46

EU Commission Communication“Making the Internal Energy Market work (oct. 2012)

three basic messages:

● Enforcement:● Infringements 3rd package, focus on unbundling● Only 25 TSO’s in 11 MS’s are certified Where to go now?

● Concentrated generation markets; investments too much dr iven by subsidies● Focus on competition (i.e. Gazprom case)● Best practice exchange (vulnerable) consumer protetct ion

● Consumer disengagements● Increase awareness, switching, savings, energy servic es, markett pricing, smart

metering…….● Quit regulated HH-consumer pricing

● Flexible & smart energy system● Market based, rewarding supply/demand flexibility● Warning word on capacity markets; coordinate at EU-leve ls!!

Page 47: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

47

www.clingendael.nl/ciep

Page 48: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Annexes

48

The Internal Energy Market:Back -ups

Page 49: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

GAS: From field to end user:

49

Gas value chain in Europe and Asia covers more than one jurisdiction

At every step both companies and governments must come to an agreement

management of risks and benefits has changed dramatically in the past decade

security of transit a joint interest between supplier and consumer

pipeline supplies create long term relationships along the value chain

investments are large

GAS: From field to end user: a complicated political and economic process to fit the value chain pieces

together

Page 50: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Model 4: Retail competition

50

Energy salesEnergy flows in same company

IPP IPP IPP IPP IPP

Wholesale marketplace

Transmission wires

Retail marketplace

Distribution wires

RetailerDistco/retailer

RetailerDistco/retailer

Retailer

Customer Customer Customer Customer Customer

Choice of supplier for all customers

Page 51: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Effective Unbundling

51

Two options● Ownership unbundling of TSO

– Network operators can not be affiliated or be part of a group which is active in supply, generation and production .

– Minority stakes in both supply and network companie s are allowed

● Independent system operator (ISO)– Second best approach: MS allowed to derogate OU if ISO

is designated– Transmission assets may stay in vertically integrat ed

company– Technical and commercial operation ISO– ISO has say on investment decision– ISO fully independent from supply or production.

Page 52: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

What is an ISO?

52

● Core task of an ISO

● PJM is a „deep ISO“

System managment

Operational studies

Procurement analysis

Balancing call-off

Real-time dispatch

AS Procurement

Commercial

Revenue collection

Agreements

Capital plan management

Customer contracts

Demand forecasting

Long term statement

Asset ops.

Operational planning

Maintenance strategy & assethealth analysis

Work scheduling

Physical network ops.

Maintenance

Network development /investment

Strategy & planning

Scheme development

Procurement / contractmanagement

Building mgt, testing, etc.

Balancing ISODeep ISOOperational ISO

Source: the figure relies on Frontier Economics, 2007

Page 53: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Agency for Regulatory Cooperation

53

• Individual decision making powers for specific cross-border issues ( "Article 22" exemptions > 2 MS

•The advisory role to the Commission

• Based on the standard rules and practices for EC Regulatory Agencies

• Headed by an Agency Director• Separate Board of Regulators

– To ensure independence of regulators at European level

– Solely responsible for all regulatory matters and decisions

• own Board of Appeal• staff of around 40-50 people

Page 54: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

DGCOMP-actions, Sector Enquiry, case laws

54

Abuse • LT import contracts• Inspections (Eon, GdF, RWE• Market sharing gas• Eon settlement ?

Mergers● GdF-Suez● Eon-Ruhrgas● Endesa● ….

Impacts: • Eon partly OU electricity grid

• RWE partly OU gasgrid• the EdF-case??

• the Suez/GdF case? • the ENI-initiatives…?

Page 55: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Electricity price breakdowns

55

Many differences, not only taxes

2008 figures (EU), Source: EPRG-group

Page 56: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Transmission tariff evolution

56

Page 57: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

European Electricity Rules

57

Page 58: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

European Gas Rules

58

Page 59: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Florence and Madrid Fora

59

Public & private participants:● EU Commission & presidency● governments & regulators

(CEER/ERGEG)● TSO’s (ETSO), producers, traders,

suppliers, consumers No formal statusconsensus & voluntarity basedFocus on cross border issues,

gas, power

The regional markets

Page 60: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Thousands of possible situations and overall social economic welfare assessed via market studies

60

Color Code Exchanges < 1 TWh < 5 TWh < 10 TWh > 10 TWh

Country balancesimporterrather balancedexporter

• 5% of generating costs saved by new interconnection

• Direct connection for 125 GW RES

• - 170 Mt/y CO 2 emissions savings

Page 61: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

61

Page 62: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

62

Page 63: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Solar: making the right choices?

63

Page 64: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Going offshore…

64

Page 65: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Evidence

65

Page 66: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Reading material (1)

66

● From regional markets to a single energy market; Merc ados study 2010 http://ec.europa.eu/energy/gas_electricity/studies/ doc/2010_gas_electricity_markets.pdf

● Unbundling of EU Gas and Electricity Transmission sys tem operators; 2006 study for the EU Commission http://ec.europa.eu/energy/gas_electricity/studies/ doc/electricity/2006_03_unbundling_electricity_gas.pdf

● The effects of liberalisation on employment; study for the EU Commission http://ec.europa.eu/energy/gas_electricity/studies/ doc/gas/2001_09_effects_iberalisatione_employment.pdf

● Electricity liberalisation indicators; reprot by Oxer a to the EU Commission, 2001● EU Commission website on the internal energy market

http://ec.europa.eu/energy/gas_electricity/index_en .htm● Liberalising Dutch energy markets, CIEP 2006

http://www.clingendael.nl/publications/2006/2006090 0_paper_ciep_dejong.pdf● The third energy market package; are we singing the r ight song? CIEP 2008

http://www.clingendael.nl/publications/2008/2008020 0_ciep_briefingpaper_jong.pdf● Crossing Borders in EU gas networks; the missing lin ks; CIEP 2009

http://www.clingendael.nl/publications/2009/2009090 0_ciep_paper_gas_networks.pdf● A smart EU energy policy, CIEP 2010

http://www.clingendael.nl/publications/2010/2010041 2_CIEP_Misc.%20Publication_JJong_Smart%20EU%20Energy%20Policy.pdf

● A new EU Gas security of supply architecture; FSR poli cy brief, 2012 http://www.clingendael.nl/publications/2010/2010041 2_CIEP_Misc.%20Publication_JJong_Smart%20EU%20Energy%20Policy.pdf

Page 67: The EU Energy Market - ERRA€¦ · • GTE becomes ENTSO-G: formalised institution • ETSO becomes ENTSO-E: formalised institution • Develop binding network codes (interoperability,

Reading material (2)