The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts...

760
The Environmental Assessment and Management (TEAM) Guide Florida Supplement Revised June 2000 Environmental assessments help determine compliance with current environmental regulations. The U.S. Air Force, U.S. Army, Defense Logistics Agency (DLA), and Corps of Engi- neers (Civil Works) have adopted environmental compliance programs that identify compliance problems before they are cited as violations by the U.S. Environmental Protection Agency. Since 1984, the U.S. Army Construction Engineering Re- search Laboratory, in cooperation with numerous Department of Defense (DOD) components, has developed environmental compliance assessment checklist manuals. The Environ- mental Assessment and Management (TEAM) Guide was developed for use by all DOD components. Currently there are five participating DOD components: the Air Force, Air National Guard, Army, Civil Works, and DLA. These agencies have agreed to share the development and maintenance of this Guide. The Guide combines Code of Federal Regulations and management practices into a series of checklists that show legal requirements and the specific operations or items to review. TEAM Guide is supplemented by DOD component- specific manuals detailing DOD component regulations and policies. The Florida Supplement was developed to be used in conjunction with the TEAM Guide, using existing Florida state environmental legislation and regulations as well as suggested management practices. CERL Special Report 96/94 August 1996 Revised June 2000 Approved for public release; distribution is unlimited.

Transcript of The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts...

Page 1: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

The Environmental Assessment and Management (TEAM) Guide

Florida Supplement Revised June 2000 Environmental assessments help determine compliance with current environmental regulations. The U.S. Air Force, U.S. Army, Defense Logistics Agency (DLA), and Corps of Engi-neers (Civil Works) have adopted environmental compliance programs that identify compliance problems before they are cited as violations by the U.S. Environmental Protection Agency.

Since 1984, the U.S. Army Construction Engineering Re-search Laboratory, in cooperation with numerous Department of Defense (DOD) components, has developed environmental compliance assessment checklist manuals. The Environ-mental Assessment and Management (TEAM) Guide was developed for use by all DOD components. Currently there are five participating DOD components: the Air Force, Air National Guard, Army, Civil Works, and DLA. These agencies have agreed to share the development and maintenance of this Guide.

The Guide combines Code of Federal Regulations and management practices into a series of checklists that show legal requirements and the specific operations or items to review. TEAM Guide is supplemented by DOD component- specific manuals detailing DOD component regulations and policies. The Florida Supplement was developed to be used in conjunction with the TEAM Guide, using existing Florida state environmental legislation and regulations as well as suggested management practices.

CERL Special Report 96/94 August 1996

Revised June 2000

Approved for public release; distribution is unlimited.

Page 2: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts
Page 3: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts
Page 4: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Introduction

i

FOREWORD This is USACERL Special Report 96/94. The report is based on the information available on Enflex Federal and State Regulations of April 2000. The research was performed for the Air National Guard under Military Interdepartmental Purchase Request (MIPR) number OMAF57/3400/357/A/9830147/PO, technical monitor Chuck Smith; the Army Environmental Center under MIPR 0C48R0006, technical monitor Matthew Andrews; the National Guard Bureau under MIPR 0CCER6EL11, technical monitor Phil Dao; the Air Force Center for Environmental Excellence under MIPR FQ7624-00-08010, technical monitor Scott Newquist; the U.S. Army Corps of Engineers under FAD3123-X-2402-JAN-980803369, technical monitor James Wolcott; the U.S. Army Reserve Center under MIPR 00CCWEL009, technical monitor Dave Jennings; and the U.S. Postal Service under MIPR number 102590-99-Z-093, technical monitor Paul Fennewald. The research was performed by the Environmental Processes Branch (CN-E), Installations Division (CN), of the U.S. Army Construction Engineering Research Laboratory (CERL). The CERL Principal Investigator was Carolyn O’Rourke. Dr. Ilker Adiguzel is Chief, CN-E, and Dr. John T. Bandy is Chief, CN. Dr. Alan Moore is Acting Director of CERL.

Page 5: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Introduction

ii

Page 6: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Introduction

iii

NOTICE This manual is intended as general guidance for personnel at Department of Defense (DOD) installations/CW facilities. It is not, nor is it intended to be, a complete treatise on environmental laws and regulations. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information contained herein. For any specific questions about, or interpretations of, the legal references herein, consult appropriate legal counsel.

Page 7: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Introduction

iv

Page 8: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Introduction

v

FLORIDA SUPPLEMENT The Florida Supplement to the U.S. TEAM Guide contains protocols necessary for determining compliance with environmental regulations. This manual is a supplement to the U.S. TEAM Guide; the supplement does not replace it. The following Florida agencies issue regulations and have responsibility in the areas indicated: • Department of Agriculture and Consumer Services responsibility for pesticide and herbicide regulation under

the Pesticide Section. • Department of Environmental Protection has responsibility for the following areas:

- Air Quality - Hazardous Waste Management and Transportation - Motor Vehicle Noise as Stipulated under Statues, 1989, Chapter 403 - Off-site Transportation of Biohazardous Waste. - Permits for dredging and filling conducted in, on, over the State's surface waters - Solid Waste Management, sludges, demolition construction disposal landfills, and compost under Solid

Waste Management Program - Underground Injection Control - Underground Storage Tanks - Used Oil and Oily Waste Management - Water Quality, including surface water and groundwater, and stormwater discharges - Coastal construction control lines along sand beaches - Permits for construction of erosion control devices new construction, reconstruction, and modification of

existing structures - Aquatic Plant Control - Environmental permitting of activities and water quality protection.

• Department of Natural Resources has responsibility for preservation of wildlife. • Division of Historical Resources, Department of the State has responsibility for the preservation of historical

sites remains. • Office of Motor Carrier Compliance has responsibility for transportation of hazardous materials. • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water

Management Districts have responsibility for stormwater management and water use within each district. The state level stormwater regulation is in effect for the Northwest Florida Water Management District.

Page 9: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Introduction

vi

Page 10: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Introduction

vii

ACRONYMS ACGIH American Conference of Governmental Industrial Hygienists AQMA air quality management area ASTM American Society for Testing and Materials AWWA American Water Works Association BACT best available control technology BOD biochemical oxygen demand BTEX benzene, toluene, elthylbenzene, xylene CAR control area responsible party CAS Chemical Abstract Service CEM continuous emission monitoring CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFC chlorofluorocarbons CWA Clean Water Act dB decibel dBA decibels using A-weighting network dBC decibels using C-weighting network DEQ Department of Environmental Quality ESA Endangered Species Act FIFRA Federal Insecticide, Fungicide, and Rodenticide Act GVWR gross vehicle weight rating HEPA Filter high efficiency particulate air filter HWM hazardous waste management IARC International Agency for Research on Cancer ICRU International Commission on Radiological Units and Measurements IUPAC International Union of Pure and Applied Chemistry LAER lowest achievable emission rate Ldn day-night airport noise level Leq equivalent noise level LPG Liquefied Petroleum Gas MC medium curing MCL maximum contaminant level MFL million fibers per liter MSDS material safety data sheet MSW municipal-type solid waste MSWLF municipal solid waste landfill MWC municipal waste combustor NBS National Bureau of Standards NEPA National Environmental Policy Act NFPA National Fire Protection Association NHPA National Historic Preservation Act NPDES National Pollutant Discharge Elimination System NTNCWS nontransient noncommunity water system OSHA Occupational Safety and Health Administration PAH polycyclic aromatic hydrocarbons PCB polychlorinated biphenyl PEL permissible exposure limit POTW publicly owned treatment works PUC Public Utility Commission of Oregon RACT reasonably available control technology

Page 11: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Introduction

viii

ACRONYMS

RC rapid curing RCRA Resource Conservation and Recovery Act RDF refuse-derived fuel REL recommended exposure level RGF recirculating gravel filter RVP Reid vapor pressure SAE Society of Automotive Engineers SARA Superfund Amendments and Reauthorization Act SC slow curing SDWA Safe Drinking Water Act SIC Standard Industrial Classification SMCL secondary maximum contaminant level SPCC spill prevention countermeasure and control SPL sound pressure level SWDA Solid Waste Disposal Act TLV threshold limit value TNTC too numerous to count TPH total petroleum hydrocarbons TRI toxic release inventory TSCA Toxic Substance Control Act TSD treatment, storage, and disposal TSDF treatment, storage, and disposal facility TSP total suspended particulate TSS total suspended solids TTHM total trihalomethane UL Underwriters Laboratory UFC Uniform Fire Code USEPA United States Environmental Protection Agency UST underground storage tank VOC volatile organic compound VOL volatile organic liquid WPCF Water Pollution Control Facilities

Page 12: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Introduction

ix

COMMONLY USED ABBREVIATIONS

bbl barrel mg milligram Btu British thermal unit mi mile C Celsius min minute cfs cubic feet per second MJ megajoule cm centimeter mL milliliter cm2 square centimeter mm millimeter dscf dry standard cubic foot mo month dscm dry standard cubic meter mrem millirem F Fahrenheit MW megawatt ft foot ng nanogram ft2 square feet NTU nephelometric turbidity unit ft3 cubic feet oz ounce g gram pCi picoCurie gal gallon ppm part per million gJ gigajoule ppmv part per million by volume gr grain ppmw part per million by weight h hour psi pound per square inch ha hectare psia pounds per square inch absolute hp horsepower psig pounds per square inch gauge in. inch qt quart J Joule s second kg kilogram scf standard cubic foot km kilometer scm standard cubic meter kPa kilopascals sdcf standard dry cubic foot L liter sdcm standard dry cubic meter lb pound TU turbidity unit m meter V volt m3 cubic meter yd yard MBtu million British thermal units yd2 square yard meq milligram equivalent yr year CO carbon monoxide NO2 nitrogen dioxide CO2 carbon dioxide NOx nitrogen oxides Hg mercury SO2 sulfur dioxide

Page 13: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Introduction

x

Page 14: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Introduction

xi

METRIC CONVERSION TABLE The following conversion table may be used throughout this manual to make approximate conversions between U.S. units and metric units.

1 in. = 2.54 cm or 25.4 mm 1 ft = 0.3048 m 1 ft2 = 0.093 m2

1 ft3 = 0.028 m3

1 psi = 6.895 kPa 1 lb = 0.454 kg 1 mi = 1.61 km 1 gal = 3.78 L °F = (°C + 17.78) x 1.8 °C = 0.55 (°F - 32) 1 yd = 0.9144 m 1 Btu = 4.184 kJ 1 acre = 4046.9 m2 1 acre = 0.405 hectare

Page 15: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Comment Form

Comments and questions regarding the Florida Supplement can be addressed to:

Carolyn O’Rourke

e-mail [email protected] phone 217-398-5553 or 1-800-USACERL

fax 217-373-3430

Please include the following information with your comment: User Name: Affiliation (installation, command, etc.): email: Phone: FAX:

Page #

Checklist item #

Line #

Comments

Page 16: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

REPORT DOCUMENTATION PAGE Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate to any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations, 1215 Jefferson Davis Highway, Suite 12-4, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank)

2. REPORT DATE

June 2000

3. REPORT TYPE AND DATES COVERED

Final

4. TITLE AND SUBTITLE

The Environmental Assessment and Management (TEAM) Guide Florida Supplement, Revised

5. FUNDING NUMBERS

MIPR OMAF57/3400/357/A/9830147/PO (ANG) 0C48R0006 (AEC) 0CCER6EL11 (NGB) FQ7624-00-08010 (AFCEE) FAD3123-X-2402-JAN-980803369 (USACE) 00CCWEL009 (USARC)

6. AUTHOR(S)

Carolyn O’Rourke

102590-00-Z-093 (USPS)

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES)

U.S. Army Construction Engineering Research Laboratory (CERL) P.O. Box 9005 Champaign, IL 61826-9005

8. PERFORMING ORGANIZATION REPORT NUMBER

SR 96/94, August 1996

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES)

See report Foreword for a complete list of sponsors.

10. SPONSORING/MONITORING AGENCY REPORT NUMBER

11. SUPPLEMENTARY NOTES

Original document prepared by U.S. Army Construction Engineering Research Laboratory (CERL). Copies of this revised document are available from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA, or can be downloaded from the HQ AFCEE or USACERL (Denix) Bulletin Boards. This guide updates and supercedes ADA316041. 12a. DISTRIBUTION/AVAILABILITY STATEMENT

Approved for public release; distribution is unlimited. 12b. DISTRIBUTION CODE

13. ABSTRACT (Maximum 200 words)

Environmental assessments help determine compliance with current environmental regulations. The U.S. Air Force, U.S. Army, Defense Logistics Agency (DLA), and Corps of Engineers (Civil Works) have adopted environmental compliance programs that identify compliance problems before they are cited as violations by the U.S. Environmental Protection Agency. Since 1984, the U.S. Army Construction Engineering Research Laboratory, in cooperation with numerous Department of Defense (DOD) components, has developed environmental compliance assessment checklist manuals. The Environmental Assessment and Management (TEAM) Guide was developed for use by all DOD components. Currently there are five participating DOD components: the Air Force, Air National Guard, Army, Civil Works, and DLA. These agencies have agreed to share the development and maintenance of this Guide. The Guide combines Code of Federal Regulations and management practices into a series of checklists that show legal requirements and the specific operations or items to review. TEAM Guide is supplemented by DOD component-specific manuals detailing DOD component regulations and policies. The Florida Supplement was developed to be used in conjunction with the TEAM Guide, using existing Florida state environmental legislation and regulations as well as suggested management practices. 14. SUBJECT TERMS

Environmental Compliance Assessment and Management Program The Environmental Assessment and Management (TEAM) Guide Environmental Compliance Laws and Regulations Environmental Compliance Checklists

15. NUMBER OF PAGES

16. PRICE CODE

17. SECURITY CLASSIFICATION OF REPORT

Unclassified

18. SECURITY CLASSIFICATION OF THIS PAGE

Unclassified

19. SECURITY CLASSIFICATION OF ABSTRACT

Unclassified

20. LIMITATION OF ABSTRACT

SAR

NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89)

Page 17: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-1 Air Emissions Management

SECTION 1

AIR EMISSIONS MANAGEMENT

Florida Supplement, June 2000

This section covers the state requirements for Air Emissions Management and is intended to supplement the U.S. TEAM Guide. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

Definitions

• Acid Mist - liquid drops of any size of any acid including but not limited to sulfuric acid and sulfur trioxide, hydrochloric acid and nitric acid as measured by test methods approved by the Department (Florida Administrative Code, Title 62, Chapter 296, Section 200 (FAC 62-296.200)).

• Actual Emissions - the actual rate of emission of a pollutant from an emissions unit as determined in accordance

with the following provisions: 1. In general, actual emissions as of a particular date shall equal the average rate, in tons per year, at which

the emissions unit actually emitted the pollutant during a 2-yr period which precedes the particular date and which is representative of the normal operation of the emissions unit. The Department may allow the use of a different time period upon a determination that it is more representative of the normal operation of the emissions unit. Actual emissions shall be calculated using the emissions unit's actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period.

2. The Department may presume that unit-specific allowable emissions for an emissions unit are equivalent to the actual emissions of the emissions unit provided that, for any regulated air pollutant, such unit-specific allowable emissions limits are Federally enforceable.

3. For any emissions unit (other than an electric utility steam generating unit specified in subparagraph (4) of this definition) which has not begun normal operations on a particular date, actual emissions shall equal the potential emissions of the emissions unit on that date.

4. For an electric utility steam generating unit (other than a new unit or the replacement of an existing unit) actual emissions of the unit following a physical or operational change shall equal the representative actual annual emissions of the unit following the physical or operational change, provided the owner or operator maintains and submits to the Department on an annual basis for a period of 5 yr from the date the unit resumes regular operation, information demonstrating that the physical or operational change did not result in an emissions increase. A longer period, not to exceed 10 yr, may be required by the Department if it determines such a period to be more representative of the normal postchange operations of the unit. The definition of "representative actual annual emissions" found in 40 CFR 52.21(b)(33) is hereby incorporated by reference (FAC 62-296.200).

• Affected Pollutant - in a nonattainment area or area of influence the pollutant for which the area is designated

nonattainment is the affected pollutant except in the case of ozone nonattainment areas where the affected pollutant is volatile organic compounds (VOC) (FAC 62-296.200).

• Air Curtain Incinerator -

1. A portable or stationary combustion device that directs a plane of high velocity forced draft air through a manifold head into a pit with vertical walls in such a manner as to maintain a curtain of air over the surface of the pit and a recirculating motion of air under the curtain. An air curtain incinerator is controlled burning as defined in FAC 62-701.300(3) (FAC 62-256.200).

Page 18: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-2 Air Emissions Management

2. A portable or stationary combustion device that directs a plane of high velocity forced draft air through a manifold head into a pit with vertical walls in such a manner as to maintain a curtain of air over the surface of the pit and a recirculating motion of air under the curtain (FAC 62-296.200).

• Air-Dried Coating - coatings that are dried by the use of air or forced warm air at temperatures up to 194 F (90

C) (FAC 62-296.200). • Air Pollutant - Any substance (particulate, liquid, gaseous, organic or inorganic) which if released, allowed to

escape, or emitted, whether intentionally or unintentionally, into the outdoor atmosphere may result in or contribute to air pollution.

• Air Pollution -

1. The presence in the outdoor atmosphere of the state of any one or more substances or contaminants in quantities that are or may be potentially harmful or injurious to human health or welfare, animal or plant life, or property, or unreasonably interfere with the enjoyment of life or property, including outdoor recreation (FAC 62-256.200).

2. The presence in the outdoor atmosphere of the state of any one or more substances or pollutants in quantities that are or may be harmful or injurious to human health or welfare, animal or plant life, or property, or unreasonably interfere with the enjoyment of life or property, including outdoor recreation (FAC 62-296.200).

• Air Pollution Control Equipment -

1. Any equipment or feature installed by the manufacturer or replaced with a device or system equivalent in design and function to the part that was originally installed on the motor vehicle, which constitutes an operational element of the air pollution control system or mechanism of a motor vehicle (FAC 62-242.300).

2. Equipment, including that used to separate entrained particulate matter or organic vapors from gases, gas separation equipment, thermal oxidation equipment, and chemical reaction/conversion equipment, which is designed and used to reduce the discharge of a specific air pollutant to the atmosphere:

a. Destructive Control Device any device intended and designed for the reduction of VOC pollutant emissions from an emissions unit that alters the chemical composition of the pollutant flowing through the device.

b. Nondestructive Control Device any device intended and designed for the reduction of VOC pollutant emissions from an emissions unit that does not alter the chemical composition of the pollutant flowing through the device (FAC 62-296.200).

• Air Pollution Episode - any occurrence of elevated levels of pollutants in the atmosphere that require hasty and

unusual abatement action (FAC 62-256.200). • Air Quality Control Region - any air quality control region designated pursuant to Section 107 of the Clean Air

Act. The boundaries of the air quality control regions in Florida are set forth in 40 CFR Sections 81.49, 81.68, 81.91, 81.95, 81.96 and 81.97. A copy of the above referenced documents is available from the Superintendent of Documents, U.S. Government Printing Office, Washington, DC, and may be inspected at the Department's Tallahassee office (FAC 62-296.200).

• Allowable Emissions - the emission rate calculated using the maximum rated capacity of the emissions unit, as

limited or modified by any state or Federally enforceable restrictions on the operating rate or hours of operation, or both, and the most stringent state or Federal emission limiting standard applicable to the emissions unit; or the maximum allowable emission rate specified by any state or Federally enforceable permit conditions (FAC 62-296.200).

Page 19: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-3 Air Emissions Management

• Alternative Control Techniques Document or ACT - a guidance document issued by the U.S. Environmental Protection Agency under the Clean Air Act (42 U.S.C. s. 7511b), which identifies control alternatives for sources of volatile organic compounds (VOC) and nitrogen oxides (NO(x)) that emit more than 25 tons/yr (FAC 62-296.200).

• Ambient Air Quality Standard or Ambient Standard - a restriction established to limit the quantity or

concentration of an air pollutant that may be allowed to exist in the ambient air for any specific period of time. 1. National Ambient Air Quality Standard means an ambient standard established by EPA as listed in 40

CFR 50. 2. Primary Standard means an ambient standard established to protect public health. 3. Secondary Standard means an ambient standard established to protect the public welfare including the

protection of animal and plant life, property, visibility and atmospheric clarity, and the enjoyment of life and property.

4. State Ambient Air Quality Standard means an ambient standard established or adopted by the Department (FAC 62-296.200).

• Ancillary Equipment - the equipment used with a dry cleaning machine in a dry cleaning system, including

emission control devices, pumps, filters, muck cookers, stills, solvent tanks, solvent containers, water separators, exhaust dampers, diverter valves, interconnecting piping, hoses, and ducts (FAC 62-215.300(2)).

• Application Area - the area in which a coating is applied by spraying, dipping, or flowcoating techniques (FAC

62-296.200). • Approved Fuel - fuel approved by the Department to emit or release a minimum of pollutants when burned

(FAC 62-256.200). • Approved Refrigerant Recycling Equipment - equipment that is certified by Underwriters Laboratories or

another U.S. Environmental Protection Agency approved independent standards testing organization, and certified by the Department of Environmental Protection, to meet standards developed by the U.S. Environmental Protection Agency as provided for in the Clean Air Act Amendments of 1990 (42 U.S.C. 7671h). Such equipment may either recover and recycle refrigerant (recover/recycle equipment) or only recover refrigerant (recover-only equipment). Equipment purchased before the commencement of certification by Underwriters Laboratories or another independent standards testing organization shall be considered approved if it is determined by the U.S. Environmental Protection Agency to be substantially identical to equipment which has been certified to meet applicable standards (FAC 62-281.200).

• Area of Influence - an area which is outside the boundary of a nonattainment or air quality maintenance area but

within the locus of all points that are 50 km outside of the boundary of the nonattainment or air quality maintenance area (FAC 62-296.200).

• Area Source - a perchloroethylene dry cleaning facility which consumes an amount of perchloroethylene less

than 2100 gal/yr for dry-to-dry machines only, or consumes less than 1800 gal/yr and utilizes both dry-to-dry and transfer machines onsite (FAC 62-215.300(2)).

• Articles - any clothing, garments, textiles, fabrics, and leather goods that are dry cleaned (FAC 62-215.300(2)). • Asphalt - a dark brown to black cementitious material (solid, semisolid, or liquid in consistency) in which the

predominating constituents are bitumens that occur in nature as such or which are obtained as a residue in refining petroleum (FAC 62-296.200).

Page 20: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-4 Air Emissions Management

• Batch Process - a process that takes in the basic raw materials at the beginning of a cycle and processes them in accordance with a predetermined scheme during which no more basic raw materials are added to the process. Two variations include:

1. Processes in which some of the reactants (materials) are added at the beginning with the remainder added as the reaction progresses.

2. Processes in which once the materials are added, one or more products are continuously removed as the reaction progresses. Such processes include, but are not limited to, production of super phosphate, basic oxygen furnaces, and cement batch plants (FAC 62- 296.200).

• Best Available Control Technology or BACT - an emission limitation, including a visible emissions standard,

based on the maximum degree of reduction of each pollutant emitted which the Department, on a case by case basis, taking into account energy, environmental and economic impacts, and other costs, determines is achievable through application of production processes and available methods, systems and techniques (including fuel cleaning or treatment or innovative fuel combustion techniques) for control of each such pollutant:

1. If the Department determines that technological or economic limitations on the application of measurement methodology to a particular part of an emissions unit or facility would make the imposition of an emission standard infeasible, a design, equipment, work practice, operational standard or combination thereof, may be prescribed instead to satisfy the requirement for the application of BACT. Such standard shall, to the degree possible, set forth the emissions reductions achievable by implementation of such design, equipment, work practice or operation.

2. Each BACT determination shall include applicable test methods or shall provide for determining compliance with the standard(s) by means which achieve equivalent results (FAC 62-296.200).

• Biohazardous Waste - any solid waste or liquid waste that may present a threat of infection to humans. The term

includes, but is not limited to, nonliquid human tissue and body parts; laboratory and veterinary waste which contain human-disease-causing agents; discarded sharps; human blood, human blood products, and body fluids. The following are also included:

1. Used absorbent materials such as bandages, gauzes, or sponges supersaturated, having the potential to drip or splash, with blood or body fluids from areas such as operating rooms, delivery rooms, trauma centers, emergency rooms, or autopsy rooms.

2. Devices that retain visible blood adhering to inner surfaces after use and rinsing such as intravenous tubing, hemodialysis filters, and catheters. Medical devices used in the treatment of hepatitis B virus or human immunodeficiency virus suspected or positive patients shall be segregated as biohazardous waste.

3. Other contaminated solid waste materials that represent a significant risk of infection because they are generated in medical facilities which care for persons suffering from diseases requiring strict isolation criteria and listed by the United States Department of Health and Human Services, Centers for Disease Control, "CDC Guideline for Isolation Precautions in Hospitals," July/August 1983 (FAC 62-296.200).

• Biological Waste - solid waste that causes or has the capability of causing disease or infection and includes, but

is not limited to, biohazardous waste, diseased or dead animals, and other wastes capable of transmitting pathogens to humans or animals (FAC 62-296.200).

• Biological Waste Incineration Facility - one or more incinerators located on one or more contiguous or adjacent

properties which is/are operated or utilized for the disposal or treatment of biological waste and is/are owned or operated by the same person or by persons under common control (FAC 62-296.200).

• Biweekly - any consecutive 14-day period of time (FAC 62-215.300(2)). • Calibration Gas - a gas of known concentration and mixture that is used to establish the response curve of an

exhaust gas analyzer. The calibration gas concentration shall be certified and documented by the manufacturer

Page 21: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-5 Air Emissions Management

in accordance with the appropriate National Institute of Standards and Technology (NIST) protocol (FAC 62-242.300).

• Capture System - all equipment, including hoods, ducts, fans, booths, ovens, dryers, etc., used to contain,

collect, capture, or transport a pollutant to a control device (FAC 62-296.200). • Carbon Adsorber - a bed of activated carbon into which a contaminant gas-vapor stream is routed and which

adsorbs the contaminant (FAC 62-215.300(2)). • Carbon Adsorption System - a device containing adsorbent material (e.g., activated carbon, aluminum, silica

gel); an inlet and outlet for exhaust gases; and a system to regenerate the saturated adsorbent. The carbon adsorption system must provide for the proper disposal or reuse of all VOC adsorbed (FAC 62-296.200).

• Carbonaceous Fuel - solid materials composed primarily of vegetative matter such as tree bark, wood waste, or

bagasse (FAC 62-296.200). • Carbonaceous Fuel Burning Equipment - a firebox, furnace or combustion device which burns carbonaceous

and fossil fuels for the primary purpose of producing steam or to heat other liquids or gases. The term includes bagasse burners, bark burners, and waste wood burners, but does not include teepee or conical wood burners or incinerators (FAC 62-296.200).

• Cause or Contribute - with respect to a violation of an ambient air quality standard, to have a significant impact

on the ambient air concentration of a pollutant at any locality that does not or would not meet the applicable standard (FAC 62-296.200).

• Clean Dry Wood - wood (including lighter pine), lumber or tree and shrub trunks, branches, and limbs which are

free of paint, pentachlorophenol, creosote, tar, asphalt, or other wood preservatives and which when burned does not emit excessive visible emissions (FAC 62-256.200).

• Clear Coat - a coating which lacks color and opacity or is transparent and uses the undercoat as a reflectant base

or undertone color (FAC 62-296.200). • Coating - the application of a protective, decorative, or functional film to a surface (FAC 62296.200). • Coating Application System - any operations and equipment which apply, convey, and dry a surface coating,

including, but not limited to, spray booths, flow coaters, conveyors, flashoff areas, air dryers and ovens (FAC 62-296.200).

• Coating Applicator - an apparatus used to apply a surface coating to a surface (FAC 62-296.200). • Coating Line - one or more apparatus or operations which include a coating applicator, flashoff area, and oven

wherein a surface coating is applied, dried and/or cured (FAC 62-296.200). • Coil Coating - the coating of any flat metal sheet or strip that comes in rolls or coils (FAC 62-296.200). • Coin-operated Dry Cleaning Machine - a dry cleaning machine that is operated solely by the customer (FAC

62-215.300(2)). • Cold Cleaning - the batch process of cleaning and removing soils from metal surfaces by brushing, flushing or

immersion while maintaining the solvent below its boiling point. Wipe cleaning is not included in this definition (FAC 62-296.200).

Page 22: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-6 Air Emissions Management

• Cold Mixed Asphaltic Concrete Patching Material - a mixture of asphalt cement, stone aggregate, and mineral filler blended together with a small amount of petroleum solvent (diluent). The diluent prevents the material from hardening after the heat of mixing has dissipated, thereby allowing stockpile storage of the material for use in pavement repairs when the use of hot asphaltic concrete is impractical (FAC 62-296.200).

• Colorimetric Detector Tube - a glass tube containing material impregnated with a chemical which visibly reacts

to the analyte in order to allow measurement of the concentration of that analyte in the air (FAC 62-215.300(2)). • Commence Construction - as applied to the construction or modification of a facility, means that the owner has

all preconstruction permits and approvals required under Federal air pollution control laws and regulations and those air pollution control laws and regulations which are part of the State Implementation Plan (SIP) or which are part of FAC 62-210 or FAC 62-212, to the extent that the provisions of these laws and regulations specify conditions or requirements for obtaining a state construction permit for an emissions unit, and has:

1. Begun, or caused to begin, a continuous program of actual onsite construction or physical modification of the facility, to be completed within a reasonable time.

2. Entered into binding agreements or contractual obligations, which cannot be canceled or modified without substantial loss to the owner or operator, to undertake a program of actual construction or physical modification of the facility to be completed within a reasonable time; or

3. Begun, or caused to begin, those onsite activities, other than preparatory activities, which mark the initiation of a change in the method of operation of the facility (FAC 62-296.200).

• Complete - in reference to an application for a permit, means that the application contains all of the information

necessary for processing the application (FAC 62-296.200). • Condensate - hydrocarbon liquid separated from natural gas which condenses due to changes in the temperature

and/or pressure and remains liquid at standard conditions (FAC 62-296.200). • Condensate Stripper System - a column and associated condensers, used to strip, with air or steam, total reduced

sulfur (TRS) compounds from contaminated condensate streams (FAC 62296.200). • Constant Four-wheel Drive Vehicle - any four-wheel drive vehicle that cannot be converted to a two-wheel

drive vehicle except by removing one of the vehicle's drive shafts (FAC 62-242.300). • Construction - the act of performing onsite fabrication, erection, installation or modification of an emissions unit

or facility of a permanent nature, including installation of foundations or building supports; laying of underground pipe work or electrical conduit; and fabrication or installation of permanent storage structures, component parts of an emissions unit or facility, associated support equipment, or utility connections. Land clearing and other site preparation activities are not a part of the construction activities (FAC 62-296.200).

• Continuous Monitoring System - all equipment required under applicable rules used to calibrate, sample,

condition (if applicable), and analyze air pollutant emissions, or used to provide a permanent record of emissions or process parameters (FAC 62-296.200).

• Continuous Unloader - a bulk materials unloading system that is normally installed at wharf or pier side. A

typical system is essentially of enclosed construction, providing for dust abatement and weather tightness, utilizing screw conveyors, elevators, conveyor belt arrangements, or similar devices to facilitate basically uninterrupted discharge of materials from vessel cargo holds (FAC 62296.200).

• Control Techniques Guidelines Document or CTG - a guidance document issued by the U.S. Environmental

Protection Agency under the Clean Air Act (42 U.S.C. s. 7511b) which defines reasonably available control technology (RACT) and presumptive RACT limits for a source category (FAC 62-296.200).

Page 23: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-7 Air Emissions Management

• Conveyorized Degreasing - the continuous process of cleaning and removing soils from metal surfaces by operating with either cold or vaporized solvents.

• Cutback Asphalt - asphalt cement that has been liquefied by blending with petroleum solvents (diluents). Upon

exposure to atmospheric conditions, the diluents evaporate, leaving the asphalt cement to perform its function (FAC 62-296.200).

• Department - the State of Florida Department of Environmental Protection (FAC 62-242.300; FAC 62-256.200

and FAC 62-296.200). • Department Air Stagnation Advisory - a temporary prohibition of open burning activities by the Department that

is based upon a Department forecast of a stagnant atmospheric meteorological condition that does not allow the dispersion of air pollutants (FAC 62-256.200).

• Desorption - the regeneration of a carbon adsorber by removal of the contaminant adsorbed onto the carbon

(FAC 62-215.300(2)). • Diverter Valve - a flow control device that directs air through a refrigerated condenser when the door of the dry

cleaning machine is opened (FAC 62-215.300(2)). • Dry Cleaning - the process of cleaning articles using petroleum-based or synthetic solvents (FAC 62-

215.300(2)). • Dry Cleaning Cycle - the washing and drying of articles in a dry-to-dry or transfer machine system (FAC 62-

215.300(2)). • Dry Cleaning Facility -

1. An establishment with one or more dry cleaning systems (FAC 62-215.300(2)). 2. A facility engaged in the cleaning of fabrics in a nonaqueous solvent by means of one or more washes in

solvent, extraction of excess solvent by spinning, and drying by tumbling in an airstream. The facility includes: washer, dryer, filter and purification systems; ; waste disposal systems; holding tanks; pumps and attendant piping and valves (FAC 62-296.200).

• Dry Cleaning Machine - a dry-to-dry machine or each machine of a transfer machine system (FAC 62-

215.300(2)). • Dry Cleaning Machine Drum - the perforated container inside the dry cleaning machine that holds articles

during the cleaning process (FAC 62-215.300(2)). • Dry Cleaning System - a dry-to-dry machine and its ancillary equipment or a transfer machine and its ancillary

equipment (FAC 62-215.300(2)). • Dryer - a machine used to remove solvent from articles by tumbling them in a heated air stream (see reclaimer)

(FAC 62-215.300(2)). • Dry-to-Dry Machine - a one-machine dry cleaning operation in which washing and drying are performed in the

same machine (FAC 62-215.300(2)). • Dynamometer - an instrument for measuring mechanical power of an automobile engine. Usually this unit is

comprised of floor mounted steel rollers upon which the power wheels of the car are driven and the power measured (FAC 62-242.300).

Page 24: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-8 Air Emissions Management

• Emission - the discharge or release into the atmosphere of one or more air pollutants (FAC 62296.200). • Emission Limiting Standard or Emission Standard or Emission Limitation or Performance Standard - any

restriction established in or pursuant to a regulation adopted by the Department which limits the quantity, rate, concentration or opacity of any pollutant released, allowed to escape or emitted, whether intentionally or unintentionally, into the atmosphere, including any restriction which prescribes equipment, sets fuel specifications, or prescribes operation or maintenance procedures for an emissions unit to assure emission reduction or control (FAC 62-296.200).

• Emission Point or Discharge Point - the point at which an air pollutant first enters the atmosphere (FAC 62-

296.200). • Emissions Inspection or Inspection - the determination of the level of exhaust emissions from a motor vehicle

and, when applicable, the performance of a three-point component check (FAC 62-242.300). • Emissions Inspector - the individual who performs the motor vehicle emissions inspection whether in an

inspection station, a reinspection station, or a self-inspection station (FAC 62- 242.300). • Emissions Unit - any part or activity of a facility that emits or has the potential to emit any air pollutant (FAC

62-296.200). • Emulsified Asphalt - an emulsion of asphalt cement and water which contains a small amount of an emulsifying

agent; a heterogeneous system containing two normally immiscible phases (asphalt and water) in which the water forms the continuous phase of the emulsion, and minute globules of asphalt form the discontinuous phase (FAC 62-296.200).

• Establishment - any business or other public or private entity, operated at a single fixed location, required to be

certified under the criteria set forth in FAC 62-281.300, "Applicability" (FAC 62-281.200). • Excess Emissions - emissions of pollutants in excess of those allowed by any applicable air pollution rule of the

Department, or by a permit issued pursuant to any such rule or FAC 62-4. The term applies only to conditions which occur during startup, shutdown, sootblowing, load changing, or malfunction (FAC 62-296.200).

• Excessive Visible Emissions - air pollutants emitted in such quantity as to obscure an observer's view to a degree

equal to or greater than Number two (or 40 percent opacity) on the Ringelmann Smoke Chart as published in the U.S. Bureau of Mines Information Circular No. 7718 (FAC 62-256.200).

• Exhaust Damper - a flow control device that prevents the contaminant gas-vapor stream from exiting the

emission unit into a carbon adsorber before room air is drawn into the dry cleaning machine (FAC 62-215.300(2)).

• Exhaust Emissions - substances emitted into the atmosphere from the tailpipe(s) of a motor vehicle (FAC 62-

242.300). • Exhaust Gas Analyzer - a device which employs industry-recognized gas analyzer technology and which will

provide vehicle exhaust gas analysis data of acceptable accuracy and precision for CO, hydrocarbons (HC) and CO2, and with capability for NO (FAC 62-242.300).

• Existing - facilities or emissions units which commenced construction or reconstruction or were purchased

before 9 December 1991 (FAC 62-215.300(2)).

Page 25: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-9 Air Emissions Management

• Existing Emissions Unit - an emissions unit which was in existence, in operation, or under construction, or had received a permit to begin construction prior to 18 January 1972. However, "existing emissions unit" for the purposes of FAC 62-296.700 through FAC 62-296.712 and FAC 62212.500, shall mean any emissions unit which is not defined as a new emissions unit with respect to a specific rule or provision of any of those sections. For the purpose of FAC 62-296.500 through FAC 62-296.512, existing emissions units are those emissions units which were constructed or for which a construction permit was issued prior to 1 July 1979 (FAC 62-296.200).

• Exterior Base Coating - a coating applied to the exterior of a can to provide exterior protection to the metal and

background for the lithographic or printing operation (FAC 62-296.200). • Extinguished - the absence of any visible flames, smoke or emissions (FAC 62-256.200). • Extreme Performance Coating - coating designed to withstand exposure to harsh conditions such as continuous

weather exposure and temperatures consistently above 203 F (95 C), or abrasive and scouring agents (FAC 62-296.200).

• Facility - all of the emissions units which are located on one or more contiguous or adjacent properties and

which are under the control of the same person (or persons under common control) (FAC 62-296.200). • Federally Enforceable - Pertaining to limitations and conditions which are enforceable by the Administrator,

including any requirements developed pursuant to Title 40 of the Code of Federal Regulations, any requirements within the State Implementation Plan, and any requirements established pursuant to permits issued under:

1. The state Title V permit program; 2. Rule 62-210.300(2)(b), F.A.C.; 3. 40 CFR 52.21; or 4. Rule 62-210.300, 62-212.400, 62-212.500, 17-500(transferred), 17-2.510(transferred), 17-

2.520(transferred), or 17-2.17(repealed), F.A.C. • Filter - a porous device through which perchloroethylene is passed to remove contaminants in suspension.

Examples include lint filter (button trap), cartridge filter, tubular filter, regenerative filter, prefilter, polishing filter, and spin disc filter (FAC 62-215.300(2)).

• Firebox - the chamber or compartment of a boiler or furnace in which materials are burned but does not mean

the combustion chamber of an incinerator (FAC 62-296.200). • Flashoff Area - the space between the application area and the oven (FAC 62-296.200). • Flexographic Printing - the application of words, designs and pictures to a substrate by means of a roll printing

technique in which the pattern to be applied is raised above the printing roll and the image carrier is made of rubber or other elastomeric materials (FAC 62-296.200).

• Fossil Fuel - natural gas, petroleum, coal, or any form of solid, liquid, or gaseous fuel derived from such

material (FAC 62-296.200). • Fossil Fuel Steam Generators - a furnace or boiler which produces steam by combustion of oil, coal, or gas of

fossil origin (FAC 62-296.200). • Freeboard Height -

1. For heated vapor degreasers is the distance from the top of the vapor zone to the top of the degreaser tank. 2. For cold cleaning degreasers is the distance from the solvent to the top edge of the cold cleaner (FAC 62-

296.200).

Page 26: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-10 Air Emissions Management

• Freeboard Ratio - the freeboard height divided by the width of the degreaser (FAC 62-296.200). • Fuel - any material that is burned within the confines of a vehicle that serves as the energy source for propelling

the vehicle (FAC 62-242.300). • Fugitive Emissions - those emissions which could not reasonably pass through a stack, chimney, vent or other

functionally equivalent opening (FAC 62-296.200). • Garbage - all kitchen and table food waste, animal or vegetative waste that is attendant with or results from the

storage, packaging, preparation, cooking or handling of food materials (FAC 62-256.200). • Gross Vehicle Weight (GVW) - the gross vehicle weight of a motor vehicle as specified by Section 320.01 F.S.

(FAC 62-242.300). • Group I Containers - combustible containers which formerly contained organic or metallo-organic pesticides,

except organic mercury, lead, cadmium, or arsenic compounds (FAC 62- 256.200). • Halogenated Organic Compound - any organic compound in which one or more hydrogen atoms have been

replaced by a halogen atom(s) (FAC 62-296.200(128)(a)). • Hazardous Air Pollutant (HAP) - an air pollutant:

1. Identified by the CAS number or chemical name from the following list: CAS Number Chemical Name 1. 750 Acetaldehyde 2. 60355 Acetamide 3. 75058 Acetonitrile 4. 98862 Acetophenone 5. 539632- Acetylaminofluorene 6. 107028 Acrolein 7. 79061 Acrylamide 8. 79107 Acrylic acid 9. 107131 Acrylonitrile 10. 107051 Allyl chloride 11. 92671 4-Aminobiphenyl 12. 62533 Aniline 13. 90040 o-Anisidine 14. 0 Antimony Compounds 15. 0 Arsenic Compounds (inorganic including arsine) 16. 1332214 Asbestos 17. 71432 Benzene (including benzene from gasoline) 18. 92875 Benzidine 19. 98077 Benzotrichloride 20. 100447 Benzyl chloride 21. 0 Beryllium Compounds 22. 92524 Biphenyl 23. 117817 Bis(2-ethylhexyl)phthalate (DEHP) 24. 542881 Bis(chloromethyl)ether 25. 75252 Bromoform 26. 106990 1,3-Butadiene 27. 0 Cadmium Compounds 28. 156627 Calcium cyanamide 29. 105602 Caprolactam

Page 27: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-11 Air Emissions Management

CAS Number Chemical Name 30. 133062 Captan 31. 63252 Carbaryl 32. 75150 Carbon disulfide 33. 56235 Carbon tetrachloride 34. 463581 Carbonyl sulfide 35. 120809 Catechol 36. 133904 Chloramben 37. 57749 Chlordane 38. 7782505 Chlorine 39. 79118 Chloroacetic acid 40. 532274 2-Chloroacetophenone 41. 108907 Chlorobenzene 42. 510156 Chlorobenzilate 43. 67663 Chloroform 44. 107302 Chloromethyl methyl ether 45. 126998 Chloroprene 46. 0 Chromium Compounds 47. 0 Cobalt Compounds 48. 0 Coke Oven Emissions 49. 1319773 Cresols/Cresylic acid (isomers and mixture) 50. 95487 o-Cresol 51. 108394 m-Cresol 52. 106445 p-Cresol 53. 98828 Cumene 54. 0 Cyanide Compounds (XCN where X = H or any other group where a

formal dissociation may occur. For example KCN or Ca(CN)2.) 55. 94757 2,4-D, salts and esters 56. 3547044 DDE 57. 334883 Diazomethane 58. 132649 Dibenzofurans 59. 96128 1,2-Dibromo-3-chloropropane 60. 84742 Dibutylphthalate 61. 106467 1,4-Dichlorobenzene(p) 62. 91941 3,3-Dichlorobenzidene 63. 111444 Dichloroethyl ether (Bis(2-chloroethyl)ether) 64. 542756 1,3-Dichloropropene 65. 62737 Dichlorvos 66. 111422 Diethanolamine 67. 121697 N,N-Diethyl aniline (N,N-Dimethylaniline) 68. 64675 Diethyl sulfate 69. 119904 3,3-Dimethoxybenzidine 70. 60117 Dimethyl aminoazobenzene 71. 1119937 3,3-Dimethyl benzidine 72. 79447 Dimethyl carbamoyl chloride 73. 68122 Dimethyl formamide 74. 57147 1,1-Dimethyl hydrazine 75. 131113 Dimethyl phthalate 76. 77781 Dimethyl sulfate 77. 534521 4,6-Dinitro-o-cresol, and salts 78. 51285 2,4-Dinitrophenol 79. 121142 2,4-Dinitrotoluene 80. 123911 1,4-Dioxane (1,4-Diethyleneoxide)

Page 28: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-12 Air Emissions Management

CAS Number Chemical Name 81. 122667 1,2-Diphenylhydrazine 82. 106898 Epichlorohydrin (1-Chloro-2,3-epoxypropane) 83. 106887 1,2-Epoxybutane 84. 140885 Ethyl acrylate 85. 100414 Ethyl benzene 86. 51796 Ethyl carbamate (Urethane) 87. 75003 Ethyl chloride (Chloroethane) 88. 106934 Ethylene dibromide (Dibromoethane) 89. 107062 Ethylene dichloride (1,2-Dichloroethane) 90. 107211 Ethylene glycol 91. 151564 Ethylene imine (Aziridine) 92. 75218 Ethylene oxide 93. 96457 Ethylene thiourea 94. 75343 Ethylidene dichloride (1,1-Dichloroethane) 95. 0000 Formaldehyde 96. 0 Glycol ethers (includes mono and di-ethers of ethylene glycol,

diethylene glycol, and triethylene glycol R(OCH2CH2)( n)-OR' where n = 1, 2, or 3, R = alkyl or aryl groups, and R' = R, H, or groups which, when removed, yield glycol ethers with the structure: R- (OCH2CH) (n)-OH. Polymers are excluded from the glycol category.)

97. 76448 Heptachlor 98. 118741 Hexachlorobenzene 99. 87683 Hexachlorobutadiene 100. 77474 Hexachlorocyclopentadiene 101. 67721 Hexachloroethane 102. 822060 Hexamethylene-1,6-diisocynate 103. 680319 Hexamethylphosphoramide 104. 110543 Hexane 105. 302012 Hydrazine 106. 7647010 Hydrochloric acid 107. 7664393 Hydrogen fluoride (Hydrofluoric acid) 108. 123319 Hydroquinone 109. 78591 Isophorone 110. 0 Lead Compounds 111. 58899 Lindane (all isomers) 112. 108316 Maleic anhydride 113. 0 Manganese Compounds 114. 0 Mercury Compounds 115. 67561 Methanol 116. 72435 Methoxychlor 117. 74839) Methyl bromide (Bromomethane 118. 74873) Methyl chloride (Chloromethane 119. 71556 Methyl chloroform (1,1,1-Trichloroethane) 120. 78933 Methyl ethyl ketone (2-Butanone) 121. 60344 Methyl hydrazine 122. 74884 Methyl iodide (Iodomethane) 123. 108101 Methyl isobutyl ketone (Hexone) 124. 624839 Methyl isocyanate 125. 80626 Methyl methacrylate 126. 1634044 Methyl tert butyl ether 127. 101144 4,4- Methylene bis (2-chloroaniline) 128. 75092 Methylene chloride (Dichloromethane)

Page 29: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-13 Air Emissions Management

CAS Number Chemical Name 129. 101688 Methylene diphenyl diisocyanate (MDI) 130. 101779 4,4-Methylenedianiline 131. 0 Mineral fibers (fine), includes mineral fiber emissions from facilities

manufacturing or processing glass, rock, or slag fibers (or other mineral derived fibers) of average diameter 1 micrometer or less.

132. 91203 Naphthalene 133. 0 Nickel Compounds 134. 98953 Nitrobenzene 135. 92933 4-Npitrobiphenyl 136. 100027 4-Nitrophenol 137. 79469 2-Nitropropane 138. 684935 N-Nitroso-N-methylurea 139. 62759 N-Nitrosodimethylamine 140. 59892 N-Nitrosomorpholine 141. 56382 Parathion 142. 82688 Pentachloronitrobenzene (Quintobenzene) 143. 87865 Pentachlorophenol 144. 108952 Phenol 145. 106503 p-Phenylenediamine 146. 75445 Phosgene 147. 7803512 Phosphine 148. 7723140 Phosphorus 149. 85449 Phthalic anhydride 150. 1336363 Polychlorinated biphenyls (Aroclors) 151. 0 Polycyclic organic matter (includes organic compounds with more than

one benzene ring, and which have a boiling point greater than or equal to 100 C)

152. 1120714 1,3-Propane sultone 153. 57578 beta-Propiolactone 154. 123386 Propionaldehyde 155. 114261 Propoxur (Baygon) 156. 78875 Propylene dichloride (1,2-Dichloropropane) 157. 75569 Propylene oxide 158. 75558 1,2-Propylenimine (2-Methyl aziridine) 159. 91225 Quinoline 160. 106514 Quinone 161. 0 Radionuclides (including radon), a type of atom which spontaneously

undergoes radioactive decay 162. 0 Selenium Compounds 163. 100425 Styrene 164. 96093 Styrene oxide 165. 1746016 2,3,7,8-Tetrachlorodibenzo-p-dioxin 166. 79345 1,1,2,2-Tetrachloroethane 167. 127184 Tetrachloroethylene (Perchloroethylene) 168. 7550450 Titanium tetrachloride 169. 108883 Toluene 170. 95807 2,4-Toluene diamine 171. 584849 2,4-Toluene diisocyanate 172. 95534 o-Toluidine 173. 8001352 Toxaphene (chlorinated camphene) 174. 120821 1,2,4-Trichlorobenzene 175. 79005 1,1,2-Trichloroethane

Page 30: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-14 Air Emissions Management

CAS Number Chemical Name 176. 79016 Trichloroethylene 177. 95954 2,4,5-Trichlorophenol 178. 88062 2,4,6-Trichlorophenol 179. 121448 Triethylamine 180. 1582098 Trifluralin 181. 540841 2,2,4-Trimethylpentane 182. 108054 Vinyl acetate 183. 593602 Vinyl bromide 184. 75014 Vinyl chloride 185. 75354 Vinylidene chloride (1,1-Dichloroethylene) 186. 1330207 Xylenes (isomers and mixtures) 187. 95476 o-Xylenes 188. 108383 m-Xylenes 189. 106423 p-Xylenes

2. For all listings above that contain the word "compounds" and for glycol ethers, the following applies:

unless otherwise specified, these listings are defined as including the named chemical and any unique chemical substance that contains the named chemical (i.e., antimony, arsenic, etc.) as part of that chemical's infrastructure (FAC 62-212.200).

• Heating Coil - a device used to heat the air stream recirculated from the dry cleaning machine drum following

condensation of perchloroethylene from the air stream and prior to re-entering the dry cleaning machine drum (FAC 62-215.300(2)).

• Human Crematory - any combustion apparatus used solely for the cremation of dead human bodies with

appropriate containers as described in FAC 62-296.401(5)(e) (FAC 62-296.200). • Hydrocarbon - any organic compound of carbon and hydrogen only (FAC 62-296.200). • Idle - the engine revolutions per minute (rpm) with the vehicle in "neutral" or "park" and no pressure on the

throttle (FAC 62-242.300). • Idle Mode Test - an exhaust emissions test conducted at idle conditions as specified in 40 CFR 85.2212 (FAC

62-242.300). • Incinerator - a combustion apparatus designed for the ignition and burning of solid, semisolid, liquid or gaseous

combustible wastes (FAC 62-296.200). • Innovative Control Technology - any system of air pollution control that has not been adequately demonstrated

in practice, but would have a substantial likelihood of achieving greater continuous emissions reduction than any control system in current practice or of achieving at least comparable reductions at lower cost in terms of energy, economics, or nonair quality environmental impacts (FAC 62-296.200).

• Inspection Lane - an area located within an inspection station, reinspection station, or self-inspection station

which is devoted to and maintained for motor vehicle inspections conducted pursuant to the Florida Clean Outdoor Air Law. In reinspection stations and self-inspection stations this lane may be used for emissions related repairs (FAC 62-242.300).

• Inspection Station - a facility, other than a reinspection or self-inspection station, situated in a permanent

structure or a mobile unit, for the purpose of conducting emissions inspections of motor vehicles as required by the Florida Clean Outdoor Air Law (FAC 62-242.300).

Page 31: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-15 Air Emissions Management

• Interior Base Coating - a coating applied by roller coater or spray to the interior of a can to provide a protective

lining between the can metal and product (FAC 62-296.200). • Interior Body Spray - a coating sprayed on the interior of the can body to provide a protective film between the

product and the can (FAC 62-296.200). • Knife Coating - the application of a coating material to a substrate by means of drawing the substrate beneath a

knife that spreads the coating evenly over the full width of the substrate (FAC 62-296.200). • Kraft Recovery Furnace - Any straight kraft recovery furnace or cross furnace used to recover chemicals

consisting of primarily sodium and sulfur by burning black liquor. If the kraft recovery furnace is equipped with a direct contact evaporator or wet-bottom electrostatic precipitator, this equipment shall be considered part of the kraft recovery furnace(62-296.200).

• Land-Clearing Debris - uprooted or cleared vegetation resulting from a land clearing operation and does not

include yard trash (FAC 62-256.200). • Land-Clearing Operation - the uprooting or clearing of vegetation in connection with construction for buildings,

rights-of-way, residential, commercial, or industrial development, or the initial clearing of vegetation to enhance property value; but does not include the maintenance burning of yard trash resulting from fallen limbs, branches, or leaves, or any other routine property clean-up activities (FAC 62-256.200).

• Large Area Source - a dry cleaning facility that:

1. Contains only dry-to-dry machines and consumes between 140 and 2100 gal/yr of perchloroethylene. 2. Contains only transfer machines and consumes between 200 and 1800 gal/yr of perchloroethylene. 3. Contains both dry-to-dry and transfer machines and consumes between 140 and 1800 gal/yr of

perchloroethylene (FAC 62-215.300(2)). • Loaded Mode Preconditioning - placing the vehicle's drive wheels on a chassis dynamometer, placing the

vehicle's transmission in "drive" for automatics or 3rd gear for manual shift, operating the vehicle at the appropriate roll speed as specified in FAC 62-242.600(2), for gasoline engines for 30 s, and then returning the vehicle to idle speed for completion of an idle mode test (FAC 62242.300).

• Low Solvent Coating - coatings which contain less organic solvent than the conventional coatings used by the

industry. Low solvent coatings include waterborne, higher solids, electrodeposition and powder coatings (FAC 62-296.200).

• Lowest Achievable Emission Rate or LAER - an allowable emission rate determined in accordance with the

provisions of FAC 62-212.510. This term applied to a modification means the lowest achievable emission rate for that portion of the facility which is modified (FAC 62-296.200).

• Major Facility - any facility which emits, or has the potential to emit:

1. 5 tons/yr or more of lead or lead compounds, measured as elemental lead 2. 30 tons/yr or more of acrylonitrile 3. 100 tons/yr or more of any other air pollutant subject to regulation under Chapter 403, Florida Statutes

(FAC 62-296.200). • Major Source - a dry cleaning facility that consumes an amount of perchloroethylene exceeding 2100 gal/yr for

dry-to-dry machines only or exceeding 1800 gal/yr for both dry-to-dry and transfer machines (FAC 62-215.300(2)).

Page 32: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-16 Air Emissions Management

• Malfunction - any unavoidable mechanical and/or electrical failure of air pollution control equipment or process equipment or of a process resulting in operation in an abnormal or unusual manner (FAC 62-296.200).

• Maximum Uncontrolled Emissions - the maximum capacity of an emissions unit or facility to emit a pollutant

under its physical and operational design, including any quantifiable fugitive and unconfined emissions and excluding any restrictions on hours of operation or on the type or amount of material that may be combusted, stored, or processed and any air pollution control equipment, methods, or techniques that may be used. The maximum uncontrolled emission rate is the maximum emission rate that would occur absent the use of any air pollution control equipment, methods, or techniques and absent any regulatory restrictions on hours of operation or on the type or amount of fuels or materials combusted, stored, or processed, when the emissions unit is operated at its maximum physical and operational capacity. The maximum uncontrolled emissions of an emissions unit or facility do not include any secondary emissions that may be associated with the emissions unit or facility (FAC 62-296.200).

• Minor Betterment of Public Roads - improvements to existing public roads intended to increase their safety and

serviceability as the need is dictated by increased traffic levels, or other changes in their use. These improvements could include, but are not limited to, the extension or construction of acceleration lanes, deceleration lanes, turning storage lanes, or median crossovers (FAC 62-296.200).

• Minor Facility - any facility that is not a major facility (FAC 62-296.200). • Mobile Service Unit - a motor vehicle or trailer equipped with approved refrigerant recycling equipment,

working as part of a certified establishment, which travels to motor vehicles off the premises of the certified establishment to perform servicing of air conditioning equipment (FAC 62-281.200).

• Modification - any physical change in, change in the method of operation of, or addition to a facility that would

result in an increase in the actual emissions of any air pollutant subject to legislation under the Act, including any not previously emitted, from any emissions unit or facility.

1. A physical change or change in the method of operation shall not include: a. routine maintenance, repair, or replacement of component parts of an emissions unit b. a change in ownership of an emissions unit or facility.

2. For any pollutant that is specifically regulated by the EPA under the Clean Air Act, a change in the method of operation shall not include an increase in the hours of operation or in the production rate, unless such change would be prohibited under any Federally enforceable permit condition which was established after 6 January 1975.

3. For any pollutant that is not specifically regulated by the EPA under the Clean Air Act, a change in the method of operation shall not include an increase in the hours of operation or in the production rate, unless such change would exceed any restriction on hours of operation or production rate included in any applicable Department air construction or air operation permit (FAC 62-296.200).

• Motor Vehicle -

1. any self-propelled vehicle required to be registered under Section 320.02, F.S. (FAC 62-242.300) 2. any vehicle which is self-propelled, excluding watercraft and aircraft, and any vehicle which is propelled

by electric power obtained from overhead trolley wires, but not operated upon rails (FAC 62-281.200). • Motor Vehicle Air-Conditioner - mechanical vapor compression refrigeration equipment used to cool the

driver's or passenger compartment of any motor vehicle. This definition is not intended to encompass the hermetically sealed refrigeration systems used on motor vehicles for refrigerated cargo (FAC 62-281.200).

• Motor Vehicle Inspection Program or MVIP - the emissions inspection program established under the Clean

Outdoor Air Law and administered by the Department of Highway Safety and Motor Vehicles (FAC 62-242.300).

Page 33: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-17 Air Emissions Management

• Muck Cooker - a device for heating waste material containing solvent in order to volatilize and recover the

solvent (FAC 62-215.300(2)). • Multipoint Calibration - calibration of the exhaust gas analyzer with a Department-approved standard

calibration gas mixture with the range of calibration including zero and two upscale points as follow (FAC 62-242.300):

Span Points

Low High 300 ppm propane 1200 ppm propane 1.0% CO 4.0% CO 6.0% CO2 12.0% CO2 1000 ppm NO 3000 ppm NO

• National Weather Service Air Stagnation Advisory - an advisory issued by the National Weather Service to

caution local and regional agencies of meteorological conditions which are conducive to poor dispersion and that are expected to persist for at least 36 h (FAC 62-256.200).

• Net Weight - the net weight of a motor vehicle as specified by Section 320.01, F.S. (FAC 62-242.300). • New - facilities or emissions units which commenced construction or reconstruction or were purchased on or

after 9 December 1991 (FAC 62-215.300(2)). • New Emissions Unit - an emissions unit which is not in existence, for which an application for a permit to

construct has not been submitted before the effective date of an applicable section or provision, or which has been reclassified as a new emissions unit pursuant to any provision of FAC 62210, FAC 62-212, or FAC 62-296 (FAC 62-296.200).

• Nitric Acid Plant - any facility producing weak nitric acid by employing either the pressure or atmospheric

pressure process (FAC 62-296.200). • Nonattainment Area -

1. An area which has been designated by the Administrator of the United States Environmental Protection Agency (EPA), pursuant to the Federal Clean Air Act, as exceeding national primary or secondary ambient air quality standards for the pollutants CO or ozone (FAC 62-242.300).

2. Any area not meeting ambient air quality standards and designated as a nonattainment area under FAC 62-275.410. Such an area may be designated as a particulate, SO2, NO2, CO, lead or ozone nonattainment area, depending on which ambient standard has been violated. An area may be designated as nonattainment for more than one air pollutant. Ozone nonattainment areas may be transitional, marginal, moderate, serious, severe, or extreme as classified in FAC 62-275.410 (FAC 62-296.200).

• Nonexempt Motor Vehicle - any motor vehicle that has not been exempted from the requirement for an

emissions inspection pursuant to Department of Highway Safety and Motor Vehicles FAC 15C-6.002 (FAC 62-242.300).

• Nonrural Land Clearing - any land clearing operation that is conducted in urban or residential areas,

incorporated or unincorporated cities or towns, or in any nonrural area as designated by the Department and shall not include any land clearing operation that is associated with country, livestock or with agricultural activities (FAC 62-256.200).

Page 34: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-18 Air Emissions Management

• Nuisance - any open burning activity that is potentially harmful or injurious to human health or property or which is annoying or offensive to occupants of three or more occupied residences (FAC 62-256.200).

• Objectionable Odor - any odor present in the outdoor atmosphere which by itself or in combination with other

odors, is or may be harmful or injurious to human health or welfare, which unreasonably interferes with the comfortable use and enjoyment of life or property, or which creates a nuisance (FAC 62-296.200).

• Odor - a sensation resulting from stimulation of the human olfactory organ (FAC 62-296.200). • Old Design Kraft Recovery Furnace - any straight kraft recovery furnace which is not of "membrane wall"

construction to minimize air in-leakage (FAC 62-296.200). • Opacity -

1. the relative degree that a diesel motor vehicle's tailpipe exhaust gas plume obstructs the transmission of visible light (FAC 62-242.300)

2. a condition which renders material partially or wholly impervious to rays of light causing obstruction of observer's view (FAC 62-296.200).

• Open Burning - the burning of any matter in such a manner that the products of combustion resulting from the

burning are emitted directly into the outdoor atmosphere without passing through a stack or chimney (FAC 62-256.200).

• Open Field - any location in a well ventilated cleared area that is at least 200 ft in all directions from any

wooded area or occupied building(s), and 100 ft from any public road (FAC 62-256.200). • Open Top Vapor Degreasing - the batch process of cleaning and removing soils from metal surfaces by

condensing hot solvent vapor on the colder metal parts (FAC 62-296.200). • Organic Compounds - any substance that contains the element carbon, except carbon oxides and various

carbonates (FAC 62-296.200). • Outdoor Heating Device - any apparatus, machine, equipment, or other contrivance in which any type of fuel

capable of producing air pollution is burned, used outdoors for the purpose of giving protection from cold or frost (FAC 62-256.200).

• Oven - a chamber within which heat is used to bake, cure, polymerize, and/or dry a surface coating (FAC 62-

296.200). • Overvarnish - a coating applied directly over ink to reduce the coefficient of friction, to provide a gloss, and to

protect the finish against abrasion and corrosion (FAC 62-296.200). • Owner or Operator - any person or entity who or which owns, leases, operates, controls or supervises an

emissions unit or facility (FAC 62-296.200). • Packaging Rotogravure Printing - rotogravure printing upon paper, paper board, metal foil, plastic film, and

other substrates, which are, in subsequent operations, formed into packing products and labels for articles to be sold (FAC 62-296.200).

• Paper Coating - coatings put on paper and pressure sensitive tapes regardless of substrate. Related web coating

processes on plastic film and decorative coatings on metal foil are included in this definition (FAC 62-296.200). • Particulate Matter -

Page 35: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-19 Air Emissions Management

1. With respect to concentrations in the atmosphere, particulate matter means any airborne finely divided solid or liquid material.

2. With respect to emissions, particulate matter means all finely divided solid or liquid material, other than uncombined water, emitted to the atmosphere as measured by applicable reference methods, or an equivalent or alternative method, specified in 40 CFR 60 Appendix A and adopted as part of FAC 62-297 (FAC 62-296.200).

• Penetrating Prime Coat - an application of low viscosity liquid asphalt to an absorbent surface. It is used to

prepare an untreated base for an asphalt surface. The prime penetrates the base and plugs the voids, hardens the top, and helps bind to the overlying asphalt course. It also reduces the necessity of maintaining an untreated base course prior to placing the asphalt pavement (FAC 62-296.200).

• Perceptible Leaks - any contaminant vapor or liquid leaks detectable by:

1. Odor; 2. Visual observation of pooled liquid or condensation droplets; or 3. Instrument detection of emissions pursuant to the requirements of FAC 62215.300(6)(g) and (h) (FAC 62-

215.300(2)). • Perchloroethylene Consumption - the total volume of perchloroethylene purchased yearly based upon purchase

receipts (FAC 62-215.300(2)). • Pesticide - any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating

any insects, rodents, nematodes, fungi, weeds, or other forms of plant or animal life or viruses, except viruses or fungi on or in living man or other animals, which the Department of Agriculture and Consumer Services shall declare to be a pest, and any substance or mixture of substances intended for use as a plant regulator, defoliant, or desiccant (FAC 62-256.200).

• Potential Emissions or Potential to Emit - the maximum capacity of an emissions unit or facility to emit a

pollutant under its physical and operational design. Any enforceable physical or operational limitation on the capacity of the emissions unit or facility to emit a pollutant, including any air pollution control equipment and any restrictions on hours of operation or on the type or amount of material combusted, stored, or processed shall be treated as part of its design provided that, for any air pollutant that is specifically regulated by the EPA under the Clean Air Act, such physical or operational limitation is Federally enforceable. The potential emissions of an emissions unit or facility do not include any secondary emissions that may be associated with the emissions unit or the facility (FAC 62-296.200).

• PM10 -

1. With respect to concentrations in the atmosphere, PM(10) means particulate matter with an aerodynamic diameter less than or equal to a nominal 10 micrometers as measured by a reference method based on 40 CFR Part 50 Appendix J, and designated in accordance with 40 CFR Part 53 or by an equivalent method designated in accordance with 40 CFR Part 53.

2. With respect to emissions, PM(10) means finely divided solid or liquid material, with an aerodynamic diameter less than or equal to a nominal 10 micrometers emitted to the atmosphere as measured by an applicable reference method or by an equivalent or alternative method specified in 40 CFR Part 51 Appendix M and adopted as part of FAC 62-297 (FAC 62-296.200).

• Premises of a Certified Establishment - all contiguous and adjacent properties comprising the single fixed

location at which the establishment operates (FAC 62-281.200). • Prime Coat - the first film of coating applied in a multicoat operation (FAC 62-296.200).

Page 36: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-20 Air Emissions Management

• Process Weight - the total weight of all materials introduced into any process. Solid fuels and recycled materials are included in the determination of process weights; but uncombined water, liquid and gaseous fuels, combustion air, or excess air are not included (FAC 62-296.200).

• Program Area - counties designated by Department rule as air quality nonattainment areas and counties which

voluntarily request inclusion in the Motor Vehicle Inspection Program pursuant to the provisions of Section 325.204, F.S. (FAC 62-242.300).

• Proper Operation and Maintenance of Refrigerant Recycling Equipment - operating the equipment in

accordance with the manufacturer's approved training program and using the equipment only for the refrigerant for which the equipment is designed (FAC 62-281.200).

• Proper Procedures for Recovering and Recycling Used Refrigerant - using approved refrigerant recycling

equipment in conformity with standards of proper usage developed by the U.S. Environmental Protection Agency as provided for in the Clean Air Act Amendments of 1990 (42 U.S.C. 7671h) (FAC 62-281.200).

1. When recover/recycle equipment is used, proper procedures include the requirement to recycle the refrigerant onsite.

2. When recover-only equipment is used, proper procedures include the requirement to transfer the recovered refrigerant to a refrigerant reclamation facility only (FAC 62-281.200).

• Publication Rotogravure - rotogravure printing upon paper that is subsequently formed into books, magazines,

catalogues, brochures, directories, newspaper supplements and other types of printed materials (FAC 62-296.200).

• Reasonably Available Control Technology or RACT - the lowest emission limit that a particular emissions unit

is capable of meeting by the application of control technology that is reasonably available considering technological and economic feasibility. It may require technology that has been applied to similar, but not necessarily identical, source categories (FAC 62-296.200).

• Reclaimer - a machine used to remove perchloroethylene from clothing by tumbling it in a heated air stream

(FAC 62-215.300(2)). • Reclamation - the process by which recovered refrigerant is purified to the Air Conditioning and Refrigeration

Institute (ARI) Standard of Purity 700-88 by a refrigerant reprocessing or manufacturing facility (FAC 62-281.200).

• Reconstruction -

1. Subject to the conditions set forth in FAC 62-212.700, reconstruction of an emissions unit is presumed if the fixed capital cost of the new components exceeds 50 percent of the fixed capital cost of a comparable entirely new emissions unit. The concept of reconstruction shall be used only with respect to emissions units located in a nonattainment area that are major for the pollutant for which the area is nonattainment (FAC 62-296.200).

2. The replacement of a washer, dryer, or reclaimer; or replacement of any components of a dry cleaning system to such an extent that the fixed capital cost of the new components exceeds 50 percent of the fixed capital cost that would be, required to construct a comparable new system (FAC 62-215.300(2)).

• Recycle Refrigerant Onsite -

1. To use approved recover/recycle equipment to recover and recycle refrigerant from motor vehicles on the premises of a certified establishment for recharging motor vehicle air conditioner units on the premises of the same certified establishment only.

Page 37: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-21 Air Emissions Management

2. To use approved recover/recycle equipment to recover and recycle refrigerant from motor vehicles with a mobile service unit for recharging motor vehicle air conditioner units with the same mobile service unit only (FAC 62-281.200).

• Refrigerant - any Class I or Class II substance for use in a motor vehicle air conditioner as provided for in the

Clean Air Act Amendments of 1990 (42 U.S.C. 7671a) (FAC 62-281.200). • Refrigerated Condenser - a vapor recovery system into which an air-perchloroethylene, gas-vapor stream is

routed and the perchloroethylene is condensed by cooling the gas-vapor stream (FAC 62-215.300(2)). • Refrigerated Condenser Coil - the coil containing the chilled liquid used to cool and condense the

perchloroethylene (FAC 62-215.300(2)). • Reinspection Station - a facility that has been licensed pursuant to Department of Highway Safety and Motor

Vehicles FAC 15C-6.001, as a facility to reinspect motor vehicles which fail the required annual inspection at one of the inspection stations (FAC 62-242.300).

• Relocatable Facility - a facility such as, but not limited to, an asphalt plant, portable power generator, and

cement batch plant, which is designated to be physically moved to, and operated on, different sites by being wholly or partially dismantled and re-erected in essentially the same configuration. It shall not be operable while in transit (FAC 62-296.200).

• Residential Land Clearing - a land clearing operation that is conducted by the homeowner or an individual

contracted by the homeowner of an existing residential dwelling of not more than two family units for the purpose of initially clearing vegetation on the property (FAC 62-256.200).

• Ringelmann Chart - the chart published and described in the U.S. Bureau of Mines Information Circulars No.

8333 and No. 7718. The above references are available from the Superintendent of Documents, U.S. Government Printing Office, Washington, DC, and may be inspected at the Department's Tallahassee office (FAC 62-296.200).

• Roll Coating - the application of a coating material to a substrate by means of hard rubber or steel rolls (FAC

62-296.200). • Roll Printing - the application of words, designs, and pictures to a substrate usually by means of a series of hard

rubber or steel rolls each with only partial coverage (FAC 62-296.200). • Room Enclosure - a stationary structure that encloses a transfer machine system, and is vented to a carbon

adsorber or an equivalent control device during operation of the transfer machine system (FAC 62-215.300(2)). • Rotogravure Coating - the application of a coating material to a substrate by means of a roll coating technique in

which the pattern to be applied is etched on the coating roll. The coating material is picked up in these recessed areas and is transferred to the substrate (FAC 62-296.200).

• Rotogravure Printing - the application of words, designs, and pictures to a substrate by means of a roll printing

technique which involves an intaglio or recessed image areas in the form of cells (FAC 62-296.200). • Routine Maintenance of Public Roads - those activities necessary to maintain the public highway system in as

near original condition as is practical, not to include large scale resurfacing, or reconstruction (FAC 62-296.200).

Page 38: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-22 Air Emissions Management

• Sand Seal Coat - a thin asphalt surface treatment designed to seal surface cracks in existing pavements for the purpose of preventing the intrusion of water into the pavement base. The sand seal coat consists of a light application of liquid asphalt covered with fine aggregate (FAC 62-296.200).

• Secretary - the Secretary of the Department (FAC 62-296.200). • Self-inspection Station - a facility that has been licensed pursuant to Department of Highway Safety and Motor

Vehicles FAC 15C-6.001, for the purpose of conducting required annual emissions inspections on vehicles owned or leased by a self-inspector (FAC 62-242.300).

• Self-inspector - any person or governmental entity that owns or leases at least 25 motor vehicles, including

vehicles held for resale by a motor vehicle dealer licensed under Chapter 320, F.S., and is licensed by the Department of Highway Safety and Motor Vehicles to inspect such vehicles (FAC 62-242.300).

• Sharps - devices with physical characteristics capable of puncturing, lacerating, or otherwise penetrating the

skin. These devices include, but are not limited to needles, intact or broken glass, and intact or broken hard plastic (FAC 62-296.200).

• Shutdown - the cessation of the operation of an emissions unit for any purpose (FAC 62-296.200). • Significant Impact - an impact of emissions on ambient air quality in excess of any of the following pollutant-

specific concentration values: 1. SO2

a. Maximum 3-h concentration not to be exceeded more than once per year--25.0 micrograms/m3. b. Maximum 24-h concentration not to be exceeded more than once per year--1.0 micrograms/m3 for

Class I areas; 5.0 micrograms/m3 for all other areas. c. Annual arithmetic mean--1.0 micrograms/m3.

2. PM10 a. Maximum 24-h concentration not to be exceeded more than once per year--1.0 micrograms/m3 for

Class I areas; 5.0 micrograms/m3 for all other areas. b. Annual arithmetic mean--1.0 micrograms/m3.

3. NO2 a. Annual arithmetic mean--1.0 micrograms/m3.

4. CO a. Maximum 1-h concentration not to be exceeded more than once per year--2.0 mg/m3. b. Maximum 8-h concentration not to be exceeded more than once per year--0.5 mg/m3.

5. Lead a. Maximum quarterly arithmetic mean--0.03 micrograms/m3 (FAC 62-296.200).

• Single Coat - single film of coating applied directly to the metal substrate omitting the primer application (FAC

62-296.200). • Small Area Source - a dry cleaning facility that:

1. Contains only dry-to-dry machines and consumes less than 140 gal/yr of perchloroethylene. 2. Contains only transfer machines and consumes less than 200 gal/yr of perchloroethylene. 3. Contains both dry-to-dry and transfer machines and consumes less than 140 gal/yr of perchloroethylene

(FAC 62-215.300(2)). • Soil Thermal Treatment Facility - either a stationary or mobile facility system designed, constructed, or utilized,

and permitted by the Department to handle, store, and thermally treat or process petroleum contaminated soils. "Soil thermal treatment facility" does not include electrical power plants in which thermal treatment of contaminated soils from their own property results in ash which is disposed of in accordance with Chapters FAC

Page 39: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-23 Air Emissions Management

62-701 or FAC 62-702, or facilities that treat RCRA and hazardous waste or hazardous substances (FAC 62-296.200).

• Solid Sulfur Storage and Handling Facility - a facility designed and utilized for unloading, transferring, or

storing elemental sulfur in pelletized form (FAC 62-296.200). • Solid Waste - includes garbage, refuse, yard trash, clean debris, white goods, special waste, ashes, sludge, or

other discarded material, including solid, liquid, semisolid, or contained gaseous material resulting from domestic, industrial, commercial, mining, agricultural, or governmental operations (FAC 62-296.200).

• Solvent - organic materials which are liquid at standard conditions and which are used as dissolvers, viscosity

reducers, or cleaning agents (FAC 62-296.200). • Solvent Metal Cleaning - the process of cleaning soil from metal surfaces by cold cleaning or open top vapor

degreasing or conveyorized degreasing (FAC 62-296.200). • Source - each dry cleaning facility (FAC 62-215.300(2)). • Span Gas - a calibration gas of known concentration which is used routinely to determine the repeatability of the

measurements made by an exhaust gas analyzer (FAC 62-242.300). • Special Waste - solid wastes that can require special handling and management, including, but not limited to,

white goods, whole tires, used oil, mattresses, furniture, lead-acid batteries, and biological wastes (FAC 62-296.200).

• Stack - a pipe, duct, chimney, or other functionally equivalent device that confines and conveys air pollutants

from an emissions unit or group of emissions units into the atmosphere through an emission point designed to discharge air pollutants into the atmosphere, but not including flares (FAC 62-296.200).

• Standard Conditions - a temperature of 68 F (20 C) and a pressure of 14.7 psia (760 mm Hg) (FAC 62-

296.200). • Standard Sulfur Pellets - any generally spherical form of solid sulfur (such as air or water- formed prills, or

granules, or hemispherical forms such as Sandvick rotoform, but not including agglomerates, popcorn, slate or crushed bulk sulfur) that meets all of the following specifications. All required tests shall be performed on sulfur pellets that have been allowed to stand a minimum of 20 days after being formed. All test results shall be the arithmetic average of three test runs, each on a separate representative composite sample of the shipment or lot being tested.

1. Not more than 20 percent retained on a 1/4 in. U.S. (6.3 mm) screen, determined in accordance with Sulfur Development Institute of Canada (SUDIC) Test Method S2-77: Sieve Analysis of Sulfur Forms, as adopted in FAC 62-297.

2. Less than 6 percent additional fines (minus 50 U.S. screen) generated under SUDIC's standard Stress Level II test (Method S5-77: Determination of Friability of Sulfur Forms 28 in. (700 mm) Diameter Tumbler Test) (FAC 62-296.200).

• Startup - the commencement of operation of any emissions unit that has shut down or ceased operation for a

period of time sufficient to cause temperature, pressure, chemical, or pollution control device imbalances, which result in excess emissions (FAC 62-296.200).

• State Implementation Plan (SIP) or Implementation Plan - the EPA approved plan that Section 110 of the Clean

Air Act requires a state to submit to the Administrator (FAC 62-296.200).

Page 40: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-24 Air Emissions Management

• Still - any device used to volatilize and recover perchloroethylene from contaminated solvent (FAC 62-215.300(2)).

• Sulfur Storage and Handling Facility - a facility designed and utilized for unloading, transferring, or storing

elemental sulfur in molten form, solid pelletized form, or solid vats (FAC 62-296.200). • Sulfuric Acid Plant - any installation producing sulfuric acid by burning elemental sulfur, alkylation acid,

hydrogen sulfides, organic sulfides, and mercaptans, or acid sludge (FAC 62-296.200). • Sunset - official sunset as set forth by the U.S. Naval Observatory (tables are available at National Weather

Services offices) (FAC 62-256.200). • Tack Coat - a light application of liquid asphalt to an existing asphalt pavement or base to ensure a bond

between the surface being paved, or repaired, and the overlying paving or patching material (FAC 62-296.200). • Tamper - to dismantle, remove, or render ineffective any air pollution control equipment installed on a motor

vehicle by the vehicle manufacturer or commercial importer except to replace such device or system with a device or system equivalent in design and function to the part which was originally installed on the motor vehicle (FAC 62-242.300).

• Temperature Sensor - a thermometer or thermocouple used to measure temperature (FAC 62-215.300(2)). • Three-Point Component Check - an inspection to confirm that the following air pollution control equipment, if

installed on the motor vehicle by the vehicle manufacturer or importer, is in place and appears properly connected and undamaged as determined by visual observation:

1. catalytic converter 2. unvented fuel cap 3. fuel inlet restrictor (FAC 62-242.300).

• Topcoat - the final film of coating applied in a multiple coat operation (FAC 62-296.200). • Total Reduced Sulfur (TRS) - the sum of the sulfur compounds hydrogen sulfide, methyl mercaptan, dimethyl

sulfide, and dimethyl disulfide that are released during the kraft pulping process and measured by EPA Reference Method 16 or a designated alternate method (FAC 62-296.200).

• Transfer Machine System - a multiple-machine dry cleaning operation in which washing and drying are

performed in different machines. Examples include: 1. a washer and dryer(s) 2. a washer and reclaimer(s) 3. a dry-to-dry machine and reclaimer(s) (FAC 62-215.300(2)).

• Trash - construction or demolition debris, and other debris such as paper, cardboard, cloth, glass, street

sweepings, vehicle tires, and other like matter (FAC 62-256.200). • True Vapor Pressure - the equilibrium partial pressure exerted by a petroleum liquid as determined in

accordance with methods described in American Petroleum Institute Bulletin 2517, "Evaporation Loss from External Floating Roof Tanks," 1980. The above reference is available from American Petroleum Institute, 2101 L. Street, Northwest, Washington, DC, and may be inspected at the Department's Tallahassee office (FAC 62-296.200).

Page 41: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-25 Air Emissions Management

• RPM Preconditioning - placing the vehicle's transmission in "park" for automatics or "neutral" for manual shift, increasing the engine rpm to 2500 300 rpm for 30 s, while monitoring the engine rpm with a tachometer and then returning the vehicle to idle speed for completion of an idle mode test (FAC 62-242.300).

• Two-Piece Can Exterior End Coating - a coating applied by roller coating or spraying to the exterior end of a

can to provide protection to the metal (FAC 62-296.200). • Unconfined Emissions - emissions that escape and become airborne from unenclosed operations or that are

emitted into the atmosphere without being conducted through a stack (FAC 62-296.200). • Vapor Balance System - a combination of pipes or hoses that creates a closed system between the vapor spaces

of an unloading tank and a receiving tank such that vapors displaced from the receiving tanks are transferred to the tank being unloaded (FAC 62-296.200).

• Vapor Collection System - a vapor transport system that uses direct displacement by the liquid loaded to force

vapors from the tank into a vapor control system (FAC 62-296.200). • Vapor Control System - a system that will not allow emissions of volatile organic compounds in the displaced

vapor at a rate greater than 80 mg/L (4.7 gr/gal) of gasoline transferred (FAC 62296.200). • Vapor-Mounted Seal - a primary seal mounted so there is an annular vapor space underneath the seal. The

annular vapor space is bounded by the bottom of the primary seal, the tank wall, the liquid surface, and the floating roof (FAC 62-296.200).

• Vapor Recovery System - a system that collects and conserves vapors which otherwise would be released to the

atmosphere (FAC 62-296.200). • Visible Emission - an emission greater than 5 percent opacity or 1/4 Ringelmann measured by standard methods

(FAC 62-296.200). • Volatile Organic Compound (VOC) - any compound of carbon excluding CO, CO2, carbonic acid, metallic

carbides, or carbonates, and ammonium carbonate, which participates in atmospheric photochemical reactions. This includes any such organic compound other than the following, which have been determined to have negligible photochemical reactivity (FAC 62-210.200) [Revised May 1999]:

Methane Ethane Methylene chloride (dichloromethane) 1,1,1-trichloroethane (methyl chloroform) 1,1,2-trichloro-1,2,2-trifluoroethane (CFC-113) Trichlorofluoromethane (CFC-11) Dichlorodifluoromethane (CFC-12) Chlorodifluoromethane (HCFC-22) Trifluoromethane (HFC-23) 1,2-dichloro 1,1,2,2-tetrafluoroethane (CFC-114) Chloropentafluoroethane (CFC-115) 1,1,1-trifluoro 2,2-dichloroethane (HCFC-123) 1,1,1,2-tetrafluoroethane (HFC-134a) 1,1-dichloro 1-fluoroethane (HCFC-141b) 1-chloro 1,1-difluoroethane (HCFC-142b) 2-chloro 1,1,1,2-tetrafluoroethane (HCFC-124) Pentafluoroethane (HFC-125) 1,1,2,2-tetrafluoroethane (HFC-134)

Page 42: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-26 Air Emissions Management

1,1,1-trifluoroethane (HFC-143a) 1,1-difluoroethane (HFC-152a) Parachlorobenzotrifluoride (PCBTF) Cyclic, branched, or linear completely methylated siloxanes Acetone Perfluorocarbon compounds which fall into these classes:

Cyclic, branched, or linear, completely fluorinated alkanes; Cyclic, branched, or linear, completely fluorinated ethers with no unsaturations; Cyclic, branched, or linear, completely fluorinated tertiary amines with no unsaturations; and Sulfur containing perfluorocarbons with no unsaturations and with sulfur bonds only to carbon and

fluorine. Tetrachloroethylene (Perchloroethylene) 1,1,1,2,3,4,4,5,5,5-decafluoropentane (HFC-43-10mee) 3,3-dichloro-1,1,1,2,2-pentafluoropropane (HCFC-225ca) 1,3-dichloro-1,1,2,2,3-pentafluoropropane (HCFC-225cb) Difluoromethane (HFC-32) Ethylfluoride (HFC-161) 1,1,1,3,3,3-hexafluoropropane (HFC-236fa) 1,1,2,2,3-pentafluoropropane (HFC-245ca) 1,1,2,3,3-pentafluoropropane (HFC-245ea) 1,1,1,2,3-pentafluoropropane (HFC-245eb) 1,1,1,3,3-pentafluoropropane (HFC-245fa) 1,1,1,2,3,3-hexafluoropropane (HFC-236ea) 1,1,1,3,3-pentafluorobutane (HFC-365mfc) Chlorofluoromethane (HCFC-31) 1,2-dichloro-1,1,2-trifluoroethane (HCFC-123a) 1-chloro-1-fluoroethane (HCFC-151a) 1,1,1,2,2,3,3,4,4-nonafluoro-4-methoxybutane (C(4)F(9)OCH(3)) 2-(difluoromethoxymethyl)-1,1,1,2,3,3,3-hepafluoropropane ((CF(3))(2)CFCF(2)OCH(3)) 1-ethoxy-1,1,2,2,3,3,4,4,4-nonafluorobutane (C(4)F(9)OC(2)H(5)) 2-(ethoxydifluoromethyl)-1,1,1,2,3,3,3-heptafluoropropane ((CF(3))(2)CFCF(2)OC(2)H(5)) Methyl acetate.

• Washer - a machine used to clean articles by immersing them in perchloroethylene. This includes a dry-to-dry

machine when used with a reclaimer (FAC 62-215.300(2)). • Waste Pesticide Containers - any containers made of combustible materials, including but not limited to, paper,

plastic, or burlap, that formerly contained pesticides and which the manufacturer or formulator provided as an end-user conveyance for the specified product (FAC 62-256.200).

• Waste-to-Energy Facility - a facility that uses an enclosed device using controlled combustion to thermally

break down solid, liquid, or gaseous combustible solid waste to an ash residue which contains little or no combustible material, and produces electricity, steam, or other energy as a result. The term does not include facilities that primarily burn fuels other than solid waste, even if the facilities also burn some solid waste as a fuel supplement. The term also does not include facilities that burn vegetative, agricultural, or silvicultural wastes; bagasse, clean dry wood, methane, or other landfill gas; wood fuel derived from construction or demolition debris; or waste tires, alone or in combination with fossil fuels. For the purposes of FAC 62-296.416, the term does not include facilities that primarily burn biomedical or hazardous waste and industrial boilers that burn pelletized paper waste as a supplemental fuel (FAC 62-296.200).

• Water Separator - a device used to recover perchloroethylene from a water-perchloroethylene mixture (FAC 62-

215.300(2)).

Page 43: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-27 Air Emissions Management

• Yard Trash - vegetative matter resulting from landscaping and yard maintenance operations and includes materials such as tree and shrub trimmings, grass clippings, palm fronds, trees, and tree stumps (FAC 62-256.200).

• Year or Yearly - any consecutive 12-mo period of time (FAC 62-215.300(2)).

Page 44: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-28 Air Emissions Management

Page 45: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-29 Air Emissions Management

AIR EMISSIONS MANAGEMENT GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: Missing Checklist Items AE.2.1.FL. General AE.5.1.FL. and AE.5.2.FL.

Stacks AE.5.3.FL. Permits AE.6.1.FL. through AE.6.8.FL. Management/ Administrative AE.7.1.FL. Operations AE.8.1.FL. through AE.8.3.FL. Emissions Limits AE.9.1.FL. through AE.9.3.FL. Steam Generators AE.10.1.FL. through AE.10.4.FL. Fuel Burning Equipment

Carbonaceous Fuel Burning Equipment AE.15.1.FL. through AE.15.3.FL. Miscellaneous Incinerators AE.25.1.FL. through AE.25.3.FL. Medical Waste Incinerators

General Biological Waste Incineration

Facilities AE.30.1.FL.

Crematoriums AE.30.2.FL. and AE.30.3.FL. Printing Presses and Graphic Arts AE.60.1.FL. Fugitive Emissions AE.65.1.FL. and AE.65.2.FL. Dry Cleaning Operations

Petroleum Solvent AE.70.1.FL. Perchloroethylene AE.75.1.FL. and AE.75.2.FL.

Acid Production Units Nitric Acid Plants AE.80.1.FL. Sulfuric Acid Plants AE.80.2.FL. through AE.80.6.FL.

CFCs and Halons Repair/Recycling AE.90.1.FL. through AE.90.3.FL. Recordkeeping AE.95.1.FL. and AE.95.2.FL.

Degreasing Operations General AE.115.1.FL. Cold Cleaning AE.116.1.FL. Vapor Cleaning AE.117.1.FL. and AE.117.2.FL.

Miscellaneous VOC Operations AE.125.1.FL. Open Burning AE.130.1.FL. Vehicle Emissions AE.135.1.FL. through AE.135.4.FL. Asphalt Paving Materials/Operations AE.145.1.FL. Other Emissions/Sources

Soil Thermal Treatment Facilities AE.155.1.FL. County/City-Specific Requirements AE.160.1.FL.

Page 46: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-30 Air Emissions Management

AIR EMISSIONS MANAGEMENT GUIDANCE FOR FLORIDA APPENDIX USERS

REFER TO APPENDIX NUMBERS: REFER TO APPENDIX TITLES:

1-1 Ambient Air Quality Standards 1-2 Particulate Emission Limit Standards 1-3 Stationary Sources Exempt from Construction Permit

Requirements 1-4 SO2 Limitations for Fossil Fuel Steam Generators with More

than 250 MBtu/h Heat Input 1-5 NO2 Limitations for Fossil Fuel Steam Generators with More

than 250 MBtu/h Heat Input 1-6 Air Curtain Incinerator Requirements 1-7 Biological Waste Incineration Facilities Design,

Operating, Monitoring, and Operator Training Requirements

1-8 Open Burning Prohibitions and Allowable Procedures 1-9 Federal Regulations Incorporated By Reference

Page 47: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-31 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.2. MISSING CHECKLIST ITEMS

AE.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 48: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-32 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

AE.5. GENERAL

AE.5.1.FL. Air pollution control devices must not be circumvented (FAC 62-210.650) [Moved in structural reorganization of AE.5 October 1999].

Verify that no person circumvents any air pollution control devices or allows the emission of air pollutants without the proper operation of the applicable air pollution control devices.

AE.5.2.FL. Federal facilities must not permit the discharge of air pollutants which cause odorous emissions (FAC 62-296.320 (2)) [Moved in structural reorganization of AE.5 October 1999].

Verify that the Federal facility does not permit the discharge of air pollutants which cause an objectionable odor.

Stacks (NOTE: Stack requirements do not apply to those built on or before 31 December 1970. However, if stacks constructed before this date have been modified since 31 December 1970, stack requirements do apply (FAC 62-210.550).)

AE.5.3.FL. Stacks must utilize good engineering practice and state-approved dispersion techniques (FAC 62-210.550) [Moved in structural reorganization of AE.5 October 1999].

Verify that, in limiting emissions, stacks utilize good engineering practice and state-approved dispersion techniques (see Definitions).

Page 49: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-33 Air Emissions Management

Page 50: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-34 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

AE.6. PERMITS

AE.6.1.FL. Sources operating under general permits must follow specific procedures (FAC 62-215.220) [Moved in structural reorganization of AE.5 October 1999].

Verify that, if the Federal facility intends to operate sources under a general permit, the following are submitted in advance:

- notice of intent to the Department using required notification form - written notice of any correction within 30 days, including change in:

- name, address, phone number of responsible official or of source - source status requiring more frequent monitoring or reporting than

indicated in the most recent notification. Verify that:

- there is no deviation from the permit activity - Department inspections are allowed - Department-required information is accurate.

AE.6.2.FL. Sources operating under general permits must meet specific requirements (FAC 62-215.230) [Moved in structural reorganization of AE.5 October 1999].

Verify that, if Federal facilities intend to operate sources under general permits:

- notice of intent is filed 30 days prior to the 5th anniversary of the existing permit

- no deviation from the specified activity and conditions of the permit is allowed

- the terms and conditions of the permit are met.

Verify that, if the Department has approved operations under a general permit, sources meet terms and conditions, including the following:

- records of monitoring information are maintained for at least 5 y from the date of collection and contain:

- place, time, operating conditions of measurement - methodology used - entity which performed monitoring - analytical results, calibration, maintenance records, strip chart

recordings, and copies of all Department-required reports.

Verify that, in the event of deviations from general permit conditions, including malfunctions, semiannual reports are submitted.

Verify that a detailed, onsite plan is kept with procedures for operating and maintaining equipment during source startup, shutdown, and malfunction, and that

Page 51: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-35 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

records of plan implementation are kept on site for at least 5 yr:

- reports are submitted semiannually if any startups, shutdowns, or malfunctions occurred in that period, and include corrective actions

- written notification is sent to the Department within 7 working days if any action is taken that is inconsistent with the plan.

Verify that excess emissions do not exceed 2 h in any 24-h period.

Verify that best operational practices are utilized to minimize excess emissions.

AE.6.3.FL. Federal facilities must meet permit requirements (FAC 62-210.300) [Moved in structural reorganization of AE.5 October 1999].

Verify that, prior to construction, modification, or operation of any unit which emits air pollutants, the Federal facility has a current permit from the State of Florida.

Verify that the terms and conditions of any permit are met.

(NOTE: Appendix 1-3 lists stationary sources exempt from permitting requirements.)

AE.6.4.FL. Federal facilities must follow state regulations on corrections to permits (FAC 62-210.360) [Moved in structural reorganization of AE.5 October 1999].

Verify that the Federal facility notifies the Department in writing of minor corrections to permit information, including:

- typographical errors - name, address, or phone number change - changes requiring more frequent monitoring or reporting - changes required by Federal regulations.

AE.6.5.FL. Federal facilities must file notifications if they intend to relocate sources (FAC 62-210.370 (1)) [Moved in structural reorganization of AE.5 October 1999].

Verify that, if Federal facilities intend to relocate a source, the Department is notified in writing within 30 days prior to the relocation.

AE.6.6.FL. Federal facilities must file an annual operating report for an air pollutant

Verify that the state-required Annual Operating Report for Air Pollutant Emitting Facility is completed each year for:

Page 52: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-36 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

emitting facility (FAC 62-210.370 (3) (a), (b)) [Moved in structural reorganization of AE.5 October 1999].

- all Title V sources - all synthetic non-Title V sources - all sources that could emit 10 tons/yr or more of VOCs or 25 tons/yr of NOx

and located in an ozone nonattainment area or ozone air quality maintenance area

- all sources for which a report is required by permit or is requested by the Department.

(NOTE: Reports will be submitted to the Department by 1 March of the following

year unless otherwise indicated by the permit.)

AE.6.7.FL. Federal facilities must follow regulations governing reasonably available control technology (RACT) concerning particulate matter emissions (FAC 62-296.700 (1) through (3) [Moved in structural reorganization of AE.5 October 1999].

Verify that existing emissions units emitting particulate matter and located in or under the influence of an air quality maintenance area limit particulate matter emission by applying RACT as specified in 62-296.701 through 712 or FAC 62-296. 401 through 415.

(NOTE: The following facilities and emissions units located within a particulate matter air quality maintenance area or area of influence are exempt from this section:

- any facility with total maximum allowable emissions of particulate matter of less than 15 tons/yr and 5 lb/h

- any facility demonstrating to the Department that the impact within the designated air quality maintenance area of the total maximum allowable particulate matter emissions will not exceed 1 microgram/m3, annual average, and 5 microgram/m3, 24-h average

- any emissions unit with total allowable emissions of particulate matter of less than 1 ton/yr

- any emissions unit of unconfined particulate matter located more than 5 km outside the boundary of a particulate matter air quality maintenance area

- any emissions unit of unconfined particulate matter from open stockpiling of materials, vehicular traffic, and other emissions from roads and plant grounds or construction activities

- any movable drop transfer point where the discharge point and receiving point of materials are moved in relationship to each other, either continuously or intermittently, so that the enclosure of the drop transfer point with an emissions control device is not practicable.)

Verify that specific, differing RACT particulate matter emission limiting standards

for stationary emissions units are followed (units listed in FAC62-296.401 through 62-296.414, versus those listed FAC 62-296.701 through 62-296.712.)

AE.6.8.FL. Reasonably available control technology

(NOTE: These requirements apply to those major VOC and NOx-emissions units in facilities that are not regulated for VOC under FAC 62-296.501 through 62-

Page 53: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-37 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

(RACT) requirements for major VOC and NOx-emitting sources must be met (FAC 62-296.570 (1) through (4) (1) through (7) and (9)) [Moved in structural reorganization of AE.5 October 1999].

296.516 and those that are not exempt under FAC 62-296.500 (1) (b) or by 62-296.500 through 516 or 62-210.300.)

Verify that the owner or operator of any emissions unit subject to these requirements has applied for operating permits.

(NOTE: In applying for a permit, if the owner or operator of an emissions unit assumes stricter NOx or VOC-emissions limits than those required in this section, this will be considered compliance with RACT for purposes of this requirement.)

Verify that owners or operators operate according to the terms and conditions of their permit application.

Verify that, for compliance dates and monitoring, the following emission-limiting standards are met:

- permit applicants propose a schedule for implementing RACT emission-limiting standards no later than 31 May 1995

- RACT compliance are demonstrated in the schedule specified in the emissions unit's air operation permit

- fuel-specific NOx and VOC-emissions limits are incorporated into the new or revised operation permit for each emissions unit

- for units without a continuous emission monitoring system for NOx or VOCs, compliance with emission limits are demonstrated by annual emission testing according to applicable EPA Reference Methods from FAC 62-297.401 or other methods approved by the Department except as otherwise stated in this section on RACT

- any required annual emission testing is conducted between 1 October and 30 September.

(NOTE: Annual compliance testing while firing oil is not necessary for units

operating in oil for less than 400 h in the current Federal fiscal year.)

(NOTE: For units with a continuous emission monitoring system, compliance will be demonstrated based on a 30 day rolling average and performance specifications in 40 CFR Part 60, Appendix B, or 40 CFR Part 75 (adopted by reference), will be met.)

Verify that the following sources do not exceed their respective N0x-emission limits:

- emissions from any rear-wall fired, forced circulation, 16-burner, compact furnace do not exceed 0.20 lb/MBtu while firing natural gas and 0.36 lb/MBtu while firing oil

- emissions from any front-wall fired, natural circulation, 18-burner, compact furnace do not exceed 0.40 lb/MBtu while firing natural gas and 0.53 lb./MBtu of NOx while firing oil

Page 54: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-38 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

- emissions from any front-wall fired, natural circulation, 24-burner, compact furnace do not exceed 0.50 lb/MBtu while firing natural gas and 0.62 lb/MBtu of NOx while firing oil

- emissions from any tangentially fired, low-heat release, large furnace do not exceed 0.20 lb/MBtu while firing natural gas

- emissions from any gas turbine do not exceed 0.50 lb/MBtu while firing natural gas and 0.90 lb/MBtu while firing oil

- emissions of VOC and NOx from carbonaceous fuel burning facilities, other than waste-to-energy facilities, do not exceed 5.0 lbs. MBtu and 0.9 lb/MBtu

- emissions from any oil-fired diesel generator do not exceed 4.75 lb/MBtu - emission from any other combustion emissions unit not covered in this

section do not exceed 0.50 lb/MBtu.

(NOTE: For gas turbines, unless compliance is demonstrated by using a continuous emissions monitoring unit, it will be demonstrated by a stack test on a representative turbine unit in a facility with similar turbines.)

(NOTE: Annual compliance will be demonstrated in accordance with the EPA method from FAC 62297.401 or other method approved by the Department in accordance with FAC 62.297.620.)

(NOTE: Emissions limits in this section always apply except during startup, shutdown, or malfunction per FAC 62-219.700.)

Page 55: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-39 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

AE.7. MANAGEMENT/ ADMINISTRATIVE

AE.7.1.FL. Federal facilities must comply with Depart-mental directives concerning preplanned abatement strategies for air pollution episodes (FAC 62-273.300 (1) through (4)). [Moved in structural reorganization of AE.5 October 1999].

Verify that the Federal facility, upon written request from the Department, prepares and submits a standby plan describing action to reduce emissions when an air pollution episode is declared.

Verify that the standby plan is submitted within 30 days of the Department request.

Verify that the standby plan is approved by the Department.

Page 56: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-40 Air Emissions Management

Page 57: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-41 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

AE.8. OPERATIONS

AE.8.1.FL. Federal facilities must take specific actions during air pollution alert episodes (FAC 62-273.400 (2) (a) through (g)) [Moved in structural reorganization of AE.5 October 1999].

Verify that the following curtailment actions are taken whenever an air pollution alert episode is declared:

- in general: - all forms of open burning are prohibited - use of incinerators for disposal of solid or liquid waste is prohibited - boiler lancing or soot blowing are done only between 12 noon and

4:00 p.m. - all unnecessary motor vehicle operations are eliminated

- for fossil fuel steam electric generators: - use fuels with low ash or sulfur content

- conduct boiler lancing and soot blowing from 12 noon to 4:00 p.m. - divert electric power generation to facilities outside alert area

- for process steam generating facilities burning fossil fuel: - use fuels with low ash and sulfur content

- conduct boiler lancing and soot blowing from 12 noon to 4:00 p.m. - substantially reduce steam demands consistent with continuing plant

operations - for process steam generating facilities that fire wood, bark, or bagasse totally

or in combination with other fuels: - switch to fossil fuels with low ash and sulfur content or by diverting

steam demands to steam generators using low ash and sulfur content fuels

- maximize use of 12 noon to 4:00 p.m. for boiler lancing and soot blowing

- substantially reduce steam demands consistent with continuing plant operations

- for pulp and paper, citrus, mineral, phosphate processing, allied chemical, secondary metal industries, and petroleum operations:

- enact preplanned abatement strategies, including curtailing, postponing, or deferring production and all operations

- curtail trade waste disposal operations which emit air pollutants - for bulk handling operations that transfer, handle, or store cement, fertilizer,

phosphate rock, grain, feed, run-of-pile triple super phosphate, lime, sand, gravel, dolomite:

- curtail, postpone, or defer bulk handling operations to reduce fugitive dust

- for any other industrial or commercial establishments that emit air pollutants: - curtail, postpone, or defer operations

- curtail trade waste disposal operations that emit air pollutants.

Page 58: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-42 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

AE.8.2.FL. Federal facilities must take specific actions during air pollution warning episodes (FAC 62-273.500 (2) (a) through (g)) [Moved in structural reorganization of AE.5 October 1999].

Verify that the following curtailment actions are taken whenever an air pollution warning episode is declared:

- in general: - all open burning is prohibited - use of incinerators for any disposal of solid or liquid waste is prohibited - boiler lancing or soot blowing is done only between 12 noon and 4:00

p.m. - motor vehicle operation is reduced, and use of car pools and public

transportation is increased - unnecessary use of space heating or cooling is prohibited

- for fossil fuel steam electric generators: - use fuels with lowest available ash or sulfur content

- conduct boiler lancing and soot blowing from 12 noon to 4:00 p.m. - divert electric power generation to facilities outside warning area or to

generating stations emitting less pollutants per kilowatt generated - for process steam generating facilities burning fossil fuel: - use fuels with lowest available ash and sulfur content

- conduct boiler lancing and soot blowing from 12 noon to 4:00 p.m. - stand by to enact preplanned emergency action plan

- for process steam generating facilities that fire wood, bark, or bagasse totally or in combination with other fuels:

- reduce heat and steam demands to absolute necessities consistent with preventing equipment damage

- maximize use of 12 noon to 4:00 p.m. for boiler lancing and soot blowing

- for pulp and paper, citrus, mineral, phosphate processing, allied chemical, secondary metal industries, and petroleum operations:

- commence preplanned abatement strategies for elimination of all air pollutants

- eliminate air pollutants from trade waste disposal operations that emit air pollutants

- for bulk handling operations that transfer, handle, or store fertilizer, phosphate rock, grain, feed, run-of-pile triple super phosphate, cement, lime, sand, gravel, dolomite:

- cease, curtail, postpone, defer transfer or storage of material - for any other industrial or commercial establishments that emit air pollutants: - curtail, postpone, or defer operations

- eliminate trade waste disposal operations which emit air pollutants.

AE.8.3.FL. Federal facilities must take specific actions during air pollution

Verify that the following curtailment actions are taken whenever an air pollution emergency episode is declared:

Page 59: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-43 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

emergency episodes (FAC 62-273.600 (2) (a) through (f)) [Moved in structural reorganization of AE.5 October 1999].

- in general: - all open burning is prohibited - use of incinerators for any disposal of solid or liquid waste is prohibited - the following places of employment will immediately stop operations:

- mining and quarrying of nonmetallic minerals - all construction work (except that which must proceed to avoid

emergency physical harm) - all manufacturing except those required to have an air pollution

emergency plan - all wholesale trade establishments except those distributing drugs,

surgical supplies, and food - all local, county, state government offices except those vital for

public safety and welfare - all retail trade except pharmacies, surgical supply distributors, and

stores primarily selling food -wholesale and retail laundries, cleaning and dyeing establishments,

photographic studios, beauty and barber shops, shoe repair shops - advertising, consumer credit, adjustment and collection agencies;

duplicating, addressing, blueprint, photocopying, mailing, and stenographic equipment rental services; commercial testing laboratories

- automobile repair services and garages - amusement and recreational establishments, including movie

theaters - elementary and secondary schools, colleges, universities,

professional schools, junior colleges, vocation schools, public and private libraries

- all manufacturing and commercial establishments not included above minimize air pollutants to the extent possible without injury to persons or equipment.

- use of motor vehicles is prohibited except in emergencies and with local or state police

- unnecessary lighting, heating, or cooling in unoccupied structures is prohibited

- for fossil fuel steam electric generators: - use of fuels with lowest ash and sulfur content

- conduct boiler lancing and soot blowing from 12 noon to 4:00 p.m. - divert electric power generation to facilities outside warning area or to

generating stations emitting less pollutants per kilowatt generated - for steam generating facilities that fire coal, oil, natural gas, wood, bark, or

bagasse: - reduce heat and steam demands to absolute necessities consistent with

preventing equipment damage - conduct boiler lancing and soot blowing from 12 noon to 4:00 p.m. - taking action in preplanned emergency action plan

- for pulp and paper, citrus, mineral, phosphate processing, allied chemical,

Page 60: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-44 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

secondary metal industries, and petroleum operations: - continue preplanned abatement strategies for elimination of all air

pollutants - eliminate air pollutants from trade waste disposal operations that emit

air pollutants - for bulk handling operations that transfer, handle, or store fertilizer,

phosphate rock, grain, feed, run-of-pile triple super phosphate, cement, lime, sand, gravel, dolomite:

- cease, curtail, postpone, defer the transfer or storage of material - for any other industrial or commercial establishments that emit air pollutants: - curtail, postpone, or defer operations

- eliminate trade waste disposal operations that emit air pollutants.

Page 61: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-45 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

AE.9. EMISSIONS LIMITS

AE.9.1.FL. Federal facilities must not cause or contribute to concentrations of pollutants in the ambient air that exceed specific limitations (FAC 62--272.100 through 272.500) [Moved in structural reorganization of AE.5 October 1999].

Verify that Federal facilities do not cause or contribute to concentrations of the following pollutants in the ambient air that exceed the limitations specified in Appendix 1-1: SO2, PM10, CO, ozone, NO2, lead.

AE.9.2.FL. Federal facilities must not exceed specific limitations for emission of particulate matter from process equipment (FAC 62-296.310) [Moved in structural reorganization of AE.5 October 1999].

(NOTE: Restrictions apply to any emissions unit that processes raw materials to produce a finished product through a chemical or physical change except:

- the burning of fuel for indirect heating when the products of combustion do not come into direct contact with process materials

- the burning of refuse - the processing of salvage materials by burning.)

Verify that particulate matter emissions do not exceed the amount shown in Appendix 1-2.

AE.9.3.FL. Federal facilities must meet specific requirements for visible emissions (FAC 62-296.310 (2)) [Moved in structural reorganization of AE.5 October 1999].

Verify that no person permits to be discharged into the atmosphere any air pollutants from new or existing emissions units, the density of which is equal to or greater than that designated as Number 1 on the Ringelmann Chart, the opacity of which is equal to or greater than 20 percent.

Page 62: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-46 Air Emissions Management

Page 63: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-47 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.10. STEAM GENERATORS

AE.10.1.FL. Existing fossil fuel steam generator emission units with greater than 250 MBtu/h heat input must meet air quality emissions standards (FAC 62-296.405 (1) (a) through (d), (f)) and (g)).

Verify that, for existing emissions units of fossil fuel steam generators with more than 250 MBtu/h heat input, the following visible emissions standards are followed:

- 20 percent opacity (except for either one 6-min period/h, during which opacity does not exceed 27 percent, or one 2-min period/h, during which opacity does not exceed 40 percent)

- emissions units test annually for particulate emission compliance.

(NOTE: The Department may allow for alternative compliance standards.)

Verify that existing fossil fuel steam generator emission units do not exceed SO2 emissions limitations set for in Appendix 1-4.

Verify that existing fossil fuel steam generator emission units do not exceed NO2 emissions limitations set for in Appendix 1-5.

Verify that units use continuous emissions monitoring as required by the Department.

Verify that any reactivated or previously exempted unit whose operated capacity factor for the previous 6 months is greater than 30 percent installs continuous monitoring systems no later than 12 mo following the previous 6-mo period of achieving this capacity.

Verify that all emissions units install and follow Department guidelines for continuous monitoring equipment for SO2, NO2, O2 or CO2, and opacity.

(NOTE: Emissions units exempted from installing continuous monitoring systems for monitoring opacity are:

- emissions units burning only gas and/or oil which comply with applicable state visible emission limiting standards without using emission control equipment

- any emissions unit using a wet scrubber.)

Verify that facilities for which monitoring is required submit quarterly written reports on emissions in excess of allowable standards and keep all data on file for 2 yr.

Page 64: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-48 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.10.2.FL. New fossil fuel steam generator emissions units must meet air quality emissions standards (FAC 62-296.405 (2)) [Revised May 1999].

Verify that, for new emissions units of fossil fuel steam generators with more than 250 MBtu/h heat input, the Standards of Performance for New Stationary Sources are followed for visible emissions, particulate matter, SO2, and NO2.

(NOTE: See the U.S. TEAM Guide, section AE.10., for details.)

AE.10.3.FL. New and existing fossil fuel steam generators with less than 250 MBtu/h heat input must meet specific air quality emission control standards (FAC 62-296.406) [Revised June 2000].

(NOTE: These emissions limits apply to new and existing emissions units, except for emissions units that would otherwise be exempt from permitting (see Appendix 1-3), and emissions units that would otherwise be considered insignificant. These standards apply unless otherwise specified by rule, or by order or permit issued by the Department prior to 15 July 1989.)

Verify that new and existing fossil fuel steam generators with less than 250 Mbtu/hr heat input do not exceed the visible emissions limit of 20 percent opacity, except for either one 6-min period per hour, during which opacity does not exceed 27 percent, or one 2-min period per hour during which opacity does not exceed 40 percent.

(NOTE: The option selected is specified in the emissions unit's construction and operation permits. An opacity of 30 percent is allowed for emissions units rated at 241 million Btu per hour heat input for which a valid Department operating permit was issued prior to 1 October 1972 in Escambia County, while burning fuel oil in conjunction with waste material derived from waste streams previously discharged into underground wells.)

Verify that new and existing fossil fuel steam generators with less than 250 Mbtu/hr heat input apply best available control technology for particulate matter.

Verify that new and existing fossil fuel steam generators with less than 250 Mbtu/hr heat input apply best available control technology for sulfur dioxide.

AE.10.4.FL. Fossil fuel steam generating facilities with one or more boilers that individually or in combination have a heat input equal to or greater than 30 MBtu/h must meet air quality emissions standards (FAC 62-296.702).

Verify that fossil fuel steam generating facilities with one or more boilers which individually or in combination have a heat input equal to or greater than 30 MBtu/h meet air quality emissions standards:

- for particulate matter: emissions do not exceed 0.10 lb/MBtu - for visible emissions: emissions do not exceed 20 percent opacity.

Page 65: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-49 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.10.5.FL. Federal facilities must not discharge excess emissions (FAC 62-210.700) [Moved in structural reorganization of AE.5 October 1999].

(NOTE: Excess emissions from startup, shutdown, or malfunction of any emissions unit will be permitted if:

- best operational practices (see definition) are followed - the duration of excess emissions is minimized and does not exceed 2 h in any

24-h period unless authorized by the Department.)

Verify that for emissions from existing fossil fuel steam generators from soot blowing and load change:

- they do not exceed 3 h in any 24-h period - visible emissions do not exceed Number 3 of the Ringlemann Chart (60

percent opacity) - best operational practices are followed - duration of excess emissions is minimized.

(NOTE: A load change occurs when the operational capacity is in the 10 to 100 percent range, other than startup or shutdown, which exceeds 10 percent of the unit's rated capacity and which occurs at a rate of 0.5 percent/min or more.)

Verify that visible emissions above 60 percent opacity for boiler cleaning and load changes are allowed for not more than four 6-min periods, during the 3-h period of allowable excess emissions.

Verify that particulate matter emissions do not exceed an average of 3 lb/MBtu heat input during the 3-h period of allowable excess emissions.

Verify that reasonably preventable excess emissions caused by poor maintenance, poor operation, or equipment or process failure do not occur during startup, shutdown, or malfunction.

Verify that the Department is notified in case of excess emissions from malfunctions.

Page 66: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-50 Air Emissions Management

Page 67: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-51 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.15. FUEL BURNING EQUIPMENT

Carbonaceous Fuel Burning Equipment

AE.15.1.FL. Existing carbonaceous fuel burning equipment must meet air quality emissions standards (FAC 62-296.410 (1)).

Verify that, for emissions units with a valid operation or construction permit issued prior to 1 July 1974, the following standards are used:

- burners with a capacity less than 30 MBtu/h heat input: - visible emissions with density of number 1 on Ringelmann Chart (20

percent opacity) - exception: number 2 (40 percent opacity) allowed for not more than 2

min in any 1 h - burners with a capacity equal to or greater than 30 MBtu/h heat input: - visible emissions: 1.5 on Ringelmann Chart (30 percent opacity)

- exception: number 2 (40 percent opacity) allowed for not more than 2 min in any 1 h

- particulate matter: 0.3 lb/MBtu of carbonaceous fuel heat input plus 0.1 lb/MBtu heat input of fossil fuel.

AE.15.2.FL. New carbonaceous fuel burning equipment must meet air quality emissions standards (FAC 62-296.410 (2)).

Verify that, for new emissions units, the following standards are used:

- burners with a capacity less than 30 MBtu/h total heat input: - 1 on Ringelmann Chart (20 percent opacity) - exception: number 2 (40 percent opacity) allowed for not more than

2 min in any 1 h - burners of capacity equal to or greater than 30 MBtu/h total heat input: - visible emissions: 1.5 on Ringelmann Chart (30 percent opacity)

- exception: number 2 (40 percent opacity) allowed for not more than 2 min in any 1 h

- particulate matter: 0.2 lb/MBtu of heat input of carbonaceous fuel plus 0.1 lb/MBtu heat input of fossil fuel.

AE.15.3.FL. Carbonaceous fuel burners with a total heat input capacity of 30 MBtu/h or more must meet air quality

Verify that carbonaceous fuel burners with a total heat input capacity of 30 MBtu/h or more meet air quality emissions standards:

- for particulate matter:

Page 68: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-52 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

emissions standards (FAC 62-296.703).

- emissions do not exceed 0.2 lb/MBtu heat input of carbonaceous fuel plus 0.1 lb/MBtu heat input of fossil fuel

- for visible emissions: - emissions do not exceed 30 percent opacity.

Page 69: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-53 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.25. MISCELLANEOUS INCINERATORS

AE.25.1.FL. All incinerators of less than 50 tons/day must meet air quality standards (FAC 62-296.401(1)).

Verify that, for any incinerators with a charging rate of less than 50 tons/day:

- there are no visible emissions (5 percent opacity) except those not exceeding 20 percent opacity for up to 3 min in any 1-h period

- there is no objectionable odor.

AE.25.2.FL. Existing and new incinerators must meet air quality standards (FAC 62-296.401(2)).

Verify that existing incinerators, other than those used for biological waste disposal, with a charging rate equal to or greater than 50 tons/day meet these standards:

- particulate matter of 0.1 gr/standard ft3 dry gas corrected to 50 percent excess air

- no objectionable odor allowed.

Verify that new incinerators, other than those used for biological waste disposal, with a charging rate equal to or greater than 50 tons/day meet these standards:

- particulate matter of 0.08 gr/standard ft3 dry gas corrected to 50 percent excess air

- no objectionable odor.

AE.25.3.FL. New and existing air curtain incinerators must meet specific air quality standards (FAC 62-296.401(7)(a) through (o)) [Citation Revised July 1998].

Verify that the following standards in Appendix 1-6 are met for any new or existing air curtain incinerator located at a landfill for any time period or at any other site for more than 6 mo.

Page 70: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-54 Air Emissions Management

Page 71: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-55 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

MEDICAL WASTE INCINERATORS

AE.30. GENERAL

Biological Waste Incineration Facilities

AE.30.1.FL. Biological waste incineration facilities must meet existing requirements (FAC 62-296.401(4)) [Revised July 1998].

(NOTE: These requirements do not apply facilities which cremate human remains for which a death certificate has been issued or fetal remains in circumstances when a fetal death certificate is not issued, or to animal crematories.)

Verify that facilities with a capacity equal to or less than 500 lb/h meet the following requirements:

- particulate matter emissions do not exceed 0.100 gr/dry standard ft3 of flue gas, corrected to 7 percent O2

- HCl emissions do not exceed 4 lb/h.

Verify that facilities with a capacity greater than 500 lb/h but less than or equal to 2000 lb/h meet the following requirements:

- particulate matter emissions do not exceed 0.030 gr/dry standard ft3 of flue gas, corrected to 7 percent O2

- HCl emissions do not exceed 4.0 lb/h, or are reduced by 90 percent by weight on an hourly average basis.

Verify that for facilities with a capacity greater than 2000 lb/h meet the following

requirements:

- particulate matter emissions do not exceed 0.020 gr/dry standard ft3 of flue gas, corrected to 7 percent O2

- HCl emissions do not exceed 50 ppm by volume, dry basis, corrected to 7 percent O2 on a 3-h average basis, or are reduced by 90 percent by weight on an hourly average basis.

Verify that all facilities meet the design, operating, monitoring, and operator

training requirements given in Appendix 1-7.

Page 72: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-56 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Crematoriums

AE.30.2.FL. Human crematoriums must meet specific requirements (FAC 62-296.401(5)). [Revised July 1997; Revised July 1998].

Verify that particulate matter emissions do not exceed 0.080 gr per dry standard ft3 of flue gas, corrected to 7 percent O2.

Verify that CO emissions do not exceed 100 ppm by volume, dry basis, corrected to 7 percent O2 on an hourly average basis.

Verify that human crematories cremate only dead human bodies with appropriate containers.

Verify that the containers contain no more than 0.5 percent by weight chlorinated plastics as demonstrated by the manufacturer's data sheet.

Verify that, if containers are incinerated, documentation from the manufacturers certifying that they are composed of 0.5 percent or less by weight chlorinated plastics is kept on-file at the site for the duration of their use and for 2 yr after their use.

Verify that no other material, including biomedical waste, is incinerated.

AE.30.3.FL. Crematorium operators must meet training requirements (FAC 62-296.401(f)) [Revised July 1998].

Verify that all crematory operators are trained by the equipment manufacturer's representatives or another qualified organization in a Department approved training program.

Verify that a copy of the training certificate for each operator is submitted to the Department within 15 days of training.

Verify that, if the crematory unit is modified so that a Department construction permit is required, operators are retrained to operate the modified unit and copies of their training certificates are sent to the Department within 15 days after completion of initial compliance test.

Verify that operator certificates are kept on file at the facility for the duration of the operator's employment and for 2 yr after termination of employment.

Page 73: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-57 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.60. PRINTING PRESSES AND GRAPHIC ARTS

AE.60.1.FL. Packaging, publication rotogravure, or flexographic printing operations must meet specific emissions requirements (FAC 62-296.515(1) and (2)).

Verify that packaging and publication rotogravure or flexographic printing operations with prior-to-control potential to emit VOCs is equal to or more than 100 tons/yr (90 Mg/yr) meet one of the following emissions criteria:

- volatile fraction of ink as it is applied to the substrate contains 25 percent by volume or less of organic solvent and 75 percent by volume or more of water

- ink as it is applied to the substrate, less water, contains 60 percent by volume or more nonvolatile material

- an incineration system is used which oxidizes at least 90 percent of the VOCs (VOC measured as total combustible carbon) to CO2 and water.

Page 74: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-58 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.65. FUGITIVE EMISSIONS

AE.65.1.FL. Federal facilities must meet specific requirements for visible emissions (FAC 62-296-310 (3)) [Moved in structural reorganization of AE.5 October 1999].

Verify that, without taking reasonable precaution, no person permits emissions of unconfined particulate matter from any emissions unit, including, but not limited to:

- vehicle movement - transportation of materials - construction, alternation, demolition, wrecking - loading, unloading - storing, handling.

(NOTE: Reasonable precautions are specified on Department permits and include, but are not limited to:

- paving and maintaining roads, parking areas, yards - application of water or chemicals to control emissions from building

demolition, road grading, construction, land clearing - application of asphalt, water, oil, chemicals, or other dust suppressants to

unpaved roads, yards, open stock piles - removal of particulate matter from roads, other paved areas, buildings, work

areas - landscaping or planting vegetation - use of hood, fans, filters - confining abrasive blasting where possible - enclosing or covering conveyor systems.)

AE.65.2.FL. Materials handling, sizing, crushing, and grinding operations must meet air quality emissions standards (FAC 62-296.711) [Moved in structural reorganization of AE.5 October 1999].

(NOTE: Requirements apply to the following materials handling, sizing, crushing, and grinding operations:

- loading or unloading of materials to or from containers like railcars, trucks, ships, and storage

- conveyor systems other than portable conveyor systems - storage of materials in storage structures such as silos or enclosed bins, which

have a storage capacity of 50 yd3 or more - various crushing and/or grinding activities - various sizing and/or screening activities - static drop transfer points where the discharge point and receiving point of

the materials being handled are not moving in relationship to one another.)

Page 75: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-59 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that visible emissions from operations do not exceed 5 percent opacity.

Verify that visible emissions from conveyors/hatch coverings do not exceed 10 percent opacity when conveyors/coverings are moved.

Verify that, if it is necessary to totally or partially enclose an operation and exhaust particulate-laden gas through vents or stacks in order to meet visible emissions standards, emissions of particulate from vents or stacks do not exceed 0.03 gr/dscf.

Verify that operations meet any RACT requirements specified by the Department.

Page 76: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-60 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

DRY CLEANING OPERATIONS

AE.70. PETROLEUM SOLVENT

AE.70.1.FL. Petroleum solvent dry cleaning facilities must meet Federal standards (FAC 62-296.412 (4)).

Verify that petroleum dry cleaning facilities located in ozone nonattainment or air quality maintenance areas in FAC 62-275 (Air Quality Areas) and ozone attainment areas, with solvent consumption equal to or greater than 9750 and 15,000 gal/yr, meet the following requirements:

- each dry cleaning dryer is a solvent recovery dryer - such dryers are properly installed, operated, maintained - each solvent filter is a cartridge filter - such filters are drained in their sealed housing for at least 8 h before removal - monthly records of solvent consumption are kept - owners or operators of a petroleum solvent dryer include leak inspection and

repair in the operating manual and on a clearly visible label on the facility.

Verify that labels say:

- To protect against fire hazards, loss of valuable solvents, and emissions of solvent to the atmosphere, periodic inspection of this equipment for evidence of leaks and prompt repairs of any leaks is required. The equipment must be inspected every 15 days, and all vapor or liquid leaks be repaired within the subsequent 15-day period.

Page 77: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-61 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

DRY CLEANING OPERATIONS

AE.75. PERCHLOROETHYLENE

AE.75.1.FL. New and existing perchloroethylene dry cleaning facilities must meet Federal standards (FAC 62-296.412 (1)).

Verify that all new and existing perchloroethylene dry cleaning facilities meet national emission standards (40 CFR Part 63, adopted by reference by FAC 62-296.820).

AE.75.2.FL. New and existing perchloroethylene dry cleaning facilities must meet VOC emissions standards (FAC 62-296.412(1) through (3)).

(NOTE: Existing perchloroethylene dry cleaning facilities with a solvent consumption of 1475 gal/yr or more that are not yet permitted either by a major source permit or a Title V permit must meet these VOC emissions standards. These VOC emissions standards do not apply to existing sources with major source permits or Title V permits. New or existing dry cleaning facilities outside an ozone nonattainment area or air quality maintenance area that have a total capacity equal to or greater than 10 lb of articles are exempt from these VOC emissions standards if solvent mileage is equal to or greater than the following:

- for new facilities, 20,000 lb of articles/52-gal drum of solvent - for existing facilities, 15,000 lb of articles/52-gal drum of solvent.)

Verify that existing perchloroethylene dry cleaning facilities with total rated dryer

capacity of 10 lb of articles or greater comply with the following standards:

- vent all dryer exhaust through a carbon adsorption system or refrigerated condensation unit which:

- is closed to the atmosphere at all times except when articles are loaded or unloaded through the door of the machine

- is not vented to the atmosphere until the air vapor stream temperature on the outlet side of the refrigerated condenser is equal to or less than 45 °F

- emit no more than 100 ppm by volume of VOC from dryer control device before dilution

- treat all diatomaceous earth filters so residue contains 55 lb or less of VOCs/220 lb of wet waste material

- reduce VOCs from all solvent stills to 132 lb or less/220 lb of wet waste material

- drain all filtration cartridges in filter housing for at least 24 h before

Page 78: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-62 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

discarding cartridge, or dry all drained cartridges without emitting VOCs to the atmosphere

- repair all perceptible leaks of VOCs or order needed parts within 3 working days

- keep monthly records of solvent consumption.

Page 79: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-63 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.80. ACID PRODUCTION UNITS

Nitric Acid Plants

AE.80.1.FL. Nitric acid plant emissions must not exceed specific limitations in existing plants (FAC 62-296.408).

Verify that the following standards are met by new and existing emissions units producing weak nitric acid (50 to 70 percent) by pressure or atmospheric pressure process:

- visible emissions: 10 percent opacity - NO2: 3 lb/ton of acid produced (100 percent basis).

Sulfuric Acid Plants

AE.80.2.FL. Sulfuric acid plant emissions must not exceed specific limitations in existing plants (FAC 62196.402 (1)).

Verify that the following standards are met for existing sulfuric acid plants:

- Florida portion of the Jacksonville, FL-Brunswick, GA, Interstate Air Quality Control Region in 40 CFR 81.91:

- visible emissions: 10 percent opacity - SO2: 29 lb/ton of 100 percent acid produced - acid mist: 0.5 lb/ton of 100 percent acid produced

- all other areas of Florida: - visible emissions: 10 percent opacity

- SO2: 10 lb/ton of 100 percent acid produced - acid mist: 0.3 lb/ton of 100 percent acid produced.

AE.80.3.FL. Sulfuric acid plant emissions must not exceed specific limitations in new plants (FAC 62296.402 (2).

Verify that the following standards are met for new sulfuric acid plants:

- visible emissions: 10 percent opacity - SO2: 4 lb/ton of 100 percent acid produced - acid mist: 0.15 lb/ton of 100 percent acid produced

Page 80: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-64 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.80.4.FL. For sulfuric acid plants, continuous emissions monitoring require-ments must be met (FAC 62296.402 (4)).

Verify that continuous emissions monitoring requirements for sulfuric acid plants are installed, calibrated, operated, and maintained in accordance with Department regulations.

AE.80.5.FL. Sulfuric acid plants with a production capacity greater than 300 tons/day must operate continuous monitoring equip-ment (FAC 62-296.402 (4) (a)).

Verify that any sulfuric acid plant with a production capacity greater than 300 tons/day (production expressed as 100 percent acid) operates continuous monitoring systems for measuring SO2 for each sulfuric acid emission source.

Verify that, where two or more emissions units emit through a common stack, continuous monitoring systems, if required, are installed on each emission unit prior to combination of the emission.

AE.80.6.FL. Sulfuric acid plants required to operate continuous monitoring equip-ment must meet record-keeping and reporting require-ments (FAC 62-296.402 (5)).

Verify that facilities required to operate continuous monitoring equipment submit quarterly written reports to the Department of emissions in excess of emission limiting standards.

Verify that recorded data is kept on file at the sulfuric acid plant source for 2 yr.

Page 81: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-65 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

CFCS AND HALONS

AE.90. REPAIR/RECYCLING

(NOTE: CFC and halon requirements concerning motor vehicle air-conditioning (MVAC) refrigerant recovery and recycling apply to establishments that:

- install or service motor vehicle air-conditioners - release or may release refrigerants while:

- doing collision repairs - changing parts of motor vehicles - salvaging or dismantling motor vehicles except for those:

- which purchase or accept motor vehicles for salvage exclusively from establishments that already recovered all refrigerants from the vehicles prior to shipment

- whose business is processing for material recovery in compliance with Department regulations

- have two or fewer service bays - have only one service bay dedicated to automobile air-conditioner repairs - have five or fewer employees on any one shift.)

(NOTE: A mobile service unit is considered part of the Departmentally certified establishment from which it operates and is not required to be separately certified.)

AE.90.1.FL. Establishments must limit motor vehicle air-conditioning (MVAC) refrigerant and recycling emissions (FAC 62-281.400 (1)).

Verify that no establishment:

- intentionally vents or disposes of refrigerants to the atmosphere - installs services, repairs, salvages, destroys, or dismantles a motor vehicle air

conditioner without the use of approved refrigerant recycling equipment - adds refrigerant to any MVAC system without first ensuring that no

detectable leaks exists - recharges an MVAC system with recovered refrigerant that has not been

either recycled onsite or reclaimed to the ARI Standard of Purity 700-88 by a refrigerant reclamation facility.

AE.90.2.FL. Persons repairing or servicing motor vehicle air-conditioners (MVACs) must be trained and certified according to Department requirements (FAC 62-281.400 (2) and

Verify that establishments subject to Departmental MVAC requirements must have mechanics who successfully completed a Departmentally-approved training program:

- in the proper operation and maintenance of refrigerant recycling equipment - in proper procedures for recovering and recycling used refrigerants from

MVACs.

Page 82: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-66 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

62281.600 (1) through (3)).

Verify that required training certificates are displayed on the premises of the establishment.

Verify that mechanics are able to demonstrate on the establishment premises or the mobile service unit their ability to:

- perform the proper procedures for recovery and recycling of used refrigerants - properly operate and maintain refrigerant recycling equipment.

AE.90.3.FL. Federal facilities must follow regulations governing refrigeration equipment using ozone depleting substances (FAC 62-215.230 (16) (a) (b)), 62-281.300, and 62-281.700 (1)).

Verify that Federal facilities with appliances or refrigeration equipment which use Class I or II ozone-depleting substances such as chlorofluorocarbons and hydrochlorofluorocarbons service, repair, and maintain the equipment according to the requirements in 40 CFR 82 Subpart F.

Verify that Class I or II substances are not emitted into the environment during the repair, servicing, maintenance, or disposal except as provided by Federal regulation.

Verify that Federal reporting and recordkeeping requirements are met.

Verify that equipment used for either recovery and recycling or for recovery only of MVAC refrigerants is certified by the Department.

Page 83: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-67 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

CFCS AND HALONS

AE.95. RECORDKEEPING

AE.95.1.FL. Federal facilities establishments must follow Department require-ments concerning MVAC recordkeeping (FAC 62-281.400(3) (a) through (c)).

Verify that establishments maintain records relating to MVAC service and the purchase, recycling, reclamation of MVAC refrigerants.

Verify that records are maintained on the premises of the certified establishment for a minimum of 3 yr and include:

- invoices for each MVAC service performed - record of amount of refrigerant recycled on site each month and amount of

refrigerant transferred to a refrigerant reclamation facility - records of amount of refrigerant purchased and used each month.

AE.95.2.FL. Federal establishments must submit a certification of compliance to the Department before beginning operations (FAC 62-281.500 (1)).

Verify that establishments dealing with MVACs submit a certification of compliance to the Department before beginning operations using a Departmentally approved form.

(NOTE: Such certificates of compliance are not transferable.)

Page 84: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-68 Air Emissions Management

Page 85: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-69 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

DEGREASING OPERATIONS

AE.115. GENERAL

AE.115.1.FL. Solvent metal cleaners and degreasers must meet requirements to control VOC emissions (FAC 62296.511(1)).

Verify that cold cleaning, open-top vapor degreasing and conveyorized degreasing operations meet emission limiting standards and control technology.

Page 86: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-70 Air Emissions Management

Page 87: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-71 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

DEGREASING OPERATIONS

AE.116. COLD CLEANING

AE.116.1.FL. Cold cleaners must meet specific control requirements for solvent metal cleaning (FAC 62296.511(2)).

Verify that the cold cleaner is equipped with a cover and that it can be operated easily with one hand if:

- solvent volatility is greater than 0.3 lb/in2 (15 mm Hg or 2 kPa) measured at 100 F (38 C)

- solvent is agitated or heated.

Verify that the cleaner is equipped for draining cleaned parts.

(NOTE: Parts will be enclosed under the cover while draining if solvent volatility is greater than 0.6 lb/in.2 (31 mm Hg or 4.1 kPa) measured at 100 oF (38 oC), except that drainage may be external for applications if an internal-type cannot fit into the cleaning system.)

Verify that one of the following control devices is installed if solvent volatility is greater than 0.6 /in.2 (31 mm Hg or 4.1 kPa) measured at 100 oF (38 oC), or if the solvent is heated above 120 oF (50 oC):

- freeboard with freeboard ratio greater than or equal to 0.7 - water cover (where the solvent is insoluble in and heavier than water) - other control systems that are equivalent, such as refrigerated chiller or

carbon adsorption.

Verify that a permanent, conspicuous label summarizes operating requirements.

Verify that waste solvent is stored only in covered containers and is not disposed of or transferred, such that greater than 20 percent of waste solvent (by weight) can evaporate into the atmosphere.

Verify that the cover is closed whenever parts are not being handled in the cleaner.

Verify that cleaned parts are drained for at least 15 s, or until dripping stops.

Verify that, if a solvent spray is used, it is a solid fluid stream which does not cause excessive splashing and is not a fine or shower-type spray.

Page 88: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-72 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Page 89: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-73 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

DEGREASING OPERATIONS

AE.117. VAPOR CLEANING

AE.117.1.FL. Open top vapor degreasers must meet specific control requirements (FAC 62.296.511 (1) (b) 1 and (3)).

Verify that any open top vapor degreaser is equipped with a cover that can be opened and closed easily without disturbing the vapor zone.

Verify that the following safety switches are provided:

- a condenser flow switch and thermostat which shut off the heat if the condenser coolants are not circulating or are too warm

- a spray safety switch which shuts off the spray pump if the vapor level drops more than 4 in. (10 cm) below the bottom condenser coil

- a vapor level control thermostat which shuts off the heat when the vapor level rises too high.

Verify that one of the following control devices are installed:

- freeboard ratio greater than or equal to 0.75, and a powered or mechanically assisted cover if the degreaser opening is greater than 10.8 ft2 (1.0 m2)

- refrigerated chiller - enclosed cover or arrangement in which the door opens only when the dry

part is entering or exiting the degreaser - carbon adsorption system with ventilation greater than or equal to 50

ft3/min/ft2 (15 m3/min/m2) of air or vapor area (when cover is open), and exhausting less than 25 ppm of solvent averaged over one complete adsorption cycle.

(NOTE: Open top vapor degreasers with an open area smaller than 10.8 ft2 (1.0

m2) are exempt from the control device requirement.)

Verify that cover is closed at all times except when processing work loads through the degreaser.

Verify that solvent carryout is minimized by:

- racking parts to allow complete drainage - moving parts in and out of degreaser at less than 11 ft/min (3.3 m/min) - holding parts in vapor zone at least 30 s or until condensation stops - decanting any pools of solvent on cleaned parts before removal from vapor

zone

Page 90: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-74 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- allowing parts to dry within degreaser for at least 15 s, or until visually dry.

Verify that porous or absorbent materials (e.g., cloth, leather, wood, rope) are not degreased.

Verify that workload does not occupy more than half of degreaser's open top area.

Verify that the degreaser is not loaded to where vapor level would drop more than 4 in. (10 cm) below bottom condenser coil when workload is removed from vapor zone.

Verify that spray is always below vapor level.

Verify solvent leaks are immediately repaired or that the degreaser is shut down.

Verify that waste solvent is stored only in covered containers and not disposed or transferred, such that greater than 20 percent of waste solvent (by weight) can evaporate into the atmosphere.

Verify that cleaner is not operated so water is visually detectable in solvent exiting the water separator.

Verify that ventilation fans are not used near degreaser opening or that exhaust ventilation does not exceed 66 ft3/min/ ft2 (20 m3/min/m2) of degreaser open area, unless necessary to meet OSHA requirements.

Verify that a permanent, conspicuous label summarizes operating procedures in FAC 62-296.511 (3) (d) through (l) (portions of Solvent Metal Cleaning control requirements).

AE.117.2.FL. Conveyorized degreasers must meet specific control requirements (FAC 62-296.511 (1) (b) 2 and (4))

Verify that owners and operators of conveyorized degreasers meet the following requirements:

- workplace fans are not used near the degreaser opening - exhaust ventilation does not exceed 66 ft3/min/ft2 (20 m3/min/m2) of

degreaser opening unless necessary to meet OSHA requirements.

Verify that one of the following control devices are installed:

- refrigerated chiller - carbon absorption system, with ventilation greater than or equal to 49

ft3/min/ft2 (15 m3/min/m2) of air/vapor (when downtime covers are open) and exhausting is less than 25 ppm of solvent by volume averaged over a complete absorption cycle.

Page 91: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-75 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

(NOTE: Conveyorized degreasers with an air/vapor interface smaller than 21.5 ft2 (2.0 m2) are exempt from this requirement.)

Verify that the cleaner has equipment (drying tunnel or tumbling basket) which is adequate to prevent cleaned parts from carrying out solvent or liquid vapor.

Verify that these safety switches are provided:

- condenser flow switch and thermostat, which shut off sump heat if condenser coolant is either not circulating or too warm

- spray safety switch, which shuts off spray pump or conveyor if vapor level drops more than 4 in. (10 cm) below bottom condenser coil

- vapor level control thermostat, which shuts off heat when vapor level rises too high.

Verify that openings are minimized during operation so entrances and exits will

silhouette workloads with an average clearance between parts and edge of degreaser opening of less than 4 in. (10 cm) of less than 10 percent of width of opening.

Verify that downtime covers are provided for closing off entrance and exist during shutdown hours.

Verify that carryout emissions are minimized by:

- racking parts for best drainage - maintaining vertical conveyor speed at less than 11 ft/min (3.3 m/min).

Verify that waste solvent is stored only in covered containers and waste solvent is not disposed or transferred, such that greater than 20 percent of the waste solvent (by weight) can evaporate into the atmosphere.

Verify that any solvent leaks are repaired immediately or that the degreaser is shut down.

Verify that the cleaner is not operated so that water is visually detectable in the solvent exiting the water separator.

Verify that downtime covers are placed over the entrances and exits of conveyorized degreasers immediately after the conveyors and exhausts are shut down and are not removed until just before startup.

Page 92: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-76 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.125. MISCELLANEOUS VOC OPERATIONS

AE.125.1.FL. Federal facilities must follow Department guidelines concerning emissions of volatile organic compounds (VOCs) or organic solvents (FAC 62-296.320 (1)).

Verify that no person uses VOCs or organic solvents in any process without applying existing vapor emission control devices or systems ordered by the Department.

Page 93: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-77 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.130. OPEN BURNING

AE.130.1.FL. Open burning is prohibited under specific circumstances (FAC 5I-2.004, 5I-2.006 and 62-256.100 through 800) [Revised June 2000].

Verify that open burning of the following materials and types of fires does not occur:

- tires - rubber material - bunker C material - residual oil - asphalt - roofing material - railroad cross ties - other creosoted lumber - plastics except for polyethylene black plastic - mulch used in agriculture - garbage - trash other than yard waste and household paper products (except as in

Appendix 1-8) - waste pesticide containers products (except as in Appendix 1-8) - open burning within 1000 ft of any active runway of a Department of

Transportation-approved public airport - open burning which reduces visibility on public roadways to less than 1000

ft - open burning during a National Weather Service Air Stagnation Advisory,

Department Air Stagnation Advisory, Air Pollution Episode, or by direction of the Division of Forestry regarding weather conditions unfavorable for safe burning

- open burning which violates other laws, rules, regulations or ordinances. Verify that there is no open burning except as listed in Appendix 1-8.

Verify that authorization is obtained from the Florida Division of Forestry for burns relating to agriculture, silviculture and rural land clearing, and is obtained either on the day of the burn or after 4:00 p.m. of the previous day.

Verify that any authorized burn that goes out of compliance is brought into compliance within 2 hr.

Page 94: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-78 Air Emissions Management

Page 95: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-79 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.135. VEHICLE EMISSIONS

AE.135.1.FL. Motor vehicle emissions inspection personnel and training must be certified by the State (FAC 62-242.900.)

Verify that motor vehicle emissions inspection personnel are certified by the Department.

Verify that Department regulations are followed concerning inspector certification renewal.

Verify that, for certification of motor vehicle emissions, inspection personnel, training curricula, and course instructors meet requirements set forth by the Department.

Verify that the Department has approved training facilities for motor vehicle emissions inspector instruction.

AE.135.2.FL. Operating motor vehicles whose air pollution control equipment has been tampered with is not permitted. (FAC 62-243.100 through 400 and FAC 15C-6.002).

(NOTE: The following motor vehicles are exempt from the requirement concerning motor vehicle operations and tampering [see definition] with related motor vehicle air pollution control equipment:

- those with net vehicle weights greater than 5000 lb or gross vehicle weights greater than 10,000 lb

- those designated as model year 1974 or older - farm vehicles - imported nonconforming motor vehicles documented as exempt from Federal

emission control requirements under 40 CFR, Subpart P - those owned by persons who with hardship exemptions or exchanged engine

certifications unless otherwise constrained by regulation - those sold for salvage purposes only.)

Verify that, after 1 January 1990, no person operates on public roads or street any

nonexempt motor vehicle that has been tampered with.

AE.135.3.FL. Motor vehicles must limit visible emissions (FAC 62-244.100 through 400).

Verify that no person operates the following on public roads and streets:

- any gasoline-powered motor vehicle which emits visible emissions from the exhaust pipe for more than a continuous period of 5 s

- any diesel-powered motor vehicle which emits visible emissions from the exhaust pipe for more than a continuous period of 5 s, except during acceleration, lugging, or deceleration.

Page 96: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-80 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

(NOTE: The following motor vehicles are exempt from these visible emissions provisions:

- motorcycles, mopeds, golf carts - farm vehicles - motor vehicles owned by persons who received hardship exemptions.)

AE.135.4.FL. Federal vehicles must follow emissions inspections require-ments. (Title 15 Department of Highway Safety and Motor Vehicles 15C-6.001 and 002) [Revised May 1999].

Verify that Federally owned, leased, or operated vehicles carry required vehicle emissions inspection certificates.

Verify that, beginning 1 January 1991, any rebuilt motor vehicle or one which has had an engine exchange meets Department emissions standards of the model year of the motor vehicle chassis.

Verify that any motor vehicle which received an exchanged engine prior to 1 January 1991 complies with Department regulations concerning inspections.

Verify that all other motor vehicles comply with Department regulations concerning inspections requirements.

(NOTE: The following concerns exemptions from emissions inspections: - if the Department determines that the engine was manufactured prior to 1975,

the motor vehicle is exempt from annual emissions inspection requirements - any motor vehicle which has been manufactured or rebuilt to operate on

propane, natural gas, or electricity is exempt from emissions inspection upon verifications by the Department

- temporary exemptions from emissions inspections may be allowed if Department requirements are met, including:

- submission of application - motor vehicle meets the following during the entire 90-day period prior

to its registration expiration date: - vehicle is absent from program area

- vehicle is impossible or unsafe to drive - vehicle owner or lessee is incapacitated or absent from program

area and vehicle is not driven in program area - temporary exemptions last 1 yr from the issuance date or 30 days prior

to the next registration expiration date, whichever is sooner.)

Verify that the owner of any vehicle seeking or having a waiver for a temporary or permanent exemption from emissions inspections follows Departmentally approved procedures.

Page 97: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-81 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.145. ASPHALT PAVING MATERIALS/ OPERATIONS

AE.145.1.FL. Federal facilities must not use or apply cutback asphalt in paving or maintaining operations (FAC 62-296.512 (1) and (2)).

Verify that cutback asphalts are not used for paving or maintaining roads, streets, highways, and parking lots.

(NOTE: The following are exempt from the prohibition against using cutback asphalt in paving and maintaining operations:

- when long-life storage of liquid asphalt is necessary - when stockpile storage of cold mixed asphaltic concrete patching materials is

necessary - when the use or application at ambient temperature less than 50 °F (10 °C), as

determined by the nearest National Weather Service Station, is necessary - when cutback asphalt is used solely as a penetrating prime coat - when cutback asphalt is to be used as a tack coat in the routine maintenance

of public roads or in the minor betterment of public roads.)

Page 98: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-82 Air Emissions Management

Page 99: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-83 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.155. OTHER EMISSIONS/SOURCES

Soil Thermal Treatment Facilities

AE.155.1.FL. Soil thermal treatment facilities for petroleum-contaminated soil must meet air pollution control requirements (FAC 62-296.415 (1) through (4) and (6)).

Verify that all new, modified, and existing soil thermal treatment facilities, as defined in FAC 62-775 (Soil Thermal Treatment Facilities), meet the following air pollution control requirements by 1 December 1992:

Verify that, for VOCs, the treatment facility exposes organic vapors from the soil during treatment to one of the following combinations:

Minimum Temperature (oF) Minimum Time (s) 1500 1.0 1600 0.5 1800 0.3

(NOTE: Minimum temperature will be determined by a continuous temperature monitor per FAC 62-296.415 (6) (Continuous Emissions Monitoring Requirements).)

(NOTE: The treatment facility has to meet the minimum temperatures except for 4 min in any 60-min period, so long as the temperature does not fall below 100 oF the required minimum temperature for the corresponding residence time; minimum residence times will be met or exceeded at all times during soil treatment.)

Verify that, for CO emissions:

- average CO emissions do not exceed 100 ppm by volume, dry basis, during all 60 consecutive min periods of operation

- flue gases leaving the high temperature zone are continuously monitored per FAC 62-296.415 (6) (Continuous Emissions Monitoring Requirements)

- temperature and CO monitors are collocated unless Department allows otherwise

- the treatment facility has an air permit authorizing PCB processing, if PCB-contaminated soil is thermally treated

- visible emissions from a stack do not exceed 5 percent opacity - particulate matter emissions do not exceed 0.04 gr/dry standard ft3

- unconfined emissions of particulate matter from the soil are controlled by water application or containment before and after thermal soil treatment.

Page 100: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-84 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that, facility is equipped with instruments to continuously monitor and record the temperature and CO concentration of flue gases leaving the high temperature zone before any dilution air is mixed with flue gases.

Verify that the temperature monitor is certified by manufacturer to be accurate within 1 percent of temperature being measured and is calibrated at least annually by the manufacturer's recommended procedure.

Verify that calibration is at a minimum of three temperatures and over a range from 10 percent below to 10 percent above flue gas hot zone temperature of soil thermal treatment facility.

Verify that calibration records are kept for a minimum of 3 yr.

Verify that the CO monitor is certified by manufacturer to be accurate to within 10 percent of the CO concentration by volume, mean value, or 5 percent of the applicable standard of 100 ppm, whichever is greater, as determined by EPA Test Method 10 in 40 CFR Part 60, Appendix A and adopted by reference in FAC 62-296.800 (Standards of Performance for New Stationary Sources (NSPS)).

Verify that the CO monitoring device is certified, calibrated, and operated according to Specification 4 of 40 CFR Part 60, Appendix B, adopted by reference in FAC 62-296.800 (NSPS), excluding Section 5.2 (Calibration Drift Test Period) of Specification 2.

Page 101: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-85 Air Emissions Management

COMPLIANCE CATEGORY: AIR EMISSIONS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

AE.160. COUNTY/CITY-SPECIFIC REQUIREMENTS

AE.160.1.FL. In Broward, Dade, Duval, Hillsborough, Palm Beach, Pinellas, and other Departmentally-designated counties, vehicles must meet specific emissions standards (FAC 62-242.300 and 62-242.400(3)(e)).

Verify that, in the counties of Broward, Dade, Duval, Hillsborough, Palm Beach, and Pinellas motor vehicles emissions standards and test procedures meet Department standards.

(NOTE: The Department may designate other counties as ozone or CO nonattainment areas.)

Verify that gasoline-powered motor vehicle exhaust emissions standards are met as specified in the following table:

Gasoline-Powered Motor Vehicle Exhaust Emissions Standards

Vehicle Class and Maximum Emission Concentration Model Year

HC (ppm) CO (percent)

Class I: Net wt or GVW of 6000 lb or less

1975 - 1977 500 5.0 1978 - 1979 400 4.0 1980 300 3.0 1981+ 220 1.2

Class II: Net wt or GVW of 6001 lb to 10,000 lb

1975 - 1977 750 6.5 1978 - 1979 600 5.5 1980 400 4.5 1981 - 1984 300 3.0 1985+ 220 1.2

Page 102: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-86 Air Emissions Management

Page 103: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-87 Air Emissions Management

Appendix 1-1

Ambient Air Quality Standards (Source: FAC 62-272.300)

The following are the limitations of concentrations of specific pollutants in the ambient air:

SO2: Maximum 3 h concentration not to be exceeded more than once per yr: 1300 micrograms/m3 (0.5 ppm) Maximum 24-h concentration not to be exceeded more than once per yr: 260 micrograms/m3 (0.1 ppm) Annual Arithmetic mean: 60 micrograms/m3 (0.02 ppm)

PM10:

24-h average concentration not to be exceeded more than once/yr: 150 micrograms/m3 Expected annual arithmetic mean concentration: 50 micrograms/m3

CO2:

Maximum 1 h concentration not be exceeded more than once per yr: 35 ppm (40 mg/m3) Maximum 8 h concentration not be exceeded more than once per yr: 9 ppm (10 mg/m3)

Ozone:

Daily maximum 1-h concentration, not to be exceeded an average of more than 1 day per yr: 0.12 ppm (235 micrograms/m3

(NOTE: An exceedance will occur for any calendar day when the maximum hourly average concentration for that day exceeds the standard. A day with more than 1 hourly value exceeding the standard counts as a single exceedance.)

NO2: Annual arithmetic mean: 100 micrograms/m3 (0.05 ppm)

Lead:

Maximum quarterly arithmetic mean: 1.5 micrograms/m3

Page 104: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-88 Air Emissions Management

Page 105: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-89 Air Emissions Management

Appendix 1-2

Particulate Emission Limit Standards (Source: FAC 62-296.310 (1))

No person may cause or permit particulate matter emission through a stack, vent, or any emissions unit in total quantities in excess of the amount shown in the following table.

a. Interpolation of the data in this table for the process weight rates up to 30 tons/h must use the equation: E = 3.59P (0.62), where P is less than or equal to 30 tons/h.

b. Interpolation and extrapolation of the data for process weight rates over 30 tons/day/h must use the

equation: E = 17.31P (0.16), where P is greater than 30 tons/h, where E = emissions in lb/h, and P = process weight rate in tons/h.

Process Weight Table

Rate (tons/h) Emission Rate (lb/h) 0.025 0.36 0.050 0.56 0.250 1.52 0.50 2.34 2.50 6.34 5 9.74 10 14.97 30 29.57 40 31.23 60 33.33 80 34.90 100 36.17 200 40.41 500 46.79

Page 106: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-90 Air Emissions Management

Page 107: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-91 Air Emissions Management

Appendix 1-3

Stationary Sources Exempt from Construction Permit Requirements (Source: FAC 62-210.300(3)(a) and (3)(b)) [Added July 1998; Revised May 1999]

Rule 62-210.300(3)(a) Categorical Exemptions

- one or more fossil fuel steam generators and hot water generating units located within a single facility; collectively having a total rated heat input equaling 100 million BTU per hour or less; and collectively burning annually no more than 145,000 gallons of fuel oil containing no more than 1.0 percent sulfur, or no more than 290,000 gallons of fuel oil containing no more than 0.5 percent sulfur, or an equivalent prorated amount of fuel oil if multiple fuels are used, provided none of the generators or hot water generating units is subject to the Federal Acid Rain Program or any standard or requirement under 42 U.S.C. section 7411 or 7412

- any individual fossil fuel steam generator and hot water generating unit with a rated heat input equaling 100 million BTU per hour or less and burning annually no more than 150 million standard cubic feet of natural gas or propane or no more than one million gallons of fuel oil containing no more than 0.05 percent sulfur, or an equivalent prorated amount if multiple fuels are used, provided:

- the total annual fuel consumption for all at a facility does not exceed 375 million scf of natural gas or 2.5 million gallons of propane or 2.5 million gal of fuel oil containing no more than 0.05 percent sulfur, or an equivalent prorated amount if multiple fuels are used

- the unit is not subject to the Federal Acid Rain Program or any standard or requirement under 42 USC Sections 7411 or 7412

- steam and hot water generating units, collectively having a total rated heat input equaling 10 MBtu/h or less, and fired exclusively by natural gas or propane, provided that during periods of natural gas curtailment, only propane or fuel oil containing no more than 1.0 percent sulfur is fired and none of the generators or hot water heating units is subject to the Federal Acid Rain Program or any standard or requirement under 42 USC Sections 7411 or 7412

- home, comfort heating with maximum heat output of less than 1 MBtu/h - internal combustion engines in boats, aircraft and vehicles used for transportation of passengers or freight - incinerators in one or two-family dwellings or in multifamily dwellings with four or less family units - vacuum cleaning systems used exclusively for residential housekeeping purposes - cold storage refrigeration equipment except for any located at a Title V source using an ozone- depleting

substance regulated under 40 CFR Part 82 - vacuum pumps in laboratory operations - steam cleaning equipment - belt or drum sanders with a total sanding surface of 5 ft2 or less and other equipment used only on wood or

plastics with a density of 20 lb/ft3 or more - space heating equipment other than boilers - noncommercial smoke houses for smoking food products - bakery ovens located at any retail bakery facility which derives at least fifty percent of its revenues from retail

sales on premises. Also, bakery ovens located at any commercial bakery facility utilizing only non-conveyor belt ovens operating on a single baking cycle in which a determinate amount of product is cooked at one baking (i.e., batch ovens)

- laboratory equipment for chemical or physical analyses - brazing, soldering, or welding equipment - laundry dryers, extractors, or tumbler for fabrics cleaned with only water solution or bleach or detergents - petroleum dry cleaning facilities with a solvent consumption of less than 3250 gal/yr - portable air curtain incinerations except any intended to be continuously operated at one site for more than 6 mo

or at any Department-permitted landfill for any length of time, provided that any exempt air curtain incinerator complies with applicable state requirements

- emergency electrical generators, heating units, and general purpose diesel engines, operating no more than 400 h/yr and not subject to the Federal Acid Rain Program

Page 108: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-92 Air Emissions Management

- heating units, general purpose internal combustion engines, or other combustion devices which are located within a single facility, are not otherwise a categorical exemption, and are not pollution control devices, provided:

- none of the devices is subject to the Federal Acid Rain Program - total fuel consumption by these devices is limited to 32,000 gal/yr of diesel fuel, 4000 gal/yr of gasoline,

4.4 million scf/yr of natural gas or propane, or an equivalent prorated amount if multiple fuels are used, and

- fuel for the devices is limited to natural gas, diesel fuel, gasoline and propane - fire and safety equipment - surface coating facilities in ozone attainment areas provided that 6.0 gal of coating per day or less are applied - phosphogypsum disposal areas and cooling ponds - degreasing unit using heavier-than-air vapors exclusively, except any such unit using or emitting any substance

classified as hazardous air pollutant - volume reduction processes as defined by the state when the operator manages only mercury-containing lamps

removed from the source where the volume reduction process is located - mercury recovery processes as defined by the state when the operator manages only mercury-containing devices

temporarily or permanently removed from service from the operator's own facilities - bulk gasoline plants, provided:

- they are not at a facility subject to permitting requirements for major sources - the emissions do not contribute to total emissions that would make a facility subject to permitting

requirements for major sources - only petroleum-based lubricants, gasoline, diesel fuel, mineral spirits and kerosene are received and

distributed - total storage capacity for gasoline does not exceed 100,000 gal - throughput rate (receive and distribute) of 1.3 million gallons of gasoline is not exceeded in any

consecutive 12 mo period - the facility is not subject to NSPS requirements - the facility is not subject to volatile organic compound RACT requirements

- petroleum lubrication systems - application of fungicide, herbicide, or pesticide - asbestos renovation and demolition activities - non-halogenated solvent storage and cleaning operations, provided the solvents do not contain hazardous air

pollutants - vehicle refueling operations and associated fuel storage - restaurants - burning of drugs seized by law enforcement agencies in boilers with a heat input of 250 MBtu/h or more.)

Rule 62-210.300(3)(b)(1): Generic Emissions Unit Exemption. An emissions unit or pollutant-emitting activity that is not entitled to a categorical exemption pursuant to Rule 62-210.300(3)(a), F.A.C., shall be exempt from the permitting requirements of this chapter, Chapter 62-212, F.A.C., and Chapter 62-4, F.A.C., if:

- is subject to no unit-specific regulatory requirement - neither emits nor has the potential to emit:

- 500 lb/yr or more of lead and lead compounds expressed as lead - 1000 lb/yr or more of any hazardous air pollutant - 2500 lb/yr or more of total hazardous air pollutants, and - 5 tons per year or more of any other regulated pollutant

- its emissions, in combination with the emissions of other units and activities at the facility, do not cause the facility to emit or have the potential to emit any pollutant in such amount as to make the facility a Title V source

Page 109: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-93 Air Emissions Management

- in the case of a proposed new emissions unit at an existing facility, the emissions of such unit, in combination with the emissions of any other proposed new or modified units and activities at the facility, do not result in a modification subject to the preconstruction review requirements

- in the case of a proposed new pollutant-emitting activity, such activity would not constitute a modification of any existing non-exempt emissions unit at a non-Title V source or any existing non-insignificant emissions unit at a Title V source.

Rule 62-210.300(3)(2): Generic Facility Exemption. A facility that is not entitled to a categorical exemption pursuant to Rule 62-210.300(3)(a), F.A.C., shall be exempt from the permitting requirements of this chapter, Chapter 62-212, F.A.C., Chapter 62-213, F.A.C., and Chapter 62-4, F.A.C., if all of the emissions units and activities within the facility, including any proposed new emissions units and activities, meet the exemption criteria of Rule 62-210.300(3)(a), F.A.C., or Rule 62-210.300(3)(b)1., F.A.C., or if:

- no emissions unit or pollutant-emitting activity within the facility would be subject to any unit-specific regulatory requirement

- the facility neither emits or has the potential to emit: - 1000 lb/yr or more of lead and lead compounds expressed as lead - 1 ton/yr or more of any hazardous air pollutant - 2.5 tons/yr or more of total hazardous air pollutants - 25 tons/yr or more of carbon monoxide, nitrogen oxides and sulfur dioxide; and - 10 tons/yr or more of any other regulated pollutant.

- the facility does not emit or have the potential to emit any pollutant in such amount as to make the facility a Title V source, nor would the facility be a Title V source for any other reason.

Rule 62-210.300(3)(b)(3): Temporary Exemptions for Emissions Units at Certain Title V Sources. Except for an emissions unit that is subject to any applicable regulation or permitting requirement under Rule 62-212.400 (Prevention of Significant Deterioration) or 62-212.500 (Preconstruction Review for Nonattainment Areas), any emissions standard or other requirement adopted by reference prior to 1 July 1995, or any RACT provisions, an emissions unit that is described in a timely and complete permit application under Chapter 62-213 (Operation Permits for Major Sources of Air Pollution), and not subject to an existing valid air permit, is exempt from permitting until a final determination on a permit is made. In addition, no emissions unit is exempt under this paragraph if its emissions cause or contribute to a significant net emissions increase which would trigger preconstruction review, or if it is constructed or modified subsequent to 23 November 1994. This exemption is available only to emissions units contained within either facilities that were Title V sources on or before 25 October 25 and that commenced operation on or before that date, or facilities that became Title V sources by operation of law after 25 October 1995, and have timely applied for an initial Title V air operation permit. Rule 62-210.300(3)(b)4 Temporary Phosphogypsum Exemption. Until they receive a permit pursuant to Chapter 62-213, F.A.C., (Operation Permits for Major Sources of Air Pollution.) phosphogypsum disposal areas are exempt from the requirement to obtain an air operation permit.

Page 110: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-94 Air Emissions Management

Page 111: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-95 Air Emissions Management

Appendix 1-4

SO2 Limitations for Fossil Fuel Steam Generators with More than 250 MBtu/h Heat Input (Source: FAC 62-296.405 (1) (c))

1. Emissions units burning liquid fuel: stations--2.5 lb/MBtu heat input

a. Emissions units in Duval County with a nameplate generating capacity of greater than 250 MW which commenced operation prior to 1 August 1977--1.98 lb/MBtu heat input.

b. Emissions units in Duval County with a nameplate generating capacity of less than 160 MW which

commenced operation prior to 1 October 1964--1.10 lb/MBtu heat input.

c. All other emissions units in Duval County--1.65 lb/MBtu heat input.

d. Hillsborough County: emissions units south of State Highway 60 with a nameplate generating capacity of less than 100 MW which commenced operation prior to 1 June 1955-1.1 lb/MBtu heat input.

e. Escambia County: emissions units north of Interstate 10 with a nameplate generating capacity of

less than 50 MW which commenced operation prior to 1 October 1952--1.98 lb/MBtu heat input.

f. Escambia County: no emissions unit north of Interstate 10 with a rated heat input of 515 MBtu/h or less for which a valid Department operating permit was issued prior to 30 September 1972 shall emit in the aggregate more than 57.5 tons per any 24-h period.

g. Manatee County: emissions units with a nameplate generating capacity of greater than 700 MW for

which a valid Department operating permit was issued prior to 1 January 1979--1.1 lb/MBtu heat input.

h. Leon and Wakulla Counties, emissions units with a nameplate generating capacity of less than 260

MW for which a valid Department operating permit was issued prior to 1 November 1977--1.87 lb/MBtu heat input.

i. Dade, Broward, and Palm Beach Counties, emissions units with a nameplate generating capacity of

less than 170 MW which commenced operation prior to 1 May 1958--1.1 lb/MBtu heat input, except in the event of a fuel or energy crisis declared by the Governor of Florida or the President of the United States--2.75 lb/MBtu heat input. Notification concerning the quantity and estimated duration of the increase in emissions shall be given to the Department prior to burning the higher sulfur fuel.

j. All other areas of the state--2.75 lb/MBtu heat input.

2. Emissions units burning solid fuel.

a. Hillsborough County: no emissions unit with a nameplate generating capacity of greater than 120

MW which commenced operation prior to 1 November 1967 shall emit more than 2.4 lb of SO2/MBtu heat input on a weekly average nor shall a group of such emissions units located on one or more contiguous or adjacent properties and which are under common control emit more than 10.6 tons/h of SO2 on a weekly average. A plan for ensuring compliance with Florida Ambient Air Quality Standards will be incorporated into the revised operating permit for such emissions units.

Page 112: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-96 Air Emissions Management

b. Hillsborough County: no emissions unit with a nameplate generating capacity of greater than 400 MW which commenced operation after 1 November 1967, and prior to 1 June 1976, shall emit in total more than 6.5 lb of SO2/MBtu heat input on a 2-h average, nor shall a group of such emissions units located on one or more contiguous or adjacent properties and which are under common control emit more than 31.5 tons/h of SO2 on a 3-h average and 25 tons/h of SO2 on a 24-h average.

c. Escambia County: emissions units north of Interstate 10 with a nameplate generating capacity of

more than 50 MW which commenced operation prior to 1 September 1973-5.90 lb/MBtu heat input. d. All other areas of the state--6.17 lb/MBtu heat input.

3. Owners of fossil fuel steam generators shall monitor their emissions and the effects of the emissions on

ambient concentrations of SO2 in a manner, frequency, and locations approved, and deemed reasonably necessary and ordered by the Department.

Page 113: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-97 Air Emissions Management

Appendix 1-5

NO2 Limitations for Fossil Fuel Steam Generators with More than 250 MBtu/h Heat Input (Source: FAC 62-296.405 (1) (d))

1. Duval County: emissions units with a nameplate generating capacity of greater than 450 MW which commenced operation prior to 1 August 1977--0.30 lb/MBtu heat input.

2. Manatee County: emissions units with a nameplate generating capacity of greater than 700 MW for

which a valid Department operating permit was issued prior to 1 January 1979--0.30 lb/MBtu heat input.

3. Leon County: emissions units with a nameplate generating capacity of greater than 200 MW for which a valid Department operating permit was issued prior to 1 November 1977--0.30 lb/MBtu heat input

4. Hillsborough County: emissions units with a nameplate generating capacity of greater than 400 MW

which commenced operation after 1 January 1976 and prior to 1 January 1985--0.70 lb/MBtu heat input.

Page 114: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-98 Air Emissions Management

Page 115: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-99 Air Emissions Management

Appendix 1-6

Air Curtain Incinerator Requirements (Source: FAC 62-296.401(7)(a) through (n)) [Citation Revised July 1998]

The following requirements apply to any air curtain incinerator, new or existing, located at a landfill for any time period or at any other site for more than 6 mo:

1. Outside of startup periods, no visible emissions (5 percent opacity or less) is allowed, except that an opacity of up to 20 percent is permitted for not more than 3 min in any 1 h.

2. During startup periods, (not to exceed the first 30 min of operation), an opacity of up to 35 percent,

averaged over a 6-min period, is allowed.

3. The general excess emissions guideline (FAC 62-210.700) to handle startups, shutdowns, and malfunctions does not apply to air curtain incinerators.

4. The following dimensions for the pit must be strictly adhered to: no more than 12 ft wide, between 8 and

15 ft deep, and no longer than the length of the manifold. The pit must not be dug within a previously active portion of the landfill.

5. The only materials that can be burned in an air curtain incinerator are wood wastes consisting of trees,

logs, large brush, stumps relatively free of soil, unbagged leaves and yard trash, tree surgeon debris, and clean, dry lumber such as pallets.

6. Burning of sawdust, paper, trash, tires, garbage, plastics, liquid wastes, chemically treated or painted

wood, and other similar materials is prohibited.

7. Only virgin oil, natural gas, or liquefied petroleum gas may be used to start the fire. The use of waste oil, chemicals, gasoline, or tires is prohibited.

8. An air curtain incinerator must be not be started before sunrise. For refractory lined air curtain

incinerators, charging must have completely stopped before sunset. For all other air curtain incinerators, charging must have completely stopped 2 h before sunset

9. The permitted burning rate, in tons per day, must not exceed the value obtained by dividing the number

100,000 by the permitted number of days that burning is authorized to take place.

10. New air curtain incinerators must be located at least 300 ft from any pre-existing, occupied building located off site. Air curtain incinerators existing as of 1 October 1986 must be located at least 200 ft from any occupied building located off site.

11. Air curtain incinerators used at landfills may not be operated within 1000 ft of any active portion of the

landfill unless the air curtain incinerator is separated from the active portion of the landfill by a controlled gate or check-in station.

12. The material must not be loaded into the air curtain incinerator so that it protrudes above the air curtain.

13. Ash must not build up in the pit to higher than one-third the pit depth or to the point where the ash begins

to impede combustion, whichever occurs first.

Page 116: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-100 Air Emissions Management

14. A detailed operation and maintenance guide must be available to the operators at all times, and the permittee must provide the proper training to all operators before they work at the incinerator.

Page 117: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-101 Air Emissions Management

Appendix 1-7

Biological Waste Incineration Facilities Design, Operating, Monitoring, and Operator Training Requirements

(Source: FAC 62-296.401(4)(e)(1 through 7)) [Revised July 1998]

1. Any incinerator must operate with a combustion zone design temperature of no less than 1800 F for at least a 1.0 s gas residence time in the secondary (or last) combustion chamber. Primary chamber and stack must not be utilized in calculating this residence time.

2. Mechanically fed facilities must incorporate an air lock system to prevent opening the incinerator to the

room environment. The volume of the loading system must be designed to prevent overcharging thereby assuring complete combustion of the waste.

3. CO2 emissions must not exceed 100 ppm by volume, dry basis, corrected to 7 percent O2 on an hourly

average basis. 4. Incineration or ignition of waste must not begin until the secondary (or last) combustion chamber

temperature requirement is attained.

a. All air pollution control and continuous emission monitoring equipment must be operational and functioning properly prior to the incineration or ignition of waste and until all the wastes are incinerated.

b. The secondary (or last) combustion chamber temperature requirement must be maintained until the

wastes are completely combusted.

5. Radioactive waste may not be burned in an incinerator subject to this rule unless the incinerator has been issued a Department of Health and Rehabilitative Services (DHRS) license to incinerate radioactive waste or the waste is of such quantity to be exempt in accordance with DHRS Rule 10D91 or FAC 10D-104.003

6. Hazardous waste may not be burned in an incinerator subject to this rule unless the incinerator has been

issued a hazardous waste permit by the Department or the waste is of such quantity to be exempt in accordance with FAC 62-730.

7. Any operator of an incinerator subject to Rule 62-296.410(4), F.Z.C., must be trained by the equipment

manufacturer's representative or by an equivalent organization approved through the permitting process.

a. The content of the training program must be submitted to the Department for approval.

i. Construction permit applicants must submit a training program, or reference a previously submitted training program, with the construction permit application.

ii. The training must provide a basic understanding of the principles of the combustion process,

provide instruction on proper operating practices and procedures, and increase awareness of regulation requirements and safety concerns.

iii. Training programs must be minimum of 16 h instruction.

Page 118: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-102 Air Emissions Management

iv. The Department must approve training programs that meet, at a minimum, the criteria set forth in the EPA Medical Waste Incinerator Operator Training Program Course Handbook EPA 453/B-93-018 and Instructor's Guide EPA 453/B-93-019.

b. A copy of the training certificate for each operator having satisfactorily completed the Department-

approved training program must be submitted to the Department within 15 days of training.

i. If the incinerator is modified to the extent that a Department construction permit is required, the operators must be retrained to operate the modified incinerator.

ii. Owners of new or modified incinerators must submit copies of the operator training

certificates within 15 days after completion of the initial compliance test.

c. An operator's certificate must be kept on file at the facility for the duration of the operator's employment and for an additional 2 yr after termination of employment. The owner must not allow the incinerator to be operated unless it is operated by an operator who has satisfactorily completed the required training program.

Page 119: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-103 Air Emissions Management

Appendix 1-8

Open Burning: Allowable Procedures (Source: FAC 62-256.300 through 62-256.700) [Revised June 2000]

ALLOWABLE OPEN BURNING FOR FROST OR COLD PROTECTION: • Open burning or use of outdoor heating devices for frost or cold protection in connection with agricultural

operations is allowed, if the fuel and the heating device used have approval from the Environmental Regulation Commission prior to use, or have been authorized by the Department.

• The following fuels are approved for use:

• No. 2 diesel fuel.

• No. 2 fuel oil.

• Propane gas.

• Alcohol (ethanol or methanol).

• Butane.

• Liquid petroleum gas.

• Petroleum coke.

• Charcoal.

• Clean dry wood.

• Methane. • Additional fuels: submit petition with the following to the Department:

• Name, address, telephone number of applicant.

• Trade name or other designation of fuel.

• Chemical composition of fuel.

• Composition and quantity of air contaminants given off per unit of fuel.

• Expected rate of fuel use. • The following heating devices are approved for use:

• Spot heater--spot heaters.

• HY-LO Return Stack--Scheu Products Company.

Page 120: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-104 Air Emissions Management

• HY-LO Large Cone--Scheu Products Company.

• Brader Heater--Brader Heaters, Inc.

• Georges Heater--Georges Enterprises, Inc.

• Agri-Heat Heater--Agri-Heat, Inc.

• A conical heater--Fulton-Cole Seed Company.

• Orchard-Rite Heater--Orchard Rite, Ltd.

• Return Stack 2000 used heaters approved for W.H. Clark Fruit Company.

• Radiant Omni-Heater--New Draulics, Inc.

• HY-LO Lazy Flame Heater--Scheu Products Company.

• Sun Heater Model 23--Fleming Troutner Agricultural Heating, Inc.

• Self Vaporizing Model M.B.S.-1--Burner, Inc.

• Hy-LO Auto Clean Stack--Scheu Products Company.

• Mobil Tree Heat--Mobil Oil Corporation.

• Fireball--Sebring Forest Products. INFORMATION ON EXCEPTIONS TO FUELS AND HEATING DEVICES FOR FROST OR COLD PROTECTION NOT INCLUDED ABOVE: • In prolonged cold weather and shortage of approved fuels, the Department may make exceptions to persons with

approved heating devices who had sufficient approved fuels for at least 20 h of burning, providing that:

• more than a total of 20 h of temperatures of 25 F or lower has occurred during the season

• sufficient approved fuels and clean dry wood are not available for adequate cold or frost protection

• burning unapproved fuel is necessary to prevent irreparable damage to agricultural crops

• there is not forecast of a condition conducive to an air pollution episode as defined by FAC 17-211. • In these instances, the Department announces to the news media when an exception is necessary. • The Department does not allow the burning of tires, rubber, asphalt, tar, railroad cross ties, other creosoted

materials, or plastics as fuel. ALLOWABLE OPEN BURNING FOR NON-RURAL LAND CLEARING: • Open burning of wooden material or vegetation from land clearing (except for agricultural, silvicultural, or

forestry operations, or structural demolition) is allowed if:

Page 121: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-105 Air Emissions Management

• One of the following open burning setback requirements are met:

• 300 ft or more from any occupied building for residential land clearing

• 300 ft or more from any occupied building if an air curtain incinerator is used

• 1000 ft or more from any occupied building is an air curtain incinerator is not used.

• Setback is 100 ft or more from any public highway or road and prevailing winds direct smoke away.

• Open burning is ignited after 9:00 a.m. and is extinguished 1 h before sunset.

• Open burning is attended at all times.

• Open burning is not intended to circumvent Department rules.

• Piles of materials to be burned are within size and number restrictions of local fire.

• control authorities and time period allowances in FAC 62-2546.500 (1) (c).

• Wet or green vegetable matter is not burned.

• Starter fuel or materials must not emit excessive visible emissions.

• Prohibited materials (see previous page, this appendix) are not used as starter materials.

• Amount of dirt in land clearing open burning operation is minimized.

• All insulation, electrical wiring, linoleum, carpeting, roofing material such as tar paper and asphalt shingles or excessive-smoke producing or air toxic materials are removed in advance.

• Air curtain incinerators are allowed for combustion of land clearing debris. For this:

• Permits are not required if such incinerators are portable units that will not operate on any one site for more

than 6 mo in any 1 yr. • Portable units: air curtain incinerators may operate as portable units if these requirements are met:

• pit width, length, side walls properly maintained to provide for complete combustion and emissions control

• pit width not to exceed 12 ft

• materials restricted to land clearing debris

• excessive visible emissions not allowed except for a period of up to 30 min during startups and shutdowns, as defined by FAC 62-296.

• Stationary units: air curtain incinerators intended as stationary units--continuously operate at one site for

more than 6 mo, or operate at a Department-permitted land fill-- must obtain a Department air pollution permit.

• Exceptions to the setback requirements may be granted by the Department if:

Page 122: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-106 Air Emissions Management

• the applicant obtains a signed statement from every affected resident within the setback area that waives

his/her objections to the open burning associated with the land clearing

• the applicant submits same to the Department 48 h before the open burning.

• Although the above restrictions in this appendix apply, concerning air curtain incinerators:

• Refractory-lined air curtain incinerators with forced underdraft air may begin burning at sunrise and may be charged until sunset, if they maintain a setback distance of 1000 ft from occupied buildings located offsite and if they do not create a nuisance.

• When the air curtain incinerator is not in operation, public access must be restricted. ALLOWABLE OPEN BURNING FOR COMMERCIAL AND MUNICIPAL PURPOSES: • Open burning in connection with industrial, commercial, or municipal operations is prohibited except when the

Department determines:

• it is the only feasible method and prior approval is obtained from the Department

• when an emergency exists to protect human health and safety

• in connection with county or municipal operations to burn hurricane, tornado, fire or other disaster-generated yard waste using an air curtain incinerator following FAC 62- 256.500 (2) guidelines.

ALLOWABLE OPEN BURNING ESSENTIAL TO A RESEARCH PROJECT: • Open burning and use of outdoor heating devices essential to a research project are allowed with prior

Department approval.

• Specifics for application purposes are given in FAC 62-256.600 (2) and (3). ALLOWABLE OPEN BURNING OF YARD TRASH AND HOUSEHOLD PAPER PRODUCTS: • Open burning to reduce yard trash and household paper products from occupied residential premises of not more

than two family units is allowed in ozone attainment areas as specified in FAC 62-275 if all of the following are met:

• does not produce smoke, soot, odors, visible emissions, heat, flame, radiation, other nuisance

• meets the following setback requirements:

• is 100 ft or more from any occupied building other than that owned and leased by the individual

doing the burning

• is 50 ft or more from any public highway or road

• is ignited after 9:00 a.m. and extinguished 1 h before sunset providing no visible smoke is allowed over any adjacent residence or road to cause a nuisance

(NOTE: These setback requirements apply in counties not specifically listed next.)

Page 123: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-107 Air Emissions Management

• meets the following setback requirements for the counties of Dade, Broward, Pinellas, Hillsborough,

Palm Beach, Duval, Orange, Polk, Brevard, Volusia, Escambia, Lee, Sarasota, Pasco, Seminole, Alachua, Manatee, Leon, Marion, Okaloosa, Lake, Bay, St. Lucie, and Collier:

• is 300 ft or more from any occupied building other than that owned and leased by the individual

doing the burning

• is 100 ft or more from any public highway or road

• is ignited after 9:00 a.m. and extinguished 1 hr before sunset providing no visible smoke is allowed over any adjacent residence or road to cause a nuisance

• is 50 ft or more from any residence on the property where the burning is done

• is attended, and adequate fire extinguishing equipment is always readily available

• is not done with green or wet materials

• is not prohibited by any local, county, municipal, or other government regulation

• is enclosed in a noncombustible container or ground excavation covered by a metal mesh or grill

• is set back at least 25 ft from any woodlands, forest, or brush.

• Open burning to reduce yard trash on occupied residential premises of not more than two family units in

nonattainment or maintenance areas for ozone as defined in FAC 62-2 is allowed if:

• a municipal, county, or commercial solid waste collection service for yard trash is not available at least once a week

• prior authorization is obtained from the Department

• open burning complies with Departmental regulations for open burning.

OTHER OPEN BURNING: • A camp fire, bonfire, or other fire is allowed solely for recreational purposes, for ceremonial occasions, for

outdoor noncommercial preparation of food, or on cold days for outdoor workers, as long as excessive visible emissions are not emitted.

• Flaring of waste gases is allowed for safety reasons, if excessive visible emissions are not emitted. • Open burning associated with instruction and training of organized fire fighters or industrial employees under

supervision of appropriate fire control public officials is permitted if:

• burning activities are conducted by a full-time municipal fire control agency in accordance with National Fire Protection Association document 1403 (adopted by reference).

• the Department, Division of Forestry, local fire control officials are notified in advance of time and

place of open burning.

Page 124: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-108 Air Emissions Management

• Waste pesticide containers may be burned in open fields by owners of crops or other authorized persons if:

• plastic containers are the original ones provided by manufacturer and not reused ones designed for other products

• containers are classified as Group I containers bear label instructions that small quantities may be burned in open fields as permitted by the Department

• quantity of containers burned each day do not exceed the amount accumulated during 1 day's use of

pesticide, and that:

• no more than 500 lb of pesticide containers are burned per day at any specific location

• if more than one fire is set in any area, each burning site is 1000 yd from any other location where burning is occurring simultaneously.

• Group I containers to be disposed of by open burning must be empty in accordance with Department rules in

FAC 62-256.700, "Open Burning and Frost Protection Fires," (6) (d) (1) and (2) for ensuring this, and must meet the following open burning criteria:

• does not produce smoke, soot, odors, visible emissions, heat, flame, radiation, or nuisance

• is 200 ft or more away from any farm workers or occupied buildings

• is 100 ft or more away from any public road

• is ignited after 9:00 a.m. and extinguished 1 h before sunset of the same day

• is attended by the person responsible at an upwind location for the burning for the entire burn period

• is enclosed in a noncombustible container or ground excavation covered by a metal grill

• is in accord with all other related Department, Division of Forestry, and State rules.

Page 125: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-109 Air Emissions Management

Appendix 1-9

Federal Regulations Incorporated By Reference (Source: FAC 62-204.800) [Added May 1999]

All federal regulations cited throughout the air pollution rules of the Department are adopted and incorporated by reference in this rule. The purpose and effect of each such federal regulation is determined by the context in which it is cited. Procedural and substantive requirements in the incorporated federal regulations are binding as a matter of state law only where the context so provides. (1) Chapter 40, Code of Federal Regulations, Part 50, National Primary and Secondary Ambient Air Quality Standards.

(a) The provisions of 40 CFR Part 50, Sections 50.1 through 50.12, revised as of July 1, 1996, are adopted and incorporated by reference.

(b) The following appendices of 40 CFR Part 50, revised as of July 1, 1996, or later as specifically indicated, are adopted and incorporated by reference:

1. 40 CFR 50 Appendix A, Reference Method for the Determination of Sulfur Dioxide in the Atmosphere (Pararosaniline Method).

2. 40 CFR 50 Appendix B, Reference Method for Determination of Suspended Particulate Matter in the Atmosphere (High-Volume Method).

3. 40 CFR 50 Appendix C, Measurement Principle and Calibration Procedure for the Measurement of Carbon Monoxide in the Atmosphere (Non-Dispersive Infrared Photometry).

4. 40 CFR 50 Appendix D, Measurement Principle and Calibration Procedure for the Measurement of Ozone in the Atmosphere.

5. 40 CFR 50 Appendix E, Reference Method for Determination of Hydrocarbons Corrected for Methane.

6. 40 CFR 50 Appendix F, Measurement Principle and Calibration Procedure for the Measurement of Nitrogen Dioxide in the Atmosphere (Gas Phase Chemiluminescence).

7. 40 CFR 50 Appendix G, Reference Method for the Determination of Lead in Suspended Particulate Matter Collected from Ambient Air.

8. 40 CFR 50 Appendix H, Interpretation of the National Ambient Air Quality Standards for Ozone. 9. (Reserved). 10. 40 CFR 50 Appendix J, Reference Method for the Determination of Particulate Matter as PM(10) in

the Atmosphere. 11. 40 CFR 50 Appendix K, Interpretation of the National Ambient Air Quality Standards for

Particulate Matter.

(2) Chapter 40, Code of Federal Regulations, Part 51, Requirements for Preparation, Adoption, and Submittal of Implementation Plans.

(a) The following subparts of 40 CFR Part 51, revised as of July 1, 1996, or later as specifically indicated, are adopted and incorporated by reference:

1. 40 CFR 51, Subpart I, Review of New Sources and Modifications. 2. 40 CFR 51, Subpart P, Protection of Visibility. 3. 40 CFR 51, Subpart T, Conformity to State or Federal Implementation Plans of Transportation Plans,

Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws, amended August 15, 1997, 62 FR 43780.

4. 40 CFR 51, Subpart W, Determining Conformity of General Federal Actions to State or Federal Implementation Plans.

(b) The following appendices of 40 CFR Part 51, revised as of July 1, 1996, or later as specifically indicated, are adopted and incorporated by reference:

Page 126: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-110 Air Emissions Management

1. 40 CFR 51, Appendix M, Recommended Test Methods for State Implementation Plans, amended June 16, 1997, 62 FR 32500.

2. 40 CFR 51, Appendix P, Minimum Emission Monitoring Requirements. 3. 40 CFR 51, Appendix W, Guideline on Air Quality Models (Revised), amended August 12, 1996, 61

FR 41838.

(3) Chapter 40, Code of Federal Regulations, Part 52, Approval and Promulgation of Implementation Plans. The provisions of 40 CFR Part 52, Subpart K, revised as of July 1, 1996, are adopted and incorporated by reference. (4) Chapter 40, Code of Federal Regulations, Part 53, Ambient Air Monitoring Reference and Equivalent Methods.

(a) The following subparts of 40 CFR Part 53, revised as of July 1, 1996, are adopted and incorporated by reference:

1. 40 CFR 53, Subpart A, General Provisions. 2. 40 CFR 53, Subpart B, Procedures for Testing Performance Characteristics of Automated Methods

for SO(2), CO, O(3), and NO(2). 3. 40 CFR 53, Subpart C, Procedures for Determining Comparability Between Candidate Methods and

Reference Methods. 4. 40 CFR 53, Subpart D, Procedures for Testing Performance Characteristics of Methods for PM(10).

(5) Chapter 40, Code of Federal Regulations, Part 55, Outer Continental Shelf Air Regulations. The provisions of 40 CFR Part 55, Sections 55.1 through 55.15, revised as of July 1, 1996, are adopted and incorporated by reference. (6) Chapter 40, Code of Federal Regulations, Part 58, Ambient Air Quality Surveillance.

(a) The following subparts of 40 CFR Part 58, revised as of July 1, 1996, are adopted and incorporated by

reference: 1. 40 CFR 58, Subpart A, General Provisions. 2. 40 CFR 58, Subpart B, Monitoring Criteria. 3. 40 CFR 58, Subpart C, State and Local Air Monitoring Stations (SLAMS). 4. 40 CFR 58, Subpart D, National Air Monitoring Stations (NAMS). 5. 40 CFR 58, Subpart E, Photochemical Assessment Monitoring Stations (PAMS). 6. 40 CFR 58, Subpart F, Air Quality Index Reporting.

(b) The following appendices of 40 CFR Part 58, revised as of July 1, 1996, or later as specifically indicated, are adopted and incorporated by reference:

1. 40 CFR 58, Appendix A, Quality Assurance Requirements for State and Local Air Monitoring Stations (SLAMS).

2. 40 CFR 58, Appendix B, Quality Assurance Requirements for Prevention of Significant Deterioration (PSD) Air Monitoring.

3. 40 CFR 58, Appendix C, Ambient Air Quality Monitoring Methodology. 4. 40 CFR 58, Appendix D, Network Design for State and Local Air Monitoring Stations (SLAMS),

National Air Monitoring Stations (NAMS), and Photochemical Assessment Monitoring Stations (PAMS).

5. 40 CFR 58, Appendix E, Probe Siting Criteria for Ambient Air Quality Monitoring. 6. 40 CFR 58, Appendix F, Annual SLAMS Air Quality Information. 7. 40 CFR 58, Appendix G, Uniform Air Quality Index and Daily Reporting.

(7) Chapter 40, Code of Federal Regulations, Part 60, Standards of Performance for New Stationary Sources. (a) Definitions. For the purposes of Rule 62-204.800(7), F.A.C., the definitions contained in the various

provisions of 40 CFR Part 60, adopted herein shall apply except that the term "Administrator" when used in 40 CFR Part 60, shall mean the Secretary or the Secretary's designee.

Page 127: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-111 Air Emissions Management

(b) Standards Adopted. The following Standards of Performance for New Stationary Sources contained in 40 CFR Part 60, revised as of July 1, 1996, or later as specifically indicated, are adopted and incorporated by reference:

1. 40 CFR 60, Subpart D, Fossil-fuel-fired Steam Generators for which Construction is Commenced after August 17, 1971, amended February 12, 1999, 64 FR 7458 (effective July 1, 1999).

2. 40 CFR 60, Subpart Da, Electric Utility Steam Generators for which Construction is Commenced after September 18, 1978, amended September 16, 1998, 63 FR 49442 (effective April 1, 1999), amended February 12, 1999, 64 FR 7458 (effective July 1, 1999).

3. 40 CFR 60, Subpart Db, Industrial-Commercial-Institutional Steam Generating Units, amended September 16, 1998, 63 FR 49442 (effective April 1, 1999); amended February 12, 1999, 64 FR 7458 (effective July 1, 1999).

4. 40 CFR 60, Subpart Dc, Small Industrial-Commercial-Institutional Steam Generating Units, amended February 12, 1999, 64 FR 7458 (effective July 1, 1999).

5. 40 CFR 60, Subpart E, Incinerators. 6. 40 CFR 60, Subpart Ea, Municipal Waste Combustors for which Construction is Commenced after

December 20, 1989, and on or before September 20, 1994, amended February 12, 1999, 64 FR 7458 (effective July 1, 1999).

7. 40 CFR 60, Subpart Eb, Municipal Waste Combustors for which Construction is Commenced After September 20, 1994, or for Which Modification or Reconstruction is Commenced After June 19, 1996, amended August 25, 1997, 62 FR 45116 and 62 FR 45124. Any municipal waste combustor plant which contains a municipal waste combustor unit subject to 40 CFR 60, Subpart Eb, is subject to the permitting requirements of Chapter 62-213, F.A.C. Any municipal waste combustor plant subject to the permitting requirements of Chapter 62-213, F.A.C., solely because it is subject to 40 CFR 60, Subpart Eb, shall file an application for an operation permit under the requirements of Chapter 62-213, F.A.C., ninety days before expiration of the source's construction permit, but no later than 180 days after commencing operation.

8. 40 CFR 60, Subpart Ec, Hospital/Medical/Infectious Waste Incinerators for Which Construction is Commenced After June 20, 1996, promulgated September 15, 1997, 62 FR 48348.

9. 40 CFR 60, Subpart F, Portland Cement Plants. 10. 40 CFR 60, Subpart G, Nitric Acid Plants. 11. 40 CFR 60, Subpart H, Sulfuric Acid Plants. 12. 40 CFR 60, Subpart I, Asphalt Concrete Plants. 13. 40 CFR 60, Subpart J, Petroleum Refineries, amended February 12, 1999, 64 FR 7458 (effective

July 1, 1999). 14. 40 CFR 60, Subpart K, Storage Vessels for Petroleum Liquids for Which Construction,

Reconstruction, or Modification Commenced after June 11, 1973, and prior to May 19, 1978. 15. 40 CFR 60, Subpart Ka, Storage Vessels for Petroleum Liquids for Which Construction,

Reconstruction, or Modification Commenced after May 18, 1978, and prior to July 23, 1984. 16. 40 CFR 60, Subpart Kb, Volatile Organic Liquid Storage Vessels (Including Petroleum Liquid

Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced after July 23, 1984.

17. 40 CFR 60, Subpart L, Secondary Lead Smelters. 18. 40 CFR 60, Subpart M, Secondary Brass & Bronze Production Plants. 19. 40 CFR 60, Subpart N, Basic Oxygen Process Furnaces for Which Construction is Commenced

after June 11, 1973. 20. 40 CFR 60, Subpart Na, Basic Oxygen Process Steelmaking Facilities for which Construction is

Commenced after January 20, 1983. 21. 40 CFR 60, Subpart O, Sewage Treatment Plants. 22. 40 CFR 60, Subpart P, Primary Copper Smelters. 23. 40 CFR 60, Subpart Q, Primary Zinc Smelters. 24. 40 CFR 60, Subpart R, Primary Lead Smelters. 25. 40 CFR 60, Subpart S, Primary Aluminum Reduction Plants. 26. 40 CFR 60, Subpart T, Phosphate Fertilizer Industry: Wet Process Phosphoric Acid Plants.

Page 128: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-112 Air Emissions Management

27. 40 CFR 60, Subpart U, Phosphate Fertilizer Industry: Superphosphoric Acid Plants. 28. 40 CFR 60, Subpart V, Phosphate Fertilizer Industry: Diammonium Phosphate Plants. 29. 40 CFR 60, Subpart W, Phosphate Fertilizer Industry: Triple Superphosphate Plants. 30. 40 CFR 60, Subpart X, Phosphate Fertilizer Industry: Granular Triple Superphosphate Storage

Facilities, amended April 15, 1997, 62 FR 18277. 31. 40 CFR 60, Subpart Y, Coal Preparation Plants. 32. 40 CFR 60, Subpart Z, Ferroalloy Production Facilities. 33. 40 CFR 60, Subpart AA, Steel Plants: Electric Arc Furnaces Constructed after October 21, 1974,

and on or before August 17, 1983, amended March 2, 1999, 64 FR 10105 (effective July 1, 1999). 34. 40 CFR 60, Subpart AAa, Steel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization

Vessels Constructed after August 17, 1983, amended March 2, 1999, 64 FR 10105 (effective July 1, 1999).

35. 40 CFR 60, Subpart BB, Kraft Pulp Mills. 36. 40 CFR 60, Subpart CC, Glass Manufacturing Plants, amended February 12, 1999, 64 FR 7458

(effective July 1, 1999). 37. 40 CFR 60, Subpart DD, Grain Elevators. 38. 40 CFR 60, Subpart EE, Surface Coating: Metal Furniture, except Subsection 60.316(d). 39. 40 CFR 60, Subpart GG, Stationary Gas Turbines. 40. 40 CFR 60, Subpart HH, Lime Manufacturing Plants. 41. 40 CFR 60, Subpart KK, Lead-Acid Battery Manufacturing Plants. 42. 40 CFR 60, Subpart LL, Metallic Mineral Processing Plants. 43. 40 CFR 60, Subpart MM, Automobile and Light-Duty Truck Surface Coating Operations. 44. 40 CFR 60, Subpart NN, Phosphate Rock Plants, amended February 12, 1999, 64 FR 7458

(effective July 1, 1999). 45. 40 CFR 60, Subpart PP, Ammonium Sulfate Manufacturing. 46. 40 CFR 60, Subpart QQ, Graphic Arts Industry: Publication Rotogravure Printing. 47. 40 CFR 60, Subpart RR, Pressure Sensitive Tape and Label Surface Coating Operations, except

Subsection 60.446(c). 48. 40 CFR 60, Subpart SS, Industrial Surface Coating: Large Applications, except Subsection

60.456(d). 49. 40 CFR 60, Subpart TT, Metal Coil Surface Coating, except Subsection 60.466(d). 50. 40 CFR 60, Subpart UU, Asphalt Processing and Asphalt Roofing Manufacturer, except Subsection

60.474(g). 51. 40 CFR 60, Subpart VV, Equipment Leaks of VOC in the Synthetic Organic Chemicals

Manufacturing Industry, except Subsection 60.482-1(c)(2) and Section 60.484. 52. 40 CFR 60, Subpart WW, Beverage Can Surface Coating Industry, except Subsection 60.496(c). 53. 40 CFR 60, Subpart XX, Bulk Gasoline Terminals, amended February 12, 1999, 64 FR 7458

(effective July 1, 1999); except Subsection 60.502(e)(6). 54. 40 CFR 60, Subpart BBB, Rubber Tire Manufacturing Industry. 55. 40 CFR 60, Subpart DDD, Polymer Manufacturing Industry, amended March 9, 1999, 64 FR 11536

(effective July 1, 1999); amended May 7, 1999, 64 FR 24511 (effective October 1, 1999); except Subsection 60.562-2(c).

56. 40 CFR 60, Subpart FFF, Flexible Vinyl and Urethane Coating and Printing. 57. 40 CFR 60, Subpart GGG, Equipment Leaks of VOC in Petroleum Refineries. 58. 40 CFR 60, Subpart HHH, Synthetic Fiber Production Facilities. 59. 40 CFR 60, Subpart III, Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air

Oxidation Unit Process, except Subsection 60.613(e). 60. 40 CFR 60, Subpart JJJ, Petroleum Dry Cleaners. 61. 40 CFR 60, Subpart KKK, Equipment Leaks of VOC from Onshore Natural Gas Processing Plants. 62. 40 CFR 60, Subpart LLL, Onshore Natural Gas Processing SO(2) Emissions. 63. 40 CFR 60, Subpart NNN, Synthetic Organic Chemical Manufacturing Industry (SOCMI)

Distillation Operations, except Subsection 60.663(e).

Page 129: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-113 Air Emissions Management

64. 40 CFR 60, Subpart OOO, Nonmetallic Mineral Processing Plants, amended June 9, 1997, 62 FR 31351.

65. 40 CFR 60, Subpart PPP, Wool Fiberglass Insulation Manufacturing. 66. 40 CFR 60, Subpart QQQ, Petroleum Refinery Wastewater Systems. 67. 40 CFR 60, Subpart RRR, Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor

Processes. 68. 40 CFR 60, Subpart SSS, Magnetic Tape Coating Facilities, amended February 12, 1999, 64 FR

7458 (effective July 1, 1999). 69. 40 CFR 60, Subpart TTT, Industrial Surface Coating: Surface Coating of Plastic Parts for Business

Machines. 70. 40 CFR 60, Subpart UUU, Calciners and Dryers in Mineral Industries. 71. 40 CFR 60, Subpart VVV, Polymeric Coating of Supporting Substrates Facilities, except

Subsections 60.743(a)(3)(v)(A) and (B), 60.743(e), 60.745(a) and Section 60.746. 72. 40 CFR 60, Subpart WWW, Municipal Solid Waste Landfills, amended June 16, 1998, 63 FR

32743; amended February 24, 1999, 64 FR 9258 (effective July 1, 1999). Any municipal solid waste land fill subject to 40 CFR 60, Subpart WWW, and which has a design capacity equal to or greater than 2.5 million Megagrams and 2.5 million cubic meters is subject to the permitting requirements of Chapter 62-213, F.A.C. Any municipal solid waste landfill subject to the permitting requirements of Chapter 62-213, F.A.C., solely because it is subject to 40 CFR 60, Subpart WWW, shall file an application for an operation permit under Chapter 62-213, F.A.C., by the later of March 12, 1997, or 180 days after the issuance of the solid waste permit that modifies the design capacity of the facility to be equal to or greater than 2.5 million Megagrams and 2.5 million cubic meters. In addition to the initial design capacity report and nonmethane organic compound (NMOC) emission rate report, as applicable, submitted earlier to the U.S. Environmental Protection Agency, any municipal solid waste landfill subject to 40 C.F.R. 60, Subpart WWW, shall submit to the Department a design capacity and NMOC emission rate report as outlined in 40 CFR 60.757 no later than December 31, 1996.

(c) The Standards of Performance for New Stationary Sources adopted by reference in this rule shall be controlling over other standards in the air pollution rules of the Department except that any emissions limiting standard contained in or determined pursuant to the air pollution rules of the Department which is more stringent than one contained in a Standard of Performance, or which regulates emissions of pollutants or emissions units not regulated by an applicable Standard of Performance, shall apply.

(d) General Provisions Adopted. The general provisions of 40 CFR Part 60, Subpart A, revised as of July 1, 1996, and amended February 24, 1997, 62 FR 8314; January 6, 1998, 63 FR 414; and May 4, 1998, 63 FR 24436; amended February 12, 1999, 64 FR 7458 (effective July 1, 1999); are adopted and incorporated by reference except 40 CFR 60.4, 40 CFR 60.8(b)(2) and (3), 40 CFR 60.11(e), 40 CFR 60.16, and 40 CFR 60.17.

(e) Appendices Adopted. The following appendices of 40 CFR Part 60, revised as of July 1, 1996, or later as specifically indicated, are adopted and incorporated by reference.

1. 40 CFR 60, Appendix A, Test Methods, amended October 7, 1997, 62 FR 52384; February 9, 1998 63 FR 6493; and February 12, 1998, 63 FR 7199, amended February 12, 1999, 64 FR 7458 (effective July 1, 1999).

2. 40 CFR 60, Appendix B, Performance Specifications. 3. 40 CFR 60, Appendix C, Determination of Emission Rate Change. 4. 40 CFR 60, Appendix D, Required Emission Inventory Information. 5. 40 CFR 60, Appendix F, Quality Assurance Procedures.

(8) Chapter 40, Code of Federal Regulations, Part 60, Subpart C, Emission Guidelines and Compliance Times.

(a) General Applicability and Definitions. 1. The Emission Guidelines for Existing Sources adopted by reference in this rule shall be controlling

over other standards in the air pollution rules of the Department except that any emissions limiting standard contained in or determined pursuant to the air pollution rules of the Department which is

Page 130: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-114 Air Emissions Management

more stringent than one contained in an Emission Guideline, or which regulates emissions of pollutants or emissions units not regulated in an applicable Emission Guideline, shall apply.

2. For the purposes of Rule 62-204.800(8), F.A.C., the definitions contained in the various provisions of 40 CFR Part 60, adopted herein shall apply except that the term "Administrator" when used in 40 CFR Part 60, shall mean the Secretary or the Secretary's designee.

(b) Municipal Waste Combustors. 40 CFR 60, Subpart Cb, Emission Guidelines and Compliance Times for Large Municipal Waste Combustors That Are Constructed on or Before September 20, 1994, amended August 25, 1997, 62 FR 45119, is hereby adopted and incorporated by reference, subject to the following provisions.

1. Applicability. The applicability of Rule 62-204.800(8)(b), F.A.C., shall be the same as set forth in 40 CFR 60.32b.

2. Definitions. For purposes of Rule 62-204.800(8)(b), F.A.C., the definitions in 40 CFR 60.51b shall apply except for the terms "municipal waste combustor plant" which shall have the same meaning as defined in 40 CFR 60.31b.

3. Emission Limiting Standards. a. The emission limit for particulate matter shall be the same as set forth in 40 CFR

60.33b(a)(1)(i). b. The opacity limit shall be the same as set forth in 40 CFR 60.33b(a)(1)(iii). c. The emission limits for cadmium and lead shall be the same as set forth in 40 CFR

60.33b(a)(2)(i), (a)(2)(iii) and (a)(4). d. The emission limit for mercury shall be the same as set forth in 40 CFR 60.33b(a)(3) except

that, where applicable, the emission limiting standards of Rule 62-296.416, F.A.C., also shall apply.

e. The emission limit for sulfur dioxide shall be the same as set forth in 40 CFR 60.33b(b)(1)(i) and (b)(3)(i).

f. The emission limit for hydrogen chloride shall be the same as set forth in 40 CFR 60.33b(b)(2)(i) and (b)(3)(ii).

g. The emission limit for total mass dioxin/furans (tetra -- through octa-chlorinated dibenzo-p-dioxins and dibenzofurans) shall be the same as set forth in 40 CFR 60.33b(c)(1)(i) and (c)(1)(ii).

h. The emission limit for nitrogen oxides shall be the same as set forth in 40 CFR 60.33b(d), (d)(1) and (d)(3). 40 CFR 60.33b(d)(2) shall not apply.

i. The emission limit for carbon monoxide shall be the same as set forth in 40 CFR 60.34b(a). 4. Operating Practices. The operating practices applicable to each municipal waste combustor unit

subject to Rule 62-204.800(8)(b), F.A.C., shall be the same as set forth in 40 CFR 60.53b(b) and (c). 5. Operator Training. The operator training and certification requirements of 40 CFR 60.54b shall

apply to all municipal waste combustor units subject to Rule 62-204.800(8)(b), F.A.C. Compliance with these requirements shall be conducted according to the schedule specified in 40 CFR 60.39b(c)(4).

6. Fugitive Ash Emissions. The fugitive ash emissions requirements applicable to each municipal waste combustor unit subject to Rule 62-204.800(8)(b), F.A.C., shall be the same as set forth in 40 CFR 60.55b.

7. Compliance and Performance Testing. a. The compliance and performance testing requirements applicable to each municipal waste

combustor unit subject to Rule 62-204.800(8)(b), F.A.C., shall be the same as set forth in 40 CFR 60.58b, except as provided for under 40 CFR 60.24(b)(2) and Rule 62-204.800(8)(b)7., F.A.C.

b. The alternative performance testing schedule for dioxins/furans specified in 40 CFR 60.58b(g)(5)(iii) shall apply to municipal waste combustor plants that achieve a dioxin/furan emission level less than or equal to 15 nanograms per dry standard cubic meter, corrected to 7 percent oxygen.

8. Reporting and Recordkeeping. The reporting and recordkeeping requirements applicable to each municipal waste combustor unit subject to Rule 62-204.800(8)(b), F.A.C., shall be the same as set

Page 131: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-115 Air Emissions Management

forth in 40 CFR 60.59b, except for the siting requirements under 40 CFR 60.59b(a),(b)(5) and (d)(11).

9. Compliance Schedules. All municipal waste combustor plants subject to Rule 62-204.800(8)(b), F.A.C., shall comply with the compliance schedule specified in 40 CFR 60.39b(c)(1) and, where applicable, the compliance schedule specified in 40 CFR 60.39b(c)(5). The owners or operators of those facilities for which 40 CFR 60.39b(c)(1)(i) or (ii) applies shall, no later than September 16, 1996, submit to the Department either a closure agreement or a schedule for compliance with all applicable standards and conditions of Rule 62-204.800(8)(b), F.A.C. The schedule shall include dates of achievement for each of the increments of progress specified in 40 CFR 60.21(h)(1) through (5), hereby adopted and incorporated by reference.

10. Permit Application Deadline. Any municipal waste combustor plant which contains a municipal waste combustor unit subject to 40 C.F.R. 60, Subpart Cb, is subject to the permitting requirements of Chapter 62-213, F.A.C. Any municipal waste combustor plant subject to the permitting requirements of Chapter 62-213, F.A.C., solely because it is subject to 40 CFR 60, Subpart Cb, shall file an application for an operation permit under the requirements of Chapter 62-213, F.A.C., no later than July 15, 1997.

(c) Municipal Solid Waste Landfills. 40 CFR 60, Subpart Cc, Emission Guidelines and Compliance Times for Municipal Solid Waste Landfills, amended June 16, 1998, 63 FR 32743; amended February 24, 1999, 64 FR 9258 (effective July 1, 1999); is hereby adopted and incorporated by reference, subject to the following provisions.

1. Applicability. a. The facility to which Rule 62-204.800(8)(c), F.A.C., applies is each existing municipal solid

waste (MSW) landfill: (i) For which construction, reconstruction or modification was commenced before May 30,

1991; and (ii) Which has accepted waste at any time since November 8, 1987, or has additional design

capacity available for future waste deposition. b. Physical or operational changes made to an existing MSW landfill solely to comply with the

provisions of Rule 62-204.800(8)(c), F.A.C., are not considered a modification or reconstruction and would not subject an existing MSW landfill to the requirements of 40 CFR 60, Subpart WWW (see 40 CFR 60.750).

2. Definitions. The terms used but not defined in 40 CFR 60, Subpart Cc, have the meaning given to them in the Act and in Subparts A, B, and WWW of 40 CFR 60.

3. Standards for Air Emissions from MSW Landfills. a. Each owner or operator of an MSW landfill subject to Rule 62-204.800(8)(c), F.A.C., and

which also meets the following conditions as of December 31, 1996, shall comply with the provisions of 40 C.F.R. 60.752(b)(2)(i) through (v) commencing from December 31, 1996.

(i) The landfill has a design capacity greater than or equal to 2.5 million Megagrams and 2.5 million cubic meters. The landfill may calculate design capacity in either Megagrams or cubic meters for comparison with the exemption values. Any density conversions shall be documented and submitted with the initial design capacity report and any application for a solid waste permit; and

(ii) The landfill has a nonmethane organic compound (NMOC) emission rate of 50 Megagrams per year or more.

b. Any MSW landfill which has a design capacity greater than or equal to 2.5 million Megagrams and 2.5 million cubic meters but whose NMOC emission rate as of December 31, 1996, is less than 50 Megagrams per year shall comply with the provisions of 40 CFR 60.752(b)(2)(i) through (v) commencing from December 31 of the first year after 1996, for which the nonmethane organic compound emission rate equals or exceeds 50 Megagrams per year.

4. Compliance Procedures. Each owner or operator of an MSW landfill subject to the air emissions standards of Rule 62-204.800(8)(c)3., F.A.C., shall:

a. Comply with the operational standards in 40 CFR 60.753; b. Comply with the compliance provisions in 40 CFR 60.755; and

Page 132: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-116 Air Emissions Management

c. Comply with the monitoring provisions in 40 CFR 60.756. 5. Reporting and Recordkeeping. Each owner or operator of an MSW landfill to which Rule 62-

204.800(8)(c), F.A.C., applies shall comply with the reporting and recordkeeping provisions of 40 CFR 60.757 and .758, as applicable, except that the initial design capacity report and NMOC emission rate report described in 40 CFR 60.757 shall be submitted to the Department no later than December 31, 1996. The provisions of 40 C.F.R. 60.754, as applicable, shall be used to calculate the landfill NMOC emission rate for the purposes of the submittal of NMOC emission rate reports and determining whether the landfill has a nonmethane organic compound (NMOC) emission rate of 50 Megagrams per year or more.

6. Permit Application Deadline. Each existing MSW landfill that is subject to Rule 62-204.800(8)(c), F.A.C., and has a design capacity greater than or equal to 2.5 million Megagrams and 2.5 million cubic meters is subject to the permitting requirements of Chapter 62-213, F.A.C. Any existing MSW landfill subject to the requirements of Chapter 62-213, F.A.C., solely because it is subject to Rule 62-204.800(8)(c), F.A.C., shall file an application for an operation permit under the requirements of Chapter 62-213, F.A.C., no later than December 31, 1997.

7. Effective Date of State Emission Standards for MSW Landfills. The provisions of Rule 62-204.800(8)(c), F.A.C., shall become effective on December 31, 1996.

(d) Hospital/Medical/Infectious Waste Incinerators. 40 CFR 60, Subpart Ce, Emission Guidelines and Compliance Times for Hospital/Medical/Infectious Waste Incinerators promulgated September 15, 1997, 62 FR 48379, is hereby adopted and incorporated by reference, effective September 1, 1999, subject to the following provisions.

1. Applicability. The applicability of Rule 62-204.800(8)(d), F.A.C., shall be the same as set forth in 40 CFR 60.32e.

2. Definitions. The terms used but not defined in 40 CFR 60, Subpart Ce, have the meaning given them in the Clean Air Act and in 40 CFR 60, Subparts A, B, and Ec.

3. Emission Limiting Standards. a. The opacity limit applicable to each hospital/medical/infectious waste incinerator subject to

Rule 62-204.800(8)(d), F.A.C., shall be the same as set forth in 40 CFR 60.52c(b). b. Except as provided for in Rule 62-204.800(8)(d)3.c., F.A.C., the emission limits applicable to

each small, medium and large hospital/medical/infectious waste incinerator subject to Rule 62-2-4.800(8)(d), F.A.C., shall be the same as set forth in Table 1 of 40 CFR 60, Subpart Ce.

c. The emission limits applicable to each small hospital/medical/infectious waste incinerator, subject to Rule 62-204.800(8)(d), F.A.C., located more than 50 miles from the boundary of the nearest Standard Metropolitan Statistical Area (defined in 40 CFR 60.31e), and which burns less than 2,000 pounds per week of hospital waste and medical/infectious waste, shall be the same as set forth in Table 2 of 40 CFR 60, Subpart Ce. The 2,000 pound per week limitation shall not apply during performance tests.

4. Operator Training and Qualification. The operator training and qualification requirements applicable to each hospital/medical/infectious waste incinerator subject to Rule 60-204.800(8)(d), F.A.C., shall be the same as set forth in 40 CFR 60.53c.

5. Waste Management. The waste management plan requirements applicable to each hospital/medical/infectious waste incinerator subject to Rule 62-204.800(8)(d), F.A.C., shall be the same as set forth in 40 CFR 60.55c.

6. Inspection. Each small hospital/medical/infectious waste incinerator subject to the emission limits under Rule 62-204.800(8)(d)3.c., F.A.C., shall comply with the inspection requirements and inspection schedule set forth in 40 CFR 60.36e.

7. Compliance and Performance Testing. a. Except as provided for under Rule 62-204.800(8)(d)7.b., F.A.C., the compliance and

performance testing requirements applicable to each hospital/medical/infectious waste incinerator subject to Rule 62-204.800(8)(d), F.A.C., shall be the same as set forth in 40 CFR 60.56c, excluding the fugitive emissions testing requirements under 40 CFR 60.56c(b)(12) and (c)(3).

Page 133: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-117 Air Emissions Management

b. Each small hospital/medical/infectious waste incinerator subject to the emission limits under Rule 62-204.800(8)(d)3.c., F.A.C., shall comply with the compliance and testing requirements set forth in 40 CFR 60.37e(b).

8. Monitoring. a. Except as provided for under Rule 62-204.800(8)(d)8.b., F.A.C., the monitoring requirements

applicable to each hospital/medical/infectious waste incinerator subject to Rule 62-204.800(8)(d), F.A.C., shall be the same as set forth in 40 CFR 60.57c.

b. Each small hospital/medical/infectious waste incinerator subject to the emission limits under Rule 62-204.800(8)(d)3.c., F.A.C., shall comply with the monitoring requirements set forth in 40 CFR 60.37e(d).

9. Reporting and Recordkeeping. a. The reporting and recordkeeping requirements applicable to each hospital/medical/infectious

waste incinerator subject to Rule 62-204.800(8)(d), F.A.C., shall be the same as set forth in 40 CFR 60.58c(b), (c), (d), (e), and (f), excluding 60.58c(b)(2)(ii) and (b)(7).

b. In addition to the requirements of Rule 62-204.800(8)(d)9.a., F.A.C., each small hospital/medical/infectious waste incinerator subject to the emission limits under Rule 62-204.800(8)(d)3.c., F.A.C., shall comply with the reporting and recordkeeping requirements set forth in 40 CFR 60.38e(b).

10. Compliance Times. a. Each hospital/medical/infectious waste incinerator subject to Rule 62-204.800(8)(d), F.A.C.,

shall comply with the operator training and qualification requirements of Rule 62-204.800(8)(d)4., F.A.C., according to the schedule set forth in 40 CFR 60.39e(e).

b. Each small hospital/medical/infectious waste incinerator subject to the emission limits under Rule 62-204.800(8)(d)3.c., F.A.C., shall comply with the inspection requirements of Rule 62-204.800(8)(d)6., F.A.C., according to the schedule set forth in 40 CFR 60.39e(e).

c. Except as provided for under Rule 62-204.800(8)(d)10.d., F.A.C., each hospital/medical/infectious waste incinerator subject to Rule 62-204.800(8)(d), F.A.C., shall comply with all remaining requirements of Rule 62-204.800(8)(d), F.A.C., according to the schedule set forth in 40 CFR 60.39e(b).

d. Each hospital/medical/infectious waste incinerator subject to Rule 62-204.800(8)(d), F.A.C., that chooses to comply with the alternate schedule set forth in 40 CFR 60.39e(c), shall submit to the Department the information specified in 40 CFR 60.39e(d)(1)(i) and (ii) as part of the permit application required pursuant to Rule 62-204.800(8)(d)11., F.A.C.

11. Permit Application Deadline. Any hospital/medical/infectious waste incinerator subject to Rule 62-204.800(8)(d), F.A.C., is subject to the permitting requirements of Chapter 62-213, F.A.C. Any hospital/medical/infectious waste incinerator that becomes subject to the permitting requirements of Chapter 62-213, F.A.C., for the first time solely because it is subject to Rule 62-204.800(8)(d), F.A.C., shall file an application for an operation permit under the requirements of Chapter 62-213, F.A.C., no later than May 1, 2000, unless the facility will cease operations permanently within one year of the U.S. Environmental Protection Agency's approval of the Florida Department of Environmental Protection's 40 CFR 60, subpart Ce implementation plan, which case an application for an operation permit under the requirements of Chapter 62-213, F.A.C., shall not be required. Any hospital/medical/infectious waste incinerator that has previously filed an application for an operation permit under the requirements of Chapter 62-213, F.A.C., shall file an amendment to its application (if the permit has not been issued) or an application for a permit revision no later than May 1, 2000.

(9) Chapter 40, Code of Federal Regulations, Part 61, National Emission Standards for Hazardous Air

Pollutants.

(a) Definitions. For purposes of Rule 62-204.800(9), F.A.C., the definitions contained in the various provisions of 40 CFR Part 61, adopted herein shall apply, except that the term "Administrator" when

Page 134: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-118 Air Emissions Management

used in 40 CFR Part 61, shall mean the Secretary or the Secretary's designee except as noted in 40 CFR 61.157.

(b) Standards Adopted. The following National Emission Standards for Hazardous Air Pollutants contained in 40 CFR Part 61, revised as of July 1, 1996, or later as specifically indicated, are adopted and incorporated by reference.

1. 40 CFR 61, Subpart C, Beryllium. 2. 40 CFR 61, Subpart D, Beryllium Rocket Motor Firing. 3. 40 CFR 61, Subpart E, Mercury. 4. 40 CFR 61, Subpart F, Vinyl Chloride, except Section 61.66. 5. 40 CFR 61, Subpart J, Equipment Leaks (Fugitive Emission Sources) of Benzene, except

Subsection 61.112(c). 6. 40 CFR 61, Subpart K, Radionuclide Emissions from Elemental Phosphorous Plants. 7. 40 CFR 61, Subpart L, Benzene Emissions from Coke By-Product Recovery Plants, amended

February 12, 1999, 64 FR 7458 (effective July 1, 1999); except Subsection 61.136(d). 8. 40 CFR 61, Subpart M, National Emission Standard for Asbestos, amended February 12, 1999,

64 FR 7458 (effective July 1, 1999) except that DEP Form Number 62-257.900(1) shall be used in lieu of the form identified as Figure 3 in Section 61.145 of 40 CFR Part 61.

9. 40 CFR 61, Subpart N, Inorganic Arsenic Emissions from Glass Manufacturing Plants, amended February 12, 1999, 64 FR 7458 (effective July 1, 1999).

10. 40 CFR 61, Subpart O, Inorganic Arsenic Emissions from Primary Copper Smelters. 11. 40 CFR 61, Subpart P, Inorganic Arsenic Emissions from Arsenic Trioxide and Metallic

Arsenic Production Facilities. 12. 40 CFR 61, Subpart V, Equipment Leaks (Fugitive Emissions Sources). 13. 40 CFR 61, Subpart Y, Benzene Emissions from Benzene Storage Vessels, except Section

61.273. 14. 40 CFR 61, Subpart BB, Benzene Emissions from Benzene Transfer Operations, except

Section 61.353. 15. 40 CFR 61, Subpart FF, Benzene Emissions from Benzene Waste Operations.

(c) The National Emissions Standards for Hazardous Air Pollutants adopted by reference in this rule shall be controlling over other standards in the air pollution rules of the Department, except that any emissions limiting standard contained in or determined pursuant to the air pollution rules of the Department which is more stringent than one contained in a National Emission Standard, or which regulates pollutants or emissions units not regulated by an applicable National Emission Standard, shall apply.

(d) General Provisions Adopted. The general provisions of 40 CFR Part 61, Subpart A, revised as of July 1, 1996, and amended February 24, 1997, 62 FR 8314; and January 6, 1998, 63 FR 414; amended February 12, 1999, 64 CFR 7458 (effective July 1, 1999); are adopted and incorporated by reference except 40 CFR 61.04, 40 CFR 61.08, 40 CFR 61.11, and 40 CFR 61.18.

(e) Appendices Adopted. The following appendices of 40 CFR Part 61, revised as of July 1, 1996, or later as specifically indicated, are adopted and incorporated by reference:

1. 40 CFR 61 Appendix A, National Emission Standards for Hazardous Air Pollutants Compliance Status Information, amended February 12, 1999, 64 FR 7458 (effective July 1, 1999).

2. 40 CFR 61 Appendix B, Test Methods, except Method 111 for Polonium 210, Method 114 for Radionuclides and Method 115 for Radon-222, amended February 9, 1998, 63 FR 6493; and February 12, 1998, 63 FR 7199.

3. 40 CFR 61 Appendix C, Quality Assurance Procedures.

(10) Chapter 40, Code of Federal Regulations, Part 63, National Emission Standards for Hazardous Air Pollutants for Source Categories.

Page 135: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-119 Air Emissions Management

(a) Definitions. For the purposes of Rule 62-204.800(10), F.A.C., the definitions contained in the various provisions of 40 CFR Part 63, adopted herein shall apply, except that the term, "Administrator," when used in 40 CFR Part 63, shall mean the Secretary or the Secretary's designee.

(b) Standards Adopted. The following National Emission Standards for Hazardous Air Pollutants contained in 40 CFR Part 63, revised as of July 1, 1996, or later as specifically indicated, are adopted and incorporated by reference:

1. 40 CFR 63, Subpart F, Organic Hazardous Air Pollutants from the Synthetic Organic Chemical Manufacturing Industry, amended December 5, 1996, 61 FR 64572; January 17, 1997, 62 FR 2722; and May 12, 1998, 63 FR 26078; amended April 26, 1999, 64 FR 20189 (effective October 1, 1999).

2. 40 CFR 63, Subpart G, Organic Hazardous Air Pollutants from the Synthetic Organic Manufacturing Industry Process Vents, Storage Vessels, Transfer Operations, and Wastewater, amended December 5, 1996, 61 FR 64572; and January 17, 1997, 62 FR 2722; and December 9, 1998, 63 FR 67787 (effective April 1, 1999); amended April 26, 1999, 64 FR 20189 (effective October 1, 1999).

3. 40 CFR 63, Subpart H, Organic Hazardous Air Pollutants for Equipment Leaks, amended January 17, 1997, 62 FR 2722; amended April 26, 1999, 64 FR 20189 (effective October 1, 1999).

4. 40 CFR 63, Subpart I, Organic Hazardous Air Pollutants for Certain Processes Subject to the Negotiated Regulation for Equipment Leaks, amended January 17, 1997, 62 FR 2722.

5. 40 CFR 63, Subpart L, Coke Oven Batteries. 6. 40 CFR 63, Subpart M, Perchloroethylene Dry Cleaning Facilities, amended September 19,

1996, 61 FR 49263. 7. 40 CFR 63, Subpart N, Chromium Emissions From Hard and Decorative Chromium

Electroplating and Chromium Anodizing Tanks, amended January 30, 1997, 62 FR 4463; and August 11, 1997, 62 FR 42918.

8. 40 CFR 63, Subpart O, Ethylene Oxide Emissions Standards for Sterilization Facilities, amended December 9, 1997, 62 FR 64736; and December 4, 1998, 63 FR 66990 (effective April 1, 1999).

9. 40 CFR 63, Subpart Q, Industrial Process Cooling Towers, amended July 23, 1998, 63 FR 39516 (effective April 1, 1999).

10. 40 CFR 63, Subpart R, Gasoline Distribution Facilities (Bulk Gasoline Terminals and Pipeline Breakout Stations), amended February 28, 1997, 62 FR 9087.

11. 40 CFR 63, Subpart S, Pulp and Paper Industry, promulgated April 15, 1998, 63 FR 18504; amended August 7, 1998, 63 FR 42238; September 16, 1998, 63 FR 49455; and December 28, 1998, 63 FR 71385 (effective April 1, 1999); amended April 26, 1999, 64 FR 17555 (effective October 1, 1999); except 40 CFR 63.453(m), 40 CFR 63.457(b)(5)(iii), and 40 CFR 63.457(c)(3)(ii).

12. 40 CFR 63, Subpart T, Halogenated Solvent Cleaning, amended May 5, 1998, 63 FR 24749; and December 11, 1998, 63 FR 68397 (effective April 1, 1999).

13. 40 CFR 63, Subpart U, Group I Polymers and Resins, amended January 14, 1997, 62 FR 1835; and July 15, 1997, 62 FR 37720; amended March 9, 1999, 64 FR 11536 (effective July 1, 1999); amended May 7, 1999, 64 FR 24511, and June 30, 1999 64 FR 35023 (effective October 1, 1999).

14. 40 CFR 63, Subpart W, Epoxy Resins Production and Non-Nylon Polyamides Production. 15. 40 CFR 63, Subpart X, Secondary Lead Smelters, amended December 12, 1996, 61 FR

65334; and June 13, 1997, 62 FR 32209; and August 24, 1998, 63 FR 45007 (effective April 1, 1999); amended January 29, 1999, 64 FR 4570 (effective July 1, 1999).

16. 40 CFR 63, Subpart Y, Marine Tank Vessel Loading Operations. 17. 40 CFR 63, Subpart AA, Phosphoric Acid Manufacturing Plants, promulgated June 10, 1999,

64 FR 31358 (effective October 1, 1999). 18. 40 CFR 63, Subpart BB, Phosphate Fertilizer Production Plants, promulgated June 10, 1999,

64 FR 31358 (effective October 1, 1999).

Page 136: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-120 Air Emissions Management

19. 40 CFR 63, Subpart CC, Petroleum Refineries, amended February 21, 1997, 62 FR 7937; March 20, 1998, 63 FR 13533; May 18, 1998, 63 FR 27212; and June 9, 1998, 63 FR 31358; and August 18, 1998, 63 Fr 44135 (effective April 1, 1999).

20. 40 CFR 63, Subpart EE, Magnetic Tape Manufacturing Operations, amended April 29, 1999, 64 FR 17460 (effective July 1, 1999).

21. 40 CFR 63, Subpart GG, Aerospace Manufacturing and Rework Facilities, amended December 17, 1996, 61 FR 66226; March 27, 1998, 63 FR 15006; and September 1, 1998, 63 FR 46525 (effective April 1, 1999).

22. 40 CFR 63, Subpart HH, Oil and Natural Gas Production Facilities, promulgated June 17, 1999, 64 FR 32610 (effective October 1, 1999).

23. 40 CFR 63, Subpart II, Shipbuilding and Ship Repair (Surface Coating), amended December 17, 1996, 61 FR 66226.

24. 40 CFR 63, Subpart JJ, Wood Furniture Manufacturing Operations, amended June 3, 1997, 62 FR 30257; June 9, 1997, 62 FR 31361; and December 28, 1998, 63 FR 71376 (effective April 1, 1999).

25. 40 CFR 63, Subpart KK, Printing and Publishing Industry. 26. 40 CFR 63, Subpart LL, Primary Aluminum Reduction Plants, promulgated October 7, 1997,

62 FR 52384. 27. 40 CFR 63, Subpart SS, Closed Vent Systems, Control Devices, Recovery Devices and

Routing to a Fuel Gas System or a Process, promulgated June 29, 1999, 64 FR 34854 (effective October 1, 1999).

28. 40 CFR 63, Subpart TT, Equipment Leaks -- Control Level 1, promulgated June 29, 1999, 64 FR 34854 (effective October 1, 1999).

29. 40 CFR 63, Subpart UU, Equipment Leaks -- Control Level 2 Standards, promulgated June 29, 1999, 64 FR 34854 (effective October 1, 1999).

30. 40 CFR 63, Subpart WW, Storage Vessels (Tanks) -- Control Level 2, promulgated June 29. 1999, 64 FR 34854 (effective October 1, 1999).

31. 40 CFR 63, Subpart YY, Generic Maximum Achievable Control Technology Standards, promulgated June 29, 1999, 64 FR 34854 (effective October 1, 1999).

32. 40 CFR 63, Subpart CCC, Steel Pickling -- HCL Process Facilities and Hydrochloric Acid Regeneration Plants, promulgated June 22, 1999, 64 FR 33202 (effective October 1, 1999).

33. 40 CFR 63, Subpart DDD, Mineral Wool Production, promulgated June 1, 1999, 64 FR 29490 (effective October 1, 1999).

34. 40 CFR 63, Subpart EEE, Hazardous Waste Combustors, promulgated June 19, 1998, 63 FR 33782.

35. 40 CFR 63, Subpart GGG, Pharmaceuticals Production, promulgated September 21, 1998, 63 FR 50280 (effective April 1, 1999).

36. 40 CFR Part 63, Subpart HHH, Natural Gas Transmission and Storage Facilities, promulgated June 17, 1999, 64 FR 32610 (effective October 1, 1999).

37. 40 CFR 63, Subpart m, Flexible Polyurethane Foam Production, promulgated October 7, 1998, 63 FR 53979 (effective April 1, 1999).

38. 40 CFR 63, Subpart JJJ, Group IV Polymers and Resins, amended October 18, 1996, 61 FR 54342; November 25, 1996, 61 FR 59849; January 14, 1997, 62 FR 1835; June 6, 1997, 62 FR 30993; February 27, 1998, 63 FR 9944; and March 31, 1998, 63 FR 15312; amended March 9, 1999, 64 FR 11536 (effective July 1, 1999); amended May 7, 1999, 64 FR 24511, June 8, 1999, 64 FR 30406, and June 30, 1999, 64 FR 35023 (effective October 1, 1999).

39. 40 CFR 63, Subpart LLL, Portland Cement Manufacturing Industry, promulgated June 14, 1999, 64 FR 31898 (effective October 1, 1999). If a facility becomes subject to the permitting requirements of Chapter 62-213, F.A.C., solely because it is subject to the emission limiting requirements of 40 CFR Part 63, Subpart LLL, the facility shall submit an application for such permit no later than October 1, 2000.

40. 40 CFR 63, Subpart MMM, Pesticide Active Ingredient Production, promulgated June 23, 1999, 64 FR 33550 (effective October 1, 1999).

Page 137: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-121 Air Emissions Management

41. 40 CFR 63, Subpart NNN, Wool Fiberglass Manufacturing, promulgated June 14, 1999, 64 FR 31695 (effective October 1, 1999).

42. 40 CFR 63, Subpart PPP, Polyether Polyols Production, promulgated June 1, 1999, 64 FR 29420 (effective October 1, 1999).

43. 40 CFR 63, Subpart TTT, Primary Lead Smelting, promulgated June 4, 1999, 64 FR 30194 (effective October 1, 1999).

44. 40 CFR 63, Subpart XXX, Ferroalloys Production: Ferromanganese and Silicomanganese, promulgated May 20, 1999, 64 FR 27450 (effective October 1, 1999).

(c) The National Emissions Standards for Hazardous Air Pollutants adopted by reference in this rule

shall be controlling over other standards in the air pollution rules of the Department, except that any emissions limiting standard contained in or determined pursuant to the air pollution rules of the Department which is more stringent than one contained in a National Emission Standard, or which regulates pollutants or emissions units not regulated by an applicable National Emission Standard, shall apply.

(d) General Subparts Adopted. The following general subparts of 40 CFR Part 63 are adopted and incorporated by reference.

1. 40 CFR Part 63, Subpart A, General Provisions, amended May 4, 1998, 63 FR 24436; and October 7, 1998, 63 FR 53979 (effective April 1, 1999); amended February 12, 1999, 64 FR 7458 (effective July 1, 1999); except 40 CFR 63.5(e), 40 CFR 63.5(f), 40 CFR 63.6(g), 40 CFR 63.6(h)(9), 40 CFR 63.6(j), 40 CFR 63.13, and 40 CFR 63.14.

2. 40 CFR Part 63, Subpart B, Requirements for Control Technology Determinations for Major Sources in Accordance with Clean Air Act Sections, Sections 112(g) and 112(j), amended December 27, 1996, 61 FR 68384, is adopted and incorporated by reference, subject to the following provisions.

a. The "effective date of Section 112(g)(2)(B)" as defined in 40 CFR 63.41 shall be July 1, 1997.

b. The "Notice of MACT Approval" as defined in 40 CFR 63.41 shall be the air construction permit.

c. The "permitting authority" as defined in 40 CFR 63.41 shall be the Department. d. In lieu of the administrative procedures for review of the Notice of MACT Approval as set

forth in 40 CFR 63.43(f)(1) through (5), the Department will follow the permit processing procedures of Rule 62-4.055, F.A.C.

e. In lieu of the opportunity for public comment on the Notice of MACT Approval as set forth in 40 CFR 63.43(h), the Department will provide opportunity for public comment on the Notice of MACT Approval pursuant to Rule 62-210.350, F.A.C.

f. The Notice of MACT Approval shall become effective upon issuance of the air construction permit by the Department.

3. 40 CFR Part 63, Subpart C, List of Hazardous Air Pollutants, Petitions Process, Lesser Quantity Designations, Source Category List, amended April 10, 1998, 63 FR 17838; and May 26, 1998, 63 FR 28554.

4. 40 CFR Part 63, Subpart D, Compliance Extensions for Early Reductions of Hazardous Air Pollutants, except any notice required to be published by the Department shall be prepared by the Department and published by the applicant with proof of publication submitted to the Department.

(e) Appendices Adopted. The following appendices of 40 CFR Part 63, revised as of July 1, 1996, or later as specifically indicated, are adopted and incorporated by reference:

1. Appendix A, Test Methods, amended March 17, 1997, 62 FR 12546; October 7, 1997, 62 FR 52384; March 27, 1998, 63 FR 15006; and April 15, 1998, 63 FR 18504.

2. Appendix B, Sources Defined for Early Reduction Provisions. 3. Appendix C, Determination of the Fraction Biodegraded (F(bio)) in a Biological Treatment

Unit, amended December 9, 1998, 63 Fr 67787 (effective April 1, 1999). 4. Appendix D, Alternative Validation Procedure for EPA Waste and Wastewater Methods.

Page 138: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-122 Air Emissions Management

(11) Chapter 40, Code of Federal Regulations, Part 64, Compliance Assurance Monitoring. The provisions

of 40 CFR 64, promulgated October 22, 1997, 62 FR 54940, are adopted and incorporated by reference. (12) Chapter 40, Code of Federal Regulations, Part 68 (Reserved). (13) Chapter 40, Code of Federal Regulations, Part 70, State Operating Permit Programs. The provisions of

40 CFR Part 70, Sections 70.1 through 70.11, revised as of July 1, 1996, and amended October 22, 1997, 62 FR 54946, are adopted and incorporated by reference.

(14) Chapter 40, Code of Federal Regulations, Part 72, Permits Regulation. The following subparts of 40

C.F.R. Part 72, revised as of July 1, 1996, are adopted and incorporated by reference: (a) 40 CFR 72, Subpart A, Acid Rain Program General Provisions. (b) 40 CFR 72, Subpart B, Designated Representative. (c) 40 CFR 72, Subpart C, Acid Rain Permit Applications. (d) 40 CFR 72, Subpart D, Acid Rain Compliance Plan and Compliance Options. (e) 40 CFR 72, Subpart E, Acid Rain Permit Contents. (f) 40 CFR 72, Subpart F, Federal Acid Rain Permit Issuance Procedures. (g) 40 CFR 72, Subpart G, Acid Rain Phase II Implementation. (h) 40 CFR 72, Subpart H, Permit Revisions. (i) 40 CFR 72, Subpart I, Compliance Certification.

(15) Chapter 40 Code of Federal Regulations, Part 73, Sulfur Dioxide Allowance System. The following subparts of 40 CFR Part 73, revised as of July 1, 1996, are adopted and incorporated by reference:

(a) 40 CFR 73, Subpart A, Background and Summary. (b) 40 CFR 73, Subpart B, Allowance Allocations. (c) 40 CFR 73, Subpart C, Allowance Tracking System. (d) 40 CFR 73, Subpart D, Allowance Transfers. (e) 40 CFR 73, Subpart E, Auctions, Direct Sales, and Independent Power Producers Written

Guarantee. (f) 40 CFR 73, Subpart F, Energy Conservation and Renewable Energy Reserve. (g) 40 CFR 73, Subpart G, Small Diesel Refineries.

(16) Chapter 40, Code of Federal Regulations, Part 75, Continuous Emission Monitoring. (a) The following subparts of 40 CFR Part 75, revised as of July 1, 1996, are adopted and incorporated

by reference: 1. 40 CFR 75, Subpart A, General. 2. 40 CFR 75, Subpart B, Monitoring Provisions. 3. 40 CFR 75, Subpart C, Operation and Maintenance Requirements. 4. 40 CFR 75, Subpart D, Missing Data Substitution Procedures. 5. 40 CFR 75, Subpart E, Alternative Monitoring Systems. 6. 40 CFR 75, Subpart F, Recordkeeping Requirements. 7. 40 CFR 75, Subpart G, Reporting Requirements.

(b) The following appendices of 40 C.F.R. Part 75, revised as of July 1, 1996, or later as specifically indicated, are adopted and incorporated by reference:

1. Appendix A, Specifications and Test Procedures. 2. Appendix B, Quality Assurance and Quality Control Procedures. 3. Appendix C, Missing Data Estimation Procedures. 4. Appendix D, Optional SO(2) Emissions Data Protocol for Gas-Fired and Oil-Fired Units. 5. Appendix E, Optional NO(x) Emissions Estimation Protocol for Gas-Fired Peaking Units and

Oil-Fired Peaking Units. 6. Appendix F, Conversion Procedures, amended November 20, 1996, 61 FR 59142. 7. Appendix G, Determination of CO(2) Emissions.

Page 139: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

1-123 Air Emissions Management

8. Appendix H, Revised Traceability Protocol No. 1.

(17) Chapter 40, Code of Federal Regulations, Part 76, Acid Rain Nitrogen Oxides Emission Reduction Program.

(a) The provisions of 40 CFR Part 76,Sections 76.1 through 76.16, revised as of December 19, 1996, 61 FR 67112, and amended January 23, 1997, 62 FR 3463, and June 12, 1997,62 FR 32038, are adopted and incorporated by reference.

(b) The following appendices of 40 CFR Part 76, revised as of July 1, 1996, or later as specifically indicated, are adopted and incorporated by reference:

1. Appendix A, Phase I Affected Coal-Fired Utility Units with Group 1 or Cell Burner Boilers. 2. Appendix B, Procedures and Methods for Estimating Costs of Nitrogen Oxides Controls

Applied to Group 1, Phase I Boilers.

(18) Chapter 40, Code of Federal Regulations, Part 77, Excess Emissions. The provisions of 40 CFR Part 77, Sections 77.1 through 77.6, revised as of July 1, 1996, are adopted and incorporated by reference.

(19) Chapter 40, Code of Federal Regulations, Part 78, Appeal Procedures for Acid Rain Program. The

provisions of 40 CFR Part 78, Sections 78.1 through 78.20, revised as of July 1, 1996, are adopted and incorporated by reference.

(20) Chapter 40, Code of Federal Regulations, Part 81, Designation of Areas for Air Quality Planning

Purposes. The following sections of 40 C.F.R. Part 81, revised as of July 1, 1996, are adopted and incorporated by reference:

(a) 40 CFR 81, Section 81.49, Southeast Florida Intrastate Air Quality Control Region. (b) 40 CFR 81, Section 81.68, Mobile (Alabama) -- Pensacola --Panama City (Florida) -- Southern

Mississippi Interstate Air Quality Control Region. (c) 40 CFR 81, Section 81.91, Jacksonville (Florida) -- Brunswick (Georgia) Interstate Air Quality

Control Region. (d) 40 CFR 81, Section 81.95, Central Florida Intrastate Air Quality Control Region. (e) 40 CFR 81, Section 81.96, West Central Florida Intrastate Air Quality Control Region. (f) 40 CFR 81, Section 81.97, Southwest Florida Intrastate Air Quality Control Region.

(21) Chapter 40, Code of Federal Regulations, Part 82, Protection of Stratospheric Ozone. The following subparts of 40 CFR Part 82, revised as of July 1, 1996, are adopted and incorporated by reference:

(a) 40 CFR 82, Subpart A, Production and Consumption Controls. (b) 40 CFR 82, Subpart B, Servicing of Motor Vehicle Air Conditioners. (c) 40 CFR 82, Subpart C, Ban on Nonessential Products Containing Class I Substances and Ban on

Nonessential Products Containing or Manufactured With Class II Substances. (d) 40 CFR 82, Subpart E, The Labeling of Products Using Ozone -- Depleting Substances. (e) 40 CFR 82, Subpart F, Recycling and Emissions Reduction. (f) 40 CFR 82, Subpart G, Significant New Alternatives Policy Program.

(22) Chapter 40, Code of Federal Regulations, Part 93, Determining Conformity of Federal Actions to State or Federal Implementation Plans. The provisions of 40 CFR 93, Subpart A, Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded or Approved Under Title 23 U.S.C. or the Federal Transit Laws, amended August 15, 1997, 62 FR 43780, are adopted and incorporated by reference.

Page 140: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

SECTION 2

CULTURAL RESOURCES MANAGEMENT

Florida Supplement, June 2000 This section covers the state requirements for Cultural Resources Management and is intended to supplement the U.S. TEAM Guide. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

Definitions

• Archaeological Materials - artifacts and remains of historic shipwreck sites including, but not limited to, ships' structure and rigging, hardware, tools, utensils, cargo, personal items of crew and passengers, and treasure trove (Florida Administrative Code, Title 1A, Chapter 31, Section 0015(3) (FAC 1A-31.0015(3))).

• Division - the Division of Historical Resources of the Florida Department of State (FAC 1A-31.0015(5)). • Exploration Agreement - a contractual agreement between any person and the Division that authorizes the

conduct of certain exploration activities for archaeological materials on state-owned sovereignty submerged lands, imposes conditions on the conduct of those activities, and does not create any interest in real property or in any state-owned sovereignty submerged lands (FAC 1A-31.0015(6)).

• Person - any individual, firm, association, joint venture, partnership, estate, trust, syndicate, fiduciary,

corporation, group, or governmental entity or officer (FAC 1A-31.0015(7)). • Salvage Agreement - a contractual agreement between any person and the Division that authorizes the conduct

of certain excavation or removal activities for archaeological materials on state-owned sovereignty submerged lands, imposes conditions on the conduct of these activities, and does not create any interest in any real property or in any state-owned sovereignty submerged lands (FAC 1A-31.0015(8)).

• Sovereignty Submerged Lands - those lands including, but not limited to, tidal flats, sand bars, shallow banks,

and lands waterward of the ordinary or mean high water line, under navigable fresh and salt waters to which the State of Florida acquired title on 3 March 1845 by virtue of statehood, and which have not been heretofore conveyed or alienated (FAC 1A-31.0015(9)).

Page 141: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts
Page 142: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

CULTURAL RESOURCES MANAGEMENT GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: Missing Checklist Items CR.2.1.FL.

Archaeological/Indian Sites CR.15.1.FL. through CR.15.10.FL.

Page 143: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

COMPLIANCE CATEGORY: CULTURAL RESOURCES MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

CR.2. MISSING CHECKLIST ITEMS

CR.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 144: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

COMPLIANCE CATEGORY: CULTURAL RESOURCES MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

CR.15. ARCHAEOLOGICAL/ INDIAN SITES

CR.15.1.FL. Specific procedures must be followed when unmarked human burials are discovered during archaeological excavations authorized by the Division or conducted by an archaeologist employed by an accredited institution (FAC 1A-44.003).

Verify that the following procedures are followed when unmarked human burials are discovered during archaeological excavations authorized by the Division or conducted by an archaeologist employed by an accredited institution:

- all activity that might disturb the burial, beyond those investigations required to ascertain the age of the burial, ceases pending authorization to continue from either the State Archaeologist or the District Medical Examiner, whomever has jurisdiction

- the archaeologist in charge of the excavations immediately determines, as closely as possible, the age of the remains

- if the archaeologist in charge of the excavations determines that the remains are less than 75 yr old, the District Medical Examiner is notified within 7 days

- if the archaeologist in charge of the investigations determines that the burial is greater than 75 yr old, the State Archaeologist is notified within 7 days

- archaeological activities resume after the State Archaeologist is notified - the archaeologist conducting the excavations submits a report to the State

Archaeologist (even in cases where the District Medical Examiner has jurisdiction) within 15 days of the discovery of the burial that contains the following information:

- a description of the burial and any associated artifacts - the archaeologist's opinion of the age and cultural affiliation of the

burial - a description of the biological characteristics of the remains - a recommendation for where the skeletal remains and any associated

artifacts should be held pending final disposition.

CR.15.2.FL. Specific procedures must be followed when unmarked human burials are discovered other than during archaeological excavations authorized by the Division or conducted by an archaeologist employed by an accredited institution (FAC 1A-44.004).

Verify that the following procedures are followed when unmarked human burials are discovered other than during archaeological excavations authorized by the Division or conducted by an archaeologist employed by an accredited institution:

- all activity that may disturb the burial ceases immediately and does not resume until so authorized by the District Medical Examiner or the State Archaeologist, whomever has jurisdiction

- within 7 days, the individual in charge of the activity that lead to the discovery notifies the District Medical Examiner

- all activity that may disturb the burial is ceased pending notification and authorization to proceed.

Page 145: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

COMPLIANCE CATEGORY: CULTURAL RESOURCES MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

(NOTE: Nothing in this section should be construed as requiring excavation of human skeletal remains unless excavation is required to prevent destruction of the remains.)

CR.15.3.FL. Human skeletal remains must be treated in accordance with specific requirements (FAC 1A-45.002) [Revised July 1998].

Verify that human skeletal materials are provided safe, proper, and respectful care.

Verify that steps are taken to ensure that human skeletal remains are not damaged nor destroyed.

Verify that human skeletal remains are available for legitimate scientific study.

Verify that the Federal facility requests that the Division of Historical Resources assume jurisdiction over human skeletal it no longer desires to curate when such remains represent the burial of an individual that has been dead more than 75 yr.

Verify that the Federal facility requests the local District Medical Examiner assume jurisdiction over human skeletal it no longer desires to curate when such remains represent the burial of an individual that has been dead less than 75 yr.

(NOTE: The provisions of this rule do not restrict the legal, medical, or educational use of human skeletal remains in any setting not open to the general public for the purpose of viewing such remains, or the display of human skeletal remains or associated burial artifacts in a manner not objectionable to persons or groups with a kinship, tribal, community, or ethnic relationship to the individual whose remains are displayed.)

(NOTE: The use of casts or other replicas of human skeletal remains in public displays and exhibits designed to provide information to the public about human biology and anatomy and about the customs of particular groups is encouraged.)

CR.15.4.FL. Federal facilities conducting field investigation activities on a designated archaeological site must be permitted by the Division (Florida Statutes (FS) 267.11).

Verify that Federal facilities which conduct field investigation activities on a designated archaeological site are permitted by the Division.

CR.15.5.FL. Federal facilities that are permitted by the Division for excavation and surface reconnaissance on state lands must meet specific

Verify that Federal facilities which are permitted by the Department for excavation and surface reconnaissance on stated land or land within the boundaries of designated state archaeological landmarks or landmark zones comply with all rules and regulations prescribed by the Division in the permit, and meet the following requirements:

Page 146: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

COMPLIANCE CATEGORY: CULTURAL RESOURCES MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

qualifications (FS 267.12). requirements:

- possesses or will secure the archaeological expertise for the performance of systematic archaeological field research

- performs a comprehensive analysis and interpretation in the form of publishable reports and monographs

- such reports are submitted to the Division.

Verify that no archaeological activity is commenced by an accredited institution until the Division determines that the planned project will be in conformance with regulations.

Verify that all specimens collected under a permit issued by the Division belong to the state with the title thereto vested in the Division.

CR.15.6.FL. Specific prohibitions apply to Federal facilities conducting field investigations on any land owned or controlled by the state or its departments or institutions (FS 267.13(1)).

Verify that no Federal facility conducts field investigations on any land owned or controlled by the state or its departments or institutions or within the boundaries of any designated state archaeological landmark or landmark zone without being permitted by the Division or having first received from the Division a notice to proceed under the procedures relating to accredited institutions.

Verify that no Federal facility appropriates, defaces, destroys, or otherwise alters any archaeological site or specimen located upon any land owned or controlled by the state or within the boundaries of a designated state archaeological landmark or landmark zone, except in the course of activities pursued under the authority of a permit or under procedures relating to accredited institutions granted by the Division.

CR.15.7.FL. Exploration, excavation, or salvage of archaeological materials from state-owned sovereignty submerged lands must have Division approval (FAC 1A-31.0035(2)).

Verify that persons conducting activities or operations for the exploration, excavation, or salvage of archaeological materials from state-owned sovereignty submerged lands have an exploration or salvage agreement with the Division.

CR.15.8.FL. Persons operating under an exploration agreement must meet specific requirements (FAC 1A-31.0055(2), (3), and (5)).

Verify that prop-wash excavating devices are not used during exploration activities except to define the limits of the archaeological site or to remove noncultural overburden.

(NOTE: Any other use of prop-wash devices must be done only with the specific approval from the Division.)

Page 147: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

COMPLIANCE CATEGORY: CULTURAL RESOURCES MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that archaeological materials are not removed from their location, except in coordination with the Division and to the extent necessary to document the age and nature of the vessel and materials discovered.

Verify that all exploratory data collected under the exploration agreement is provided to the Division within a reasonable time period.

CR.15.9.FL. Persons operating under a salvage agreement must meet specific requirements (FAC 1A-31.0065(2)).

Verify that persons operating under a salvage agreement follow all the guidelines specified in the agreement, including procedures for the following:

- position finding - artifact tagging and inventory - artifact handling - artifact processing and stabilization - the reporting of all such data to the Division.

CR.15.10.FL. A list of vessels used in search or salvage operations must be submitted to the Division (FAC 1A-31.011).

Verify that, in advance of initial exploration or salvage activities or operations, the Division is furnished with a list of all vessels to be used in the search or salvage operation, including a description and the registration number of each vessel.

Verify that no vehicle engages in exploration or salvage operations if it has not been reported to the Division.

Verify that all vessels used in exploration or salvage activities or operations are marked with identifying exploration or salvage agreement numbers supplied by the Division in a form visible from air and sea.

Verify that written identification provided by the Division is carried at all times by the vessel engaged in the search and salvage operations.

Page 148: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-1 Hazardous Materials Management

SECTION 3

HAZARDOUS MATERIALS MANAGEMENT

Florida Supplement, June 2000

This section covers the state requirements for Hazardous Materials Management and is intended to supplement the U.S. TEAM Guide. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

Definitions

• Agricultural Employee - each full-time and each part-time non-seasonal employee within this state reported by the owner or operator of an agricultural facility to the Department of Labor and Employment Security for unemployment compensation tax purposes, the total number of which shall not be less than the number for the month reflecting the lowest number of employees for the calendar year (Florida Administrative Code, Title 9G, Chapter 14, Section 002 (FAC 9G-14.002)) [Added July 1998].

• Agricultural Facility - a facility which engages primarily in the commercial production of agricultural

commodities, and has hazardous materials present which qualify for the routine agricultural use exemption under the Emergency Planning and Community Right-to-Know Act (EPCRA), Section 311(e). Commercial production shall include the handling and packaging of the owner/operator's agricultural commodities only when the handling and packaging is incidental to or in conjunction with the owner/operator's agricultural operation (FAC 9G-14.002) [Added July 1998].

• Commission - the State Hazardous Materials Emergency Response Commission created pursuant to s. 301 of

EPCRA (FAC 9G-14.002) [Added July 1998]. • Committee - any local emergency planning committee established in the state pursuant to s. 301 of EPCRA

(FAC 9G-14.002) [Added July 1998]. • Department - the Department of Labor and Employment Security (Florida Statutes (FS) 442.102). • Department - the Department of Community Affairs (FAC 9G-14.002) [Added July 1998]. • Employee - any person employed on or after the effective date [1 January 1985] of this act who is, has been, or

may be exposed under normal operating conditions or foreseeable emergencies to any toxic substance in the employer's workplace (FS 442.102).

• Employee - each full-time and each part-time employee employed within the State by the owner or operator of a

facility as reported to the Department of Labor and Employment Security for unemployment compensation tax purposes for the last month of the calendar year (FAC 9G-14.002) [Added July 1998].

• Employer - any person, firm, corporation, partnership, association, or other entity engaged in a business or

providing a service, including the state and any of its political subdivisions, that manufactures, produces, uses, applies, or stores toxic substances. An independent contractor or subcontractor shall be deemed the sole employer of his employees, even when his employees are performing work at the workplace of another employer. The term employer does not include:

- employers employing two or fewer employees - employers of domestic workers in private homes

Page 149: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-2 Hazardous Materials Management

- bona fide farmers or an association of farmers employing employees in agricultural labor performed on a farm, or in the onsite packing facilities for agricultural products from such farms, who employ 12 or fewer regular employees and who employ 24 or fewer other employees at one time for seasonal or occasional agricultural labor that is completed in less than 30 continuous days, provided such seasonal or occasional employment does not exceed 60 days in the same calendar year. The term farm includes stock, dairy, poultry, fruit, furbearing animal, fish, and truck farms, ranches, nurseries, and orchards. The term agricultural labor includes field foremen, timekeepers, checkers, and other farm labor supervisory personnel

- employers of professional athletes, such as professional boxers, wrestlers, and other professional baseball, football, basketball, hockey, polo, tennis, jai alai, and similar players

- employers employing labor under court sentences requiring the performance of community services as provided in FS 316.193 (FS 442.102).

• Employer - any governmental body and any employer subject to the Hazard Communication Standard adopted

by the Occupational Safety and Health Administration as codified in 29 CFR 1910.1200, as amended by 52 FR 31,852, August 24, 1987. The term specifically includes those employers subject to this standard in the manufacturing sector and the nonmanufacturing sector.) (FS 252.87) [Added July 1998].

• EPCRA - the Emergency Planning and Community Right-to-Know Act of 1986, Title III of the Superfund

Amendments and Reauthorization Act of 1986, ss. 300 through 329 of Pub. L. No. 99-499, 42 U.S.C. ss. 11001, et seq.; and federal regulations adopted thereunder (FAC 9G-14.002) [Added July 1998].

• Expose or Exposure - any situation arising from or related to the work operation of an employer in which an

employee may inhale, absorb through the skin or eyes, accidentally ingest, or otherwise come into contact with a toxic substance (FS 442.102).

• Facility - facility as defined in s. 329 of EPCRA. Vehicles placarded according to 49 Code of Federal

Regulations shall not be considered a facility except for the purposes of Section 304 of EPCRA (FAC 9G-14.002) [Added July 1998].

• Governmental Body - the state, its political subdivisions, and all agencies and instrumentalities thereof (FS

252.87) [Added July 1998]. • Hazardous Material - any hazardous chemical, toxic chemical, or extremely hazardous substance, as defined in

s. 329 of EPCRA (FAC 9G-14.002) [Added July 1998]. • Owner/Operator - a sole proprietorship, or partnership, or company with an assigned Federal Employer

Identification number, that reports employees to the Florida Department of Labor and Employment Security including, at a minimum, employees at the facility in Florida subject to reporting under EPCRA Sections 302 or 312 (FAC 9G-14.002) [Added July 1998].

• Report - a notification under s. 302 of EPCRA or an inventory form under s. 312 of EPCRA. (FAC 9G-14.002)

[Added July 1998]. • Toxic Substances - any chemical substance or mixture in a gaseous, liquid, or solid state, which substance or

mixture causes a significant risk to safety or health during, or as a proximate result of, any customary or reasonably foreseeable handling or use; which is listed in the Florida Substance List complied in accordance with the provisions of FS 442.103; and which is manufactured, produced, used, applied, or stored in the workplace (FS 442.102).

• Work Area - a room or defined space in a workplace where toxic sustenance are manufactured, produced, used,

applied, or stored and where employees are present in the course of their employment (FS 442.102).

Page 150: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-3 Hazardous Materials Management

• Workplace - an establishment or business of an employer at one geographic location at which work is performed

and which contains one or more work areas. In the case of the state or any of its political subdivisions acting as an employer, the workplace is defined as all work areas wholly owned or controlled by the state or the subdivision. In the case of an independent contractor or subcontractor, the workplace is defined as all work area wholly owned or controlled by the independent contractor or subcontractor (FS 442.102).

Page 151: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-4 Hazardous Materials Management

Page 152: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-5 Hazardous Materials Management

HAZARDOUS MATERIALS MANAGEMENT GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: Missing Checklist Items HM.2.1.FL. Personnel Training HM.10.1.FL. through HM.10.3.FL. Releases of Hazardous Materials HM.20.1.FL. Spills reportable under Title II as well as other spills to the water or land must be reported to the Division of Emergency Management, 904-488-4915 or 904-488-1320 (instate, 24 h/day). Emergency Planning HM.25.1.FL. Right-to-Know HM.30.1.FL.

HAZARDOUS MATERIALS MANAGEMENT

GUIDANCE FOR FLORIDA APPENDIX USERS

REFER TO APPENDIX NUMBERS: REFER TO APPENDIX TITLES:

3-1 Florida Toxic Substance List

Page 153: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-6 Hazardous Materials Management

COMPLIANCE CATEGORY: HAZARDOUS MATERIALS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HM.2. MISSING CHECKLIST ITEMS

HM.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 154: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-7 Hazardous Materials Management

COMPLIANCE CATEGORY: HAZARDOUS MATERIALS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HM.10. PERSONNEL TRAINING

(NOTE: See Appendix 3-1 for the Florida Toxic Substance List.)

HM.10.1.FL. Education and training must be provided to personnel who work with toxic substances (FS 442.115 (1) and (2)) [Revised July 1998].

Verify that the following instruction is provided:

- the chemical name and any common names, unless withheld from the material safety data sheet as a trade secret, of the toxic substance to which an employee may be exposed under normal operating conditions

- the location of the toxic substance in the workplace - appropriate first aid treatment and antidotes in the event of improper

exposure or overexposure to the toxic substance - the proper and safe handling of the toxic substance

- the health effects of the toxic substances as described in the relevant material safety data sheet

- appropriate emergency treatment - the procedures for cleanup of leaks and spill of the toxic substance - the potential for flammability, explosion, and reactivity of the toxic substance - the rights and duties of the employee.

Verify that instruction is provided to new employees within 30 days of

employment and at least annually thereafter.

HM.10.2.FL. [Deleted July 1998].

[Regulation 38I-30.011 has been repealed.]

HM.10.3.FL. Personnel who do not work with toxic substances directly but who may be exposed to toxic substances in emergency situations must be trained (FS 442.115(4)) [Revised July 1998].

Verify that, where employers only store toxic substances in sealed containers in the workplace and employees are not exposed to those substances in normal circumstances, appropriate instruction concerning procedures for dealing with toxic substances under foreseeable emergency situations is provided.

(NOTE: Regulation 38I-30.011 has been repealed.)

Page 155: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-8 Hazardous Materials Management

Page 156: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-9 Hazardous Materials Management

COMPLIANCE CATEGORY: HAZARDOUS MATERIALS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HM.20 RELEASES OF HAZARDOUS MATERIALS

HM.20.1.FL. Reportable releases must be reported to the State (9G-14.011) [Added July 1998].

Verify that any facility required by 42 USC 11004(a) to immediately report the release of a hazardous substance or extremely hazardous substance to the Commission, provides the same notification to the State Warning Point, telephone number (904) 413-9911 or (800) 320-0519. Verify that any facility required by 42 USC 11004(c) to provide a written follow-up emergency notice to the Commission and a Committee submits the written follow-up report as soon as practicable to the Community Emergency Coordinator for the Committee as designated in the Committee plan, at the Committee mailing address, and to the Commission.

(NOTE: The written follow-up emergency notice must include all information required by 42 USC 11004(c).)

Page 157: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-10 Hazardous Materials Management

Page 158: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-11 Hazardous Materials Management

COMPLIANCE CATEGORY: HAZARDOUS MATERIALS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HM.25. EMERGENCY PLANNING

HM.25.1.FL. The presence of toxic substances must be reported to the local fire department (FS 442.118).

Verify that employers report to the local fire department in a county, municipality, or political subdivision the presence of toxic substances.

Verify that the report includes a list of work areas, sufficiently identified by name and location, where toxic substances are regularly present.

Verify that the list includes the chemical and common name.

Verify that, whenever circumstances regarding the name and location of the substance change sufficiently to warrant an updated report, the report is updated.

(NOTE: An employer operating a plant or facility that continues in operation, including maintenance periods, 24 h a day, 7 days a week, 365 days a year, is not required to report when the plant or facility is manned at all times by personnel qualified to provide the required information.)

Page 159: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-12 Hazardous Materials Management

Page 160: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-13 Hazardous Materials Management

COMPLIANCE CATEGORY: HAZARDOUS MATERIALS MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HM.30 RIGHT-TO-KNOW

HM.30.1.FL. Federal facilities required to submit an annual inventory form or report under EPCRA must meet State requirements (FAC 9G-14.003, 9G-14.004, 9G-14.0045, and 9G-14.009) [Added July 1998].

(NOTE: Annual registration fee is waived for governmental bodies.)

Verify that the Federal facility has paid the one time filing fee.

Verify that the annual reporting fee is paid for a facility with Standard Industrial Classification Code between 20 and 39 that is required to submit a USEPA Toxic Chemical Release Inventory report to the Commissions under 313 EPCRA.

Verify that the Federal facility promptly informs the Commission of any changes in formation necessary for developing and implementing the emergency plan, any changes in information included on filings and changes in ownership.

Page 161: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-14 Hazardous Materials Management

Page 162: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-15 Hazardous Materials Management

Appendix 3-1

Florida Toxic Substance List (Source: Florida Administrative Code 38I-30.003)

(1) The Toxic Substance Advisory Council, created by Section 442.105, has submitted recommendations on the

Florida Substance List to the Secretary of Labor and Employment Security. The Secretary has determined that the substances set out in this rule should be considered toxic substances subject to the provisions of Chapter 442, Florida Statutes.

(2) The toxic substances compiled in the Florida Substance List are listed by Chemical Abstract Service Number in

ascending numerical order. The Chemical Abstract Service nomenclature is used whenever feasible. (3) The Florida Substance List consists of the following substances: CAS Number Hazardous Substance n/a Butyl acetyl ricinoleate n/a Chromium carbonate n/a Coal dust n/a Cotton dust, raw n/a 2,4-diamylphenol n/a Dibenoyl chloride n/a Diethyl acetoacetate n/a Isobutyl heptyl ketone n/a Isopropenyl acetylene n/a Monochloro-s-triazinetrione acid n/a Mono-(trichloro)tetra(monopotassium dichloro)penta-s-triazine-trione n/a tert-octyl mercaptan n/a 2-nitro-p-toluidine n/a Perlite dust n/a N-phenyl-n-ethylethanolamine n/a Silicate soapstone dust 50-00-0 Formaldahyde 50-07-7 Mitomycin C 50-18-0 Cyclophosphamide 50-28-2 Oestradiol-17 beta 50-29-3 Dichloro diphenyl trichloroethane (DDT) 50-32-8 Benzo(a)pyrene 50-55-5 Reserpine 50-76-0 Actinomycin D 50-78-2 Acetol (2) 51-21-8 Fluoracil 51-52-5 Propylthiouracil 51-75-2 Nitrogen mustard 51-79-6 Urethane 51-83-2 Carbachol chloride 52-24-4 Thio-tepa 53-16-7 Oestrone 53-70-3 Dibenz(a,h)anthracene 53-96-3 N-fluoren-2-ylacetamide

Page 163: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-16 Hazardous Materials Management

CAS Number Hazardous Substance 54-11-5 Nicotine 54-62-6 Aminopterin 55-18-5 N-nitrosodiethylamine 55-38-9 Fenthion 55-63-0 Nitroglycerin 55-86-7 Nitrogen mustard hydrochloride 55-91-4 Isofluorphate 55-98-1 1,4-butanediol dimethanesulphonate 56-04-2 Methylthiouracil 56-23-5 Carbon tetrachloride 56-25-7 Cantharidin 56-38-2 Parathion 56-49-5 3-methylcholanthrene 56-53-1 Diethylstilbestrol 56-55-3 Benz(a)anthracene 56-57-5 4-nitroquinoline-1-oxide 56-72-4 Coumaphos 56-75-7 Chloramphenicol 57-06-7 Allyl isothiocyanate 57-14-7 1,1-dimethylhydrazine 57-24-9 Strychnine 57-41-0 Phenytoin 57-47-6 Physostigmine 57-57-8 beta-propriolactone 57-63-6 Ethinyloestradiol 57-64-7 Physostigmine salicylate (1:1) 57-74-9 Chlordane 57-83-0 Progesterone 57-97-6 7,12-dimethylbenz(a)anthracene 58-22-0 Testosterone 58-36-6 Phenoxarsine, 10,10'-oxydi- 58-89-9 Lindane 59-89-2 N-nitrosomorpholine 59-89-2 Phenoxybenzamine 60-11-7 P-dimethylaminoazobenzene 60-24-2 2-mercaptoethanol 60-29-7 Ethyl ether 60-34-4 Methyl hydrazine 60-41-3 Strychnine sulfate 60-51-5 Dimethoate 60-57-1 Dieldrin 61-57-4 Niridazole 61-82-5 Amitrole 62-38-4 Acetoxyphenylmercury 62-44-2 P-acetophenetidide 62-50-0 Ethyl methanesulfonate 62-53-3 Aniline 62-55-5 Thioacetamide 62-56-6 Thiourea 62-73-7 Dichlorvos 62-74-8 Sodium fluoroacetate

Page 164: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-17 Hazardous Materials Management

CAS Number Hazardous Substance 62-75-9 N-nitrosodimethylamine 63-25-2 Carbaryl 63-92-3 Phenoxybenzamine hydrochloride 64-00-6 Phenol,3-(1-methylethyl)-, methylcarbamate 64-17-5 Ethyl alcohol 64-18-6 Formic acid 64-19-7 Acetic acid 64-67-5 Diethyl sulfate 64-86-8 Colchicine 65-30-5 Nicotine sulfate 65-85-0 Benzoic acid 66-25-1 Hexanal 66-27-3 Methyl methanesulfonate 66-75-1 Uracil mustard 66-81-9 Cycloheximide 67-56-1 Methyl alcohol 67-63-0 Isopropyl alcohol 67-64-1 Acetone 67-66-3 Chloroform 67-72-1 Hexachloroethane 68-11-1 Thioglycolic acid 68-12-2 Dimethylformamide 68-22-4 Norethisterone 68-76-8 Tris(aziridinyl)-p-benzoquinone 70-25-7 N-methyl-N'-nitro-n-nitrosoguanidine 70-69-9 Propiophenone, 4-amino- 71-23-8 Propyl alcohol 71-36-3 N-butyl alcohol 71-41-0 Amyl alcohol 71-43-2 Benzene 71-55-6 1,1,1-trichloroethane 71-63-6 Digitoxin 72-20-8 Endrin 72-33-3 Mestranol 72-43-5 Methoxychlor 72-57-1 Trypan blue 74-83-9 Methyl bromide 74-85-1 Ethylene 74-86-2 Acetylene 74-87-3 Methyl chloride 74-88-4 Methyl iodide 74-89-5 Methylamine 74-90-8 Hydrogen cyanide 74-93-1 Methyl mercaptan 74-96-4 Ethyl bromide 74-97-5 Chlorobromomethane 74-99-7 Propyne 75-00-3 Ethyl chloride 75-01-4 Vinyl chloride 75-02-5 Vinyl fluoride 75-04-7 Ethylamine

Page 165: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-18 Hazardous Materials Management

CAS Number Hazardous Substance 75-05-8 Acetonitrile 75-07-0 Acetaldehyde 75-08-1 Ethyl mercaptan 75-09-2 Methylene chloride 75-12-7 Formamide 75-15-0 Carbon disulfide 75-18-3 Dimethyl sulfide 75-19-4 Cyclopropane 75-20-7 Calcium carbide 75-21-8 Ethylene oxide 75-24-1 Trimethylaluminum 75-25-2 Bromoform 75-29-6 Isopropyl chloride 75-31-0 Isopropylamine 75-34-3 1,1-dichloroethane 75-35-4 1,1-dichloroethylene (vinylidene chloride) 75-36-5 Acetyl chloride 75-38-7 Vinylidene fluoride 75-43-4 Dichlorofluoromethane 75-44-5 Phosgene 75-45-6 Chlorodifluoromethane 75-47-8 Iodoform 75-50-3 Trimethylamine 75-52-5 Nitromethane 75-54-7 Methyldichlorosilane 75-55-8 Propylene imine 75-56-9 Propylene oxide 75-61-6 Difluorodibromomethane 75-63-8 Trifluorobromomethane 75-63-9 tert-butylamine 75-65-0 tert-butyl alcohol 75-66-1 2-methyl-2-propanethiol 75-66-3 Difluoro-1-chloroethane 75-69-4 Trichlorofluoromethane 75-71-8 Dichlorodifluoromethane 75-74-1 Tetramethyl lead 75-77-4 Trimethylchlorosilane 75-78-5 Dimethyldichlorosilane 75-79-6 Methyltrichlorosilane 75-83-2 2,2-dimethylbutane 75-84-3 tert-butyl carbinol 75-85-4 2-methyl-2-butanol 75-86-5 Acetone cyanohydrin 75-91-2 Tertbutyl hydroperoxide 75-94-5 Vinyl trichlorosilane 75-99-0 2,2-dichloropropionic acid 76-02-8 Trichloroacetyl chloride 76-03-9 Trichloroacetic acid 76-06-2 Chloropicrin 76-11-9 1,1,1,2-tetrachloro-2,2-difluoroethane 76-12-0 1,1,2,2-tetrachloro-1,2-difluoroethane

Page 166: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-19 Hazardous Materials Management

CAS Number Hazardous Substance 76-13-1 1,1,2-trichloro-1,2,2-trifluoroethane 76-14-2 Dichlorotetrafluoroethane 76-15-3 Chloropentafluoroethane 76-22-2 Camphor 76-44-8 Heptachlor 77-47-4 Hexachlorocyclopentadiene 77-73-6 Dicyclopentadiene 77-78-1 Sulfuric acid, dimethyl ester 77-81-6 Tabun 78-00-2 Tetraethyl lead 78-10-4 Tetraethyl ester silicic acid (ethyl silicate) 78-30-8 Tri-o-cresyl phosphate 78-34-2 Dioxathion 78-53-5 Amiton 78-59-1 3,5,5-trimethyl-2-cyclohexen-1-one (isophorone) 78-67-1 2,2'-azobis(2-methyl propionitrile) 78-71-7 Oxetane,3,3-bis(chloromethyl)- 78-78-42 Methylbutane (isopentane) 78-79-5 Isoprene 78-81-9 Isobutylamine 78-82-0 2-methylpropanenitrile (isobutyronitrile) 78-83-1 Isobutyl alcohol 78-84-2 Isobutyraldehyde 78-85-3 Methacrylaldehyde (2-methylpropenal) 78-86-4 2-chlorobutane (sec-butyl chloride) 78-87-5 Propylene dichloride 78-89-7 2-chloro-1-propanol 78-90-0 1,2-propanediamine 78-92-2 sec-butyl alcohol 78-93-3 Methyl ethyl ketone (MEK) 78-94-4 3-buten-2-one 78-95-5 Chloroacetone 78-96-6 1-amino-2-propanol 78-97-7 Lactonitrile 79-00-5 1,1,2-trichloroethane 79-01-6 Acetylenetrichloride 79-03-8 Propionylchloride 79-04-9 Chloroacetyl chloride 79-06-1 Acrylamide 79-09-4 Propionic acid (solution) 79-10-7 Acrylic acid 79-11-8 Chloroacetic acid 79-19-6 Thiosemicarbazide 79-20-9 Methyl ester acetic acid 79-21-0 Peroxyacetic acid 79-22-1 Methyl chloroformate 79-24-3 Nitroethane 79-27-6 1,1,2,2-tetrabromoethane 79-29-8 2,3-dimethylbutane 79-34-5 Acetylene tetrachloride 79-36-7 Dichloroacetyl chloride

Page 167: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-20 Hazardous Materials Management

CAS Number Hazardous Substance 79-38-9 Chlorotriflouroethylene 79-41-4 Methacrylic acid 79-44-7 Dimethylcarbamoyl chloride 79-46-9 2-nitropropane 80-10-4 Dichlorodiphenylsilane 80-15-9 Cumene hydroperoxide 80-46-6 p-(tert-phenyl) phenol 80-48-8 Methyl ester p-toluene sulfonic acid 80-56-8 Alpha-pinene 80-62-6 Methyl methacrylate 80-63-7 Methyl 2-chloroacrylate 81-07-2 Saccharin 81-81-2 3-(alpha-acetonylbenzyl)-4-hydroxycoumarin 82-28-0 1-amino-2-methylanthraquinone 82-66-6 Diphacinone 82-68-8 Pentachloronitrobenzene 83-26-1 2-pivaloyl-1,3-indandione (Pival) 83-79-4 Rotenone (Commercial) 84-17-3 Dehydrostilbestrol 84-66-2 Diethyl phthalate 84-74-2 Dibutyl phthalate 85-00-7 Diquat 85-44-9 Phthalic anhydride 85-71-2 Methyl phthalyl ethyl glycolate 86-50-0 Azinphos-methyl 86-88-4 N-(1-naphthyl)-2-thiourea (ANTU) 87-62-7 O-xylidine 87-68-3 Hexachlorobutadiene 87-86-5 Pentachlorophenol 87-90-1 Trichloro-s-triazinetrione 88-05-1 Aniline, 2,4,6-trimethyl- 88-06-2 2,4,6-trichlorophenol 88-09-5 2-ethylbutyric acid 88-10-8 Diethyl carbamoyl chloride 88-16-4 O-chlorobenzotrifluoride 88-72-2 O-nitrotoluene 88-73-3 1-chloro-2-nitrobenzene 88-85-7 Dinoseb 88-89-1 Picric acid 89-72-5 O-sec-butylphenol 90-12-0 1-methylnaphthalene 90-41-5 2-biphenylamine 90-94-8 Michler's ketone 91-08-7 Toluene 2,6-diisocyanate 91-17-8 Decahydronaphthalene 91-20-3 Naphthalene 91-22-5 Quinoline 91-49-6 N-butylacetanilide 91-59-8 2-naphthylamine 91-66-7 N,N-diethylaniline 91-80-5 Methapyrilene

Page 168: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-21 Hazardous Materials Management

CAS Number Hazardous Substance 91-94-1 3,3-dichlorobenzidine 91-99-6 2-2'(m-tolylimido) diethanol 92-04-6 3-chloro-4-biphenylol 92-15-9 Acetoacetyl-o-anisidine 92-52-4 Biphenyl 92-53-5 4-phenylmorpholine 92-59-1 Ethylbenzylaniline 92-66-0 4-bromodiphenyl 92-67-1 4-aminobiphenyl 92-84-2 Phenothiazine 92-87-5 Benzidine 92-93-3 4-nitrobiphenyl 92-94-4 p-terphenyl 93-68-5 o-acetoacetotoluidide 93-76-5 2,4,5-trichlorophenoxy acetic acid 93-90-3 2-(n-methylanilino)-ethanol 93-96-9 Bis(alpha-methylbenzyl) ether 94-04-2 2-ethylhexanoic acid, vinyl ester 94-36-0 Benzoyl peroxide 94-58-6 1,2-methylenedioxy-4-propyl benzene 94-59-7 4-allyl-1,2-(methylenedioxy)-benzene 94-70-2 2-epoxybenzamine 94-75-7 2,4-dichlorophenoxyacetic acid 94-78-0 3-(phenoazo)-2-6-pyradinediamine 95-06-7 Diethyl-2-chloro-2-propanyl ester carbamodithioic acid 95-13-6 1H-indene 95-46-5 1-bromo-2-methyl benzene 95-47-6 1,2-dimethyl benzene 95-48-7 2-methyl phenol 95-49-8 1-chloro-2-methyl benzene 95-50-1 1,2-dichlorobenzene 95-53-4 ortho-toluidine 95-57-8 2-chlorophenol 95-76-1 3,4-dichlorobenzenamine 95-80-7 4-methyl-1,3-benzenediamine 95-83-0 4-chloro-1,2-benzenediamine 96-09-3 Phenyl-oxirane 96-10-6 Diethylaluminum chloride 96-12-8 1,2-dibromo-3-chloropropane 96-14-0 3-methylpentane 96-17-3 2-methylbutanal 96-18-4 Allyl trichloride 96-20-8 2-amino-1-butanol 96-22-0 Diethyl ketone 96-23-1 1,3-dichloro-2-propanol 96-33-3 2-propanoic acid, methyl ester 96-34-4 Methyl ester chloroacetic acid 96-37-7 Methylcyclopentane 96-45-7 2-imidazolidinethione 96-47-9 2-methyltetrahydrofuran 96-49-1 Ethylene carbonate

Page 169: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-22 Hazardous Materials Management

CAS Number Hazardous Substance 96-54-8 Methylpyrrole 96-69-5 4,4'-thiobis(6-tert, butyl-m-cresol) 97-00-7 1-chloro-2,4-dinitrobenzene 97-02-9 2,4-dinitroaniline 97-36-9 M-acetoacetxylidide 97-56-3 O-aminoazotoluene 97-62-1 Ethyl isobutyrate 97-63-2 Ethyl methacrylate 97-64-3 Ethyl lactate 97-77-8 Disulfiram 97-88-1 Butyl methacrylate 97-93-8 Triethylaluminum 97-94-9 Triethylborane 97-96-1 2-ethylbutyraldehyde 97-97-2 Dimethyl chloracetal 97-99-4 Tetrahydrofurfuryl alcohol 98-00-0 Furfuryl alcohol 98-01-1 Furfural 98-05-5 Benzenearsonic acid 98-06-6 tert-butylbenzene 98-07-7 Benzotrichloride 98-08-8 Benzotrifluoride 98-12-4 Cyclohexyltrichlorosilane 98-13-5 Phenyl trichlorosilane 98-16-8 Benzenamine, 3-(trifluoromethyl)- 98-27-1 P-tert-butyl-o-cresol 98-28-2 4-tert-butyl-2-chlorophenol 98-29-3 4-tertbutyl catechol 98-51-1 P-tert-butyltoluene 98-82-8 Cumene 98-83-9 alpha-methylstyrene 98-84-0 alpha-methylbenzylamine 98-87-3 Benzal chloride 98-88-4 Benzoyl chloride 98-95-3 Nitrobenzene 99-08-1 M-nitrotoluene 99-35-4 Trinitrobenzene 99-55-8 5-nitro-o-toluidine 9-59-2 5-nitro-o-anisidine 99-65-0 M-dinitrobenzene 99-87-6 P-cymene 99-98-9 Dimethyl-p-phenylenediamine 99-99-0 P-nitrotoluene 100-00-5 P-nitrochlorobenzene 100-01-6 P-nitroaniline 100-02-7 P-nitrophenol 100-14-1 Benzene, 1-(chloromethyl)-4-nitro- 100-20-9 Terephthaloyl chloride 100-25-4 P-dinitrobenzene 100-36-7 N,N-diethylethylene-diamine 100-37-8 N,N-diethylethanolamine

Page 170: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-23 Hazardous Materials Management

CAS Number Hazardous Substance 100-40-3 4-vinyl cyclohexene 100-41-4 Ethylbenzene 10o-42-5 Styrene 100-44-7 Benzylchloride 100-50-5 1,2,3,6-tetrahydrobenzaldehyde 100-51-6 Benzylalcohol 100-52-7 Benzaldehyde 100-53-8 Benzyl mercaptan 100-61-8 N-methyl aniline 100-63-0 Phenylhydrazine 100-73-2 Acrolein dimer 100-74-3 N-ethyl morpholine 100-75-4 N-nitrosopiperidine 100-79-8 Dioxolan 100-99-2 Triisobutylaluminum 101-14-4 4,4'-methylene bis(2-chloroaniline) 101-61-1 4,4'-methylene bis(N,N-dimethyl)benzenamine 101-68-8 Methylene bisphenyl isocyanate 101-77-9 4,4-methylene dianiline 101-80-4 4,4-oxydianiline 101-83-7 Dicyclohexylamine 101-84-8 Phenyl ether vapor 101-90-6 Diglycidyl resorcinol ether 101-96-2 N,N'-di-sec-butyl-p-phenylenediamine 102-01-2 Aceto acetanilide 102-36-3 Isocyanic acid, 3,4-dichlorophenyl ester 102-54-5 Dicyclopentadienyl iron 102-56-7 2,5-dimethoxyaniline 102-67-0 Tripropyl aluminum 102-69-2 Tripropylamine 102-71-6 Triethanolamine 102-79-4 N-butyldiethanolamine 102-81-8 2-n-dibutylaminoethanol 102-82-9 Tributylamine 102-85-2 Tributyl phosphite 103-09-3 2-ethylhexyl acetate 103-11-7 2-ethylhexyl acrylate 103-44-6 Vinyl-2-ethylhexyl ether 103-65-1 Propylbenzene 103-69-5 N-ethylaniline 103-75-3 2-ethoxy-3,4-dihydro-2-pyran 103-84-4 Acetanilide 103-85-5 Phenylthiourea 103-89-9 P-acetotoluidide 104-15-4 P-toluenesulfonic acid 104-51-8 Butylbenzene 104-72-3 Decylbenzene 104-75-6 2-ethylhexylamine 104-76-7 2-ethylhexanol 104-78-9 3-(d-iethylamino)propylamine 104-88-1 P-chlorobenzaldehyde

Page 171: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-24 Hazardous Materials Management

CAS Number Hazardous Substance 104-89-2 2-methyl-5-ethylpiperidine 104-90-5 2-methyl-5-ethylpyridine 104-94-9 P-anisidine 105-05-5 P-diethyl benzene 105-30-6 Methyl isobutyl carbinol 105-37-3 Ethyl propionate 105-38-4 Vinyl propionate 105-39-5 Ethyl chloroacetate 105-45-3 Methyl acetoacetate 105-46-4 sec-butyl acetate 105-54-4 Ethylbutyrate 105-56-6 Ethyl cyanoacetate 105-57-7 Acetal 105-58-8 Diethyl carbonate 105-60-2 Caprolactam dust and vapor 105-64- Diisopropyl peroxydicarbonate 105-66-8 N-propyl butyrate 105-74-8 Dilauroyl peroxide 106-20-7 Bis(2-ethylhexyl)amine 106-32-1 Ethyl caprylate 106-35-4 Ethyl butyl ketone 106-36-5 Propyl propionate 106-38-7 P-bromotoluene 106-42-3 P-xylene 106-44-5 P-cresol 106-46-7 P-dichlorobenzene 106-48-9 P-chlorophenol 106-49-0 P-toluidine 106-50-3 P-phenylene diamine 106-51-4 Quinone 106-63-3 Ethyl amyl ketone 106-63-8 Isobutyl acrylate 106-71-8 2cyanoethyl acrylate 106-87-6 Vinyl cyclohexene dioxide 106-88-7 1,2-butylene oxide 106-89-8 Epichlorohydrin 106-92-3 ((2-propenyloxy)methyl)oxirane 106-93-4 Ethylene dibromide 106-94-5 N-propyl bromide 106-95-6 Allyl bromide 106-96-7 3-bromopropyne 106-98-9 1-butene 106-99-0 1,3-butadiene 107-02-8 Acrolein 107-05-1 Allylchloride 107-06-2 1,2-dichloroethane 107-07-3 Ethylene chlorohydrin 107-10-8 Propylamine 107-11-9 Allylamine 107-12-0 Propionitrile 107-13-1 Acrylonitrile

Page 172: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-25 Hazardous Materials Management

CAS Number Hazardous Substance 107-15-3 Ethylenediamine 107-16-4 Formaldehyde cyanohydrin 107-18-6 Allyl alcohol 107-19-7 Propargyl alcohol 107-20-0 Chloroacetaldehyde 107-21-1 Ethylene glycol particulate and vapor 107-25-5 Vinyl methyl ether 107-27-7 Chloroethylmercury 107-30-2 Chloromethyl methyl ether 107-31-3 Methyl formate 107-37-9 Allyl trichlorosilane 107-39-1 2,4,4-trimethyl-1-pentene 107-40-4 2,4,4-trimethyl-2-pentene 107-41-5 Hexyleneglycol 107-44-8 Sarin 107-45-9 tert-octylamine 107-49-3 Tepp 107-66-4 Dibutyl phosphate 107-71-1 tert-butyl peroxyacetate 107-72-2 Amyltrichlorosilane 107-83-5 Isohexane 107-84-6 Isoamyl chloride 107-87-9 Methyl propyl ketone 107-89-1 Acetaldol 107-92-6 Butyric acid 107-98-2 Propylene glycol methyl ether 108-01-0 2-(dimethylamino) ethanol 108-03-2 1-nitropropane 108-05-4 Vinyl acetate 108-08-7 2,4-dimethylpentane 108-09-8 1,3-dimethylbutylamine 108-10-1 Methyl isobutyl ketone 108-16-7 N,N-dimethylisopropanolamine 108-18-9 Diisopropylamine 108-20-3 Isopropyl ether 108-21-4 Isopropyl acetate 108-22-5 Isopropenyl acetate 108-23-6 Isopropyl chloroformate 108-24-7 Acetic anhydride 108-31-6 Maleic anhydride 108-38-3 m-xylene 108-39-4 M-cresol 108-46-3 Resorcinol 108-57-6 Divinyl benzene 108-60-1 2,2-dichloro isopropyl ether 108-62-3 Metaldehyde 108-83-8 Diisobutyl ketone 108-86-1 Bromobenzene 108-87-2 Methylcyclohexane 108-88-3 Toluene 108-89-4 4-picoline

Page 173: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-26 Hazardous Materials Management

CAS Number Hazardous Substance 108-90-7 Chlorobenzene 108-91-8 Cyclohexylamine 108-93-0 Cyclohexanol 108-94-1 Cyclohexenone 108-95-2 Phenol 108-98-5 Phenyl mercaptan 109-01-3 1-methyl piperazine 109-02-4 4-methylmorpholine 109-06-8 2-picoline 109-08-0 2-methylpyrazine 109-21-7 Butylbutyrate 109-52-4 Pentanoic acid 109-53-5 Vinyl isobutyl ether 109-55-7 3-(dimethylamino)-propylamine 109-59-1 Ethylene glycol isopropyl ether 109-60-4 N-propyl acetate 109-61-5 Propyl chloroformate 109-63-7 Boron trifluoride etherate 109-65-9 Butyl bromide 109-66-0 Pentane 109-67-1 1-pentene 109-69-3 Butyl chloride 109-73-9 Butylamine 109-74-0 Butyronitrile 109-76-2 1,3-propanediamine 109-77-3 Malononitrile 109-78-4 Ethylene cyanohydrin 109-79-5 Butyl mercaptan 109-83-1 N-methylethanolamine 109-86-4 Methyl cellosolve 109-87-5 Methylal 109-89-7 Diethylamine 109-92-2 Vinyl ethyl ether 109-93-3 Divinyl ether 109-94-4 Ethyl formate 109-95-5 Ethyl nitrite 109-97-7 Pyrrole 109-99-9 Tetrahydrofuran 110-00-9 Furan 110-02-1 Thiophene 110-05-4 Di-tert-butyl peroxide 110-12-3 Methyl isoamyl ketone 110-19-0 Isobutyl acetate 110-22-5 Di-acetyl peroxide 110-43-0 Methyl (N-amyl) ketone 110-49-6 2-methoxyethyl acetate 110-53-2 1-bromopentane 110-54-3 Hexane 110-56-5 1,4-dichlorobutane 110-57-6 Trans-1,4-dichlorobutene 110-58-7 Amylamine

Page 174: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-27 Hazardous Materials Management

CAS Number Hazardous Substance 110-62-3 Valeraldehyde 110-66-7 Amyl mercaptan 110-67-8 3-methoxypropionitrile 110-68-9 N-methylbutylamine 110-69-0 Butyraldoxime 110-71-4 Ethylene glycol dimethyl ether 110-74-7 Propyl formate 110-75-8 Vinyl-2-chloroethyl ether 110-80-5 2-ethoxyethanol 110-82-7 Cyclohexane 110-83-8 Cyclohexene 110-85-0 Piperazine 110-86-1 Pyridine 110-87-2 Dihydropyran 110-88-3 Trioxane 110-89-4 Piperidine 110-91-8 Morpholine 110-96-3 Diisobutylamine 110-97-4 Diisopropanolamine 111-15-9 2-ethoxyethyl acetate 111-26-2 Hexylamine 111-30-8 Glutaraldehyde 111-34-2 Vinyl butyl ether 111-36-4 N-butyl isocyanate 111-40-0 Diethylenetriamine 111-41-1 (2-aminoethyl) ethanolamine 111-42-2 Diethanolamine 111-43-3 Propylether 111-44-4 Dichloroethyl ether 111-48-8 Thiodiglycol 111-50-2 Adipoyl chloride 111-64-8 Caprylyl chloride 111-65-9 Octane 111-66-0 1-octene 111-68-2 Heptylamine 111-69-3 Adiponitrile 111-76-2 2-butoxy ethanol 111-77-3 Diethylene glycol methyl ether 111-84-2 Nonane 111-86-4 Octylamine 111-88-6 1-octanethiol 111-91-1 Bis(2-chloroethyl) formal 111-92-2 Dibutylamine 112-04-9 Octadecyl trichlorosilane 112-24-3 Triethylenetetramine 112-26-5 Triglycol dichloride 112-57-2 Tetraethylene pentamine 112-58-3 Hexylether 112-98-1 Dibutoxy tetraglycol 114-26-1 Ddvp 115-02-6 Azaserine

Page 175: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-28 Hazardous Materials Management

CAS Number Hazardous Substance 115-07-1 Propylene 115-09-3 Mercurymethylchloride 115-10-6 Methylether 115-11-7 2-methylpropene 115-19-5 3-methyl butynol 115-21-9 Trichloroethylsilane 115-26-4 Dimefox 115-28-6 Chlorendic acid 115-29-7 Endosulfan 115-76-4 2,2-diethyl-1,3-propanediol 115-84-4 2-ethyl-2-butyl-1,3-propanediol 115-86-6 Triphenyl phosphate 115-90-2 Fensulfothion 116-02-9 3,3,5-trimethyl-1-cyclohexanol 116-14-3 Tetrafluoroethylene 116-60-3 Aldicarb 117-79-3 2-amino-anthraquinone 117-81-7 Di(2-ethylhexyl) phthalate 118-52-5 1,3-dichloro-5,5-dimethyl hydantoin 118-74-1 Hexachlorobenzene 118-96-7 Trinitrotoluene 119-38-0 Isopropylmethylpyrazolyl dimethylcarbamate 119-42-6 O-cyclohexylphenol 119-90-4 3,3'-dimethoxybenzidine 119-93-7 3,3'-dimethylbenzidine 120-58-1 Isosafrole 120-71-8 P-cresidine 120-80-9 Catechol(pyrocatechol) 120-82-1 1,2,4-trichlorobenzene 120-92-3 Cyclopentanone 120-94-5 Methylpyrrolidine 121-14-2 Dinitrotoluene 121-43-7 Methyl borate 121-44-8 Triethylamine 121-45-9 Trimethyl phosphite 121-46-0 Norbornadiene 121-69-7 Dimethylaniline 121-73-3 M-chloronitrobenzene 121-75-5 Malathion 121-82-4 Cyclonite 122-14-5 Fenitrothion 122-20-3 Triisopropanolamine 122-39-4 Diphenylamine 122-51-0 Ethyl orthoformate 122-60-1 Phenyl glycidyl ether (PGE) 122-66-7 Hydrazobenzene 122-82-7 Acetoacet-p-phenetidide 122-98-5 N-phenylethanolamine 123-00-2 4-aminopropyl morpholine 123-04-6 2-ethylhexyl chloride 123-05-7 2-ethylhexanal

Page 176: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-29 Hazardous Materials Management

CAS Number Hazardous Substance 123-07-9 P-ethylphenol 123-15-9 2-methylvaleraldehyde 123-17-1 2,6,8-trimethyl-4-nonanol 123-19-3 Dipropyl ketone 123-20-6 Vinyl butyrate 123-31-9 Hydroquinone 123-38-6 Propionaldehyde 123-42-2 Diacetone alcohol 123-54-6 Acetyl acetone 123-62-6 Propionic anhydride 123-63-7 Paraldehyde 123-66-0 Ethyl caproate 123-72-8 N-butyraldehyde 123-73-9 Crotonaldehyde 123-75-1 Pyrrolidine 123-81-9 Glycol dimercaptoacetate 123-86-4 N-butyl acetate 123-91-1 1,4-dioxane 123-92-2 Isoamyl acetate 124-13-0 Caprylaldehyde 124-16-3 1-(butoxyethoxy)-2-propanol 124-38-9 Carbon dioxide 124-40-3 Dimethylamine 124-65-2 Sodium cacodylate 124-68-5 2-amino-2-methyl-1-propanol 124-87-8 Picrotoxin 126-33-0 Sulfolane 126-39-6 2-methyl-2-ethyl-1,3-dioxolane 126-72-7 Tris(2,3-dibromopropyl)phosphate 126-73-8 Tributyl phosphate 126-85-2 Nitrogen mustard n-oxide 126-98-7 Methylacrylonitrile 126-99-8 Chlopoprene 127-00-4 1-chloro-2-propanol 127-18-4 Tetrachloroethylene 127-19-5 Dimethyl acetamide 128-37-0 Butylated hydroxytoluene (BHT) 128-44-9 Sodium saccharin 129-06-6 Warfarin sodium 129-15-7 2-methyl-1-nitroanthraquinone 131-11-3 N,N-dimethylphthalate 131-17-9 Diallyl phthalate 133-06-2 Captan 134-29-2 O-anisidine hydrochloride 134-32-7 1-naphthylamine 135-01-3 O-diethyl benzene 135-02-4 0-methoxybenzaldehyde 135-20-6 Cupferron 135-88-6 N-phenyl-beta-naphthylamine 135-98-8 sec-butylbenzene 136-40-3 Phenazopyridine hydrochloride

Page 177: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-30 Hazardous Materials Management

CAS Number Hazardous Substance 136-78-7 Crag herbicide 136-81-2 O-amyl phenol 137-05-3 Methyl 2-cyanoacrylate 137-26-8 Thiram 137-32-6 2-methyl-1-butanol 138-22-7 N-butyl lactate 139-13-9 Nitrilotriacetic acid (NTA) 139-65-1 4,4'-thiodianiline 139-87-7 N-ethyldiethanolamine 139-91-3 5-(morpholinomethyl)-3-[(5-nitrofurfurylidene) amino]-2-oxazolidinone 140-29-4 Benzyl cyanide 140-31-8 1-(2-aminoethyl) piperazine 140-57-b Aramite 140-76-1 Pyridine, 2-methyl-5-vinyl 140-88-5 Ethyl acrylate 140-89-6 Potassium xanthate 141-32-2 Butyl acrylate 141-43-5 Ethanolamine 141-57-1 Propyltrichlorosilane 141-66-2 Dicrotophos 141-78-6 Ethyl acetate 141-79-7 Mesityl oxide 141-91-3 2,6-dimethylmorpholine 141-93-5 M-diethyl benzene 141-97-9 Ethyl acetoacetate 142-04-1 Aniline hydrochloride 142-29-0 Cyclopentene 142-59-6 Ethylene bis dithiocarbamate 142-62-1 Caproic acid 142-64-3 Piperazine dihydrochloride 142-68-7 Pentamethylene oxide 142-82-5 Heptane (N-heptane) 142-83-6 2,4-hexadienal 142-84-7 Dipropylamine 142-92-7 sec-hexyl acetate 142-96-1 Dibutyl ether 143-16-8 Dihexylamine 143-33-9 Sodium cyanide 143-50-0 Kepone 144-49-0 Fluoroacetic acid 144-62-7 Oxalic acid 148-01-6 Dinitolmide 148-82-3 Melphalan 149-31-5 2-methyl-1,3-pentanediol 149-74-6 Dichloromethylphenylsilane 150-76-5 4-methoxyphenol 151-38-2 Methoxyethylmercuric acetate 151-50-8 Potassium cyanide 151-56-4 Ethyleneimine 151-67-7 2-bromo-2-chloro-1,1,1-trifluoroethane 152-16-9 Diphosphoramide, octamethyl-

Page 178: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-31 Hazardous Materials Management

CAS Number Hazardous Substance 154-93-8 N,N'-bis(2-chloroethyl)-n-nitrosourea 156-10-5 P-nitrosodiphenylamine 156-43-4 P-phenetidine 156-59-2 Dichloroethylene-cis 156-60-5 Dichloroethylene-trans 156-62-7 Calcium cyanamide 156-87-6 3-aminopropanol 189-55-9 Dibenzo(a,i)pyrene 189-64-0 Dibenzo(a,h)pyrene 191-30-0 Benzo(a,l)pyrene 192-65-4 Dibenzo(a,e)pyrene 193-39-5 Indeno(1,2,3-cd)pyrene 194-59-2 7h-diebenzo(c,g)carbazole 205-82-3 Benzo(j)fluoranthene 205-99-2 Benzo(b)fluoranthene 207-08-9 Benzo(k)fluoranthene 218-01-9 Chrysene 224-42-0 Dibenz(a,j)acridine 225-51-4 Benz(c)acridine 226-36-8 Dibenz(a,h)acridine 287-23-0 Cyclobutane 287-92-3 Cyclopentane 291-64-5 Cycloheptane 297-78-9 Isobenzan 297-97-2 Thionazin 298-00-0 Methyl parathion 298-02-2 Phorate 298-04-4 Disulfoton 299-75-2 Treosulphan 299-84-3 Ronnel 299-86-5 Crufomate 300-62-9 Amphetamine 300-76-5 Naled 301-04-2 Lead acetate 302-01-2 Hydrazine 302-70-5 Nitrogen mustard n-oxide hydrochloride 303-34-4 Lasiocarpine 305-03-3 Chlorambucil 309-00-2 Aldrin 314-40-9 Bromacil 315-18-4 Mexacarbamate 315-22-0 Monocrotaline 316-42-7 Emetine, dihydrochloride 319-84-6 alpha-hexachlorocyclohexane 319-85-7 beta-hexachlorocyclohexane 327-98-0 Trichloronate 330-54-1 Diuron 333-41-5 Diazinon 334-88-3 Diazomethane 353-36-6 Ethyl fluoride 353-42-4 Boron trifluoride compound with methyl ether (1:1)

Page 179: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-32 Hazardous Materials Management

CAS Number Hazardous Substance 353-50-4 Carbonyl fluoride 359-06-8 Fluoroacetyl chloride 366-70-1 Procarbazine hydrochloride 371-62-0 Ethylene fluorohydrin 372-09-8 Cyanoacetic acid 373-02-4 Nickel acetate 379-79-3 Ergotaminetartrate 420-04-2 Cyanamide 431-03-8 2,3-butanedione 434-07-1 Oxymetholone 443-48-1 Metronidazole 446-86-6 Azathioprine 460-19-5 Cyanogen 462-06-6 Fluorobenzene 463-51-4 Ketene 463-58-1 Carbon oxysulfide 463-82-1 2,2-dimethylpropane 464-06-2 2,2,3-trimethylbutane 465-73-6 Isodrin 470-90-6 Chlorofenvinphos 479-45-8 Tetryl 492-80-8 Auramine 494-03-1 N,N-bis(2-chloroethyl)-2-naphthylamine 496-03-7 Butyraldol 502-39-6 Methylmercuric dicyandiamide 503-17-3 2-butyne 504-20-1 Phorone 504-24-5 Pyridine, 4-amino 504-29-0 2-aminopyridine 504-60-9 1,3-pentadiene (mixed cis and trans isomers) 505-60-2 Mustard gas 506-61-6 Potassium silver cyanide 506-68-3 Cyanogen bromide 506-77-4 Cyanogen chloride 506-78-5 Cyanogen iodide 507-20-0 tert-butyl chloride 507-70-0 Borneol 509-14-8 Tetranitromethane 510-15-6 Chlorobenzilate 513-35-9 2-methyl-2-butene 513-36-0 Isobutyl chloride 513-37-1 Dimethyl vinyl chloride 513-42-8 Methallyl alcohol 513-53-1 2-butanethiol 514-73-8 Dithiazanine iodide 528-29-0 O-dinitrobenzene 531-76-0 Merphalan 531-82-8 N-(4-(5 nitro-2-furyl)2-thiazolyl)acetamide 532-27-4 alpha-chloroacetophenone 534-07-6 Bis(chloromethyl) ketone 534-22-5 2-methyl furan

Page 180: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-33 Hazardous Materials Management

CAS Number Hazardous Substance 534-52-1 Dinitro-o-cresol 535-89-7 Crimidine 538-07-8 Ethylbis(2-chloroethyl) amine 538-93-2 Isobutylbenzene 540-54-5 Propyl chloride 540-59-0 Acetylene dichloride 540-67-0 Methyl ethyl ether 540-73-8 1,2-dimethylhydrazine 540-84-1 Isooctane 540-88-5 tert-butyl acetate 541-25-3 Lewisite 541-41-3 Ethylchloroformate 541-53-7 Dithiobiuret 541-85-5 Ethyl sec-amyl ketone 542-18-7 Cyclohexylchloride 542-55-2 Isobutyl formate 542-58-5 2-chloroethyl acetate 542-75-6 1,3-dichloropropene 542-76-7 Propionitrite, 3-chloro- 542-88-1 Bis(chloromethyl)ether 542-90-5 Ethylthiocyanate 542-92-7 1,3-cyclopentadiene 543-59-9 1-chloropentane 544-10-5 1-chlorohexane 552-30-7 Trimellitic anhydride 554-12-1 Methyl propionate 555-77-1 Tris(2-chloroethyl)amine 555-84-0 1-(5-nitrofurfurylidene)amino-2-imidazolidinone 556-52-5 Glycidol 556-61-6 Methyl isothiocyanate 556-64-9 Methyl thiocyanate 557-17-5 Methyl-n-propyl ether 557-20-0 Diethyl zinc 557-40-4 Allyl ether 557-98-2 2-chloropropylene 558-13-4 Carbon tetrabromide 558-25-8 Methanesulfonyl fluoride 560-21-4 2,3,3-trimethylpentane 563-12-2 Ethion 563-41-7 Semicarbazide hydrochloride 563-43-9 Ethylaluminum dichloride 563-45-1 3-methyl-1-butene 563-46-2 2-methyl-1-butene (technical) 563-47-3 Methallyl chloride 563-78-0 2,3-dimethyl-1-butene 563-79-1 2,3-dimethyl-2-butene 563-80-4 Methyl isopropyl ketone 564-02-3 2,2,3-trimethylpentane 565-59-3 2,3-dimethylpentane 565-76-4 2,3,4-trimethyl-1-pentene 569-61-9 Ci basic red 9 monohydrochloride

Page 181: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-34 Hazardous Materials Management

CAS Number Hazardous Substance 583-60-8 O-methylcyclohexanone 584-84-9 Toluene-2,4-diisocyanate (TDI) 584-94-1 2,3-dimethylhexane 589-34-4 3-methylhexane 589-38-8 3-hexanone 589-43-5 2,4-dimethylhexane 589-90-2 1,4-dimethylcyclohexane 590-01-2 Butyl propionate 590-18-1 2-butene-cis 590-21-6 1-chloropropylene 590-86-3 Isopentaldehyde 590-88-5 1,3-butanediamine 590-96-5 Methylazoxymethanol 591-21-9 1,3-dimethyl cyclohexane 591-47-9 4-methycyclohexene 591-76-4 Isoheptane 591-78-6 Methyl butyl ketone 591-87-7 Allyl acetate 591-97-9 1-crotylchloride 592-01-8 Calcium cyanide 592-04-1 Mercuric cyanide 592-41-6 1-hexene 592-43-8 2-hexene (mixed cis & trans isomers) 592-45-0 1,4-hexadiene 592-62-1 Methylazoxymethanol acetate 592-84-7 Butyl formate 592-87-0 Lead thiocyanate 593-60-2 Vinyl bromide 594-27-4 Tetramethyl tin 594-36-5 tert-amyl chloride 594-42-3 Perchloromethyl mercaptan 594-56-9 2,3,3-trimethyl-1-butene 594-71-8 2-chloro-2-nitropropane 594-72-9 1,1-dichloro-1-nitroethane 595-44-8 1,1-dichloro-1-nitropropane 595-90-4 Tetraphenyl tin 597-64-8 Tetraethyltin 598-75-4 3-methyl-2-butanol 598-92-5 1-chloro-1-nitroethane 598-96-9 3,4,4-trimethyl-2-pentene 600-25-9 1-chloro-1-nitropropane 602-87-9 Nitroacenaphthene 603-34-9 Triphenyl amine 608-73-1 Benzen hexachloride (BHC) 609-26-7 2-methyl-3-ethylpentane 613-29-6 N,N-dibutylaniline 613-35-4 N,N'-diacetylbenzidine 614-45-9 tert-butyl perbenzoate 614-78-8 Thiourea, (2-methyl-phenyl)- 615-53-2 N-nitroso-n-methylurethane 616-21-7 1,2-dichlorobutane

Page 182: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-35 Hazardous Materials Management

CAS Number Hazardous Substance 616-29-5 1,3-diamino-2-propanol 616-38-6 Methylcarbonate 616-45-5 2-pyrrolidinone 617-51-6 Isopropyl lactate 617-89-0 Furfurylamine 621-64-7 N-nitrosodi-n-propylamine 621-77-2 Tripentylamine 622-08-2 Ethylene glycol monobenzyl ether 622-40-2 4-(2-hydroxyethyl) morpholine 623-42-7 Methyl butyrate 623-70-1 Ethyl crotonate 624-29-3 1,4-dimethylcyclohexane-cis 624-64-6 2-butene-(e) 624-83-9 Methyl isocyanate 625-27-4 2-methyl-2-pentene 625-30-9 sec-amylamine 625-55-8 Isopropyl formate 625-58-1 Ethyl nitrate 625-86-5 2,5-dimethylfuran 626-17-5 M-phthalodinitrile 626-23-3 Di-sec-butylamine 626-38-0 sec-amyl acetate 627-11-2 Chloroethyl chloroformate 627-13-4 N-propyl nitrate 627-19-0 1-pentyne 627-20-3 beta-amylene-cis 627-53-2 Diethyl selenide 628-32-0 Ethyl propyl ether 628-37-5 Diethyl peroxide 628-63-7 N-amyl acetate 628-76-2 1,5-dichloropentane 628-81-9 Ethyl butyl ether 628-96-6 Ethylene glycol dinitrate 629-14-1 Ethylene glycol diethyl ether 630-08-0 Carbon monoxide 630-60-4 Quabain 636-21-5 ortho-toluidine hydrochloride 638-17-5 Thialdine 638-21-1 Phenylphosphine 638-49-3 Amyl formate 638-56-2 Bis (2-(2-chloroethoxy)ethyl) ether 639-58-7 Triphenyltin chloride 640-19-7 Fluoroacetamide 643-28-7 N-isopropylaniline 643-58-3 2-methylbiphenyl 644-64-4 Dimetilan 645-62-5 2-ethyl-3-propylacrolein 646-04-8 2-pentane(e) 671-16-9 Procarbazine 674-82-8 Diketen 675-14-9 Cyanuric fluoride

Page 183: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-36 Hazardous Materials Management

CAS Number Hazardous Substance 676-97-1 Methyl phosphonic dichloride 680-31-9 Hexamethyl phosphoramide 681-84-5 Methyl silicate 684-16-2 Hexafluoroacetone 684-93-5 N-nitroso-n-methylurea 688-74-4 Tri-n-butyl borate 689-97-4 Vinyl acetylene 691-37-2 4-methyl-1-pentene 696-28-6 Phenyl dichloroarsine 702-03-4 N-(2-cyanoethyl)cyclohexylamine 712-68-5 2-amino-5(5-nitro-2-furyl)-1,3,4-thiadiazole 732-11-6 Phosmet 759-73-9 N-nitroso-n-ethylurea 760-21-4 2-ethyl-1-butene 760-93-0 Methacrylic anhydride 763-29-1 2-methyl-1-pentene 764-35-2 Methyl propyl acetylene 765-34-4 Glycidaldehyde 772-54-3 N-benzyldiethylamine 777-37-7 2-chloro-5-nitrobenzotrifluoride 786-19-6 Carbophenothion 794-93-4 Panfuran S 814-49-3 Diethyl chlorophosphate 814-68-6 Acrylyl chloride 814-78-8 Methyl isopropenyl ketone 818-61-1 Ethylene glycol monoacrylate 821-08-9 Divinyl acetylene 822-06-0 Hexamethylene diisocyanate (HDI) 824-11-3 Trimethylolpropane phosphite 827-52-1 Cyclohexylbenzene 838-88-0 4,4'-methylene bis(2-methylaniline) 869-29-4 Allylidene diacetate 871-27-2 Diethylaluminum hydride 872-10-6 Diamyl sulfide 872-50-4 I-methyl-2-pyrrolidone 900-95-8 Stannane, acetoxytriphenyl- 919-86-8 Demeton-s-methyl 920-46-7 Methacryloyl chloride 924-16-3 N-nitrosodi-n-butylamine 926-56-7 4-methyl-1,3-pentadiene 926-57-8 1,3-dichlorobutene-2 926-65-8 Vinyl isopropyl ether 927-07-1 tert-butyl peroxypivalate 927-80-0 Ethoxyacetylene 928-45-0 Butyl nitrate 928-55-2 Propenyl ethyl ether 930-22-3 Butadiene monoxide 930-55-2 N-nitrosopyrrolidine 944-22-9 Fonofos 947-02-4 Phosfolan 950-10-7 Mephosfolan

Page 184: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-37 Hazardous Materials Management

CAS Number Hazardous Substance 950-37-8 Methidathion 991-42-4 Norbormide 998-30-1 Triethoxysilane 999-61-1 2-hydroxypropyl acrylate 999-81-5 Chlormequat chloride 1002-16-0 Amyl nitrate 1031-47-6 Triamiphos 1066-30-4 Chromium acetate 1066-45-1 Trimethyltin chloride 1067-20-5 3,3-diethylpentane 1068-87-7 2,4-dimethyl-3-ethyl pentane 1103-86-9 Zinc potassium chromate 1116-54-7 N-nitrosodiethanolamine 1116-70-7 Tributylaluminum 1118-58-7 2-methyl-1,3-pentadiene 1119-49-9 N-butyl acetamide 1120-23-6 2,beta-butoxyethoxyethyl chloride 1120-71-4 1,3-propane sultone 1122-60-7 Nitrocyclohexane 1124-33-0 Pyridine, 4-nitro., 1-oxide 1126-78-9 N-butylaniline 1129-41-5 Metolcarb 1186-53-4 2,2,3,4-tetramethyl pentane 1189-85-1 tert-butyl chromate 1191-15-7 Diisobutylaluminum hydride 1195-42-2 Isopropyl cyclohexylamine 1271-28-9 Nickelocene 1300-73-8 Xylidene 1302-52-9 Beryl ore 1303-28-2 Arsenic pentoxide 1303-33-9 Arsenic trisulfide 1303-86-2 Boron oxide 1303-96-4 Borate, tetradecahydrate 1304-29-6 Barium peroxide 1304-56-9 Beryllium oxide 1304-82-1 Bismuth telluride 1305-62-0 Calcium hydroxide 1305-78-8 Calcium oxide 1306-19-0 Cadmium oxide 1306-23-6 Cadmium sulphide 1308-38-9 Chromic oxide 1309-37-1 Iron oxide fume 1309-48-4 Magnesium oxide fume 1309-64-4 Antimony trioxide 1310-58-3 Potassium hydroxide 1310-73-2 Sodium hydroxide 1312-73-8 Potassium sulfide 1313-60-6 Sodium peroxide 1313-99-1 Nickel oxide 1314-13-2 Zinc oxide fume 1314-18-7 Strontium peroxide

Page 185: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-38 Hazardous Materials Management

CAS Number Hazardous Substance 1314-20-1 Thorium dioxide 1314-62-1 Vanadium pentoxide, dust and fume 1314-80-3 Phosphorus pentasulfide 1314-84-7 Zinc phosphide 1314-85-8 Phosphorus sesquisulfide 1315-04-4 Antimony pentasulfide 1317-35-7 Manganese oxide 1317-95-9 Tripoli dust 1319-77-3 Cresol 1320-01-0 Amyl toluene 1320-21-4 Pentyl xylyl ether 1321-60-4 Trimethycyclohexanol 1321-64-8 Pentachloronaphthalene 1321-65-9 Trichloronaphthalene 1327-53-3 Arsenous oxide 1330-20-7 Xylene 1330-43-4 Borate, tetra-anhydrous 1331-11-9 3-ethoxypropionic acid 1331-28-8 Chlorostyrene 1331-43-7 Diethylcyclohexane 1332-21-4 Asbestos dust 1333-13-7 tert-butyl-m-cresol 1333-74-0 Hydrogen 1333-82-0 Chromium(vi) oxide (1:3) 1335-32-6 Lead subacetate 1335-87-1 Hexachloronaphthalene 1335-88-2 Tetrachloronaphthalene 1336-36-3 Polychlorinated biphenyls 1338-23-4 Methyl ethyl ketone peroxide 1341-24-8 Chloroacetophenone 1344-95-2 Calcium silicate 1397-94-0 Antimycin a 1420-04-8 Clonitralid 1420-07-1 Dinoterb 1464-53-5 Diepoxybutane 1467-79-4 Dimethycyanamide 1477-55-0 M-xylene-alpha,alpha-diamine 1552-12-1 1,5-cyclooctadiene 1558-25-4 Trichloro(chloromethyl)silane 1563-66-2 Carbofuran 1600-27-7 Mercuric acetate 1609-19-4 Chlorodiethylsilane 1615-80-1 1,2-diethylhydrazine 1622-32-8 Ethanesulfonyl chloride, 2-chloro- 1640-89-7 Ethyl cyclopentane 1642-54-2 Diethylcarbamazine citrate 1653-19-6 2,3-dichlorobutadiene-1,3 1663-35-0 Vinyl-2-methoxyethyl ether 1678-91-7 Ethylcyclohexane 1694-09-3 Benzyl violet 3B 1696-20-4 4-acetyl morpholine

Page 186: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-39 Hazardous Materials Management

CAS Number Hazardous Substance 1746-01-6 2,3,7,8-tetrachlorodibenzo-p-dioxin 1752-30-3 Acetone thiosemicarbazide 1789-58-8 Ethyl dichlorosilane 1809-19-4 Dibutyl phosphite 1836-75-5 Nitrofen 1910-42-5 Paraquat dichloride 1912-24-9 Atrazine 1918-02-1 Picloram 1929-82-4 Nitrapyrin 1937-37-7 Direct black 38 1982-47-4 Chloroxuron 2001-95-8 Valinomycin 2016-57-1 Decylamine 2032-65-7 Methiocarb 2036-15-9 Dipropylaluminum hydride 2038-03-1 4-(2-aminoethyl)-morpholine 2049-92-5 P-tert-amylaniline 2050-92-6 Diamylamine 2074-50-2 Paraquat methosulfate 2084-18-6 3-methyl-2-butanethiol 2097-19-0 Phenylsilatrane 2100-42-7 2,5-dimethoxychlorobenzene 2104-64-5 Epn 2109-64-0 Dibutylisopropanolamine 2156-96-9 Decyl acrylate 2160-93-2 tert-butyldiethanolamine 2179-59-1 Allyl propyl disulfide 2207-04-7 1,4-dimethylcyclohexane-trans 2216-33-3 3-methyloctane 2216-34-4 4-methyloctane 2223-93-0 Cadmium stearate 2231-57-4 Thiocarbazide 2234-13-1 Octachloronaphthalene 2238-07-5 Diglycidyl ether 2244-21-4 Potassium dichloro-s triazinetrione 2275-18-5 Prothoate 2303-16-4 Diallate 2385-85-8 Mirex 2425-06-1 Captafol 2426-08-6 N-butyl glycidyl ether (BGE) 2426-54-2 2-(diethylamino) ethyl acrylate 2449-49-2 alpha-methylbenzyl dimethylamine 2454-37-7 (m-aminophenyl) methyl carbinol 2497-07-6 Oxydisulfoton 2524-03-0 Dimethyl phosphorochloridothioate 2528-36-1 Dibutyl phenyl phosphate 2540-82-1 Formothion 2551-62-4 Sulfur hexafluoride 2570-26-5 Pentadecylamine 2587-90-8 Phosphorothioic acid, O,O-dimethyl-s-(2-methylthio)ethyl ester 2602-46-2 Direct blue 6

Page 187: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-40 Hazardous Materials Management

CAS Number Hazardous Substance 2631-37-0 Promecarb 2636-26-2 Cyanophos 2642-71-9 Azinphos-ethyl 2646-17-5 1-(o-tolylazo)-2-naphthol 2665-30-7 Phosphonothioic acid, methyl-,O-(nitrophenyl) o-phenyl ester 2698-41-1 O-chlorobenzylidene malononitrile (OCBM) 2699-79-8 Sulfuryl fluoride 2703-13-1 Phosphonothioic acid, methyl-,O-ethyl-o (4-(methylthio)phenyl)ester 2757-18-8 Thallous malonate 2763-96-4 Muscimol 2778-04-3 Endothion 2782-57-2 Dichloro-s-triazinetrione 2806-85-1 3-ethoxypropionaldehyde 2842-38-8 N-(2-hydroxyethyl) cyclohexylamine 2867-47-2 2-(dimethylamino) ethyl methacrylate 2893-78-9 Sodium dichloro isocyanurate 2921-88-2 Chlorpyrifos 2935-44-6 2,5-hexandediol 2937-50-0 Allyl chlorocarbonate 2971-90-6 Clopidol 3037-72-7 Silane,(4-aminobutyl)diethoxymethyl- 3068-88-0 Betabutyrolactone 3074-75-7 2-methyl-4-ethylhexane 3074-77-9 3-methyl-4-ethylhexane 3081-14-9 N,N'-bis-(1,4-dimethyl-pentyl)-p-henylenediamine 3221-61-2 2-methyloctane 3251-23-8 Cupric nitrate 3254-63-5 Phosphoric acid, dimethyl 4-(methylthio) phenyl ester 3312-60-5 N-(3-aminopropyl) cyclohexylamine 3333-52-6 Tetramethyl succinonitrile 3333-67-3 Nickel carbonate 3383-96-8 Temephos 3452-97-9 3,5,5-trimethylhexanol 3522-94-9 2,2,5-trimethylhexane 3564-09-8 Ponceau 3R 3569-57-1 Sulfoxide, 3-chloropropyl octyl 3570-75-0 2-(2-formylhydrazino)-4-(5-nitro-2-furyl)thiazole 3615-21-2 Benzimidazole,4,5-dichloro-2-(trifluoro-methyl)- 3689-24-5 Sulfotepp 3691-35-8 Chlorophacinone 3697-24-3 5-methylchrysene 3724-65-0 Crotonic acid 3734-97-2 Amiton oxalate 3761-53-3 Ponceau mx 3771-19-5 Nafenopin 3775-90-4 tert-butylaminoethyl methacrylate 3811-04-9 Potassium chlorate 3825-26-1 Ammonium perfluoro-octanoate 3878-19-1 Fuberidazole 3917-15-5 Vinyl allyl ether 3953-10-4 2-ethylbutyl acrylate

Page 188: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-41 Hazardous Materials Management

CAS Number Hazardous Substance 4016-14-2 Isopropyl glycidyl ether (IGE) 4032-86-4 3,3-dimethylheptane 4044-65-9 Bitoscanate 4098-71-9 Isophorone diisocyanate 4104-14-7 Phosacetim 4170-30-3 Crotonaldehyde 4301-50-2 Fluenetil 4342-03-4 Dacarbazine 4418-66-0 Phenol,2,2'-thiobis(4-chloro-6-methyl)- 4439-24-1 Ethylene glycol monoisobutyl ether 4461-41-0 2-chlorobutene-2 4461-48-7 4-methyl-2-pentene 4549-40-0 N-nitrosomethylvinylamine 4784-77-4 1-crotyl bromide 4806-61-5 Ethyl cyclobutane 4835-11-4 Hexamethylenediamine, N,N'-dibutyl- 5124-30-1 Methylene bis(4-cyclohexylisocyanate) 5309-52-4 2-ethyl-3-propylacrylic acid 5332-73-0 3-methoxypropylamine 5344-82-1 Thiourea, (2-chlorophenyl) 5408-74-2 2-vinyl-5-ethylpyridine 5419-55-6 Triisopropyl borate 5432-61-1 N-2-(ethylhexyl)-cyclohexylamine 5459-93-8 N-ethylcyclohexylamine 5714-22-7 Sulfur pentafluoride 5836-29-3 Coumatetralyl 5894-60-0 Hexadecyltrichlorosilane 6032-29-7 2-pentanole 6117-91-5 Crotonyl alcohol 6358-53-8 Citrus red no. 2 6423-43-4 Propylene glycol dinitrate 6484-52-2 Ammonium nitrate 6533-73-9 Thallous carbonate 6607-45-0 alpha,beta-dichlorostyrene 6806-86-6 Chloromethyl 6923-22-4 Monocrotophos 7154-79-2 2,2,3,3-tetramethyl pentane 7415-31-8 1,3-dichloro-2-butene 7429-90-5 Aluminum, metal and oxide and welding fumes 7439-92-1 Lead, inorganic, dust and fumes 7439-93-2 Lithium 7439-95-4 Magnesium 7439-96-5 Manganese 7439-97-6 Mercury 7439-98-7 Molybdenum 7440-01-9 Neon 7440-02-0 Nickel 7440-06-4 Platinum 7440-09-7 Potassium 7440-16-6 Rhodium, metal fume and dusts 7440-22-4 Silver

Page 189: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-42 Hazardous Materials Management

CAS Number Hazardous Substance 7440-23-5 Sodium 7440-25-7 Tantalum 7440-28-0 Thallium 7440-31-5 Tin 7440-33-7 Tungsten 7440-36-0 Antimony 7440-37-1 Argon 7440-38-2 Arsenic 7440-39-3 Barium 7440-41-7 Beryllium 7440-43-9 Cadmium 7440-47-3 Chromium 7440-48-4 Cobalt metal, dust, and fume 7440-50-8 Copper fume, dust, and mist 7440-58-6 Hafnium 7440-59-7 Helium 7440-61-1 Uranium (natural) 7440-65-5 Yttrium 7440-66-6 Zinc 7440-67-7 Zirconium 7440-70-2 Calcium 7440-74-6 Indium 7446-09-5 Sulfur dioxide 7446-27-7 Lead phosphate 7446-34-6 Selenium sulfide 7446-70-0 Aluminum chloride 7487-94-7 Mercuric chloride 7521-80-4 Butyl trichlorosilane 7550-45-0 Titanium chloride 7553-56-2 Iodine 7572-29-4 Dichloroacetylene 7580-67-8 Lithium hydride 7581-97-7 2,3-dichlorobutane 7601-89-0 Sodium perchlorate 7601-90-3 Perchloric acid 7616-94-6 Perchloryl fluoride 7631-86-9 Amorphous silica 7631-89-2 Sodium arsenate 7631-90-5 Sodium bisulfite 7631-99-4 Sodium nitrate 7632-51-1 Vanadium tetrachloride 7637-07-2 Boron trifluoride 7646-69-7 Sodium hydride 7646-78-8 Stannic chloride 7646-85-7 Zinc chloride fume 7647-01-0 Hydrogen chloride 7647-18-9 Antimony pentachloride 7664-38-2 Phosphoric acid 7664-39-3 Hydrogen fluoride 7664-41-7 Ammonia 7664-93-9 Sulfuric acid

Page 190: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-43 Hazardous Materials Management

CAS Number Hazardous Substance 7681-49-4 Sodium fluoride 7681-57-4 Sodium metabisulfite 7688-21-3 2-hexene-cis 7697-37-2 Nitric acid 7704-34-9 Sulfur 7718-54-9 Nickel chloride 7719-09-7 Thionyl chloride 7719-12-2 Phosphorus trichloride 7722-64-7 Potassium permanganate 7722-84-1 Hydrogen peroxide 7722-88-5 Tetrasodium pyrophosphate 7723-14-0 Phosphorus (yellow) 7726-95-6 Bromine 7727-21-1 Potassium persulfate 7727-37-9 Nitrogen (liquefied) 7738-94-5 Chromic acid 7757-79-1 Potassium nitrate 7758-01-2 Potassium bromate 7758-19-2 Sodium chlorite 7761-88-8 Silver nitrate 7773-06-0 Ammonium sulfamate (ammate) 7775-09-9 Sodium chlorate 7775-11-3 Sodium chromate 7775-14-6 Sodium hydrosulfite 7778-43-0 Arsenic acid, disodium salt 7778-44-1 Calcium arsenate 7778-50-9 Potassium dichromate 7778-54-3 Calcium hypochlorite 7778-74-7 Potassium perchlorate 7782-39-0 Deuterium 7782-41-4 Fluorine 7782-42-5 Graphite (natural) dust 7782-44-7 Oxygen (liquid) 7782-49-2 Selenium 7782-50-5 Chlorine 7782-65-2 Germanium tetrahydride 7783-00-8 Selenious acid 7783-06-4 Hydrogen sulfide 7783-07-5 Hydrogen selenide 7783-20-2 Ammonium sulfate 7783-41-7 Oxygen difluoride 7783-54-2 Nitrogen trifluoride 7783-60-0 Sulfur tetrafluoride 7783-70-2 Antimony pentafluoride 7783-79-1 Selenium hexafluoride 7783-80-4 Tellurium hexafluoride 7784-34-1 Arsenic chloride 7784-41-0 Potassium arsenate 7784-42-1 Arsine 7784-46-5 Sodium arsenite 7786-34-7 Mevinphos

Page 191: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-44 Hazardous Materials Management

CAS Number Hazardous Substance 7786-81-4 Nickel sulfate 7787-47-5 Beryllium chloride 7787-49-7 Beryllium fluoride 7787-71-5 Bromine trifluoride 7789-00-6 Potassium chromate 7789-00-6 Chromic acid, dipotassium salt 7789-04-0 Chromium phosphate 7789-06-2 Strontium chromate 7789-09-5 Ammonium dichromate 7789-30-2 Bromine pentaflouride 7790-91-2 Chlorine trifluoride 7790-94-5 Chlorosulfuric acid 7790-98-9 Ammonium perchlorate 7791-12-0 Thallous chloride 7791-21-1 Chlorine monoxide 7791-23-3 Selenium oxychloride 7791-25-5 Sulfuryl chloride 7803-49-8 Hydroxylamine 7803-51-2 Phosphine 7803-52-3 Stibine 7803-62-5 Silicon tetrahydride 8001-35-2 Toxaphene 8001-58-9 Creosote 8001-86-3 Isano oil 8002-05-9 Petroleum 8002-74-2 Paraffin wax fume 8003-34-7 Pyrethrum 8004-13-5 Phenyl ether-biphenyl mixture vapor 8006-20-0 Gas, producer 8006-61-9 Gasoline 8006-64-2 Turpentine 8007-45-2 Coal tar 8008-20-6 Kerosine 8008-51-3 Camphor oil (light) 8022-00-2 Methyl demeton 8030-30-6 Benzin 8038-30-6 Rubber solvent (naphtha) 8052-41-3 Stoddard solvent 8052-42-4 Asphalt fumes 8065-48-3 Demeton 9004-66-4 Iron dextran 9004-70-0 Collodion 9014-01-1 Subtilisins (proteolytic enzymes) 10022-31-8 Barium nitrate 10024-97-2 Nitrous oxide 10025-67-9 Sulfur monochloride 10025-73-7 Chromic chloride 10025-78-2 Trichlorosilane 10025-87-3 Phosphorus oxychloride 10026-11-6 Zirconium tetrachloride 10026-13-8 Phosphorus pentachloride

Page 192: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-45 Hazardous Materials Management

CAS Number Hazardous Substance 10028-15-6 Ozone 10031-59-1 Thallium sulfate 10034-81-8 Magnesium perchlorate 10034-85-2 Hydriodic acid 10034-93-2 Hydrazine sulfate 10035-10-6 Hydrogen bromide 10042-76-9 Strontium nitrate 10048-13-2 Sterigmatocystin 10049-04-4 Chlorine dioxide 10061-01-5 Cis-1,3-dichloropropene 10061-02-6 Trans-1,3-dichloropropene 10099-74-8 Lead nitrate 10102-06-4 Uranyl nitrate 10102-18-8 Sodium selenite 10102-20-2 Sodium tellurite 10102-43-9 Nitric oxide 10102-44-0 Nitrogen dioxide 10102-48-4 Lead arsenate 10108-56-2 N-butylcyclohexylamine 10108-64-2 Cadmium chloride 10124-36-4 Cadmium sulphate 10124-50-2 Potassium arsenite 10137-74-3 Calcium chlorate 10137-80-1 N-2-(ethylhexyl) aniline 10138-74-6 N-(2-hydroxyethyl) propylene diamine 10140-87-1 Ethanol, 1,2-dichloro-, acetate 10141-05-6 Cobaltous nitrate 10210-68-1 Cobalt carbonyl 10213-74-8 3-(2-ethylbutoxy) propionic acid 10265-92-6 Methamidophos 10294-33-4 Boron tribromide 10294-34-5 Boron trichloride 10294-40-3 Barium chromate 10311-84-9 Dialifor 10361-95-2 Zinc chlorate 10377-60-3 Magnesium nitrate 10476-95-6 Methacrolein diacetate 10544-72-6 Nitrogen tetroxide 10544-73-7 Nitrogen trioxide 10588-01-9 Chromic acid, disodium salt 10595-95-6 N-nitrosomethylethylamine 11114-92-4 Cobalt alloy, Co, Cr 11135-81-2 Sodium potassium alloys 12001-26-2 Mica dust 12001-28-4 Crocidolite dust 12001-29-5 Chrysotile dust 12002-03-8 Paris green 12035-72-2 Nickel subsulphide 12054-48-7 Nickel hydroxide 12075-68-2 Ethylaluminum sesquichloride 12079-65-1 Manganese cyclopentadienyl tricarbonyl

Page 193: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-46 Hazardous Materials Management

CAS Number Hazardous Substance 12108-13-3 Methylcyclopentadienyl manganese tricarbonyl 12124-97-9 Ammonia bromide 12125-01-8 Ammonia fluoride 12125-02-9 Ammonia chloride 12179-04-3 Borate, tetrapentahydrate 12263-85-3 Methylaluminum sesquibromide 12542-85-7 Methylaluminum sesquichloride 12604-58-9 Ferrovanadium dust 12770-50-2 Beryllium-aluminum alloy 13010-47-4 1-(2-chloroethyl)-3-cyclohexyl-1-nitrosourea 13057-78-8 Chloroisocyanuric acid 13071-79-9 Terbufos 13106-47-3 Beryllium carbonate 13121-70-5 Cyhexatin 13138-45-9 Nickel nitrate 13171-21-6 Phosphamidon 13194-48-4 Ethoprophos 13195-76-1 Triisobutyl borate 13256-22-9 N-nitrososarcosine 13327-32-7 Beryllium hydroxide 13360-63-9 Ethylbutylamine 13410-01-1 Sodium selenate 13423-61-5 Magnesium dichromate 13446-10-1 Ammonium permanganate 13450-90-3 Gallium trichloride 13463-39-3 Nickel carbonyl 13463-40-6 Iron pentacarbonyl 13477-00-4 Barium chlorate 13494-80-9 Tellurium 13510-49-1 Beryllium phosphate 13765-19-0 Calcium chromate 13823-29-5 Thorium nitrate 13838-16-9 2-chloro-1,1,2-trifluoroethyl difluoromethyl ether 13843-81-7 Lithium dichromate 13889-92-4 Propyl chlorothioformate 13952-84-6 sec-butylamine 13987-01-4 Tripropylene 14018-95-2 Zinc bichromate 14167-18-1 Salcomine 14307-33-6 Calcium bichromate 14464-46-1 Cristobalite dust 14484-64-1 Ferbam 14807-96-6 Silica, talc, non-asbestos form 14808-60-7 Quartz dust 14686-13-6 Heptylene-2-trans 14861-06-4 Vinyl crotonate 14901-08-7 Cycasin 14977-61-8 Chromyl chloride 15191-85-2 Beryllium silicate 15271-41-7 Bicyclo[2.2.1]Heptane-2-carbonitrile, 5-chloro-6-((((methylamino)carbonyl)oxy)imino)- (1st-(1-alpha, 2-beta,4-alpha,5-alpha,6e))-

Page 194: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-47 Hazardous Materials Management

CAS Number Hazardous Substance 15468-32-3 Tridymite dust 15663-27-1 Cis-platinous diammine dichloride 15699-18-0 Nickel ammonium sulfate 15930-94-6 Zinc chromate hydroxide 15980-15-1 1,4-thioxane 16071-85-6 Direct brown 16219-75-3 Ethylidene norbornene 16543-55-8 N-nitrosonornicotine 16721-80-5 Sodium sulfide 16752-77-5 Methomyl 16842-03-8 Cobalt hydrocarbonyl (as Co) 16853-85-3 Lithium tetrahydroaluminate 17014-71-0 Potassium peroxide 17702-41-9 Decaborane 17702-57-7 Formparanate 17804-35-2 Benomyl 18454-12-1 Lead chromate 18883-66-4 Streptozotocin 19287-45-7 Diborane 19624-22-7 Pentaborane 20816-12-0 Osmium tetroxide 20830-75-5 Digoxin 20830-81-3 Daunomycin 20859-73-8 Aluminum phosphide 21087-64-9 Metribuzin 21351-79-1 Cesium hydroxide 21548-32-3 Fosthietan 21609-90-5 Leptophos 21908-53-2 Mercuric oxide 21923-23-9 Chlorthiophos 22224-92-6 Fenamiphos 23135-22-0 Oxamyl 23214-92-8 Adriamycin 23505-41-1 Pirimifos-ethyl 23950-58-5 Pronamide 24017-47-8 Triazofos 24934-91-6 Chlormephos 25013-15-4 Vinyl toluene 25103-58-6 tert-dodecyl mercaptan 25136-55-4 Dimethyldioxane 25154-52-3 Nonylphenol 25167-70-8 Diisobutylene 25167-93-5 Nitrochlorobenzene 25339-56-4 3-heptene (mixed isomers) 25360-10-5 tert-nonyl mercaptan 25377-83-7 Octene (mixed isomers) 25551-13-7 Trimethyl benezene 25567-67-3 Dinitrochlorobenzene 25639-42-3 Methylcyclohexanol 26094-13-3 Butylamine oleate 26419-73-8 Carbamic acid, methyl-,O-(((2,4-(dimethyl-1, 3-dithiolan-2-yl)methylene)amino-

Page 195: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

3-48 Hazardous Materials Management

CAS Number Hazardous Substance 26628-22-8 Sodium azide 26952-21-6 Isooctyl alcohol 27137-85-5 Trichloro(dichlorophenyl)silane 27152-57-4 Calcium arsenite 27215-95-8 Nonene 28347-13-9 Xylylene dichloride 28434-86-8 3,3'-dichloro-4-4'-diaminodiphenyl ether 28772-56-7 Bromadiolone 28983-37-1 tert-tetradecyl mercaptan 28984-85-2 Nitrobiphenyl 29191-52-4 Anisidine 30030-25-2 Vinylbenzyl chloride 30174-58-4 tert-decylmercaptan 30674-80-7 Methacycloyloxyethyl isocyanate 30714-78-4 Ethyl butyl carbonate 32280-46-9 N,N-diethyl-1,3-butanediamine 32749-94-3 2,3-dimethyl pentaldehyde 34099-73-5 Ethyl borate 34590-94-8 Dipropylene glycol monomethyl ether 35400-43-2 Sulprofos 37300-23-5 Zinc yellow 39156-41-7 2,4-diaminoanisole sulphate 39196-18-4 Thiofanox 39413-47-3 Zinc beryllium silicate 42350-99-2 2-chloro-4,6-di-tert-amylphenol 50782-69-9 Phosphonothioic acid, methyl-,s-(2-(bis(1-methylethyl)amino)ethyl o-ethyl ester 53449-21-9 Chlorodiphenyl (42% chlorine) 53558-25-1 Pyriminil 55720-99-5 Chlorinated diphenyl oxide 55738-54-0 Trans-2-(dimethylamino)methylimino)-5-(2-(5-nitro-2-furyl) vinyl)-1,3,4-oxadiazole 58270-08-9 Zinc, dichloro(4,4-dimethyl-5((((methyl-amino)carbonyl) oxy)imino)pentane-nitrile)-(t-4) 59355-75-8 Methyl acetylene-propadiene mixture (MAPP) 59536-65-1 Polybrominated biphenyls 60676-86-0 Silica, fused, dust 61788-32-7 Hydrogenated terphenyls 62207-76-5 Cobalt,((2,2'-(1,2-ethanediylbis(nitrilomethylidyne))bis (6-fluorophenolato))(2-)-N,N',O,O')- 64037-54-3 3,4,-dichlorobutene-1 65996-89-6 Tar, cole, high-temp 65996-90-9 Tar, cole, high-temp 65996-91-0 Coal tar light oil 73090-68-3 tert-Butyl tertralin 73090-69-4 Chloro-4-tert-amylphenol 73513-30-1 Methylpentaldehyde 77536-68-6 Tremolite

Page 196: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-1

SECTION 4

HAZARDOUS WASTE MANAGEMENT

Florida Supplement, June 2000

This section covers the state requirements for Hazardous Waste Management and is intended to supplement the U.S. TEAM Guide. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

NOTES:

Unless specifically indicated otherwise, when used in any such provisions as adopted from 40 CFR Parts 262, 263, 264, 265, 266, 268, 270, and 273, United States shall mean the State of Florida, USEPA shall mean the Department, and Administrator or Regional Administrator shall mean the Secretary of the Department or the Secretary's designee, where appropriate. Any reference to 40 CFR Parts 270 or 124 as adopted by reference in 40 CFR Parts 262, 263, 264, 265, 266, 268, 270, and 273 shall mean the permitting provisions in FAC 62-4, FAC 62-730 or Section 403.722, Florida Statutes. Any reference to the Federal Solid Waste Disposal Act as amended by the Resource Conservation and Recovery Act of 1976 (RCRA) and its amendments, within 40 CFR parts 124, 262, 263, 264, 265, 266, 268, 270, and 273 as adopted by reference herein, shall be construed to refer to comparable provisions of the Florida Resource Recovery and Management Act (FRRMA) as established in Part IV of Chapter 403, Florida Statutes. The Department adopts by reference 40 CFR Part 266 revised as of 1 July 1998. EPA Form 8700-12 is hereby adopted and incorporated by reference as published in the 26 February 1980 Federal Register and revised in the 29 November 1985 Federal Register. All generators, transporters, or persons who own or operate a facility which treats, stores, or disposes of hazardous waste must notify the Department using this form, unless they have notified USEPA prior to the effective date of this rule. All generators, transporters, or persons who own or operate a facility which treats, stores, or disposes of hazardous waste, and everyone required to notify under FAC 62-730.181, shall notify the Department of all changes in status and shall use this form to do so. EPA Form 8700-13A/B (5-80) (Revised 8-91), OMB: 2050-0024 is hereby adopted and incorporated by reference. Copies of the form and instructions may be obtained by contacting the Hazardous Waste Regulation Section, Division of Waste Management, Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, Florida 32399-2400. EPA Form 8700-12 is hereby adopted and incorporated by reference as published in the 26 February 1980 Federal Register and revised in the 29 November 1985 Federal Register. EPA Form 8700-13A/B (5-80) (Revised 8-91), OMB: 2050-0024 is hereby adopted and incorporated by reference. Copies of the form and instructions may be obtained by contacting the Hazardous Waste Regulation Section, Division of Waste Management, Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, Florida 32399-2400. (FAC 62-730.150 (5) and (6)).

Page 197: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-2

Definitions

(NOTE: The Department adopts by reference the definitions contained in 40 CFR Part 260.10 revised as of 1 July 1998 (62-730.020 (1)).) • Closure - the cessation of operation of a hazardous waste facility or unit, and the act of securing such a

facility or unit pursuant to the requirements of FAC 62-730.180, so that it will pose no significant threat to human health or the environment (FAC 62-730.210.).

• Emergency Situation - a sudden release of hazardous waste or hazardous materials during

transportation or at a product storage facility (FAC 62-730.161(3)). • Mercury-Containing Devices - any electrical product, or other devices, excluding a battery or a

mercury-containing lamp, that is unprocessed and has been determined by the Department as proven to release mercury into the environment. The Department has determined that the following items are included in this definition: mercury thermostats, electrical mercury switches and relays, thermometers, manometers, ampoules removed from lamps or these devices in accordance with the 40 CFR 273.13 or 273.33 thermostat ampoule removal standards as adopted by reference under Rule 62-730.185, FAC, and other devices which contain liquid mercury as a component necessary for their operation (FAC 62-737.200) [Added May 1999].

• Mercury-Containing Lamp - any type of high or low pressure lighting device that is unprocessed such

as being crushed by a generator per paragraph 62-737.400(6)(b), contains mercury, and that generates light through the discharge of electricity either directly or indirectly through a fluorescing coating. This term includes fluorescent lamps, mercury vapor lamps, metal halide lamps, high pressure sodium lamps, and neon lamps containing mercury. The term excludes mercury-containing lamps used in residential applications and that are disposed of as part of ordinary household waste. For the purpose of this Chapter, except for annual reporting requirements under subsection 62-737.800(12), it is assumed that 4 unbroken lamps are equal to 1 kg in weight (FAC 62-737.200) [Added May 1999].

• Mercury-Containing Residuals or Residuals - material or waste including separate glass, separate

metal, phosphor powder, ampoules not removed from the lamps or these devices in accordance with the 40 CFR 273.13 or 273.33 thermostat ampoule removal standards, filtration material or any other residuals or combinations of the above that are generated as a result of mercury-containing lamp or device recovery or reclamation operations, or as the result of a cleanup, and that contain or have been in contact with mercury (FAC 62-737.200) [Added May 1999].

• Notice of Deficiency (NOD) - a certified letter from the Department to a permit applicant indicating

those items which were not completed or were inadequate in the original permit application or in subsequent submittals and requesting the submission of the required information (FAC 62-730.210).

• One-time Cleanup - removal of hazardous waste where: waste has been abandoned on a property; the

property is under bankruptcy proceedings or an administrative, civil, criminal, or judicial proceeding to compel facility closure; or any other situation which necessitates a one-time cleanup or removal of hazardous waste (FAC 62-730.161(3)(b)).

• Permit - the legal authorization granted by the Department to engage in or conduct any construction,

operation, or closure of any hazardous waste facility or any research development and demonstration facility for a specified period of time (FAC 62-730.210).

• Temporary Operating Permit (TOP) - the legal authorization, limited to a maximum of 3 yr, granted by

the Department to operate a hazardous waste facility in accordance with Section 403.722(2), Florida Statutes, and FAC 62-730.231 (FAC 62-730.210).

Page 198: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-3

• Universal Waste Lamp Or Device Destination Facility or Lamp Or Device Destination Facility - a mercury recovery or reclamation facility permitted by the Department or an out-of-State recycling facility permitted by another state for the process of universal waste lamp or devices and the ultimate recovery and reclamation of the mercury they contain, and one that meets the applicability requirements for a destination facility under 40 CFR 273.60 as adopted by reference under Rule 62-730.185, FAC (FAC 62-737.200) [Added May 1999].

• Universal Waste Device or Device - any mercury-containing device, excluding one generated by a

household exempt under 40 CFR 261.4(b)(1), that is also characteristically hazardous for mercury under 40 CFR 261.24 and is being managed in accordance with this chapter (FAC 62-737.200) [Added May 1999].

• Universal Waste Lamp or Lamp - any mercury-containing lamp that is also characteristically hazardous

for mercury under 40 CFR 261.24 and is being managed in accordance with this Chapter (FAC 62-737.200) [Added May 1999].

• Universal Waste Lamp Or Device Handler or Handler - a generator, or another person including a

transfer facility storing lamps or devices more than 10 days, that generates or receives universal waste lamps or devices from other handlers, accumulates and manages these lamps and devices in accordance with this Chapter, and ships them to a universal waste lamp or device destination facility (FAC 62-737.200) [Added May 1999].

1. A large quantity handler of universal waste lamps or devices is: a generator or reverse distribution handler accumulating 5,000 kilograms or more of universal waste lamps or devices at any one time.

2. A small quantity handler of universal waste lamps or devices is a generator or reverse distribution handler accumulating less than 5,000 kilograms of universal waste lamps or devices at any one time; or another handler that accumulates less than 2,000 kilograms of lamps or 100 kilograms of devices at any one time.

• Universal Waste Lamp Or Device Transfer Facility or Transfer Facility - an in-state-transportation-

related facility including loading docks, parking areas, storage areas, and other similar areas, including those designated at lamp generator facilities during relamping activities, where shipments of universal waste lamps or devices are held during the normal course of transportation for 10 days or less. Transfer facilities do not include handler facility areas where handlers are accumulating lamps or devices in accordance with 40 CFR 273.15 or 273.35 (FAC 62-737.200) [Added May 1999].

• Universal Waste Lamp Or Device Transporter or Transporter - any person, including a generator or

other handler, engaged in the off-site transportation of universal waste lamps or devices to a handler or lamp or device destination facility by air, rail, highway, or water (FAC 62-737.200) [Added May 1999].

Page 199: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-4

Page 200: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-5

HAZARDOUS WASTE MANAGEMENT GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: Missing Checklist Items HW.2.1.FL. State-Specific Hazardous Waste Requirements HW.5.1.FL. and HW.5.2.FL. All Sizes of Generators HW.10.1.FL. In 62-730.030, the Department adopts by reference 40 CFR Part 261 revised as of 1 July 1998, and all appendices except for the amendments in the Federal Registers dated 20 May 1992 (57 FR 21524), 1 July 1992 (57 FR 29220), 6 May 1998 (63 FR 24963), and 26 May 1998 (63 FR 28555). This part contains USEPA's rules on the identification and listing of hazardous waste. No delisting is effective until it is adopted by the Department. The following modifications shall apply to 40 CFR 261 and its Appendices in order to coordinate with state law and rules:

a. References to 40 CFR Parts 260.20, 260.21, 260.22, and 260.23, which contain USEPA's rules on rulemaking petitions, shall not change.

b. References to 40 CFR 262 shall mean rules adopted by DEP regarding generators of hazardous wastes, reference to 40 CFR 263 shall mean rules adopted by DEP regarding transporters of hazardous waste, reference to 40 CFR Parts 264 and 265 shall mean rules adopted by DEP regarding treaters, storers, and disposers of hazardous wastes, references to 40 CFR 266 shall mean rules adopted by DEP regarding standards for the management of specific hazardous waste, references to 40 CFR 268 shall mean rules adopted by DEP regarding land disposal restrictions, references to 40 CFR Parts 270 and 124 shall mean rules adopted by DEP regarding permitting of hazardous waste facilities, references to 40 CFR 273 shall mean rules adopted by DEP regarding standards for universal waste management, and references to Section 3010 of RCRA shall mean notification requirements of Florida Law.

c. 40 CFR 261.5(g)(3)(iii) shall refer to hazardous waste management programs approved by the USEPA. d. Any reference to Section 1004(5) of RCRA, which is the definition of hazardous waste, shall mean

Section 403.703(21), Florida Statutes. Conditionally Exempt Small Quantity Generators (CESQG)

HW.15.1.FL.

Small Quantity Generators (SQG) In 62-730.030, the Department adopts by reference 40 CFR Part 262 revised as of 1 July 1998, including the Appendix with the exception of 40 CFR 262.34(e).

General HW.20.1.FL. through HW.20.4.FL. Generators In 62-730.030, the Department adopts by reference 40 CFR Part 262 revised as of 1 July 1998, including the Appendix with the exception of 40 CFR 262.34(e).

General HW.55.1.FL. through HW.55.3.FL. Transfer Facilities HW.95.1.FL. through HW.95.3.FL. Transportation HW.100.1.FL. In 62-730.170, the Department adopts by reference 40 CFR Part 263 revised as of 1 July 1998. All TSDFs

In 62-730.180, the Department adopts by reference 40 CFR Part 264 and Part 265, revised as of 1 July 1998. In addition to the other reporting requirements of 40 CFR Part 264 Subpart F as adopted above, whenever the owner or operator is required to determine ground water quality and ground water flow rate and direction, a copy of the complete report of such determination must be submitted to the department within 30 days after the report is finalized. The corrective action program set forth in 40 CFR 264.100 as adopted above, or another appropriate corrective action program, shall extend beyond the facility property boundary. In addition to the requirements of 40 CFR 264 Subpart F, as adopted above, the owner or operator shall also comply with the ground water quality standards and criteria of Chapters 62-3 and 62-4, FAC

General HW.105.1.FL. through HW.105.5.FL.

Page 201: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-6

Restricted Wastes The Department adopts by reference 40 CFR Part 268 revised as of 1 July 1998, and all appendices, with the exception of 268.5, 268.6, 268.42(b) and 268.44, and the amendments to 40 CFR 268.2(k), 268.7(a), 268.7(b), 268.7(e), and 268.49 dated 26 May 1998 (63 FR 24963), which are optional. The authority for implementing the excluded sections remains with USEPA. Documentation Requirements HW.145.1.FL. Closure HW.170.1.FL. Additional State-Specific Requirements

Research, Development, and Demonstration Permits

HW.175.1.FL.

Emergency Detonation or Thermal Treatment of Hazardous Waste

HW.175.2.FL. and HW.175.3.FL.

Additional Requirements for Interim Status TSDFs (NOTE: All references to the term "interim status" in the USEPA regulations adopted by reference herein shall not be applicable to these rules. The standards contained in 40 CFR 265, adopted by reference herein, shall be effective insofar as their applicability to existing facilities in operation upon the effective date of this rule (FAC 62-730.150(4)). Export/Import of Hazardous Waste HW.265.1.FL. (NOTE: Florida adopts by reference 40 CFR 273 revised as of 1 July 1998, at FAC 62-270.185. The universal waste requirements listed in this chapter are in addition to the Federal requirements.) Small Quantity Universal Waste Handler

General HW.280.1.FL. through HW.280.4.FL. Personnel Training HW.300.1.FL. Containers HW.310.1.FL.

Large Quantity Universal Waste Handler General HW.370.1.FL. through HW.370.5.FL. Personnel Training HW.390.1.FL. Containers HW.400.1.FL.

Universal Waste Transporters HW.450.1.FL. through HW.450.4.FL.

Page 202: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-7

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HW.2. MISSING CHECKLIST ITEMS

HW.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 203: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-8

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HW.5. STATE-SPECIFIC HAZARDOUS WASTE REQUIREMENTS

HW.5.1.FL. An emergency identification number may be allowed under specific conditions (FAC 62-730.161).

(NOTE: Emergency situations are those such as spills, cleanup of abandoned sites, and one-time cleanup of a site that does not normally generate hazardous waste and will not generate waste in the foreseeable future.)

(NOTE: In order to apply for an emergency USEPA/DEP ID number, the generator of the hazardous waste must send the Department a completed DEP Form 62-730.900(3) and follow the instructions on the form.)

Verify that the holder of an emergency identification number does not ship hazardous wastes not listed on DEP Form 62-730.900(3) he submitted to the Department.

Verify that the holder of an emergency identification number does not ship a greater volume of hazardous waste than listed on DEP Form 62-730.900(3) without delivering, within 24 h of the shipment, a written explanation of the reason for exceeding the original estimated volume.

Verify that the holder of an emergency identification number does not ship hazardous waste later than 60 days after the issue date of the emergency USEPA/DEP ID number.

Verify that the holder of an emergency identification number sends the Department a legible copy of all signed and returned manifests and the land disposal restriction notices and certifications (required under 40 CFR 268.7) for the hazardous wastes shipped under the emergency USEPA/DEP ID number within 45 days of the last shipment.

Verify that, a generator with an emergency identification number who generates greater than 1000 kg (2200 lb) of hazardous waste in a calendar month, submits a biannual report.

HW.5.2.FL. Information about any hazardous waste activity requested by the Department must be submitted within 30 days (FAC 62-730.150(7)).

Verify that any information specifically requested in writing by the Department concerning waste management activities from any person who generates, treats, stores, transports, disposes of, or otherwise handles, or has handled, or proposes to handle hazardous waste, is submitted within 30 days of receipt of the Department's request.

Page 204: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-9

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Page 205: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-10

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HW.10. ALL SIZES OF GENERATORS

HW.10.1.FL. All generators who treats, stores, or disposes of hazardous waste must notify the Department of changes in status (FAC 62-730.150(5)).

Verify that all generators who dispose of hazardous waste notify the Department of all changes in status using USEPA Form 8700-12.

(NOTE: This notification requirement is repeated in HW.100 and HW.105.)

Page 206: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-11

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HW.15. CONDITIONALLY EXEMPT SMALL QUANTITY GENERATORS (CESQG)

HW.15.1.FL. CESQG are required to meet additional recordkeeping requirements (FAC 62-730-030(c)(3)).

Verify that, when a CESQG chooses to send its hazardous waste to an offsite TSDF, the hazardous waste delivery is documented through written receipts and other records.

Verify that the records are retained for at least 3 yr and include names and addresses of the generator and the TSDF, the type and amount of hazardous waste delivered, and the date of shipment.

Page 207: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-12

Page 208: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-13

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SMALL QUANTITY GENERATORS (SQG)

HW.20. GENERAL

HW.20.1.FL. Generators of more than 100 kg (220 lb) but less than 1000 kg of hazardous waste in a calendar mo (SQGs) are limited to 180 day onsite accumulation without a permit (FAC 62-730.160(3)).

(NOTE: Florida will not grant an additional 90 days onsite storage for SQGs sending wastes to TSDFs more than 200 miles distant.)

Verify that SQGs only accumulated hazardous waste onsite for 180 days or less without a permit.

HW.20.2.FL. SQG who accumulate hazardous waste onsite for 180 days or less without a permit must document inspections and maintain aisle space (FAC 62-730.160(6) and (7)).

Verify that SQGs inspect areas where containers are stored, at least weekly, looking for leaks and signs of deterioration caused by corrosion or other factors.

Verify that SQGs keep written documentation of inspections for at least 3 yr.

Verify that, at a minimum, the inspections documentation includes the date and time of the inspection, legibly printed name of the inspector, number of containers, the condition of the containers, a notation of the observations made, and the date and nature of any repairs or other remedial actions.

Verify that SQGs maintain adequate aisle space between containers of hazardous waste to allow for inspection of the condition and labels of the individual containers.

HW.20.3.FL. SQGs must complete specific sections of the uniform hazardous waste manifest (FAC 62-730.160)(4)).

Verify that SQGs of hazardous waste complete the following sections of the Uniform Hazardous Waste Manifest: Items 1 through 16, D, F, H, I, and K on Form 8700-22, and Items 21 through 32, O, Q, R, and T on Form 8700-22A.

(NOTE: Copies of a list of vendors that supply the form and instructions may be obtained by contacting the Hazardous Waste Regulation Section, Division of Waste Management, Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, Florida 32399-2400.)

Page 209: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-14

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HW.20.4.FL. SQGs must submit biennial reports to the Department (FAC 62-730.160(5)).

Verify that SQGs of hazardous waste submit biennial reports required by 40 CFR 262.41, as adopted by reference in this section, to the Department on USEPA Form 8700-13A/B.

(NOTE: Copies of the form and instructions may be obtained by contacting the Hazardous Waste Regulation Section, Division of Waste Management, Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, Florida 32399-2400.)

Page 210: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-15

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

GENERATORS

HW.55. GENERAL

HW.55.1.FL. Generators who accumulate hazardous waste onsite for 90 days or less without a permit must document inspections and maintain aisle space (FAC 62-730.160(6) and (7)).

Verify that generators inspect areas where containers are stored, at least weekly, looking for leaks and signs of deterioration caused by corrosion or other factors.

Verify that generators keep written documentation of inspections for at least 3 yr.

Verify that, at a minimum, the inspections documentation includes the date and time of the inspection, legibly printed name of the inspector, number of containers, the condition of the containers, a notation of the observations made, and the date and nature of any repairs or other remedial actions.

Verify that generators maintain adequate aisle space between containers of hazardous waste to allow for inspection of the condition and labels of the individual containers.

HW.55.2.FL. Generators must complete specific sections of the uniform hazardous waste manifest (FAC 62-730.160)(4)).

Verify that generators of hazardous waste complete the following sections of the Uniform Hazardous Waste Manifest: Items 1 through 16, D, F, H, I, and K on Form 8700-22, and Items 21 through 32, O, Q, R, and T on Form 8700-22A.

(NOTE: Copies of a list of vendors which supply the form and instructions may be obtained by contacting the Hazardous Waste Regulation Section, Division of Waste Management, Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, Florida 32399-2400.)

HW.55.3.FL. Generators must submit biennial reports to the Department (FAC 62-730.160(5)).

Verify that generators of hazardous waste submit biennial reports required by 40 CFR 262.41, as adopted by reference in this section, to the Department on USEPA Form 8700-13A/B.

(NOTE: Copies of the form and instructions may be obtained by contacting the Hazardous Waste Regulation Section, Division of Waste Management, Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, Florida 32399-2400.)

Page 211: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-16

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HW.95. TRANSFER FACILITIES

HW.95.1.FL. Hazardous waste transfer facilities must meet specific requirements (FAC 62-730.171 (1), (3), and (4)).

(NOTE: 40 CFR 263.12 as adopted by reference in FAC 62-730.170, provides that transporters who store manifested hazardous waste in proper containers at a transfer facility for 10 days or less are exempt from regulation as a TSDF. If the waste is stored for more than 10 days, the facility is subject to the permitting requirements for a hazardous waste storage facility.)

Verify that a transfer facility which stores manifested shipments of hazardous waste for more than 24 h but 10 days or less notifies the Department of its hazardous waste activity at least 30 days prior to the storage of hazardous waste.

Verify that the transfer facility annually updates the notification information (DEP Form 62-730.900(6).

Verify that the owner/operator of a transfer facility has an USEPA/DEP identification number for each transfer facility location.

Verify that the transfer facility has a written closure plan to show that the facility will be closed in a manner which satisfies the requirements of the closure performance, notification, and decontamination standards for closure under interim status (40 CFR 265.111, 265.112, 265.114 and 265.115).

Verify that the closure plan was submitted to the Department with the facility's first Transfer Facility Notification Form (DEP Form 62-730.900(6)).

Verify that within 60 days of completion of closure, the owner/operator of the transfer facility submits to the Department a certification that the facility has been closed in accordance with the specifications in the closure plan.

(NOTE: The certification must be signed by both the owner/operator of the transfer facility and an independent registered, professional engineer.)

HW.95.2.FL. Hazardous waste transfer facilities must meet specific reporting and recordkeeping requirements (FAC 62-730.171 (2)(c) and(e)).

Verify that all records required for transfer facilities are maintained in permanent form and are available for inspection by the Department.

Verify that records are kept at the facility unless the Department gives written approval to do otherwise.

Verify that a written record of when hazardous waste enters and leaves the facility is maintained.

Page 212: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-17

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that the written record includes: the generator's name, the generator's USEPA/DEP identification number, and the manifest number.

Verify that, for CESQGs without an USEPA/DEP identification number, the record includes the name and address of the generator.

(NOTE: This recordkeeping requirement applies to all hazardous wastes including hazardous waste generated by CESQG.)

HW.95.3.FL. Hazardous waste transfer facilities must meet specific operational requirements (FAC 62-730.171 (2)(a) and(d)).

Verify that hazardous waste stored in containers or vehicles at transfer facilities is to be stored on a manmade surface which is capable of preventing spills or releases to the ground.

Verify that the transfer facility complies with the requirements of 40 CFR 265 Subparts B (general facility standards, see HW.105 in the U.S. TEAM Guide), C (preparedness and prevention, see HW.110 in the U. S. TEAM Guide), D (contingency and emergency plan, see HW.105 of the U. S. TEAM Guide), and I (management of containers, see HW.115 and HW.120 in the U.S. TEAM Guide).

(NOTE: The aisle space requirements described in 40 CFR 265.35 and the special requirements for incompatible wastes described in 40 CFR 265.177(c) (separation of incompatible wastes by a dike, berm, wall, or other device) do not apply to containers stored in trucks loaded in accordance with DOT regulations described in 40 CFR 263.10.)

(NOTE: The owner/operator of the transfer facility must submit the contingency and emergency plan to the Department with their first Transfer Facility Notification Form (DEP Form FAC 62-730.900(6)).)

Page 213: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-18

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HW.100. TRANSPORTATION

HW.100.1.FL. All hazardous waste transporters who treat, store, or dispose of hazardous waste must notify the Department of changes in status (FAC 62-730.150(5)).

Verify that all transporters who dispose of hazardous waste notify the Department of all changes in status using USEPA Form 8700-12.

(NOTE: This notification requirement is repeated in HW.10 and HW.105.)

Page 214: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-19

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ALL TSDFs

HW.105. GENERAL

HW.105.1.FL. The permitting of TSDFs must meet specific requirements (FAC 62-730.200 and 62-730.231).

(NOTE: This item applies to the issuance, denial, renewal, modification, and revocation of any research development and demonstration permit, temporary operation permit (TOP), operation permit, construction permit, and closure permit for a TSDF in Florida.)

(NOTE: Whenever a hazardous waste permit is required and other rules of the Department require another type of permit, the Department will make every effort to consolidate the review, issuance, and reissuance of Department permits.)

(NOTE: Permits may be issued or denied for one or more hazardous waste management units at a facility without simultaneously issuing or denying a permit to all hazardous waste management units at the facility. The permit status of any unit for which a permit has not been issued or denied is not affected by the issuance or denial of a permit to any other unit at the facility.)

Verify that all facilities which do not qualify for a temporary operating permit (TOP), who have not made timely and complete application for a TOP, or whose TOP has expired, comply with 40 CFR 264 standards (as adopted in FAC 62-730.180(1)).

Verify that any hazardous waste facility which is deemed to have a TOP, because it is required to obtain a hazardous waste permit after a rule change by the Department, complies with the following requirements:

- the owner/operator has complied with the notice requirements of Section 403.72(2), Florida Statutes

- the owner/operator submits a completed and signed Application for a Hazardous Waste Facility Permit Part I (DEP Form 62-730.900(2)(a)) and Application for a Hazardous Waste Facility Permit Certification (DEP Form 62-730.900(2)(d)) at the earlier of:

- 6 mo after the date the rule is filed - 30 days after the facility is first subject to the rule amendment that

requires the facility to obtain a hazardous waste permit.

Verify that a facility operating under a TOP does not:

- treat, store, or dispose of any hazardous waste not specified in Part I of the permit application

- employ any process not specified in Part I of the permit application

Page 215: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-20

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- exceed the design capacities specified in Part I of the permit application.

Verify that a facility operating under a TOP complies with the standards of 40 CFR 265 as adopted by reference in FAC 62-730.180.

HW.105.2.FL. TSDFs must comply with requirements for construction and operation permits (FAC 62-730.240, 62-730.250, and 62-730.300).

Verify that construction or major modification of any unit at a hazardous waste facility is accomplished within the terms of a construction permit.

Verify that operation of a TSDF does not begin until an operation permit has been issued by the Department.

(NOTE: TSDFs that are issued an operation permit shall comply with 40 CFR 264 standards adopted in FAC 62-730.180, except for hazardous waste management units for which no Part 264 standards have been adopted in which case Part 265 standards shall apply.)

Verify that 180 days prior to the expiration of any hazardous waste permit, a renewal application is submitted to the Department.

HW.105.3.FL. All TSDFs who treat, store, or dispose of hazardous waste must notify the Department of changes in status (FAC 62-730.150(5)).

Verify that all TSDFs who treat, store, or dispose of hazardous waste notifies the Department of all changes in status using USEPA Form 8700-12.

(NOTE: This notification requirement is repeated in HW.10 and HW.100.)

HW.105.4.FL. The location of a transfer facility at a TSDF requires a permit modification (FAC 62-730.180(10)).

Verify that the location of a transfer facility at a permitted TSDF is accomplished with a permit modification.

(NOTE: The permit modification requires public notice.)

HW.105.5.FL. TSDFs must meet additional groundwater monitoring requirements (FAC 62-730.180(4) and (5)).

Verify that, whenever the owner/operator is required to determine groundwater quality and groundwater flow rate and direction, a copy of the complete report of the determination is submitted to the Department within 30 days after the report is finalized.

(NOTE: The corrective action program set forth in 40 CFR 264.100 or another appropriate corrective action program, must extend beyond the facility property boundary.)

(NOTE: In addition to the requirements of 40 CFR 264 Subpart F, as adopted above, the owner or operator shall also comply with the ground water quality

Page 216: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-21

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

standards and criteria of FAC 62-3 and FAC 62-4.)

Verify that groundwater discharge considerations (found in FAC 62-28.700) incorporated into the hazardous waste facility permits are met.

Page 217: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-22

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ALL TSDFs

HW.145. DOCUMENTATION REQUIREMENTS

HW.145.1.FL. TSDFs must submit biennial reports on USEPA Form 8700-13A/B (61-730.180(7)).

Verify that owners/operators of TSDFs submit biennial reports (required by 40 CFR 264.75 and 265.75 as adopted by reference) to the Department on USEPA Form 8700-13A/B.

Page 218: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-23

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ALL TSDFs

HW.170. CLOSURE

HW.170.1.FL. Closure and postclosure activities must have a closure permit (FAC 62-730.260).

Verify that an application for a closure permit is made at the time specified for the notification of a closure under 40 CFR 264.112(d) or 40 CFR 265.112(d) as adopted in FAC 62-730.180, or at the time specified in a permit issued under FAC 62-730.

Verify that the Federal facility applies for renewal of the closure permit at least 180 days prior to its expiration throughout the closure and post closure period.

Verify that the Federal facility meets all closure permit conditions and compliance schedules.

(NOTE: If a clean closure demonstration is not successful, all postclosure care requirements will apply and the permit may be modified accordingly.)

(NOTE: If closure or postclosure plans are approved by the Department as part of a temporary operating permit (TOP), construction, or operation permit application, the applicant for a closure permit must include a copy of the approved closure or postclosure plans with the application. The applicant must also either: attach a certification stating that no changes have been made to the plans or provide an amended plan showing all the changes which have been made or are proposed to be made to the plans.)

Verify that, within 60 days of completion of closure, certification that the facility has been closed in accordance with the specifications in the closure plan is submitted to the Department.

Verify that the closure certification is signed by both the owner/operator of the hazardous waste facility and an independent, registered, professional engineer.

Page 219: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-24

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ALL TSDFs

HW.175. ADDITIONAL STATE- SPECIFIC REQUIREMENTS

HW.175.1.FL. Innovative and experimental hazardous waste treatment technology or process requires a permit (FAC 62-730.330).

Verify that any Federal facility holding a research, development, or demonstration permit comply with all the permit conditions.

(NOTE: Permits will cover operation of the facility for not longer than 1 yr; renewal will be for not more than 1 yr.)

HW.175.2.FL. Claims of exemption under 40 CFR 266.20(b) must meet specific requirements (FAC 62-730.181 (2)) [Added July 1998].

Verify that owners/operators of facilities claiming exemption to regulations under 40 CFR 266.20(b) maintain detailed operations records that may be used to determine if the claim of exemption is valid.

(NOTE: 40 CFR 266.20(b) applies to products produced for the general public’s use that are used in a manner that constitutes disposal and contains recyclable materials that are not presently subject to regulation if the recyclable materials have undergone a chemical reaction in the course of producing the products so as to become inseparable by physical means and if such products meet the applicable treatment standards in Subpart D of Part 268 (or applicable prohibition levels in 40 CFR 268.32 or RCRA section 3004(d), where no treatment standards have been established) for each recyclable material (i.e., hazardous waste) that they contain. Commercial fertilizers that are produced for the general public's use that contain recyclable materials also are not presently subject to regulation provided they meet these same treatment standards or prohibition levels for each recyclable material that they contain. However, zinc-containing fertilizers using hazardous waste K061 that are produced for the general public's use are not presently subject to regulation.)

Verify that the records are retained for at least 3 yr and are available to the Department upon request.

HW.175.3.FL. Suspected or confirmed hazardous waste contamination sites must be posted (FAC 62-730.181 (3)) [Added July 1998].

Verify that owners or operators of suspected or confirmed contaminated sites where a risk of exposure to the public exists place warning signs.

Verify that warning signs are at least 2 ft by 2 ft, made of durable weather resistant material, with a white background and red lettering of a size indicated in Figures 1,

Page 220: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-25

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

[Added July 1998]. 2, 3 and 4 (Appendix 6 - 1).

Verify that warning signs are unobstructed and are mounted in such a manner that the center of the sign is approximately 56 in. above ground surface and is capable of being seen from at least 75 ft away.

Verify that warning sign text corresponds with the following:

- contaminated site displays warning signs consistent with Figure 1 (A "contaminated site" means any area in which the soil, surface water, or air is contaminated with hazardous waste.)

- a waste site study area displays warning signs consistent with Figure 2 (A "waste site study area" means any area that is suspected, but not yet confirmed by analysis, of being contaminated with hazardous waste.)

- a site where a treatment system is operating displays a warning sign consistent with Figure 3

- a site which has a hazardous waste cover displays a warning sign consistent with Figure 4.

Verify that the text on all signs includes the telephone number for a point of

contact at the appropriate regulatory agency for information.

Emergency Detonation or Thermal Treatment of Hazardous Waste

HW.175.4.FL. The emergency detonation or thermal treatment of reactive hazardous waste must be authorized by the Department (FAC 62-730.320(1) and (2)(a)).

(NOTE: Reactive hazardous waste is defined as waste that is highly reactive, shock sensitive, or explosive and can only be safely disposed of through its prompt detonation or treatment. To be considered for an emergency authorization there must be an immediate danger and imminent hazard to persons and property in the surrounding area.)

Verify that a Federal facility has been granted an authorization for the emergency detonation or treatment of reactive hazardous wastes.

(NOTE: Oral permission will be followed within 5 days by a written order. Written orders are accompanied by the publication of public notice. Permission granted will not exceed 90 days.)

Verify that only the wastes specified are disposed of under this permit (authorization).

Verify that the time and place of the detonation or treatment and the procedures specified in the notice to the Department are followed.

Verify that the detonation or treatment is conducted or supervised by local law

Page 221: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-26

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

enforcement officials, bomb squads, or other officials or agencies experienced in the handling and disposal of explosives.

Verify that all other local, state, and Federal approvals and licenses required for the activities allowed in this authorization shall be obtained.

HW.175.5.FL. The detonation or thermal treatment of reactive hazardous waste under emergency authorization must meet specific requirements (FAC 62-730.320(2)(b) through (h)).

Verify that visible residual materials are recovered from the site and properly disposed of in accordance with Department rules.

Verify that adequate fire protection to assure confinement and control of any fire resulting from the operation is provided.

Verify that the local Department representative or their designee is notified (he may be present to observe the treatment or detonation).

Verify that, prior to treatment or detonation, the site is secured and no site access allowed except by authorized personnel.

Verify that the area around the site is visually inspected to assure that no unauthorized personnel are present.

Verify that the securing and inspection of the site is made to at least the following distances:

Pounds of Waste Explosive Minimum Distance

0 to 100 204 m (670 ft) 101 to 1,000 380 m (1250 ft) 1,001 to 10,000 530 m (1730 ft) 10,001 to 30,000 690 m (2260 ft)

Verify that the thermal treatment or detonation is conducted only at the times and place specified in the permittee's notice to the Department.

Verify that, if required by the Department as a condition of its approval, soil sampling is conducted before and after the detonation or treatment.

Verify that, within 30 days of the emergency detonation or thermal treatment, a complete written summary is submitted to the Department of the detonation or treatment which includes actual procedures used, disposition of any residues from the process, and other pertinent information.

Page 222: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-27

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HW.265. EXPORT/IMPORT OF HAZARDOUS WASTE

HW.265.1.FL. A primary exporter of hazardous waste must send reports and notifications to the Department (FAC 62-730.160(2)).

Verify that a primary exporter of hazardous waste files a copy of the advance notification required by 40 CFR 262.53, the annual reports required by 40 CFR 262.56, and the exception reports required by 40 CFR 262.55 with the Department.

Page 223: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-28

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SMALL QUANTITY UNIVERSAL WASTE HANDLERS

(NOTE: Florida has adopted the Federal regulations on universal wastes, and has added regulations for mercury-containing lamps and devices. These additional regulations are included here.)

HW.280. GENERAL

(NOTE: Mercury-containing lamps or devices that have been identified as hazardous waste and are not being managed as universal waste lamps or devices may be managed as hazardous waste.)

HW.280.1.FL. Spent universal waste lamps or devices must be shipped only to specific destinations (FAC 62-737.400(1)(b)) [Added May 1999].

Verify that handlers of spent universal waste lamps or devices only ship these lamps or devices to a handler or universal waste lamp or device destination facility.

HW.280.2.FL. Handlers managing lamps or devices as universal wastes must meet registration requirements (FAC 62-737.400(2) and (3)(a)) [Added May 1999].

(NOTE: A generator or handler managing lamps or devices covered under a reverse distribution program, or a person only collecting spent lamps from generators of 10 or less spent lamps per month and who does not accumulate more than 100 kg of lamps at one time, is not required to register with the Department for these activities.)

Verify that before beginning operations and annually thereafter by 1 March, a handler of spent universal waste lamps or devices registers by notifying the Department, using DEP Form 62-737.900(1), of the intent to be a handler.

Verify that the handler certifies that the Federal facility has employee training procedures in place for the proper handling, emergency response, and containment and cleanup of spent universal waste lamps or devices.

Verify that a handler does not begin or continue operations without a current and valid registration issued by the Department.

HW.280.3.FL. Handlers must manage universal waste lamps and devices according to specific standards (FAC 62-737.400(5), (6) and (7)) [Added May 1999].

Verify that handlers manage universal waste lamps and devices in a way that prevents breakage, releases of their components to the environment, and their exposure to moisture.

Verify that, in the event of a release, the handler determines whether the cleanup residues (e.g., cleanup equipment and contaminated soils) resulting from the

Page 224: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-29

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

[Added May 1999]. release are hazardous waste, and if so, manages them as hazardous wastes.

Verify that a handler of universal waste devices or lamps that removes mercury-containing ampoules from these devices or lamps complies with the thermostat ampoule removal requirements under 40 CFR 273.13(c) or 273.33(c).

Verify that where a generator of universal waste lamps uses crushing equipment on-site to reduce the volume of the stored lamps:

- this is done in a final accumulation container - the lamps are crushed in a controlled manner that prevents the release of

mercury vapor or other contaminants - the crushing operations and maintenance of the unit are performed in

accordance with written procedures developed by the manufacturer of the equipment including specific instructions for the frequency of filter changes

- the employees using this equipment are thoroughly familiar with these written procedures and emergency procedures should equipment malfunction occur.

(NOTE: The following requirements do not apply to generators of universal

waste, just handlers; see Definitions.)

Verify that a handler stores its universal waste lamps or devices indoors, and does not store more than the amount specified in its registration or closure plan.

Verify that a handler does not store for more than one year universal waste lamps or devices from the date of generation or from when they were first received.

Verify that handlers are able to demonstrate the length of lamp or device storage as specified in 40 CFR 273.15 or 273.35 (as adopted by reference under FAC 62-730.185).

Page 225: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-30

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SMALL QUANTITY UNIVERSAL WASTE HANDLERS

(NOTE: Florida has adopted the Federal regulations on universal wastes, and has added regulations for mercury-containing lamps and devices. These additional regulations are included here.

HW.300. PERSONNEL TRAINING

(NOTE: Mercury-containing lamps or devices that have been identified as hazardous waste and are not being managed as universal waste lamps or devices may be managed as hazardous waste.)

HW.300.1.FL. Small quantity handlers of waste lamps or devices must meet personnel training requirements (FAC 62-737.400(4)) [Added May 1999].

Verify that a small quantity handler of lamps or devices ensures that all its employees involved with the management of universal waste lamps or devices, are trained in the proper handling (e.g., packaging and preventing breakage) and emergency cleanup and containment procedures applicable to its handling or transport of spent universal waste lamps or devices.

Verify that these emergency procedures are kept at the business location of the handler and made available for inspection upon request by the Department.

Page 226: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-31

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SMALL QUANTITY UNIVERSAL WASTE HANDLERS

(NOTE: Florida has adopted the Federal regulations on universal wastes, and has added regulations for mercury-containing lamps and devices. These additional regulations are included here.)

HW.310. CONTAINERS

(NOTE: Mercury-containing lamps or devices that have been identified as hazardous waste and are not being managed as universal waste lamps or devices may be managed as hazardous waste.)

HW.310.1.FL. Containers for universal waste lamps and devices must meet specific requirements (FAC 62-737.400(5)) [Added May 1999].

Verify that fragile universal waste devices, crushed universal waste lamps, and lamps or devices showing evidence of leakage, spillage, or damage that could cause leakage, are placed in closed containers that are structurally sound, compatible with the universal waste lamp or device, and lack evidence of leakage, spillage, or damage that could allow leakage.

Verify that universal waste lamps, devices, or the containers in which they are stored are labeled or marked clearly as follows:

- for universal waste lamps, the words "Spent Mercury-Containing Lamps for Recycling", "Universal Waste Mercury Lamps", "Waste Mercury Lamps" or Used Mercury lamps" (except for those crushed which will be labeled "Crushed Mercury Lamps")

- for universal waste devices, the words "Spent Mercury-Containing Devices for Recycling", "Universal Waste Mercury Devices", "Waste Mercury Devices" or "Used Mercury Devices" (except for thermostats which will be labeled per 40 CFR 273.14(d)).

Page 227: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-32

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

LARGE QUANTITY UNIVERSAL WASTE HANDLERS

HW.370. GENERAL

HW.370.1.FL. Spent universal waste lamps or devices must be shipped only to specific destinations (FAC 62-737.400(1)(b)) [Added May 1999].

Verify that handlers of spent universal waste lamps or devices only ship these lamps or devices to a handler or universal waste lamp or device destination facility.

HW.370.2.FL. Handlers managing lamps or devices as universal wastes must meet registration requirements (FAC 62-737.400(2) and (3)(a)) [Added May 1999].

(NOTE: A generator or handler managing lamps or devices covered under a reverse distribution program, or a person only collecting spent lamps from generators of 10 or less spent lamps per month and who does not accumulate more than 100 kg of lamps at one time, is not required to register with the Department for these activities.)

Verify that before beginning operations and annually thereafter by 1 March, a handler of spent universal waste lamps or devices registers by notifying the Department, using DEP Form 62-737.900(1), of the intent to be a handler.

Verify that the handler certifies that the Federal facility has employee training procedures in place for the proper handling, emergency response, and containment and cleanup of spent universal waste lamps or devices.

Verify that a handler does not begin or continue operations without a current and valid registration issued by the Department.

HW.370.3.FL. Handlers managing lamps or devices as universal wastes must submit operating and closure plans (FAC 62-737.400(3)(b)) [Added May 1999].

(NOTE: These requirements do not apply to a generator facility or a handler area used only for lamps and devices collected as results of its participation in reverse distribution program.)

Verify that the owner or operator of a large quantity handler facility where 2000 kilograms or more of universal waste lamps or 100 kilograms or more of the devices are accumulated at one time:

Page 228: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-33

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- develops and submits to the Department, along with its registration, an operational plan including a description of its general housekeeping measures, employee training program, methods to prevent breakage or releases, and its methods for responding to releases of universal lamps or devices or their components

- submits to the Department, along with its registration, a closure plan.

HW.370.4.FL. Handlers must manage universal waste lamps and devices according to specific standards (FAC 62-737.400(5), (6) and (7)) [Added May 1999].

Verify that handlers manage universal waste lamps and devices in a way that prevents breakage, releases of their components to the environment, and their exposure to moisture.

Verify that, in the event of a release, the handler determines whether the cleanup residues (e.g., cleanup equipment and contaminated soils) resulting from the release are hazardous waste, and if so, manages them as hazardous wastes.

Verify that a handler of universal waste devices or lamps that removes mercury-containing ampoules from these devices or lamps complies with the thermostat ampoule removal requirements under 40 CFR 273.13(c) or 273.33(c).

Verify that where a generator of universal waste lamps uses crushing equipment on-site to reduce the volume of the stored lamps:

- this is done in a final accumulation container - the lamps are crushed in a controlled manner that prevents the release of

mercury vapor or other contaminants - the crushing operations and maintenance of the unit are performed in

accordance with written procedures developed by the manufacturer of the equipment including specific instructions for the frequency of filter changes

- the employees using this equipment are thoroughly familiar with these written procedures and emergency procedures should equipment malfunction occur.

(NOTE: The following requirements do not apply to generators of universal

waste, just handlers; see Definitions.)

Verify that a handler stores its universal waste lamps or devices indoors, and does not store more than the amount specified in its registration or closure plan.

Verify that a handler does not store for more than one year universal waste lamps or devices from the date of generation or from when they were first received.

Verify that handlers are able to demonstrate the length of lamp or device storage as specified in 40 CFR 273.15 or 273.35 (as adopted by reference under FAC 62-730.185).

HW.370.5.FL. Handlers Verify that a handler of lamps or devices accumulating 5000 kilograms or more of

Page 229: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-34

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

must meet tracking requirements (FAC 62-737.400(8)) [Added May 1999].

lamps or devices, or 5000 kilograms or more of lamps or devices and other universal waste, tracks receipts and shipments of these lamps or devices in accordance with 40 CFR 273.39.

Page 230: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-35

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

LARGE QUANTITY UNIVERSAL WASTE HANDLERS

HW.390. PERSONNEL TRAINING

HW.390.1.FL. Large quantity handlers of waste lamps or devices must meet personnel training requirements (FAC 62-737.400(4)) [Added May 1999].

Verify that a large quantity handler of lamps or devices ensures that all its employees involved with the management of universal waste lamps or devices, are trained in the proper handling (e.g., packaging and preventing breakage) and emergency cleanup and containment procedures applicable to its handling or transport of spent universal waste lamps or devices.

Verify that these emergency procedures are kept at the business location of the handler and made available for inspection upon request by the Department.

Page 231: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-36

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

LARGE QUANTITY UNIVERSAL WASTE HANDLERS

HW.400. CONTAINERS

HW.400.1.FL. Containers for universal waste lamps and devices must meet specific requirements (FAC 62-737.400(5)) [Added May 1999].

Verify that fragile universal waste devices, crushed universal waste lamps, and lamps or devices showing evidence of leakage, spillage, or damage that could cause leakage, are placed in closed containers that are structurally sound, compatible with the universal waste lamp or device, and lack evidence of leakage, spillage, or damage that could allow leakage.

Verify that universal waste lamps, devices, or the containers in which they are stored are labeled or marked clearly as follows:

- for universal waste lamps, the words "Spent Mercury-Containing Lamps for Recycling", "Universal Waste Mercury Lamps", "Waste Mercury Lamps" or Used Mercury lamps" (except for those crushed which will be labeled "Crushed Mercury Lamps")

- for universal waste devices, the words "Spent Mercury-Containing Devices for Recycling", "Universal Waste Mercury Devices", "Waste Mercury Devices" or "Used Mercury Devices" (except for thermostats which will be labeled per 40 CFR 273.14(d)).

Page 232: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-37

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

HW.450. UNIVERSAL WASTE TRANSPORTERS

HW.450.1.FL. Transporters of universal waste lamps or devices must ship them only to handlers or universal waste destination facility (FAC 62-730.400(1)) [Added May 1999].

Verify that transporters of spent universal waste lamps or devices only ship these lamps or devices to a handler or universal waste lamp or device destination facility.

Verify that a transporter using trucks for the transport of spent universal waste lamps and devices only uses trucks that are totally enclosed and in good condition.

(NOTE: A transporter using trucks or other mode(s) of transportation should also refer to the United States Department of Transportation's requirements contained in 49 CFR Parts 171 through 173.)

HW.450.2.FL. Transporters of universal waste lamps or devices must meet registration requirements (FAC 62-737.400(2)) [Added May 1999].

Verify that before beginning operations and annually thereafter by 1 March, a transporter of spent universal waste lamps or devices registers by notifying the Department, using DEP Form 62-737.900(1), of the intent to be a transporter.

HW.450.3.FL. Transporters must manage universal waste lamps and devices according to specific standards (FAC 62-737.400(5)) [Added May 1999].

Verify that handlers manage universal waste lamps and devices in a way that prevents breakage, releases of their components to the environment, and their exposure to moisture.

Verify that, in the event of a release, the handler determines whether the cleanup residues (e.g., cleanup equipment and contaminated soils) resulting from the release are hazardous waste, and if so, manages them as hazardous wastes.

Verify that fragile universal waste devices, crushed universal waste lamps, and lamps or devices showing evidence of leakage, spillage, or damage that could cause leakage, are placed in closed containers that are structurally sound, compatible with the universal waste lamp or device, and lack evidence of leakage, spillage, or damage that could allow leakage.

Verify that universal waste lamps, devices, or the containers in which they are stored are labeled or marked clearly as follows:

- for universal waste lamps, the words "Spent Mercury-Containing Lamps for Recycling", "Universal Waste Mercury Lamps", "Waste Mercury Lamps" or Used Mercury lamps" (except for those crushed which will be labeled

Page 233: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

Hazardous Waste Management

4-38

COMPLIANCE CATEGORY: HAZARDOUS WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

"Crushed Mercury Lamps") - for universal waste devices, the words "Spent Mercury-Containing Devices

for Recycling", "Universal Waste Mercury Devices", "Waste Mercury Devices" or "Used Mercury Devices" (except for thermostats which will be labeled per 40 CFR 273.14(d)).

HW.450.4.FL. Transporters of waste lamps or devices must meet personnel training requirements (FAC 62-737.400(4)) [Added May 1999].

Verify that a transporter of lamps or devices ensures that all its employees involved with the management of universal waste lamps or devices, are trained in the proper handling (e.g., packaging and preventing breakage) and emergency cleanup and containment procedures applicable to its handling or transport of spent universal waste lamps or devices.

Verify that these emergency procedures are kept on each one of the transporter's vehicles and at the business location of the transporter, and made available for inspection upon request by the Department.

Page 234: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-1 Natural Resources Management

SECTION 5

NATURAL RESOURCES MANAGEMENT

Florida Supplement, June 2000 This section covers the state requirements for Natural Resources Management and is intended to supplement the U.S. TEAM Guide. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

Definitions

• Aquatic Plant - any plant, including a floating, emersed, submersed, or ditchbank species growing in, or closely associated with, an aquatic environment, and includes any part or seed of such plant (Florida Administrative Code (FAC) 62C-20.0015(1) and FAC 62C-52.002(2)).

• Aquatic Plant Management - an activity designed to control the growth of aquatic plants so as to protect human

health, safety and recreation and, to the greatest degree practicable, to prevent injury to non-target plants, animal life, and property (FAC 62C-20.0015(2)).

• Beneficial Aquatic Plants - indigenous aquatic plant species that provide fish and wildlife habitat, water quality

protection, and shoreline stabilization (FAC 62C-52.002(3)). • Bureau - the Bureau of Aquatic Plant Management, an administrative subdivision of the Department (FAC 62C-

20.0015(3) and FAC 62C-52.002(4)). • E - commercially exploited (Official Lists). • Class I Prohibited Aquatic Plants - plant species that are not possessed, collected, transported, cultivated, or

imported under any circumstances (FAC 62C-52.011(1)). • Class II Prohibited Aquatic Plants - plant species that are considered to be highly invasive and noxious in

localized areas of the state of Florida. These plants may be cultured in a nursery regulated by the FDA, and may only be sold out of state upon DACS approval. These species may not be imported or collected from the wild and must be contained in a manner that prevents the dissemination from the nursery premises (FAC 62C-52.011(2)).

• Collection - the removal or gathering of any aquatic plant, including any part or seed thereof, from the place in

which it is growing in the natural environment (FAC 62C-52.002(5)). • Commercially Exploited Plants - species native to the state that are subject to being removed in significant

numbers from native habitats in the state and sold or transported for sale (Florida Statutes (FS) 581.185(2)(a)). • Cultivation or Culture - to grow or cause to reproduce any aquatic plant (FAC 62C-52.002(7)). • Department - the State of Florida Department of Natural Resources (FAC 62C-52.002(8)). • Endangered Plants - species of plants native to the state that are in imminent danger of extinction within the

state, the survival of which is unlikely if the causes of decline in the number of plants continue, and includes all

Page 235: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-2 Natural Resources Management

species determined to be endangered or threatened pursuant to the Federal Endangered Species Act of 1973, as amended, Pub. L. No. 93-205 (87 Stat. 884) (FS 581.185(2)(b)).

• Excessive Collection - the taking of native aquatic plants from a wild collection site to the extent there is no

longer a reasonable assurance of the continued maintenance of a self sustaining native aquatic plant species population within that site (FAC 62C-52.002(9)).

• FDA - Florida Department of Agriculture and Consumer Services (Official Lists). • GFC - Florida Game and Fresh Water Fish Commission (Official Lists). • Harvest - to dig up, remove, or cut and remove from the place where grown (FS 581.185(2)(c)). • Importation - the transportation of aquatic plants into the geographical limits of the State of Florida from outside

the geographical limits of the State of Florida (FAC 62C-52.002(11)). • Maintenance Program - a method for the control of aquatic plants in which techniques are used in a coordinated

manner on a continuous or periodic basis in order to maintain the plant population at a desirable level (FAC 62C-20.0015(9)).

• Motorboat - any boat or vessel propelled or powered by machinery (FAC 16N-22.002(5)). • Native Aquatic Plant - any aquatic plant that is indigenous to the state of Florida, as determined by the

Department (FAC 62C-52.002(13)). • Nonnursery Cultivation - the tending of aquatic plant species for harvest in the natural environment (FAC 62C-

52.002(17)). • Noxious Aquatic Plant - any part, including but not limited to seeds or reproductive parts, of an aquatic plant

that has the potential to hinder the growth of beneficial aquatic plants, to interfere with irrigation or navigation, or to adversely affect the public welfare or the natural resources of the state (FAC 62C-52.002(19)).

• PE - proposed for endangered designation (Official Lists). • Permit - a license issued by the Department (FAC 62C-52.002(20)). • Permittee - any person to whom a permit is issued (FAC 62C-52.002(21)). • Person - individuals, children, firms, associations, joint ventures, partnerships, estates, trusts, business trusts,

syndicates, fiduciaries, corporations, and all other groups or combinations (FAC 62C-52.002(22)). • Plant - any member of the plant kingdom, including reproductive and vegetative parts thereof (FS

581.185(2)(e)). • Prohibited Aquatic Plant - any of the aquatic plants designated by the Department on the prohibited aquatic

plant list, or in an emergency order as authorized by the Department (FAC 62C- 52.002(23)). • PT - proposed for threatened designation (Official Lists). • Regional Biologist - a professional biologist employed by the Bureau who is located in a region of the state

designated by the Bureau and whose duties are to carry out the responsibilities of the Bureau within the assigned region (FAC 62C-20.0015(12)).

Page 236: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-3 Natural Resources Management

• Shipment or Shipments - the act or process of transferring or moving plants or plant products from one point to

another or the plants or plant products being transferred or moved (FAC 5B-40.001(4)). • SSC - species of special concern (Official Lists). • T - threatened (Official Lists). • T (E/P) - threatened/experimental population (Official Lists). • T (S/A) - threatened/similarity of appearance (Official Lists). • Threatened Plants - species native to the state that are in rapid decline in the number of plants within the state,

but which have no so decreased in such number as to cause them to be endangered (FS 581.185(2)(h)). • USFWS - United States Fish and Wildlife Service (Official Lists). • Vessel - synonymous with boat, and includes every description of watercraft, barge, and airboat other than a

seaplane on the water used or capable of being used as a means of transportation on water (FAC 16N-22.002(19)).

• Waters - rivers, streams, lakes, navigable waters and associated tributaries, canals, meandered lakes, enclosed

water systems, and any other bodies of water (FAC 62C-20.0015(24)). • Waters of Special Concern - Class I and II waters, Outstanding Florida Waters, and waters designated by rule as

a fish management area by the Florida Game and Fresh Water Fish Commission. • Wild Collection Site - an area where aquatic plants are naturally occurring and in which the Department has

permitted collection activities (FAC 62C-52.002(28)).

Page 237: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-4 Natural Resources Management

NATURAL RESOURCES MANAGEMENT

GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: Missing Checklist Items NR.2.1.FL. Water Resource Management NR.15.1.FL. Wildlife NR.20.1.FL. through NR.20.19.FL.

NATURAL RESOURCES MANAGEMENT

GUIDANCE FOR FLORIDA APPENDIX USERS

REFER TO APPENDIX NUMBERS: REFER TO APPENDIX TITLES:

5-1 Endangered and Potentially Endangered Fauna and Flora 5-2 Exemptions From Permits to Control Aquatic Plants 5-3 Prohibited Aquatic Plants

Page 238: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-5 Natural Resources Management

Page 239: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-6 Natural Resources Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

NR.2. MISSING CHECKLIST ITEMS

NR.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 240: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-7 Natural Resources Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

NR.15. WATER RESOURCE MANAGEMENT

NR.15.1.FL. Federal facilities must follow county regulations for building in coastal zones to preserve coastal barrier dunes (FS 161.053).

(NOTE: This checklist item moved here from NR.20.20.FL.; May 1999.)

Verify that Federal facilities follow county coastal construction control lines along the sand beaches of the state fronting on the Atlantic Ocean, the Gulf of Mexico, or the State of Florida.

Page 241: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-8 Natural Resources Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

NR.20. WILDLIFE

NR.20.1.FL. Endangered species must not be pursued, molested, harmed, harassed, captured, possessed, or sold without a permit (FAC 39-27.002(1)).

Verify that endangered species, parts thereof, and their nests or eggs are not pursued, molested, harmed, harassed, captured, possessed, or sold (see Appendix 5-1, Tables 1 and 2), except as authorized by the Executive Director Department by specific permit.

(NOTE: Permits will be issued only when the permitted activity will clearly enhance the survival potential of the species.)

NR.20.2.FL. Threatened species must not be pursued, molested, harmed, harassed, captured, possessed, or sold without a permit (FAC 39-27.002(2)).

Verify that threatened species, parts thereof, and their nests or eggs are not pursued, molested, harmed, harassed, captured, possessed, or sold (see Appendix 5-1, Tables 1 and 2), except as authorized by the Executive Director Department by specific permit.

(NOTE: Permits will be issued only for scientific or conservation purposes and only upon a showing by the federal facility that the permitted activity will not have a negative impact on the survival potential of the species.)

NR.20.3.FL. Species of special concern must not be taken, possessed, transported, or sold without a permit (FAC 39-27.002(1)).

Verify that species of special concern, parts thereof, and their nests or eggs are not taken, possessed, transported, or sold (see Appendix 5-1, Tables 1 and 2), except as authorized by GFC regulations, by permit from the Executive Director, or by statute or regulation of any other state agency.

(NOTE: Permits will be issued upon reasonable conclusion that the permitted activity will not be detrimental to the survival potential of the species.)

NR.20.4.FL. Endangered and commercially exploited plants must not be harvested without a permit (FAC 5B-40.003(1) and (2)).

Verify that plants listed as endangered or commercially exploited (see Appendix 5-1, Table 3) that grow on private or public land are not harvested, collected, picked, removed, injured, or destroyed without written permission from the landowner.

Verify plants, or parts thereof, on the endangered plant list growing on public or private land are not harvested without a permit from the Department.

Verify that Federal facilities transporting for the purpose of sale, selling, or offering for sale any plant contained on the endangered or commercially exploited plant list that is harvested from the Federal facility's own property is permitted by

Page 242: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-9 Natural Resources Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

the Department.

Verify that Federal facilities harvesting three or more plants or parts thereof of a species contained on the commercially exploited plant list from private or public land are permitted by the Department.

NR.20.5.FL. Federal facilities must follow specific regulations in order to harvest plants on the threatened plant list (FAC 5B-40.005(1)) [Revised July 1997].

Verify that Federal facilities obtain written permission from the landowner to willfully harvest, collect, pick, remove, injure, destroy, transport, carry, or convey on any public road or highway or sell or offer for sale any plant listed as threatened (see Appendix 5-1,) that is growing on private or public land or water.

NR.20.6.FL. Federal facilities may not control or attempt to control aquatic plants in waters except when permitted by the Department (FAC 62C-20.002(1)).

Verify that Federal facilities do not control or attempt to control aquatic plants in waters except as provided in a permit issued by the Department unless such activities are in waters expressly exempt from permit requirements (see Appendix 5-2).

NR.20.7.FL. Federal facilities with aquatic plant control permits must follow specific recordkeeping and recording requirements (FAC 62C-10.0055) [Cite Revised July 1997].

Verify that permitted Federal facilities maintain records of aquatic plant control activities conducted under the permit requirements.

Verify that the record of aquatic plant control activities is submitted to the Bureau no later than 30 days following the expiration date of the permit on the Aquatic Plant Control Operations Report form.

(NOTE: An equivalent report may be used provided it is approved in advance by the Bureau.)

Verify that permitted Federal facilities promptly notify the regional biologist of any unusual changes of which they are aware in circumstances or conditions that occur in association with permitted aquatic plant control activities, such as, but not limited to:

- water conditions that might cause a fish kill if treated - a significant change in water level.

Verify that permitted Federal facilities make a reasonable effort to notify potential users of waters subject to the operation's aquatic plant control activities where there are use restrictions for waters following treatment using one or more of the

Page 243: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-10 Natural Resources Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

following written methods of notice:

- posting signs at access points - placing public notices in newspapers or other publication of general

distribution in the affected areas - placing notices at residences - establishing a signal or marker system - giving notice at established point of contact - other methods approved by the Bureau.

Verify that the written public notice includes at least the types of activities that will

be temporarily prohibited or restricted and the dates for which these prohibitions or restrictions are applicable.

NR.20.8.FL. Federal facilities with aquatic plant control permits must follow specific operations require-ments (FAC 62C-20.0055) [Revised July 1997].

Verify that Federal facilities follow label requirements of the product to be used.

(NOTE: When the label does not indicate a potable water intake setback distance, herbicides will not be used to manage floating plants or aquatic vegetation within two miles upstream or 0.5 miles downstream of a functioning potable water intake in a river system. Herbicides will not be used on floating plants within 0.5 miles of a functioning potable water intake in a lake or on other aquatic vegetation within two miles of a functioning potable water intake in a lake. If herbicides are used within these distances written notification by certified mail must be given to the operator of the water treatment plant and the bureau at least one week prior to the treatment, unless an alternative notification system has previously been approved by the Department.)

Verify that the application of herbicides is controlled at all times to minimize drift of herbicides onto nonpermitted sites or plant species and that use of the herbicide is conducted in a manner which at all times causes the least possible adverse effect upon human health, safety, recreational uses, non-target plants, fish, and wildlife.

Verify that Federal facilities do not use herbicides for management activities in manatee aggregation sites when manatees are present.

Verify that herbicide treatments which cause rapid decay of aquatic vegetation and possible oxygen depletion allows time for recovery and stabilization of oxygen levels between treatments.

Verify that permitted Federal facilities remove from the site and properly dispose of all drums, cartons, bags, or other herbicide containers that result from aquatic plant control activities.

Page 244: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-11 Natural Resources Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

NR.20.9.FL. Federal facilities must not engage in any activities involving the nonnursery cultivation or collection of any aquatic plant species without a permit (FAC 62C-52.003(1), (3), (4), and (6)) [Revised July 1997].

Verify that Federal facilities do not engage in any activity involving the nonnursery cultivation or collection, importation, transportation, sale, or possession of any aquatic plant species without a Department-issued permit.

Verify that Federal facilities do not collect aquatic plant material from sovereignty lands without a permit issued by the Bureau.

Verify that Federal facilities use only native plants cultured in a nursery regulated by the Department of Agriculture and Consumer Services or collected from an approved wild collection site for revegetation, restoration, or mitigation of wetlands in sovereignty lands.

Verify that Federal facilities do not place or knowingly distribute for use in natural waters, or waters connected to natural waters any prohibited or non-native aquatic plants.

Verify that the collection of native aquatic plants, including any part or seed thereof, from aquatic preserves, state parks, or sovereignty lands under lease to other entities is prohibited at the Federal facility.

NR.20.10.FL. Federal facilities must not possess any Class I or Class II prohibited aquatic plants without a permit (FAC 62C-52.003(2) and (5)) [Cite Revised July 1997].

Verify that Federal facilities do not possess any Class I prohibited aquatic plant (see Appendix 5-3) without a Department-issued permit.

Verify that Federal facilities do not possess any Class II prohibited aquatic plant (see Appendix 53) without a permit issued by the Department or FDA.

Verify that Federal facilities do not cause the dissemination of any prohibited plants (see Appendix 5-3).

NR.20.12.FL. Federal facilities may not cut, harvest, remove, or eradicate any of the grass commonly known as sea oats and sea grapes (FS 370.041(2)).

Verify that Federal facilities do not cut, harvest, remove, or eradicate any of the grass commonly known as sea oats or Uniola paniculata and Coccolobis uvifera commonly known as sea grapes from any public or private land without consent of the owner of such land or person having lawful possession thereof.

(NOTE: Licensed, certified nurserymen may sell the above plants if they are commercially grown from seeds or by vegetative propagation.)

NR.20.13.FL. Federal facilities must comply with the Marine Turtle Protection Act (FS 370.12(1)).

(NOTE: This regulation applies to the following species of marine turtles: - Atlantic loggerhead turtle (Caretta caretta caretta) - Atlantic green turtle (Chelonis mydas mydas) - Leatherback turtle (Dermochelys coriacea)

Page 245: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-12 Natural Resources Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Act (FS 370.12(1)). - Atlantic hawksbill turtle (Eretmochelys imbricata imbricata) - Atlantic ridley turtle (Lepidochelys kempi).)

Verify that, unless otherwise provided by the Federal Endangered Species Act or its impending regulations, no Federal facility takes, possesses, disturbs, mutilates, destroys, causes to be destroyed, sells, offers for sale, transfers, molests, or harasses any marine turtle or its nest or eggs at any time.

(NOTE: For the purposes of the previous statement, "take" means an act that actually kills or injures marine turtles, and includes significant habitat modification or degradation that kills or injures marine turtles by significantly impairing essential behavioral patterns, such as breeding, feeding, or sheltering.)

Verify that the Federal facility does not possess any marine turtle or parts thereof unless it is in possession of a special permit or loan agreement from the Department enabling the holder to possess a marine turtle or parts thereof for scientific, educational, or exhibitional purposes.

NR.20.14.FL. Federal facilities must follow specific regulations for the protection of mammalian dolphins (FS 370.12(3)).

Verify that Federal facilities do not catch, attempt to catch, molest, injure, kill, annoy, or otherwise interfere with the normal activity and well-being of, mammalian dolphins (porpoises), except as provided below.

Verify that Federal facilities that take one or more mammalian dolphins from the waters of the state for scientific, educational, or exhibitional purposes are permitted by the Division of Marine Resources (DMR).

Verify that a Federal facility which holds one or more mammalian dolphins in captivity provides and maintains facilities that meet the requirements of DMR.

Verify that no mammalian dolphin is shipped within or outside the state without a special permit from DMR.

(NOTE: Notwithstanding the above provisions, it is unlawful to capture at any time any nursing female mammalian dolphin or her calf, or both.)

NR.20.15.FL. Federal facilities must follow specific regulations for the protection of manta rays (FS 370.12(4)).

Verify that Federal facilities do not intentionally destroy any manta rays.

NR.20.16.FL. Federal Verify that Federal facilities do not take, attempt to take, otherwise destroy, sell, or

Page 246: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-13 Natural Resources Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

facilities may not take, possess, destroy, or sell any sea fan, hard or stony coral, or fire coral (FS 370.114).

attempt to sell any sea fan of the species Gorgonia flabellum, or of the species Gorgonia ventalina, or any hard or stony coral (Scleractinia), or any fire coral (Millepora).

Verify that Federal facilities do not possess any fresh, uncleaned, or uncured sea fan of the species Gorgonia flabellum or of the species Gorgonia ventalina or any fresh, uncleaned, or uncured hard or stony coral (Scleractinia) or any fresh, uncleaned, or uncured fire coral (Millepora) unless it can be proven by certified invoice that the sea fan or coral was imported from a foreign country or was taken before 1 July 1976.

(NOTE: This section does not apply to any sea fan or coral taken for scientific or educational purposes when the taking is approved by the Department.)

Verify that Federal facilities do not, under any circumstances, take coral from or possess it in, the John Pennekamp Coral Reef State Park.)

NR.20.17.FL. Federal facilities must not kill Florida or wild panthers (FS 372.671).

Verify that Federal facilities do not kill Florida panthers (Felis concolor coryi).

Verify that Federal facilities do not kill any species of panther (Felis concolor) that occurs in the wild.

NR.20.18.FL. Federal facilities must comply with the Florida Manatee Sanctuary Act (FAC 16N22.001) [Revised July 1997].

Verify that Federal facilities comply with all applicable rules and regulations of the Florida Manatee Sanctuary Act that protects the West Indian (Florida) manatee or sea cow (Trichechus manatus).

Verify that unless authorized by the terms of a valid state or Federal permit, the Federal facility does not at any time by any means or in any manner, intentionally or negligently annoy, molest, harass or disturb, or attempt to molest, harass or disturb any manatee; injure or harm or attempt to injure or harm; collect or capture or attempt to collect or capture; pursue, hunt, wound or kill or attempt to pursue, hunt, wound, or kill; or possess literally or constructively any manatee or part of any manatee.

Verify that Federal facilities know the Department-specified regulations regarding motorboat speeds and vessel operations for the management zone in which the Federal facility is located.

NR.20.19.FL. Federal facilities must follow specific regulations regarding stone

(NOTE: Stone crab refers to the species Menippe mercenaria or any other species of the family Xanthidae as the Marine Fisheries Commission defines by rule.)

Page 247: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-14 Natural Resources Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

and blue crabs (FS 370.13 and 370.135).

Verify that Federal facilities do not catch or possess, regardless of where taken, for its own use or to sell or offer for sale, any stone crab or parts thereof, of any size between 15 May and 15 October of each year.

Verify that Federal facilities do not willfully molest any stone crab trap, line, or buoy that is the property of any licenseholder, without the permission of that licenseholder.

Verify that Federal facilities do not transport on the water, fish with, or cause to be fished with, set, or place any trap designed for taking blue crabs unless the Federal facility is the holder of a valid saltwater products license and the trap has a current state number permanently attached to the buoy.

Verify that the trap number is affixed in legible figures at least 1 in. high on each buoy used.

Verify that the saltwater products license number is on board the boat.

Verify that a buoy or a time release buoy is attached to each trap or at each end of a weighted trot line and is of such color, hue, and brilliancy to be easily distinguished, seen, and located, and that such color and trap number are permanently and conspicuously displayed on the boat used for setting and collecting such traps and buoys.

Verify that Federal facilities do not sell or offer for sale any eggbearing blue crabs.

Verify that, except when authorized by a special activity license for the soft-shell crab or bait trade, Federal facilities do not possess for sale blue crabs measuring less than 5 in. from point to point across the carapace in an amount greater than 10 percent of the total number of blue crabs possessed.

Verify that blue crab traps are worked during daylight hours only.

NR.20.20.FL. [Moved May 1999].

(NOTE: This checklist item moved to NR.15.1.FL.; May 1999.)

Page 248: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-15 Natural Resources Management

Appendix 5-1

Endangered and Potentially Endangered Fauna and Flora (Source: Official Lists, available at http://fcn.state.fl.us/fwc/pubs/endanger.html)

Scientific Name Common Name(s) GFC FWS Fish Acipenser brevirostrum Shortnose sturgeon E E Acipenser oxyrhynchus Atlantic sturgeon SSC T* Ammocrypta asprella Crystal darter T Centropomus undecimalis Common snook SSC Cyprinodon variegatus hubbsi Lake Eustis pupfish SSC Etheostoma histrio Harlequin darter SSC Etheostoma okaloosae Okaloosa darter E E Etheostoma olmstedi maculaticeps Southern tessellated darter; tesselated

johnny darter SSC

Fundulus jenkinsi Saltmarsh topminnow SSC Menidia conchorum Key silverside T Micropterus notius Suwannee bass SSC Micropterus n. sp. cf coosae Shoal bass; Chipola bass SSC Notropis melanostomus Blackmouth (=Pond Creek) shiner E Pteronotropis welaka Bluenose shiner SSC Rivulus marmoratus Mangrove rivulus; rivulus SSC Starksia starcki Key blenny SSC *Applicable only to the subspecies A.o. desotoi (Gulf sturgeon) Amphibians Haideotriton wallacei Georgia blind salamander SSC Hyla andersonii Pine Barrens treefrog SSC Rana capito Gopher (=crawfish) frog SSC Rana okaloosae Bog frog SSC Reptiles Alligator mississippiensis American alligator SSC T(S/A) Caretta caretta Atlantic loggerhead turtle T T Chelonia mydas mydas Atlantic green turtle E E Crocodylus acutus American crocodile E E Dermochelys coriacea Leatherback (=leathery) turtle E E Diadophis punctatus acricus Big Pine Key ringneck snake T Drymarchon corais couperi Eastern indigo snake T T Elaphe guttata guttata Red rat snake; corn snake SSC* Eretmochelys imbricata imbricata Atlantic hawksbill turtle E E Eumeces egregius egregius Florida Keys mole skink SSC Eumeces egregius lividus Bluetail mole skink T T Gopherus polyphemus Gopher turtle SSC Graptemys barbouri Barbour's map (=sawback) turtle SSC Kinosternon bauri Striped mud turtle E* Lepidochelys kempi Atlantic ridley turtle E E Macroclemys temmincki Alligator snapping turtle SSC

Page 249: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-16 Natural Resources Management

Scientific Name Common Name(s) GFC FWS Neoseps reynoldsi Sand skink T T Nerodia fasciata taeniata Atlantic salt marsh snake T T Pituophis melanoleucus mugitus Florida pine snake SSC Pseudemys concinna suwanniensis Suwannee cooter SSC Stilosoma extenuatum Short-tailed snake T Storeria dekayi victa Florida brown snake T* Tantilla oolitica Miami black-headed snake; rimrock

crowned snake T

Thamnophis sauritus sackeni Florida ribbon snake T* *Applicable in lower Florida Keys only Birds Ajaia ajaja Roseate spoonbill SSC Ammodramus maritimus juncicolus Wakulla seaside sparrow SSC Ammodramus maritimus mirabilis Cape Sable seaside sparrow E E Ammodramus maritimus peninsulae Scott's seaside sparrow SSC Ammodramus savannarum floridanus Florida grasshopper sparrow E E Aphelocoma coerulescens coerulescens

Florida scrub jay T T

Aramus guarauna Limpkin SSC Campephilus principalis Ivory-billed woodpecker E E Charadrius alexandrinus tenuirostris Southeastern snowy plover T Charadrius melodus Piping plover T T Cistothorus palustris griseus Worthington's marsh wren SSC Cistothorus palustris marianae Marian's marsh wren SSC Columba leucocephala White-crowned pigeon T Dendroica kirtlandii Kirtland's warbler E E Egretta caerulea Little blue heron SSC Egretta rufescens Reddish egret SSC Egretta thula Snowy egret SSC Egretta tricolor Tricolored (=Louisiana) heron SSC Eudocimus albus White ibis SSC Falco peregrinus tundrius Arctic peregrine falcon E Falco sparverius paulus Southeastern American kestrel T Grus americana Whooping crane SSC T(E/P) Grus canadensis pratensis Florida sandhill crane T Haematopus palliatus American oystercatcher SSC Haliaeetus leucocephalus Bald eagle T T Mycteria americana Wood stork E E Pandion haliaetus Osprey SSC* Pelecanus occidentalis Brown pelican SSC Picoides borealis Red-cockaded woodpecker T E Polyborus plancus audubonii Audubon's crested caracara T T Rostrhamus sociabilis Snail kite E E Rynchops niger Black skimmer SSC Speotyto cunicularia Burrowing owl SSC Sterna antillarum Least tern T Sterna dougallii Roseate tern T T Vermivora bachmanii Bachman's warbler E E

Page 250: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-17 Natural Resources Management

Scientific Name Common Name(s) GFC FWS *Applicable in Monroe County only Mammals Balaena glacialis Right whale E E Balaenoptera borealis Sei whale E E Balaenoptera physalus Finback whale E E Blarina carolinensis (=brevicauda) shermani

Sherman's short-tailed shrew SSC

Eumops glaucinus floridanus Florida (=Wagner's) mastiff bat E Felis concolor coryi Florida panther E E Megaptera novaeangliae Humpback whale E E Microtus pennsylvanicus dukecampbelli

Duke's (=Florida) saltmarsh vole E E

Mustela vison evergladensis Everglades mink T Myotis grisescens Gray bat E E Myotis sodalis Indiana bat E E Neotoma floridana smalli Key Largo woodrat E E Odocoileus virginianus clavium Key deer; toy deer E E Oryzomys argentatus Silver rice rat E E Oryzomys palustris sanibeli Sanibel Island rice rat SSC Peromyscus gossypinus allapaticola Key Largo cotton mouse E E Peromyscus polionotus allophrys Choctawhatchee beach mouse E E Peromyscus polionotus niveiventris Southeastern beach mouse T T Peromyscus polionotus peninsularis St. Andrews beach mouse E Peromyscus polionotus phasma Anastasia Island beach mouse E E Peromyscus polionotus trissyllepsis Perdido Key beach mouse E E Physeter catodon Sperm whale; cachalot E E Podomys floridanus Florida mouse SSC Sciurus niger avicennia Big Cypress (=mangrove) fox squirrel T Sciurus niger shermani Sherman's fox squirrel SSC Sorex longirostris eionis Homosassa shrew SSC Sylvilagus palustris hefneri Lower Keys marsh rabbit E E Tamias striatus Eastern chipmunk SSC Trichechus manatus West Indian (=Florida) manatee E E Ursus americanus floridanus Florida black bear T* *Not applicable in Baker and Columbia counties and Apalachicola National Forest Corals Dendrogyra cylindrus Pillar coral E Crustaceans Palaemonetes cummingi Squirrel Chimney (=Florida) cave

shrimp T

Procambarus econfinae Econfina crayfish SSC Procambarus erythrops Sims Sink crayfish SSC Procambarus pictus Black Creek crayfish SSC Insects

Page 251: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-18 Natural Resources Management

Scientific Name Common Name(s) GFC FWS Heraclides aristodemus ponceanus Schaus' swallowtail butterfly E E Molluscs Liguus fasciatus Florida tree snail SSC Orthalicus reses Stock Island tree snail E T* *(applies only to subspecies o. r. reses) Plants Acacia choriophylla Tamarindillo E Acrostichum aureum Golden leather fern E Acrostichum danaeifolium Giant leather fern C Actaea pachypoda Baneberry; dollseyes E Adiantum melanoleucum Fragrant maidenhair fern E Adiantum tenerum Brittle maidenhair fern E Amorpha crenulata Crenulate (=Miami) lead plant E E Anemia wrightii Parsley fern E Aquilegia canadensis Wild (=Southern; =Canadian)

columbine E

Arabis canadensis Sicklepod E Argythamnia blodgettii Blodgett's wild-mercury E Aristolochia tomentosa Dutchman's pipe E Asclepias curtissii Curtiss' (=sandhill) milkweed E Asclepias viridula Apalachicola (=green) milkweed T Asimina tetramera Four-petal (=opossum) pawpaw E E Asplenium auritum Auricled spleenwort E Asplenium monanthes San Felasco (=single sorus)

spleenwort E

Asplenium pumilum Dwarf (=chervil) spleenwort E Asplenium serratum Bird's nest spleenwort; wild birdnest

fern E

Asplenium subtile Spleenwort (unnamed) E Asplenium trichomanes-dentatum Spleenwort (unnamed) E Asplenium verecundum Delicate spleenwort (unnamed) E Aster hemisphericus Aster (unnamed) E Aster spinulosus Pinewoods aster E Athyrium asplenioides Southern lady fern T Baptisia hirsuta Pineland (=hairy) wild indigo T Baptisia megacarpa Apalachicola wild indigo E Baptisia simplicifolia Coastal Plain wild indigo; scare-weed T Basiphyllaea corallicola Carter’s orchid (unnamed) E Bigelowia nuttalli Nuttal's rayless goldenrod E Blechnum occidentale Sinkhole fern E Bletia purpurea Pine pink orchid T Bonamia grandiflora Florida (=large-flowered) bonamia E T Bourreria cassinifolia Little strongback E Brassia caudata Long-tailed spider orchid E Brickellia cordifolia Flyr's brickell-bush E

Page 252: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-19 Natural Resources Management

Scientific Name Common Name(s) GFC FWS Brickellia eupatorioides var. floridana (=B. mosieri)

Florida brickell-bush; Florida boneset E

Bulbophyllum pachyrrhachis Rattail orchid E Bumelia anomala Clark’s buckthorn E Bumelia lycioides Gopherwood buckthorn (unnamed) T Bumelia thornei Thorne’s buckthorn E Burmannia flava Fakahatchee burmannia E Byrsonima lucida Locust berry E Cacalia diversifolia Variable-leaved Indian plantain T Calamintha ashei Ashe's savory; lavender basil T Calamovilfa curtissii Curtiss' reedgrass; Curtiss' sand grass E Callirhoe papaver Poppy mallow E Calopogon barbatus Bearded grass pink T Calopogon multiflorus Many-flowered grass pink E Calycanthus floridus Sweetshrub E Campanula robinsiae Robins' (=Chinsegut) bellflower E E Campylocentrum pachyrrhizum Leafless orchid E Campyloneurum angustifolium Narrow strap fern E Campyloneurum costatum Tailed strap fern E Campyloneurum phyllitidus Long strap fern E Canella winteriana Wild Cinnamon E Carex baltzelli Baltzell's sedge T Cassia keyensis (=Chaemecrista lineata var. keyensis)

Big Pine partridge pea; Florida Keys senna

E

Catesbaea parviflora Small-flowered (=dune) lily-thorn E Catopsis berteroniana Powdery catopsis E Catopsis floribunda Many flowered air plant E Catopsis nutans Nodding catopsis E Celtis iguanaea Iguana hackberry E Celtis pallida Spiny hackberry E Cereus eriophorus Indian river prickly apple E E Cereus gracilis West coast prickly apple E Cereus pentagonus Dildoe cactus E Cereus robinii Tree cactus E E Chamaesyce (=Euphorbia) deltoidea ssp. deltoidea

Wedge (=deltoid) spurge E E

Chamaesyce (=Euphorbia) garberi Garber's spurge E T Chamaesyce porteriana Porter's spurge E Cheilanthes microphylla Southern lip fern E Chionanthus pygmaeus Pygmy fringetree E E Chrysophyllum oliviforme Satinleaf E Chrysopsis cruiseana Cruise’s golden aster E Chrysopsis floridana Florida golden aster E E Cienfuegosia yucatanensis Yellow hibiscus E Cladonia perforata Perforate reindeer lichen; deer moss E E Cleistes divaricata Rosebud orchid; spreading pogonia T Clitoria fragrans Pigeon-wing (=sandhill) butterfly-pea E T Clusia rosea Balsam apple (unnamed) E Coccothrinax argentata Silver palm E Colubrina cubensis Colubrina E

Page 253: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-20 Natural Resources Management

Scientific Name Common Name(s) GFC FWS Conradina breviflora Short-leaved rosemary E Conradina etonia Etonia rosemary E Conradina glabra Apalachicola (=panhandle) rosemary E E Conradina grandiflora Large-flowered rosemary E Corallorhiza odontorhiza Autumn coralroot E Cordia sebestena Geiger tree E Cornus alternifolia Pagoda dogwood E Cranichis muscosa Moss orchid (unnamed) E Crataegus phaenopyrum Washington thorn E Croomia pauciflora Few-flowered croomia E Crossopetelum ilicifolium Christmas berry E Crossopetelum rhacoma Rhacoma E Crotolaria avonensis Avon Park rattlebox; Avon Park

harebells E E

Cryptotaenia canadensis Honewort E Ctenitis sloanei Red hair comb fern E Ctenitis submarginalis Brown hair comb fern (unnamed) E Cucurbita okeechobeensis Okeechobee gourd; Indian pumpkin E E Cupania glabra Cupania E Cyrtopodium punctatum Cowhorn (=cigar) orchid E Deeringothamnus pulchellus White squirrel-banana; beautiful

pawpaw E E

Deeringothamnus rugelii Yellow squirrel-banana; Rugel's pawpaw

E E

Delphinium carolinianum Carolina larkspur E Dennstaedtia bipinnata Cuplet (=hay-scented) fern E Dicerandra christmanii Garrett's mint E E Dicerandra cornutissima Long-spurred balm; Robins' mint E E Dicerandra frutescens Scrub balm; Lloyd's mint E E Dicerandra immaculata Spotless-petaled balm; Lakela's

(=Olga's) mint E E

Digitaria pauciflora Florida pineland crabgrass E Dodecatheon meadia Shooting star E Proserafilifolia Dew-thread E Drosera intermedia Water sundew T Eltroplectris calcarata Spurred neotia E Encyclia boothiana var. erythronioides

Dollar (=dogtooth) orchid E

Encyclia cochleata Shell (=clamshell) orchid E Encyclia pygmaea Dwarf epidendrum E Encyclia tampensis Butterfly orchid C Epidendrum acunae Acuna's epidendrum E Epidendrum anceps Dingy-flowered epidendrum E Epidendrum conopseum Greenfly orchid C Epidendrum difforme Unbelled epidendrum E Epidendrum nocturnum Night-scent orchid; night-smelling

epidendrum E

Epidendrum rigidum (=E. strobiliferum)

Rigid epidendrum E

Epidendrum strobiliferum Matted epidendrum E

Page 254: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-21 Natural Resources Management

Scientific Name Common Name(s) GFC FWS Epigaea repens Trailing arbutus E Eragrostis tracyi Sanibel Island lovegrass E Eriogonum longifolium var. gnaphalifolium (=E. floridanum)

Scrub buckwheat E T

Ernodea littoralis Beach creeper T Eryngium cuneifolium Wedge-leaved button snake-root;

scrub celery E E

Erythronium umbilicatum Dogtooth lily; dimpled dogtooth violet E Eugenia confusa Redberry ironwood E Eugenia rhombea Red stopper E Eulophia alta Wild (=ground) coco T Euphorbia telephioides Telephus spurge E T Forestiera godfreyi Godfrey’s swamp privet E Galactia smallii Small's milkpea E E Galeandra beyrichii Helmet orchid E Garberia heterophylla Garberia T Gentiana pennelliana Wiregrass gentian E Goniophlebium triseriale Polypody fern (unnamed) T Goodyera pubescens Downy rattlesnake orchid E Gossypium hirsutum Wild cotton E Govenia utriculata Gowen’s orchid E Guaiacum sanctum Lignum-vitae tree E Guzmania monostachia Fuch's bromeliad E Habenaria distans Rein orchid (unnamed) E Harperocallis flava Harper's beauty E Harrisella filiformis Orchid (unnamed) T Harrisella porrecta Orchid (unnamed) Hartwrightia floridana Florida hartwrightia Hasteola robertiorum Gulf hammock indian plantain E Hedeoma graveolens Mock pennyroyal Helianthus carnosus Lakeside sunflower E Hepatica americana Liverleaf E Hexalectris spicata Crested coralroot E Hexastylis arifolia Heartleaf T Hippomane mancinella Manchineel E Hybanthus concolor Green violet E Hydrangea arborescens Wild hydrangea E Hymenocallis henryae Henry’s spiderlily E Hypelate trifoliata Inkwood T Hypericum cumulicola Highlands scrub St. John's-wort E E Hypericum edsonianum Edison's St. John's-wort; Edison's

ascyrum E

Hypericum lissophloeus Smooth-barked St. John's-wort E Hypolepis repens Flakelet fern Ilex ambigua Carolina (=sand) holly Ilex amelanchier Serviceberry holly Ilex cassine Cassine Ilex decidua Possumhaw Ilex krugiana Krug's holly Ilex montana Mountain winterberry

Page 255: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-22 Natural Resources Management

Scientific Name Common Name(s) GFC FWS Ilex opaca var. arenicola Scrub (=sand-loving American) holly Ilex verticillata Common winterberry Illicium floridanum Florida anise T Illicium parviflorum Yellow star anise E Ionopsis utricularioides Delicate ionopsis; violet orchid E Ipomoea microdactyla Wild potato morning glory E Ipomoea tenuissima Rocklands morning glory E Isoetes engelmannii Engelmann's quillwort E Isotria verticillata Whorled pogonia E Jacquemontia curtissii Pineland (=Curtiss') clustervine E Jacquemontia reclinata Beach (=reclined) clustervine E Jacquinia keyensis Joewood T Justicia cooleyi Cooley's water willow E E Justicia crassifolia Thick-leaved (=large-flowered) water

willow E

Kalmia latifolia Mountain laurel T Lantana depressa Pineland lantana E Lechea cernua Nodding (=drooping) pinweed T Lechea divaricata Pine pinweed E Lechea lakelae Lakela’s pinweed E Leitneria floridana Florida corkwood T Leochilus labiatus Lipped orchid E Lepanthopsis melanantha Harris' tiny orchid E Lepuropetalon spathulatum Little people E Liatris ohlingerae Florida gayfeather; scrub blazing star E E Liatris provincialis Godfrey's blazing star; Godfrey's

gayfeather E

Licaria triandra Gulf licaria E Lilium catesbaei Catesby's lily T Lilium iridollae Panhandle lily E Lindera melissifolia Swamp spicebush; Jove's fruit;

pondberry E E

Lindera subcoriacea Bog spicebush E Linum carteri var. carteri Miami (=Carter's small-flowered) flax E Linum carteri var. smallii South Florida (=Carter's large-

flowered) flax E

Linum westii West's flax E Liparis elata Tall liparis orchid T Listera australis Southern tway blade T Litsea aestivalis Pond spice; pond bush E Lobelia cardinalis Cardinal flower T Lomariopsis kunzeana Holly fern E Lupinus aridorum McFarlin's (=scrub) lupine E E Lupinus westianus Gulfcoast (=panhandle) lupine T Lycopodium cernuum Nodding club moss C Lycopodium dichotomum Hanging (=coneless) club moss E Lythrum curtissii Curtiss' loosestrife E Macbridea alba White birds-in-a-nest E T Macradenia lutescens Trinidad macradenia E Macranthera flammea Hummingbird flower E

Page 256: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-23 Natural Resources Management

Scientific Name Common Name(s) GFC FWS Magnolia acuminata Cucumber tree E Magnolia ashei Ashe's magnolia E Magnolia pyramidata Pyramidal magnolia E Malaxis unifolia Green adder's mouth E Malus angustifolia Crabapple T Marshallia obovata Barbara's buttons (unnamed) E Marshallia ramosa Southern barbara's buttons E Matela alabamensis Alabama milkweed; Alabama

anglepod E

Matela baldwyniana Baldwin’s anglepod E Matela flavidula Yellow-flowered anglepod E Matela floridana Florida milkweed; panhandle

anglepod E

Matela gonocarpos Anglepod (unnamed) T Maxillaria crassifolia Hidden orchid E Medeola viginiana Indian cucumber-root E Melanthera parvifolia Small-leaved melanthera E Microgramma heterophylla Climbing vine fern E Monotropa hypopithys Pinesap (unnamed) E Monotropsis reynoldsiae Pigmy-pipes; sweet pinesap E Myrcianthes fragrans Simpson’s stopper T Najas filifolia Slender naiad T Nemastylis floridana Fall-flowering pleat-leaf; celestial lily E Nephrolepis biserrata Boston fern; Giant sword fern T Neurodium lanceolatum Ribbon fern E Nolina atopocarpa Florida beargrass T Nolina brittoniana Scrub (=Britton's) beargrass E E Okenia hypogaea Burrowing four-o'clock E Oncidium floridanum Florida oncidium E Oncidium luridum Mule-ear orchid; dingy- flowered

oncidium E

Ophioglossum palmatum Hand adder's tongue fern E Opuntia spinosissima Semaphore cactus E Opuntia stricta Shell mound prickly pear cactus T Opuntia triacantha Keys joe-jumper E Osmunda cinnamomea Cinnamon fern C Osmunda regalis Royal fern C Oxypolis greenmanii Giant water dropwort; giant water

cowbane E

Pachysandra procumbens Allegheny spurge E Panicum abscissum Cutthroat grass E Parnassia caroliniana Coastal parnassia; Carolina grass-of-

parnassus E

Parnassia grandifolia Grass-of-parnassus E Paronychia chartacea Paper-like nailwort; papery E

whitlow-wort T

Pecluma dispersa Polypoda fern (unnamed) E Pecluma plumula Plume polypoda fern E Pecluma ptilodon Swamp plume polypoda fern E Pellaea atropurpurea Cliff brake fern E

Page 257: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-24 Natural Resources Management

Scientific Name Common Name(s) GFC FWS Peperomia glabella Cypress peperomia E Peperomia humilis Pepper (unnamed) E Peperomia magnoliifolia Spatulate peperomia E Peperomia obtusifolia Florida peperomia E Phoradendron rubrum Mahogany mistletoe E Phyllanthus liebmannianus Pinewood dainties; Florida leaf flower E Physocarpus opulifolius Ninebark E Pinckneya pubens(=P. bracteata) Hairy fevertree T Pinguicula caerulea Blue butterwort T Pinguicula ionantha Violet-flowered (=Godfrey's)

butterwort E T

Pinguicula lutea Yellow butterwort T Pinguicula planifolia Chapman's butterwort T Pinguicula primuliflora Primrose flowered butterwort E Pityopsis flexuosa Panhandle golden aster E Platanthera blephariglottis Large white fringed orchid T Platanthera ciliaris Yellow fringed orchid T Platanthera clavellata Little club-spur orchid; small green

wood orchid E

Platanthera cristata Golden (=crested) fringed orchid T Platanthera flava Southern tubercled orchid; gypsy-

spikes T

Platanthera integra Southern yellow fringless orchid; orange rain orchid

E

Platanthera nivea Snowy orchid; bog torch T Pleurothallis gelida Orchid (unnamed) E Pogonia ophioglossoides Rose pogonia T Poinsettia pinetorum Everglades poinsettia E Polygala lewtonii Scrub milkwort; Lewton's polygala E E Polygala smallii Tiny (=Small's) milkwort E E Polygonella ciliata var. basiramia (=P. basiramia)

Hairy jointweed; hairy (=tufted) wireweed

E E

Polygonella macrophylla Large-leaved jointweed T Polygonella myriophylla Small's jointweed; sandlace; woody

wireweed E E

Polygonum meisnerianum Mexican tear-thumb E Polyradicion lindenii Ghost orchid; palm polly E Polystachya flavescens (=P. concreta; =P. extinctoria)

Pale-flowered polystachya E

Ponthieva brittoniae Mrs. Britton’s shadow witch E Prescottia oligantha Orchid small flowered E Prunus geniculata Scrub plum E E Pseudophoenix sargentii Buccaneer (=Sargent's cherry) palm E Pteris bahamensis Cretanbrave fern E Pteroglossaspis Wild coco; false coco (=Eulophia)

ecristata T

Remirea maritima Beach star E Rhapidophyllum hystrix Needle palm C Rhexia parviflora Apalachicola (=small- flowered)

meadowbeauty E

Page 258: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-25 Natural Resources Management

Scientific Name Common Name(s) GFC FWS Rhipsalis baccifera Mistletoe cactus E Rhododendron alabamense Alabama azalea E Rhododendron austrinum Orange (=Florida) azalea E Rhododendron canescens Pink azalea C Rhododendron chapmanii Chapman's rhododendron E E Rhus michauxii Michaux’s sumac E Ribes echinellum Miccosukee (=Florida) gooseberry E T Roystonea elata Florida royal palm E Rudbeckia nitida var. nitida St. John's-susan; yellow coneflower E Ruellia noctiflora Night-flowering ruellia E Sachsia bahamensis Bahama sachsia E Salix eriocephala Heart-leaved willow E Salix floridana Florida willow E Salvia urticifolia Nettle-leaved sage E Sarracenia leucophylla White-top pitcherplant E Sarracenia minor Hooded pitcherplant T Sarracenia psittacina Parrot pitcherplant T Sarracenia purpurea Decumbant pitcherplant T Sarracenia rubra Red-flowered (=sweet) pitcherplant T Scaevola plumieri Inkberry T Schisandra coccinea Bay star vine E Schizaea germanii Ray (=tropical curly-grass) fern E Schwalbaea americana American chaffseed E E Scutellaria floridana Florida skullcap; helmet- flowers E T Silene polypetala Fringed campion; fringed catchfly E E Sphenomeris clavata Parsley fern E Sphenostigma coelestina Bartram’s ixia E Spigelia gentianoides Gentian (=panhandle) pinkroot E E Spigelia loganioides Florida (=Levy) pinkroot E Spiranthes brevilabris var. floridana Florida ladies' tresses E Spiranthes costaricensis Ladies' tresses (unnamed) E Spiranthes elata Tall neottia E Spiranthes laciniata Lace-lip ladies' tresses T Spiranthes longilabris Long-lip ladies' tresses T Spiranthes ovalis Oval ladies' tresses E Spiranthes polyantha Florida Keys (=Fort George; =green)

ladies' tresses E

Spiranthes torta Southern ladies' tresses E Spiranthes tuberosa Little ladies' tresses; little pearl twist T Stachydeoma araveolens Mock pennyroyal E Stachys crenata Shade betony E Stachys tenuifolia Narrow-leaved betony E Staphylea trifolia Bladdernut E Stenorrhynchos lanceolata Leafless beak orchid T Stewartia malacodendron Silky camellia E Strumpfia maritima Pride-of-big-pine E Stylisma abdita Hidden stylisma E Suriana maritima Bay cedar E Swietenia mahogani West Indian mahogany E Taxus floridana Florida yew E

Page 259: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-26 Natural Resources Management

Scientific Name Common Name(s) GFC FWS Tectaria coriandrifolia Hairy (=Hattie Bauer) halberd fern E Tectaria heracleifolia Halberd fern (unnamed) T Tephrosia angustissima Narrow-leaved (=coastal) hoary pea E Tetrazygia bicolor Tetrazygia T Thalictrum cooleyi Cooley's meadowrue E E Thalictrum thalictroides Rue anemone E Thelypteris augescens Aspidium fern (unnamed) T Thalypteris grandis Collier County maiden fern E Thelypteris reptans Creeping fern E Thelypteris reticulata Aspidium fern (unnamed) E Thelypteris sclerophylla Aspidium fern (unnamed) E Thelypteris serrata Aspidium fern (unnamed) E Thrinax morrissi Brittle thatch palm E Thrinax radiata Florida thatch palm E Tillandsia balbisiana Inflated wild pine; air plant T Tillandsia fasciculata Common wild pine; common air plant E Tillandsia flexuosa Twisted air plant E Tillandsia pruinosa Fuzzy-wuzzy air plant E Tillandsia utriculata Giant wild pine; giant air plant E Tillandsia valenzuelana Wild pine; air plant (unnamed) T Tipularia discolor Crane-fly orchid T Torreya taxifolia Florida torreya E E Tournefortia gnaphalodes Sea lavender E Tragia saxicola Florida keys noseburn E Trichomanes holopterum Entire winged bristle fern E Trichomanes krausii Krause’s bristle fern E Trichomanes lineolatum Lined bristle fern E Trichomanes punctatum Florida bristle fern E Trillium lancifolium Lance-leaved wake-robin E Triphora craigheadii Craighead's nodding-caps; Craighead's

pogonia E

Triphora latifolia Broad-leaved nodding- caps; broad- leaved pogonia

E

Triphora trianthophora Nodding pogonia; three- birds orchid T Tripsacum floridanum Florida tripsacum E Tropidia polystachya Young-palm orchid E Vanilla barbellata Worm-vine orchid; link vine E Vanilla dilloniana Leafless vanilla E Vanilla mexicana Unscented vanilla E Vanilla phaeantha Leafy (=oblong-leaved) vanilla E Vanilla planifolia Commercial vanilla E Veratrum woodii Woods' false hellebore E Verbena (=Glandularia) maritima Coastal vervain E Verbena (=Glandularia) tampensis Tampa vervain E Verbesina chapmanii Chapman's crownbeard T Vicia ocalensis Ocala vetch E Viola tripartita Yellow violet E Warea amplexifolia Clasping warea E E Warea carteri Carter's mustard E E Xanthorhiza simplicissima Yellowroot E

Page 260: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-27 Natural Resources Management

Scientific Name Common Name(s) GFC FWS Xyris longisepala Kral's (=karst pond) yellow-eyed grass E Xyris scabrifolia Harper's (=harsh-leaf) yellow-eyed

grass T

Zamia floridana Florida coontie C Zamia integrifolia Florida arrowroot C Zamia umbrosa East coast coontie C Zanthoxylum americanum Prickly ash E Zanthoxylum coriaceum Leathery prickly ash E Zanthoxylum flavum Yellowheart E Zephyranthes atamasco Rain lily T Zephyranthes simpsonii Simpson’s zephyr lily T Zephyranthes treatia Treat’s zephyr lily T Zigadenus leimanthoides Coastal death camas E Ziziphus celata Florida (=scrub) jujube E E

Page 261: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-28 Natural Resources Management

Page 262: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-29 Natural Resources Management

Appendix 5-2

Exemptions From Permits to Control Aquatic Plants (Source: FAC 62C-20.0035, 62C 20.0055)[Revised July 1997]

No permit is required from the Department for Federal facilities that undertake the following specific aquatic plant control operations:

1. control activities undertaken in waters owned by one person, other than the state, provided there is no connection to Waters of Special Concern

2. control activities undertaken in Class IV waters, as designated by the Department of Environmental

Regulation, or in artificially created waters used exclusively for agricultural purposes, provided there is no connection to Waters of Special Concern

3. physical or mechanical removal of aquatic plants to create a narrow access corridor not to exceed 25 ft in

width, of sufficient length waterward from the shore to allow access for a boat or swimmer to reach open water

4. control activities certified pursuant to the Florida Electrical Power Plant Siting Act, the Florida Industrial

Siting Act, or the Florida Transmission Line Siting Act

5. control activities using fish as a biological control agent when the introduction and use of the fish has been approved by a permit granted by the Game and Fresh Water Fish Commission

6. control activities using other biological control agents, approved for general release by the U.S.

Department of Agriculture and the FDA, and previously released in the state

7. control activities in waters of 10 surface acres or less provided there is no connection to Waters of Special Concern.

8. activities for which the Department of Environmental Regulation has issued a dredge and fill permit

9. governmental, university, or industrial research agencies when applying labeled pesticides to experimental

or demonstration plots not to exceed a total cumulative area of 25 acres/yr, provided that the person conducting the research notifies the Bureau in advance of treatment of the water body to be treated, the date or dates of treatment, and the chemicals to be used

10. control activities in electrical power plant cooling ponds, cooling reservoirs, or cooling canals.

Page 263: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-30 Natural Resources Management

Page 264: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-31 Natural Resources Management

Appendix 5-3

Prohibited Aquatic Plants (Source: FAC 62C-52.011)

Table 1: Class I Prohibited Aquatic Plants Scientific Name Common Name Alternanthera philoxeroides Alligatorweed, green lead plant Casuarina spp. Australian Pine Crassula helmsii Swamp stone crop Eichhornia spp. Waterhyacinth Hydrilla verticillata Hydrilla, Florida elodea, stargrass, oxygen grass Ipomoea aquatica Water spinach Ipomoea fistulosa Lagarosiphon spp. African elodea Limnocharis flava Sawah flowing rush Lythrum salicaria Purple loosestrife Melaleuca quinquenervia Melaleuca Mimosa pigra Giant sensitive plant, cat's claw Monochoria hastata Monochoria vaginalis Myriophyllum spicatum Eurasian watermilfoil Nechamandra alternifolia Oryza rufipogon Wild Red rice Pontederia rotundifolia Tropical pickerelweed Salvinia spp. (excluding S. minima) Schinus terebinthifolius Brazilian-pepper Sparganium erectum Exotic bur-reed Stratiotes aloides Water-aloe, soldier plant Trapa spp. Water chestnut Vossia cuspidata Hippo grass

Page 265: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

5-32 Natural Resources Management

Table 2: Class II Prohibited Aquatic Plants

Scientific Name Common Name Hygrophila polysperma Hygro Limnophila sessiliflora Ambulia Pistia stratiootes Waterlettuce

Page 266: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

6-1 Other Environmental Issues

SECTION 6

OTHER ENVIRONMENTAL ISSUES

Florida Supplement, June 2000 This section covers the state requirements for Other Environmental Issues and is intended to supplement the U.S. TEAM Guide. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

Page 267: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

6-2 Other Environmental Issues

Page 268: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

6-3 Other Environmental Issues

OTHER ENVIRONMENTAL ISSUES

GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: The NEPA Process Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

Missing Checklist Items O1.2.1.FL. Environmental Noise Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

Missing Checklist Items O2.2.1.FL. IRP Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

Missing Checklist Items O3.2.1.FL. Pollution Prevention

State-Specific Requirements: General Requirements for Recycling Spent Mercury-Containing Lamps and Devices

[Deleted May 1999. Florida manages spent mercury-containing lamps and devices as universal wastes; see the Hazardous Waste Management chapter for information on universal wastes.]

Spent Mercury-Containing Lamps and Devices Facilities

[Deleted May 1999. Florida manages spent mercury-containing lamps and devices as universal wastes; see the Hazardous Waste Management chapter for information on universal wastes.]

Missing Checklist Items O4.2.1.FL. Program Management Refer to the U.S. TEAM Guide and the DOD Component Supplements for DOD and service-specific requirements.

Page 269: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

6-4 Other Environmental Issues

COMPLIANCE CATEGORY: OTHER ENVIRONMENTAL ISSUES

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

NEPA O1.2. Missing Checklist Items

O1.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 270: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

6-5 Other Environmental Issues

COMPLIANCE CATEGORY: OTHER ENVIRONMENTAL ISSUES

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ENVIRONMENTAL NOISE O2.2. Missing Checklist Items

O2.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 271: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

6-6 Other Environmental Issues

COMPLIANCE CATEGORY: OTHER ENVIRONMENTAL ISSUES

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

IRP O3.2. Missing Checklist Items

O3.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 272: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

6-7 Other Environmental Issues

COMPLIANCE CATEGORY: OTHER ENVIRONMENTAL ISSUES

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

POLLUTION PREVENTION O4.2. Missing Checklist Items

O4.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 273: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-1 Pesticide Management

SECTION 7

PESTICIDE MANAGEMENT

Florida Supplement, June 2000 This section covers the state requirements for Pesticide Management and is intended to supplement the U.S. TEAM Guide. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

Definitions

• Application Equipment - any purgeable equipment used for the application of methyl bromide as a soil fumigant (FAC 5E-2.036).

• Application of Fumigant - release of fumigant into structure or enclosed space (FAC 5E-14.102). • Application Site - the specific field being treated with methyl bromide (FAC 5E-2.036). • Available Water Capacity - the ability of the soil to hold water available for use by most plants and commonly

expressed as inches of water per inch of soil (FAC 5E-2.038). • Bedrock - the solid rock that underlies the soil and other consolidated material or that is exposed at the surface

(FAC 5E-2.038). • Designated Agent - a commercial applicator retained for the purpose of applying methyl bromide. The term

may also apply to a grower or grower's employee who is a certified applicator (FAC 5E-2.036). • Drainage Class - refers to the frequency and duration of periods of saturation or partial saturation during soil

formation (FAC 5E-2.038). • Fumigation Operation - all the details prior to the application of a fumigant, the application of a fumigant, the

fumigation period, and the post fumigation details (FAC 5E-14.102). • Fumigation Period - period of time from the application of the fumigant until the ventilation of the structure is

completed and the structure is declared safe for occupancy (FAC 5E-14.102). • General Fumigation - application of fumigants to one or more rooms or their contents in a structure, or the

entire structure; or to commodities under gas-tight sheets or tarpaulins (FAC 5E-14.102). • Horizon - a layer of soil, approximately parallel to the surface, having distinct characteristics produced by soil

forming processes (FAC 5E-2.038). • Multi-Unit Structure - a structure consisting of one or more stories or functionally distinct units, in which units

share a common wall of wood or metal studs or single masonry, including fire walls (FAC 5E-14.102). • Operator - any person on the application equipment during methyl bromide application (FAC 5E-2.036). • Permeability - the quality of the soil that enables water to move through the soil and is measured as the number

of inches per hour that water moves through the saturated soil (FAC 5E-2.038).

Page 274: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-2 Pesticide Management

• Permeable, Better Drained Soils - those soils that are in a drainage class where water is removed more rapidly

than in poorly drained soils, and have a permeability of 6 in./h or more, and an available water capacity of 0.10 in./in. of soil or less, in all horizons to a depth of 80 in. or to bedrock if bedrock is within 80 in. of the surface (FAC 5E-2.038).

• Poorly Drained - that soil drainage class where water is removed so slowly that the soil is saturated periodically

during the growing season or remains wet for long periods (FAC 5E-2.038). • Preventive Treatment - application of measures for the purpose of preventing infestation or infection of

structures by wood-infesting organisms (FAC 5E-14.102). • Residential Area - any area other than an agricultural area or as otherwise specifically exempted by Chapter 482,

F.S. (FAC 5E-14.102). • Restricted-Use Pesticide - a pesticide which, when applied in accordance with its directions for use, and

warnings, and cautions and for uses for which it is registered or for one or more such uses, or in accordance with a widespread and commonly recognized practice, may generally cause, without additional regulatory restrictions, unreasonable adverse effects on the environment, or injury to the applicator or other persons, and which has been classified as a restricted-use pesticide by the Department of the administrator of the United Sates Environmental Protection Agency [Florida does not have a restricted use listing, see the Federal list in the U. S. TEAM Guide Pesticide Management Checklist] (F. S. 487.021).

• Spot Fumigation - application of fumigant to localized harborage or infestation within, on, or under a structure

or enclosed space, or to a lawn under tarpaulins (FAC 5E-14.102). • Spot Treatment - treatment restricted to specific areas of a structure to control or prevent pests (FAC 5E-

14.102). • Structure - any building including its foundation, walls and roof but excluding any surfacing portions such as

driveways or walkways that merely lie on the land and provide no means for a fumigant to pass outside of the fumigation seal (FAC 5E-14.111).

• Synthetic organo-auxin Herbicides - herbicides which produce hormonal auxin type effects on plants similar to

the effects of 2,4-D. These herbicides include: 2,4-D, 2,4-Dichlorophenoxyacetic acid, in all forms 2,4,5-T, 2,4,5-Trichlorophenoxyacetic acid, in all forms Silvex, 2-(2,4,5-Trichlorophenoxy)propionic acid, in all forms MCPA, 4-chloro-2-methylphenoxyacetic acid, in all forms 2,4-DP, 2-(2,4-Dichlorophenoxy)propionic acid, in all forms MCPP, 2-(2-methyl-4-chlorophenoxy)propionic acid, in all forms MCPB, 4-(2-methyl-4-chlorophenoxy)butyric acid, in all forms Dicamba, 2-Methoxy-3, 6-dichlorobenzoic acid, in all forms Triclopyr, (3,5,6-Trichloro-2-pyridinyl)oxyacetic acid, in all forms (FAC 5E-2.033).

Page 275: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-3 Pesticide Management

PESTICIDE MANAGEMENT

GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: Missing Checklist Items PM.2.1.FL. Pesticide Applicators PM.5.1.FL. through PM.5.4.FL. Pesticide Application

General PM.10.1.FL. and PM.10.2. Equipment PM.15.1.FL. Agriculture

Aldicarb PM.20.1.FL. and PM.20.2.FL. Organo-Auxin Herbicides PM.20.3.FL. through PM.20.5.FL. Methyl Bromide and Bromacil PM.20.6.FL. through PO.20.8.FL.

Landscape PM.30.1.FL. Other

Organotin Antifouling Paints and Alachlor PM.35.1.FL. and PM.35.2.FL. Fumigation PM.35.3.FL. through PM.35.5.FL.

Documentation PM.40.1.FL. and PM.40.2.FL. Storage, Mixing, Preparation PM.45.1.FL.

PESTICIDE MANAGEMENT

GUIDANCE FOR FLORIDA APPENDIX USERS

REFER TO APPENDIX NUMBERS: REFER TO APPENDIX TITLES:

7-1 Minimum Distances from Susceptible Crops for Organo-Auxin Herbicide Applications

Page 276: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-4 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PM.2. MISSING CHECKLIST ITEMS

PM.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 277: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-5 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PM.5. PESTICIDE APPLICATORS

(NOTE: The requirements in PM.5.1.FL. through PM.5.3.FL. do not apply to pesticide applicators with current DOD training.)

PM.5.1.FL. Pesticide applicators must be licensed (FAC 5E-9.019 and 5E-9.021).

Verify that a pesticide applicator is a licensed private, public, or commercial applicator.

Verify that a private, public, or commercial applicator is licensed in at least one primary category.

Verify that public and commercial applicators are licensed in all primary and secondary categories applicable to the types of pesticide applications to be made.

PM.5.2.FL. Pesticide applicators must comply with specific requirements (FAC 5E-9.034).

(NOTE: Licensed applicators are responsible for the pesticide use activities and actions of individuals under their direct supervision.)

Verify that a licensed applicator is in a location from which they can physically arrive on site before or during pesticide use, if and when their presence is needed.

Verify that a licensed applicator provides the following training to an unlicensed individual prior to unlicensed individual applying any pesticide for which a license is required:

- safety procedures and precautions to be followed in using the product - the need to properly wear and maintain any required personal protective

equipment - the common signs and symptoms of pesticide poisoning - the dangers of eating, drinking, or smoking while using pesticides - the need to wash clothing and bathe after working with pesticides - the name and location of a nearby medical facility that can provide treatment

in case of pesticide poisoning - how and under what circumstances to contact the licensed applicator.

PM.5.3.FL. Certified operators must renew their certificate (FAC Section 5E-14.132).

Verify that certified operators apply to the department for certificate renewal on or before 1 June of each year.

Page 278: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-6 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PM.5.4.FL. Fumigators must satisfy specific criteria (FAC Section 5E-14.107 and 5E-14.136).

Verify that a fumigator carries a special identification card while performing pest control duties.

Verify that fumigators who hold special identification cards always perform their functions under the direction and supervision of a certified operator.

Verify that each general fumigation is personally directed, supervised, and performed by a certified fumigation operator or personally by a special fumigation identification card holder.

Verify that the certified fumigation operator or his designated special fumigation identification card holder is available and on call at all times during the fumigation period.

Verify that the certified operator in charge of fumigation does the following:

- trains each special fumigation identification card holder to know the location, purpose, use, and maintenance of personal protective equipment and fumigant detection and safety devices, and when and how to use this equipment

- trains each employee assigned to fumigation work to immediately report any irregularities or emergencies to the certified operator in charge or his special fumigation identification card holder.

Page 279: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-7 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PESTICIDE APPLICATION

PM.10. GENERAL

PM.10.1.FL. The use of pesticides must comply with specific requirements (FAC 5E-14.106 (1) through (5)).

Verify that only those pesticides having Federal or state label clearance are used.

Verify that no registered pesticide is used in a manner inconsistent with its labeling.

Verify that licensees and certified operators maintain at the licensed business locations specimen copies of current registered labels for all pesticides used in their pest control operations.

Verify that all pesticide concentrates used in the field are kept under lock when in unattended service vehicles.

Verify that all pesticide concentrates used in the field are kept in leakproof containers legibly tagged or labeled for identification and providing information required by EPA recommendations or regulations.

Verify that pesticides kept in containers other than application equipment are accurately identified by a permanent, durable label or tag, showing the common or chemical name of principal active ingredients, and providing information required by EPA recommendations or regulations.

Verify that fill-pipes or hoses through which spray tanks are filled terminate 2 in. above the spray tank intake fill opening or are equipped with an effective anti-siphoning device to prevent back siphonage into water supply.

PM.10.2.FL. Pesticide use for preconstruction soil treatments must comply with specific requirements (FAC 5E-14.106 (6)).

Verify that pesticides used for preconstruction soil treatments are applied in accordance with labeling requirements.

Verify that the pesticide, in its original formulation, is mixed at the preconstruction treatment site immediately prior to application.

Verify that a copy of the label of the registered pesticide being used is kept in the vehicle from which the application is performed.

Verify that the licensee maintains records for 3 yr of each preconstruction soil treatment indicating the date of treatment, address of property treated, total square

Page 280: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-8 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

footage of structure treated, pesticide used, percent concentration of mixture applied, and total volume applied.

Page 281: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-9 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PESTICIDE APPLICATION

PM.15. EQUIPMENT

(NOTE: These requirements in PM.15.1.FL. do not apply to pesticide vehicles and trailers that meet DOD requirements.)

PM.15.1.FL. All vehicles and trailers used in the conduct of pest control must be marked (FAC 5E-14.103).

Verify that all motor vehicles and trailers used in behalf of or by any licensee or licensee's employees in the conduct of pest control are permanently marked with the licensee's name or trade name, as registered with the Department.

(NOTE: The term "permanently marked" means paint or decals applied to the vehicle body itself.)

Verify that the licensee's name or trade name appears conspicuously on both sides of each motor vehicle and each trailer, and is in bold lettering at least 1.5 in. high, distinctly contrasting in color with the background, and in plain view of the public.

(NOTE: Personal motor vehicles are exempt from the identification requirement when such vehicles are not actively, constantly, and regularly used in the conduct of pest control.)

Page 282: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-10 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PESTICIDE APPLICATION

PM.20. AGRICULTURE

Aldicarb

PM.20.1.FL. Aldicarb use must comply with specific requirements (FAC 5E-2.028(1)). [Revised July 1997]

Verify that the use of Aldicarb complies with the following criteria:

- it is applied only during the time period for which written authorization is issued by the Department

- it is applied only at the site for which written authorization is issued by the Department

- experimental use is authorized by the USEPA - it is not applied within 300 ft of any well - it is not used on citrus within 1000 ft of any well when any soil series within

the intended site of application is identified by the USDA as highly permeable well-drained sand, unless the applicator furnishes the Department with construction documentation confirming that the well is properly cased to a depth of 100 ft below ground service or a minimum of 30 ft below the water table.

(NOTE: Any well that meets the following provisions is exempt from the setback

requirements: - the well is not used for human consumption

- the well has been posted with a conspicuous warning notice stating NOT FOR HUMAN CONSUMPTION

- if the well is situated on property under different ownership from the property where the Aldicarb application is to be made, a signed statement has been obtained from the well owner authorizing the posting of the warning notice.)

Verify that the warning notice remains in place subsequent to the Aldicarb

application.

Verify that citrus grove use is limited to one application per year, that the application is made only from 1 January through 30 April, and that the application does not exceed 5 lb active ingredient or 33 lb of 15 G formulation per acre.

Page 283: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-11 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PM.20.2.FL. Users of Aldicarb must comply with reporting requirements (FAC 5E -2.028(2) and (3)). [Revised July 1997; Revised May 1999]

Verify that at least 10 days before applying Aldicarb, the licensed applicator files the original and three copies of a Notice of Intended Application of Aldicarb, Form DACS-130317.

(NOTE: Licensed applicators conducting research with Aldicarb and making application to no more than 10 acres/site are exempt from the 10 day preapplication notification requirement, providing that a signed statement attesting the application is for research purposes is filed with Form DACS-130317.)

Verify that, when there is a change in the licensed applicator for a particular site, the following requirements are met:

- the original applicator files an original and three copies of Form DACS-130309 canceling the original notice of application for that site

- the newly designated applicator also files an original and three copies of Form DACS-130309.

Verify that, when the intended application of Aldicarb is canceled for any site, the

following requirements are met:

- the applicator files an original and three copies of Form DACS-130309 - the form is filed no later than 30 days after the intended application period, in

which case no application of Aldicarb is made to that site without further written authorization from the Department.

Verify that, if any other information submitted to the Department on Forms

DACS-130317 or DACS130309 changes, the applicator files an original and three copies of Form DACS-130309 reflecting the corrected information no later than 30 days after the authorized application period.

Organo-Auxin Herbicides

PM.20.3.FL. The use of synthetic organo-auxin herbicides must comply with wind speed requirements (FAC 5E-2.033 (3) and (4)).

Verify that applicators comply with the wind speed restrictions contained in Appendix 7-1 when spraying organo-auxin herbicides.

(NOTE: Susceptible crops are defined as commercially produced plants or crops that may be damaged when exposed to low concentrations of organo-auxin herbicides.)

(NOTE: Users of organo-auxin products on citrus as plant growth regulators are exempt from the wind speed restrictions contained in Appendix 7-1 provided they adhere to the restrictions appearing on the product label.)

Page 284: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-12 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PM.20.4.FL. The use of synthetic organo-auxin herbicides must comply with specific requirements (FAC 5E-2.033 (5), (7) and (8)).

Verify that applicators minimize the production of droplets with mean volume diameter of less than 200 micrometers regardless of the spray equipment utilized.

Verify that, when utilizing boom application equipment on the ground, flat fan nozzles or their equivalent are used and application pressures do not exceed 35 lb/in.2.

(NOTE: Applications of organo-auxin herbicides on citrus as plant growth regulators are exempt from these requirements.)

(NOTE: Aerial application of organo-auxin herbicides by fixed wing aircraft from 1 January until 1 May of each year in Hendry, Palm Beach, Glades, or Martin counties is prohibited.)

Verify that applicators who apply organo-auxin herbicides to ditches, canals, or the banks of similar waterways assure that they are not treating water that will be directly used for the irrigation of sensitive crops.

PM.20.5.FL. Users of synthetic organo-auxin herbicides must comply with recordkeeping requirements (FAC 5E-2.033 (6)).

Verify that persons making spray applications of organo-auxin herbicides or plant growth regulators to cumulative land or water surface areas exceeding 5 acres/24-h period maintain the following records for 2 yr:

- name and address of the owner, tenant, or lessee in control of the land and the name and address of the applicator

- location of the site to be treated - location of the mixing and loading area - description of application equipment used - date and time of application - trade name, manufacturer, formulation, total amount of product to be applied

per acre, and the amount of active ingredient of the product applied per acre - total acreage and crop or site treated - average hourly wind speed and direction - nozzle type, including gallons per minute rating at specified pressure and

angle of spray emission if applicable.

Methyl Bromide And Bromacil

PM.20.6.FL. The use of methyl bromide as a soil

Verify that a commercial applicator retained for the purpose of applying methyl bromide is present at the application site during all phases of methyl bromide

Page 285: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-13 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

fumigant must comply with specific requirements (FAC 5E-2.036(3), (4)(b)(3)-(4), and (6)).

application or handling.

Verify that soil is adequately sealed by rolling, tarping, or packing, to prevent escape of methyl bromide.

Verify that operator seats located over injection apparatus are positioned to prevent worker exposure.

(NOTE: The following uses are exempt from these requirements: - methyl bromide fumigation, by raised tarp method, of plant beds and other

small areas - methyl bromide fumigation of potting mix, greenhouse soils, and sites treated

specifically for control of ants.)

PM.20.7.FL. Methyl bromide application equip-ment must comply with specific requirements (FAC 5E-2.036 (4)(a), (b)(1)-(2) and (5)).

Verify that nonpurgeable apparatus is not used for methyl bromide application.

Verify that application equipment for the use of methyl bromide as a soil fumigant complies with the following requirements:

- Teflon hoses reinforced with stainless steel wire braid or its equivalent between any fumigant container and the flow divider

- lines from any flow divider to the point of injection are of materials approved by the manufacturer for methyl bromide service

- injection apparatus of a length sufficient to insure an injection depth of not less than 6 in. below the soil surface.

Verify that at least 5 gal of potable water is kept on the application equipment

clearly marked DECONTAMINATION WATER - NOT TO BE USED FOR DRINKING, and that an additional 5 gal, so marked, is kept elsewhere on the application site.

Verify that a self-contained breathing apparatus is on site, but not on the application equipment.

PM.20.8.FL. The use of Bromacil must comply with specific requirements (FAC 5E-2.038).

Verify that Bromacil is not used for weed control in nonbedded citrus groves located on any permeable, better drained soil identified in the intended site of application.

(NOTE: Permeable, better drained soils which occur in citrus producing areas of the state include soils unnamed and characteristic of Quartzipsamments, and the following soil series classifications:

- Adamsville - Archbold

Page 286: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-14 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- Astatula - Bahiahonda - Broward - Canaveral - Candler - Cocoa - Dade - Florahome - Fort Meade - Gainesville - Lake - Lakewood - Neilhurst - Orlando - Orsino - Palm Beach - Paolo - Satellite - St. Augustine - St. Lucie - Tavares.)

Page 287: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-15 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PESTICIDE APPLICATION

PM.30. LANDSCAPE

PM.30.1.FL. Pesticide applicators must comply with notification requirements when applying any pesticide to a lawn or exterior foliage (FAC 5E-14.147).

Verify that a notice is posted in a conspicuous location at the time of application of a pesticide to a lawn or to exterior foliage.

Verify that the notice complies with Department requirements.

Page 288: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-16 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PESTICIDE APPLICATION

PM.35 OTHER

Organotin Antifouling Paints and Alachlor

PM.35.1.FL. The use of organotin antifouling paints must comply with specific requirements (FAC 5E-2.035).

Verify that organotin antifouling paints are not used on vessels less than 82 ft in deck length unless the vessels are aluminum.

Verify that organotin antifouling paints classified as restricted use pesticides are used only by licensed restricted use pesticide applicators or persons under the direct supervision of a licensed restricted use pesticide applicator.

PM.35.2.FL. The use of all pesticide products containing Alachlor is prohibited (FAC 5E-2.037). [Revised July 1997]

Verify that no pesticide product containing Alachlor is used.

Fumigation

PM.35.3.FL. Fumigation must comply with specific requirements (FAC 5E-14.111).

Verify that neither the structure nor enclosed space to be fumigated nor any part or parts thereof is occupied by persons during the fumigation period.

Verify that structures or enclosed spaces which are physically joined to or in contact with the structure to be fumigated is not occupied by persons during the fumigation period.

Verify that, in the event that one or more structures in a row of physically joined structures is to be fumigated, at least one additional complete building structure next to and on both sides of the structure to be fumigated is vacated, provided there are no common drains, air ducts, conduits, attics, or other means of permitting escape or passage of the fumigant from the structure to be fumigated

Page 289: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-17 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

into the other structures.

Verify that in the event that one or more units in a multi-unit structure is to be fumigated, the entire multi-unit structure is vacated prior to fumigation.

Verify that the certified operator in charge or his designated special fumigation identification card holder makes a careful examination of all parts of the structure to be fumigated, including locked rooms, compartments, and closets, and of structures or enclosed spaces physically joined to or in contact with said structure, to verify that no persons have remained therein.

Verify that the fumigation of structures complies with the directions and precautions on the registered label and labeling.

Verify that when fumigating structures with methyl bromide, sulfuryl fluoride, or any other relatively odorless gas, technical chloropicrin is used separately as a warning agent immediately prior to release of the relatively odorless gas at the rate of not less than 1 fl. oz/15,000 ft3 of space to be fumigated.

(NOTE: Registered label mixtures of at least 0.25 percent chloropicrin by net weight analysis may be used as a warning agent in lieu of technical chloropicrin.)

PM.35.4.FL. Certified operators or designated special fumigation identification card holders must comply with final, pre-application requirements (FAC 5E-14.112).

Verify that immediately before the fumigant is to be applied, the certified operator in charge or his designated special fumigation identification card holder makes a final, personal inspection of the structure and ascertains that:

- all preparations have been completed - no unauthorized person is in the structure or enclosed space to be fumigated,

or in any adjacent structures or spaces that are required by these regulations to be vacated

- no open fires, flames, pilot lights, or oil lamps are burning.

Verify that prior to the application of fumigants, clearly legible warning signs of stiff, weather-proof material are securely and conspicuously posted as follows:

- in tape-and-seal fumigation operations: - at or on all doors and entrances to the structure or enclosed space

- at least one warning sign on all sides of the structure or enclosed space not having a door or an entrance

- in tent fumigation operations and commodity fumigation: - at or on all doors and entrances to the structure or enclosed space

- at least one warning sign on the outside of the tents or sealing covers on all sides of the structure, enclosed space, or commodities being fumigated

- at all doors and entrances to common carriers or enclosed space being

Page 290: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-18 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

fumigated - upon all gangplanks, ladders, etc., from the dock, pier, or land to vessel.

Verify that the warning signs conform in design and information to the

requirements contained in FAC 5E-14.112.

Verify that warning signs posted on the outside of tents or sealing covers are not removed prior to the commencement of ventilation.

Verify that warning signs posted on the structure (itself), enclosed space, or commodities being fumigated are not removed until the end of the fumigation period, when ventilation has been completed and the premises declared safe for reoccupancy.

Verify that, when conditions involving abnormal hazards exist, the person exercising direct and personal supervision of the fumigation operation takes such safety precautions additional to those prescribed by FAC 5E-14 as are reasonably necessary to protect the public health and safety.

Verify that all doors and entrances to the structure being fumigated are locked, barred, or otherwise secured against entry until the end of the exposure period, then opened for ventilation and relocked, barred, or otherwise secured against reentry until declared safe for reoccupancy.

PM.35.5.FL. Certified operators or designated special fumigation identification card holders must make a postfumigation clearance inspection (FAC 5E-14.113).

Verify that the certified operator in charge or his designated special fumigation identification card holder personally determines, using label recommended gas detecting or monitoring devices, that the entire structure or enclosed space fumigated, including bedding therein, has been monitored and safely ventilated.

Verify that the certified operator in charge or his designated special fumigation identification card holder personally certifies by his own signature that the fumigated structure or enclosed space, and adjacent vacated structures, are safe for human entry, occupancy, or reoccupancy.

Verify that the notice of clearance is conspicuously posted on all entrances to the structure or enclosed space.

Page 291: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-19 Pesticide Management

Page 292: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-20 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PESTICIDE APPLICATION

PM.40. DOCUMENTATION

PM.40.1.FL. Pesticide applicators must comply with recordkeeping requirements (FAC 5E-9.032) [Revised May 1999].

Verify that a licensed pesticide applicator maintains records relating to the application of all restricted use pesticides.

Verify that the records contain the following information for each application:

- name and license number of the licensee responsible for the application - name of the person who actually applied the pesticide - date and time of treatment - crop, commodity, or type of target site treated - total size of the treatment site - brand name and EPA registration number of the pesticide product applied - total amount of formulated product applied - application method - name of the person requesting or authorizing the application - location of the treatment site, which may be described using any of the

following designations: - county, range, township, and section

- an identification system utilizing maps and/or written descriptions which accurately identify the location and distinguish the treatment site from other sites

- the identification system established by the United States Department of Agriculture found at 7 CFR Sec. 110 (1994).

Verify that the required information is recorded no later than 2 working days after

the date of application.

Verify that all records are retained for 2 yr and maintained in a manner that is accessible by authorized representatives.

Verify that a licensed applicator who has made or supervised an application of a restricted-use pesticide, within 30 days of the pesticide application, provides a copy of the required application records to the person for whom the pesticide application was made.

Page 293: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-21 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PM.40.2.FL. Persons performing fumigation must comply with notification requirements (FAC 5E-14.110).

Verify that each licensee, before performing general fumigation, notifies in writing the department inspector at least 24 h in advance of the fumigation period.

Verify that the notice provides the following:

- company name and business location address - accepted common or trade name and active ingredients of fumigant to be

used - name of certified operator in charge and/or his designated special fumigation

identification card holder, together with his day and night telephone number - location and type of structure to be fumigated - date of, and approximate time of release of, and approximate length of, the

fumigation period.

(NOTE: In verifiable emergencies only, where 24 h advance notification is not possible, advance telephone or telegraph notice may be given, provided it is followed by written confirmation stating the required information.)

Page 294: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-22 Pesticide Management

COMPLIANCE CATEGORY: PESTICIDE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PM.45. STORAGE, MIXING, PREPARATION

PM.45.1.FL. Storage of restricted use pesticides must comply with specific requirements (FAC 5E-2.022).

Verify that restricted use pesticides are stored and maintained in a secure manner so that they are not easily accessible to unauthorized persons.

Page 295: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

7-23 Pesticide Management

Appendix 7-1

Minimum Distance from Susceptible Crops for Organo-Auxin Herbicide (Source: Florida Administrative Code 5E-2.033(3))

Based upon wind speed and direction at the time of application, the distance which must separate the closest edge of the area to be sprayed from susceptible crops is listed in Table 1. Susceptible crops are defined as commercially produced plants or crops that may be damaged when exposed to low concentrations of organo-auxin herbicides. Examples of susceptible crops are tomatoes, peppers, watermelons, eggplants, and ornamental broadleaf plants. Users or organo-auxin products on citrus as plant growth regulators are exempt from the wind speed restrictions below provided they adhere to the restrictions appearing on the product label.

Minimum Distance From Susceptible Crops Wind Speed Aerial Equipment Ground Equipment 0 - 3 mph 1/2 mile downwind 1/8 mile downwind 1/2 mile crosswind 1/8 mile crosswind 50 feet upwind 20 feet upwind 3 - 6 mph 1 mile downwind 1/4 mile downwind 1/2 mile crosswind 1/8 mile crosswind 50 feet upwind 5 feet upwind 6 - 10 mph 2 miles downwind 1/2 mile downwind 1/2 mile crosswind 1/4 mile crosswind 50 feet upwind 5 feet upwind Above 10 mph Prohibited Prohibited Note: "Crosswind" means wind from a direction 90 degrees (± 10 degrees) to a line drawn between the proposed treatment site and a susceptible commercial crop site.

Page 296: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-1 Petroleum, Oil, and Lubricant (POL) Management

SECTION 8

PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement, June 2000 This section covers the state requirements for POL Management and is intended to supplement the U.S. TEAM Guide. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

Definitions

The definitions in FAC 62-701 are adopted (see the Solid Waste Management chapter). • Contamination or Contaminated - the presence of petroleum or petroleum products or their chemical

constituents in surface water, groundwater, soil, sediment, or upon the land, in quantities or concentrations that may result in exceedances of the applicable cleanup target levels specified in Chapter 62-777, FAC, or water quality standards in Chapters 62-3, 62-302, 62-520 or 62-550, FAC, or in quantities or concentrations that may result in contaminated sediment (FAC 62-770.200) [Revised June 2000].

• Excessively Contaminated Soil - for the purposes of Section 376.3071(11)(b)2., F.S. (unless laboratory results

verify that the organic vapor analysis data are not relevant), soil saturated with petroleum or petroleum products or soil that causes a total corrected hydrocarbon measurement of 500 parts per million (ppm) or higher for Gasoline Analytical Group or 50 ppm or higher for Kerosene Analytical Group. Readings shall be obtained at the site on an organic vapor analysis instrument with a flame ionization detector in the survey mode upon sampling the headspace in half-filled, 16-ounce jars. Each soil sample shall be split into two jars, the two samples shall be brought to a temperature of between 20°C (68°F) and 32°C (90°F) and the readings shall be obtained five minutes thereafter. One of the readings shall be obtained with the use of an activated charcoal filter unless the unfiltered reading is non-detect. The total corrected hydrocarbon measurement shall be determined by subtracting the filtered reading from the unfiltered reading. Instruments with a photo ionization detector may be used after a determination is made of that instrument's equivalent response to an instrument with a flame ionization detector. Photo ionization detectors shall not be used in situations where humidity will interfere with the instruments' sensitivity (including periods of rain, measuring wet or moist soil). Analytical instruments shall be calibrated in accordance with the manufacturer's instructions (FAC 62-770.200).

• Free Product - petroleum or petroleum product in excess of 0.01 ft in thickness, measured at its thickest point,

floating on surface water or groundwater (FAC 62-770.200). • Gasoline Analytical Group - aviation gasoline, gasohol, and motor gasoline or equivalent petroleum products

(FAC 62-770.200). • Groundwater - water beneath the surface of the ground within a zone of saturation whether or not flowing

through known or definite channels (FAC 62-770.200). • Kerosene Analytical Group - diesel, Jet-A, JP-5, and kerosene or equivalent petroleum products (FAC 62-

770.200). • Petroleum Contact Water or PCW - water containing product. Examples of materials that meet the definition of

PCW include the following: 1. Condensate from underground and aboveground petroleum tanks.

Page 297: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-2 Petroleum, Oil, and Lubricant (POL) Management

2. Water bottoms or drawdown water removed from a petroleum storage tank system as defined in FAC 62-761 and 62-762.

3. Product, or water in contact with product, that displays a visible sheen contained in spill containment and secondary containment areas associated with petroleum tank storage, petroleum transportation, and petroleum distribution systems; however, stormwater that displays a visible sheen contained in spill containment and secondary containment areas associated with a diesel or No. 2 fuel storage tank, transportation, or distribution system is not PCW.

4. Petroleum tank filler sump and dispenser sump water. 5. Recovered product or water in contact with product, which does not contain hazardous constituents

other than petroleum, from first response actions to petroleum spills or from petroleum contamination site cleanups conducted under FAC 62-770.

6. Aboveground petroleum tank seal leakage water. 7. Pumpable liquids from petroleum tank cleaning operations.

Examples of materials that do not meet the definition of PCW include the following:

1. Equipment or vehicle wash water. 2. Bilge water. 3. Separated solids from tank cleaning operations. 4. Groundwater contaminated with hazardous constituents other than PCW. 5. Wastewaters regulated or permitted under other applicable Department rules or standards, such as

FAC 62-620 and FAC 62-660 (FAC 62-740.030). • Petroleum Refinery - a location with a primary Standard Industrial Classification (SIC) code facility

classification of 291 1, Petroleum Refining (FAC 62-740.030). • Producer - any person, within the meaning of Section 403.703(4), F.S., by site, whose act or process generates

PCW or whose act first causes PCW to become subject to regulation. This term includes owners and operators of storage tank systems regulated under FAC 62-761 and FAC 62-762, examples include owners or operators of retail service stations, convenience stores, wholesale product distribution facilities, product terminals, pipeline breakout tanks, and aboveground storage tanks where PCW is collected. A producer may recover product from PCW it produces or receives from another producer without becoming classified as a recovery facility (FAC 62-740.030).

• Product - petroleum product as defined in Section 376.301(16), F.S. (1993) (FAC 62-740.030). • Product Recovery - the removal of free product (FAC 62-770.200). • Recovery Facility - a facility that recovers product from PCW beyond the level of recovery obtained by a

producer and meets the PCW management practices for recovery facilities. A recovery facility is not considered a producer, except for the PCW it may produce onsite from its product storage tanks (FAC 62-740.030).

• Site - the contiguous land upon which a producer is located (FAC 62-740.030). • Site or Petroleum Contamination Site - any contiguous land, surface water, and groundwater areas upon or into

which a discharge of petroleum or petroleum products has occurred or for which evidence exists that such a discharge has occurred (FAC 62-770.200) [Revised June 2000].

• Surface Waters - includes rivers, lakes, streams, springs, impoundments, and all other waters upon the surface of

the earth, whether contained in bounds created naturally or artificially, or diffused. Onsite stormwater, wastewater, or process water retention or treatment facilities that are not connected to other surface waters are not included in the definition of surface waters (FAC 62-770.200) [Revised June 2000].

Page 298: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-3 Petroleum, Oil, and Lubricant (POL) Management

• Transporter - a person who transports PCW offsite by rail or over public roads (FAC 62-740.030). • Used Oil -Any lubricants for use in internal combustion engines that have been refined from crude oil and, as a

result of use, storage, or handling, have become unsuitable for their original purpose due to the presence of impurities or loss of properties, but which may be suitable for further use as a fuel or is economically recyclable for use as a fuel. Used oil shall not include any used oil that has been mixed with any material which is a hazardous waste, unless the material is a hazardous waste solely due to the characteristic of ignitability as defined in 40 CFR Section 261, Subpart C. Used oil containing more than 1000 ppm of total halogens is presumed to be mixed with a hazardous waste as listed in 40 CFR Section 261, Subpart D, unless a demonstration is made that the used oil does not contain a hazardous waste (FAC 62-770.200).

• Used Oil Filter - any device which is an integral part of an oil flow system, the primary purpose of which is to

remove contaminants from the flowing oil contained within the system and which, as a result of use has become contaminated and unsuitable for its original purpose, is removed from service and contains entrapped used oil (FAC 62-710.850).

• Used Oil Filter Processor - a person who removes oil from used oil filters to prepare them for recycling.

Generators of used oil filters who consolidate, drain, or crush used oil filters for offsite recycling are not used oil filter processors providing the generator complies with the requirements of subsection (3) of this section (FAC 62-710.850).

• Used Oil Filter Transporter - any person who transports for hire used oil filters to a used oil filter transfer or

processing facility (FAC 62-710.850). • Used Oil Filter Transfer Facility - any facility that is used to store, for more than 10 days, used oil filters which

were not generated at that facility. A person who stores their own used oil filters generated at their own noncontiguous operations on their own property is not considered a used oil filter transfer facility provided the used oil filters are processed by a registered used oil filter processor (FAC 62-710.850).

• Waters or Waters of the State - those waters as defined in section 403.031, F.S. (FAC 62-770.200).

Page 299: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-4 Petroleum, Oil, and Lubricant (POL) Management

PETROLEUM, OIL, AND LUBRICANT MANAGEMENT GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: Missing Checklist Items PO.2.1.FL. Discharges/Spills

Spills must be reported immediately to the Division of Emergency Management 904/488-2915 and 904/488-1320 (instate, 24 h/day).

Used Oil The Department adopts by reference 40 CFR 279 revised as of 1 July 1993, and the amendments in the Federal Register dated 4 March 1994 (59 FR 10550), which contain the Federal standards for the management of used oil. References in 40 CFR 279 to 40 CFR 262 shall mean rules adopted by the Department regarding generators of hazardous wastes; reference to 40 CFR 263 shall mean rules adopted by the Department regarding transporters of hazardous waste; reference to 40 CFR 264 and 265 shall mean rules adopted by the Department regarding treaters, storers, and disposers of hazardous wastes; references to 40 CFR 266 shall mean rules adopted by the Department regarding standards for the management of specific hazardous waste; and references to Section 3010 of RCRA shall mean notification requirements of Florida Law. The above-mentioned Department rules are found in FAC 62-730. Unless specifically indicated otherwise, when used in any such provisions as adopted from 40 CFR 279, United States shall mean the State of Florida, EPA shall mean the Department, and Administrator or Regional Administrator shall mean the Secretary of the Department or the Secretary's designee, where appropriate. Any reference to 40 CFR 270 or 124 as adopted by reference in 40 CFR 279 shall mean the permitting provisions in FAC 62-4 or FAC 62-730, or Section 403.722, Florida Statutes. Any reference to the Resource Conservation and Recovery Act of 1976 (RCRA) as adopted by reference in 40 CFR 279 shall be construed to refer to comparable provisions of the Florida Resource Recovery and Management Act as established in IV of Chapter 403, Florida Statutes.

Used Oil Transportation PO.75.1.FL. State-Specific Used Oil Requirements

Registrations and Notifications PO.95.1.FL. and PO.95.2.FL. Used Oil Processing General Permits PO.95.3.FL. Used Oil Filter Management PO.95.4.FL. and PO.95.5.FL.

State-Specific POL Requirements Petroleum Contact Water (PCW) PO.100.1.FL. through PO.100.8.FL. Petroleum-Contamination Sites PO.100.9.FL. through PO.100.16.FL. POL-Contaminated Soil Thermal Treatment PO.100.17.FL. through PO.100.22.FL.

[Deleted June 2000] (NOTE: FAC 62-775 has been repealed, and PO.100.17.FL. through PO.100.22.FL. have been deleted without further comment. Florida has replaced FAC 62-775 with FAC 62-713, which applies to treatment facilities for soil contaminated with a variety of substances. See SO.175.FL. in the Solid Waste Management chapter for details.)

Page 300: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-5 Petroleum, Oil, and Lubricant (POL) Management

PETROLEUM, OIL, AND LUBRICANT MANAGEMENT GUIDANCE FOR FLORIDA APPENDIX USERS

REFER TO APPENDIX NUMBERS: REFER TO APPENDIX TITLES:

8-1 Site Assessment Objectives 8-2 Soil Sampling and Analysis Parameters and Test Methods

[Deleted June 2000] 8-3 Criteria for Treating PCB Contaminated Soil at a Stationary

Thermal Treatment Facility [Deleted June 2000]

Page 301: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-6 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PO.2. MISSING CHECKLIST ITEMS

PO.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 302: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-7 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PO.75. USED OIL TRANSPORTATION

PO.75.1.FL. Transporters of more than 500 gal of used oil annually must be certified (62-710.600) [Revised July 1998].

(NOTE: The following are not required to be certified: - local governments or private solid waste haulers under contract to a local

government that transports used oil collected from households to a public used oil collection center

- persons who transport at one time less than 55 gal of used oil that is stored in tightly closed containers which are secured in a totally enclosed section of the transport vehicle.)

Verify that transporters who transport over public highways more than 500 gal of

used oil annually, not including oily waste, are certified as a used oil transporter.

Page 303: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-8 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PO.95. STATE-SPECIFIC USED OIL REQUIREMENTS

Registrations and Notifications

PO.95.1.FL. Used oil handling activities must meet registration requirements (62-710.500) [Revised July 1998].

Verify that the following register their used oil handling activities annually with the Department by 1 March of each year:

- used oil transporters and transfer facilities - used oil processors - used oil fuel marketers who sell used oil fuel - used oil burners of off-specification used oil.

(NOTE: Transporters may submit one registration form for their entire

transportation fleet.)

Verify that the validated registration form and identification number are displayed in a prominent place at each facility location.

Verify that each public used oil collection center notifies the Department no later than 30 days after first accepting used oil from the public.

(NOTE: The Department must acknowledge filing of the notification within 30 days of receipt.)

PO.95.2.FL. Registered used oil activities must meet recordkeeping and reporting requirements (62-710.510) [Revised July 1998].

Verify that the following information is recorded for used oil activities:

- the source of the used oil, including the name and street address of each source, the EPA identification number of the source, if applicable

- the total number of gallons of used oil received from each source, including any oily wastes that may be an integral part of the used oil shipment

- the type of used oil received, using the type code designation found in the form instructions

- the date of receipt - the destination or end use of used oil and oily wastes, including name and

street address of each destination or end user, the used oil identification number, if applicable, and the end use code designation found in the form instructions.

Page 304: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-9 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that the records are retained for a period of 3 yr.

Verify that the records are kept at the street address of the registered person and are available for inspection by the Department during normal business hours.

Verify that persons required to register their oil handling activities with the Department (see PO.95.2.FL) submit an annual summary of their records to the Department no later than 1 March.

Verify that public used oil collection centers submit an estimate of the quantity of used oil accepted from the public during the previous calendar year to the Department no later than 1 July.

Used Oil Processing General Permits

PO.95.3.FL. Used oil processing facilities must operate under general permit requirements (62-710.800) [Revised June 2000].

(NOTE: The owner/operator of a used oil processing facility must operate, modify, or close the facility only pursuant to a general permit, meet the applicable general permit requirements for recordkeeping and reporting for registered activities (in FAC 62-4.510 and FAC 62-4.520), and the requirements of FAC 62-710 including the requirements in 40 CFR 279 Subpart F.)

(NOTE: Permits are not required for the burning of used oil as a fuel, provided a valid Department air permit is in effect for the facility.)

Verify that, before operating, modifying, or closing a facility under a general permit, the owner/operator of a used oil processing facility notifies the Department.

Verify that the notification for a new facility or a renewal of a general permit is submitted 30 days before the operation begins or an existing general permit expires.

(NOTE: The general permit for a used oil processing facility is valid for 5 yr. A general permit may be renewed by submission of the required and the closure plan.).

Verify that the used oil processing facility has (part of its general permit notification) a written closure plan to show how the facility will be closed to meet the following requirements:

- there will be no need for further facility maintenance - used oil will not contaminate surface or groundwater - all soils will be free of oil, and equipment will be emptied and cleaned or

Page 305: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-10 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

dismantled.

Verify that the closure plan is updated whenever significant operational changes occur or design changes are made.

Verify that the closure plan is maintained with records required in PO.95.3.FL (FAC 62-710.510).

Used Oil Filter Management

PO.95.4.FL. Used oil filter management must meet registration, record keeping, and reporting requirements (62-710.850(1) through (5)).

Verify that each generator of used oil filters whose solid waste is typically disposed of in a landfill is either:

- registered as a used oil filter processor - ensures that its filters are processed by a registered used oil filter processor.

(NOTE: This does not include the recycling of engine blocks on which used oil filters remain.)

Verify that the following are registered:

- used oil filter transporters - used oil filter transfer facilities - used oil filter processors - end users of used oil filters, including scrap metal dealers, metal foundries,

and thermal processing units such as cement kilns, who accept used oil filters from a person who is not a registered used oil filter processor.

(NOTE: An end user is not required to register with respect to used oil filters that

have been obtained from a registered used oil filter processor.)

Verify that registered used oil filter processor records include the destination or end use of the processed used oil filters, including the name and street address of each destination or end user.

Verify that all records are retained for 3 yr.

Verify that records are kept at the street address of the registered person and are available for inspection by the Department during normal business hours.

Verify that no later than 1 March of each year, each registered used oil filter processor submits an annual report for the preceding calendar year to the

Page 306: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-11 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Department.

Verify that the annual report summarize the records kept on the destination or end use of the processed used oil filters.

PO.95.5.FL. Used oil filter management must meet storage requirements (62-710.850 (6)).

Verify that all storage of used oil filters is in aboveground containers which are clearly labeled USED OIL FILTERS.

Verify that all used oil filter storage containers are in good condition (no severe rusting, apparent structural defects, or deterioration) with no visible oil leakage.

Verify that all used oil filter containers are sealed or otherwise protected from weather and stored on an oil- impermeable surface.

Verify that, upon detection of a release of oil from any used oil filter container, the following requirements are met:

- the release is stopped - the released oil is contained - the released oil and any subsequent oily waste is cleaned up and managed

properly - any leaking used oil filter storage container is repaired or replaced prior to

returning it to service.

Page 307: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-12 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PO.100. STATE-SPECIFIC POL REQUIREMENTS

Petroleum Contact Water (PCW)

(NOTE: These requirements for PCW apply to any person producing, transporting, or storing PCW for the purpose of recovering product and to any person recovering product from PCW. These management practices do not apply to materials not meeting the definition of PCW or used oil, oily waste, or other materials regulated under FAC 62-710 (see Definitions) (FAC 62-740.020).)

PO.100.1.FL. PCW producers who determine not to recover product from PCW must meet specific requirements (FAC 62-740.040(1) through (4)).

Verify that, if a producer decides not to recover product from the PCW or the PCW contains hazardous constituents above those found in the product that produced the PCW, the PCW is a solid waste and the producer of the PCW determines whether the PCW is a hazardous waste in accordance with 40 CFR 262.11 (as adopted by reference in FAC 62-730).

Verify that, if a producer has determined PCW to be a hazardous waste and has determined not to recover product, the PCW is managed in accordance with hazardous waste requirements (FAC 62-730).

Verify that, if a producer has determined PCW to be nonhazardous and has determined not to recover product, the PCW is managed in accordance with the following requirements:

- transport and dispose of the PCW offsite at a Publicly Owned Treatment Works (POTW) subject to regulation under section 402 or section 307(b) of the Clean Water Act, as amended, or other facility permitted by the Department

- transport and dispose of the PCW offsite at a pretreatment facility connected to a POTW subject to regulation under section 402 or section 307(b) of the Clean Water Act, as amended

- transport or pipe the PCW to an onsite treatment facility permitted by the Department, the USEPA, or certified, pursuant to Chapter 403, Part II, Florida Statutes and FAC 62-17

- transport or pipe the PCW to an onsite storage or slop tank - transport the PCW to a recovery facility that meets the requirements of FAC

62-740 - transport the PCW to a facility that has a currently valid industrial waste

permit, air operating permit, or other local, state, or Federal permit, provided that the PCW is managed at the facility in a manner to prevent any violation of Department groundwater, surface water, and air emissions standards.

Page 308: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-13 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PO.100.2.FL. PCW producers who determine to recover product from PCW must meet specific require-ments (FAC 62-740.040(5) through (8)).

Verify that a producer who decides to recover product or have product recovered from PCW maintains adequate records including documentation of process knowledge or test results to demonstrate that the PCW:

- contains a recoverable product - is managed as a product - undergoes product recovery - is managed in accordance with the applicable PCW management practices - does not contain levels of hazardous constituents above those found in the

source of the PCW.

Verify that methods used for recovery of product in PCW include the following:

- phase separation of product from PCW by the producer - use of one or more oil/water separators by the producer - use of available technology onsite by the producer beyond oil/water

separators (e.g., centrifuge, filter press, thermal desorption, etc.) - shipment of PCW to and reintroduction of the PCW into a petroleum refinery - recovery of product from PCW at a recovery facility.

(NOTE: If a producer conducts initial onsite recovery of product from PCW by

one or more of the methods above and determines not to recover additional product the producer is subject to and must comply with PO.100.1.FL.)

(NOTE: PCW managed for the recovery of product in accordance with the management standards contained in FAC 62-740 is not a solid waste as defined in 40 CFR 261.2.)

PO.100.3.FL. PCW producers must meet specific management requirements (FAC 62-740.100(1) through(3), and (10)).

Verify that, if the producer is subject to the aboveground and/or underground storage tank regulations (FAC 62-761 or FAC 62-762), the tanks in which PCW is managed (these are not the tanks in which the PCW is initially produced) are registered and managed in accordance with the applicable requirements.

Verify that PCW storage tanks are clearly labeled or marked with the words PETROLEUM CONTACT WATER.

Verify that a producer either maintain onsite records that reflect accumulation and removal dates of PCW from such storage tanks or clearly mark the PCW storage tanks with the date when PCW accumulation first begins after the existing PCW in the storage tank has been removed.

Verify that, if a producer stores PCW in containers or tanks that are not required to

Page 309: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-14 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

be registered under FAC 62-761 or FAC 62-762, the following requirements are met:

- the container or tank is made of or lined with material that is compatible with PCW

- the container or tank is kept closed and stored in a safe manner - the container or tank is clearly labeled or marked with the words

PETROLEUM CONTACT WATER and the date when PCW accumulation first begins after the existing PCW in the container or tank has been removed

- the container or tank is not handled in a manner that may rupture it or cause it to leak

- the container or tank is inspected for leaks and deterioration at least weekly.

Verify that a producer does not store PCW in containers or tanks for more than 180 days.

Verify that producers utilizing continuous input/output tanks demonstrate compliance with the 180 storage limitation by maintaining inventory records showing throughout of more than 100 percent of the tank capacity or the in-put PCW during a 180-day period.

Verify that a producer does not mix or commingle PCW with any other material not identified as an example of PCW in the definition of PCW or defined as PCW.

PO.100.4.FL. PCW producers must meet specific shipping requirements (FAC 62-740.100(4), (5), (7), (8),and(9)) [Citation revised July 1997].

Verify that a shipping paper is included with each offsite shipment of PCW.

Verify that the shipping paper identifies the PCW as PETROLEUM CONTACT WATER.

Verify that the producer notifies the recovery facility receiving its PCW that the PCW does not contain levels of hazardous constituents above those found in the source of the PCW.

Verify that, if a producer ships PCW within Florida, the producer only ships PCW to another producer, a petroleum refinery, a recovery facility that meets the PCW management practices, or a permitted hazardous waste facility.

Verify that, if a producer ships PCW outside Florida, the producer and transporter will be subject to the receiving state's laws and regulations pertaining to the management of PCW upon leaving the State of Florida.

(NOTE: Within the boundaries of the State of Florida, the producer and transporter must maintain compliance with FAC 62-740.)

Verify that a producer shipping PCW offsite by rail or over public roads for

Page 310: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-15 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

recovery uses a hazardous waste transporter or a transporter who has received a DEP/EPA ID number by notifying the Department on EPA Form 8700-12 of its intent to transport PCW.

PO.100.5.FL. PCW producers must meet specific recordkeeping requirements (FAC 62-740.100(6)).

Verify that a producer with onsite product storage capacity of less than 95,000 gal maintains records of the PCW related activity for 3 yr and makes the records available to the Department upon 5 working days notice if records are not maintained onsite.

Verify that a producer with onsite product storage capacity of 95,000 gal or more maintains records of the following PCW related activity for 3 yr, maintains these records onsite, and makes these records available to the Department upon request.

(NOTE: Onsite record retention may include the use of electronic media such as computers or telephone facsimiles.)

Verify that PCW-related records include the following:

- date and volume of the PCW removed from the product or PCW tank and shipped offsite

- names and addresses of transporters shipping PCW offsite - name and address of the PCW receiving facility destination - a copy of the shipping paper included with each shipment of PCW - a copy of the written statement provided to the receiving facility from the

producer that the PCW does not contain levels of hazardous constituents above those found in the source of the PCW

- copies of weekly container or tank inspections.

PO.100.6.FL. Transporters shipping PCW for product recovery must meet specific requirements (FAC 62-740.200).

(NOTE: Compliance with this Chapter shall not excuse a transporter from compliance with other applicable Florida laws and Florida Department of Transportation rules.)

Verify that a transporter of PCW destined for recovery is a hazardous waste transporter in compliance with FAC 62-730.170, or has a DEP/EPA ID number by notifying the Department on EPA Form 8700-12 of its intent to transport PCW.

Verify that a transporter who is not a producer or who does not engage in the ultimate recovery of product from PCW does not store PCW for more than 35 days.

Verify that, if a transporter stores PCW in containers or tanks which are not required to be registered under FAC 62-761 or FAC 62-762, the following

Page 311: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-16 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

requirements are met:

- the container or tank is made of or lined with material that is compatible with PCW

- the container or tank is kept closed and stored in a safe manner - the container or tank is clearly labeled or marked with the words

PETROLEUM CONTACT WATER and the date when PCW accumulation first begins after the existing PCW in the container or tank has been removed

- the container or tank is not handled in a manner that may rupture it or cause it to leak

- the container or tank is inspected for leaks and deterioration at least weekly.

Verify that a transporter that stores PCW in tanks required to be registered in accordance with FAC 62-761 or FAC 62-762, manages the tanks in accordance with the applicable requirements for the storage of pollutants.

Verify that a transporter keeps an operating record of the following PCW-related activities for 3 yr and makes the records available to the Department upon request:

- name and location of the person shipping the PCW - date the PCW was picked up - volume of the PCW transported - name and location of the person receiving the PCW - delivery date of the PCW - a copy of the shipping paper used for the shipment of the PCW.

Verify that a transporter does not mix or commingle PCW with any other material

not identified as an example of PCW in the definition of PCW or defined as PCW.

PO.100.7.FL. PCW recovery facilities must meet specific management requirements (FAC 62-740.300(1), (2)(a) and (b), and (6)).

Verify that a recovery facility receiving PCW has one of the following:

- a hazardous waste facility operation permit - an exemption from the hazardous waste permitting process - a used oil processing general permit in accordance with Section 62-710.800.

(NOTE: For the purpose of this permit, the words “used oil” shall mean PCW and the phrase “used oil processing facility” shall mean PCW recovery facility.)

Verify that, if a recovery facility stores PCW in registered aboveground or underground tanks, the applicable requirements for the storage of pollutants as specified in FAC 62-761 or FAC 62-762 are met.

Verify that, if a producer stores PCW in containers or tanks that are not required to be registered under FAC 62-761 or FAC 62-762, the following requirements are

Page 312: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-17 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

met:

- the container or tank is made of or lined with material that is compatible with PCW

- the container or tank is kept closed and stored in a safe manner - the container or tank is clearly labeled or marked with the words

PETROLEUM CONTACT WATER and the date when PCW accumulation first begins after the existing PCW in the container or tank has been removed

- the container or tank is not handled in a manner that may rupture it or cause it to leak

- the container or tank is inspected for leaks and deterioration at least weekly.

Verify that a recovery facility tests and manages all waste residuals after the recovery of product as appropriate in accordance with hazardous waste requirements (FAC 62-730), or other applicable rules of the Department.

PO.100.8.FL. PCW recovery facilities must meet specific recordkeeping requirements (FAC 62-740.300 (2)(c), (3) through (5)).

Verify that PCW recovery facilities maintain records of PCW-related activities for each shipment of PCW received for a minimum of 3 yr, maintain the records onsite, and make the records available to the Department upon request.

Verify that PCW-related records for each shipment include the following:

- name and address of the PCW producer - name and address of the PCW transporter - date of receipt of the PCW shipment - volume of the PCW received - a copy of the shipping paper used for shipment of the PCW - documentation of weekly container or tank inspections.

Verify that a recovery facility is able to demonstrate to the Department by operating procedures or records kept onsite that, under normal operating practices, it recovers product from PCW.

Verify that a recovery facility has written assurances from the producer that the PCW does not contain levels of hazardous constituents above those found in the source of the PCW.

Verify that these written assurances are maintained by the recovery facility for 3 yr.

Verify that a recovery facility maintains records documenting quantities of product recovered from PCW and submits a report to the Department by 1 March of each year.

Verify that the annual report includes the total quantity of the PCW received and

Page 313: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-18 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

an estimate of the total quantity of product recovered from the PCW during the previous calendar year.

Verify that records for each PCW shipment are maintained for a minimum of 3 yr, onsite, and are made available to the Department upon request.

Petroleum-Contamination Sites

PO.100.9.FL. POL contamination and discharges must be reported to the Department (FAC 62-770.250) [Revised July 1997; Revised July 1998; Revised June 2000].

Verify that the Department is notified of discovery of contamination (unless the contamination is the result of a previously reported discharge for which site rehabilitation completion has not been achieved or the contamination is known to be from a non-petroleum product source) or a discharge of petroleum or petroleum products within 1 week of discovery.

Verify that discharges of reportable quantities onto the surface of lands or to surface waters are reported to the State Warning Point or Department of Environmental Protection, Bureau of Emergency Response as soon as possible but no later than 24 hr after occurrence.

PO.100.10.FL. Initial remedial action at POL contamination sites must meet specific requirements (FAC 62-770.300(1)(a), (b), and (d) through (f), and (4)(a)) [Revised July 1998; Revised June 2000].

Verify that, within 3 days of discovery of free product, one of the following actions is taken by the responsible party:

- cleanup services for product recovery are obtained - product recovery is initiated.

Verify that product recovery does not spread contamination into previously uncontaminated areas through untreated discharges, improper treatment, improper disposal, or improper storage.

Verify that product recovery methods are submitted to the Department prior to implementation.

(NOTE: The following methods of product recovery may be implemented without Department or local program approval:

- absorbent pads - skimmer pumps that include pumps with mechanical, electrical, or hand-

bailed purging operations - hand or mechanical bailing - fluid vacuum techniques (for example, vacuum pump trucks) or total fluid

displacement pumps, as long as the technique used does not smear or spread free product or result in contaminating previously uncontaminated media,

Page 314: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-19 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

and the volume of groundwater recovered is not greater than two times the volume of free product recovered, except that the first 1000 gal of the total fluid recovered per discharge are exempt from meeting the required ratio of groundwater to free product.)

(NOTE: Product recovery is complete when free product has been removed to the

maximum extent practicable.)

Verify that written notification is provided to the Department within 10 days after initiation of product recovery.

Verify that an annual status report documenting the recovery progress and summarizing the recovery activities is submitted to the Department.

Verify that a Source Removal Report is submitted to the Department within 60 days of completion of free product removal.

PO.100.11.FL. [Deleted July 1998].

PO.100.12.FL. POL contaminated sites must meet site assessment requirements (FAC 62-770.600(1) and (6)) [Revised July 1998; Citation Revised June 2000].

Verify that a site assessment is initiated within 30 days of discovery of contamination.

Verify that the site assessment includes those tasks necessary to achieve its objectives (see Appendix 8-1).

Verify that 2 copies of a Site Assessment Report are submitted to the Department within 270 days of discovery of contamination.

PO.100.13.FL. [Deleted July 1998].

PO.100.14.FL. POL contamination sites with Remedial Action Plans must meet specific requirements (FAC 62-770.700(1), (11), (12), (13) and (18)) [Citation Revised July 1997; Revised

Verify that within 120 days of approval of the Remedial Action Plan, the operation of the active remediation system is initiated.

Verify that within 120 days of initiating operation of the active remediation system(s), engineering drawings ("as built" drawings) are submitted by the responsible party to the Department or to the local program.

Page 315: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-20 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

June 2000]. Verify that, during implementation of the Remedial Action Plan, status reports of remedial action are submitted annually by the responsible party to the Department or to the local program, unless a greater frequency is specified in the approved Remedial Action Plan.

Verify that the status reports are submitted within 60 days after the anniversary date of initiating operation of the active remediation system.

Verify that, if effluent concentrations or air emissions exceeding those in the approved Remedial Action Plan, or excessive plume migration occur during operation of the treatment system, collective actions are taken and the Department is notified within 7 days.

Verify that, if the condition may represent a threat to human health, safety, or the environment, the Department is notified within 24 h.

(NOTE: Active remediation is complete when the No Further Action or the Natural Attenuation criteria have been met.)

Verify that a Post Active Remediation Monitoring Plan is submitted to the Department when the No Further Action criteria or the leveling off criteria have been achieved.

PO.100.15.FL. [Deleted June 2000].

(NOTE: Regulation repealed.)

PO.100.16.FL. Specific notices must be given during the process of POL contamination site cleanup (FAC 62-770.830).

Verify that persons responsible for conducting site rehabilitation provide a drilling schedule or other written notification to the Department at least 3 days prior to installing monitoring or recovery wells and allow Department personnel the opportunity to observe the installation of the wells.

Verify that persons responsible for conducting site rehabilitation provide written notification to the Department at least 3 days prior to any sampling required, and allow Department personnel to observe sampling and take split samples.

POL-Contaminated Soil Thermal Treatment

(NOTE: FAC 62-775 has been repealed, and PO.100.17.FL. through PO.100.22.FL. have been deleted without further comment. Florida has replaced FAC 62-775 with FAC 62-713, which applies to treatment facilities for soil contaminated with a variety of substances. See SO.175.FL. in the Solid Waste Management chapter for details.)

Page 316: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-21 Petroleum, Oil, and Lubricant (POL) Management

COMPLIANCE CATEGORY: PETROLEUM, OIL, AND LUBRICANT (POL) MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PO.100.17.FL. [Deleted June 2000].

PO.100.18.FL. [Deleted June 2000].

PO.100.19.FL. [Deleted June 2000].

PO.100.20.FL. [Deleted June 2000].

PO.100.21.FL. [Deleted June 2000].

PO.100.22.FL. [Deleted June 2000].

Page 317: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-22 Petroleum, Oil, and Lubricant (POL) Management

Appendix 8-1

Site Assessment Objectives (FAC 62-770.600(2)) [Revised July 1998; Revised June 2000]

The objectives of site assessments are the following, as applicable: 1. to determine or confirm the source(s) of contamination to the extent practicable and to estimate the volume of

petroleum or petroleum products that were released. That confirmation may include a determination of the structural integrity, in accordance with the testing procedures specified in Chapters 62-761 or 62-762, FAC, of any petroleum storage tank system that exists at the site and is likely to be the source of the contamination

2. to establish the horizontal extent and thickness of free product (if the soil concentration of a petroleum products'

contaminant of concern is above its soil saturation concentration (Csat), free product may be present) 3. to determine whether contamination is present, and to determine the horizontal and vertical extent of

contamination in every medium found to be contaminated 4. to estimate the total mass and mass distribution of petroleum or petroleum products in the subsurface as product

entrapped above the water table, free product, and product entrapped below the water table 5. to determine whether source removal in accordance with Rule 62-770.300, FAC, is warranted 6. to identify the aquifer or aquifers expected to be affected by the site and their groundwater classification, unless

the site meets the No Further Action criteria in Rule 62-770.680(1), FAC 7. to identify and characterize any perched zone, if present, unless the site meets the No Further Action criteria in

Rule 62-770.680(1), FAC 8. to describe relevant geologic and hydrogeologic characteristics of affected and potentially affected

hydrogeologic zones, unless the site meets the No Further Action criteria in Rule 62-770.680(1), FAC 9. to describe geologic and hydrogeologic characteristics of the site that influence migration and transport of

petroleum products' contaminants of concern, unless the site meets the No Further Action criteria in Rule 62-770.680(1), FAC

10. to determine the rate and direction of groundwater flow (at all affected depths, as appropriate), to determine the

extent of water table fluctuation, to evaluate the potential effect of seasonal variations on the rate and direction of groundwater flow, and to determine whether there are any tidal effects in sites located near surface water, unless the site meets the No Further Action criteria in Rule 62-770.680(1), FAC

11. to determine other mechanisms of transport of petroleum products' contaminants of concern in the immediate

vicinity of the site, including rate and direction of movement of petroleum products' contaminants of concern in sewer lines, subsurface utility conduits or vaults, soil and surface water, as applicable, unless the site meets the No Further Action criteria in Rule 62-770.680(1), FAC

12. to determine by means of a well survey whether any municipal or public water supply wells are present within a

1/2 mi radius of the site, whether the site is located within the regulated wellhead protection zone of a municipal wellfield or public water supply well, and whether any private water supply wells (including potable, irrigation and industrial) are present within a 1/4 mi radius of the site, unless the site meets the No Further Action criteria in Rule 62-770.680(1), FAC

Page 318: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-23 Petroleum, Oil, and Lubricant (POL) Management

13. to determine whether any surface water will be exposed to contamination originating from the site 14. if non-petroleum products' contaminants of concern are detected during the assessment, to identify the general

location of the source in relation to the site and to evaluate whether the non-petroleum products' contaminants of concern may have an effect on future rehabilitation activities of the petroleum contamination

15. to report any off site activities (for example, dewatering, active remediation, or flood control pumping) in the

immediate vicinity of the site that may have an effect on the groundwater flow at the site, unless the site meets the No Further Action criteria in Rule 62-770.680(1), FAC

16. to evaluate the degree to which human health, safety, or welfare may be affected by exposure to the

contamination 17. to evaluate the effect of the contamination on the environment 18. to facilitate the selection of the most cost-effective remediation strategy for the site that is protective of human

health and the environment, unless No Further Action is deemed appropriate under the provisions of Rule 62-770.680, FAC

Page 319: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-24 Petroleum, Oil, and Lubricant (POL) Management

Appendix 8-2

Soil Sampling and Analysis Parameters and Test Methods (FAC 62-775.410 (1) through (5)) [Deleted June 2000]

Page 320: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

8-25 Petroleum, Oil, and Lubricant (POL) Management

Appendix 8-3

Criteria for Treating PCB Contaminated Soil at a Stationary Thermal Treatment Facility (FAC 62-775.410 (6)) [Deleted June 2000]

Page 321: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-1

Solid Waste Management

SECTION 9

SOLID WASTE MANAGEMENT

Florida Supplement, June 2000 This section covers the state requirements for Solid Waste Management and is intended to supplement the U.S. TEAM Guide. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

Definitions

• Abatement - a remedial action to remove waste tires from a waste tire site (Florida Administrative Code, Title 62, Chapter 711, Section 200(1) (FAC 62-711.200(1))).

• Agricultural Waste - the solid wastes resulting from normal farming operations, the raising and slaughtering of

animals, and the processing of animal products, orchard, and field crops that are stored, transported, or disposed of as an unwanted waste material (FAC 62-701.200(1)).

• Airport - any area of land or water, or any manmade object or facility located thereon, which is used, or intended

for use, for the landing and takeoff of aircraft, and any appurtenant areas that are used, or intended for use, for airport buildings or other airport facilities or rights-of-way, together with all airport buildings and facilities located thereon (FAC 62-701.200(2)).

• Amount of Recovered Materials - the amount of the types of recovered materials received by a certified person

or a registrant, measured in short tons (FAC 62-722.200(1)). • Approved Operator Training Course - an education course designed to train operators of landfills that has been

developed or reviewed by the Solid Waste Management Training Committed and approved by the Secretary of the Department (FAC 62-703.200(1)).

• Aquifer - a geologic formation, group of formations, or part of a formation capable of yielding a significant

amount of groundwater to wells, springs, or surface water (FAC 62-701.200(5)). • Ash Residue - all the solid residue and any entrained liquids resulting from the combustion of solid waste in a

solid waste combustor, including bottom ash, fly ash, and combined bottom and fly ash, but excluding recovered metals glass, and other recovered materials separated from the ash residue (FAC 62-702.200(1)).

• Backyard Composting - the composting of organic solid waste, such as grass clippings, leaves, or food waste,

generated by a homeowner or tenant of a single or multi-family residential unit or an apartment complex unit, where composting occurs at that dwelling unit (FAC 62-709.200(1)).

• Biological Waste Incineration Facility - one or more incinerators located on one or more contiguous or adjacent

properties that are operated or utilized for the disposal or treatment of biological waste and are owned or operated by the same person or by persons under common control (FAC 62- 703.200(2)).

• Biomedical Waste - any solid or liquid waste which may present a threat of infection to humans, including

nonliquid tissue, body parts, blood, blood products and body fluids from humans and other primates; laboratory and veterinary wastes which contain human disease-causing agents; and discarded sharps. The following are also included:

Page 322: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-2

Solid Waste Management

- used, absorbent materials saturated with blood, blood products, body fluids, or excretions or secretions contaminated with visible blood; and absorbent materials saturated with blood or blood products that have dried.

- non-absorbent disposable devices that have been contaminated with blood, body fluids or secretions or excretions visibly contaminated with blood, but have not been treated by an approved method (FAC 64E-16.002)[Revised July 1998].

• Biomedical Waste Generator - a facility or person that produces biomedical waste. The term includes hospitals,

skilled nursing or convalescent hospitals, intermediate care facilities, clinics, dialysis clinics, dental offices, health maintenance organizations, surgical clinics, medical buildings, physicians' offices, laboratories, veterinary clinics, and funeral homes. Mobile health care units, such as bloodmobiles, that are part of a stationary biomedical waste generator, are not considered individual biomedical waste generators. Funeral homes that do not practice embalming are not considered biomedical waste generators (FAC 64E-16.002)[Revised July 1998].

• Bird Hazard - an increase in the likelihood of bird/aircraft collisions that may cause damage to the aircraft or

injury to its occupants (FAC 62-701.200(8)). • Body Fluids - those fluids that have the potential to harbor pathogens, such as human immunodeficiency virus

and hepatitis B virus and includes lymph, semen, vaginal secretions, cerebrospinal, synovial, pleural, peritoneal, pericardial, and amniotic fluids. In instances when identification of the fluid can not be made, it shall be considered to be a regulated body fluid. Body excretions such as feces, and secretions such as nasal discharges, saliva, sputum, sweat, tears, urine, and vomitus shall not be considered biomedical waste, unless visible contaminated with blood (FAC 64E-16.002) [Revised July 1998].

• Bottom Ash - the solid material remaining after combustion of solid waste, that is discharged from the grates or

stoker of a solid waste combustor (FAC 62-702.200(1)(a)). • Bulky Wastes - items whose large size or weight precludes or complicates their handling by normal collection,

processing, or disposal methods (FAC 62-701.200(9)). • Cell - a volume of solid waste received since the last previous application of initial cover. The compacted waste

and subsequent initial cover constitute a cell which usually contains wastes deposited in one day (FAC 62-701.200(10)).

• Certified Person - any person who handles, purchases, receives, recovers, sells, or is an end user of recovered

materials, reports to and is certified by the Department. A person whose activities are limited strictly to the transportation of recovered materials is not considered to be a person who handles, purchases, receives, recovers, sells, or is an end user of recovered materials (FAC 62-722.200(2)).

• Class I Landfills - landfills that receive an average of 20 tons or more or solid waste per day. Class I landfills

receive general, nonhazardous household, commercial, industrial, and agricultural wastes (FAC 62-701.340(3)(a) and (c)).

• Class II Landfills - landfills that receive an average of less than 20 tons of solid waste per day. Class II landfills

receive general, nonhazardous household, commercial, industrial, and agricultural wastes (FAC 62-701.340(3)(b) and (c)).

• Class III Landfills - landfills that receive only yard trash, construction and demolition debris, waste tires,

asbestos, carpet, cardboard, paper, glass, plastic, furniture, other than appliances, or other materials approved by the Department that are not expected to produce leachate that poses a threat to public health or the environment. Class III landfills do not accept putrescible household waste. Class III landfills are exempted from some or all

Page 323: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-3

Solid Waste Management

of the requirements for liners, leachate controls, and water quality monitoring, if so determined by the Department (FAC 62-701.340(3)(d)).

• Clean Debris - any solid waste that is virtually inert, that is not a pollution threat to groundwater or surface

waters, that is not a fire hazard, and that is likely to retain its physical and chemical structure under expected conditions of disposal or use. The term includes brick, glass, ceramics, and uncontaminated concrete including embedded pipe or steel (FAC 62-701.200(11)).

• Cleaned Soil - soil which has been treated at a soil treatment facility, which has received a completed post-

treatment analysis, and which meets all of the criteria specified in Rule 62-713.520(2), F.A.C. (FAC 62-713.200) [Added June 2000].

• Closing - the time at which a solid waste management facility ceases to accept wastes, and includes those actions

taken by the owner or operator of the facility to prepare the facility for any necessary monitoring and maintenance after closing (FAC 62-701.200(12)).

• Closure - the cessation of operation of a solid waste management facility and the act of securing such a facility

so that it will pose no significant threat to human health or the environment. This includes closing, long term monitoring, maintenance, and financial responsibility (FAC 62- 701.200(13)).

• Co-disposal - the disposal of two or more different types of waste in the same solid waste disposal unit (FAC

62-702.200(3)). • Combustion - the treatment of solid waste in a device that uses heat as the primary means to change the

chemical, physical, or biological character or composition of the waste. Combustion processes include incineration and pyrolysis (FAC 62-702.200(4)).

• Commercial Solid Waste - all types of solid waste generated by stores, offices, restaurants, warehouses, and

other nonmanufacturing activities, excluding residential and industrial wastes (FAC 62-701.200(15)). • Composite Liner - a liner comprised of a geomembrane, which is underlain and in direct contact with a soil

component (FAC 62-701.200(18)). • Compost - solid waste that has undergone biological decomposition of organic matter, and has been disinfected

using composting or similar technologies, and has been stabilized to a degree that is potentially beneficial to plant growth and that is used or sold for use as a soil amendment, artificial top soil, growing medium amendment, or other similar uses (FAC 62-709.200(2)).

• Composting - the process by which biological decomposing of organic solid waste is carried out under

controlled aerobic conditions, and which stabilizes the organic fraction into a material that can easily and safely be stored, handled, and used in an environmentally acceptable manner. The presence of anaerobic zones within the composting material will not cause the process to be classified as other than composting. Simple exposure of solid waste under uncontrolled conditions resulting in natural decay is not composting (FAC 62-709.200(3)).

• Composting Facility - a solid waste management facility where solid waste is processed using composting

technology. Processing may include physical turning, windrowing, aeration, or other mechanical handling of organic matter (FAC 62-709.200(4)).

• Construction and Demolition Debris - materials generally considered to be not water soluble and nonhazardous

in nature, including but not limited to steel, glass, brick. concrete, asphalt material, pipe, gypsum, wallboard, and lumber, from the construction or destruction of a structure as part of a construction or demolition project or from

Page 324: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-4

Solid Waste Management

the renovation of a structure. The term includes rocks, soils, tree remains, trees, and other vegetative matter that normally result from land clearing or land development operations for a construction project including such debris from construction of structures at a site remote from the construction or demolition project site. Mixing of construction and demolition debris with other types of solid waste, including material that is not from the actual construction or destruction of a structure, will cause it to be classified as other than construction and demolition debris (FAC 62-701.200(19)).

• Contaminated - soiled by any biomedical waste (FAC 64E-16.002)[Citation Revised July 1998]. • Contaminated Soil - soil that has become contaminated with concentrations of chemical constituents that (FAC

62-713.200) [Added June 2000]: 1. are in excess of the Residential Direct Exposure soil cleanup target levels in Table II of Chapter 62-777,

F.A.C.; 2. are in excess of the soil cleanup target levels calculated in accordance with Rule 62-713.520(2)(c), F.A.C.;

or 3. are expected to result in exceedances of the Department's ground water or surface water standards or

criteria as evaluated in Rule 62-713.510(6)(d), F.A.C. • Curing Area - an area where organic material that has undergone the rapid initial stage of composting is further

stabilized into a humus-like material (FAC 62-709.200(5)). • Decontamination - the process of removing pathogenic microorganisms from objects or surfaces, thereby

rendering them safe for handling (FAC 64E-16.002)[Added July 1998]. • Department - the State of Florida Department of Environmental Protection (FAC 62-701.200(20)). • Department - the Department of Health or its representative county health department (FAC 64E-

16.002)[Added July 1998]. • Design Period - the operating life of the solid waste management facility plus any long-term care period after

closing (FAC 62-701.200(21)). • Disease Vectors - any rodents, flies, mosquitoes, or other animals, including insects, capable of transmitting

disease to humans (FAC 62-701.200(22)).

• Disinfection - a process which results in a minimum Log 6 kill against the vegetative organisms listed in Table 1, and a minimum Log 4 kill against Bacillus stearothermophilus spores utilizing steam or a minimum Log 4 kill against Bacillus Subtilis spores utilizing dry heat, chemicals, or microwave shredding (64E-16.0020[Revised July 1998].

• Disposal - the discharge, deposit, injection, dumping, spilling, leaking, or placing of any solid waste into or

upon any land or water so that such solid waste or any constituent thereof may enter other lands or be emitted into the air or discharged into any waters, including groundwaters, or otherwise enter the environment (FAC 62-701.200(23)).

• End User - a person who makes a product utilizing recovered materials as a raw material in place of, or in

addition to, virgin raw materials and who receives more than 600 tons/yr of recovered materials from persons in Florida who are not certified (FAC 62-722.200(4)).

• Engineer of Record - a professional engineer registered in the state of Florida that is appointed by the

owner/operator of the solid waste management facility (FAC 62-701.200(24)).

Page 325: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-5

Solid Waste Management

• Exempt Generator - either of the following:

1. any person who produces recovered materials 2. a generator who annually transfers all of its recovered materials to a person who is certified by the

Department, or who annually transfers an amount of recovered materials less than 600 tons to any combination of in-state persons who make a product utilizing recovered materials as a raw material in place of, or in addition to, virgin raw materials, or to persons out of Florida (FAC 62-722.200(5)).

• Facility - all contiguous land and structures, other appurtenances, and improvements on the land used for solid

waste management (FAC 62-701.200(25)). • Facility- all contiguous land, structures, and other appurtenances which are owned, operated, and licensed as a

single entity which may consist of several generating, treatment, or storage units (FAC 64E-16.002)[Added July 1998].

• Facility Operator - any person, including the owner, who is principally engaged in, and is in charge of, the

actual operation, supervision, and maintenance of a solid waste management facility and includes the onsite person in charge of a shift or period of operation during any part of the day, such as facility managers, supervisors, and equipment operators. It does not include office personnel, laborers, equipment operators not in a supervisory capacity, transporters, corporate directors, elected officials, or other persons in managerial roles unless such persons are directly involved in onsite supervision or operation of a solid waste management facility (FAC 62-703.200(5)).

• Fill - manmade deposits of earth or waste materials used to fill excavations, to increase the vertical or horizontal

extent of land or solid waste disposal units, or to build embankments (FAC 62-701.200(26)). • Final Cover - the materials used to cover the top and sides of a landfill when fill operations cease

(FAC 62-701.200(27)). • Fly Ash - the residue from the combustion of solid waste, that is entrained in the gas stream of a solid waste

combustor. Fly ash includes particulates, cinders, soot, and solid waste from air pollution control equipment (FAC 62-702.200(1)(b)).

• Foreign Matter - the inorganic and organic constituents in a solid waste stream that are not readily decomposed

and that may be present in the compost. For purposes of these regulations, foreign matter is metals, glass, plastics, rubber, bones, and leather, but does not include sand, grit, rocks, or other similar materials (FAC 62-709.200(7)).

• Fugitive Emissions - those emissions that could not reasonably pass through a stack, chimney, vent, or other

functionally equivalent opening (FAC 62-702.200(6)). • Garbage - all kitchen and table food waste, and animal or vegetative waste that is attendant with or results from

the storage, preparation, cooking, or handling of food materials (FAC 62-701.200(28)). • Gas Condensate - the liquid generated as a result of gas recovery processes at a landfill (FAC 62-701.200(29)). • Gas Control System - a system of wells, trenches, pipes, and other related structures that vent the gas produced

in a solid waste disposal unit to the atmosphere (FAC 62-701.200(30)). • Gas Recovery Facility - a system of wells, trenches, pipes, and other related ancillary structures such as

manholes, compressors, and monitoring installations that collect and transport the gas produced in a waste

Page 326: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-6

Solid Waste Management

disposal unit to one or more gas processing points or flares. The flow of gas through such a system may be produced by naturally occurring gas pressure gradients or may be aided by an induced draft generated by mechanical means (FAC 62-701.200(31)).

• Generation - the act or process of producing solid waste (FAC 62-701.200(32)). • Geomembrane - a low-permeability synthetic membrane used as an integral part of a system designed to limit

the movement of liquid or gas in the system (FAC 62-701.200(33)). • Geotextile - a permeable textile used as a part of a system designed to act as a filter to prevent the flow of fine

particles into drainage systems, to provide planar flow for drainage, to serve as a cushion to protect geomembranes, or to provide structural support (FAC 62-701.200(35)).

• Groundwater - water beneath the surface of the ground within a zone of saturation, whether or not it is flowing

through known and definite channels (FAC 62-701.200(36)). • Health Care Provider - any person who provides medical care or personal services, as that term is defined in

section 400.402, F.S., to another individual (FAC 64E-16.002) [Revised July 1998]. • Home User - an individual who generates biomedical waste as a result of self-care or care by family member or

other non health care provider (FAC 64E-16.002) [Added July 1998]. • Household Waste - any solid waste, including garbage, trash, and sanitary waste in septic tanks, derived from

households, including single and multiple residences, hotels and motels, bunkhouses, ranger stations, crew quarters, campgrounds, picnic grounds, and day-use recreation areas (FAC 62-701.200(38)).

• Indoor - within a structure that excludes rain and public access and that would control air flows in the event of a

fire (FAC 62-711.200(3)). • Industrial Solid Waste - solid waste generated by manufacturing or industrial processes that is not a hazardous

waste. Such waste may include, but is not limited to, waste resulting from the following manufacturing processes: electric power generation; fertilizer/agricultural chemicals; food and related products or byproducts; inorganic chemicals; iron and steel manufacturing; leather and leather products; nonferrous metals manufacturing or foundries; organic chemicals; plastics and resins manufacturing; pulp and paper industry; rubber and miscellaneous plastic products; stone, glass, clay, and concrete products; textile manufacturing; transportation equipment; and water treatment. This term does not include mining waste or oil and gas waste (FAC 62-701.200(39)).

• Initial Cover - a 6-in. layer of compacted earth, used to cover an area of solid waste before placement of

additional waste, intermediate cover, or final cover. The term also includes other material or thickness, approved by the Department, that minimizes disease vector breeding, animal attraction, and moisture infiltration, minimizes fire potential, prevents blowing litter, controls odor, and improves landfill appearance (FAC 62-701.200(40)).

• Interim Operator - a person who has, in the opinion of the facility manager, shown competency in his chosen

occupation through a combination of work experience, education, and training and who has at least 1 yr of experience at that facility or a similar facility (FAC 62-703.200(4)).

• Intermediate Cover - a layer of compacted earth at least 1 ft in depth applied to a solid waste disposal unit. The

term also includes other material or thickness, approved by the Department, that minimizes disease vectors, odors, and fire, and is consistent with the leachate control design of the landfill (FAC 62-701.200(41)).

Page 327: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-7

Solid Waste Management

• Land Clearing Debris - rocks, soils, tree remains, trees, and other vegetative matter which normally results from

land clearing or land development operations for a construction project. Land clearing debris does not include vegetative matter from lawn maintenance, commercial or residential landscape maintenance, right-of-way or easement maintenance, farming operations, nursery operations, or any other sources not related directly to a construction project (FAC 62-701.803(1)).

• Land Reclamation - the restoration of productivity to lands made barren through processes such as erosion,

mining, or land clearing (FAC 62-709.200(8)). • Landfill - a solid waste disposal facility, that is an area of land or an excavation where wastes are or have been

placed for disposal, for which a permit, other than a general permit, is required. This term does not include: 1. a land spreading site 2. a surface impoundment 3. an injection well (FAC 62-701.200(42)).

• Lateral Expansion - any horizontal increase in the dimensions of the waste boundary of an existing solid waste

disposal unit (FAC 62-701.200(43)). • Leachate - liquid that has passed through or emerged from solid waste and may contain soluble, suspended, or

miscible materials (FAC 62-701.200(44)). • Leak Resistant - prevents liquid from escaping to the environment in the upright position (FAC 64E-

16.002)[Revised July 1998]. • Lift - a completed horizontal series of cells (FAC 62-701.200(45)). • Lined Landfill - a landfill constructed with a liner made of synthetic materials, low-permeability soils, or a

combination of these materials, that has been permitted by the Department, and that meets the Department's landfill design criteria at the time of permitting (FAC 62-701.200(46)).

• Liner - a continuous layer of low-permeability natural or synthetic materials, under the bottom and sides of a

landfill, solid waste disposal unit, or leachate surface impoundment, that controls the downward or lateral escape of waste constituents or leachate (FAC 62-701.200(47)).

• Liner System - a system of leachate collection and liner layers comprised of natural or synthetic materials

installed between the subgrade and the waste for the purpose of containing the waste and collecting and removing leachate (FAC 62-701.200(48)).

• Liquid Waste - any waste material that is determined to contain free liquids as defined by Method 9095 (Paint

Filter Liquids Test), as described in Test Methods for Evaluating Solid Wastes, Physical/Chemical Methods (USEPA Pub. No. SW-846) (FAC 62-701.200(49)).

• Lower Explosive Limit (LEL) - the lowest percent by volume of a mixture of explosive gases that will propagate

a flame in air at a temperature of 25 οC and atmospheric pressure (FAC 62-701.200(50)). • Manure - a solid waste composed of excreta of animals, and residual materials that have been used for bedding,

sanitary, or feeding purposes for such animals. For the purposes of these regulations, manure does not mean such material generated and managed by normal farming operations (FAC 62-709.200(9)).

Page 328: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-8

Solid Waste Management

• Materials Recovery - any process by which one or more of the various components in solid waste is separated and concentrated for reuse (FAC 62-701.200(51)).

• Materials Recovery Facility - a solid waste management facility that provides for the extraction from solid waste

of recyclable materials, material suitable for use as a fuel or soil amendment, or any combination of such materials (FAC 62-701.200(52) and FAC 62-722.200(6)).

• Mercury-Containing Device - any electrical product, or other device, excluding batteries and lamps, that is

determined by the department as proven to release mercury into the environment (Florida Statutes (FS) 403.7186(1)) [Added May 1999].

• Mesophilic Stage - a biological stage in the composting process characterized by active bacteria that favor a

moderate temperature range of 20 to 45 οC. It occurs later in a composting process after the thermophilic stage and is associated with a moderate rate of decomposition (FAC 62- 709.200(10)).

• Mobile Soil Treatment Facility - a soil thermal treatment facility which is transported to a soil contamination site

for the sole purpose of treating petroleum contaminated soil from that specific site (FAC 62-713.200) [Added June 2000].

• Monitoring Wells - strategically located wells from which water samples are drawn for water quality analysis

(FAC 62-701.200(54)). • Monofill - a waste pile, landfill, or solid waste disposal unit into which only one type of solid waste is placed

(FAC 62-702.200(8)). • Motor Vehicle - an automobile, motorcycle, truck, trailer, semitrailer, truck tractor and semitrailer combination,

or any other vehicle operated on the roads of Florida, used to transport persons or property, and propelled by power other than muscular power. The term does not include traction engines, road rollers, such vehicles as run only upon a track, bicycles, moped, or farm tractors or trailers (FAC 62-711.200(4)).

• Nonexempt Generator - either of the following:

1. any person who produces recovered materials 2. any person generally who annually transfers an amount in excess of 600 tons of recovered materials to any

combination of in-state persons who make a product utilizing recovered materials as a raw material in place of, or in addition to, virgin raw materials, or to persons out of Florida (FAC 62-722.200(7)).

• Non-Petroleum Contaminated Soil - contaminated soil which does not meet the definition of petroleum

contaminated soil (FAC 62-713.200) [Added June 2000]. • 100-yr Floodplain - the lowland and relatively flat areas adjoining inland and coastal waters, including flood-

prone areas of offshore islands, that are inundated by the 100-yr flood (FAC 62-701.200(56)). • Onsite - on the same or geographically contiguous property, that may be divided by public or private right-of-

way (FAC 62-701.200(57)). In regard to biomedical waste, "onsite" means an area that is part of, or included on the license of and at the same physical address as the facility where the biomedical waste is generated (FAC 10D-104.002(17)).

• Open Burning - the burning of any material under such conditions that the products of combustion are emitted

directly into the atmosphere (FAC 62-701.200(58)).

Page 329: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-9

Solid Waste Management

• Operator - any person, including the owner, who is principally engaged in, and is in charge of, the actual operation, supervision, and maintenance of a solid waste management facility (FAC 62-701.200(59)).

• Outer Container - any rigid type container used to enclose packages of biomedical waste (FAC 64E-16.002)

[Revised July 1998]. • Packages - any material that completely envelops biomedical waste. This includes red bags, sharps containers,

and outer containers (FAC 64E-16.002) [Revised July 1998]. • Person - any individual, partnership, corporation, association, or public body engaged in the generation, storage,

transport, or treatment of biomedical waste (FAC 64E-16.002) [Added July 1998]. • Person - any and all persons, natural or artificial, including any individual, firm, or association; any municipal or

private corporation organized or existing under the laws of Florida or any other state; any county of Florida; and any governmental agency of Florida or the Federal Government (FAC 62-701.200(60)).

• Petroleum Contaminated Soil - soil which has become contaminated with one or more of the following liquid

products made from petroleum: all forms of fuel known as gasoline, diesel fuel, jet fuel, kerosene, grades 2 through 6 fuel oils, crude oil, bunker C oil, residual oils; and non-hazardous petroleum based lubricating, hydraulic, and mineral oils. This definition includes soil which, although predominantly contaminated with petroleum, also contains small amounts of volatile organic halocarbons provided the total weight of the volatile organic halocarbons in the soil is less than one percent of the total weight of petroleum contamination in the soil as determined by a total recoverable petroleum hydrocarbon analysis (FAC 62-713.200) [Added June 2000].

• Point of Origin - the room or area where the biomedical waste is generated (FAC 64E-16.002) [Revised July

1998]. • Processed Tire - a tire that has been treated mechanically, chemically, or thermally so that the resulting material

is a marketable product or is suitable for proper disposal (FAC 62-711.200(6)). • Processing - any technique designed to change the physical, chemical, or biological character or composition of

any solid waste so as to render it safe for transport, amenable to recovery, storage, or recycling; safe for disposal; or reduced in volume or concentration (FAC 62-701.200(62)).

• Professional Engineer - an engineer registered in the State of Florida (FAC 62-701.200(63)). • Professional Geologist - a geologist registered in the State of Florida (FAC 62-701.200(64)). • Public Sharps Collection Program - a cooperative program designed as a non-profit community service to assist

the home user in the safe disposal of discarded sharps (FAC 64E-16.002) [Added July 1998]. • Puncture Resistant - able to withstand punctures from contained sharps during normal usage and handling (FAC

64E-16.002) [Revised July 1998]. • Quantity - weight, volume, or actual number of tires. For purposes of these regulations, assume that, for

passenger tires, there are 100 tires/ton and 10 tires/yd3 and that, for truck tires, there are 20 tires/ton (FAC 62-711.200(7)).

• Recovered Materials - metal, paper, glass, plastic, textile, or rubber materials that have known recycling

potential, can be feasibly recycled, and have been diverted and source separated or have been removed from the solid waste stream for sale, use, or reuse as raw materials, whether or not the materials require subsequent

Page 330: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-10

Solid Waste Management

processing or separation from each other, but does not include materials destined for any use that constitutes disposal. Recovered materials as described above are not solid waste (FAC 62-701.200(65) and FAC 62-722.200(9)).

• Recovered Materials Processing Facility - a facility engaged solely in the storage, processing, resale, or reuse of

recovered materials (FAC 62-722.200(10)). • Recyclable Material - those materials that are capable of being recycled and that would otherwise be processed

or disposed of as solid waste (FAC 62-701.200(66)). • Recycling - any process by which solid waste, or materials that would otherwise become solid waste, are

collected, separated, or processed and reused or returned to use in the form of raw materials or products (FAC 62-701.200(67)).

• Residuals - any liquids, sludges, metals, fabric, or by-products resulting from the processing or storage of tires.

Residuals do not include processed tires held for recycling or disposal (FAC 62-711.200(8)). • Resource Recovery - the process of recovering materials or energy from solid waste, excluding those materials

or solid waste under control of the Nuclear Regulatory Commission (FAC 62-701.200(68)). • Restricted - the use of any measure, such as a lock, sign, or location, to prevent unauthorized entry (FAC 64E-

16.002) [Revised July 1998]. • Sanitary Nuisance - a condition created by any person, or the keeping, maintaining, propagation, existence, or

permitting of anything by a person by which the health or lives of individuals may be threatened or impaired, or by which disease may be caused or transmitted (FAC 62-701.200(69)).

• Saturated - soaked to capacity (FAC 64E-16.002) [Citation Revised July 1998]. • Sealed - free from openings that allow the passage of liquids (FAC 64E-16.002) [Citation Revised July 1998]. • Sharps - objects capable of puncturing, lacerating, or otherwise penetrating the skin (FAC 64E-16.002) [Revised

July 1998]. • Sharps Container - a rigid, leak and puncture resistant container, designed primarily for the containment of

sharps, clearly labeled with the phrase and international biological hazard symbol as described in section 64E-16.004(2)(a), FAC, and manufactured with dyes meeting the requirements for incidental metals as described in section 64E-16.004(2)(b)1.b., FAC (FAC 64E-16.002) [Added July 1998].

• Shredding - a process of reducing the particle size of solid waste through the use of grinding, shredding, milling,

or rasping machines (FAC 62-701.200(70)). • Site - the area of land or water within the property boundaries of a solid waste management facility where one or

more solid waste processing, resource recovery, recycling, storage, or disposal areas are located (FAC 62-701.200(71)).

• Sludge - a solid waste pollution control residual that is generated by any industrial or domestic wastewater

treatment plant, water supply treatment plant, air pollution control facility, septic tank, grease trap, portable toilet or related operation, or any other such waste having similar characteristics . Sludge may be a solid, liquid, or semisolid waste, but does not include the treated effluent from a wastewater treatment plant (FAC 62-701.200(72)).

Page 331: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-11

Solid Waste Management

• Small Quantity - an amount less than 600 tons/yr of the total amount of all recovered materials handled,

purchased, received, recovered, sold, or used by a person (FAC 62-722.200(12)). • Soil Treatment Facility - either a stationary or mobile facility designed, constructed or utilized, and permitted by

the Department to handle, store, and treat or process contaminated soil. The term does not include electrical power plants in which thermal treatment of contaminated soil from its own property results in ash which is disposed of in accordance with Chapters 62-701 or 62-702, F.A.C., and it does not include facilities which treat hazardous wastes (FAC 62-713.200) [Added June 2000].

• Solid Waste - sludge unregulated under the Federal Clean Water Act or Clean Air Act; sludge from a waste

treatment works, water supply treatment plant, or air pollution control facility; or garbage, rubbish, refuse, special waste, or other discarded material, including solid, liquid, semisolid, or contained gaseous material resulting from domestic, industrial, commercial, mining, agricultural, or governmental operations. Materials not regulated as solid waste are:

1. recovered materials 2. nuclear source or byproduct materials 3. suspended or dissolved materials in domestic sewage effluent or irrigation return flows, or other regulated

point source discharges 4. regulated air emissions 5. fluids or wastes associated with natural gas or crude oil exploration or production (FAC 62-701.200(73)).

• Solid Waste Combustor - an enclosed device that uses controlled combustion, the primary purpose of which is to

thermally break down solid, liquid, or gaseous combustible solid waste to an ash residue that contains little or no combustible material (FAC 62-702.200(11)).

• Solid Waste Disposal Facility - any solid waste management facility that is the final resting place for solid

waste, including landfills and incineration facilities that produce ash from the process of incinerating municipal solid waste (FAC 62-701.200(74)).

• Solid Waste Disposal Unit - a discrete area of land used for the disposal of solid waste (FAC 62-701.200(75)). • Solid Waste Management - the process by which solid waste is collected, transported, stored, separated,

processed, or disposed of in any other way, according to an orderly, purposeful, and planned program that includes closure and long-term maintenance (FAC 62-701.200(76)).

• Solid Waste Management Facility - any solid waste disposal area, volume reduction plant, transfer station,

materials recovery facility, or other facility, the purpose of which is resource recovery or the disposal, recycling, processing, or storage of solid waste. The term does not include recovered materials processing facilities, except the portion of such facilities, if any, that is used for the management of solid waste (FAC 62-701.200(77)).

• Source Separated - the recovered materials separated from solid waste where the recovered materials and solid

waste are generated. The term does not require that various types of recovered materials be separated from each other and recognizes de minimis solid waste, in accordance with industry standards and practices, may be included in the recovered materials (FAC 62-722.200(13)).

• Special Wastes - solid waste that can require special handling and management, including, but not limited to,

white goods, waste tires, used oil, lead-acid batteries, construction and demolition debris, ash residue, yard trash, and biological waste (FAC 62-701.200(78)).

Page 332: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-12

Solid Waste Management

• Spent Mercury-Containing Lamp or Spent Lamp - a lamp for which mercury is required for its operation that has been used and removed from service and that is to be discarded (Florida Statutes (FS) 403.7186(1)) [Added May 1999].

• Stabilized - biological and chemical decomposition of the waste has ceased or diminished to a level so that such

decomposition no longer poses a pollution, health, or safety hazard (FAC 62- 701.200(79)). In regard to composting, stabilized means that the compost has at least passed through the thermophilic stage, and that biological decomposition of the solid waste has occurred to a sufficient degree that will allow beneficial use (FAC 62-709.200(12)).

• Stationary Soil Treatment Facility - a facility which treats soil contaminated with petroleum or other chemical

contaminants which is generated at off-site locations and transported to the facility (FAC 62-713.200) [Added June 2000].

• Sterilization - a process which results in a minimum Log 6 kill against Bacillus stearothermophilus spores

utilizing steam or a minimum Log 6 kill against Bacillus Subtilis spores utilizing dry heat, chemicals, or microwave shredding (FAC 64E-16.002) [Added July 1998].

• Storage -- The holding of packaged biomedical waste for a period longer than three days at a facility or in a

transport vehicle (FAC 64E-16.002) [Added July 1998]. • Thermophilic Stage - a biological stage in the composting process characterized by active bacteria that favor a

high temperature range of 45 to 70 οC. It occurs early in a composting process before the mesophilic stage and is associated with a high rate of decomposition (FAC 62-709.200(13)).

• Tire - a continuous solid or pneumatic rubber covering encircling the wheel of a motor vehicle

(FAC 62-711.200(10)). • Tire Disposal - to deposit, dump, spill, or place any waste tire or residuals into or upon any structure, land, or

water. Tire disposal also includes the burning of any waste tire or residuals in a waste-to-energy facility, incinerator, or other facility used solely for the disposal of solid waste (FAC 62- 711.200(11)).

• Tire Recycling - any process by which waste tires or residuals are reused or returned to use in the form of

products or raw materials (FAC 62-711.200(12)). • Trained Operator - a person who has shown competency in his/her chosen occupation through a combination of

work experience, education, training, and successful completion of an examination, or operators who have successfully completed certain training courses (FAC 62-703.200(9)).

• Transfer - the movement of biomedical waste within a facility (FAC 64E-16.002) [Added July 1998]. • Transfer Station - a site whose primary purpose is to store or hold solid waste for transport to a processing or

disposal facility. It does not include green boxes, compactor units, permanent dumpsters, and other containers from which solid wastes are transported to a landfill or other solid waste management facility (FAC 62-701.200(81)).

• Transport - the movement of biomedical waste away from a facility (FAC 64E-16.002) [Added July 1998]. • Transport Vehicle - a motor vehicle, as defined in Section 320.01, F.S., a rail car, watercraft or aircraft, used for

the transportation of biomedical waste (FAC 64E-16.002) [Revised July 1998].

Page 333: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-13

Solid Waste Management

• Treated Soil - soil which has undergone treatment at a soil treatment facility to reduce the levels of contaminants in the soil. Treated soil includes cleaned soil, soil which has undergone treatment but has not yet been analyzed, and soil which has undergone treatment but does not meet the definition of cleaned soil. Treated soil does not include soil which has been blended but not undergone any other treatment processing at the facility (FAC 62-713.200) [Added June 2000].

• Treatment - any process, including steam, chemicals, microwave shredding, or incineration, that changes the

character or composition of biomedical waste to render it noninfectious by disinfection or sterilization (FAC 64E-16.002) [Revised July 1998].

• Type of Recovered Material - old newspaper (ONP), old corrugated containers (OCC), high grade/office paper,

mixed paper, plastic bottles, all other plastic, aluminum cans, other nonferrous, steel cans, other ferrous (other than used oil filters), glass, rubber (other than waste tires), and textiles (FAC 62-722.200(14)).

• Unlined Landfill - a landfill that does not have a bottom liner system that was approved by the Department as

part of a construction permit, or which has a bottom liner system that does not or did not meet the Department's landfill design criteria at the time of construction. This term includes landfills underlain by only in-situ soils unless these soils have been tested and approved by the Department as part of a construction permit (FAC 62-701.200(82)).

• Uppermost Aquifer - the geologic formation nearest the natural ground surface that is an aquifer, as well as

lower aquifers that are hydraulically interconnected with this aquifer within a facility's property boundary (FAC 62-701.200(84)).

• Used Tire - a whole waste tire that has a minimum tread depth of 3/32 in. or greater and is suitable for use on a

motor vehicle (FAC 62-711.200(13)). • Vector - a carrier organism that is capable of transmitting a pathogen from one organism to another (FAC 62-

709.200(14)). • Veterinary Waste - used needles generated during the care of any animal; body tissues, organs, carcasses, blood,

blood products, and body fluids removed from and sharps used on nonhuman primates; body parts, sharps, carcasses, bedding material, excretions, secretions, saturated absorbent materials, and tissues of animals contaminated with or exposed to a human disease-causing agent, typically generated in the research or pharmaceutical setting (FAC 10D-104.002(29)).

• Volume Reduction Plant - an incinerator, pulverizer, compactor, shredding and baling plant, composting plant,

or other plant that accepts and processes solid waste for recycling or disposal (FAC 62-701.200(85)). • Waste Tire - a tire that has been removed from a motor vehicle and has not been retreaded or regrooved. Waste

tire includes used tires and processed tires (FAC 62-711.200(14)). • Waste Tire Collection Center - a site where waste tires are collected from the public before being offered for

recycling or disposal and where fewer than 1000 tires are kept onsite on any given day (FAC 62-711.200(15)). • Waste Tire Collector - a person who transports more than 25 waste tiers over public highways at any one time

(FAC 62-711.200(16)). • Waste Tire Processing Facility - a site where equipment is used to recapture reusable byproducts from waste

tires or to cut, burn, or otherwise alter waste tires so that they are no longer whole. The term includes mobile waste tire processing equipment (FAC 62-711.200(17)).

Page 334: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-14

Solid Waste Management

• Waste Tire Site - a site at which 1000 or more waste tires are accumulated (FAC 62-711.200(18)). • White Goods - inoperative and discarded refrigerators, ranges, washers, water heaters, freezers, and other similar

domestic and commercial large appliances (FAC 62-701.200(88)). • Working Face - that portion of a landfill where waste is deposited, spread, and compacted before placement of

initial cover (FAC 62-701.200(89)). • Yard Trash - vegetative matter resulting from landscaping maintenance or land clearing operations and includes

materials such as tree and shrub trimmings, grass clippings, palm fronds, trees, and tree stumps (FAC 62-701.200(90)).

Page 335: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-15

Solid Waste Management

Page 336: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-16

Solid Waste Management

SOLID WASTE MANAGEMENT GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: Missing Checklist Items SO.2.1.FL. General SO.5.1.FL. through SO.5.3.FL. Permits/Notifications/Exemptions SO.6.1.FL. and SO.6.2.FL. Operations SO.8.1.FL. Specific Wastes SO.9.1.FL. through SO.9.5.FL. Transfer Facilities SO.15.1.FL. through SO.15.4.FL. (NOTE: The checklist items in SO.10.1.FL. through SO.10.4.FL. have been moved to SO.15.1.FL. through SO.15.4.FL.; May 1999)

Recycling SO.25.1.FL. through SO.25.4.FL. Resource Recovery Facilities SO.95.1.FL. through SO.95.3.FL. Medical Waste

Generators SO.105.1.FL. through SO.105.8.FL. Containers/Labeling/Storage Areas SO.110.1.FL. through SO.110.33.FL. Transportation SO.115.1.FL. through SO.115.14.FL. Treatment/Disposal SO.120.1.FL. through SO.120.16.FL. Documentation SO.125.1.FL. and SO.125.2.FL.

Landfills Permits SO.135.1.FL. and SO.135.2.FL. Location Restrictions SO.135.3.FL. Construction and Design Criteria SO.135.4.FL. through SO.135.11.FL. Operating Criteria SO.135.12.FL. through SO.135.23.FL. Monitoring Criteria SO.135.24.FL. through SO.135.30.FL. Closure Criteria SO.135.31.FL. through SO.135.38.FL. Postclosure Care Requirements SO.135.39.FL. through SO.135.43.FL. Documentation SO.135.44.FL. through SO.135.48.FL.

Construction/Demolition Landfills SO.140.1.FL. through SO.140.17.FL. Industrial Waste Units SO.150.1.FL. Surface Impoundments SO.155.1.FL. Waste Tires Facilities SO.160.1.FL. through SO.160.18.FL. Yard Waste/Composting SO.165.1.FL. through SO.165.18.FL. Other Disposal Units

Solid Waste Management Facilities - Permits

SO.170.1.FL.

Solid Waste Management Facilities - Location Restrictions

SO.170.2.FL.

Other Treatment/Processing Units Solid Waste Combustor Ash Management SO.175.1.FL. through SO.175.4.FL. Recycling of Ash Residue SO.175.5.FL.

Soil Treatment Facilities SO.175.6.FL. through SO.175.14.FL.

Page 337: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-17

Solid Waste Management

WATER QUALITY MANAGEMENT GUIDANCE FOR FLORIDA APPENDIX USERS

REFER TO APPENDIX NUMBERS: REFER TO APPENDIX TITLES:

9-1 Solid Wastes and Solid Waste Management Facilities Exempted From These Regulations

9-2 Physical Properties for Biomedical Waste Plastic Bags 9-3 Water Quality Monitoring Parameters 9-4 Compost Testing Parameters 9-5 Classification of Compost

Page 338: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-18

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.2. MISSING CHECKLIST ITEMS

SO.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 339: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-19

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

SO.5 GENERAL

SO.5.1.FL. Specific solid wastes and solid waste management facilities are exempt from these regulations (FAC 62-701.220(1) and (2)) [Moved in structural reorganization of SO.5 October 1999].

Determine whether solid waste activities are exempt from the requirements for solid wastes and solid waste management facilities (see Appendix 9-1).

Verify that all other solid wastes and solid waste activities are in compliance with the protocol.

SO.5.2.FL. Solid waste storage and disposal must not cause violation of air or water quality standards (FAC 62-701.300(1)(b)) [Moved in structural reorganization of SO.5 October 1999].

Verify that solid waste is not stored or disposed of in a manner or location that causes air quality standards to be violated or water quality standards or criteria of receiving waters to be violated.

SO.5.3.FL. Burning of solid waste must meet specific requirements (FAC 62-701.300(3)) [Moved in structural reorganization of SO.5 October 1999].

Verify that open burning of solid waste is prohibited, except in the case of the burning of natural disaster debris.

Verify that controlled burning of solid waste is prohibited except in a permitted incinerator, or in a facility in which the burning of solid waste is authorized by a site certification order.

(NOTE: Clean vegetative and wood wastes may be burned in an air curtain incinerator.)

Page 340: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-20

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

SO.6 PERMITS/ NOTIFICATIONS/ EXEMPTIONS

SO.6.1.FL. Solid waste facilities must be permitted (FAC 62-701.300(1)(a)) [Moved in structural reorganization of SO.5 October 1999].

Verify that solid waste is not stored, processed, or disposed of except at a permitted solid waste management facility or a facility exempt from permitting.

SO.6.2.FL. Disposal of hazardous waste in a solid waste management facility must be permitted (FAC 62-730) [Moved in structural reorganization of SO.5 October 1999].

Verify that no hazardous waste is disposed of in a solid waste management facility, unless such facility is permitted for such disposal.

Page 341: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-21

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

SO.8 OPERATIONS

SO.8.1.FL. Operators of biological waste incineration facilities, mobile soil thermal treatment facilities, and waste-to-energy facilities must be certified (FAC 62-703.700) [Moved in structural reorganization of SO.5 October 1999].

Verify that the person who performs the duties of an operator of a biological waste incineration facility or mobile soil thermal treatment facility is a trained operator or an interim operator.

Verify that all waste-to-energy facility operators comply with the standards set forth by the American Society of Mechanical Engineers (ASME) as described in ASME QRO-1-1989, USEPA-453-B-93-020 (56 Federal Register 5488).

(NOTE: An operator who is certified by ASME is considered a trained operator.)

Verify that the waste-to-energy facility owner develops a site-specific training manual to be used for the annual training of other personnel at the facility (operators who complete the annual training are also considered trained operators).

Verify that the owner of any mobile soil thermal treatment facility does not employ an interim operator to perform the duties of a trained operator until an approved training program is developed or reviewed by the Department.

Page 342: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-22

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

SO.9 SPECIFIC WASTES

SO.9.1.FL. Disposal of polychlorinated biphenyl (PCB) wastes must meet specific requirements (FAC 62-701.300(4) and (5)) [Moved in structural reorganization of SO.5 October 1999].

Verify that liquids containing a PCB concentration of 50 ppm or greater, or nonliquid PCBs at concentrations of 50 ppm or greater in the form of contaminated soil, rags, or other debris are not deposited in any solid waste disposal unit.

SO.9.2.FL. Disposal of special waste must meet specific requirements (FAC 62-701.300(8) and (9)) [Moved in structural reorganization of SO.5 October 1999].

Verify that the following special wastes are not disposed of at any landfill:

- lead-acid battery - used oils - yard trash, except in unlined landfills classified by Department rule - white goods - whole waste tires, except as provided in section SO.160, Waste Tires

Facilities.

Verify that lead-acid batteries are not disposed of in any waste-to-energy facilities.

SO.9.3.FL. Disposal of certain liquids must meet specific requirements (FAC 62-701.300(10)) [Moved in structural reorganization of SO.5 October 1999].

Verify that noncontainerized liquid waste is not placed in solid waste disposal units, unless:

- the waste is household waste other than septic tank waste - the waste is leachate or gas condensate derived from the solid waste disposal

unit, or byproducts of the treatment of such leachate or gas condensate, and the solid waste disposal unit is lined and has a leachate collection system.

Verify that containers holding liquid waste are not placed in a solid waste disposal

unit, unless:

- the container is a small container similar in size to that normally found in household waste

- the container is designed to hold liquids for use other than storage - the waste is household waste.

Page 343: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-23

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000 [Reorganized October 1999]

Verify that liquid waste containers or tanks 20 gal or larger in capacity either have one end removed or cut open, or have a series of punctures around the bottom to ensure that the container is empty and free of residue, and that the empty container or tank is compacted to its smallest practical volume for disposal.

SO.9.4.FL. Disposal of clean debris must meet specific requirements (FAC 62-701.730(1)) [Moved in structural reorganization of SO.5 October 1999].

Verify that clean debris is not used as fill material in any area, including waters of the state, unless the Federal facility has a dredge and fill permit issued by the Department.

(NOTE: Clean debris used as fill material is not solid waste, and such use does not require a solid waste permit.)

SO.9.5.FL. Spent mercury-containing lamps and devices are prohibited from disposal in landfills or incinerators (FAC 62-737.300(1) and (2)) [Moved in structural reorganization of SO.5 October 1999].

Verify that no mercury-containing devices or device components that contain mercury are knowingly disposed of in landfills or incinerated in any manner.

Verify that spent mercury-containing lamps or residuals are not knowingly incinerated in any municipal or other incinerator.

Page 344: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-24

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.15. TRANSFER FACILITIES

SO.15.1.FL. Solid waste transfer stations must be permitted (FAC 62-701.801(1)).

(NOTE: This checklist item moved here from SO.10.1.FL.; May 1999.)

Verify that transfer stations have general permits and comply with all permit specifications.

SO.15.2.FL. Solid waste transfer stations must follow specific design requirements (FAC 62-701.801(3)).

(NOTE: This checklist item moved here from SO.10.1.FL.; May 1999.)

Verify that onsite roads and unloading areas of transfer stations are designed for efficient movement and unloading of vehicles.

Verify that tipping, processing, sorting, storage, and compaction areas that are in enclosed buildings or covered areas have ventilation systems.

Verify that tipping, processing, sorting, storage, and compaction areas that are not enclosed are equipped with litter control devices and visual screening.

Verify that the transfer station is designed with a leachate control system to prevent discharge of leachate and mixing of leachate with stormwater.

Verify that provisions are made at the transfer station for weighing or measuring all incoming solid waste and recovered materials.

Verify that transfer station storage facilities are designed to hold the expected volume of materials until they are transferred for disposal or recycling.

Verify that, where the general public uses the transfer facility, safety procedures are established for private vehicles.

SO.15.3.FL. Solid waste transfer stations must comply with specific operational requirements (FAC 62-701.801(4) and (6)).

(NOTE: This checklist item moved here from SO.10.1.FL.; May 1999.)

Verify that prohibited wastes, as stated in section SO.5.FL., are not accepted at transfer stations, and that the handling of unauthorized wastes is addressed in the contingency plan.

Verify that an attendant is on duty whenever the facility is operating.

Page 345: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-25

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that operating hours are posted, and fencing, gates, or other means are used to prevent unauthorized access when the transfer station is closed.

Verify that litter, insects, odors, and vectors are controlled to prevent sanitary nuisance and unsightly appearance.

Verify that wastes are handled on a first-in, first-out basis to the extent practicable.

Verify that all wastes are cleaned at the end of each day's operations or during continuous operation, as necessary, to prevent odor or vector problems.

Verify that all floors are free of standing liquids, and that drainage from cleaning areas is discharged to sanitary sewers or the equivalent.

Verify that adequate fire protection is available at the transfer station at all times.

Verify that recovered materials are clearly identified and stored in a safe, sanitary manner, and that a record of the type and quantity of recovered materials is maintained and reported as part of the county's recycling program.

Verify that operational records are maintained and include a daily log of the quantity of solid waste received and transported and the origin of the waste.

Verify that operational records are compiled on a monthly basis, are available for inspection by the Department, and are retained at the transfer station for 3 yr.

Verify that stormwater is controlled at transfer stations, and that a copy of any permit for stormwater control issued by the Department or documentation that no such permit is required is submitted to the Department before the transfer station receives waste.

SO.15.4.FL. Solid waste transfer stations are required to have construction certification (FAC 62-701.801(5)).

(NOTE: This checklist item moved here from SO.10.1.FL.; May 1999.)

Verify that, within 30 days of completion of construction, the engineer of record certifies to the Department that the permitted construction of the transfer station is complete and that it was done in accordance with the plans submitted to the Department except where minor deviation was necessary.

Verify that all deviations from plans are described in detail and the reasons for deviation enumerated.

Page 346: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-26

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.25. RECYCLING

(NOTE: Persons whose activities involve handling, purchasing, receiving, recovering, selling, or end using waste tires, and who are subject to the waste tire regulations in section SO.160.FL., are not required to report information regarding waste tires pursuant to these requirements.)

(NOTE: The following persons are exempt from the requirements regarding the regulation of recovered materials stated in this section:

- exempt generators (see definition) - persons who handle, purchase, receive, recover, sell, or use recovered

materials in small quantities.)

(NOTE: Persons who are exempt from or otherwise not subject to these requirements are not required to provide a copy of any certification required by this chapter to the local government.)

SO.25.1.FL. [Deleted May 1999].

(NOTE: This information added to the NOTE above.)

SO.25.2.FL. Federal facilities that handle, purchase, receive, recover, sell, or are end users of recovered materials must be certified (FAC 62-722.400(1)).

Verify that Federal facilities that handle, purchase, receive, recover, sell, or are end users of recovered materials are certified by the Department on an annual basis.

SO.25.3.FL. Certified Federal facilities that handle, purchase, receive, recover, sell, or are end users of recovered materials must follow specific reporting requirements (FAC 62-722.400(1) and (2)).

Verify that Federal facilities which handle, purchase, receive, recover, sell, or are end users of recovered materials report to the Department, no later than 1 April of each year, the following information for the preceding calendar year:

- name, address, and phone number of the applicant - locations of all recovered materials facilities owned or operated by the

applicant

Page 347: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-27

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- amount and type of recovered materials, by county or origin, that are handled, purchased, received, recovered, or sold by the applicant

- the amount and disposal site, or the name of the person with whom disposal is arranged in the event that the applicant cannot reasonably determine amount or disposal site, of any solid waste generated by the applicant's facilities

- the total amount of recovered materials received at the facility from both certified and noncertified persons.

(NOTE: Nonexempt generators of recovered materials who transfer more than 600 tons/yr of recovered materials out of Florida or to in-state persons who make a product utilizing recovered materials as a raw material in place of, or in addition to, virgin raw materials, must report the amount and type of recovered materials handled, purchased, received, recovered, or sold out of state or to in-state persons who make a product utilizing recovered materials as a raw material in place of, or in addition to, virgin raw materials for the preceding calendar year.)

SO.25.4.FL. Federal facilities that handle, purchase, receive, recover, sell, or are end users of recovered materials must be registered in specific counties (FAC 62-722.600(1) and (2)).

(NOTE: A county or municipality with a population greater than 35,000 may have established a registration process.)

Verify that registrants report on a quarterly basis to the local government information for the preceding quarter, no later than 90 days after the ending date of each quarter, the same information that certified Federal facilities report annually to the Department, as stated above.

(NOTE: Quarters begin on 1 January, 1 April, 1 July, and 1 October.)

Page 348: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-28

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.95. RESOURCE RECOVERY FACILITIES

SO.95.1.FL. Materials recovery facilities must be permitted (FAC 62- 701.700(1)) [Revised July 1998].

Verify that Federal facility does not construct or operate a materials recovery facility without a valid permit issued by the Department.

Verify that all permit conditions are met by the materials recovery facility.

SO.95.2.FL. Materials recovery facilities must control stormwater (FAC 62-701.700(5)).

Verify that stormwater is controlled at materials recovery facilities and the conditions of any agency permits are met.

Verify that a copy of any permit for stormwater control issued by the Department, or documentation that no such permit is required, is submitted to the Department before the facility receives waste.

SO.95.3.FL. Materials recovery facilities must comply with specific operational requirements (FAC 62-701.700(3)).

Verify that an operation and maintenance manual describing the facility operations, the persons responsible for the operations, and types of equipment that will be used is kept at the facility, and that all activities at the facility are performed in accordance with the manual and plans for the facility.

Verify that the facility has a plan to screen the wastes received by the facility that specifies inspection procedures to handle unauthorized wastes.

Verify that the facility has a contingency plan that covers operations interruptions and emergencies such as fires, explosions, or natural disasters.

Verify that the facility has a closure plan that identifies the steps needed to close the facility and that provides for the following:

- owner/operator notification to the Department in writing 180 days before the date the facility is expected to close, with no waste being received by the facility after the expected closing date

- within 30 days after receiving the final solid waste shipment, the owner/operator removes or otherwise disposes of all solid waste or residue in accordance with the approved closure plan

- closure is completed within 180 days after receiving the final waste quantity and includes removal of all recovered materials from the site

Page 349: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-29

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- when closure is completed, the owner/operator certifies in writing to the Department that closure is complete.

(NOTE: The Department will inspect the closed facility within 30 days of closure

and will advise the owner/operator of the closure status.)

Page 350: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-30

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

MEDICAL WASTE

SO.105. GENERATORS

SO.105.1.FL. All biomedical waste facilities must be permitted by the Department of Health (FAC 64E-16.011) [Revised July 1998].

(NOTE: 64E-16.011 applies to both generators and treatment facilities; these permit requirements are repeated under SO.120.FL. The Department of Health regulates the packaging, transport, storage, and treatment of biomedical waste. The Department of Environmental Protection regulates biomedical waste incineration and biomedical waste disposal.)

Verify that all biomedical waste facilities are permitted annually by Department of Health.

Verify that the permit is not transferred from one person or place to another person or place.

(NOTE: A permitted generator may work at a branch office for no more than 6 h in any 7-day period without applying for an additional biomedical waste permit. These generators must notify the local the Department of Health biomedical waste coordinator of the existence and operating hours of the branch office.)

Verify that, in the event of a change of ownership of the facility or a newly constructed facility, the new generator submits an application for an initial permit within 30 days of the commencement of business.

Verify that, when a facility is leased to a second party for operation, the second party applies to the Department of Health for an initial permit within 30 days of the commencement of business and is responsible for the operation and maintenance of the facility.

Verify that a copy of the permit is maintained within view at the facility or is made available for review by Department of Health personnel.

(NOTE: A biomedical waste generator that generates less than 25 lb of biomedical waste per each 30-day period is exempt from the above permitting requirements.)

(NOTE: Persons engaged in a sharps collection program with single or multiple facility locations may operate under a single permit provided:

- the sharps collection program is open to the general public - a list identifying the location of each facility is attached to the application

Page 351: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-31

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- each facility meets the applicable permit requirements.)

SO.105.2.FL. Biomedical waste generators must comply with specific management requirements (FAC 64E-16.003(1) and (2) (b)) [Revised July 1998].

(NOTE: Facility includes generating, treatment or storage units (see Definitions). This is repeated in SO.120.FL.)

Verify that biomedical waste mixed with hazardous waste (as defined in Chapter 62-730) is managed as hazardous waste.

Verify that biomedical waste mixed with radioactive waste is managed in a manner that does not violate the provisions of Chapter 64E-5 (regulations on the control of radiation hazards, not included in this manual).

Verify that the biomedical waste is managed in accordance with biomedical waste regulations, after the radioactive component has decayed in storage (as provided for in Chapter 64E-5) or is otherwise not regulated as radioactive waste.

Verify that the packaging requirements for radioactive waste are followed, unless the requirements for biomedical waste packaging are more restrictive.

Verify that other solid waste or liquid, which is neither hazardous nor radioactive in character, combined with untreated biomedical waste, is managed as untreated biomedical waste.

Verify that all surfaces contaminated with spilled or leaked biomedical waste are decontaminated as part of the cleaning process.

Verify that all biomedical waste management records are maintained for 3 yr and are available for review by the Department.

SO.105.3.FL. Biomedical waste generators must prepare, maintain, and implement a written operating plan (FAC 64E-16.003(2)) [Revised July 1998].

(NOTE: Facility includes generating, treatment, or storage units (see Definitions). This is repeated in SO.120.FL.)

Verify that the biomedical waste facility implements a written operating plan to manage biomedical waste in accordance with these requirements.

Verify that the plan is available for review by the Department and facility personnel.

Verify that the plan includes the following:

- a description of training for personnel - procedures for segregating, labeling, packaging, transporting, storing, and

treating biomedical waste

Page 352: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-32

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- procedures for decontaminating biomedical waste spills and a contingency plan for emergencies.

Verify that facilities which have multiple specialty services include procedures

specific to each specialty if procedures vary.

Verify that plans are updated when regulations, facility policies, or procedures change.

SO.105.4.FL. Biomedical waste generators must train employees that handle biomedical waste (FAC 64E-16.003(2)(a)) [Revised July 1998].

(NOTE: Facility includes generating, treatment, or storage units (see Definitions). This is repeated in SO.120.FL.)

Verify that each biomedical waste generator trains employees who handle biomedical waste as part of their daily work responsibilities.

Verify that training is provided prior to commencement of duties related to handling biomedical waste.

Verify that refresher training is completed annually by all personnel who handle biomedical waste.

Verify that the training program details compliance with these regulations and the facility operating plan is maintained as part of the operating plan.

SO.105.5.FL. [Deleted July 1998].

SO.105.6.FL. Biomedical waste generators must meet specific requirements (FAC 64-16.006) [Added July 1998].

Verify that biomedical waste generator use only transporters who registered with the department as biomedical waste transporters.

Verify that compacting of biomedical waste within the generating facility (except recognizable human tissue, bulk liquids, or sharps) meets the following conditions:

- packages of biomedical waste are not compacted to a density greater than 22 lb/ft2

- compacted packages of biomedical waste are not subjected to further compacting

- any residual or incidental liquid is contained within the inner bag or outer container

- if the inner bag or outer container rupture during compaction, residual or

Page 353: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-33

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

incidental liquids are disposed of directly into the sanitary sewer, an on-site sewage treatment and disposal system, or other system approved to receive such wastes by the Department of Environmental Protection or the Department

- discharge of noxious air are kept to a minimum through use of HEPA filters having a pore size of 2 microns or less, negative pressure rooms, or other safety methods

- compacted packages of biomedical waste are treated by incineration or other approved treatment process.

(NOTE: Treatment processes, such as steam, chemical, gas, dry heat, or

microwaving will be considered by the Department upon written request and microbiological evidence that the proposed process provides the same degree of treatment for compacted waste as for uncompacted waste. Steam treatment systems must be tested against Bacillus stearothermophilus spores. Other proposed treatment processes must demonstrate efficacy using section 64E-16.007(4), FAC.)

SO.105.7.FL. [Deleted July 1998].

SO.105.8.FL. Home health care providers and users must meet specific requirements (FAC 64-16.001(4) and (5)) [Added July 1998].

Verify that health care providers inform their home user clients verbally and in writing of the recommended method for handling biomedical waste generated in the home setting.

Verify that home health care providers who deliver in-home medical services remove or have removed by a registered biomedical waste transporter all biomedical waste generated during the performance of these services.

Verify that home users segregate and package their biomedical waste in a manner that reduces the chance of exposure to the public.

Page 354: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-34

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

MEDICAL WASTE

SO.110. CONTAINERS/ LABELING/STORAGE AREAS

SO.110.1.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.2.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.3.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.4.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.5.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.6.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.7.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

Page 355: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-35

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.110.8.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.9.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.10.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.11.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.12.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.13.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.14.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.15.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.16.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.17.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

Page 356: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-36

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

1998].

SO.110.18.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.19.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.20.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.21.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.22.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.23.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.24.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.25.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

SO.110.26.FL. [Deleted July 1998].

[Regulation (10D-104) recodified and revised.]

Page 357: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-37

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.110.27.FL. Storage of biomedical waste must be limited to 30 days (64E-16.004(1) (a) and (b)) [Added July 1998].

Verify that storage of biomedical waste at the generating facility does not exceed 30 days.

Verify that the 30-day time period for generating facilities begins when the first non-sharps item of biomedical waste is placed into a red bag or sharps container, or when a sharps container containing only sharps is sealed.

Verify that storage of biomedical waste in a place other than at the generating facility does not exceed 30 days.

Verify that the 30 day storage period in a place other than at the generating facility begins on the day the waste is collected from the generator.

SO.110.28.FL. Storage of biomedical waste must meet specific requirements (64E-16.004(1) (c) and (d)) [Added July 1998].

Verify that indoor storage has restricted access and is designated in the written operating plan.

Verify that indoor storage is located away from pedestrian traffic, be vermin and insect free, and is maintained in a sanitary condition.

Verify that indoor storage is constructed of smooth, easily cleanable materials that is impervious to liquids.

Verify that outdoor storage areas, including containers and trailers are conspicuously marked with the international biological hazard symbol.

Verify that the international biological hazard symbol on outdoor storage areas is a minimum of 6 in. in diameter.

Verify that outdoor storage areas are secured against vandalism and unauthorized entry.

SO.110.29.FL. Packages of biomedical waste must meet specific requirements (64E-16.004(2) (a) and (b)) [Added July 1998].

Verify that packages of biomedical wastes remain sealed until treatment, except when compacted.

Verify that ruptured or leaking packages of biomedical waste are placed into larger packaging without disturbing the original seal.

Verify that all packages containing biomedical waste are visibly identifiable with the international biological hazard symbol and one of the following phrases: "BIOMEDICAL WASTE", "BIOHAZARDOUS WASTE", "BIOHAZARD",

Page 358: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-38

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

"INFECTIOUS WASTE", or "INFECTIOUS SUBSTANCE".

Verify that the international biological hazard symbol is red, orange, or black and the background color contrasts with that of the symbol or comply with the requirements cited in subpart Z of 29 CFI 1910.1030(g)(1)(C), Occupational Exposure to Bloodborne Pathogen Standard.

SO.110.30.FL. Bags used for biomedical waste must meet specific requirements (64E-16.004(2) (c)) [Added July 1998].

Verify that biomedical waste, except sharps, are packaged and sealed at the point of origin in impermeable, red plastic bags or, at the discretion of the generator, into sharps containers.

Verify that the international biological hazard symbol is at least 6 in. in diameter on bags 19" x 14" or larger, and at least 1 in. in diameter on bags smaller than 19" x 14".

Verify that each plastic bag meets the following physical properties:

- impact resistance of 165 grams and tearing resistance of 480 grams in both the parallel and perpendicular planes with respect to the length of the bag (Impact resistance will be determined using ASTM D-1709-91, and tearing resistance will be determined using ASTM D-1922-89.)

- incidental sum concentrations of lead, mercury, hexavalent chromium, and cadmium are no greater than 100 ppm for dyes used in the coloration of bags.

SO.110.31.FL. Sharp containers used for biomedical waste must meet specific requirements (64E-16.004(2) (d)) [Added July 1998].

Verify that sharps are discarded at the point of origin into single use or reusable sharps containers.

Verify that needles and scalpel blades are not placed directly into double-walled corrugated containers.

Verify that sharps containers are sealed when full.

(NOTE: A sharps container is considered full when materials placed into it reach the designated fill line, or, if a fill line is not indicated, when additional materials cannot be placed into the container without cramming or when no additional materials are to be placed in the container.)

Verify that permanently mounted sharps container holders bear the phrase and the international biological hazard symbol, if this information on the sharps container is concealed by the sharps container holder.

Verify that reusable sharps containers are only emptied into a treatment cart or directly into a treatment unit.

Page 359: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-39

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

directly into a treatment unit.

Verify that reuseable sharps containers are constructed of smooth, easily cleanable materials, and are decontaminated after each use.

Verify that the international biological hazard symbol is at least 1 in. in diameter on sharps containers.

SO.110.32.FL. Outer containers used for biomedical waste must meet specific requirements (64E-16.004(2) (e) and (f)) [Added July 1998].

Verify that all outer containers are rigid, leak-resistant, and puncture-resistant.

Verify that reuseable outer containers are constructed of smooth, easily cleanable materials and are decontaminated after each use.

Verify that the international biological hazard symbol is at least 6 in. in diameter on outer containers 19" x 14" or larger, and at least 1 in. in diameter on outer containers less than 19" x 14.

SO.110.33.FL. Labeling of biomedical waste bags, sharps containers, and outer containers must meet specific requirements (64E-16.005) [Added July 1998].

Verify that biomedical waste bags and sharps containers are labeled with the generator's name and address unless treatment occurs at the generating facility.

Verify that, if a bag or sharps container is placed into a larger bag prior to transport, the label for the exterior bag includes the generator's name and address.

(NOTE: Inner bags and inner sharps containers are not required to include the generator’s name and address.)

Verify that outer containers are labeled with the transporter's name, address, registration number, and 24-hour telephone number prior to transport.

(NOTE: The transporter may provide labels for bags or sharps containers that are generator-specific, such as bar codes or specific container numbers. Use of these generator-specific labels satisfies the requirement for the inclusion of the generator’s name and address.)

Page 360: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-40

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

MEDICAL WASTE

SO.115. TRANSPORTATION

SO.115.1.FL. Biomedical waste transporters must be registered (FAC 64E-16.009) [Revised July 1998].

(NOTE: Biomedical waste generators transporting less than 25 lb of their own biomedical waste, in their own transport vehicle, on any single occasion, are exempt from these registration requirements.)

Verify that all biomedical waste transporters are registered with the Department.

Verify that registered biomedical waste transporters notify the Department in writing within 30 days of any changes to their registration form currently on file with the Department.

Verify that biomedical waste transporters renew their registration by 30 September of each year.

Verify that the renewal applications includes the submission of an annual report on form DH 4109.

SO.115.2.FL. Biomedical waste transporters must meet specific requirements (FAC 64E-16.008(1), (2), and (6)) [Revised July 1998].

Verify that biomedical waste is not accepted for transport unless it is properly segregated, packaged, and labeled.

Verify the generators are given a receipt for pick-up.

Verify that biomedical waste is not knowingly delivered for storage or treatment to a facility which does not have a Department issued, valid permit.

SO.115.3.FL. [Deleted July 1998].

SO.115.4.FL. Biomedical waste must not be compacted or allowed to leak into the environment during transport

Verify that biomedical waste is not compacted or allowed to leak into the environment during transport.

Page 361: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-41

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

(FAC 64E-16.008(3)) [Revised July 1998].

SO.115.5.FL. [Deleted July 1998].

SO.115.6.FL. Biomedical waste may be transferred from one transport vehicle to another only under certain circumstances (FAC 64E-16.008(4)) [Revised July 1998].

Verify that the transfer of biomedical waste from one transport vehicle to another is not allowed unless the transfer occurs at a permitted storage or treatment facility (except in the case of an emergency).

SO.115.7.FL. [Deleted July 1998].

SO.115.8.FL. [Deleted July 1998].

SO.115.9.FL. All biomedical waste transport vehicles must meet specific requirements (FAC 64E-16.008(7) and (8))[Revised July 1998].

Verify that all transport vehicles are identified with the following information:

- the business name and registration number of the registered transporter - a 24-h emergency telephone number - placards showing one of the following words or phrases used in conjunction

with the international biological hazard symbol: - "BIOMEDICAL WASTE"

- "BIOHAZARDOUS WASTE" - "BIOHAZARD" - "INFECTIOUS WASTE" - "INFECTIOUS SUBSTANCE".

Verify that the international symbol is at least 6 in. in diameter and red, orange, or black with the background color contrasted with that of the symbol or comply with the requirements cited in subpart Z of 29 C.F.R. subparagraph

Page 362: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-42

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

1910.1030(g)(1)(C), Occupational Exposure to Bloodborne Pathogen Standard.

SO.115.10.FL. [Deleted July 1998].

SO.115.11.FL. Biomedical waste transport vehicles must be fully enclosed and secured when unattended (FAC 64E-16.008 (8))[Revised July 1998].

Verify that all biomedical waste transport vehicles are fully enclosed.

Verify that all biomedical waste transport vehicles are secured when unattended.

SO.115.12.FL. Biomedical waste transporters must take specific actions in the event of an accident or emergency (FAC 64E-16.008 (9) and (10)) [Revised July 1998].

Verify that biomedical waste transporters notify the Department within 1 working day by telephone and submit a follow-up report to the Department within 10 days, in writing, in the event of an accident resulting in a spill of biomedical waste.

(NOTE: In case of an emergency situation, including mechanical failure, the biomedical waste may be transferred to a transport vehicle without being at a storage or treatment facility.

Verify that, if a rental vehicle is used, the following requirements are met:

- the Department is notified of its use on the first working day after the emergency

- a copy of the written authorization from the rental agency stating awareness of the intended use of the vehicle is submitted to the Department within 7 days

- biomedical waste is removed and transported to a permitted storage or treatment facility within 24 hours of the emergency

- the vehicle is decontaminated before it is returned to the rental agency.

SO.115.13.FL. [Deleted July 1998].

SO.115.14.FL. [Deleted July 1998].

Page 363: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-43

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Page 364: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-44

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

MEDICAL WASTE

SO.120. TREATMENT/DISPOSAL

SO.120.1.FL. [Deleted July 1998].

SO.120.1.FL. All biomedical waste facilities must be permitted by the Department of Health (FAC 64E-16.011) [Revised July 1998].

(NOTE: 64E-16011 applies to both generators and treatment facilities: these permit requirements are repeated under SO.105.FL. The Department of Health regulates the packaging, transport, storage, and treatment of biomedical waste. The Department of Environmental Protection regulates biomedical waste incineration and biomedical waste disposal.)

(NOTE: Biomedical waste treatment facilities that were constructed prior to 31 December 1995 or for which a complete construction or operation permit was submitted to the Department prior to 31 December 1995 must meet these requirements at the time of permit renewal.)

Verify that all biomedical waste facilities are permitted annually by Department of Health.

Verify that the permit is not transferred from one person or place to another person or place.

(NOTE: A permitted generator may work at a branch office for no more than 6 h in any 7-day period without applying for an additional biomedical waste permit. These generators must notify the local Department of Health biomedical waste coordinator of the existence and operating hours of the branch office.)

Verify that, in the event of a change of ownership of the facility or a newly constructed facility, the new generator submits an application for an initial permit within 30 days of the commencement of business.

Verify that, when a facility is leased by the owner to a second party for operation, the second party applies to the Department of Health for an initial permit within 30 days of the commencement of business and is responsible for the operation and maintenance of the facility.

Page 365: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-45

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that a copy of the permit is maintained within view at the facility or is made available for review by Department of Health personnel.

(NOTE: A biomedical waste generator that generates less than 25 lb of biomedical waste per each 30-day period is exempt from the above permitting requirements.)

(NOTE: Persons engaged in a sharps collection program with single or multiple facility locations may operate under a single permit provided:

- the sharps collection program is open to the general public - a list identifying the location of each facility is attached to the application - each facility meets the applicable permit requirements.)

SO.120.3.FL. Biomedical waste that is treated offsite must be treated by incineration, steam, or a Department-approved alternative method within 30 days of collection from the generator (FAC 64E-16.007(1)) [Revised July 1998].

Verify that biomedical waste is treated within 30 days of collection from the generator.

Verify that biomedical waste is treated by steam, incineration, or an alternative process approved by the Department.

SO.120.4.FL. [Deleted June 1998].

SO.120.5.FL. Steam treatment units for biomedical waste must meet specific requirements (FAC 64E-16.007(2)) [Revised July 1998].

Verify that steam treatment units subject loads of biomedical waste to sufficient temperature, pressure, and time to demonstrate a minimum Log 4 kill of Bacillus stearothermophilus spores placed at the center of the waste load.

Verify that, prior to placing a steam treatment unit into service, operating parameters for temperature, pressure, and treatment time are determined.

Verify that the steam treatment unit is serviced for preventative maintenance in accordance with the maintenance schedule listed in the permit and that maintenance records are kept onsite for a period of not less than 3 yr.

Verify that each package of biomedical waste to be treated has a temperature sensitive tape or equivalent test material, such as a chemical indicator, placed on a nonheat-conducting probe at the center of each treatment container in the load that

Page 366: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-46

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

will indicate if the treatment temperature and pressure have been reached.

(NOTE: The above requirement does not apply if a steam treatment unit is equipped to continuously monitor and record temperatures and pressure during the entire length of each treatment cycle.)

Verify that waste is not considered treated if the tape or equivalent indicator, or the continuous monitoring record, fails to indicate that a temperature of at least 250 οF or 121 οC was reached during the process.

Verify that each steam treatment unit is evaluated for effectiveness with spores of B. stearothermophilus placed in the center of the waste load at least once each operating day for permitted treatment facilities, or at least once every 40 h of operation.

Verify that the steam treatment unit evaluation results are maintained onsite and available for review.

Verify that a written log is maintained for each steam treatment unit recording the following information:

- the date, time, and operator for each usage - the type and approximate amount of waste treated - the post-treatment confirmation results by recording the temperature,

pressure, and time the waste was treated, or attaching the temperature and pressure monitoring indicator.

Verify that a current operating procedure specifies at a minimum:

- parameters, determined from testing, that provide consistent treatment, such as exposure time, temperature, and pressure

- identification of standard treatment containers and placement of the load in the steam treatment unit.

SO.120.6.FL. [Deleted July 1998].

SO.120.7.FL. [Deleted July 1998].

Page 367: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-47

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.120.8.FL. [Deleted July 1998].

SO.120.9.FL. [Deleted July 1998].

SO.120.10.FL. Onsite incineration of biomedical waste must be achieved in a Department-permitted incinerator (FAC 64E-16.007(3)) [Revised July 1998].

Verify that incineration of biomedical waste is achieved in a biological waste incinerator permitted by the Department of Environmental Protection.

SO.120.11.FL. Alternative onsite treatment methods for biomedical waste must be approved (FAC 64E-16.007(4)) [Revised July 1998].

Verify that alternative treatment processes have been approved by the State Health Officer.

Verify that approved alternative treatment processes, except single-use, are evaluated for effectiveness with spores of B. stearothermophilus placed in the center of the waste load at least once each operating day for permitted treatment facilities, or at least once every 40 h of operation.

Verify that the steam treatment unit evaluation results are maintained onsite and available for review.

SO.120.12.FL. Biomedical waste may be disposed of into a sanitary sewer system, an onsite sewage treatment and disposal system, or other approved system if specific requirements are met (FAC 64E-16.007(5)) [Revised July 1998].

Verify that biomedical waste is disposed of into a sanitary sewer system, an onsite sewage treatment and disposal system, or other system approved to receive such wastes by the Department or by Department of Health, only if the following requirements are met:

- waste is in a liquid or semisolid form - aerosol formation from disposing waste is minimal.

Page 368: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-48

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.120.13.FL. [Deleted July 1998].

SO.120.14.FL. Body tissues that have been histologically fixed must be disposed of as treated biomedical waste (FAC 64E-16.007(6)) [Revised July 1998].

Verify that body tissues that have been histologically fixed are disposed of as treated biomedical waste.

(NOTE: Tissues prepared by frozen sectioning only are not considered treated.)

SO.120.15.FL. Licensed acute care hospitals that utilize a certified onsite treatment process involving grinding and sterilization must follow specific disposal procedures (FAC 64E-16.007(7)) [Revised July 1998].

(NOTE: Biomedical waste that has been treated by an approved method is to be managed as treated biomedical waste.)

Verify that licensed acute care hospitals that utilize a certified onsite treatment process involving grinding and treatment, dispose of treated biomedical waste in the normal municipal solid waste stream upon notifying the local government responsible for solid waste collection and disposal under the following conditions:

- if grinding takes place prior to treatment, procedures that minimize the chance of exposure to waste handlers are developed and implemented if the grinder fails or becomes jammed

- individuals operating the treatment system are trained in all aspects of its operation, including contingency procedures

- acute care hospitals inform the Department in writing of the installation of the unit at least 30 days prior to placing the unit into service

- inspection of the unit, including treatment and maintenance records, occurs during the annual inspection for the hospital's biomedical waste permit.

(NOTE: For the purposes here, certified means that the treatment process is steam

treatment, or has been approved as an alternative biomedical waste treatment process. Grinding also means shredding or hammermilling.)

SO.120.16.FL. Biomedical waste facilities must train employees that handle biomedical waste (FAC 64E-16.003(2)(a)) [Revised July 1998].

(NOTE: Facility includes generating, treatment, or storage units (see Definitions). This is repeated in SO.105.FL.)

Verify that each biomedical waste generator trains employees who handle biomedical waste as part of their daily work responsibilities.

Verify that training is provided prior to commencement of duties related to

Page 369: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-49

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

handling biomedical waste.

Verify that refresher training is completed annually by all personnel who handle biomedical waste.

Verify that the training program details compliance with these regulations and the facility operating plan is maintained as part of the operating plan.

SO.105.3.FL. Biomedical waste generators must prepare, maintain, and implement a written operating plan (FAC 64E-16.003(2)) [Revised July 1998].

(NOTE: Facility includes generating, treatment, or storage units (see Definitions). This is repeated in SO.105.FL.)

Verify that the biomedical waste facility implements a written operating plan to manage biomedical waste, in accordance with these requirements.

Verify that the plan is available for review by the Department and facility personnel.

Verify that the plan includes the following:

- a description of training for personnel - procedures for segregating, labeling, packaging, transporting, storing, and

treating, biomedical waste - procedures for decontaminating biomedical waste spills and a contingency

plan for emergencies.

Verify that facilities which have multiple specialty services include procedures specific to each specialty if procedures vary.

Verify that plans are updated when regulations, facility policies, or procedures change.

Page 370: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-50

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

MEDICAL WASTE

SO.125. DOCUMENTATION

SO.125.1.FL. [Deleted July 1998].

SO.125.2.FL. [Deleted July 1998].

Page 371: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-51

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.135. LANDFILLS

Permits

SO.135.1.FL. All landfills must be permitted by the Department (FAC 62-701.330(1)).

(NOTE: This regulation applies to all solid waste disposal units constructed or operated under a landfill permit after 6 January 1993, including renewals of existing permits.)

Verify that all holders of landfill construction or operation permits issued prior to 6 January 1993 receive permit modifications from the Department.

Verify that all landfills have landfill construction and operation permits issued by the Department.

Verify that the landfill complies with the landfill construction and operation permit specifications.

SO.135.2.FL. The vertical expansion of a landfill must be permitted by the Department (FAC 62-701.430).

(NOTE: Vertical expansion of a landfill is defined as the construction of a solid waste disposal unit on top of or against the side slopes of a previously filled landfill, whether active, closed, or inactive.)

Verify that any vertical expansion to a landfill is permitted by either a modification to the original permit or a new permit (if the landfill has been closed).

Verify that the vertical expansion of the landfill complies with all permit requirements.

Location Restrictions

SO.135.3.FL. Landfills must meet specific location requirements (FAC 62-701.340(4)).

Verify that the landfill site provides structural support for the facility including total wastes to be disposed of and structures to be built on the site.

Verify that a landfill or solid waste disposal unit is not located in the 100-yr

Page 372: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-52

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

701.340(4)). floodplain where it will restrict the flow of the 100-yr flood, reduce the temporary water storage capacity of the floodplain unless compensating storage is provided, or result in a washout of solid waste.

Verify that the horizontal separation between waste deposits in a landfill and the landfill property boundary is, at a minimum, 100 ft, measured from the toe of the proposed final cover slope.

Verify that the landfill is screened from public view where such screening can practically be provided.

Verify that, for landfills constructed after 6 January 1993, the zone of discharge does not exceed 100 ft from the edge of the solid waste disposal units permitted to be constructed.

Construction And Design Criteria

SO.135.4.FL. Landfills must follow specific planned construction and closure requirements (FAC 62-701.400(2)).

Verify that all landfills are designed so that solid waste disposal units will be constructed and subsequently closed at planned intervals throughout the design period of the landfill.

SO.135.5.FL. Landfills must be constructed with composite or double liners (FAC 62-701.400(3)(a)).

Verify that landfills are constructed with composite or double liners.

Verify that liners are constructed of materials with appropriate physical, chemical, and mechanical properties to prevent failure due to physical contact with the waste or leachate to which they are exposed, climatic conditions, the stress of installation, and other applied stresses and hydraulic pressures that are anticipated during the operational and closure period of the solid waste disposal unit.

Verify that liners are installed upon a base and in a geologic setting capable of providing structural support to prevent overstressing of the liner due to settlements and applied stresses.

Verify that liners are constructed so that the bottom of the liner system is not subject to fluctuations of the groundwater so as to adversely impact the integrity of the liner system.

Page 373: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-53

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that liners are designed to resist hydrostatic uplift if the liner is located below the seasonal high groundwater table.

Verify that liners are installed to cover all surrounding earth that could come into contact with the waste or leachate.

SO.135.6.FL. Landfills must have a leachate collection and removal system that is designed, constructed, maintained, and operated to collect leachate and convey it to collection points for removal (FAC 62-701.400(4)).

Verify that landfills have a leachate collection and removal system which is designed, constructed, maintained, and operated to collect leachate and convey it to collection points for removal.

Verify that the primary and secondary leachate collection and removal systems:

- are constructed of materials that are chemically resistant to the waste disposed of in the landfill and the leachate expected to be generated

- have sufficient mechanical properties to prevent collapse under pressures exerted by overlying wastes, cover materials, and any equipment used at the landfill

- have granular material or synthetic geotextile filter overlying or surrounding the leachate collection and removal system to prevent clogging of the collection system by infiltration of fine particles from the waste

- have a method to test that the pipes in the system are not clogged, and a method for cleaning the pipes in the system if they become clogged.

(NOTE: If any part of the system cannot be tested for clogging, the design must

assure that leachate can be rerouted from that part to a leachate sump in the event of a collapse.)

Verify that the primary leachate collection and removal system has a granular drainage layer above the top geomembrane liner, at least 12 in. thick, with a hydraulic conductivity of not less than 1 x 10-3 cm/s, overlain with an additional 12 in. of protective material that is chemically resistant to the waste and leachate.

Verify that the primary leachate collection and removal system is designed with a bottom slope to achieve the required leachate head after the predicted settlement determined by the foundation analysis.

(NOTE: Leachate collection systems that incorporate synthetic drainage materials may be used if it can be demonstrated that they are equivalent to or more effective than the granular design, including chemical compatibility, flow under load, and protection of the geomembrane liner.)

SO.135.7.FL. Leachate Verify that leachate recirculation systems are only used at solid waste disposal

Page 374: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-54

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

recirculation systems must be used under specific circumstances at landfills (FAC 62-701.400(5)).

units that are designed for leachate recirculation and meet the following requirements:

- the landfill is lined and has a leachate collection and removal system - ditches, berms, or other devices are installed to control any leachate runoff

- initial and intermediate cover receiving recirculated leachate are graded to shed runoff into the leachate collection system and to minimize mixing of leachate runoff and storm water

- initial and intermediate cover are permeable to the extent necessary to prevent perched water conditions and gas buildup

- leachate is not recirculated during weather conditions or in quantities that may cause runoff outside the solid waste disposal unit, surface seeps, wind-blown spray, or exceedance of the limits of the leachate head on the liner

- ponding is prohibited unless it is an integral part of the design plan - a gas management system is implemented to control odors and migration of

methane - recirculation of leachate is prohibited on top of areas where final cover has

been applied - irrigation of the final vegetative cover is done with treated leachate that meets

the water quality standards of the receiving water body, if such irrigation does not contribute significantly to leachate generation.

SO.135.8.FL. Landfill liner systems must have a construction quality assurance plan (FAC 62-701.400(7) and (8)).

Verify that landfill liner systems have a Department-approved construction quality assurance plan that provides personnel with adequate information to achieve continuous compliance with liner construction requirements.

Verify that sampling and testing for quality control is conducted in the field by trained personnel during construction and after construction completion.

Verify that the quality assurance professional engineer or his/her designee is onsite at all times during construction to monitor construction activities.

Verify that, in addition to the above requirements, the soil component of liner systems meets the following requirements:

- all required testing and analysis is performed in accordance with generally accepted engineering procedures

- a construction quality assurance/quality control plan is prepared for each soil liner project to outline project specifications and construction requirements

- field and laboratory testing during liner construction is conducted by a qualified soil testing laboratory representing the owner

- an appropriate borrow source is located prior to the soil liner installation - a field test section or test strip is constructed at the site above a prepared

subbase prior to full scale liner installation

Page 375: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-55

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- full scale liner installation begins only after completion of a successful liner test section

- if test data does not meet the requirements of the project specifications, additional random samples are tested from the liner section.

SO.135.9.FL. Landfills must have surface water management systems that meet specific requirements (FAC 62-701.400(9)).

Verify that the landfill has a stormwater management system that is designed, constructed, and maintained to, at a minimum, prevent stormwater from the peak discharge of the 25-yr storm event from running onto the portions of the landfill that are not closed.

Verify that the landfill's stormwater management system is designed, constructed, and maintained to collect and control, at a minimum, the volume of runoff from a 25-yr, 24-h storm event.

Verify that stormwater controls include retention or detention ponds, and drainage ways specifically designed and sized according to local drainage patterns, soil permeability, annual precipitation, area land use, and other characteristics of the contributing watershed.

Verify that stormwater management systems are designed to avoid mixing of stormwater with leachate, and that stormwater or other surface water that come into contact with the landfilled solid waste or mixes with leachate is considered leachate.

SO.135.10.FL. Landfills must have gas control systems that meet specific requirements (FAC 62-701.400(10)(a), (b), and (d)).

Verify that landfills that receive biodegradable wastes have a gas monitoring and control system that is designed to prevent explosions and fires, and to minimize offsite odors and damage to vegetation.

Verify that landfill gas control systems meet the following requirements:

- are designed to prevent the concentration of methane and other gases generated by the landfill from:

- exceeding 25 percent of the LEL for gases in structures on or offsite, excluding gas control or recovery components

- exceeding the LEL for gases at or beyond the landfill property boundary - causing objectionable odors at or beyond the landfill property boundary

- are designed to reduce gas pressure in the interior of the landfill by collecting the gases to prevent them from moving laterally

- do not interfere with or cause failure of the liner or leachate control systems.

(NOTE: Flaring of landfill gases may be used as a method of gas control, particularly control of objectionable odors.)

Page 376: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-56

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

particularly control of objectionable odors.)

Verify that landfills using piping or a similar conduit to convey gas are furnished with a positive means of gas condensate collection and disposal at each low point in the conveyance system.

SO.135.11.FL. Landfills that are required to have gas control systems must implement routine gas monitoring programs (FAC 62- 701.400(10)(c)).

Verify that solid waste disposal units which receive biodegradable waste implement a routine gas monitoring program to ensure that the gas control system standards above are met.

Verify that the gas monitoring program meets the following specifications:

- the location of monitoring points and frequency of monitoring is determined by the following factors:

- soil conditions - the hydrogeologic conditions surrounding the facility - the hydraulic conditions surrounding the facility - the location of the facility structures and property boundaries

- all monitoring points are sampled quarterly, and the results are reported to the Department

- if methane gas levels exceed the LEL, the owner/operator: - immediately takes all necessary steps to ensure protection of human

health and notifies the Department - within 7 days of detection submits to the Department for approval a

remediation plan for the methane gas releases describing the nature and extent of the problem and the proposed remedy

- completed the remedy within 60 days of detection unless otherwise approved by the Department.

Operating Criteria

SO.135.12.FL. Landfill operating personnel must meet specific requirements (FAC 62-701.500(1)).

Verify that all Class I and Class III landfills have at least one trained operator at the landfill during all times when the landfill receives waste.

Verify that, if an operator is employed at a Class II landfill, the person is a trained operator.

Verify that all Class I and Class III landfills have at least one spotter at each working face at all times when the landfill receives waste to detect unauthorized

Page 377: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-57

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

waste.

SO.135.13.FL. Access to landfills must be controlled by specific means (FAC 62-701.500(5)).

Verify that access to and use of the landfill facilities are controlled by fencing, gates, or other barriers, as well as signs and facility personnel.

Verify that public access and receipt of wastes occurs only when an attendant is on duty.

SO.135.14.FL. Landfills must follow specific procedures regarding the monitoring of waste for unauthorized wastes (FAC 62-701.500(6)).

Verify that the landfill has a load checking program to detect and discourage attempts to dispose of unauthorized wastes at the landfill.

Verify that the load checking program consists of the following minimum requirements:

- the landfill operator examines at least three random loads of solid waste delivered to the landfill each week

- the waste collection vehicle drivers discharge their loads at a designated location within the landfill

- a detailed inspection of the discharged material is made for any unauthorized wastes.

(NOTE: If the landfill owner or operator also owns or operates a transfer station,

the inspection may be carried out at the transfer station before delivery of the waste to the landfill.)

Verify that, if unauthorized wastes are found, the facility contacts the generator, hauler, or other party responsible for shipping waste to the landfill to determine the identity of the waste sources.

Verify that, if any regulated hazardous wastes are identified by the random load checking, or otherwise discovered to be improperly deposited at the landfill, the landfill operator promptly notifies the Department, the person responsible for shipping the wastes to the landfill, and the generator of the wastes, if known.

Verify that, if any regulated hazardous wastes are discovered at the landfill, the area where the wastes are deposited is immediately cordoned off from public access, and, if the generator or hauler cannot be identified, the landfill operator assures the cleanup, transportation, and disposal of the waste at a permitted hazardous waste management facility.

Verify that information and observations resulting from each random inspection are recorded in writing, signed by the inspector, and retained at the landfill for at

Page 378: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-58

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

least 3 yr, and that the recorded information includes, at a minimum:

- date and time of the inspection - names of the hauling firm and the driver of the vehicle - vehicle license plate number - source of the waste, as stated by the driver - observations made by the inspector during the detailed inspection.

Verify that inspectors, equipment operators, weigh station attendants, and spotters

are trained to identify unauthorized wastes or potential sources of regulated hazardous wastes.

SO.135.15.FL. Landfills must follow specific cover requirements (FAC 62-701.500(7)(a) through (g)).

Verify that all solid waste at Class I and Class II landfills is spread in layers of approximately 2 ft in thickness and compacted to approximately 1 ft in thickness or as thin a layer as practical before the next layer is applied.

Verify that solid waste at all Class III landfills is spread in layers and compacted once every week using suitable heavy equipment, and that bulky materials are worked into other materials as much as practical.

Verify that the first layer of waste placed above the liner and leachate collection system is a minimum of 4 ft in compacted thickness and consists of selected wastes containing no large rigid objects that may damage the liner or leachate collection system.

Verify that solid waste is formed into cells to construct horizontal lifts and the working face of the cell, and side grades above land surface are at a slope no greater than 3 ft horizontal to 1 ft vertical rise.

Verify that lift depth does not normally exceed 10 ft.

(NOTE: Lift depth may be deeper, depending on specific operations, daily volume of waste, width of working face, and good safety practices.)

Verify that the working face is only wide enough to accommodate vehicles discharging waste, and to minimize the exposed area and unnecessary use of cover material.

Verify that the initial cover is applied and maintained at landfills in order to minimize any adverse environmental, safety, or health effects such as those resulting from birds, unauthorized wastes, blowing litter, odors, disease, vectors, or fires.

Page 379: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-59

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that the minimum frequency for applying cover is:

- at the end of each working day for Class I and II landfills, except for areas in which solid waste will be deposited on the working face within 18 h, initial cover consists of a temporary cover, such as a tarpaulin that is removed prior to the deposition of additional waste

- at the end of each work week for Class III landfills.

Verify that an intermediate cover, in addition to the 6-in. initial cover, is applied and maintained within 7 days of cell completion if additional solid waste will not be deposited within 180 days of cell completion.

(NOTE: The landfill operator may remove all or part of the intermediate cover before placing additional waste or installing final cover.)

Verify that solid waste disposal units that are filled to design dimensions receive final cover within 180 days after attaining final elevation or in accordance with the closure plan for the landfill.

SO.135.16.FL. Landfills must meet specific requirements regarding scavenging and salvaging (FAC 62-701.500(7)(h)).

Verify that uncontrolled and unauthorized scavenging is not permitted at any landfill site.

Verify that controlled salvaging for recycling is allowed at the landfill only if permitted by the operator.

SO.135.17.FL. Landfills must maintain a litter policing operation that meets specific requirements (FAC 62-701.500(7)(i)).

Verify that a litter policing operation is employed at the landfill that keeps litter from leaving the working area.

Verify that litter outside the working area is picked up within 24 h.

(NOTE: Some litter may be exposed through the initial cover if it is in traffic areas and away from the public view.)

SO.135.18.FL. Landfills must follow specific leachate management requirements (FAC 62-701.500(8)).

Verify that the landfill operator is responsible for leachate level monitoring, sampling, analysis of the landfill leachate, and provides copies of the leachate analysis to the Department.

Verify that the landfill operator is responsible for the operation of the leachate collection and removal system and for maintaining the system as designed for the

Page 380: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-60

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

design period.

(NOTE: Leachate may be discharged to an offsite treatment plant if the landfill operator has a written contract or agreement with the offsite treatment plant to discharge leachate to the plant.)

Verify that onsite leachate treatment or pretreatment systems are part of the leachate collection and removal system and are designed to the expected characteristics of the leachate.

Verify that the landfill operator has a prepared contingency plan to handle leachate collection, removal, and treatment problems such as interruptions of discharges to a treatment plant.

Verify that quantities of leachate collected by the leachate collection and removal system are recorded in gallons per day before onsite treatment or transport offsite.

Verify that a recording rain gauge is installed, operated, and maintained to record precipitation at the landfill and that precipitation records are maintained and used at the landfill to compare with leachate generation rates.

SO.135.19.FL. Landfills must have and maintain specific equipment (FAC 62-701.500(11)).

Verify that the landfill has sufficient equipment to ensure proper operation of the landfill, and for excavating, spreading, compacting, and covering wastes.

Verify that the landfill has sufficient reserve equipment or arrangement to obtain additional equipment within 24 h of equipment breakdown.

Verify that the landfill has communications equipment for emergency and routine communications.

Verify that Class I and Class III landfills have personnel shelters, sanitary facilities, and first aid equipment.

Verify that the landfill has dust control methods.

Verify that the landfill has fire protection and fire-fighting capabilities adequate to ensure the safety of employees and to control accidental burning of solid waste in the landfill, and that the fire protection includes procedures for notification of local fire protection agencies for assistance in emergencies.

Verify that the landfill has litter-control devices, portable fences, or other suitable devices.

Page 381: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-61

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that the landfill has signs posted indicating the name of the operating authority, traffic flow, hours of operation, and restrictions or conditions of disposal.

SO.135.20.FL. Landfill roads must meet specific requirements (FAC 62- 701.500(12)).

Verify that all landfills have an all-weather access road that is passable and safe under normal operating conditions.

Verify that all landfills have an inside perimeter road and other onsite roads that are maintained to allow access to monitoring devices and stormwater controls, for landfill inspections and fire fighting.

SO.135.21.FL. Landfills must meet specific requirements regarding the handling of special wastes (FAC 62-701.520).

Verify that motor vehicles which are brought to a landfill are stored temporarily in a separate area until they are removed for recycling, and that if they cannot be recycled, all fluids and batteries are removed from the vehicles and they are compacted to minimize voids before being placed in the Class I area.

Verify that, in the event of a natural disaster, during which large volumes of debris are accumulated (such as trees and buildings that have been destroyed), the debris is transported to an area remote from habitation and burned.

Verify that the landfilling of shredded solid waste without daily soil cover is allowed as a method of final disposal at a landfill when the shredding is done at a properly designed and operated shredding facility that is approved by the Department on the following conditions:

- 70 percent of all shredded waste, dry weight, is capable of passing through a 3-in. screen

- waste is spread to a smooth contour and compacted promptly after placement and left undisturbed to prevent odors

- blowing of shredded waste by the wind is controlled - all solid waste storage areas in the shredding facility are maintained and

cleaned at the end of each day's operations or during continuous operation, as necessary, to prevent disease and vector problems

- all equipment is designed and maintained to control spillage and to achieve the required product quality

- an operation plan, including provisions for removal and proper disposal of wastes within 24 h should the facility break down or operational quality be diminished, is in effect

- the operational plan includes provisions for a stock pile of emergency soil cover material and a plan to convert the operation to a conventional landfill operation.

Page 382: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-62

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.135.22.FL. Landfill operators must have specific qualifications (FAC 62-703.300).

Verify that no person performs the duties of a landfill operator unless that person is a trained operator or an interim operator.

Verify that operators of landfills are trained to operate the appropriate type of facility at which they are employed.

(NOTE: The following persons are considered trained operators: - operators of landfills who have completed the courses and passed the

examinations required - operators who have successfully completed the Solid Waste Landfill

Operators training course given jointly by the Florida Chapter of the Governmental Refuse Collection and Disposal Association (GRCDA), the University of Florida, and the Department, prior to the review of the program by the Solid Waste Management Training Committee

- operators who have successfully completed a landfill operator course in another state that meets the requirements of training set forth in these regulations.)

SO.135.23.FL. Landfill operators must comply with specific training and training verification requirements (FAC 62-703.510 and 620).

Verify that landfill operators demonstrate the skill, knowledge, and experience necessary to operate the appropriate type of facility by qualifying for and passing the appropriate examination.

Verify that, before receiving Training Verification, a landfill operator completes an approved operator training course and has at least 1 yr of work experience in landfill operations, and either of the following:

- a high school diploma or equivalent - at least 2 yr of work experience at a Class I, II, or III landfill.

Verify that, within each 3-yr period after receiving a Verification of Training

document, an operator completes at least 15 h of continuing training in an approved continuing training course.

Monitoring Criteria (NOTE: These regulations apply only to applications for construction or lateral expansion of a solid waste disposal unit received by the Department after 6 January 1993.)

SO.135.24.FL. Landfills Verify that the landfill provides to the Department a water quality monitoring plan

Page 383: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-63

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

must have water quality monitoring plans and systems (FAC 62-701.510(2)).

for the landfill that describes the proposed groundwater, surface water, and leachate monitoring systems.

Verify that the water quality monitoring system is installed at the landfill and consists of:

- a sufficient number of groundwater wells installed at appropriate locations and depths to yield groundwater samples from the uppermost aquifer, as well as other aquifers reasonably expected to be affected by the landfill

- surface water monitoring points installed at locations to yield samples of surface water that may be affected by the landfill

- leachate monitoring points to yield representative leachate samples.

SO.135.25.FL. Landfills must follow specific regulations regarding groundwater monitoring (FAC 62-701.510(3)).

Verify that two or more detection wells are located at the solid waste disposal unit and are:

- within the zone of discharge hydraulically downgradient from the solid waste disposal unit to detect leachate releases

- no more than 50 ft from the edge of the solid waste disposal unit - capable of monitoring each solid waste disposal unit as it is operated.

(NOTE: Only one detection well is required at Class II landfills unless it is demonstrated that more are needed to assure the quality of the water.)

Verify that multiple downgradient compliance wells are located at or immediately adjacent to the compliance line of the zone of discharge, if required by the Department from assessment monitoring results.

Verify that a sufficient number of background wells installed as part of the hydrogeological investigation are maintained throughout the design life of the landfill to provide information on background water quality.

Verify that groundwater monitoring wells at the landfill meet the following requirements:

- the location of each well is determined by a registered Florida land surveyor - the identification number assigned to each well by the Department is used on

all water quality monitoring reports - wells are spaced no greater than 500 ft apart across the downgradient

direction of groundwater flow, and no greater than 1500 ft apart across the upgradient direction of groundwater flow, in the uppermost aquifer within the zone of discharge, unless site specific conditions support the use of alternate well spacing

Page 384: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-64

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- well screens are located to readily detect representative groundwater conditions within the thickness of the uppermost aquifer within the zone of discharge

- well screens do not act as conduits through confining layers between water bearing strata

- the annular space above the sampling depth is sealed to prevent contamination of samples and groundwater

- wells monitoring the unconfined water table are screened so that the water table can be sampled at all times

- any monitoring wells that are abandoned or will be covered due to lateral expansions of a landfill or the construction of new solid waste disposal units are plugged as necessary so that they do not act as conduits for any leachate release to the groundwater

- the Department is notified in writing before any wells are abandoned or plugged.

(NOTE: Detection sensors capable of detecting changes in groundwater that may

indicate leachate releases, linked to a data recorder, may be used to augment detection wells or may be used as an alternative to detection wells, upon demonstration of their effectiveness to the Department.)

SO.135.26.FL. Landfills must comply with specific surface monitoring requirements (FAC 62-701.510(4)).

Verify that all surface water bodies which may be affected by a contaminant release from the facility are monitored, except bodies of water contained completely within the property boundaries of the disposal site that do not discharge from the site to surface waters.

Verify that, in bodies of standing water, one or more representative monitoring points are located as close as practical to the facility.

Verify that, in flowing water bodies, a sufficient number of upgradient and downgradient locations are used to allow the effect of the landfill to be measured.

Verify that discharges from detention ponds for stormwater are sampled at the point of discharge to waters of the state or from the property, whichever is closer to the detention pond.

Verify that the details concerning the sampling locations and the analysis requirements are specified in the water quality monitoring plan.

Verify that each monitoring location is marked and its position is determined by a registered Florida land surveyor.

Page 385: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-65

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.135.27.FL. Landfills must comply with specific leachate sampling requirements (FAC 62-701.510(5)).

Verify that the water quality monitoring plan specifies the location of, and proposed protocol for, landfill leachate sampling to obtain a representative characterization of the leachate composition in the leachate collection and removal system as the leachate comes from the wastes and before it is subjected to conditions that may change the characteristics of the leachate.

Verify that all sampling points are located in areas that minimize pumping of leachate before sampling.

SO.135.28.FL. Water quality monitoring and leachate sampling for specific parameters must occur at specific frequencies at landfills (FAC 62-701.510(6)).

(NOTE: The following frequency of sampling and analysis requirements apply to all landfills, except when otherwise stated or when specified in a Department permit. The owner/operator of the solid waste disposal unit may request a permit modification to delete specific monitoring parameters or field parameters from routine analyses of detection wells and surface water.)

Verify that background water quality for a proposed landfill is determined by analysis of at least one water sample taken from each well and each surface water monitoring location established during the hydrogeological investigation.

Verify that the water quality information is submitted to the Department with the permit application.

Verify that sampling and analysis for background groundwater quality is for the parameters listed in Appendix 9-3, Table 1.

Verify that sampling and analysis for background surface water quality is for the parameters listed in the U.S. TEAM Guide, Appendix 9-5.

Verify that leachate is sampled and analyzed semi-annually for the parameters listed in Appendix 9-3, Table 2, and annually for the parameters listed in the U.S. Team Guide, Appendix 9-5.

Verify that, if the annual leachate sampling and analysis indicates that a contaminant listed in the U.S. TEAM Guide, Appendix 9-5 exceeds the regulatory level listed therein, the Federal facility initiates monthly sampling and analysis and notifies the Department in writing.

Verify that, if in any three consecutive months the same listed contaminant exceeds the regulatory level, the Federal facility notifies the Department, and within 90 days initiates a program designed to identify the source and reduce the presence of the contaminant in the leachate so that it no longer exceeds the regulatory level.

Verify that, if in any three consecutive months no listed contaminant is found to

Page 386: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-66

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

exceed the regulatory level, the Federal facility discontinues the monthly sampling and analysis and returns to a routine sampling schedule.

Verify that all detection wells and a representative sample of background wells are sampled and analyzed for the groundwater parameters listed in Appendix 9-3, Table 1, and that this monitoring is done at least semi-annually at lined landfills.

Verify that surface waters are sampled and analyzed semi-annually for the parameters listed in Appendix 9-3, Table.

SO.135.29.FL. Landfills must follow specific assessment monitoring requirements (FAC 62-701.510(7)(a)).

Verify that, if monitoring parameters are detected in detection wells in concentrations which are significantly above background water quality, or which are at levels above the Department's water quality standards, the Federal facility resamples the wells within 15 days after the sampling data is received, to confirm the data.

Verify that, if the data is confirmed or if the Federal facility does not resample, the Department is notified within 14 days of the detection.

Verify that, when notified by the Department, the Federal facility initiates assessment monitoring as follows:

- routine monitoring of all monitoring wells, surface water monitoring locations, and leachate sampling locations continues as normal

- within 90 days of initiating assessment monitoring and annually thereafter, the Federal facility samples and analyzes a representative sample of the background wells and all affected detection wells for the parameters listed in the U.S. TEAM Guide, Appendix 9-5

- any new parameters detected and confirmed in the affected downgradient wells are added to the routine groundwater monitoring parameter lists

- within 90 days of initiating assessment monitoring, the Federal facility installs and samples compliance monitoring wells at the compliance line of the zone of discharge and downgradient from the affected detection monitoring wells

- within 180 days of initiating assessment monitoring, the Federal facility submits a contamination assessment plan to the appropriate Department District Office that delineates the extent and cause of the contamination and evaluates methods to be used to prevent any Department water quality standards outside the zone of discharge

- the Federal facility implements the contamination assessment plan and submits a contamination assessment report to the Department

- the Federal facility takes all reasonable efforts to prevent further degradation of water quality from the landfill activities

- if, for two consecutive sampling events the concentrations of all parameters

Page 387: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-67

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

listed in Appendix 9-3, Table 1 and the U.S. Team Guide, Appendix 9-5 are at or below background values, the Federal facility, after notifying the Department, discontinues assessment monitoring and returns to the routine monitoring requirements.

SO.135.30.FL. Landfills must take specific corrective actions when water quality standards are violated or are likely to be violated (FAC 62-701.510(7)(b)).

Verify that, if the contamination assessment report indicates that the water quality standards are likely to be violated outside the zone of discharge, the Federal facility submits a remedial action plan to the Department within 90 days.

Verify that, upon Departmental approval of the remedial action plan, the Federal facility initiates corrective actions to prevent such violations.

Verify that, if any contaminants are detected and confirmed in compliance wells in concentrations which exceed both background levels and Department water quality standards or criteria, or are detected and confirmed in detection wells in concentrations that are above Department water quality minimum criteria, the Federal facility notifies the Department within 14 days of this finding and initiates corrective actions.

Verify that assessment monitoring continues throughout the corrective action period.

Closure Criteria (NOTE: Landfills or solid waste disposal units that were closed in a manner approved by the Department prior to 6 January 1993, or which have received final cover before 1 July 1985, are exempt from the requirements of this section.)

SO.135.31.FL. Inactive landfills must have closure plans or closure permits prior to closure activities (FAC 62-701.600(1)(a) and (3)).

Verify that landfills or solid waste disposal units that were no longer receiving wastes on 6 January 1993, that are not closed in accordance with an approved closure plan or closure permit, and that do not have an approved closure plan or closure permit comply with all closure regulations of this section.

(NOTE: Landfills or solid waste disposal units that were no longer receiving wastes after 6 January 1993, that have not been closed in accordance with an approved closure plan or closure permit, and that have an approved closure plan or closure permit are exempt from the closure regulations of this section as long as the closure plan or closure permit is complied with.)

Verify that landfill owners/operators obtain closure permits from the Department prior to closure of the landfill, and that they comply with permit requirements.

Page 388: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-68

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.135.32.FL. Active landfills must have closure plans or closure permits prior to closure activities (FAC 62-701.600(1)(b) and (3)).

Verify that active landfills or solid waste disposal units that receive wastes after 6 January 1993 comply with all solid waste closure requirements in this section.

Verify that landfills which have an approved closure plan or closure permit on 6 January 1993 apply for modification of their plan or permit to comply with these regulations.

(NOTE: Landfills or solid waste disposal units that are operating under a Department consent agreement, that have a closure permit, and that cease accepting wastes on or before 1 December 1992, are exempt from these requirements, with the exception of final cover requirements.)

Verify that landfill owners/operators obtain closure permits from the Department prior to closure of the landfill, and that they comply with permit requirements.

SO.135.33.FL. Landfills must follow a specific closure schedule (FAC 62-701.600(2)).

Verify that, at least 1 yr prior to the projected date when wastes will no longer be accepted or when all solid waste disposal units are expected to reach design dimensions, the owner/operator provides a written notice to the Department with a schedule for cessation of waste acceptance and closure of the landfill.

Verify that the closure schedule becomes an addendum to the landfill permit.

(NOTE: If unforeseen circumstances do not allow for the 1 yr notification, notice must be provided as soon as the need to close the facility becomes apparent.)

Verify that, at least 120 days prior to the date when wastes are no longer accepted at the landfill, the owner/operator advises users of the intent to close the landfill by posting signs at the entrance to the landfill giving the date of closing, the location of alternative disposal facilities, and the name of the person responsible for closing the landfill.

Verify that the notification signs are maintained throughout the closing period.

(NOTE: If unforeseen circumstances do not allow for the 120 day notice to users, notice must be provided as soon as the need to close the facility becomes apparent.)

Verify that, within 10 days prior to the date when wastes will no longer be accepted at the landfill, the owner/operator publishes a notice of the landfill closing in the legal advertising section of a newspaper of general circulation in the county where the activity is proposed, and provides proof of publication to the

Page 389: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-69

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Department within 7 days of publication.

SO.135.34.FL. Landfills must meet specific final cover design requirements (FAC 62-701.600(5)(g)).

Verify that landfills have a final cover designed to minimize infiltration and erosion which includes a barrier layer consisting of a soil layer, a geomembrane, or a combination of a geomembrane with a low permeability material.

Verify that, for lined Class I and Class II landfills, the barrier layer has a permeability which is substantially equivalent to, or less than, the permeability of the bottom liner system.

Verify that, if the landfill uses a geomembrane in the bottom liner system, the barrier layer also incorporates a geomembrane.

Verify that, for unlined Class I and Class II landfills, the barrier layer has a permeability of 1 x 10-7 cm/s or less.

Verify that, for Class III landfills, the barrier layer has a permeability of 1 x 10-5 cm/s or less.

Verify that, if the barrier layer consists only of soil, it is at least 18 in. thick, emplaced in 6-in. thick lifts, and has a final, 18-in. thick layer of soil which will sustain vegetation to control erosion placed on top of the barrier layer.

Verify that, if a geomembrane is used in the barrier layer, it is a semicrystalline thermoplastic at least 40 mil thick or a noncrystalline thermoplastic at least 30 mil thick with a maximum water vapor transmission rate of 2.4 g/(m2 x day), has chemical and physical resistance to materials it may come in contact with, and withstands exposure to the natural environmental stresses and forces throughout the installation, seaming process, and settlement of the waste during the closure and long-term care period.

Verify that a protective soil layer at least 24 in. thick is put on top of the geomembrane.

Verify that material specifications, installation methods, and compaction specifications are adequate to protect the barrier layer from root penetration, resist erosion, and remain stable on the final design slopes of the landfill.

Verify that this layer includes top soil or soils that will sustain vegetative growth.

(NOTE: In some cases, a drainage layer may be required between the cap (soil and geomembrane layer) and the top soil layer.)

(NOTE: An alternate design for the barrier layer, or parts of the barrier layer may

Page 390: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-70

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

be used at the landfill, if approved by the Department.)

SO.135.35.FL. Landfills must have closure design plans that contain specific information (FAC 62-701.600(5)(a) through (f) and (h) through (j)).

Verify that landfills have closure design plans that consist of engineering plans and a report on closing procedures that apply to the final closing of a solid waste disposal unit during the operation of the landfill, the final closing of the landfill, and the monitoring and maintenance during the long-term care period.

Verify that the closure design plan contains the following information:

- a plan sheet showing phases of site closing - drawings showing existing topography and proposed final grades - provisions to close solid waste disposal units within the landfill as soon as

they reach approved design dimensions and elevations and to finally close the landfill in accordance with these requirements

- final elevations before settlement - final side slope design - final cover installation plans showing the sequence of applying final cover - proposed method of stormwater control - proposed method of access control - a description of any proposed final use of the landfill property.

SO.135.36.FL. Landfills must have closure operation plans that contain specific information (FAC 62-701.600(6)).

Verify that landfills have a closure operation plan that contains the following information:

- description of the actions that will be taken to close the landfill, such as: - placement of cover - grading

- construction of berms, ditches, roads, retention-detention ponds - installation or closure of wells and boreholes - installation of fencing - seeding of vegetation - protection of onsite utilities and easements.

- a time schedule for completion of the closing and long-term care - appropriate references to the closure design and other supporting -documents - a provision for the development and implementation of the water quality

monitoring plan - a provision for the development and implementation of the routine gas

monitoring program - indication of any additional equipment and personnel needed to complete

closure of the landfill.

Page 391: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-71

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.135.37.FL. Landfills must follow specific requirements regarding temporary closure (FAC 62-701.600(7)) [Revised July 1996].

Verify that the placement of final cover on a solid waste disposal unit is delayed for a period of time specified in an approved closure plan for the following reasons:

- for the purpose of promoting biological degradation of waste - if additional solid waste will be deposited on the solid waste disposal unit

within 5 yr - if the excavation of waste is planned.

Verify that the placement of final cover is delayed only if the solid waste disposal unit is temporarily closed in accordance with an approved closure plan.

Verify that the conditions of temporary closure include the following:

- the solid waste disposal unit was constructed in compliance with its permit conditions and has a liner and leachate control system

- a schedule for closure is shown in the closure plan application - final cover is installed on side slopes of each completed disposal unit that will

not receive additional waste or that will not be mined, and all areas visible to the public are closed and landscaped

- odors and disease vectors are controlled - an intermediate cover is installed on the solid waste disposal unit - closure cost estimates include temporary closure as well as costs of final

closure - the landfill owner/operator demonstrates that delaying placement of final

cover will not cause or contribute to any significant increase in leachate escaping from the solid waste disposal unit into the environment.

Verify that a solid waste disposal unit that will be mined in the future has a

temporary final cover installed.

SO.135.38.FL. Existing landfills must follow specific closure procedures (FAC 62-701.640).

Verify that any Class I or Class II landfill receiving waste on 2 January 1994 is closed by 9 October 1996, if:

- it is within the airport setbacks, and the owner/operator cannot demonstrate that the facility is designed and will be operated so that it does not pose a bird hazard to aircraft

- it is located within the 100-yr floodplain, unless the owner/operator demonstrates that it will not restrict the flow of the 100-yr flood, reduce the temporary water storage capacity of the floodplain unless compensating storage is provided, or result in a washout of solid waste

- it is located in a fault area, seismic zone, or unstable area, unless the

Page 392: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-72

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

owner/operator demonstrates that the facility is adequately designed to tolerate the anticipated stresses associated with these areas.

(NOTE: The deadline for closure may be extended by the Department for up to 2

yr if the landfill owner/operator demonstrates to the Department prior to 9 July 1996, that:

- there is no available and practicable alternative disposal capacity - such extension will result in no immediate threat to human health or the

environment.)

Postclosure Care Requirements

SO.135.39.FL. Landfill facilities must receive postclosure care for a specific period of time (FAC 62-701.620(1) and (2)).

Verify that any landfill that receives waste after 6 January 1993 continues to monitor and maintain the integrity and effectiveness of the final cover as well as other appurtenances of the facility in accordance with the approved closure plan for 30 yr from the date of closing.

(NOTE: The Department may extend the postclosure time period if the closure design or closure operation plan is found to be ineffective. The Department may also grant permit modifications allowing for a reduced postclosure period if the Federal facility makes reasonable assurances that there is no threat to human health or the environment and if the landfill:

- was constructed and operated in accordance with approved standards and has a leachate control system and a liner

- was closed with appropriate final cover, vegetative cover has been established, and a monitoring system has been installed

- has a 10-yr history after closure of no violations of water quality standards or criteria detected in the monitoring system, and no increases over background water for any monitoring parameters that may be expected to result in violations of water quality standards or criteria

- has had no detrimental erosion of cover, and subsidence of waste has ceased.)

SO.135.40.FL. Landfill facilities involved in postclosure maintenance may modify their groundwater monitoring plan (FAC 62- 701.620(3)).

Verify that the landfill owner/operator removes a parameter from groundwater monitoring list only if so authorized by the Department.

Page 393: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-73

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.135.41.FL. The landfill owner/operator must possess a right to access to the landfill property during the postclosure care period (FAC 62-701.620(4)).

Verify that the landfill owner/operator possess or acquires a sufficient interest in, or a right to use, the property for which a permit is issued, including the access route onto the property to carry out the postclosure care requirements.

Verify that the landfill owner/operator retains the right to entry to the landfill property for the postclosure care period, after termination of solid waste operations, for inspection, monitoring, and maintenance of the site.

SO.135.42.FL. Any landfill monitoring well or device that fails during the postclosure care period must be reported and replaced (FAC 62-701.620(7)).

Verify that, if any monitoring well or other device required by the monitoring plan is destroyed or fails to operate for any reason, the landfill owner/operator immediately upon discovery, notifies the Department in writing.

Verify that all inoperative monitoring devices are replaced with functioning devices within 60 days of the discovery of the malfunctioning unit, unless the landfill owner/operator is notified otherwise in writing by the Department.

SO.135.43.FL. The Department must be notified at the end of the postclosure care period that the postclosure care is completed in accordance with regulations (FAC 62-701.620(8)).

Verify that the landfill owner/operator notifies the Department that a certification, signed and sealed by a professional engineer, verifying that postclosure care has been completed in accordance with the closure plan has been placed in the facility's operating record.

Documentation

SO.135.44.FL. Landfills must have operation plans that contain specific information (FAC 62-701.500(2)).

Verify that each landfill owner/operator has an operational plan that provides written, detailed instructions for the daily operation of the landfill.

Verify that the plan is kept on or near the landfill facility, and is accessible to landfill operators.

Verify that the operation plan is revised if operational procedures change.

Verify that the plan includes procedures for:

Page 394: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-74

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- designation of persons responsible for operation and maintenance of the facility

- contingency operations, alternate waste handling and disposal methods in case of emergency such as a fire, natural disaster, or equipment failure

- controlling the type of waste received at the site - weighing incoming waste, if required - vehicle traffic control and unloading - method and sequence of filling waste - waste compaction and application of cover - operations of gas, leachate, and stormwater controls - water quality monitoring.

SO.135.45.FL. Landfills must maintain operating records that contain specific information (FAC 62-701.500(3)).

Verify that the landfill maintains an operating record as part of the operation plan.

Verify that the operating record is kept with the operation plan, or in an alternative location designated in the operating permit that is readily accessible to landfill operators.

Verify that the operating record is available for inspection at reasonable times by Department personnel.

Verify that the operating record consists of the following information:

- all records, reports, analytical results, demonstrations, and notifications required by these regulations

- any construction, operation, and closure permits, including all modifications to those permits, issued by the Department, along with the engineering drawings and supporting information

- all personnel and operator training verifications.

SO.135.46.FL. Landfills must maintain specific waste records (FAC 62- 701.500(4)).

Verify that all solid waste is weighed as it is received at all Class I and Class III landfills, and at Class II landfills that are owned or operated by county or municipality.

Verify that landfill operators record, in tons per day, the amount of solid waste received and estimate the amounts of the following wastes:

- household waste - commercial waste - ash residue - incinerator by-pass waste - construction and demolition debris

Page 395: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-75

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- treated biohazardous waste - agricultural waste - industrial waste - yard trash - sewage sludge - industrial sludge - water/air treatment sludges.

Verify that waste reports are compiled monthly, and copies are provided to the

Department quarterly.

SO.135.47.FL. Landfills must meet specific recordkeeping requirements (FAC 62-701.500(13)).

Verify that records of all information used to develop or support the permit applications and any supplemental information submitted to comply with these regulations regarding construction of the landfill throughout the design period are kept at the landfill.

Verify that records pertaining to the operation of the landfill are kept of the design period of the landfill.

Verify that records of all monitoring information, including calibration and maintenance records, all original chart recordings for continuous monitoring instrumentation, and copies of all reports required by the permit are kept at the landfill for at least 10 yr.

Verify that background water quality records are kept for the design period of the landfill.

Verify that the landfill maintains an annual estimate of the remaining life and capacity in cubic yards of the existing constructed landfill and remaining capacity and site life of other permitted areas not yet constructed.

Verify that the annual estimate is based on a summary of the heights, lengths, and widths of the solid waste disposal units and is made and reported annually to the Department.

SO.135.48.FL. Landfills must file a closure report that contains specific information (FAC 62-701.600(4)).

Verify that landfills file a report on the final closure of the landfill that addresses the following requirements, or contains an explanation of why the requirement is not applicable:

- general landfill information, including: - identification of the landfill

- location, description, and vicinity map

Page 396: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-76

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- total acreage of waste disposal areas and total acreage of landfill property

- legal description of property on which the landfill is located - history of the landfill including dates of construction and a description

of the location and sequence of fill operations - identification of types of waste disposed of in the completed landfill

based on records, composition studies, operator memory, major waste depositors, or other information sources.

- the geotechnical investigation report and water quality monitoring plan - land use information containing a discussion and maps indicating:

- identification of adjacent landowners - zoning - present land uses - roads, highways, rights-of-way, or easements.

- a report on actual or potential gas migration in landfills that contain biodegradable wastes disposed of in porous soils that will allow migration of gas off the landfill property

- an assessment of the effectiveness of the landfill design and operation, that provides information about the effects of the landfill on adjacent ground and surface waters, and the landfill area, specifically:

- results of the geotechnical investigation - effects of surface water runoff, drainage patterns, and storm water

controls - extent and effects of methane gas migration, LEL percentage readings in

migration paths, and description of the gas venting system - condition of existing cover, thickness, and types of soils or materials

used for cover, and effectiveness of cover material as a leachate control mechanism

- the nature and characteristics of the waste disposed of at the landfill.

Page 397: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-77

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.140 CONSTRUCTION/ DEMOLITION LANDFILLS

SO.140.1.FL. Land clearing debris landfills must be permitted (FAC 62-701.803(1)) [Revised July 1998].

Verify that land clearing debris landfills have either general permits for offsite disposal of construction and demolition debris (hereafter referred to as a general permit in this section) or landfill or solid waste disposal unit permits.

Verify that land clearing debris landfills that use the general permit notify the Department in writing of the intent to use this permit, with the notification signed and sealed by a registered professional engineer.

SO.140.2.FL. Land clearing debris landfills with general permits must certify to the Department that construction of the landfill is completed in accordance with permit requirements (FAC 62.701-803(2)) [Revised July 1998].

Verify that, within 30 days of completion of construction, the engineer of record notifies to the Department that the permitted construction of the landfill is complete in accordance with the plans submitted to the Department, except where minor deviation was necessary.

Verify that all deviations from the permitted construction plans are described in detail and the reasons for deviation enumerated.

SO.140.3.FL. Stormwater must be controlled at land clearing debris landfills with general permits (FAC 62-701.803(4)) [Revised July 1998].

Verify that stormwater is controlled at construction and demolition landfills with general permits.

Verify that a copy of any permit for stormwater control issued by the Department or documentation that no such permit is required is submitted to the Department before the facility receives waste for disposal.

SO.140.4.FL. Land clearing debris landfills must have equipment for the temporary storage of solid waste other than construction and demolition debris (FAC 62-701.803(5)) [Revised July 1998].

Verify that the construction and demolition disposal facility has equipment for temporary storage and transport for solid waste, other than construction and demolition debris, to an authorized disposal facility.

Verify that such solid waste that is accepted by the construction and demolition disposal facility is segregated from the construction and demolition debris and disposed of in accordance with Department rules.

Page 398: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-78

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

1998].

SO.140.5.FL. Construction and demolition debris and land clearing debris must be compacted and sloped as necessary (FAC 62-701.803(6), (9), and 701.730(7) ) [Revised July 1998].

Verify that construction and demolition debris is compacted and sloped as necessary to assure the facility can be inspected by Department personnel during normal business hours.

SO.140.6.FL. Access to land clearing debris landfills and construction and demolition landfills must be restricted (FAC 62-701.803(7) and 701.730(7)) [Revised July 1998].

Verify that access to the construction and demolition disposal facility is controlled during the active life of the facility by fencing or other effective barriers to prevent disposal of solid waste other than construction and demolition debris.

SO.140.7.FL. Land clearing debris landfills and construction and demolition landfills must inspect incoming waste for prohibited materials (FAC 62-701.803(8) and 701.730(7)) [Revised July 1998].

(NOTE: This regulation is applicable to all land clearing debris disposal sites after 2 August 1994.)

Verify that at least one spotter is on duty at all time when the site is operating to inspect the incoming waste for prohibited materials.

Verify that any prohibited material, including buckets or cans containing tar, paint, glue, or other liquids, is removed from the waste stream and placed into appropriate containers for disposal at a permitted facility.

SO.140.8.FL. Land clearing debris landfills must meet specific closure requirements (FAC 62-701.803(10) and (11)) [Revised July 1998].

Verify that final cover or planting of vegetative cover is placed on each construction and demolition debris disposal unit within 180 days after final receipt of wastes.

Verify that final cover consists of a 24-in. thick soil layer, the upper 6 in. of which are capable of supporting vegetation and are graded to eliminate ponding, promote drainage, and minimize erosion.

Page 399: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-79

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that the side slopes of all above-grade disposal areas are no greater than 3 ft horizontal to 1 ft vertical rise.

Verify that the owner/operator notifies the Department within 30 days after closing, covering, and seeding the facility.

SO.140.9.FL. The recycling or incineration of materials at land clearing debris landfills must meet specific requirements (FAC 62-701.803(12) and (13)).

Verify that materials from the land clearing debris waste stream are recovered for purposes of recycling, provided that such recovery does not result in a violation of these regulations.

(NOTE: If materials are recovered from the construction and demolition debris waste stream for the purposes of recycling a separate solid waste permit is not required.)

Verify that a facility that employs an air curtain incinerator and that stores or disposes of construction and demolition debris at the site is permitted and meets all permitting requirements.

SO.140.10.FL. Construction and demolition debris disposal must meet permitting requirements (FAC 62-701.730(1)(a), (e), (3), (5), 62-256.500(3)) [Added July 1998].

Verify that a permit is obtained from the Department prior to the construction or operation of a construction and demolition disposal and recycling facility.

(NOTE: Construction and demolition debris landfills operating under a general permit issued by the Department on or before 1 June 1996, may continue to operate in accordance with that general permit.)

Verify that the engineer of record certifies to the Department that construction is complete at least 7 days prior to operation of a construction and demolition.

Verify that the landfill facility submits one of the following to the Department prior to receiving waste for recycling or disposal:

- a copy of a permit for stormwater control issued by the Department - documentation that a permit for stormwater control is not required.

Verify that landfill facilities have obtained an air pollution permit from the

Department for the use of Air Curtain Incinerators that are intended to be stationary units, i.e. continuously operate at one site for more than six months, or operate at any Department-permitted landfill.

(NOTE: No Department permits are required for air curtain incinerators that are designed and used as portable units and that will not operate on any one site for more than six months in any year. This does not relieve any person from the

Page 400: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-80

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

requirement of obtaining authorization to use a portable Air Curtain Incinerator, when necessary, from the Division of Forestry, or any local fire control authority.)

SO.140.11.FL. [Deleted July 1998].

SO.140.12.FL. [Deleted July 1998].

SO.140.13.FL. Burning of construction and demolition debris is allowed in accordance with Department rules (FAC 62-701.730(14) and 62-256.500).

Verify that open burning meets one of the following setback requirements:

- 300 ft or more away from any occupied building for residential land clearing - 300 ft or more away from any occupied building if an Air Curtain Incinerator

is used - 1000 ft or more away from any occupied building if an Air Curtain

Incinerator is not used.

Verify that open burning is setback 100 ft or more away from any public highway or road and the prevailing winds direct the smoke away from the public highway or road.

Verify that open burning is ignited after 9:00 a.m. and is extinguished one hour before sunset.

Verify that any open burning is attended at all times.

(NOTE : The open burning authorization is not intended to relieve any person from complying with any other applicable laws, rules, or ordinances, including Chapter 590, Florida Statutes, and rules of the Division of Forestry.)

Verify that the piles of materials to be burned are of such size that the burning will be completed within the designated time frame.

Verify that the moisture content and composition of the material to be burned is be favorable to good burning which will minimize air pollution.

Verify that wet or green vegetative materials are be burned.

Verify that the starter fuel and materials to be ignited do not emit excessive visible emissions when burned.

Page 401: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-81

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

emissions when burned.

Verify that tires are not used as starter fuels.

Verify that the amount of dirt in a land clearing open burning operation is minimized to enhance combustion and reduce emissions.

Verify that all insulation, electrical wiring, linoleum, carpeting, roofing material such as tar paper and asphalt shingles, or other excessive smoke producing or potentially air toxic material are removed prior to burning.

(NOTE: Refractory-lined air curtain incinerators with forced underdraft air may commence burning at sunrise and may be charged until sunset, provided they maintain a setback distance of 1000 feet from occupied building located off-site and do not create a nuisance. During such times as the air curtain incinerator is not in operation, public access to the air curtain incinerator must be restricted.)

SO.140.14.FL. Construction and demolition debris disposal is subject to specific disposal restrictions (FAC 62-701.730(18)) [Cite revised July 1998].

Verify that disposal areas are operated so that adverse environmental and public health impacts, such as blowing litter, odors, and vectors, are minimized.

Verify that asbestos-containing waste material is not disposed of in a construction and demolition debris disposal area.

SO.140.15.FL. Permitted construction and demolition debris disposal facilities must comply with operations requirements (FAC 62-701.730(7)) [Added July 1998].

Verify that an operation plan describing the facility operations and maintenance, emergency and contingency plans, and types of equipment that will be used, is used and maintained at the facility at all times.

Verify that the operation plan is revised, at a minimum, upon renewal of the operations permit and as operations change.

Verify that the Department is notified of operation plan changes other than those required for routine maintenance.

Verify that the facility is operated to control objectionable odors.

Verify that fuels, solvents, lubricants, and other maintenance materials are stored in secure areas separate from the disposal or sorting areas.

SO.140.16.FL. Construction Verify that operators and spotters employed at the facility are properly trained to

Page 402: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-82

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

and demolition landfills must meet operator training requirements (FAC 62-710.730(8)) [Added July 1998].

operate the facility, and to identify and properly manage any hazardous or prohibited materials which are received at the facility.

Verify that a training plan is included as part of the permit application.

Verify that the training plan includes either of the following:

- a list and schedule of those classes offered to the public which will be attended by the facility's operators and spotters

- a description of the facility's in-house training program and a demonstration that this program can be expected to adequately train operators and spotters to operate the facility and to identify and properly manage any hazardous or prohibited materials which are received at the facility.

Verify that the training plan and records documenting how the training plan is

being implemented are kept at the facility at all times.

Verify that, within 1 yr of the date that the training plan is submitted to the Department, or within 1 yr of the hiring of any particular operator, each operator completes at least 20 h of training in a course described in the training plan.

Verify that, within each 3 yr period after successfully completing the initial training course, each operator completes at least 15 h of continuing training in a course described in the training plan.

Verify that spotters meet the same training requirements as operators except that only 8 h of initial training and 8 h of continuing training are required.

SO.140.17.FL. Construction and demolition landfills must meet closure requirements (FAC 62-710.730(9) and (10)) [Added July 1998].

Verify that, at least 90 days prior to the date when wastes will no longer be accepted, construction and demolition debris disposal facilities submit an updated closure plan to the Department to reflect any changes in the closure plan due to actual operational conditions at the facility.

Verify that final cover and seeding or planting of vegetative cover is placed on each disposal unit within 180 days after it has reached its final grade.

Verify that final cover consists of a 24 in. thick soil layer, the upper 6 in. of which are capable of supporting vegetation.

Verify that final cover is graded and compacted as necessary to eliminate ponding, promote drainage, and minimize erosion.

Verify that the side slopes of all above-grade disposal units are no greater than 3 ft

Page 403: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-83

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

horizontal to 1 ft vertical rise.

Verify that, if the disposal unit is lined, the closure design includes a barrier layer or other measures to ensure that the design leachate head over the liner is not exceeded after closure.

Verify that a certification of closure construction is submitted to the Department within 30 days after closing, covering, and seeding the disposal unit.

Verify that, if disposal operations have raised the final elevations higher than 20 ft above the natural land surface, a final survey report done by a professional surveyor.

Verify that the facility is monitored and maintained for 5 yr from the date of closing.

(NOTE: This time period will be extended if assessment monitoring or corrective action has been initiated or if site-specific conditions make it likely that any contamination which may emanate from the disposal area would not be detected within 5 yr.)

Page 404: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-84

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.150. INDUSTRIAL WASTE UNITS

SO.150.1.FL. Solid waste disposal units that accept primarily industrial wastes other than construction and demolition debris, clean debris, or those materials specified as acceptable in Class III landfills must meet specific requirements (FAC 62-701.720(1) and (2)).

Verify that solid waste disposal units that accept primarily industrial wastes other than construction and demolition debris, clean debris, or materials specified as acceptable in Class III landfills meet the requirements for Class I landfills as found in SO.135.FL.

(NOTE: The owner/operator of an industrial waste disposal facility may request Departmental approval of alternate procedures and requirements.)

Page 405: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-85

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.155. SURFACE IMPOUNDMENTS

SO.155.1.FL. Surface impoundments for leachate treatment or storage that are located at landfills must meet specific requirements (FAC 62-701.400(6)(a) and (b)).

(NOTE: The requirements of this section apply to all leachate surface impoundments constructed after 6 January 1993. Leachate surface impoundments in use on 6 January 1993 must be replaced or modified to conform to these regulations by 6 January 1995.)

Verify that surface impoundments are constructed so that the bottom of the liner system is not subject to fluctuations of the groundwater so as to adversely impact the integrity of the liner system.

Verify that the surface impoundment is designed in segments so that any one segment may be taken out of service for inspection and repair with no interruption of service.

Verify that the impoundment has a double liner system consisting of upper and lower 60-mil minimum thickness geomembranes, and a leak detection and collection system between the geomembranes with a minimum hydraulic conductivity of 1 cm/s.

Verify that the lower geomembrane is placed directly on a subbase that is at least 6 in. thick and has a saturated hydraulic conductivity of less than or equal to 1 x 10-5 cm/s.

Verify that the leak detection and collection system is checked daily, and if the daily checks indicate that the upper liner is leaking at a rate greater than those predicted by the design calculations, the Department is notified.

Verify that, if the leakage rate results in the flooding of the leak detection and collection system, the impoundment is emptied and the liner is repaired.

Verify that, to preserve the liner integrity and prevent uplift, ballast material such as rounded gravel or sand, that will not cause damage to the geomembrane liner, is placed on top of any liner that is located below the water table.

Verify that a minimum of 2 ft of freeboard above the depth that would occur in the event of a 25-yr, 24-h storm is maintained in leachate surface impoundments.

Verify that disease vectors and offsite odors are controlled at the surface impoundments.

Page 406: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-86

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Page 407: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-87

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.160. WASTE TIRES FACILITIES

SO.160.1.FL. Waste tire processing facilities, collection centers, and collectors must be permitted or registered (FAC 62-711.300. FAC 62-711.310, and FAC 62-711.530(7)).

Verify that waste tire processing facilities are permitted and meet all permit requirements.

Verify that waste tire collection centers which are not exempt are permitted and comply with all permit requirements.

Verify that waste tire collectors are registered with the Department.

(NOTE: In lieu of obtaining a separate waste tire processing facility permit or collection center permit, solid waste management facilities may submit existing permits for modification to authorize the storage and processing of waste tires if they maintain a waste tire site and process the waste tires for recycling or disposal.)

Verify that waste tire sites which are not an integral part of the waste tire processing facility are closed.

(NOTE: A permit is not required for tire storage at: - a tire retreading business, unless 1000 or more tires are stored on the business

premises - a single facility that, in the ordinary course of business, removes tires from

motor vehicles, unless 1000 or more waste tires are stored on the business premises

- a retail tire-selling business that is serving as a waste tire collection center, unless 1000 or more waste tires are stored on the business premises.)

(NOTE: Processing facilities that will process less than 1000 waste tires during

any 30 days and store less than 1000 waste tires on any day may be permitted as small processing facilities. A small processing facility is subject to the same requirements as a waste tire processing facility, except where exemptions are noted.)

SO.160.2.FL. Waste tire sites must meet disposal requirements (FAC 62-711.400).

Verify that waste tire sites are on the same property as a waste tire processing facility.

Verify that waste tires are disposed of only at permitted solid waste management facilities.

Page 408: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-88

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

facilities.

(NOTE: Collection or storage of waste tires at a permitted waste tire processing facility or waste tire collection center prior to processing or use does not constitute disposal, provided that the collection and storage are in compliance with regulations.)

Verify that whole waste tires are not disposed of in a landfill.

(NOTE: Waste tires that have been cut into sufficiently small parts may be disposed of or used as initial cover at a permitted landfill in the following manner:

- for use as initial cover, a sufficiently small part means that 70 percent of the waste tire material is cut into pieces of 4 in.2 or less and 100 percent of the waste tire material is 32 in. 2 or less

- for the purposes of disposal, a sufficiently small part means that the tire has been cut into at least eight substantially equal pieces; any processed tire that is disposed of in a landfill and that does not meet the size requirements listed above must receive initial cover once every week.)

Verify that waste tires are stored only at one of the following:

- collected and stored at a permitted waste tire collection center - collected and stored before processing at a waste tire site that is an integral

part of a permitted waste tire processing facility - collected and stored before processing and recycling or disposal in a

permitted solid waste management facility - collected and stored at a facility exempted from permit requirements.

Verify that waste tire collectors transporting, disposing, or processing waste tires

are registered with the Department or exempt from registration requirements.

Verify that the Federal facility contracting with a waste tire collector for the transportation of more than 25 waste tires/mo from a single business location maintains records for that location.

Verify that the records contain the date when the tires were transported, the quantity of the tires, the registration number of the collector, and the name of the driver.

SO.160.3.FL. Waste tire sites must meet notification requirements (FAC 62-711.500).

Verify that the owner/operator of any waste tire site provides the Department with information concerning the site's size, location, and the quantity of waste tires accumulated at the site.

Page 409: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-89

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that the information includes the following:

- name of owner and operator - mailing address of owner and operator, including the telephone number and

country - location, including the street address, township, range section, latitude, and

longitude - property size and the dimensions of the waste tire pile - quantity of waste tires accumulated at the site.

SO.160.4.FL. Solid waste management facilities that are not part of waste tire processing facilities may maintain waste tire sites only if the site is used for the storage of waste tires prior to processing (FAC 62-711.510(4)).

Verify that permitted solid waste management facilities which are not an integral part of a waste tire processing facility maintain a waste tire site only if the site is used for the storage of waste tires prior to processing.

Verify that, if all waste tires are not processed at the facility every 3 mo, the facility demonstrates to the Department that the site is used for storage prior to processing rather than disposal.

SO.160.5.FL. Waste tire collectors must display a current decal with the collector registration number on each vehicle used (FAC 62- 711.520(2) and (3)).

(NOTE: Persons who use company-owned or company-leased vehicles to transport tire casings for the purposes of retreading between company-owned or company-franchised retail tire outlets and retread facilities owned or franchised by the same company are not considered waste tire collectors unless they also transport waste tires.)

Verify that any waste tire collector engaged in collecting or transporting waste tires for the purpose of storage, sale, recycling, reuse, disposal, or processing displays on each vehicle use a current decal with the waste tire collector registration number obtained from the Department for that vehicle.

Verify that the decal is affixed to the outside of the driver's front door of each vehicle used to transport waste tires.

(NOTE: Common carriers displaying an Interstate Commerce Commission number may display decals on removable marking panels.)

SO.160.6.FL. Waste tire collectors must record and maintain specific information

Verify that the waste tire collector records and maintains the following information regarding its activities for each 3 mo period of operation for 3 yr:

Page 410: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-90

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

(FAC 62-711.520(6) and (7)). - the total quantity of waste tires collected expressed in tons - where or from whom the waste tires were collected and the quantity, in tons,

collected from each where the waste tires were deposited and the quantity, in tons, deposited at each location

- receipts or other written materials documenting where all waste tires were deposited, stored, or disposed of.

Verify that the records are available for inspection by Department personnel

during normal business hours.

Verify that waste tire collectors submit to the Department an annual report that summarizes the above information.

SO.160.7.FL. Waste tire collectors must deposit waste tires for storage or disposal only at permitted waste tire processing facilities, permitted or exempt waste tire collection centers, or permitted solid waste management facilities (FAC 62-711.520(10)).

Verify that waste tire collectors deposit waste tires for storage or disposal only at permitted waste tire processing facilities, permitted or exempt waste tire collection centers, permitted solid waste management facilities, or at another site permitted by the Department to receive waste tires.

(NOTE: Waste tires that have been removed from their site of origin and are on board a motor vehicle are considered deposited if that motor vehicle has not moved over public highways in the previous 7 days.)

SO.160.8.FL. Waste tire processing facilities that have reached their permitted storage limits may not accept any waste tires for processing (FAC 62-711.530(2)).

(NOTE: Small processing facilities are exempt from this requirement.)

Verify that the waste tire processing facility does not accept any waste tires for processing if it has reached its permitted storage limit for any category of waste tires, or if the number of waste tires on the site exceeds the quantity estimate in the closing cost estimate.

Verify that the maximum storage limits are set in the following manner:

- for the aggregate of whole waste tires, processed waste tires, and residuals, 60 times the daily throughput of the processing equipment being used; however, whole waste tires do not exceed 30 times the daily through-put of the processing equipment being used

- for used tires, 10,000 used tires stored separately from other waste tires.

SO.160.9.FL. At least 75 Verify that at least 75 percent of the whole tires, used tires, and processed tires

Page 411: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-91

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

percent of the tires delivered to or contained onsite at a waste tire processing facility must be processed, disposed of, or recycled during the year (FAC 62-711.530(3)).

that are delivered to or are contained on the site of the waste tire processing facility at the beginning of each calendar year are processed and removed for disposal or recycling from the facility during the year, or disposed of onsite at a permitted solid waste management facility.

Verify that processed waste tires stored for recycling or disposal are cut into at least eight substantially equal pieces, unless the storage of tires of a larger size is permitted and does not adversely affect the environment or the public health or welfare, and that storage of a larger size is necessary for purposes of recycling or transportation.

(NOTE: Initial cover is not required for stored, processed tires that are not in excess of the storage limit of the facility.)

SO.160.10.FL. Waste tire processing facilities must meet specific recording and recordkeeping requirements (FAC 62-711.530(4) and (5)) [Revised July 1996].

Verify that the owner/operator of the waste tire processing facility records and maintains for 3 yr the following information regarding their activities:

- for all waste tires shipped from the facility, the name and waste tire collector registration number of the waste tire collector who accepted the waste tires for transport, and the quantity of waste tires shipped with that collector

- if waste tires were shipped with a person who is not a waste tire collector, the number of tires shipped; the person's name, address, and telephone number; and the place where the waste tires were deposited

- for all waste tires received at the facility, the name and waste tire collector registration number of the collector who delivered the waste tires to the facility, and the quantity of waste tires received from that collector

- if more than five waste tires were delivered by a person who is not a waste tire collector, the number of tires delivered and the person's name, address, and telephone number

- for all waste tires removed for recapping, the quantity and type removed, and the name and location of the recapping facility receiving the tires.

Verify that the above records are available for inspection by Department personnel

during normal business hours.

Verify that owners/operators of waste tire processing facilities submit quarterly reports to the Department that summarize the above information, and also include:

- the facility name, address, and permit number - the quarter covered by the report - the total quantity, by category, of waste tires received at the facility during

the quarter covered by the report - the total quantity, by category, of waste tires shipped from the facility during

the quarter covered by the report the total quantity of waste tires processed

Page 412: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-92

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

during the quarter - the total quantity, by category, of waste tires located at the facility on the last

day of the quarter - a list of all dates on which one or more categories of waste tires exceeded the

storage limit, which category or categories were in excess, and how this condition was or will be relieved.

Verify that quarterly reports are submitted by the 20th of the month following the

close of each calendar quarter.)

SO.160.11.FL. All waste tire sites, collection centers, processing facilities, and disposal facilities that store waste tires must comply with specific technical and operational standards (FAC 62- 711.540(1)).

Verify that, if the site receives waste tires from the public, a sign is posted at the entrance of the site stating operating hours, cost of disposal, and site rules.

Verify that no operations involving the use of open flames are conducted within 25 ft of a waste tire pile.

Verify that an attendant is present when the site is open for business if the site receives waste tires from the public.

Verify that fire protection services for the site are assured through notification of local fire protection authorities, that a fire safety survey is conducted at least annually, and that the survey report is made part of the next quarterly report.

Verify that the site operator prepares and keeps onsite an emergency preparedness manual, a copy of the manual is kept at an offsite location designated by the operator, the manual is updated at least once a year and upon changes in site operations, and the manual contains the following elements:

- a list of names and numbers of persons to be contacted in the event of a fire, flood, or other emergency

- a list of the emergency response equipment at the site, its location, and how it should be used in the event of a fire or other emergency

- a description of the procedures that should be followed in the event of a fire, including procedures to contain and dispose of the oily material generated by the combination of large numbers of waste tires.

Verify that the site operator immediately notifies the Department in the event of a

fire or other emergency that poses an unanticipated threat to the public health or the environment.

Verify that, within 2 weeks of any emergency, the site operator submits to the Department a written report on the emergency describing the origins of the emergency, the actions taken to deal with the emergency, the results of the actions

Page 413: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-93

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

taken, and an analysis of the success or failure of the actions.

Verify that the operator of the site maintains records of the quantity of waste tires received at the site, stored at the site, and shipped from the site.

Verify that, if the operator of the site is not the owner of the property, the operator has written authorization to operate the facility from the property owner.

Verify that communication equipment is maintained at the waste tire site to assure that the site operator can contact local fire protection authorities in case of a fire.

Verify that the owner/operator provides for control of mosquitoes and rodents so as to protect the public health and welfare.

Verify that an approach and access road to the waste tire site is kept passable for any motor vehicle at any times.

SO.160.12.FL. All waste tire sites, collection centers, processing facilities, and disposal facilities that store waste tires indoors must comply with additional technical and operational standards (FAC 62-711.540(2)).

Verify that all waste tire sites, collection centers, processing facilities, and disposal facilities that store waste tires indoors comply with the following additional technical and operational standards:

- tire piles are not more than 50 ft in width, except that piles along a wall are not more than 25 ft in width

- the width of main aisles between tire piles is not less than 8 ft - the clearance from the top of storage to sprinkler deflectors or roof structures

is not less than 3 ft - the clearance in any direction from unit heaters, radiant space heaters, duct

furnaces, and flues is not less than 3 ft - when waste tires are stowed up to 15 ft high, walls between adjacent

warehouse areas and between manufacturing and warehouse areas do not have less than a 4-h fire rating

- when waste tires are stored over 15 ft high, walls between manufacturing and warehouse areas have a fire rating of not less than 6 h and steel columns have 1 h fireproofing

- if the top of storage exceeds 20 ft in height, 2-h fireproofing is provided for the column and its connections with other structural members

- at any time when an attendant is not present, access to the site is controlled through the use of doors, fences, gates, natural barriers, or other means.

(NOTE: An automatic sprinkler system installed in compliance with The Standard

for Storage of Rubber Tires, National Fire Protection Agency 231D, Battery March Park, Quincy, Massachusetts, incorporated herein by reference, may be substituted for fire walls and column fireproofing.)

Page 414: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-94

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.160.13.FL. All waste tire sites, collection centers, processing facilities, and disposal facilities that store waste tires outdoors must comply with additional technical and operational standards (FAC 62-711.540(3)).

Verify that an outdoor waste tire site is not constructed, maintained, or operated within 200 ft of any natural or artificial body of water, including wetlands within the jurisdiction of the Department, except bodies of water contained completely within the property boundaries of the facility that do not ordinarily discharge from the site to the surface waters.

(NOTE: A Federal facility may maintain a waste tire site within the 200-ft setback area if permitted by the Department and if the site is managed in such a way as to divert stormwater or floodwaters around and away from storage piles, with the exception of artificial reefs constructed pursuant to Department permits.)

Verify that the outdoor waste pile does not exceed the following maximum dimensions:

- 50 ft wide - 10,000 ft2 area - 15 ft high.

Verify that a 50-ft wide fire lane is placed around the perimeter of each outdoor

waste pile, and that access to the fire lane for emergency vehicles is unobstructed at all times.

Verify that access to the site is controlled through the use of fences, gates, natural barriers, or other means.

Verify that the site (except small processing facilities) is bermed or given other adequate protection, if necessary, to keep liquid runoff from a potential waste tire fire from entering water bodies.

Verify that the waste tire site is kept free of grass, underbrush, and other potentially flammable vegetation at all times.

SO.160.14.FL. All waste tire sites, collection centers, processing facilities, and disposal facilities that store processed waste tires must comply with specific temperature standards (FAC 62- 711.540(4)).

Verify that, at all waste tire sites, collection centers, processing facilities, and disposal facilities that store processed waste tires, the temperature of any aboveground piles of compacted, processed tires over 8 ft high is monitored and does not exceed 300 οF.

Verify that temperature control measures are instituted so that pile temperatures do not exceed 300 οF.

(NOTE: Temperature monitoring and controls are not required for processed tires disposed of in permitted landfills.)

Page 415: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-95

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

disposed of in permitted landfills.)

SO.160.15.FL. Residuals from waste tire processing must be managed in a specific manner (FAC 62-711.540(5)).

Verify that any residuals from waste tire processing are managed so as to be contained onsite, and are controlled and disposed of in a permitted solid waste management facility or properly recycled.

SO.160.16.FL. Waste tire collection centers must be permitted and must meet specific requirements (FAC 62-711.550(1) and (2)).

Verify that waste tire collection centers are permitted by the Department.

Verify that waste tire collection centers meet the following requirements:

- no more than 1000 waste tires are stored at the collection center at any one time

- all waste tires that are not used are removed at least once a year from the site for recycling, processing, or disposal.

SO.160.17.FL. Waste tire sites must be closed in a specific manner (FAC 62-711.700).

Verify that waste tire sites which do not meet the requirements of these regulations do not receive any waste tires and are closed immediately or are brought to compliance.

Verify that, in closing waste tire sites, the owner/operator meets the following closure requirements:

- stops public access to the site - posts a notice indicating that the site is closed and giving the phone number

of the county solid waste authority - notifies the Department and county government of closing - removes all waste tires and residuals to a waste processing facility, solid

waste management facility authorized to accept waste tires, or a legitimate user of waste tires

- removes any solid waste to a permitted solid waste management facility - notifies the Department when closing is complete.

Verify that the waste tire site has a closing plan as part of the permit that contains

the following information:

- a description of how the closure requirements will be met - a closing schedule, including time period for completion - a plan for site rehabilitation if any contamination or other threat to the public

health or environment is discovered.

Page 416: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-96

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.160.18.FL. Mobile waste tire processing equipment must be permitted (FAC 62- 711.801(1), (3), and (5)).

Verify that any Federal facility that operates mobile waste tire processing equipment has a general permit for each processing unit.

Verify that processing equipment is located at:

- a waste tire site that is at a permitted solid waste management facility or waste tire processing facility

- a waste tire site or waste tire collection center or any other site where waste tires are stored that is not accepting waste tires

- a waste tire collection center that is accepting waste tires if the mobile processing equipment has not operated at that site for more than three of the preceding 30 days.

Verify that the waste tire site notifies the Department of the site's size, location,

and the quantity of the waste tires accumulated onsite, including the following information, if the processing equipment is located at a waste tire site:

- name of owner and operator - mailing address of owner and operator, including the telephone number and

county - location, including the street address, township, range and section, and

latitude and longitude - property size and the dimensions of the waste tire pile - quantity of waste tires accumulated at the site.

Verify that all processed tires and residuals are removed from the site for recycling

or further processing, or are disposed of in a permitted solid waste management facility within 30 days after the completion of the chopping, cutting, or shredding operation.

Verify that owners/operators of mobile processing equipment report to the Department every 3 mo, describing each site at which the mobile equipment has operated.

(NOTE: If mobile waste tire processing equipment operates at any site for more than 120 consecutive days, that site is considered a waste tire processing facility, and is subject to the permit requirements and regulations pertaining to waste tire processing facilities.)

Page 417: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-97

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.165. YARD WASTE/ COMPOSTING

(NOTE: The provisions of this section do not apply to compost produced as a result of contracts with local governments entered into prior to 1 October 1988 until 1 October 1998, with the exception of new contracts entered into after 1 October 1988 or modifications of the existing contracts that result in substantial changes to the facility or the quantity and quality of the waste stream.)

(NOTE: Simple exposure of solid waste with little to no mechanical handling that results in natural decay is considered disposal and is subject to the regulations regarding solid waste landfills in SO.135.)

(NOTE: Solid waste that is composted as a volume reduction measure prior to intended disposal is subject to regulations regarding solid waste landfills in SO.135.)

(NOTE: Operations that process only yard trash or manure are considered minimal technology composting and the resulting material compost.)

(NOTE: The following activities are exempt from these regulations provided that no public nuisance or any condition adversely affecting the environment or public health is created and the activity does not violate other state or local laws, ordinances, rules, regulations, or orders:

- backyard composting and the resulting compost - normal farming operations (composting of only yard trash or manure by

persons on their own property for their own use on that property as part of agronomic, horticultural, or silvicultural operations)

- the processing of yard trash into other usable materials such as mulch.

SO.165.1.FL. [Deleted July 1998].

SO.165.2.FL. Composting facilities must be permitted by the Department (FAC 62-709.310(1) and (4) and FAC 62-709.800).

Verify that no solid waste management facility whose purpose is or includes the production of compost is constructed, operated, expanded, or modified without an appropriate or currently valid permit issued by the Department.

Verify that a copy of the Department-approved engineering drawings, plans, reports, operational plans, and supporting information is kept at the facility at all times for reference and inspections.

Verify that a composting facility which processed up to 3000 yd3/yr of only yard

Page 418: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-98

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

trash or manure has a general permit and complies with general permit requirements and the following requirements:

- the facility is developed, operated, and maintained in a safe, nuisance-free manner

- the process follows method of composting that minimize odors and produce a useful, stabilized compost

- the owner/operator notifies the Department prior to beginning operations at a new facility, and at existing facilities

- the general permit is valid for 5 yr.

SO.165.3.FL. Composting facilities must comply with specific prohibitions (FAC 62-709.400).

Verify that air pollutants which cause objectionable odor are not discharged from the composting operation.

Verify that the prohibitions for solid waste management facilities listed in SO.5 are applied at the composting facility.

Verify that no compost made from solid waste is used as fill material in any natural or artificial body of water, open sinkhole, or dewatered pit.

Verify that no treated or untreated biohazardous waste is accepted at composting facilities.

Verify that used oil, hazardous waste, and asbestos-containing waste are not processed into compost except for small quantities normally found in household waste.

SO.165.4.FL. The composting facility site must have sufficient structural support for the entire operation (FAC 62-709.500(1)).

Verify that the composting facility site has sufficient structural support for the entire operation, including total waste received, material processed, compost stored, equipment, and structures to be built onsite.

SO.165.5.FL. Composting facilities must have stormwater management systems that meet specific design standards (FAC 62-709.500(3)).

Verify that the composting facility has a stormwater control system that is designed, constructed, and maintained to meet Florida stormwater discharge regulations or the requirements of the water management district when the Department has delegated stormwater permitting to a water management district.

Verify that the stormwater management system is designed to prevent runoff from

Page 419: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-99

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

709.500(3)). entering the receiving, processing, curing, or storage areas of the composting facility.

Verify that stormwater or other water which comes into contact with the solid waste received, being stored, processed, or composted, or that mixes with leachate is considered leachate and reused in the process or treated at the point of discharge.

Verify that the facility site is graded to minimize ponding of water where the solid waste or compost is received, processed, cured, or stored.

SO.165.6.FL. Composting facilities must have the operational features and appurtenances necessary to maintain a clean and orderly operation (FAC 62-709.500(4)).

Verify that the composting facility site has the necessary operational features and appurtenances to maintain a clean and orderly operation, including, at a minimum, the following:

- an effective barrier to prevent unauthorized entry and dumping into the facility site

- an all-weather access road - signs indicating the name of the operating authority, the contact person and

telephone number in case of emergency, the traffic flow, and the hours of operation and charges (if the facility receives solid waste from the general public)

- dust control devices as needed - litter control devices as needed - fire protection and control provisions to deal with accidental burning of solid

waste or compost at the facility - odor control devices, methods, or practices.

SO.165.7.FL. Composting facilities must have a plan of operation (FAC 62-709.500(5)).

Verify that the composting facility has a plan of operation which is approved by the Department.

Verify that the plan provides written instructions for the daily operation and maintenance of the facility and is revised when operational procedures change.

Verify that the plan includes the following detailed procedures, at a minimum:

- proposed equipment - controlling the type of waste received at the site - weighing or measuring incoming waste - vehicle traffic control and unloading - method and sequence of processing the waste - operations of leachate and stormwater controls

Page 420: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-100

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- designation of permitted backup receiving and disposal areas - contingency operations.

SO.165.8.FL. Composting facilities that process solid waste other than only yard trash or manure must meet specific requirements (FAC 62-709.500(7)).

Verify that, at composting facilities which process solid waste other than only yard trash or manure, the waste receiving and storage areas, and the processing and curing areas, are located on surfaces such as asphalt or concrete that minimize release of leachate into groundwater and that are capable of withstanding wear and tear from normal operations.

Verify that composting facilities which process solid waste other than only yard trash or manure have leachate collection and removal systems designed, constructed, maintained, and operated to collect and remove leachate from the waste receiving and storage areas and the processing and curing areas.

(NOTE: Washdown from the storage, processing, and curing areas; equipment; stormwater coming into contact with solid waste or compost in these areas; and condensate are considered leachate.)

Verify that leachate is reused in the process or treated in a leachate treatment system at the point of discharge.

SO.165.9.FL. Composting facilities must control odors and vectors (FAC 62-709.510(1)(b)).

Verify that composting facilities are operated in a manner, with any needed measures taken, that controls vectors and odors.

SO.165.10.FL. Composting facilities must insure proper staffing and suitable processing facilities (FAC 62-709.510(1)(c)).

Verify that the following requirements are met at composting facilities to ensure proper staffing and suitable processing facilities:

- an attendant is on duty at all facility sites during hours when solid waste is received

- all facilities have communication facilities for use in emergencies.

SO.165.11.FL. Incoming solid waste may not be mixed with finished compost at composting facilities (FAC

Verify that the composting facility takes measures to avoid the mixing of incoming solid waste with finished compost ready to be used or sold for use in order to discourage the reintroduction of weed seeds and pathogens.

Page 421: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-101

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

62-709.510(1)(d)).

SO.165.12.FL. Compost stored at composting facilities must be used or disposed of within a specific amount of time (FAC 62-709.510(1)(e) and (f)).

Verify that more than half of the compost stored at the facility is used or sold for use within each year, beginning with the third year after facility startup.

Verify that any compost remaining at the facility for 3 yr after it was produced is disposed of or reprocessed so that it can be sold or used.

Verify that the amount of compost stored at the facility does not exceed the designed storage capacity.

SO.165.13.FL. Composting facilities that process only yard trash or manure must meet specific operational requirements (FAC 62- 709.510(2)).

Verify that yard trash or manure that will not be made into compost or processed into other usable material is removed from the composting facility at least monthly.

Verify that solid waste other than yard trash or manure received at the facility is separated and stored in a manner which prevents vector problems and is removed within 72 h.

(NOTE: Recovered material that is stored in a manner that prevents vector problems may remain at the facility for up to 1 yr.)

SO.165.14.FL. Composting facilities that process solid waste other than only yard trash or manure must meet specific operational requirements (FAC 62-709.510(3)).

Verify that all waste delivered to the facility is confined to a designated delivery or storage area until processed.

Verify that any material not processed within 72 h is removed from the facility and disposed of.

Verify that any recovered materials removed from the solid waste stream are stored in a manner that prevents vector problems, and are removed from the facility at least annually.

Verify that the temperature of the composting solid waste is monitored at a depth of 2 ft into the pile on a daily basis during the initial week of composting and then on a weekly basis until the finished compost is produced.

Verify that the temperature readings and the length of the composting period is recorded, and that all records are kept for at least 3 yr and are made available for inspection by Department personnel.

Page 422: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-102

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.165.15.FL. Composting facilities that cease operation must comply with specific regulations (FAC 62-709.510(4)).

Verify that, when a solid waste management facility which produces compost ceases operation, all residuals, solid waste, and recyclable materials are removed from the site and recycled or disposed of.

Verify that any remaining compost is used in accordance with these regulations or disposed of.

SO.165.16.FL. Composting facilities that process only yard trash or manure using minimal technology must meet specific requirements (FAC 62-709.515).

Verify that the composting material is turned at least once during a 12-mo interval at composting facilities that process only yard trash or manure using minimal technology.

Verify that a buffer zone, along with pile size configuration, is provided to address objectionable odors beyond property boundaries.

Verify that particle size of larger yard trash items such as limbs, trees, and tree stumps are reduced to promote composting.

Verify that piles are no larger than can be managed by the proposed equipment.

Verify that space is provided between the piles to allow access to vehicles, including fire fighting equipment.

Verify that the resulting compost does not reheat upon standing to greater than 20 οC above ambient air temperature.

SO.165.17.FL. Compost product must be sampled and analyzed in a specific manner (FAC 62-709.530(1)).

Verify that a composite sample of the compost produced at each composting facility is analyzed at intervals of every 20,000 tons of compost product produced for every 3 mo, whichever comes first, for the parameters listed in Appendix 9-4, Table 1.

(NOTE: Compost produced by persons for their own use, when the compost is made from yard trash or manure, is not required to be sampled and analyzed as specified above.)

Verify that compost made from solid waste, other than only yard trash or manure is analyzed at intervals of every 20,000 tons of compost produced or every 3 mo, whichever comes first, for the parameters listed in Appendix 9-4, Table 2, in addition to those listed in Appendix 9-4, Table 1.

Page 423: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-103

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

(NOTE: The Department may decrease or increase the parameters to be analyzed for or the frequency of analysis based on monitoring data, changes in the waste stream or processing, or the potential presence of toxic substances.)

Verify that sample collection, preservation, and analysis assure valid and representative results pursuant to a Department-approved quality assurance plan.

SO.165.18.FL. Composting facility operators must meet specific recording and recordkeeping requirements (FAC 62-709.530(2) and (3) 62-709.550)).

Verify that composting facility owners/operators record and maintain for 3 yr the following information regarding their activities for each month of operation for the facility:

- analytical results on compost testing - the quantity, type, and source of the waste received - the quantity and type of waste processed into compost - the quantity and type of compost produced by product classification - the quantity and type of compost removed for use or disposal, by product

classification, and the market or permitted disposal facility.

Verify that records are available for inspection by the Department personnel during normal business hours and are sent to the Department upon request.

Verify that facilities producing compost from solid waste submit to the Department an annual report by 1 June of each year.

Verify that the annual report contains the following information:

- the facility name, address, and permit number - the year covered - the total quantity in tons, with sludge values expressed in dry weight, and

type of waste received at the facility during the year covered by the report - the total quantity in tons, with sludge values expressed in dry weight, and

type of waste processed into compost at the facility during the year covered by the report

- the total quantity in tons and type of compost produced at the facility, by product classification, during the year covered by the report

- the total quantity in tons and type of compost removed for use or disposal from the facility, by product classification, along with a general description of the market if for use during the year covered by the report.

(NOTE: See Appendix 9-5 for Classification of Compost.)

Page 424: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-104

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.170. OTHER DISPOSAL UNITS

Solid Waste Management Facilities: Permits

SO.170.1.FL. Solid waste management facilities must be permitted by the Department (FAC 62-701.320(1) and (2) and 62-701.730(3)).

Verify that no solid waste management facility is constructed, operated, maintained, modified, or closed without a permit issued by the Department.

Verify that the solid waste management facility meets all construction, operation, modification, and closure permit requirements.

(NOTE: No permit is required for the following activities: - disposal by persons of solid waste resulting from their own activities on their

own property, provided such waste is either from their residential property or is rocks, soils, trees, tree remains, and other vegetative matter that normally results from land development operations

- disposal by persons of solid waste resulting from their own activities on their property, provided that the environmental effects of such disposal on groundwaters and surface waters are:

- addressed or authorized by a site certification for electrical power plant siting

- addressed or authorized by a permit issued by the Department, including solid waste management permits or other environmental permits modified to include conditions for proper disposal

- onsite disposal of construction and demolition debris when the debris is disposed of on the property where it is generated, or on property that is adjacent or contiguous to and under common ownership and control as the property where the waste is generated

- clean debris that is used as fill material - disposal of solid waste resulting from normal farming operations - storage of solid waste in containers on property that is owned, rented, or

leased by the persons who generated the waste from their own activities that occurred on their property, if the solid waste in such containers is collected at least once a week

- disposal by persons of solid waste resulting from their own activities on their own property, if the waste disposal occurred before 1 October 1988.)

Page 425: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-105

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Solid Waste Management Facilities: Location Restrictions

SO.170.2.FL. Solid waste management facilities must follow specific location requirements regarding airport safety (FAC 62- 701.320(12)).

(NOTE: For the purpose of this regulation, airport runway does not include facilities used solely for helicopters or other aircraft that take off and land vertically. This regulation applies only to those facilities constructed after 6 January 1993 and lateral expansions of facilities that were constructed prior to 6 January 1993.)

Verify that solid waste management facilities where waste is stored, disposed of, or processed outdoors are not located within 10,000 ft of any licensed and operating airport runway used by turbine powered aircraft, or within 5000 ft of any licensed and operating airport runway used only by piston engine aircraft, unless it is demonstrated to the Department that the facility is designed and operated so it does not pose a bird hazard to aircraft.

Page 426: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-106

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.175. OTHER TREATMENT/ PROCESSING UNITS

Solid Waste Combustor Ash Management

(NOTE: These regulations apply to the management of ash residue generated by solid waste combustors with a total facility burning capacity of 50 tons/day or more and that primarily receive and burn solid waste collected from residential, commercial, and industrial sources. The solid waste may not contain hazardous waste, but may contain biological waste. Air curtain incinerators, trench burners, or boilers that are restricted to burning only vegetative, agricultural, or silvicultural wastes or bagasse, or clean dry wood are excluded from this rule.)

(NOTE: The Department may approve alternative procedures and requirements for any of the following provisions.)

SO.175.1.FL. Solid waste combustors must be permitted and have ash residue management plans (FAC 62-702.400).

Verify that solid waste combustors are permitted by the Department.

Verify that permitted solid waste combustors have an ash residue management plan that is incorporated into the facility's permit.

Verify that the ash residue management plan contains the following information:

- a description of the methods, equipment, and structures necessary to control the dispersion of ash residue during handling, processing, storage, loading, transportation, unloading, and disposal

- consideration of the potential pathways of human or environmental exposure to the residue

- identification of disposal sites that are intended to receive ash residue from the solid waste combustor for the life of the facility, beginning with the date the plan is submitted to the Department for approval

- an estimate of the quantities of bottom and fly ash to be generated by the facility on an annual and daily basis

- identification and quantification of the components of ash residue that can be segregated for recycling before disposal, and possible beneficial uses of ash residue

- a Quality Assurance plan before the start of any sampling, analysis, or characterization

- contractual requirements, notification, and inspections procedures which assure that hazardous wastes are not received at or burned in the facility.

Page 427: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-107

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that the ash residue management plan is updated at least every 5 yr, and as necessary to reflect changed conditions.

SO.175.2.FL. Federal facilities must meet specific ash residue storage requirements (FAC 62-702.500).

Verify that the Federal facility has enough onsite capacity to ensure that ash residue is properly managed.

Verify that proper storage of ash residue includes the following:

- storage in leak-resistant containers located inside a building or structure - storage outside in leak-resistant containers that are covered to prevent

rainwater infiltration and visible emissions, and when containers are used, free liquid is collected and controlled during the storage or unloading process

- storage onsite in a waste pile that is located inside or under a structure that provides protection from precipitation and water that runs onto the property and that meets the following criteria:

- fugitive dust emissions are controlled - the waste pile is placed on a concrete pad or other low permeability base - a leachate management system is provided to collect and treat or

otherwise control any leachate that may drain from the ash residue - leachate is returned to the quench water for residue, if necessary - leachate collection and holding facilities are provided, maintained, and

of sufficient size to prevent overflow.

Verify that ash residue is not stored for more than 90 days without prior written approval by the Department.

SO.175.3.FL. Federal facilities must follow specific requirements for the offsite transportation of ash residue (FAC 62-702.530) [Deleted April 1999].

(NOTE: Regulation repealed.)

SO.175.4.FL. Federal facilities must follow specific requirements for the disposal of ash residue (FAC 62-702.570).

Verify that ash residue is disposed of in a landfill with a leachate collection and removal system and liner system.

Verify that ash residue is analyzed every 3 mo by the solid waste combustor operator for priority pollutant metals in accordance with the facility's approved Quality Assurance/Quality Control plan.

Page 428: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-108

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that leachate is analyzed every 3 mo for priority pollutant metals.

Verify that the results of the ash and leachate analyses are submitted annually to the Department in a report that presents and summarizes the data.

Verify that, if the ash analyses indicate significantly elevated levels of metals concentrations compared to metals concentrations in ash at other facilities in the state, the facility carries out an investigation to determine the source(s) of the metals in the waste stream and submits the results of the investigation to the Department, along with a plan to reduce or eliminate the sources of the metals.

Verify that, if the metals concentrations in the leachate exceed the regulator levels in 40 CFR 261.24, the facility reports to the Department the steps it intends to take to reduce the metals concentration in the leachate.

Verify that leachate-containing metals above the regulator levels are treated onsite to reduce the metals content.

Verify that disposal facilities control fugitive dust emissions.

Verify that ash residue used for daily cover is sufficiently free of organics and other materials so as not to attract rodents, flies, or other vermin.

Verify that ash residue is not used for cover material on outside slopes or roadways unless provisions are taken to prevent migration of the ash residue.

Verify that codisposal facilities are operated to prevent the formation of impermeable layers in the landfill that interfere with the operation of the facility's stormwater and leachate management systems.

Verify that ash from municipal solid waste is sent only to permitted municipal solid waste facilities.

Verify that the Department is contacted for instructions on disposing of ash that is generated from nonmunicipal solid waste.

Recycling Of Ash Residue (NOTE: These regulations apply to the management of ash residue generated by solid waste combustors with a total facility burning capacity of 50 tons/day or more and that primarily receive and burn solid waste collected from residential, commercial, and industrial sources. The solid waste may not contain hazardous waste, but may contain biological waste. Air curtain incinerators, trench burners, or boilers that are restricted to burning only vegetative, agricultural, or silvicultural wastes or bagasse, or clean dry wood are excluded from this rule.)

Page 429: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-109

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

(NOTE: The Department may approve alternative procedures and requirements for any of the following provisions.)

SO.175.5.FL. Processed ash residue that is recycled must comply with specific regulations (FAC 62-702.600).

Verify that the ash generator describes the chemical and physical properties of the ash residue which is to be recycled at least on a monthly basis.

(NOTE: The Department may allow for an alternate description schedule based upon the particular recycling process involved, the use of the recycled product, and the volume of ash residue recycled if it is determined that such a schedule provides a substantially equivalent degree of protection for public health and the environment.)

Verify that, prior to beginning operations, the processor of the ash residue demonstrates to the Department that the process and use of the ash residue will not cause discharges of pollutants to the environment.

Verify that the processor of the ash residue takes the following actions:

- describes the chemical and physical properties of the finished product line, identifies the quantity of ash residue used in a produce, and identifies the quantity and quality of the product to be marketed or used

- demonstrates that the proposed process will physically or chemically change the ash residue so that any leachates produced after processing do not cause a violation of surface or groundwater quality standards

- demonstrates that processed ash residue or products using ash residue do not endanger human health or the environment

- establish performance standards and operational criteria for the process that demonstrate reliable operation in compliance with the above regulations.

Verify that the processor notifies the Department of any changes in the process of

ash residue which could affect any of the above demonstrations.

Soil Treatment Facilities (NOTE: The requirements in this subsection apply to stationary soil treatment facilities that accept contaminated soils from more than one off-site location and to mobile soil treatment facilities operated at contaminated sites prior to approval of remedial action plans. This chapter does not apply to on-site treatment at a contaminated site if the on-site treatment at the site:

- has been previously approved by the Department as part of a remedial action activity

- is allowed according to the source removal provisions of Rule 62-770.300, FAC.)

Page 430: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-110

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

SO.175.6.FL. Soil treatment facilities must meet permit requirements (FAC 62-713.300(1), (2)(b) and (d)) [Added June 2000].

Verify that no soil treatment facility is constructed or operated without a permit issued by the Department.

(NOTE: Persons operating soil treatment facilities under a permit (including a general permit) issued by the Department prior to 5 August 1999, may continue to operate that facility under the terms of their existing permit until it expires, except that the treated soil must meet the requirements of this subsection by 5 March 2000.)

Verify that, for stationary facilities, a copy of any permit for stormwater control issued by the Department, or documentation that no such permit is required, is submitted to the Department before the facility receives waste.

Verify that no hazardous waste is accepted for treatment at a soil treatment facility unless the facility is permitted to treat hazardous waste.

SO.175.7.FL. Soil treatment facilities must meet certain requirements for solid waste management facilities (FAC 62-701.300(1)(a) and (2)(c) through (h), and 713.300(2)(a)) [Added June 2000].

(NOTE: Soil treatment facilities are considered solid waste management facilities, and contaminated soil is considered solid waste. The following provisions apply to soil treatment facilities.)

Verify that no solid waste is stored or treated in a manner or location that causes air quality standards to be violated or water quality standards or criteria of receiving waters to be violated.

Verify that no solid waste is stored or disposed of by being placed:

- within 500 ft of an existing or approved potable water well (unless disposal takes place at a facility for which a complete permit application was filed or which was originally permitted before the potable water well was in existence; this prohibition shall not apply to any renewal of an existing permit that does not involve lateral expansion, nor to any vertical expansion at a permitted facility)

- in a dewatered pit unless the pit is lined and permanent leachate containment and special design techniques are used to ensure the integrity of the liner

- in an area subject to frequent and periodic flooding unless flood protection measures are in place

- in any natural or artificial body of water including ground water - within 200 ft of any natural or artificial body of water, including wetlands

within the jurisdiction of the Department, except bodies of water contained completely within the property boundaries of the disposal site, which do not discharge from the site to surface waters

- on the right of way of any public highway, road, or alley. (NOTE: The provision of FAC 62-701.300 regarding setbacks from airports does

Page 431: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-111

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

not apply to soil treatment facilities unless the facility accepts soil contaminated with putrescible wastes.)

SO.175.8.FL. Soil treatment facilities must meet specific design requirements (FAC 62-713.400(1) and (2)) [Added June 2000].

Verify that soil treatment facilities are designed to manage both contaminated and treated soils and to minimize their threat to public health and the environment.

Verify that after completion of construction of a soil treatment facility, and before acceptance of any contaminated soil, the engineer of record certifies to the Department on Form 62-701.900(2) that the permitted construction is complete and that it was done in accordance with the plans and design submitted to the Department except where minor deviation was necessary.

Verify that all deviations are described in detail and the reasons therefore enumerated.

Verify that the applicant provides at least seven days advance notice to the Department prior to accepting contaminated soil so that Department has the opportunity to inspect the facility.

SO.175.9.FL. Soil treatment facilities must implement a water quality monitoring plan (FAC 62-713.400(3)) [Added June 2000].

Verify that the soil treatment facility implements the water quality monitoring plan as it was included in the permit application.

SO.175.10.FL. Soil treatment facilities that blend soils must meet specific requirements (FAC 62-713.300(2)(e and (f)) [Added June 2000].

Verify that soil treatment facilities engage in the blending of soils, either before or after treatment, only if the activity will enhance treatment or beneficial use of the soils and if it is included in the facility's operation plan.

Verify that there is no blending of contaminated soil with uncontaminated soil to avoid treating the contaminated soil.

Verify that soil which exhibits the characteristic of toxicity for metals (EPA HW No. D004 - D011) is not blended.

Verify that the soil treatment facility maintains records of blending procedures used both before and after treatment.

(NOTE: Either records of blending ratios with calculations to estimate total metals concentrations of blended soil or resampling and analysis of blended soil

Page 432: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-112

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

are acceptable.)

SO.175.11.FL. Soil treatment facilities must meet operating requirements (FAC 62-713.500) [Added June 2000].

Verify that an operation plan for the facility is prepared which includes:

- a description of general facility operations, the number of personnel responsible for the operations including their respective job descriptions, and the types of equipment that will be used at the facility

- procedures to chemically test the contaminated soil received by the facility and to properly manage or dispose of unauthorized soil

- procedures to ensure that pretreatment and post-treatment testing requirements are properly implemented

- a contingency plan to cover operation interruptions and emergencies such as fires, explosions, or natural disasters

- a description of where all the contaminated soil and treated soil will be stored at the facility

- procedures to ensure operational records are adequately prepared and maintained

- procedures to ensure each batch of contaminated soil shall be clearly identified by source and stockpiled separately until all pretreatment sampling and analyses are complete.

Verify that all activities at the facility are performed in accordance with the operation plan, the facility's permit conditions and the requirements of this chapter.

Verify that the operation plan is updated as operations change but no less frequently than upon renewal of the permit.

Verify that the Department is notified of changes to the operation plan other than those required for routine maintenance.

Verify that the maximum quantity of untreated soil stored at the facility is limited to:

- 30 times the average daily through-put of the treatment equipment being used for continuous flow treatment processes

- the amount of contaminated soil that can be treated based upon the minimum area and maximum soil height requirements for batch treatment processes.

(NOTE: An alternate maximum quantity may be included in the operation plan submitted with the permit application.)

Verify that contaminated soil is physically screened, or otherwise processed, in order to ensure that particles greater in size than what can be properly treated are

Page 433: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-113

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

prevented from entering into the treatment units.

(NOTE: The allowable particle size is 2 in. mesh (diameter) or smaller, unless a demonstration is provided in the permit application that the treatment units can adequately process larger particle sizes.)

Verify that all non-treatable materials physically screened from the contaminated soil are disposed of at a permitted Class I landfill (or Waste-to-Energy facility, if allowed under that facility's permit or certification).

Verify that all operational records are maintained and kept at the facility for a minimum of 5 yr and are available for inspection by the Department, and include the following:

- tonnages of soils received on a per-job basis along with the required pretreatment analytical records

- daily operating logs demonstrating that the critical operational parameters are being achieved

- blending records - soil testing records - the results of any additional soil laboratory analyses which are needed to

operate the facility and manage the treated soil. Verify that any hazardous waste that is inadvertently accepted or is generated at the facility as a result of the treatment process is managed as a hazardous waste.

SO.175.12.FL. Stationary soil treatment facilities must implement a soil sampling and analysis plan (FAC 62-713.510) [Added June 2000].

Verify that a stationary soil treatment facility implements a soil sampling and analysis plan, as included in the permit application, which describes the sampling procedures necessary to properly characterize both contaminated and treated soils managed at the facility.

Verify that the plan ensures that representative samples of the soils are obtained which exhibit the chemical concentrations of contaminants in the soils and that a sufficient number of these samples are collected to represent the variability of the contaminants in the soils.

SO.175.13.FL. Stationary soil treatment facilities must meet closure requirements (FAC 62-713.600) [Added June 2000].

Verify that a stationary soil treatment facility has a closure plan that identifies the steps needed to close the facility, as included in the permit application.

Verify that at least 90 days prior to the date when contaminated soil will no longer be accepted, the owner or operator of the facility submits an updated and detailed closure plan to the Department to reflect any changes in the closure plan due to

Page 434: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-114

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

actual operational conditions at the facility.

Verify that this updated plan is signed, dated and sealed by a professional engineer registered under Chapter 471, F.S.

Verify that within 90 days after receiving the final shipment of contaminated soil, the owner or operator removes or otherwise disposes of all soil in accordance with the approved closure plan.

Verify that closure is completed within 180 days after receiving the final shipment of contaminated soil.

Verify that, when closure is completed, a written certification signed, dated and sealed by a professional engineer registered under Chapter 471, F.S., is provided to the Department that closure is complete.

Verify that the soil treatment facility continues to monitor and maintain the facility for 5 yr from the date of closing.

(NOTE: Long-term care is not required if the owner or operator can demonstrate that all contaminated soil, as well as treated soil which has not met the criteria for cleaned soil, has been removed from the site and that site-specific conditions make it unlikely that any ground water or surface water standards or criteria will be violated.)

SO.175.14.FL. Mobile soil treatment facilities operating under general permits must meet specific requirements (FAC 62-713.800) [Added June 2000].

(NOTE: A general permit is hereby granted to any person for the operation of a mobile soil treatment facility for thermal treatment of petroleum contaminated soil that will be operated in accordance with the standards and criteria of this subsection.)

Verify that the owner or operator of the mobile soil treatment facility notifies the Department on Form 62-713.900(2) of the intent to use this general permit.

Verify that a mobile soil treatment facility owner or operator who intends to thermally treat petroleum contaminated soil notifies the appropriate District Office of the Department by registered mall at least three days prior to initiating operation at a contaminated site.

Verify that any permitted mobile soil treatment facility takes appropriate measures to assure protection of the general public including the following:

- a security fence surrounds all areas where contaminated soil is being processed, including stockpiling, handling, and treatment areas, and extends at least 6 ft above ground surface (or, instead, the facility may have

Page 435: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-115

Solid Waste Management

COMPLIANCE CATEGORY: SOLID WASTE MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

surveillance personnel on-site at all times as an acceptable alternative) - gate access is locked when no attendant is present - appropriate warning notices are clearly posted (for example, notices should

warn of the presence of contaminated soil, the presence of excavations, or the presence of equipment).

Verify that mobile soil treatment facilities are operated only at sites with confirmed contaminated soil and treat only soil native to the site.

Verify that, unless transported off-site to a permitted Class I landfill, stationary soil treatment facility or Waste-to-Energy facility, soil which is excavated remains on-site and within the area of suspected ground water contamination until the soil has been treated so that it meets the criteria for cleaned soil.

Verify that excavated soil is stockpiled on an impermeable surface or a liner with a minimum thickness of five mils.

Verify that the stockpile is covered by a secured plastic cover with a minimum thickness of five mils until treatment in the soil treatment unit commences.

Verify that the stockpile area for untreated soil is graded to direct leachate flow to return to the original excavation pit.

Verify that there is no treatment of any non-petroleum contaminated soil at mobile soil treatment facilities.

Verify that there is no treatment of soil contaminated with polychlorinated biphenyls (PCBs) at mobile soil treatment facilities.

Verify that, for thermal treatment technologies other than rotary kiln thermal treatment units, the results of studies from pilot projects or actual operating facilities which demonstrate the feasibility of the technology proposed for treating the petroleum contaminated soil are included as part of the notification to use this general permit.

Page 436: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-116

Solid Waste Management

Appendix 9-1

Solid Wastes and Solid Waste Management Facilities Exempted From These Regulations (Source: FAC 62-701.220(1) and (2))

Facilities that were permitted or received site certification prior to 6 January 1993, or for which a complete application was submitted and deemed complete by the Department prior to 6 January 1993, are subject to the provisions that were in effect prior to 6 January 1993, and are exempt from these regulations.

These regulations in this section apply to all solid waste and solid waste management facilities in Florida, with the following exceptions:

1. surface impoundments, except leachate surface impoundments 2. injection wells 3. recovered materials, if:

a. majority of the recovered materials at a facility are demonstrated to be sold, used, or reused within 1 yr

b. the recovered materials or the products or byproducts of operations that process recovered materials are not discharged, deposited, injected, dumped, spilled, leaked, or placed into or upon any land or water so that the products or byproducts or any constituent thereof may enter other lands or be emitted into the air or discharged into any waters, including groundwater, or otherwise enter the environment or pose a threat to public health and safety

c. the recovered materials are not hazardous waste and have not been recovered from hazardous wastes 4. phosphogypsum stack systems.

Page 437: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-117

Solid Waste Management

Appendix 9-2

Physical Properties for Biomedical Waste Plastic Bags (Source: FAC 62-712.400(3))

Table 1: Physical Properties. Characteristic

Minimum Requirement

Test Method

Impact Resistance 165 g

ASTM D-1709-91

Tearing Resistance, Parallel and Perpendicular to the Length of the Bag (each plane)

480 g

ASTM D-1922-89

Page 438: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-118

Solid Waste Management

Appendix 9-3

Water Quality and Leachate Monitoring Parameters (Source: Florida Administrative Code 62-701.510)

Water Quality Monitoring Parameters The following list of water quality monitoring parameters shall be used for each type of sampling to be done. (a) Ground water monitoring parameters:

Field Parameters Laboratory Parameters Static water level in wells before purging Total ammonia -- N Specified Conductivity Chlorides pH Iron Dissolved oxygen Mercury Turbidity Nitrate Temperature Sodium Colors and sheens (by observation) Total dissolved solids (TDS) Those parameters listed in 40 CFR Part 258 Appendix I

(b) Surface water monitoring parameters:

Field Parameters Laboratory Parameters Specific Conductivity Unionized ammonia pH Total hardness Dissolved oxygen Biochemical oxygen demand (BOD(5)) Turbidity Copper Temperature Iron Colors, sheens (by observation) Mercury Nitrate Zinc Total dissolved solids (TDS) Total organic carbon (TOC) Fecal coliform Total phosphates Chlorophyll A Total nitrogen Chemical oxygen demand (COD) Total suspended solids (TSS) Those parameters listed in 40 CFR Part 258 Appendix I

Page 439: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-119

Solid Waste Management

(c) Leachate monitoring parameters:

Field Parameters Laboratory Parameters Specific conductivity Total ammonia -- N pH Bicarbonate Dissolved oxygen Chlorides Colors, sheens (by observation) Iron Mercury Nitrate Sodium Total dissolved solids (TDS) Those parameters listed in 40 CFR Part 258 Appendix I

(d) Those parameters listed in 40 CFR Part 258, Appendix II.

Page 440: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-120

Solid Waste Management

Appendix 9-4

Compost Testing Parameters (Source: FAC 62-709.530(1)(a), (c), (f), and (h))

Table 1: Compost Sample Analyzing Parameters

Parameter Unit Method Moisture Percent USEPA Method 160.3 Total Nitrogen Percent dry weight USEPA Method 351 and 353 Total Phosphorus Percent dry weight USEPA Method 365 Total Potassium Percent dry weight USEPA Method 3050/7610 Reduction in Organic Matter * Percent USEPA Method 160.4 Organic Matter Percent USEPA Method 160.4 pH Standard units USEPA Method 9045 * The reduction of organic matter is determined by comparing the organic matter content of the feedstock into the composting process and the organic matter content of the compost product. The amount of reduction is determined as a percent of the original amount contained in the feedstock using the following calculation:

Percent ROM = [1 (OMK(100 - OM) / OM(100 - OMK))]100 Where:

Percent ROM = reduction of organic matter OM = percent organic matter content of dry matter before decomposition OMK = percent organic matter content of dry matter after decomposition.

Table 2: Sample Analyzing Parameters For Compost Made From Solid Waste Other Than Only Yard Trash Or Manure

Parameter Unit Method Foreign Matter Percent See NOTE below Cadmium mg/kg dry weight USEPA Method 3050/7130 Copper mg/kg dry weight USEPA Method 3050/7210 Lead mg/kg dry weight USEPA Method 3050/7420 Nickel mg/kg dry weight USEPA Method 3050/7520 Zinc mg/kg dry weight USEPA Method 3050/7950 Fecal Coliform Most probable number per

gram of volatile suspended solids

SM 908

(NOTE: Foreign matter content is determined by passing a dried, weighed sample of the compost product through a 1/4 in. or 6 mm screen. USEPA Method 160.3 is used to dry the sample. The material remaining on the screen must be visually inspected, and the foreign matter than can be clearly identified must be separated and weighed. The weight of the separated foreign matter divided by the weight of the total sample multiplied by 100 is the percent dry weight of the foreign matter content.)

Page 441: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-121

Solid Waste Management

Appendix 9-5

Classification of Compost (Source: FAC 62-709.550)

Compost is classified based on the type of waste processed, product maturity, the amount of foreign matter in the product, the particle size and organic matter content of the product, and the concentration of heavy metals as specified in the following sections. The following characteristics are used:

1. Type of waste processed:

a. yard trash only

b. manure or yard trash with manure

c. solid waste, other than only yard trash or manure.

2. Product maturity:

a. mature

b. semimature

c. fresh.

3. Foreign matter content:

a. 2 percent dry weight

b. less than 2 percent dry weight

c. greater than 2 percent, but less than 4 percent

d. greater than 4 percent, but less than 10 percent

4. Particle size, using the screen size that the compost passed through. Organic matter content is associated with particle size:

a. fine: less than 10 mm, and an organic matter content of greater than 25 percent

b. medium: less than 15 mm, and an organic content of greater than 30 percent

c. coarse: less than 25 mm, and an organic content of greater than 35 percent.

5. Concentration for heavy metals expressed in milligrams per kilogram dry weight. If any one parameter falls in a higher concentration grouping, the code for the higher grouping will apply.

Concentration Codes

Parameter 1 2 3 4 Cadmium less than 15 less than 30 30 - 100 greater than 100 Copper less than 450 450 less than 900 900 - 3,000 greater than 3,000

Page 442: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-122

Solid Waste Management

Lead less than 500 500 less than 1,000 1,000 - 1,500 greater than 1,500 Nickel less than 50 50 less than 100 100 - 500 greater than 500 Zinc less than 900 900 less than 1,800 1,800 - 10,000 greater than 10,000

6. Compost is classified as follows.

a. Type Y is compost made only from yard trash, which is mature or semi-mature, and is fine, medium or coarse. For such compost, a foreign matter content of less than 2 percent and a metal concentration equivalent to code 1 is assumed.

b. Type YM is compost made from only manure or yard trash with manure which is mature or semimature and is fine, medium, or coarse. For such compost, a foreign matter content of less than 2 percent and a metal concentration equivalent to code 1 is assumed.

c. Type A is compost made from solid waste, other than only yard trash and manure, which is mature and is fine. The foreign matter content shall be less than or equal to 2 percent and the metal concentration shall fall under code 1. Further, it shall contain no foreign matter, such as glass or metal shards, of a size and shape that can cause injury.

d. Type B is compost made from solid waste, other than only yard trash or manure, which is mature or semimature and is fine or medium. The foreign matter content shall be less than or equal to 4 percent, and the metal concentration shall fall under codes 1 or 2. Further, it shall contain no foreign matter, such as glass or metal shards, of a size and shape that can cause injury.

e. Type C is compost made from solid waste, other than only yard trash or manure, which is mature or semimature and is fine, medium, or coarse. The foreign matter content shall be less than or equal to 10 percent and the metal concentration shall fall under codes 1, 2, or 3.

f. Type D is compost made from solid waste, or from only yard trash or manure, which is fresh and is fine, medium or coarse. It shall have a foreign matter content of less than codes 1, 2 or 3. Foreign matter content and metal concentration is assumed for fresh compost made from only

g. Type E is compost made from solid waste, other than only yard trash or manure, which has a metal concentration that falls under code 4.

7. Compost maturity will be determined as follows.

a. Mature compost is a highly stabilized compost material that has been exposed to prolonged periods of decomposition. It will not reheat upon standing to greater than 20 οC above ambient temperature. It has beneficial use and can be used in direct contact with roots. The material should be brown to black in color. This level of maturity is indicated by a reduction of organic matter of greater than 60 percent.

b. Semimature compost is compost material that is at the mesophilic stage. It will reheat upon standing to greater than 20 οC above ambient temperature. It has beneficial use, although direct contact with roots should be avoided. The material should be a light to dark brown in color. This level of maturity is indicated by a reduction of organic matter of greater than 40 percent but less than or equal to 60 percent.

c. Fresh compost is compost material that has been through the thermophilic stage and has undergone partial decomposition. The material will reheat upon standing to greater than 20 οC above ambient temperature. It has beneficial use, but proper care is needed as further decomposition and

Page 443: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

9-123

Solid Waste Management

stabilization will occur. The material should be similar in texture and color to the feed stock into the composting process. This level of maturity is indicated by a reduction of organic matter of greater than 20 percent but less than or equal to 40 percent.

Page 444: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-1 Storage Tank Management

SECTION 10

STORAGE TANK MANAGEMENT

Florida Supplement, June 2000 This section covers the state requirements for Storage Tank Management and is intended to supplement the U.S. TEAM Guide. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

NOTE

The state of Florida rescinded its aboveground storage tank regulations formerly found at Florida Administrative Code, Title 62, Chapter 762 (FAC 62-762). Those requirements have been merged with the requirements for underground storage tanks at FAC 62-761. In the process, all of the requirements for underground storage tanks have been thoroughly revised. As a result, all of the checklist items in sections ST.5.FL., ST.30.FL. through ST.95.FL., and ST.155.FL. are new as of May 1999, and all of the checklist items that were previously in those sections have been deleted without further notice.

Definitions

• Airport or Seaport Hydrant Piping - the pressurized integral piping system, including hydrant pits, associated with petroleum storage tank systems serving airports, seaports or military bases (FAC 62-761.200) [Added May 1999].

• AST - an aboveground storage tank (FAC 62-761.200) [Added May 1999]. • AST Category-A System - a system that was installed on or before 12 March 1991 (FAC 62-761.200) [Added

May 1999]. • AST Category-B System - a system that was installed after 12 March 1991, and before 13 July 1998 (FAC 62-

761.200) [Added May 1999]. • AST Category-C System - a system that was installed on or after 13 July 1998. ASTs that are removed and

relocated after July 13, 1998 are considered Category-C systems (FAC 62-761.200) [Added May 1999]. • Bulk Gasoline Plant - a gasoline storage and distribution facility which receives gasoline from bulk terminals by

trailer transport, stores it in tanks, and subsequently dispenses it to resellers, farms, businesses, service stations, or other end users, and which has an annual average daily throughput of less than 20,000 gal (75,700 L) but more than 2000 gal (7570 L) calculated on the basis of days of actual operation (FAC 62-296.200(26)).

• Bulk Gasoline Terminal - a gasoline storage facility which receives gasoline from its supply sources primarily

by pipeline, ship, or barge, and delivers gasoline to bulk gasoline plants or to commercial or retail accounts primarily by tank truck, and has an annual average daily throughput of equal to or more than 20,000 gal (75,700 L) of gasoline calculated on the basis of days of actual operation (FAC 62-296.200(27)).

• Bulk Product Facility - a waterfront location with at least one aboveground tank with a capacity greater than

30,000 gallons that is used for the storage of pollutants (FAC 62-761.200) [Added May 1999].

Page 445: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-2 Storage Tank Management

• Bulk Product Piping - on-site integral piping with an internal diameter greater than three inches that (FAC 62-761.200) [Added May 1999]:

a. originates at the first stationary or landward valve from a vessel loading or unloading area, and that delivers regulated substances up to and including the first valve or within the dike field area of a bulk product facility; or

b. is utilized for transporting regulated substances. • Cathodic Protection - a method of preventing corrosion of a metal surface by making that surface the cathode of

an electrochemical cell through the use of devices such as galvanic anodes or impressed current (FAC 62-761.200) [Added May 1999].

• Cathodic Protection Tester - a person who can demonstrate an understanding of the principles and

measurements of all common types of cathodic protection systems as applied to buried or submerged metal piping and tank systems. At a minimum, such persons shall have education and experience in soil resistivity, stray current, structure-to-soil potential, and component electrical isolation measurements of buried metal piping and tank systems (FAC 62-761.200) [Added May 1999].

• Certified Contractor - a Pollutant Storage System Specialty Contractor certified by the Department of

Professional Regulation to meet the requirements of Section 489.113, F.S. (FAC 62-761.200) [Added May 1999].

• Chlorine - includes all liquid organic and inorganic compounds in liquid form which, when discharged, may

release free chlorine (Cl or Cl(2)) (FAC 62-761.200) [Added May 1999]. • Compatible - the ability of two or more substances to maintain their respective physical and chemical properties

upon contact with one another for the design life of the storage tank system under conditions likely to be encountered in the storage tank system (FAC 62-761.200) [Added May 1999].

• Composite Tank - a steel underground tank that has been coated with a fiberglass reinforced plastic composite,

or other acceptable coating approved and built to specifications under UL 1746, ACT 100, or STI-F894-89 (FAC 62-761.200) [Added May 1999].

• Compression Vessel - any stationary aboveground container, tank, or on-site integral piping system or

combination thereof, that has a capacity of greater than 110 gallons and that is primarily used to store pollutants or hazardous substances above atmospheric pressure or at a reduced temperature in order to lower the vapor pressure of the contents. Manifold compression vessels that function as a single vessel shall be considered as one vessel (FAC 62-761.200) [Added May 1999].

• Containment And Integrity Plan or CIP - a document designed, created, and maintained at a facility, which shall

be considered a public record and made available pursuant to the provisions of Chapter 119, F.S. The CIP establishes procedures for the inspection and maintenance program for tanks storing mineral acids at that facility. The inspection and maintenance program shall be designed for the chemical and physical characteristics of the specific mineral acid stored, and for the specific materials of construction of the tank. The CIP shall be designed to ensure control of the specific mineral acid for the expected lifetime of the tank (FAC 62-761.890(1)) [Added May 1999].

• Contamination or Contaminated - the presence of regulated substances in surface water, groundwater, soil,

sediment, or upon the land, in quantities that result in exceedances of applicable cleanup target levels in Chapter 62-770, FAC, where petroleum or petroleum products are present, or water quality standards in Chapters 62-3, 62-302, 62-520, or 62-550, FAC (FAC 62-761.200) [Added May 1999].

Page 446: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-3 Storage Tank Management

• Corrosion Professional - a person who, by reason of thorough knowledge of the physical sciences and the principles of engineering and mathematics acquired by a professional education and related practical experience, is qualified to engage in the practice of corrosion control on buried or submerged metal components of a storage tank system. Such a person shall be accredited or certified as being qualified by the National Association of Corrosion Engineers or be a registered professional engineer (FAC 62-761.200) [Added May 1999].

• Crude Oil - a naturally occurring mixture which consists of hydrocarbons and/or sulfur, nitrogen and/or oxygen

derivatives of hydrocarbons and which is liquid at standard conditions (FAC 62-296.200(53)). • Discharge -

a. includes, but is not limited to, any spilling, leaking, seeping, pouring, misapplying, emitting, emptying, or dumping of any pollutant which occurs and which affects lands and the surface waters and groundwaters of the state not regulated by Florida Statutes 376.011 through 376.21 (Florida Statutes 376.301).

b. with respect to mineral acid, includes, but is not limited to, any spilling, leaking, seeping, pouring, misapplying, emitting, emptying, or dumping of any mineral acid which occurs and which affects lands and the surface and ground waters of the state (FAC 62-761.890(1)) [Added May 1999].

• Discovery -

a. either actual knowledge or knowledge of facts that could reasonably lead to actual knowledge of the existence of an incident, discharge or an unmaintained storage tank system, or

b. discovery as specified in the Petroleum Contamination Site Cleanup Criteria Rule 62-770.200(7), FAC

• Dispenser - a dispensing system that is used to transfer vehicular fuel from a fixed point to a vehicle (FAC 62-761.200) [Added May 1999].

• Dispenser Liner - a liner installed as secondary containment beneath a dispenser to prevent discharges of

regulated substances (FAC 62-761.200) [Added May 1999].

• Dispensing System - equipment that is used to transfer regulated substances from integral piping through a rigid or flexible hose or pipe to another point of use outside of the storage tank system (FAC 62-761.200) [Added May 1999].

• Double-Bottomed - an AST that has secondary containment is the form of an outer tank bottom having a closed

interstitial space between the primary tank bottom and the secondary outer tank bottom (FAC 62-761.200) [Added May 1999].

• Double Walled Tank - a storage tank that has an outer tank wall, or integral piping that provides secondary

containment of the primary tank or piping (FAC 62-761.200) [Added May 1999]. • Existing Contamination - (FAC 62-761.200) [Added May 1999]:

a. the presence of free product or sheen on the groundwater b. the presence of vapor levels in monitoring wells measured in accordance with DEP's "Guidelines for

Vapor Monitoring" or by a Flame Ionization Detector or an equivalent instrument in excess of: 1. 500 parts per million total petroleum hydrocarbons for storage tank systems containing gasoline or

equivalent petroleum products; or 2. 50 parts per million total petroleum hydrocarbons for storage tank systems containing kerosene,

diesel or other equivalent petroleum products; c. results of analytical tests on a groundwater sample that:

1. Exceed the cleanup target levels for petroleum products' chemicals of concern specified in table V of Chapter 62-770, FAC

2. Indicate the presence of a hazardous substance that is not described in (c)1. above; or 3. Indicate the presence of a regulated substance that is not described in (c)1. above; or

Page 447: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-4 Storage Tank Management

d. after 13 July 1998, results of analytical tests on a soil sample that: 1. Exceed the lower of direct exposure I and leachability Table V cleanup target levels for petroleum

products' chemicals of concern listed in table IV if chapter 62-770, FAC; or 2. Indicate the presence of a hazardous substance that is not described in (d)1. above; or 3. Indicate the presence of a regulated substance that is not described in (d)1. above.

• External Floating Roof - a storage vessel cover in an open top tank consisting of a double deck or pontoon

single deck which rests upon and is supported by the petroleum liquid being contained and is equipped with a closure seal or seals to close the space between the roof edge and tank shell (FAC 62-296.200(69)).

• Facility - a nonresidential location containing, or that contained, any stationary tank or tanks containing, or that

contained regulated substances, and that have, or had, individual capacities greater than (FAC 62-761.200) [Added May 1999]:

a. 110 gallons for UST systems; and b. 550 gallons for AST systems.

• Field-Erected Storage Tank - an AST that is constructed by assembling it onsite at the facility (FAC 62-

761.200) [Added May 1999] • Flow-Through Process Tank - a tank that forms an integral part of a production process through which there is a

steady, variable, recurring, or intermittent flow of materials during the operation of the process. Flow-through process tanks include tanks associated with vapor recovery units and oil/water separators. Flow-through process tanks do not include storage tanks used for the storage of pollutants before their introduction into the production process or for the storage of finished products or byproducts from the production process (FAC 62-761.200) [Added May 1999].

• Gasoline - any petroleum distillate having a Reid vapor pressure of 4 psia (27.6 kPa) or greater (FAC 62-

252.200). • Gasoline Dispensing Facility - any site at which gasoline is dispensed to motor vehicle gasoline tanks from

stationary storage tanks (FAC 62-252.200). • Hazardous Substances - those substances defined as hazardous substances in the Comprehensive Environmental

Response, Compensation and Liability Act of 1980, Pub. L. No. 96-510, 94 stat. 2767, as amended by the Superfund Amendments and Reauthorization Act of 1986 (FAC 62-761.200) [Added May 1999].

• Heating Oil - any petroleum-based fuel used in the operation of heating equipment, boilers, or furnaces (FAC

62-761.200) [Added May 1999]. • Hydraulic Lift Tank - a tank that holds hydraulic fluid for a closed-loop mechanical system used to operate lifts,

elevators, and other similar devices (FAC 62-761.200) [Added May 1999]. • Impervious Material - a synthetic material or other material approved in accordance with Rule 62-761.850(2),

FAC that is compatible with the stored regulated substance and has a permeability rate to the regulated substance stored of 1 x 10-7 cm/sec or less; or for concrete structures, a material that (FAC 62-761.200) [Added May 1999]:

a. meets the design and construction standards of ACI 350R-89 and ACI 224R-89, or b. is applied to the concrete in accordance with NACE International Standard RP0892-92.

• In Contact With The Soil - integral piping connected to ASTs or USTs, or any portion of a tank, that (FAC 62-

761.200) [Added May 1999]: a. physically touches the soil, or

Page 448: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-5 Storage Tank Management

b. is not in direct contact with the soil, and is separated from the soil only by a casing, wrapping, or other material that is not impervious.

c. those portions of integral piping that are elevated and that are not in direct contact from the soil are excluded from this definition.

• Incident - a condition or situation indicating that a discharge may have occurred from a storage tank system

(FAC 62-761.200) [Added May 1999]. • In-Service - a storage tank system that contains regulated substances or has regulated substances regularly added

to or withdrawn from the system (FAC 62-761.200) [Added May 1999] • Inspection and Maintenance Plan - a plan that establishes the procedures used to prevent releases of mineral

acids (FAC 62-761.890(1)) [Added May 1999]. • Integral Piping -on-site piping, originating or terminating at the regulated storage tank or tanks, that conveys

regulated substances. Vapor recovery lines, pipeline facilities, and vent lines are not considered integral piping. Integral piping is not considered on-site if the piping crosses state boundaries, or two or more county boundaries. Integral piping includes all valves, elbows, joints, flanges, and flexible connectors up to the (FAC 62-761.200) [Added May 1999]:

a. union of the piping with the dispensing system b. fill cap or fill valve c. forwarding pump used for transferring regulated substances to a flow-through process tank or an industrial

production or manufacturing point of use d. first flange or connection within the loading rack containment area.

• Internal Floating Roof - a cover or roof in a fixed roof tank that rests upon or is floated upon the petroleum

liquid being contained, and is equipped with a closure seal or seals to close the space between the roof edge and tank shell (FAC 62-296.200(93)).

• Internal Lining - a material that is applied internally on AST bottoms or USTs to protect the tank from internal

corrosion (FAC 62-761.200) [Added May 1999]. • Lease Custody Transfer - the transfer of produced crude oil and/or condensate, after processing and/or treating

in the producing operations, from storage tanks or automatic transfer facilities to pipelines or any other forms of transportation (FAC 62-296.200(99)).

• Liner -

a. an impervious material, excluding clay, that meets the performance standards of FAC 62-761.500(1)(e) (see ST.30.6.FL.) that is used as a method of secondary containment (FAC 62-761.200) [Added May 1999]

b. an artificially constructed material of sufficient thickness, density, and composition that will contain the discharge of any specified mineral acid from an aboveground tank until such time as the mineral acid can be neutralized and/or removed. The liner shall prevent any escape of specified mineral acids or accumulated liquid to the soil, surface water, or groundwater (except through secondary containment as provided in FAC 62-761.890(1)(p)) (FAC 62-761.890) [Added May 1999].

• Liquid Trap - sumps, well cellars, and other traps used in association with oil and gas production, gathering and

extraction operations (including gas production plants) to collect oil, water, and other liquids. Liquid traps may temporarily collect liquids for subsequent disposition or reinjection into a production or pipeline stream, or may collect and separate liquids from a gas stream (FAC 62-761.200) [Added May 1999].

Page 449: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-6 Storage Tank Management

• Maintenance - the normal operational upkeep to prevent a storage tank system from releasing regulated substances (FAC 62-761.200) [Added May 1999].

• Mineral Acids - hydrobromic acid (HBr), hydrochloric acid (HCl), hydrofluoric acid (HF), phosphoric acid

(H(3)PO(4)), and sulfuric acid (H(2)SO(4)), including those five acids in solution, if at least 20 percent by weight of the solution is one of the five listed acids (FAC 62-761.890(1)) [Added May 1999].

• Mobile Tank - (FAC 62-761.200) [Added May 1999]:

a. an AST that is moved to a different location at least once every 180 days, and 1. has a current valid vehicle registration with the Florida Department of Highway Safety and Motor

Vehicles and has current test and inspection markings in accordance with 49 CFR 180.415 or 2. is designed and constructed to be moved to other service locations, and its relocation within a facility

or from site to site is inherent in its use, or 3. is used for on-site construction activities, provided that the construction activities do not exceed 12

months, or the life of the construction project as long as construction is continuous, and the tanks are removed from the site when the construction is complete; and

b. not considered mobile if it is connected to stationary underground or aboveground integral piping, unless associated with the production of an agricultural commodity, provided that the tank is moved to a different location at least once every 180 days.

• New Storage Tank - with respect to tanks used to contain mineral acid, those tanks installed after 7 January 1992

(FAC 62-761.890(1)) [Added May 1999]. • Operational Life - refers to the period from the start of installation of the storage tank system to the completion

of the closure of the storage tank system (FAC 62-761.200) [Added May 1999]. • Out of Service - a storage tank system that (FAC 62-761.200) [Added May 1999]:

a. is designated as an out-of-service system by owner or operator notification to the Department on Form 62-761.900(2)

b. is empty c. does not have regulated substances transferred to or withdrawn from the tank for a maximum time of:

1. 2 yr of being taken out-of-service for USTs 2. 5 yr of being taken out-of-service for ASTs, or 3. 10 yr of being taken out-of-service for storage tank systems with secondary containment.

• Overfill - a release or discharge that occurs when a tank is filled beyond its capacity (FAC 62-761.200) [Added

May 1999]. • Pesticides - all preparations, products, and substances included in the Department of Agriculture and Consumer

Services' FAC 5E-2.002 (FAC 62-761.200) [Added May 1999]. • Petroleum Product - any liquid fuel commodity made from petroleum. Forms of fuel considered to be

petroleum products include all fuels known or sold as (FAC 62-761.200) [Added May 1999]: a. diesel fuel b. kerosene c. gasoline d. fuels containing mixtures of gasoline and other products. Forms of fuel excluded from this definition are: a. liquefied petroleum gas b. American Society for testing and materials (ASTM) grades no.5 and no. 6 residual oils:

1. bunker C residual oils 2. intermediate fuel oils used for marine bunkering with a viscosity of 30 and higher

Page 450: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-7 Storage Tank Management

3. asphalt oils 4. petrochemical feedstocks.

• Pipe - any hollow cylindrical or tubular conveyance through which regulated substances flow (FAC 62-761.200)

[Added May 1999]. • Pipeline Facilities - pipe systems, rights-of-way and any associated equipment, gathering lines, buildings or

break-out tanks necessary for the long range transportation of regulated substances (FAC 62-761.200) [Added May 1999]

• Pollutants - includes any petroleum product, pesticides, ammonia, chlorine, and derivatives thereof, excluding

LP gas (Florida Statutes 376.301). • Pressure Test - a test to determine the integrity of integral piping performed in accordance with FAC 62-

761.640(3)(e)1 (see Appendix 10-5) (FAC 62-761.200) [Added May 1999]. • Product - any commodity made from oil or gas and includes refined crude oil, crude tops, topped crude,

processed crude petroleum, residue from crude petroleum, cracking stock, uncracked fuel oil, fuel oil, treated crude oil, residuum, gas oil, casing head gasoline, natural gas gasoline, naphtha, distillate, condensate, gasoline, waste oil, kerosene, benzene, waste oil, blended gasoline, lubricating oil, blends or mixtures of oil with one or more liquid products or byproducts derived from oil or gas, and blends or mixtures of two or more liquid products or byproducts derived from oil or gas, whether herein above enumerated or not (Florida Statutes 377.19(11))(FAC 62-740.030(4)).

• Reid Vapor Pressure - the absolute vapor pressure of volatile crude oil and volatile nonviscous petroleum

liquids except liquefied petroleum gases as determined by American Society for Testing and Materials, Part 17, 1973, D-323-72 (reapproved 1977) (FAC 62-252.200).

• Regulated Substance - a liquid at standard conditions of temperature and pressure (60 oF and 14.7 pounds per

square inch absolute), that is (FAC 62-761.200) [Added May 1999]: a. a pollutant or a hazardous substance, or any mixture of the two, when stored in a UST, or b. a pollutant, when stored in an AST.

• Release - (FAC 62-761.200) [Added May 1999]:

a. a discharge, or b. a loss of regulated substances from a storage tank system into the system's secondary containment. (FAC

62-761.200) [Added May 1999]. • Release Detection -a method of (FAC 62-761.200) [Added May 1999]:

a. determining whether a discharge of a regulated substance has occurred, or b. detecting the presence of regulated substances within a storage tank system's secondary containment.

• Release Detection Response Level - is the point of measurement, calculation, observation, or level that is

established for each individual release detection device or method at which an investigation must be initiated to determine if an incident, release or discharge has occurred (FAC 62-761.200) [Added May 1999].

• Repair - to restore or replace any defective or damaged parts of a storage tank system. Replacement of a non-

defective part is not a repair (FAC 62-761.200) [Added May 1999] • Secondary Containment -

a. a release detection and prevention system that meets the performance standards of rule 62-761.500(1)(e), FAC, and includes dispenser liners, piping sumps, double walled tanks and piping systems or single

Page 451: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-8 Storage Tank Management

walled tanks or piping systems that are contained within a liner or an impervious containment area. A release prevention barrier, as specified in API standard 650, Appendix I, is considered secondary containment for field-erected aboveground storage tank bottoms (FAC 62-761.200) [Added May 1999].

b. with respect to mineral acid storage tanks, a system that is used for release prevention, and may include one or more of the following devices:

1. a double-walled tank 2. an external liner, or 3. a system or structure constructed such that accidental releases from a tank would be collected by a

drainage system within the system or structure and routed to a permitted wastewater treatment system, plant recirculating process system, or alternative containment system approved by the Department (FAC 62-761.890(1)) [Added May 1999].

• Shop-Fabricated Storage Tank - an AST that is constructed at the tank manufacturer's plant and transported to

the facility for installation (FAC 62-761.200) [Added May 1999]. • Significant Loss or Gain - the sum of losses and gains of a regulated substance over a 30 day or monthly period

that exceeds: a. for tanks with capacities between 111 and 2,000 gallons with an individual flow-through less than 5,000

gallons during the previous 30 days: 1. One percent of the tank capacity, or 2. One percent of the total weekly output, or 3. 50 gallons, whichever is greatest.

b. for tanks with capacities greater than 2000 gallons or tanks with an individual flow-through exceeding 5,000 gallons during the previous 30 days:

1. One percent of the tank capacity; or 2. One half of one percent of the amount of product dispensed during the previous 30 days, whichever

is greater (FAC 62-761.200) [Added May 1999]. • Small Diameter Piping - means integral piping with an internal diameter of 3 inches or less that is utilized for

transporting regulated substances (FAC 62-761.200) [Added May 1999]. • Stationary - a tank or tanks not meant for multiple site use or that remain in one location at the facility site for a

period of 180 days or longer (FAC 62-761.890(1)) [Added May 1999]. • Storage Tank System - a tank used to contain regulated substances, its integral piping, and all its components,

including dispensing systems, spill containment devices, overfill protection devices, secondary containment systems, and any associated release detection equipment (FAC 62-761.200) [Added May 1999].

• Submerged Filling -

1. Tank Trucks: filling with a drop tube that extends within 6 in. of the bottom of the compartment or through a nozzle installed at or within 6 in. of the bottom.

2. Service Station Underground Tanks: filling with a drop tube or pipe that extends to within 6 in. of the tank bottom.

3. Terminal or Bulk Plant Storage Tanks: filling through an outlet located in accordance with API standard 650 welded steel tanks for oil storage; Section 3.6.3 Shell nozzles, or otherwise located near the tank bottom to minimize splash (FAC 62-252.200).

• Suction Piping - piping through which regulated substances flow due to a pump located at the dispensing system

(FAC 62-761.200) [Added May 1999]. • Tank - an enclosed stationary container or structure that is designed or used to store regulated substances, and

the volume of which (including the volume of underground piping) is (FAC 62-761.200) [Added May 1999]:

Page 452: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-9 Storage Tank Management

1. for USTs, 10 percent or more buried beneath the surface of the ground 2. for ASTs, less than 10 percent beneath the surface of the ground. For purposes of this chapter, cut and

cover tanks are considered aboveground storage tanks. • Temporary Out-of-Service - a designation of a service status for a field-erected storage tank system that is

emptied solely for the purpose of cleaning, routine maintenance, or change of product for a time period exceeding thirty days, but less than six months (FAC 62-761.200) [Added May 1999].

• Tightness Test - a test for an underground storage tank or its small diameter piping that is performed in

accordance with Rule 62-761.640(3)(c)4. and (d)2., FAC, by a precision tank tester registered with the Department of Business and Professional Regulation under Section 489, F.S. At ASTs with small diameter piping in contact with the soil, a tightness test may be performed by persons who are not precision tank testers (FAC 62-761.200) [Added May 1999].

• Underground Area - an underground room, such as a basement, cellar, shaft or vault, providing enough space

for physical inspection of the exterior of the tank situated on or above the floor (FAC 62-761.200) [Added May 1999].

• UST - an underground storage tank (FAC 62-761.200) [Added May 1999]. • UST Category-A System - a system containing pollutants that was installed on or before 30 June 1992, or a

system containing hazardous substances that was installed before 1 January 1991 (FAC 62-761.200) [Added May 1999].

• UST Category-B System - a system containing pollutants that was installed after 30 June 1992, or a system

containing hazardous substances that was installed on or after 1 January 1991and before 13 July 1998 (FAC 62-761.200) [Added May 1999].

• UST Category-C System - a system that was installed on or after 13 July 1998. USTs that are removed and

relocated on or after 13 July 1998 are considered Category-C systems (FAC 62-761.200) [Added May 1999]. • Unmaintained - (FAC 62-761.200) [Added May 1999]:

1. a storage tank system that was not closed in accordance with department rules, or 2. an out-of-service storage tank system that is not returned to in-service status within:

a. 2 yr of its being out-of-service for USTs, or b. 5 yr of its being out-of-service for ASTs, or c. 10 yr of its being out-of-service for storage tank systems with secondary containment (FAC 62-

761.200) [Added May 1999]. • Upgrade - the addition or retrofit of cathodic protection, internal lining, spill prevention, overfill protection, or

secondary containment to a storage tank system, or the installation of single wall corrosion resistant storage tanks, to improve the ability of the storage tank system to prevent discharges of regulated substances (FAC 62-761.200) [Added May 1999].

• Vapor Balance System - a combination of pipes or hoses that create a closed system between the vapor spaces of

an unloading tank and a receiving tank such that vapors displaced from the receiving tanks are transferred to the tank being unloaded (FAC 62-296.200(193)).

• Vapor Collection System - a vapor transport system that uses direct displacement by the liquid loaded to force

vapors from the tank into a vapor control system (FAC 62-296.200(194)).

Page 453: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-10 Storage Tank Management

• Vapor Control System - a system that will not allow emissions of volatile organic compounds in the displaced vapor at a rate greater than 80 mg/L (4.7 gr/gal) of gasoline transferred (FAC 62-296.200(195)).

• Vapor-Mounted Seal - a primary seal mounted so there is an annular vapor space underneath the seal. The

annular vapor space is bounded by the bottom of the primary seal, the tank wall, the liquid surface, and the floating roof (FAC 62-296.200(196)).

• Vapor Recovery System - a system that collects and conserves vapors that would otherwise be released to the

atmosphere (FAC 62-252.200 and FAC 62-296.200(197)). • Vehicular Fuel - a petroleum product used to fuel motor vehicles, including aircraft, watercraft, and vehicles

used on and off roads and rails (FAC 62-761.200) [Added May 1999]. • Waxy, Heavy Pour Crude Oil - a crude oil with a pour point of 50 or higher as determined by the American

Society for Testing and Materials Standard D97-66, "Test for Pour Point of Petroleum Oils." A copy of the above referenced document is available from the American Society for Testing and Materials, 1916 Race Street, Philadelphia, PA 19103, and may be examined at the Department's Tallahassee office (FAC 62-296.200(202)).

Page 454: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-11 Storage Tank Management

STORAGE TANK MANAGEMENT GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: NOTE The state of Florida rescinded its aboveground storage tank regulations formerly found at FAC 62-762. Those requirements have been merged with the requirements for underground storage tanks at FAC 62-761. In the process, all of the requirements for underground storage tanks have been thoroughly revised. As a result, all of the checklist items in sections ST.5.FL., ST.30.FL. through ST.95.FL., and ST.155.FL. are new as of May 1999, and all of the checklist items that were previously in those sections have been deleted without further notice. Missing Checklist Items ST.2.1.FL. Aboveground Storage Tanks:

General ST.5.1.FL. and ST.5.2.FL. Performance Standards for Category-C

Storage Tanks ST.5.3.FL. through ST.5.20.FL.

Performance Standards for Category-A and Category-B Storage Tanks

ST.5.21.FL. and ST.5.22.FL.

Operating Requirements ST.5.23.FL. and ST.5.24.FL. Cathodic Protection ST.5.25.FL. Repairs ST.5.26.FL. and ST.5.27.FL. Release Detection ST.5.28.FL. and ST.5.29.FL. Releases ST.5.30.FL. through ST.5.32.FL. Documentation ST.5.33.FL. Closure or Change-In-Service ST.5.34.FL. through ST.5.39.FL.

Emissions/Discharges From Bulk Gasoline Terminals

ST.10.1.FL. and ST.10.2.FL.

Emissions/Discharges From POL Storage Vessels:

Fixed-Roof and External Floating Roof POL Storage Vessels

ST.15.1.FL. and ST.15.2.FL.

Gasoline Tanker Trucks and Trailers

ST.15.3.FL. and ST.15.4.FL.

Statewide: Gasoline Dispensing Facilities

ST.15.5.FL.

Broward, Dade, and Palm: Gasoline Dispensing Facilities

ST.15.6.FL. through ST.15.9.FL.

UST State-Specific ST.30.1.FL. and ST.30.2.FL. Performance Standards for Category-C

Storage Tanks ST.30.3.FL. through ST.30.19.FL.

Performance Standards for Category-A and Category-B Storage Tanks

ST.30.20.FL. and ST.30.21.FL.

Operating Requirements ST.30.22.FL. UST Corrosion Protection ST.50.1.FL. UST Repairs ST.55.1.FL. and ST.55.2.FL. Release Detection for USTs General ST.60.1.FL. UST Releases ST.80.1.FL. through ST.80.3.FL. UST Documentation ST.90.1.FL. Changes in Service or Closure of USTs ST.95.1.FL. through ST.95.6.FL.

Page 455: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-12 Storage Tank Management

STORAGE TANK MANAGEMENT

GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: Hazardous Waste Storage Tanks

The State of Florida has adopted the Federal requirements for hazardous waste storage tanks, which are set forth in 40 CFR 264(J) and 265(J).

Flammable Combustible Liquid Storage Tanks ST.120.1.FL. through ST.120.7.FL. [Deleted May 1999] Other Storage Tanks/Locations ST.155.1.FL. through ST.155.5.FL.

STORAGE TANK MANAGEMENT

GUIDANCE FOR FLORIDA APPENDIX USERS

REFER TO APPENDIX NUMBERS: REFER TO APPENDIX TITLES:

10-1 Applicability of UST Regulations 10-2 Applicability of AST Regulations 10-3 Performance Standards for Category-A and Category-B Storage

Tanks 10-4 Release Detection Methods 10-5 Performance Standards for Release Detection 10-6 Exemptions for ASTs and USTs

Page 456: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-13 Storage Tank Management

Page 457: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-14 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.2. MISSING CHECKLIST ITEMS

ST.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 458: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-15 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.5. ABOVEGROUND STORAGE TANKS

(NOTE: The requirements of this chapter, unless specified otherwise, apply to owners and operators of facilities, or owners and operators of aboveground stationary storage tank systems with individual storage tank capacities greater than 550 gallons, that contain or contained:

- vehicular fuel, subject to Chapter 17-61, FAC, after 21 May 1984 - pollutants after 12 March 1991

- pollutants in unmaintained storage tank systems.)

(NOTE: See Appendix 10-6 for exemptions from these requirements.)

General

ST.5.1.FL. Storage tanks must be registered with the Department (FAC 62-761.400(1)) [Added May 1999].

Verify that the owner or operator of any facility or storage tank system registers the storage tank system with the Department on Form 62-761.900(2).

Verify that a completed registration form is submitted to the Department no later than 30 days after regulated or hazardous substances are put into any new storage tank system.

ST.5.2.FL. AST owners/operators must meet notification requirements (FAC 62-761.450(1)(a) and (b)) [Added May 1999].

Verify that verbal or written notice is provided to the County at least 30 days before installation or upgrading, unless the County agrees to a shorter time period.

Verify that verbal or written notice is provided to the County at least 10 days before an internal inspection of a UST, an API 653 internal inspection, a change in service status, closure, or closure assessment, any of which is performed to meet the requirements of this Chapter.

Verify that verbal or written notice is provided to the County at least 48 hr before:

- initiating activities specified in the previous paragraphs, to confirm the date and time of the scheduled activities

- the establishment of temporary out-of-service status for field-erected ASTs - performing any tightness test required under this Chapter.

Verify that verbal or written notice is provided before the close of the County's next business day for an emergency change to an out-of-service status.

Verify that verbal or written notification of the activities specified above performed as a direct result of the emergency change in service shall be made to the County before initiating the activities.

Verify that within 30 days after completion, the owner or operator notifies the

Page 459: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-16 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Department of the following items on Storage Tank Registration Form 62-761.900(2):

- any change in ownership of a facility or of a storage tank system - closure or upgrading of a storage tank system - any change or correction in the information reported in the registration form,

including changes in the type of regulated substances stored (a change within the same blend of regulated substances need not be reported (e.g., regular unleaded to premium unleaded gasoline)).

Performance Standards for Category-C Storage Tank Systems

ST.5.3.FL. Category-C storage tank systems must be compatible with the substance stored (FAC 62-761.500(1)) [Added May 1999].

Verify that Category-C systems are made of, or internally lined with, materials that are compatible with the regulated substance stored in the system.

ST.5.4.FL. Category-C storage tank systems must meet siting restrictions (FAC 62-761.500(1)(a)) [Added May 1999].

Verify that no Category-C storage tank is installed within 500 ft of any existing community water supply system or any existing non-transient non-community water supply system, or within 100 ft of any other existing potable water supply well.

(NOTE: These prohibitions do not apply to the replacement of an existing storage tank system within the same excavation or dike field area, or the addition of new storage systems meeting the standards for Category-C systems at an existing facility.)

ST.5.5.FL. The external portions of Category-C storage tank systems must be coated (FAC 62-761.500(1)(b)) [Added May 1999].

Verify that exterior portions of aboveground tanks and aboveground integral piping (excluding double-walled systems), are coated or otherwise protected from external corrosion.

Verify that the coating is designed and applied to resist corrosion, deterioration, and degradation of the exterior wall.

(NOTE: SSPC-PA 1, Paint Application Specification No. 1 may be used to protect storage tank systems from external corrosion.)

Page 460: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-17 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.5.6.FL. Category-C storage tank systems must have spill containment (FAC 62-761.500(1)(c) and (e)) [Added May 1999].

Verify that shop-fabricated ASTs are installed with a spill containment system at each tank fill connection.

Verify that the spill containment system is a fixed component that is designed to prevent a discharge of regulated substances when the transfer hose or pipe is detached from the tank fill pipe.

Verify that the spill containment system meets the requirements for secondary containment.

Verify that the materials used for secondary containment are:

- impervious to the regulated substance and able to withstand deterioration from external environmental conditions

- non-corrosive or of corrosion-protected materials - capable of containing regulated substances for at least 30 days - of sufficient thickness and strength to withstand hydrostatic forces at

maximum capacity to prevent a discharge during its operating life.

Verify that liners are approved by the Department, and are not constructed or consist of naturally occurring in-situ soils.

Verify that secondary containment constructed of concrete are:

- designed and constructed in accordance with ACI 350-R89 and ACI 224R-89, or

- lined on the visible interior surfaces of the dike field area in accordance with NACE International Standard RP 0892-92, or SSPC Publication 97-04, Design, Installation, and Maintenance of Coating Systems for Concrete Used in Secondary Containment, or

- designed, evaluated, and certified by a professional engineer registered in the State of Florida that the concrete secondary containment system meets the General Construction Requirements.

Verify that, for cathodically protected tanks and integral piping, secondary

containment systems do not interfere with the operation of the cathodic protection system.

Verify that storage tank system equipment with closed interstitial spaces, such as double-bottomed ASTs, and double-walled integral piping in contact with the soil that is connected to ASTs, are designed, constructed and installed to allow for the detection of a breach of integrity in the inner or outer wall by the monitoring of the interstitial space, and that a breach of integrity test is performed before the storage tank system is put into service.

Page 461: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-18 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that secondary containment systems are designed and installed to direct any release to a monitoring point or points.

Verify that underground hydrant pits are installed with a spill catchment basin, secondary containment, or other spill prevention equipment to prevent the discharge of pollutants during fueling of aircraft, vessels, or at any other time the hydrant system is in use.

Verify that any such equipment is sealed to and around the hydrant piping with an impervious, compatible material.

(NOTE: Field-fabricated dispenser liners and piping sumps installed before 13 July 1998 do not have to be approved.)

ST.5.7.FL. Cathodic protection systems for Category-C storage tank systems must meet state-specific requirements (FAC 62-761.500(1)(f)) [Added May 1999].

Verify that cathodic protection systems are designed, constructed, and installed with at least one test station or method of monitoring to allow for a determination of current operating status.

Verify that cathodic protection test stations provide direct access to the soil electrolyte in close proximity to each cathodically protected structure for placement of reference electrodes and monitoring wires that connect directly to cathodically protected structures.

(NOTE: Facilities where direct access to soil in close proximity to cathodically protected structures is present, and where electrical connections to cathodically protected structures can be conveniently accomplished, need not have separate dedicated cathodic protection test stations.)

Verify that any field-installed cathode protection system is designed by a Corrosion Professional.

ST.5.8.FL. Relocated Category-C AST systems must meet state-specific requirements (FAC 62-761.500(1)(h)) [Added May 1999].

Verify that ASTs that have been removed and that are to be reinstalled at a different location:

- for field-erected tanks, comply with API Standard 653, or - for shop-fabricated tanks, are reinstalled in accordance with manufacturer's

specifications, if applicable, and with the standards in FAC 62-761.500 that were in effect on 13 July 1998.

ST.5.9.FL. Reused Category-C storage tank systems must be recertified (FAC 62-

Verify that, unless it is recertified for use by a professional engineer registered in the State of Florida, or is recertified by the manufacturer, and is brought into service in accordance with FAC 62-761.500:

Page 462: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-19 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

761.500(1)(i)) [Added May 1999].

service in accordance with FAC 62-761.500:

- a UST can not be used or reused as an AST for the storage of regulated substances

- an AST can not be used or reused as a UST for the storage of regulated substances.

ST.5.10.FL. The installation of Category-C AST systems must meet specific standards (FAC 62-761.500(3)(a)) [Added May 1999].

Verify that all components of a storage tank system are installed in accordance with the manufacturer's instructions.

Verify that storage tank systems are installed according to the applicable provisions of NFPA 30, NFPA 30A, and PEI/RP200-96.

ST.5.11.FL. Category-C AST systems must meet specific tank construction standards (FAC 62-761.500(3)(b)) [Added May 1999].

Verify that shop-fabricated tanks are constructed in accordance with one of the following:

- UL 142 - API Standard 620 - API Specification 12B - API Specification 12F - API Specification 12P - STI F911-93 - STI F921 [registered trademark] - ASME B96.1, or - UL 2085.

Verify that field-erected tanks are constructed in accordance with one of the following:

- ASME B96.l - API Standard 620 - API Standard 650 - API Specification 12B, or - API Specification 12D.

Verify that field-erected tanks have an inspection and testing frequency established in accordance with API Standard 653 and maintained for the life of the tank.

Verify that steel tanks in contact with soil have a cathodic protection system.

Verify that the cathodic protection system is designed, constructed, and installed in accordance with API RP 651 and NACE International Standard RP-0193-93.

Verify that a field-installed cathodic protection system is designed by a Corrosion

Page 463: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-20 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Professional.

Verify that the cathodic protection system is designed and installed with at least one test station, or a method of monitoring to allow for a determination of current operating status.

Verify that tanks constructed of any other material, design, or corrosion protection are approved by the Department.

ST.5.12.FL. Category-C AST systems must have secondary containment (FAC 62-761.500(3)(c)) [Added May 1999].

Verify that all tanks installed or constructed at a facility after 13 July 1998 have secondary containment beneath the tank and within the dike field area, except for the following:

- tanks containing high viscosity regulated substances are exempt from the requirements for secondary containment (however, used or waste oil tanks, regardless of viscosity, will have secondary containment beneath the tank and within the dike field area)

- double-walled shop-fabricated tanks approved by the Department do not have to be installed in a dike field area

- shop-fabricated tanks containing petroleum contact water, that are subject to this chapter, elevated above and not in contact with the soil, and that have an impervious surface directly beneath the area of the tank

- field-erected tanks used for the temporary storage of petroleum contact water that are subject to this chapter, and that have passed an internal inspection for structural integrity in accordance with API Standard 653

- AST Category-C field-erected tanks constructed within a dike field area with AST Category-A field-erected tanks will have secondary containment beneath the tank, but are not required to have secondary containment within the dike field area until 31 December 1999.

Verify that release prevention barriers such as double-bottoms, liners, or other

undertank secondary containment systems for field-erected tanks are designed and constructed in accordance with API Standard 650.

Verify that dike field areas with secondary containment:

- conform to the requirements of NFPA 30, Chapter 2-3 - contain a minimum of 110 percent of the maximum capacity of the tank or of

the largest single-walled tank within the dike field area (capacity calculations will include the volume occupied above the area of the "footprint" of the tank bottom or the largest tank within the dike field area)

- if not roofed or otherwise protected from the accumulation of rainfall, are constructed with a manually controlled pump or siphon, or a gravity drain pipe which has a manually controlled valve to remove accumulated liquids (gravity drain pipes will be designed and constructed to prevent a discharge

Page 464: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-21 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

in the event of fire) - have all integral piping and other penetrations that pass through the

secondary containment of dike field areas sealed around the outside of the penetration with an impervious compatible material to prevent the discharge of pollutants

- if constructed of steel, are tested in accordance with UL 142.

ST.5.13.FL. Category-C AST systems must have overfill protection (FAC 62-761.500(3)(d)) [Added May 1999].

Verify that no transfer of regulated substances is made unless the volume available in the tank is greater than the volume of regulated substances to be transferred.

Verify that the transfer is repeatedly monitored [sic] to prevent overfilling.

Verify that overfill protection is performed in accordance with API RP 2350.

Verify that at a minimum, fillbox covers are marked in accordance with API RP 1637, or an equivalent method approved by the Department.

Verify that all tanks are equipped with at least one of the following:

- a gauge or other measuring device that accurately shows the level of pollutant in the tank and that is visible to the person who is monitoring the filling

- a high level warning alarm - a high level liquid flow cutoff controller - an impervious dike field area or - another device approved by the Department.

Verify that calibrated stick measurements of the level of pollutants in the tank only used for tanks with a capacity of 15,000 gal or less that are not loaded with high-volume pressurized nozzles, and that such tanks are not loaded beyond 95 percent capacity.

ST.5.14.FL. Category-C AST systems must have dispenser liners (FAC 62-761.500(3)(e)) [Added May 1999].

Verify that dispensers connected to AST systems that are installed or replaced after 13 July 1998 are installed with liners beneath the union of the piping and the dispenser.

(NOTE: Dispensers mounted directly upon a tank are exempt from this requirement.)

Verify that hydrostatic tests are performed for all dispenser liners before placing the system into service.

Verify that the duration of the tests is at least:

- 24 hr for field-fabricated dispenser liners, or

Page 465: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-22 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- 3 hr for factory-made dispenser liners.

Verify that dispenser liners are installed to allow for interstitial monitoring.

ST.5.15.FL. Piping sumps installed after 13 July 1998 must meet specific standards (FAC 62-761.500(3)(f)) [Added May 1999].

Verify that piping sumps installed after 13 July 1998 are designed, constructed, and installed to minimize water entering the sump.

Verify that hydrostatic tests are performed for all piping sumps before placing the system into service.

Verify that the duration of the tests is at least:

- 24 hr for field-fabricated piping sumps, or - 3 hr for factory-made piping sumps.

Verify that piping sumps are installed to allow for interstitial monitoring.

ST.5.16.FL. Integral piping for Category-C storage tanks must meet specific installation requirements (FAC 62-761.500(4)(a)) [Added May 1999].

Verify that all integral piping is installed in accordance with the manufacturer's instructions, if applicable.

Verify that all integral piping is installed according to the applicable provisions of NFPA 30, NFPA 30A, and ASME B31.4.

Verify that a tightness test is performed on underground small diameter piping associated with ASTs before any new underground piping system is placed into service.

Verify that a pressure test is performed for underground bulk product piping before the piping system is placed into service.

ST.5.17.FL. Integral piping for Category-C storage tanks must meet specific construction requirements (FAC 62-761.500(4)(b)) [Added May 1999].

Verify that fiberglass reinforced plastic piping or other non-metallic piping installed at a facility is listed with UL 971, UL 567, certified by a Nationally Recognized Laboratory that these standards are met, or approved by the Department.

Verify that coated steel piping is constructed in accordance with ASME B31.4.

Verify that integral piping in contact with the soil is cathodically protected in accordance with API RP 1632, NACE International RP-0169-96, and STIR 892-96.

Verify that integral piping constructed of other materials, design, or corrosion

Page 466: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-23 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

protection is approved by the Department.

ST.5.18.FL. Small diameter piping for Category-C storage tanks must meet specific requirements (FAC 62-761.500(4)(c)) [Added May 1999].

Verify that pressurized small diameter piping systems connected to dispensers shall be installed with shear valves or emergency shutoff valves in accordance with NFPA 30A, Section 4-3.6, if applicable.

Verify that, for underground small diameter piping, the valves are checked at the time of installation by a certified contractor to confirm that the automatic closing function of the valve operates properly and that the valve is properly anchored.

Verify that gravity-fed small diameter integral piping systems are installed with an isolation valve at the point of connection to the storage tank to prevent the discharge of regulated substances in the case of piping failure, and that this valve meets the standards of NFPA 30A, Section 2-1.7.

Verify that swing-joints are not installed.

ST.5.19.FL. Bulk product piping for Category-C storage tanks must meet specific requirements (FAC 62-761.500(4)(d)) [Added May 1999].

Verify that bulk product piping is constructed and installed in accordance with NFPA 30, and ASME B31.4.

ST.5.20.FL. Piping for Category-C storage tanks must have secondary containment (FAC 62-761.500(4)(e)) [Added May 1999].

Verify that small diameter integral piping that is in contact with the soil or that transports regulated substances over surface waters of the state has secondary containment.

Verify that bulk product piping that is in contact with the soil has secondary containment.

Verify that remote fill piping that is in contact with the soil has secondary containment.

(NOTE: The following integral piping systems are exempt from the requirements for secondary containment:

- integral piping that is in contact with the soil, and that is connected to storage tanks containing high viscosity regulated substances

- vertical fill pipes equipped with a drop tube.)

Page 467: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-24 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Performance Standards for Category-A and Category-B Storage Tank Systems

ST.5.21.FL. Category-A and Category-B storage tanks must meet upgrade deadlines (FAC 62-761.510(1)) [Added May 1999].

Verify that upgrades are completed by the deadlines specified in Table AST in Appendix 10-3.

(NOTE: If installation or upgrade activities are initiated before the deadlines, work can continue after the deadlines, provided that all work is completed within 90 days of contract execution or receipt of construction approval or permits. Installation is considered to have begun if:

- all Federal, state, and local approvals or permits have been obtained or applied for to begin physical construction for installation of the system, or

- contractual obligations have been made for installation of the system which cannot be canceled or modified without substantial economic loss, provided that such obligations are pursued diligently in good faith to achieve the requirements of this rule.)

Verify that by 31 December 1998:

- all pressurized small diameter piping systems connected to dispensers have shear valves or emergency shutoff valves installed

- cathodic protection test stations are installed for cathodically protected AST systems without test stations

- fillboxes are color coded - ASTs that have been reinstalled as USTs, and USTs that have been

reinstalled as ASTs, meet the requirements of FAC 62-761.500 (see ST.5.3.FL. through ST.5.20.FL.)

Verify that after 13 July 1998, a closure assessment is performed before the

installation of dispenser liners, piping sumps, or secondary containment of tanks and integral piping.

Verify that valves meeting the requirements of Section 3-1.7 of NFPA 30A, are installed by 13 January 1999 on any storage tank system located at an elevation that produces a gravity head on the dispenser or on small diameter piping.

Verify that small diameter piping transporting regulated substances over surface waters of the state has secondary containment by 31 December 2004.

ST.5.22.FL. AST systems must meet upgrade deadlines (FAC 62-761.510(3)) [Added May 1999].

Verify that AST Category-B tanks installed or constructed at a facility after 12 March 1991, have secondary containment for the tank, except for the following:

Page 468: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-25 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- tanks containing high viscosity regulated substances are exempt from the requirements for secondary containment (however, used or waste oil tanks, regardless of viscosity, will have secondary containment beneath the tank and within the dike field area)

- double-walled shop-fabricated tanks approved by the Department do not have to be installed in a dike field area

- shop-fabricated tanks containing petroleum contact water, that are subject to this chapter, elevated above and not in contact with the soil, and that have an impervious surface directly beneath the area of the tank

- field-erected tanks used for the temporary storage of petroleum contact water that are subject to this chapter, and that have passed an internal inspection for structural integrity in accordance with API Standard 653.

Verify that integral piping that is in contact with the soil and that is connected to

AST systems has secondary containment if installed after 12 March 1991.

(NOTE: The following integral piping systems are exempt from the requirements for secondary containment:

- integral piping that is in contact with the soil, and that is connected to storage tanks containing high viscosity regulated substances

- vertical fill pipes equipped with a drop tube.)

Verify that by 1 January of the appropriate year shown in Table AST in Appendix 10-3, unless specified otherwise, all AST Category-A and Category-B storage tank systems meet the requirements specified in the Table or are permanently closed.

Operating Requirements

ST.5.23.FL. Storage tanks systems must meet operating and maintenance requirements (FAC 62-761.700(1)(c)) [Added May 1999].

Verify that spill containment devices, dispenser liners, and piping sumps are maintained to provide access for monthly examination and water removal as necessary.

Verify that water collected in spill containment devices, or in piping sumps and dispenser liners that is above the opening of the integral piping connection, or any regulated substances collected in these storage tank system components are removed and either reused or properly disposed of.

Verify that owners or operators ensure that the volume available in the tank is greater than the volume of regulated substances to be transferred to the tank before the transfer is made and ensure that any transfer is repeatedly monitored to prevent overfilling and spilling.

Verify that all release detection devices are tested annually to ensure proper

Page 469: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-26 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

operation according to manufacturer's specifications, and the tests include, at a minimum, a determination of whether the device operates as designed.

Verify that petroleum contact water from storage tank systems is managed in accordance with FAC 62-740 (see the POL Management chapter, section PO.100.FL.).

Verify that, regardless of the method of release detection used, inventory control is performed for ASTs containing vehicular fuel that do not have secondary containment using one of the following methods:

- inventory control in accordance with FAC 62-761.640(3)(b) in Appendix 10-5

- statistical inventory reconciliation in accordance with FAC 62-761.640(3)(c)3 in Appendix 10-5

- automatic tank gauging in accordance with FAC 62-761.640(3)(c)2 in Appendix 10-5, or

- manual tank gauging in accordance with FAC 62-761-640(3)(c)1 in Appendix 10-5.

ST.5.24.FL. AST systems must meet operating and maintenance requirements (FAC 62-761.700(3)(a), (b), (d) and (f)) [Added May 1999].

Verify that the removal or release of stormwater from a facility is performed in accordance with all applicable Department rules (for example, FAC 62-25, Regulation of Stormwater Discharge).

(NOTE: Owners and operators are advised that other Federal, state, or local requirements may apply to these activities.)

Verify that accumulated stormwater is drawn off within one week after a rainfall event unless another frequency is allowed by the facility's stormwater discharge permit or by another instrument, such as a Spill Prevention Control Countermeasure Plan or a Department permit.

Verify that accumulated stormwater is not discharged without treatment if it has a visible sheen.

Verify that if gravity drain pipes are used to remove water from the dike field areas, all valves are kept closed except when the operator is in the process of draining water.

Verify that field-erected tanks are evaluated and the re-testing frequency established and implemented in accordance with API Standard 653.

Verify that AST Category-B and Category-C tanks are evaluated at the time of installation.

Verify that initial examinations for AST Category-A and Category-B tanks are

Page 470: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-27 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

completed by 31 December 1999, certified by a professional engineer registered in the State of Florida, or approved by an API 653 inspector.

Verify that non-destructive testing is performed by qualified personnel as specified in API 653 and API 650.

Verify that bulk product piping extending over surface water:

- is tested annually in accordance with Title 33, Part 156.170, Code of Federal Regulation

- is maintained and operated in accordance with Title 33, Part 154, as applicable.

Verify that overfill protection is performed in accordance with API RP 2350 and

NFPA 30, Section 2-10, for each field-erected AST that receives fuel by mainline pipeline or marine vessels.

Cathodic Protection

ST.5.25.FL. Cathodic protection systems must meet operating requirements (FAC 62-761.700(1)(b)) [Added May 1999].

Verify that cathodic protection systems are installed, operated and maintained to provide continuous corrosion protection to the metal components of those portions of the tank and integral piping in contact with the soil.

Verify that storage tank systems equipped with any type of cathodic protection are inspected and tested by a Corrosion Professional or a Cathodic Protection Tester within 6 mo of installation or repair and at least every year thereafter in accordance with the criteria contained in NACE International RP-0169-96, RP-0193-93, and RP-0285-95, as applicable.

(NOTE: Factory-installed (galvanic) cathodic protection systems may be tested every 3 yr.)

Verify that storage tank systems with impressed current systems are inspected at intervals not exceeding 2 mo.

Verify that all sources of impressed current are inspected.

(NOTE: Evidence of proper functioning shall be current output, normal power consumption, a signal indicating normal operation, or satisfactory electrical state of the protected structure.)

Verify that impressed current systems that are inoperative for a cumulative period exceeding 1440 hr are assessed by a Corrosion Professional to ensure that the

Page 471: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-28 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

storage tank system is structurally sound, free of corrosion holes, and operating in accordance with the design criteria.

Verify that storage tank systems with sacrificial anodes either have permanent test stations for soil-to-structure potential measurements or use temporary field test stations for annual testing.

Verify that storage tank systems with cathodic protection systems that cannot achieve or maintain protection levels in accordance with the design criteria:

- are repaired in accordance ST.55.1.FL., or - are placed out-of-service.

Verify that records of the continuous operation of impressed current systems and all cathodic protection inspection and testing activities are maintained.

Repairs

ST.5.26.FL. Storage tank systems must be repaired according to specific standards (FAC 62-761.700(1)(a)) [Added May 1999].

Verify that repairs are performed if:

- any component of a storage tank system is discovered to have discharged or contributed to the discharge of a regulated substance

- there is a release of regulated substances or AST water bottoms into secondary containment

- there is an operational or structural problem that could potentially result in a discharge or release.

Verify that if repairs are required for any component or part of a storage tank

system, and the nature of the repair activities or the condition of the component or part of the system requiring a repair may result in a release, and the component or part cannot be otherwise isolated from the system, the storage tank system is taken out of operation until the tank has been repaired or replaced.

(NOTE: The restrictions against storage tank system operation do not apply if the system contains heating oil or other fuels used solely for the generation of electricity where the removal of the storage system from service would result in the shut down of electrical generating units serviced by the system.)

Verify that repairs are made:

- in a manner that will prevent discharges from structural failure or corrosion for the remaining operational life of the storage tank system

- in accordance with manufacturer's specifications, NFPA Standard 30 or other

Page 472: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-29 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

applicable reference standards - to restore the structural integrity of the storage tank system.

Verify that repaired components are tightness tested, pressure tested, or tested for a breach of integrity, as applicable, before being placed back into service.

Verify that repairs to fiberglass reinforced plastic tanks and steel tanks coated with a fiberglass reinforced plastic composite are made by an authorized representative of the tank manufacturer or its successor.

Verify that piping that is damaged or that has caused a discharge of a regulated substance is replaced or repaired.

(NOTE: Pipe sections and fittings may be repaired in accordance with applicable standards in FAC 62-761.500(4) (see ST.5.16.FL. through ST.5.20.FL.). Replacement of additional lengths of piping in contact with the soil are exempt from the requirements for secondary containment, provided that:

- the piping system does not have, or will not have to install, secondary containment until the deadlines established in FAC 62-761.510 (see ST.5.21.FL. and ST.5.22.FL.), and

- the length of replacement or additional piping is less than 25 percent of the total length of the existing integral piping for the individual tank, or 100 ft, whichever is less.)

ST.5.27.FL. AST systems must be repaired according to specific standards (FAC 62-761.700(3)(c) and (e)) [Added May 1999].

Verify that small diameter piping is tightness tested before being placed back into service whenever dispensers connected to that piping are replaced or whenever the piping has been disconnected and then reconnected.

Verify that hydrant piping and bulk product piping are pressure tested before being placed back into service.

Verify that secondary containment systems re repaired as necessary to maintain product tightness and containment volume of the system, including sealing cracks in concrete, repairing punctures, and maintaining containment walls.

Verify that, if the storage tank secondary treatment system has a crack, puncture, or other defect that compromises the system's product tightness, the system is repaired in accordance with FAC 62-761-500(1)(e) (see ST.5.6.FL.).

Release Detection

ST.5.28.FL. Storage tank Verify that storage tank systems have a method, or combination of methods, of

Page 473: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-30 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

systems must meet general release detection requirements (FAC 62-761.600(1)) [Added May 1999].

release detection that:

- can detect a new release from any portion of the storage tank system - is installed, calibrated, operated and maintained in accordance with the

manufacturer's instructions, including routine maintenance and service checks for operability to ensure that the device is functioning as designed

- meets the applicable performance standards in FAC 62-761.640 in Appendix 10-5 (all manufacturer's instructions and the performance claims and their manner of determination described in writing by the equipment manufacturer or installer will be retained for as long as the storage tank system is used).

Verify that a release detection response level is described in writing for each

method or combination of methods of release detection used for a storage tank system.

Verify that a release detection method is established and provided for all storage tank systems upon installation.

Verify that, except as otherwise specified, the release detection method or combination of methods used at a facility is performed at least once a month, but not exceeding 35 days, to determine if a release from the storage tank system has occurred.

Verify that at least once a month, but not exceeding 35 days, any storage tank and component of a storage tank that can be inspected visually is visually inspected.

(NOTE: A visual inspection is not required for any system component that has a continuous or monthly electronic release detection sensor.)

Verify that continuous electronic leak detection devices are inspected for proper operation on a monthly basis.

(NOTE: Inspection may consist of visual observation or remote verification of proper operation.)

Verify that a site suitability determination is performed by 1 January 2000 for AST systems using groundwater or vapor monitoring wells for release detection.

Verify that, if the site suitability determination indicates that on-site conditions are unsuitable for external monitoring, another method of release detection is used.

Verify that vapor monitoring plans are performed by 1 January 2000 for AST systems using vapor monitoring for release detection.

Verify that any component of a storage tank system with secondary containment has an interstitial monitoring method.

Page 474: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-31 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that pressurized piping, excluding bulk product piping, is equipped with a line leak detector (gravity piping systems are exempt from this requirement).

Verify that any storage tank system not provided with a method, or combination of methods, of release detection in accordance with this section, is closed by the date upon which release detection is to be provided.

Verify that groundwater and vapor monitoring wells meeting the standards for external monitoring, that are no longer used for release detection, are closed by 31 December 2010.

Verify that wells not meeting the standards for external monitoring are closed by 31 December 1998, unless the wells are:

- used for contamination assessment purposes, or - required by rules adopted by a County government.

ST.5.29.FL. AST tank systems must meet specific release detection requirements (FAC 62-761.600(3)) [Added May 1999].

Verify that the following methods of release detection implemented before 12 March 1991, are capable of detecting the leak rate or quantity specified in FAC 62-761.640(1)(a) in Appendix 10-5, by 31 December 1999:

- any groundwater monitoring plan, or - any Spill Prevention Control and Countermeasure Plan as required by 40

CFR Section 112.

Verify that all monitoring wells used for release detection meet the standards in FAC 62-761.640(2) in Appendix 10-5 by 1 January 2000, or are closed.

Verify that release detection for field-erected storage tanks with secondary containment beneath the tank complies with API Standard 650, Appendix I.

Verify that storage tanks upgraded with internal lining, by the completion of the installation of the internal lining, are provided with a method of release detection that meets the standards in FAC 62-761.640(2) in Appendix 10-5.

Verify that AST integral piping in contact with the soil is provided with a method, or combination of methods, of release detection.

Verify that integral piping in contact with the soil having secondary containment has interstitial monitoring, and single-walled integral piping in contact with the soil has release detection meeting the requirements of FAC 62-761.610(4) in Appendix 10-4.

Verify that facilities using a Spill Prevention Control and Countermeasure Plan as required by 40 CFR Section 112, for release detection, or a groundwater monitoring plan for release detection, meet the release detection requirements of

Page 475: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-32 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

FAC 62-761.610 in Appendix 10-4 by 31 December 1999.

(NOTE: ASTs containing high viscosity regulated substances are exempt from all release detection requirements except for visual inspections pursuant to FAC 62-761.640(2)(e) in Appendix 10-5.)

Releases

ST.5.30.FL. Spill or release incidents must meet notification requirements (FAC 62-761.450(2)) [Added May 1999].

Verify that notification of the discovery of the following incidents is made to the County on Incident Notification Form 62-761.900(6) within 24 hr or before the close of the County's next business day:

- a failed SIR evaluation, or inconclusive SIR evaluations, or a failed or inconclusive tightness, pressure, or breach of integrity test

- internal inspection results, including perforations, corrosion holes, weld failures, or other similar defects, that indicate that a release could have occurred

- unusual operating conditions, such as the erratic behavior of product dispensing equipment, the sudden loss of product from a storage tank system, or any unexplained presence of water in a tank or unexplained presence of water with or without sheen in a piping sump, unless system equipment is found to be defective but not leaking

- the presence of odors of a regulated substance from surface water or groundwater, soil, basements, sewers and utility lines at a facility or in the surrounding area from which it could be reasonably concluded that a release or discharge may have occurred

- the loss of a regulated substance from a storage tank system exceeding 100 gal on impervious surfaces, other than secondary containment, such as driveways, airport runways, or other similar asphalt or concrete surfaces, provided that the loss does not come in contact with pervious surfaces

- the loss of a regulated substance exceeding 500 gal inside a dike field area with secondary containment

- a positive response of release detection devices or methods (a positive response will be the indication of a release of regulated substances, an exceedance of the Release Detection Response Level, or a breach of integrity of a storage tank system)

- the presence of free product in a piping sump.

(NOTE: Incident Notification Form 62-761.900(6) need not be submitted if within 24 hours of discovery of an incident, or before the close of the County's next business day, the investigation of the incident confirms that a discharge did not occur, or an Incident Notification Form was previously submitted for that incident.)

Page 476: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-33 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.5.31.FL. Discharges must be reported (FAC 62-761.450(3)) [Added May 1999].

Verify that upon discovery of an unreported discharge, the owner or operator reports the following to the County on Discharge Report Form 62-761.900(1) within 24 hours or before the close of the County's next business day:

- results, or receipt of results, of analytical or field tests of surface water or groundwater indicating the presence of contamination

- free product or sheen of a regulated substance, or a regulated substance that is visibly observed in soil, on surface water, in groundwater samples, on basement floors, in subsurface water, in groundwater samples, on basement floors, in subsurface utility conduits or vaults, or in sewer lines at the facility or in the surrounding areas

- a spill or overfill event of a regulated substance to soil or another pervious surface, equal to or exceeding 25 gal, unless the regulated substance has a more stringent reporting requirement specified in 40 CFR 302

- results of analytical or field tests of soil indicating the presence of contamination

- soils stained by regulated substances that are observed during a closure assessment.

Verify that copies of analytical or field test results that confirm a discharge are

submitted to the County with Discharge Report Form 62-761.900(1).

(NOTE: A request for a retraction of a submitted Discharge Report Form may be submitted to the County or the Department if evidence is presented that a discharge did not occur at the facility. A Discharge Report Form 62-716.900(1) does not need to be submitted for previously reported discharges.)

ST.5.32.FL. Federal facilities must meet incident and discharge response require-ments (FAC 62-761.820(1)) [Added May 1999].

Verify that if an incident occurs at a facility, actions are taken promptly to investigate the incident to determine if a discharge has occurred.

Verify that if the investigation indicates that the incident was not a discharge, a written confirmation and explanation are submitted to the County, and that test results or reports, which support the findings, are maintained on site as records.

Verify that the investigation is completed within 2 weeks of the date of discovery of the incident (at the end of this time period, either a discharge report form or a written confirmation and explanation that the release was not a discharge will be submitted to the County).

Verify that any spill or loss of regulated substance into secondary containment is removed within 3 days of discovery.

Verify that if a discharge of a regulated substance occurs at a facility, actions are

Page 477: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-34 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

taken immediately to contain, remove, and abate the discharge under all applicable Department rules.

Verify that, when evidence of a discharge from a storage tank system is discovered and reported, the following actions are taken:

- if the source or cause of the discharge is unknown, the discharge is investigated in accordance with NFPA 329, Chapters 3 and 5

- the regulated substance is removed from the system as necessary to prevent further discharge to the environment (notice of the need to take the system out-of-service on an emergency basis will be made to the County)

- fire, explosion, and vapor hazards re identified and mitigated - the system is repaired; if the system cannot be repaired, it is closed.

Verify that the system is tested if the Department or County determines that:

- there has been a failure to comply with the release detection requirements - a release detection device, well, or method indicates that a discharge of a

regulated substance has occurred, and the discharge was not previously reported, or

- groundwater contamination that is not associated with previously known contamination is present in the vicinity of the system and the system is likely to be a source of the contamination.

Verify that within 3 days of the discovery of a discharge, the following steps are

initiated:

- a test on the system, if the test is necessary to confirm a discharge - if found to be leaking, placement of the system out-of-service until repaired,

replaced or closed.

Verify that contaminated soil excavated, disposed of, or stockpiled on site during the closure of a storage tank system is managed in accordance with FAC 62-770 (see the POL Management chapter, section PO.100.FL.).

Documentation

ST.5.33.FL. Federal facilities with storage tank systems must meet specific recordkeeping requirements (FAC 62-761.710) [Added May 1999].

Verify that all records are dated, maintained in permanent form, and available for inspection by the Department or County.

(NOTE: If records are not kept at the facility, they will be made available at the facility or another agreed upon location upon 5 working days notice.)

Page 478: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-35 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

May 1999]. Verify that site access to the facility is provided for compliance inspections conducted at reasonable times.

Verify that records of the following are kept for 2 yr:

- measurements and reconciliations of inventory, as applicable - repair, operation, and maintenance records - release detection results, including electronic test results, regardless of the

frequency, and monthly visual inspections (the presence of a regulated substance's odor, sheen, or free product will be recorded for each sampling event)

- release detection response level descriptions - a copy of all test data and results gathered during tightness tests, pressure

tests, and breach of integrity tests, and the name and type of the test - records of types of fuels stored per tank - the repair or replacement of gaskets, valve packings, valves, flanges, and

connection/disconnection fittings for bulk product piping if the repair or replacement is performed in response to a discharge or loss of regulated substances.

Verify that records of the following, generated after 13 July 1998, are maintained

for the life of the storage tank system:

- results of internal inspections and non-destructive testing - any performance claims for release detection equipment described in writing

by the equipment manufacturer or installer - records of storage tank system installations, replacements, and upgrades - records of installation, maintenance, inspections, and testing of cathodic

protection systems in accordance with NACE standards - site suitability determinations - vapor monitoring plans and all records kept pursuant to the plan - closure assessment reports if the location continues as a facility - verification from a Certified Contractor of the existence of a single check

valve beneath the suction pump for suction piping systems.

Closure or Change-In-Service

ST.5.34.FL. Field-erected storage tank systems temporarily taken out-of-service must meet specific requirements (FAC 62-761.800(1)) [Added May 1999].

Verify that field-erected storage tank systems taken temporarily out-of-service continue to operate and maintain corrosion protection.

Verify that, if the field-erected storage tank systems taken temporarily out-of-service has an external release detection method, the system continues to perform release detection monthly.

Page 479: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-36 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

1999]. Verify that field-erected storage tank systems taken temporarily out-of-service continue leave venting systems open and functioning.

ST.5.35.FL. Storage tank systems temporarily taken out-of-service must meet specific requirements (FAC 62-761.800(2)(a)) [Added May 1999].

Verify that storage tank systems that are taken out-of-service continue to operate and maintain corrosion protection.

Verify that storage tank systems that are taken out-of-service perform external release detection for sites without contamination, as applicable, every six months.

Verify that storage tank systems that are taken out-of-service leave vent lines open and functioning.

Verify that storage tank systems that are taken out-of-service empty the system and cap or secure all lines, pumps, manways, and ancillary equipment, as applicable.

Verify that storage tank systems that are taken out-of-service secure or close off the system to outside access.

Verify that, if the storage tank system is required to be upgraded during the time that it is out-of-service, it is upgraded or replaced before it is returned to service.

(NOTE: Systems with secondary containment installed and operated in accordance with this chapter may remain in a continuous out-of-service status for ten years. After this period, the system will be returned to service or closed.)

Verify that lightness, pressure, or other tests are performed in accordance with FAC 62-761.640(3) (see Appendix 10-5) as applicable, on any systems being returned to service.

ST.5.36.FL. AST systems temporarily taken out-of-service must meet specific requirements (FAC 62-761.800(2)(c)) [Added May 1999].

Verify that systems without secondary containment do not remain in a continuous out-of-service status for more than 5 yr.

Verify that, before the expiration of this 5 yr time period, any remaining product and sludges are removed, and a closure assessment performed for:

- AST Category-A and Category-B systems, regardless of when taken out-of-service, by 31 December 1999, or

- systems taken out-of-service after 13 July 1998.

Verify that out-of-service tanks that are returned to service are:

- inspected and evaluated in accordance with FAC 62-761.500(3)(b)1 (see ST.5.11.FL.) for shop-fabricated tanks, or

Page 480: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-37 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- structurally evaluated in accordance with API Standard 653 for field-erected tanks, unless the system has been out-of-service for less than 6 mo.

Verify that field-erected tanks changing the type of product stored within the tank

shall with API Standard 653, Section 2.2.4.

ST.5.37.FL. Closure of storage tank systems must meet specific standards (FAC 62-761.800(3)(a)) [Added May 1999].

Verify that the closure of storage tank systems is performed by:

- removing all liquids and accumulated sludges - disconnecting and capping, or removing, all integral piping - securing manways to prevent access - conducting a closure assessment.

(NOTE: After closure, storage tank systems may be used to store materials or substances other than regulated substances in accordance with all applicable Department reference standards, (for example, API 1604). Owners and operators are advised that other federal, state, or local requirements may apply to these activities.)

Verify that monitoring wells associated with closed systems that are not being used for release detection or site assessment purposes are closed.

ST.5.38.FL. AST systems must be closed under certain circumstances, and according to specific standards (FAC 62-761.800(3)(c)) [Added May 1999].

Verify that unmaintained systems are permanently closed within 90 days of discovery.

Verify that the tank is rendered free of pollutant vapors at the time of closure to prevent hazardous explosive conditions, and maintained to prevent future explosive conditions.

Verify that the tank is protected from flotation in accordance with NFPA 30, Section 2-6.

ST.5.39.FL. Closure of storage tank systems must meet closure assessment requirements (FAC 62-761.800(4)) [Added May 1999].

Verify that, at time of closure, replacement, installation of secondary containment, or change in service from a regulated substance to a non-regulated substance, an assessment is performed to determine if a discharge from the system or system components has occurred.

Verify that, if a Site Rehabilitation Completion Order (SRCO) or a Monitoring Only Plan (MOP) Approval Order has been issued by the Department for a contaminated area of a site, a closure assessment is performed for any subsequent storage tank system removal, replacement, or installation of secondary

Page 481: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-38 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

containment

(NOTE: Tanks, pipes, or other system components in contact with soil at any site are subject to closure assessment requirements.)

(NOTE: A closure assessment is not required for: - sites with documented contamination requiring a site assessment in

accordance with Chapter 62-770, FAC, including those that are eligible for the Early Detection Incentive Program (EDI), the Florida Petroleum Liability and Restoration Insurance Program (FPLRIP), and the Petroleum Cleanup Participation Program (PCPP), pursuant to Sections 376.3071 and 376.3072, F.S.

- systems initially installed with secondary containment, provided that no unexplained positive response of an interstitial release detection device or method occurred during the operational life of the system, or the secondary containment passed a breach of integrity test prior to closure

- systems upgraded with secondary containment that have closed interstitial spaces, where a closure assessment was performed prior to installation of secondary containment, provided that the secondary containment passed a breach of integrity test

- double-walled shop-fabricated aboveground tanks - aboveground systems with storage capacities less than 1100 gallons that are

upgrading with secondary containment, and that are elevated from and not in contact with the soil (instead of performing a closure assessment, a visual inspection may be performed of the system and the ground surface underneath it for signs of a discharge; written certification will be provided to the County within 10 days after installation of the secondary containment, documenting that there has been no discharge).)

Verify that closure assessment sampling and analysis is conducted according to the

Department's "Storage Tank System Closure Assessment Requirements."

Verify that a closure assessment report is submitted to the County within 60 days of completion of a closure, replacement, installation of secondary containment, or change in service from a regulated substance to a non-regulated substance.

Verify that the report includes sample types, sample locations and measurement methods, a site map, methods of maintaining quality assurance and quality control, and any analytical results obtained during the assessment in accordance with the Department's "Storage Tank System Closure Assessment Requirements."

(NOTE: Persons are advised that contaminated soil excavated, disposed of, or stockpiled on site during the closure of a storage tank system is regulated by FAC 62-770 (see the POL Management chapter, section PO.100.FL.).)

Page 482: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-39 Storage Tank Management

Page 483: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-40 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.10. EMISSIONS/ DISCHARGES FROM BULK GASOLINE TERMINALS

ST.10.1.FL. Unloading, loading, and storage operations at bulk gasoline plants must utilize specific equipment (FAC 62-296.509).

Verify that storage tanks at bulk gasoline plants are filled only by use of submerged filling equipment.

Verify that tank trucks and tank trailers used in loading and unloading operations at bulk gasoline plants utilize submerged filling equipment.

Verify that submerged filling equipment is properly [not defined] maintained.

ST.10.2.FL. Bulk gasoline terminals and their appurtenant equipment must not exceed specific VOC emissions limitations (FAC 62-296.510).

Verify that bulk gasoline terminals and their appurtenant equipment do not emit VOCs in excess of 4.7 gr/gal (80 mg/L) of gasoline loaded.

Verify that the following requirements are met when gasoline is being loading into tanks, trucks, or trailers:

- displaced vapors are vented only to the vapor control system - when loading devices are disconnected or not in use, a means is provided to

prevent liquid waste from the loading device to exceed the quantity specified for the self sealing coupler or adapter according to American Petroleum Institute regulation RP 1004 or its equivalent

- all loading and vapor lines equipped with fittings are vapor-tight - bulk gasoline terminals are equipped with a properly [not defined] installed

and operated vapor control system which accomplishes either of the following:

- recovers vapors from the equipment being controlled - directs all vapors to a combustion or incineration system.

Page 484: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-41 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.15. EMISSIONS/ DISCHARGES FROM POL STORAGE VESSELS

Fixed-Roof And External Floating-Roof POL Storage Vessels

ST.15.1.FL. Fixed-roof POL storage vessels with capacities equal to or greater than 42,000 gal (159,000 L or nominal 1000 bbl) containing POLs with a true vapor pressure greater than 1.50 psia (10.3 kPa) must meet specific emissions control standards (FAC 62-296.508).

(NOTE: Volatile POL storage vessels that are equipped with external floating roofs before 1 January 1996 are not subject to control requirements.)

Verify that fixed-roof POL storage vessels with capacities equal to or greater than 42,000 gal (159,000 L or nominal 1000 bbl) do not store POL with a true vapor pressure of 11.0 psia (76 kPa) or greater under actual storage conditions.

Verify that fixed roof POL storage vessels with capacities equal to or greater than 42,000 gal (159,000 L or nominal 1000 bbl) containing POLs with a true vapor pressure great than 1.50 psia (10.3 kPa) meet the following requirements:

- emissions units have been retrofitted with either of the following: - internal floating roofs equipped with closure seals to close the space

between the roof edges and the tank walls - equally effective alternative controls

- there are no visible holes, tears, or other openings in the seal or any seal fabric or materials

- all openings, except stub drains, are equipped with covers, lids, or seals so that the following requirements are met:

- covers, lids, or seals are in the closed position at all times, except on demand for sampling, maintenance, repair, or necessary operational practices

- rim vents, if present, are set to open when the roof is being floated off the roof leg supports or at the manufacturer's recommended setting.

ST.15.2.FL. External floating-roof POL storage vessels with capacities equal to or greater than 42,000 gal (159,000 L or 1000 bbl) must meet specific emissions control standards (FAC 62-296.516).

(NOTE: POL storage vessels meeting the following criteria are not subject to control requirements:

- are used to store waxy, heavy pour crude oil - have capacities equal to 420,000 gal (1,590,000 L or nominal 10,000 bbl)

and store crude oil and condensate prior to lease custody transfer - contain a POL with a true vapor pressure of less than 1.5 psia (10.15 kPa) - contain a POL with a true vapor pressure of less than 4.0 psia (27.6 kPa) if

vessels are of welded construction and presently possess a metallic-type shoe seal, liquid-mounted foam seal, liquid-mounted liquid-filled type of seal, or

Page 485: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-42 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

other closure device, approved by the Department - are of welded construction, equipped with a metallic-type shoe primary seal

and a secondary seal from the top of the shoe seal to the tank wall (shoe-mounted secondary seal).)

Verify that external floating-roof POL storage vessels with capacities equal to or

greater than 42,000 gal (159,000 L or 1000 bbl) meet the following requirements:

- have been fitted with either of the following: - continuous secondary seals extending from the floating roofs to the tank

walls (rim-mounted secondary seals) - equally effective alternative controls approved by the Department

- utilize seal closure devices meeting the following requirements: - seals are intact and uniformly in place around the circumference of the

floating roofs between the floating roofs and the tank walls - have no visible holes, tears, or other openings in the seals or seal fabric - for vapor-mounted (primary) seals, the accumulated area of gaps

exceeding 1/8 in. (0.32 cm) in width between the secondary seal and that tank walls does not exceed 1.0 in.2/ft (21.2 cm2/m) of tank diameter

- all openings in the external floating roof, except for automatic bleeder vents, rim space vents, and leg sleeves, meet the following requirements:

- are equipped with covers, seals, or lids in the closed position except when the openings are in actual use

- are equipped with projections in the tank which remain below the liquid surface at all times

- automatic bleeder vents are closed at all times except when the roof is floating off or landed on the roof leg supports

- rim vents are set to open when the roof is being floated off the leg supports or at the manufacturer's recommended setting

- emergency roof drains are present and have slotted membrane fabric covers, or equivalent covers, which cover at least 90 percent of the areas of opening.

Gasoline Tanker Trucks And Trailers

ST.15.3.FL. All gasoline tanker trucks and trailers must meet specific requirements (FAC 62-252.500(1) and (2)).

Verify that gasoline tanker trucks and trailers do not deliver gasoline to dispensing facilities subject to Stage I vapor control requirements unless the trucks and trailers meet the following requirements:

- are equipped to dispense and receive gasoline by submerged filling - vapors displaced from the storage tanks during filling are processed by vapor

recovery systems at bulk plants or bulk terminals.

Page 486: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-43 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.15.4.FL. Gasoline tanker trucks and trailers with delivery vessel capacities of more than 4500 gal must meet leak testing requirements (FAC 62-252.500(1) and (3)).

Verify that gasoline tanker trucks and trailers with delivery vessel capacities of more than 4500 gal meet the following leak testing requirements:

- do not sustain a pressure change of more than 3 in. of water (750 Pa) in 5 min when pressurized to 18 in. of water (4500 Pa) or evacuated to 6 in. of water (1500 Pa)

- are tested at least once every 12 mo - are tested prior to use after any of the following occurs: - damage to the delivery vessel or vapor recovery system as a result of an

accident - welding or cutting on the delivery vessel - tanker trucks or trailers are out of service for more than 1 yr.

Verify that testing results are reported to a Department of Agriculture volume

calibration inspector.

Verify that gasoline tanker trucks and trailers subject to leak testing requirements bear Department of Agriculture certification stickers.

Statewide: Gasoline Dispensing Facilities

ST.15.5.FL. Gasoline dispensing facilities meeting specific criteria must utilize Stage I vapor recovery equipment (FAC 62-252.300).

(NOTE: Stage I vapor recovery equipment requirements apply to gasoline dispensing facilities meeting either of the following criteria:

- have a monthly gasoline throughput of 20,000 gal (75,700 L) or more, located in any area designated as a nonattainment area or air maintenance area for ozone

- are subject to Stage II vapor recovery requirements (i.e., FAC 62-252.400).)

Verify that gasoline transfers from delivery vessels into stationary storage vessels at dispensing facilities occur only if stationary storage vessels are equipped for submerged filling and displaced vapors are processed by vapor recovery systems.

Verify that vapor recovery systems utilize at least one of the following methods:

- vapor-tight line from the storage tank to the delivery vessel and a means of ensuring the vapor line is connected before gasoline is transferred

- system conforming with the equipment specifications of the USEPA document entitled "Design Criteria for Stage I Vapor Control Systems -Gasoline Service Stations," which does not allow VOC emissions in the displaced vapor at a rate greater than 80 mg/L (4.7 gr/gal) transferred.

Page 487: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-44 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that vapor-laden delivery vessels unloaded at gasoline dispensing facilities meet the following requirements:

- are vapor-tight at all times except for normal pressure vacuum venting as required by the U.S. Department of Transportation or for maintenance, inspection, or gauging

- are refilled only at bulk gasoline plants or terminals complying with state requirements (i.e., FAC 62-296.509 and 62-296.510).

Broward, Dade, And Palm Beach Counties: Gasoline Dispensing Facilities

ST.15.6.FL. Gasoline dispensing facilities in Broward, Dade, and Palm Beach Counties meeting specific criteria must utilize stage II vapor recovery equipment (FAC 62-252.400(1) through (5)).

Verify that, unless exempted by the Department, gasoline dispensing facilities in Broward, Dade, and Palm Beach Counties which have dispensed 10,000 gal (37,850 L) or more of gasoline in any 1 mo during or since 1991 utilize stage II vapor recovery systems during transfers of gasoline to vehicular fuel tanks.

Verify that stage II vapor recovery systems are properly [not defined] used during gasoline transfers.

Verify that stage II recovery systems meet the following requirements:

- are 95 percent efficient by weight in the recovery of vapors displaced from vehicular fuel tanks during refueling

- all tank gauging and sampling sites are vapor-tight except when gauging or sampling occurs

- all pressure and vacuum test ports are above grade, but not more than 36 in. above grade

- all overfill drains are vapor-tight - no remote vapor check valves are used on balance-type systems.

Verify that stage II vapor recovery systems are installed according to the

manufacturer's plans and specifications and are certified by the California Air Resources Board (CARB).

Verify that operating instructions, clearly describing how to fuel vehicles correctly with vapor recovery nozzles, are conspicuously posted in gasoline dispensing areas.

Verify that operating instructions include warnings that repeated attempts to continue dispensing fuel after vehicle fuel tanks are full may result in spillage or recirculation of gasoline.

Page 488: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-45 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that, if provided by the Department or one of its agencies, Department or agency toll-free telephone numbers are conspicuously posted.

Verify that Stage II devices are installed before gasoline dispensing facilities dispense more than 10,000 gal in any 1 mo.

Verify that, after they are installed, Stage II devices are tested and certified to meet state standards.

Verify that Stage II devices are retested and recertified every 5 yr, when systems are replaced, or when at least 75 percent of the devices are replaced, repaired, or upgraded.

ST.15.7.FL. Gasoline dispensing facilities in Broward, Dade, and Palm Beach Counties that are subject to stage II vapor recovery equipment requirements must maintain specific records (FAC 62-252.400(6) and (8)(b)).

Verify that gasoline dispensing facilities in Broward, Dade, and Palm Beach Counties which are subject to stage II vapor recovery equipment requirements maintain the following records for at least 2 yr:

- gasoline quantities delivered to the facility - gasoline quantities dispensed - logs of maintenance inspections of stage II systems - invoices or work orders for any repairs performed on stage II components - results of tests performed on stage II systems and components - permits issued by the Department or its agencies.

Verify that gasoline dispensing facilities maintain the following information and,

in the event that facilities are sold, transfer the information to the new owners:

- equipment operation and function specific to a facility's Stage II vapor recovery system

- maintenance schedules and requirements for the facility's equipment - equipment manufacturer contacts (i.e., names, addresses, and telephone

numbers) for parts and service.

ST.15.8.FL. Gasoline dispensing facilities in Broward, Dade, and Palm Beach Counties that are subject to Stage II vapor recovery equipment requirements must meet maintenance requirements (FAC 62-252.400(7)).

Verify that gasoline dispensing facilities in Broward, Dade, and Palm Beach Counties which are subject to stage II vapor recovery equipment requirements meet the following maintenance requirements:

- Stage II devices are operated according to the manufacturer's specifications to ensure the integrity and efficiency of the systems

- if vapor recovery systems or system components have defects that could significantly impair the effectiveness of systems, the systems or the components are taken out of service until they are repaired

- if systems or system components have minor defects (e.g., such as very small

Page 489: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-46 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

holes, cracks, or gashes) that do not significantly reduce the effectiveness of the system below 95 percent vapor recovery, systems are repaired within 7 days of the discovery of the defect.

(NOTE: Equipment defects that could significantly impair the effectiveness of

systems and require that systems be taken out of service include the following: - absence or disconnection of any component which is required to be used in

the system as certified - vapor hose which is crimped or flattened so that vapor passage is blocked or

the pressure drop through the vapor hose exceeds the allowed pressure drop in the system as certified

- nozzle boot or coaxial hose which is torn in one or more of the following ways:

- triangular-shaped or similar tears 1/2 in. or more to a side, or a hole 1/2 in. or more in diameter

- slit of 1 in. or more in length - faceplate or flexible cone which is damaged in the following ways: - for balance nozzles and nozzles of aspirators or educator assist-type

systems, damage so that the capability to achieve a seal with fill pipe interface is affected for one-quarter of the circumference of the faceplate (accumulated)

- for nozzles of those vacuum assist-type systems using a flexible cone, damage so that more than one-quarter of the flexible cone is missing

- nozzle shutoff mechanisms which malfunction in any way - vapor return lines, including components like swivels, swing joints, and

underground or aboveground piping, which malfunction or are blocked/restricted so that pressure drops through the lines exceed the requirements of the systems as certified

- inoperative vapor processing units - inoperative vacuum-producing devices - equipment defects identified in CARB executive orders as substantially

impairing the effectiveness of the system in reducing air contaminants - other defects which could impair the effectiveness of the system recover 95

percent by weight of the gasoline vapors displaced.)

Verify that systems taken out of service display out-of-order signs until the systems are repaired, replaced, or adjusted.

Verify that all replacement parts used to retrofit existing gasoline dispensers with stage II vapor recovery equipment are original equipment manufacturer parts or aftermarket parts meeting state requirements.

ST.15.9.FL. Gasoline dispensing facilities in Broward, Dade, and Palm

Verify that gasoline dispensing facilities in Broward, Dade, and Palm Beach Counties which are subject to Stage II vapor recovery equipment requirements ensure that at least one representative of each of the facilities is knowledgeable

Page 490: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-47 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Beach Counties that are subject to Stage II vapor recovery equipment require-ments must meet training requirements (FAC 62-252.400(8)(a)).

about the operation and maintenance of the stage II vapor recovery system used at one's facility.

Page 491: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-48 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.30. UST STATE-SPECIFIC

(NOTE: The requirements of this chapter, unless specified otherwise, apply to owners and operators of facilities, or owners and operators of UST systems with individual storage tank capacities greater than 110 gallons, that contain or contained:

- vehicular fuel, subject to Chapter 17-61, FAC, after 21 May 1984 - pollutants or hazardous substances after 10 December 1990, or - regulated substances in unmaintained storage tank systems.)

(NOTE: See Appendix 10-6 for exemptions from these requirements.)

ST.30.1.FL. USTs must be registered with the Department (FAC 62-761.400(1)) [Added May 1999].

Verify that the owner or operator of any facility or storage tank system registers the storage tank system with the Department on Form 62-761.900(2).

Verify that a completed registration form is submitted to the Department no later than 30 days after regulated or hazardous substances are put into any new storage tank system.

ST.30.2.FL. USTs owners/operators must meet notification requirements (FAC 62-761.450(1)(a) and (b)) [Added May 1999].

Verify that verbal or written notice is provided to the County at least 30 days before installation or upgrading, unless the County agrees to a shorter time period

Verify that verbal or written notice is provided to the County at least 10 days before an internal inspection of a UST, an API 653 internal inspection, a change in service status, closure, or closure assessment, any of which is performed to meet the requirements of this Chapter.

Verify that verbal or written notice is provided to the County at least 48 hr before:

- initiating activities specified in the previous paragraphs, to confirm the date and time of the scheduled activities

- the establishment of temporary out-of-service status for field-erected ASTs - performing any tightness test required under this Chapter.

Verify that verbal or written notice is provided before the close of the County's next business day for an emergency change to an out-of-service status.

Verify that verbal or written notification of the activities specified above performed as a direct result of the emergency change in service shall be made to the County before initiating the activities.

Verify that within 30 days after completion, the owner or operator notifies the Department of the following items on Storage Tank Registration Form 62-761.900(2):

Page 492: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-49 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- any change in ownership of a facility or of a storage tank system - closure or upgrading of a storage tank system - any change or correction in the information reported in the registration form,

including changes in the type of regulated substances stored (a change within the same blend of regulated substances need not be reported (e.g., regular unleaded to premium unleaded gasoline)).

Performance Standards for Category-C Storage Tank Systems

ST.30.3.FL. Category-C storage tank systems must be compatible with the substance stored (FAC 62-761.500(1)) [Added May 1999].

Verify that Category-C systems are made of, or internally lined with materials that are compatible with the regulated substance stored in the system.

ST.30.4.FL. Category-C storage tank systems must meet siting restrictions (FAC 62-761.500(1)(a)) [Added May 1999].

Verify that no Category-C storage tank is installed within 500 ft of any existing community water supply system or any existing non-transient non-community water supply system, or within 100 ft of any other existing potable water supply well.

(NOTE: These prohibitions do not apply to the replacement of an existing storage tank system within the same excavation or dike field area, or the addition of new storage systems meeting the standards for Category-C systems at an existing facility.)

ST.30.5.FL. The external portions of Category-C storage tank systems must be coated (FAC 62-761.500(1)(b)) [Added May 1999].

Verify that exterior portions of aboveground tanks and aboveground integral piping (excluding double-walled systems), are coated or otherwise protected from external corrosion.

Verify that the coating is designed and applied to resist corrosion, deterioration, and degradation of the exterior wall.

(NOTE: SSPC-PA 1, Paint Application Specification No. 1 may be used to protect storage tank systems from external corrosion.)

ST.30.6.FL. Category-C storage tank systems must

Verify that USTs are installed with a spill containment system at each tank fill connection.

Page 493: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-50 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

have spill containment (FAC 62-761.500(1)(c) and (e)) [Added May 1999].

connection.

Verify that the spill containment system is a fixed component that is designed to prevent a discharge of regulated substances when the transfer hose or pipe is detached from the tank fill pipe.

Verify that the spill containment system meets the requirements for secondary containment.

Verify that the materials used for secondary containment are:

- impervious to the regulated substance and able to withstand deterioration from external environmental conditions

- non-corrosive or of corrosion-protected materials - capable of containing regulated substances for at least 30 days - of sufficient thickness and strength to withstand hydrostatic forces at

maximum capacity to prevent a discharge during its operating life.

Verify that liners are approved by the Department, and are not constructed or consist of naturally occurring in-situ soils.

Verify that secondary containment constructed of concrete are:

- designed and constructed in accordance with ACI 350-R89 and ACI 224R-89, or

- lined on the visible interior surfaces of the dike field area in accordance with NACE International Standard RP 0892-92, or SSPC Publication 97-04, Design, Installation, and Maintenance of Coating Systems for Concrete Used in Secondary Containment, or

- designed, evaluated, and certified by a professional engineer registered in the State of Florida that the concrete secondary containment system meets the General Construction Requirements.

Verify that, for cathodically protected tanks and integral piping, secondary

containment systems do not interfere with the operation of the cathodic protection system.

Verify that storage tank system equipment with closed interstitial spaces, such as double-walled USTs, and double-walled integral piping in contact with the soil that is connected to USTs, are designed, constructed and installed to allow for the detection of a breach of integrity in the inner or outer wall by the monitoring of the interstitial space, and that a breach of integrity test is performed before the storage tank system is put into service.

Verify that secondary containment systems are designed and installed to direct any release to a monitoring point or points.

Page 494: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-51 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that underground hydrant pits are installed with a spill catchment basin, secondary containment, or other spill prevention equipment to prevent the discharge of pollutants during fueling of aircraft, vessels, or at any other time the hydrant system is in use.

Verify that any such equipment is sealed to and around the hydrant piping with an impervious, compatible material.

(NOTE: Field-fabricated dispenser liners and piping sumps installed before 13 July 1998 do not have to be approved.)

ST.30.6.FL. Cathodic protection systems for Category-C storage tank systems must meet state-specific requirements (FAC 62-761.500(1)(f)) [Added May 1999].

Verify that cathodic protection systems are designed, constructed, and installed with at least one test station or method of monitoring to allow for a determination of current operating status.

Verify that cathodic protection test stations provide direct access to the soil electrolyte in close proximity to each cathodically protected structure for placement of reference electrodes, and monitoring wires that connect directly to cathodically protected structures.

(NOTE: Facilities where direct access to soil in close proximity to cathodically protected structures is present, and where electrical connections to cathodically protected structures can be conveniently accomplished, need not have separate dedicated cathodic protection test stations.)

Verify that any field-installed cathode protection system is designed by a Corrosion Professional.

ST.30.7.FL. Relocated Category-C storage tank systems must meet state-specific requirements (FAC 62-761.500(1)(g)) [Added May 1999].

Verify that USTs that have been removed and that are to be reinstalled at a different location are:

- recertified that all original warranties are confirmed by the original manufacturer or the manufacturer's successor, and reinstalled in accordance with the standards in FAC 62-761.500, that were in effect 13 July 1998, or

- recertified by a professional engineer registered in the State of Florida that the UST meets all applicable standards of FAC 62-761.500 in effect on 13 July 1998.

Verify that proof of recertification is provided to the Department and County prior

to the completion of installation.

Page 495: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-52 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.30.8.FL. Reused Category-C storage tank systems must be recertified (FAC 62-761.500(1)(i)) [Added May 1999].

Verify that, unless it is recertified for use by a professional engineer registered in the State of Florida, or is recertified by the manufacturer, and is brought into service in accordance with FAC 62-761.500:

- a UST can not be used or reused as an AST for the storage of regulated substances

- an AST can not be used or reused as a UST for the storage of regulated substances.

ST.30.9.FL. The installation of Category-C UST systems must meet specific standards (FAC 62-761.500(2)(a)) [Added May 1999].

Verify that all components of a storage tank system are installed in accordance with the manufacturer instructions.

Verify that all storage tank systems are installed according to the applicable provisions of NFPA 30 and 30A, PEI/RP100-97, and API RP 1615.

Verify that a Certified Contractor performs the installation of storage tank systems containing pollutants if the installation of the storage tank system component disturbs the backfill, or where the integral piping is connected or disconnected during installation.

(NOTE: This applies to the installation of tanks, integral piping (excluding drop tubes), overfill protection and spill containment equipment, internal release detection equipment, cathodic protection systems, secondary containment systems, and dispensing systems.)

Verify that a tightness test is performed on the tank and integral piping before any storage tank system is placed into service unless the system's equipment approval specifies otherwise.

ST.30.10.FL. Category-C UST systems must meet tank construction standards (FAC 62-761.500(2)(b)) [Added May 1999].

Verify that fiberglass reinforced plastic tanks are constructed in accordance with UL 1316 and ASTM Standard D4021-86, or certified by a nationally recognized laboratory that these standards are met.

Verify that cathodically protected steel tanks are:

- constructed in accordance with UL 58 and UL 1746, or as applicable - constructed in accordance with STI #STI-P3 [registered trademark]

Specification and Manual for External Corrosion Protection of Underground Steel Storage Tanks, or

- certified by a Nationally Recognized Laboratory that these standards are met, and constructed and designed by a corrosion professional in accordance with NACE International Standard RP0285-95 for any field-installed cathodic protection system.

Page 496: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-53 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that steel tanks coated with a fiberglass reinforced plastic composite are constructed in accordance with UL-58 and either UL 1746, STI ACT 100 [registered trademark] (F894), or certified by a nationally recognized laboratory that one of these standards is met.

Verify that storage tanks constructed of any other material, design, or corrosion protection are approved by the Department.

Verify that any new tank manufactured with previously used or remanufactured components is certified before being installed as meeting the applicable standards by Underwriters Laboratory, by a comparable certified product testing laboratory, or by a professional engineer registered in the State of Florida.

Verify that tanks are constructed or installed to provide for interstitial monitoring.

ST.30.11.FL. Category-C UST systems must have secondary containment (FAC 62-761.500(2)(c)) [Added May 1999].

Verify that all tanks installed or constructed at a facility after 13 July 1998 have secondary containment.

ST.30.12.FL. Category-C UST systems must have overfill protection (FAC 62-761.500(2)(d)) [Added May 1999].

Verify that, at a minimum, fillbox covers are marked in accordance with API RP 1637, or with an equivalent method approved by the Department.

Verify that USTs are equipped with a system that either:

- automatically shuts off flow to the tank when the tank is no more than 95 percent full

- restricts flow to the tank when the tank is no more than 90 percent full - alerts the transfer operator when the tank is no more than 90 percent full by

triggering a high level alarm - alerts the transfer operator with a high level alarm set at 400 gal below tank

top, but no less than one minute before overfilling, or - automatically shuts off flow into the tank so that none of the fittings located

on top of the tank are exposed to product due to overfilling.

ST.30.13.FL. Category-C UST systems must have dispenser liners (FAC 62-761.500(2)(e)) [Added May 1999].

Verify that storage tank systems installed or replaced after 13 July 1998 are installed with liners beneath the union of the piping and the dispenser.

Verify that hydrostatic tests are performed for all dispenser liners before placing the system into service.

Page 497: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-54 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that the duration of the tests is at least:

- 24 hr for field-fabricated dispenser liners, or - 3 hr for factory-made dispenser liners.

Verify that dispenser liners are installed to allow for interstitial monitoring.

ST.30.14.FL. Piping sumps installed after 13 July 1998 must meet specific standards (FAC 62-761.500(2)(f)) [Added May 1999].

Verify that piping sumps installed after 13 July 1998 are designed, constructed, and installed to minimize water entering the sump.

Verify that hydrostatic tests are performed for all piping sumps before placing the system into service.

Verify that the duration of the tests is at least:

- 24 hr for field-fabricated piping sumps, or - 3 hr for factory-made piping sumps.

Verify that piping sumps are installed to allow for interstitial monitoring.

ST.30.15.FL. Integral piping for Category-C storage tanks must meet specific installation requirements (FAC 62-761.500(4)(a)) [Added May 1999].

Verify that all integral piping is installed in accordance with the manufacturer's instructions, if applicable.

Verify that all integral piping is installed according to the applicable provisions of NFPA 30, NFPA 30A, and ASME B31.4.

Verify that a pressure test is performed for underground bulk product piping before the piping system is placed into service.

ST.30.16.FL. Integral piping for Category-C storage tanks must meet specific construction requirements (FAC 62-761.500(4)(b)) [Added May 1999].

Verify that fiberglass reinforced plastic piping or other non-metallic piping installed at a facility is listed with UL 971, UL 567, certified by a Nationally Recognized Laboratory that these standards are met, or approved by the Department.

Verify that coated steel piping is constructed in accordance with ASME B31.4.

Verify that integral piping in contact with the soil is cathodically protected in accordance with API RP 1632, NACE International RP-0169-96, and STIR 892-96.

Verify that integral piping constructed of other materials, design, or corrosion

Page 498: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-55 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

protection is approved by the Department.

ST.30.17.FL. Small diameter piping for Category-C storage tanks must meet specific requirements (FAC 62-761.500(4)(c)) [Added May 1999].

Verify that pressurized small diameter piping systems connected to dispensers shall be installed with shear valves or emergency shutoff valves in accordance with NFPA 30A, Section 4-3.6, if applicable.

Verify that, for underground small diameter piping, the valves are checked at the time of installation by a certified contractor to confirm that the automatic closing function of the valve operates properly and that the valve is properly anchored.

Verify that gravity-fed small diameter integral piping systems are installed with an isolation valve at the point of connection to the storage tank to prevent the discharge of regulated substances in the case of piping failure, and that this valve meets the standards of NFPA 30A, Section 2-1.7.

Verify that swing-joints are not installed.

ST.30.18.FL. Bulk product piping for Category-C storage tanks must meet specific requirements (FAC 62-761.500(4)(d)) [Added May 1999].

Verify that bulk product piping is constructed and installed in accordance with NFPA 30, and ASME B31.4.

ST.30.19.FL. Piping for Category-C storage tanks must have secondary containment (FAC 62-761.500(4)(e)) [Added May 1999].

Verify that small diameter integral piping that is in contact with the soil or that transports regulated substances over surface waters of the state has secondary containment.

Verify that bulk product piping that is in contact with the soil has secondary containment.

Verify that remote fill piping that is in contact with the soil has secondary containment.

(NOTE: The following integral piping systems are exempt from the requirements for secondary containment:

- integral piping that is in contact with the soil, and that is connected to storage tanks containing high viscosity regulated substances

- vertical fill pipes equipped with a drop tube.)

Page 499: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-56 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Performance Standards for Category-A and Category-B Storage Tank Systems

ST.30.20.FL. Category-A and Category-B storage tanks must meet upgrade deadlines (FAC 62-761.510(1)) [Added May 1999].

(NOTE: This section provides deadlines for Category-A and Category-B storage tank systems to meet the standards for Category-C storage tank systems.)

Verify that upgrades are completed by the deadlines specified in Table UST in Appendix 10-3.

(NOTE: If installation or upgrade activities are initiated before the deadlines, work can continue after the deadlines, provided that all work is completed within 90 days of contract execution or receipt of construction approval or permits. Installation is considered to have begun if:

- all Federal, state, and local approvals or permits have been obtained or applied for to begin physical construction for installation of the system, or

- contractual obligations have been made for installation of the system which cannot be canceled or modified without substantial economic loss, provided that such obligations are pursued diligently in good faith to achieve the requirements of this rule.)

Verify that by 31 December 1998:

- all pressurized small diameter piping systems connected to dispensers have shear valves or emergency shutoff valves installed

- cathodic protection test stations are installed for cathodically protected UST - fillboxes are color coded - ASTs that have been reinstalled as USTs, and USTs that have been

reinstalled as ASTs, meet the requirements of FAC 62-761.500 (see ST.30.3.FL. through ST.30.19.FL.)

Verify that after 13 July 1998, a closure assessment is performed before the

installation of dispenser liners, piping sumps, or secondary containment of tanks and integral piping.

Verify that valves meeting the requirements of Section 3-1.7 of NFPA 30A, are installed by 13 January 1999 on any storage tank system located at an elevation that produces a gravity head on the dispenser or on small diameter piping.

Verify that small diameter piping transporting regulated substances over surface waters of the state has secondary containment by 31 December 2004.

ST.30.21.FL. Category-B UST systems must meet

Verify that Category-B USTs containing pollutants, installed or constructed at a facility after 30 June 1992, have secondary containment.

Page 500: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-57 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

upgrade deadlines (FAC 62-761.510(2)) [Added May 1999].

facility after 30 June 1992, have secondary containment.

Verify that Category-B USTs containing hazardous substances, installed or constructed at a facility after 1 January 1991, have secondary containment.

Verify that small diameter integral piping in contact with the soil that is connected to UST systems has secondary containment if installed after 10 December 1990.

Verify that by 31 December of the appropriate year shown in Table UST in Appendix 10-3, all storage tank systems meet the performance standards for Category-C USTs, or are permanently closed.

Operating Requirements

ST.30.22.FL. Storage tanks systems must meet operating and maintenance requirements (FAC 62-761.700(1)(c)) [Added May 1999].

Verify that spill containment devices, dispenser liners, and piping sumps are maintained to provide access for monthly examination and water removal as necessary.

Verify that water collected in spill containment devices, or in piping sumps and dispenser liners that is above the opening of the integral piping connection, or any regulated substances collected in these storage tank system components are removed and either reused or properly disposed of.

Verify that owners or operators ensure that the volume available in the tank is greater than the volume of regulated substances to be transferred to the tank before the transfer is made and ensure that any transfer is repeatedly monitored to prevent overfilling and spilling.

Verify that all release detection devices are tested annually to ensure proper operation according to manufacturer's specifications, and the tests include, at a minimum, a determination of whether the device operates as designed.

Verify that petroleum contact water from storage tank systems is managed in accordance with FAC 62-740 (see the POL Management chapter, section PO.100.FL.).

Verify that, regardless of the method of release detection used, inventory control is performed for USTs containing vehicular fuel that do not have secondary containment using one of the following methods:

- inventory control in accordance with FAC 62-761.640(3)(b) in Appendix 10-5

- statistical inventory reconciliation in accordance with FAC 62-

Page 501: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-58 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

761.640(3)(c)3 in Appendix 10-5 - automatic tank gauging in accordance with FAC 62-761.640(3)(c)2 in

Appendix 10-5, or - manual tank gauging in accordance with FAC 62-761-640(3)(c)1 in

Appendix 10-5.

Page 502: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-59 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.50. UST CORROSION PROTECTION

(NOTE: See Appendix 10-6 for exemptions from these requirements.)

ST.50.1.FL. Cathodic protection systems must meet operating requirements (FAC 62-761.700(1)(b)) [Added May 1999].

Verify that cathodic protection systems are installed, operated and maintained to provide continuous corrosion protection to the metal components of those portions of the tank and integral piping in contact with the soil.

Verify that storage tank systems equipped with any type of cathodic protection are inspected and tested by a Corrosion Professional or a Cathodic Protection Tester within 6 mo of installation or repair and at least every year thereafter in accordance with the criteria contained in NACE International RP-0169-96, RP-0193-93, and RP-0285-95, as applicable.

(NOTE: Factory-installed (galvanic) cathodic protection systems may be tested every 3 yr.)

Verify that storage tank systems with impressed current systems are inspected at intervals not exceeding 2 mo.

Verify that all sources of impressed current are inspected.

(NOTE: Evidence of proper functioning will be current output, normal power consumption, a signal indicating normal operation, or satisfactory electrical state of the protected structure.)

Verify that impressed current systems that are inoperative for a cumulative period exceeding 1440 hr are assessed by a Corrosion Professional to ensure that the storage tank system is structurally sound, free of corrosion holes, and operating in accordance with the design criteria.

Verify that storage tank systems with sacrificial anodes either have permanent test stations for soil-to-structure potential measurements or use temporary field test stations for annual testing.

Verify that storage tank systems with cathodic protection systems that cannot achieve or maintain protection levels in accordance with the design criteria:

- are repaired in accordance ST.55.1.FL., or - are placed out-of-service.

Verify that records of the continuous operation of impressed current systems and all cathodic protection inspection and testing activities are maintained.

Page 503: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-60 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Page 504: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-61 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.55. UST REPAIRS

(NOTE: See Appendix 10-6 for exemptions from these requirements.)

ST.55.1.FL. Storage tank systems must be repaired according to specific standards (FAC 62-761.700(1)(a)) [Added May 1999].

Verify that repairs are performed if:

- any component of a storage tank system is discovered to have discharged or contributed to the discharge of a regulated substance

- there is a release of regulated substances into secondary containment - the presence of groundwater is found in the interstice of a double-walled UST

or pipe, or - there is an operational or structural problem that could potentially result in a

discharge or release.

Verify that if repairs are required for any component or part of a storage tank system, and the nature of the repair activities or the condition of the component or part of the system requiring a repair may result in a release, and the component or part cannot be otherwise isolated from the system, the storage tank system is taken out of operation until the tank has been repaired or replaced.

(NOTE: The restrictions against storage tank system operation do not apply if the system contains heating oil or other fuels used solely for the generation of electricity where the removal of the storage system from service would result in the shut down of electrical generating units serviced by the system.)

Verify that repairs are made:

- in a manner that will prevent discharges from structural failure or corrosion for the remaining operational life of the storage tank system

- in accordance with manufacturer's specifications, NFPA Standard 30 or other applicable reference standards

- to restore the structural integrity of the storage tank system.

Verify that repaired components are tightness tested, pressure tested, or tested for a breach of integrity, as applicable, before being placed back into service.

Verify that repairs to fiberglass reinforced plastic tanks and steel tanks coated with a fiberglass reinforced plastic composite are made by an authorized representative of the tank manufacturer or its successor.

Verify that piping that is damaged or that has caused a discharge of a regulated substance is replaced or repaired.

(NOTE: Pipe sections and fittings may be repaired in accordance with applicable standards in FAC 62-761.500(4) (see ST.30.15.FL. through ST.30.19.FL.):

Page 505: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-62 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- Replacement of additional lengths of piping in contact with the soil are exempt from the requirements for secondary containment, provided that:

- the piping system does not have, or will not have to install, secondary containment until the deadlines established in FAC 62-761.510 (see ST.30.20.FL. and ST.30.21.FL.), and

- the length of replacement or additional piping is less than 25 percent of the total length of the existing integral piping for the individual tank, or 100 ft, whichever is less.)

ST.55.2.FL. UST systems must be repaired according to specific standards (FAC 62-761.700(2)) [Added May 1999].

(NOTE: Single-walled storage tank systems that have been upgraded with cathodic protection or internally lined before 30 June 1992, may be repaired in accordance with this section until the storage tank system is upgraded with secondary containment. Storage tank systems with secondary containment may be repaired in accordance with this section at anytime during the operational life of the storage tank system.)

Verify that tanks are tightness tested before being placed back in service, unless another testing method has been approved.

Verify that small diameter piping is tightness tested before being placed back into service whenever dispensers connected to that piping are replaced or whenever the piping has been disconnected and then reconnected.

Verify that tanks are repaired with internal lining only if:

- the internal lining is installed in accordance with API RP 1631, and documentation is available from the installer that demonstrates these requirements have been met, and

- within 10 yr after the installation of internal lining, and every 5 yr thereafter, the internally lines tank is:

- inspected internally in accordance with NLPA 631, Chapter B, and found to be structurally sound with the internal lining still performing in accordance with original design specifications, or repaired to original design specifications in accordance with API RP 1631 (if the tank fails to meet these criteria, the owner or operator shall close the storage tank system ), or

- evaluated in accordance with ASTM Designation ES 40-94. and determined by a Corrosion Professional to be suitable for the installation of cathodic protection (if a determination is made that the system is suitable, cathodic protection will be designed by a Corrosion Professional, installed by a Certified Contractor, and operated according to the rules for Category-C tanks; if the system is determined to be unsuitable, it will be closed), and

- tightness tested before the tank is placed back into service and every 5 yr after installation of the internal lining.

Page 506: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-63 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that tanks are repaired with internal lining and cathodic protection only if:

- the internal lining is installed in accordance with API RP 1631 - the cathodic protection system meets the requirements of FAC 62-761-

500(2)(a)2.b (see ST.30.9.FL.), and - a tightness test is performed before the tank is placed back into service and

every 5 yr after installation of the internal lining.

Verify that UST Category-A tanks that were upgraded with internal lining or cathodic protection, or both, are internally inspected or tightness tested, as applicable.

Page 507: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-64 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

RELEASE DETECTION FOR USTs

(NOTE: UST systems that store fuel solely for use by emergency power generators are not required to comply with release detection standards (FAC 62-761.600(2)(c)).)

(NOTE: See Appendix 10-6 for exemptions from these requirements.)

ST.60. GENERAL

ST.60.1.FL. Storage tank systems must meet general release detection requirements (FAC 62-761.600(1)) [Added May 1999].

Verify that storage tank systems have a method, or combination of methods, of release detection that:

- can detect a new release from any portion of the storage tank system - is installed, calibrated, operated and maintained in accordance with the

manufacturer's instructions, including routine maintenance and service checks for operability to ensure that the device is functioning as designed

- meets the applicable performance standards in FAC 62-761.640 in Appendix 10-5 (all manufacturer's instructions and the performance claims and their manner of determination described in writing by the equipment manufacturer or installer will be retained for as long as the storage tank system is used).

Verify that a release detection response level is described in writing for each

method or combination of methods of release detection used for a storage tank system.

Verify that a release detection method is established and provided for all storage tank systems upon installation.

Verify that, except as otherwise specified, the release detection method or combination of methods used at a facility is performed at least once a month, but not exceeding 35 days, to determine if a release from the storage tank system has occurred.

Verify that at least once a month, but not exceeding 35 days, any storage tank and component of a storage tank that can be inspected visually is visually inspected.

(NOTE: A visual inspection is not required for any system component that has a continuous or monthly electronic release detection sensor.)

Verify that continuous electronic leak detection devices are inspected for proper operation on a monthly basis.

Page 508: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-65 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

(NOTE: Inspection may consist of visual observation or remote verification of proper operation.)

Verify that a site suitability determination is performed for UST systems by 31 December 1998 for storage tank systems using groundwater or vapor monitoring wells for release detection.

Verify that, if the site suitability determination indicates that on-site conditions are unsuitable for external monitoring, another method of release detection is used.

Verify that vapor monitoring plans are performed by 31 December 1998 for UST systems for storage tank systems using vapor monitoring for release detection.

Verify that any component of a storage tank system with secondary containment has an interstitial monitoring method.

Verify that pressurized piping, excluding bulk product piping, is equipped with a line leak detector (gravity piping systems are exempt from this requirement).

Verify that any storage tank system not provided with a method, or combination of methods, of release detection in accordance with this section, is closed by the date upon which release detection is to be provided.

Verify that groundwater and vapor monitoring wells meeting the standards for external monitoring, that are no longer used for release detection, are closed by 31 December 2010.

Verify that wells not meeting the standards for external monitoring are closed by 31 December 1998, unless the wells are:

- used for contamination assessment purposes, or - required by rules adopted by a County government.

Page 509: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-66 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.80. UST RELEASES

(NOTE: See Appendix 10-6 for exemptions from these requirements.)

ST.80.1.FL. Spill or release incidents must meet notification requirements (FAC 62-761.450(2)) [Added May 1999].

Verify that notification of the discovery of the following incidents is made to the County on Incident Notification Form 62-761.900(6) within 24 hr or before the close of the County's next business day:

- a failed SIR evaluation, or inconclusive SIR evaluations, or a failed or inconclusive tightness, pressure, or breach of integrity test

- internal inspection results, including perforations, corrosion holes, weld failures, or other similar defects, that indicate that a release could have occurred

- unusual operating conditions, such as the erratic behavior of product dispensing equipment, the sudden loss of product from a storage tank system, or any unexplained presence of water in a tank or unexplained presence of water with or without sheen in a piping sump, unless system equipment is found to be defective but not leaking

- the presence of odors of a regulated substance from surface water or groundwater, soil, basements, sewers and utility lines at a facility or in the surrounding area from which it could be reasonably concluded that a release or discharge may have occurred

- the loss of a regulated substance from a storage tank system exceeding 100 gal on impervious surfaces, other than secondary containment, such as driveways, airport runways, or other similar asphalt or concrete surfaces, provided that the loss does not come in contact with pervious surfaces

- the loss of a regulated substance exceeding 500 gal inside a dike field area with secondary containment

- a positive response of release detection devices or methods (a positive response will be the indication of a release of regulated substances, an exceedance of the Release Detection Response Level, or a breach of integrity of a storage tank system)

- the presence of free product in a piping sump.

(NOTE: Incident Notification Form 62-761.900(6) need not be submitted if: - within 24 hours of discovery of an incident, or before the close of the

County's next business day, the investigation of the incident confirms that a discharge did not occur, or

- an Incident Notification Form was previously submitted for that incident.)

ST.80.2.FL. Discharges must be reported (FAC 62-761.450(3)) [Added May 1999].

Verify that upon discovery of an unreported discharge, the owner or operator reports the following to the County on Discharge Report Form 62-761.900(1) within 24 hours or before the close of the County's next business day:

Page 510: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-67 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

1999]. - results, or receipt of results, of analytical or field tests of surface water or groundwater indicating the presence of contamination

- free product or sheen of a regulated substance, or a regulated substance that is visibly observed in soil, on surface water, in groundwater samples, on basement floors, in subsurface water, in groundwater samples, on basement floors, in subsurface utility conduits or vaults, or in sewer lines at the facility or in the surrounding areas

- a spill or overfill event of a regulated substance to soil or another pervious surface, equal to or exceeding 25 gal, unless the regulated substance has a more stringent reporting requirement specified in 40 CFR 302

- results of analytical or field tests of soil indicating the presence of contamination

- soils stained by regulated substances that are observed during a closure assessment.

Verify that copies of analytical or field test results that confirm a discharge are

submitted to the County with Discharge Report Form 62-761.900(1).

(NOTE: A request for a retraction of a submitted Discharge Report Form may be submitted to the County or the Department if evidence is presented that a discharge did not occur at the facility. A Discharge Report Form 62-716.900(1) does not need to be submitted for previously reported discharges.)

ST.80.3.FL. Federal facilities must meet incident and discharge response requirements (FAC 62-761.820(1)) [Added May 1999].

Verify that if an incident occurs at a facility, actions are taken promptly to investigate the incident to determine if a discharge has occurred.

Verify that if the investigation indicates that the incident was not a discharge, a written confirmation and explanation are submitted to the County, and that test results or reports, which support the findings, are maintained on site as records.

Verify that the investigation is completed within 2 weeks of the date of discovery of the incident (at the end of this time period, either a discharge report form or a written confirmation and explanation that the release was not a discharge will be submitted to the County).

Verify that any spill or loss of regulated substance into secondary containment is removed within 3 days of discovery.

Verify that if a discharge of a regulated substance occurs at a facility, actions are taken immediately to contain, remove, and abate the discharge under all applicable Department rules.

Verify that, when evidence of a discharge from a storage tank system is discovered

Page 511: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-68 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

and reported, the following actions are taken:

- if the source or cause of the discharge is unknown, the discharge is investigated in accordance with NFPA 329, Chapters 3 and 5

- the regulated substance is removed from the system as necessary to prevent further discharge to the environment (notice of the need to take the system out-of-service on an emergency basis will be made to the County)

- fire, explosion, and vapor hazards re identified and mitigated - the system is repaired; if the system cannot be repaired, it is closed.

Verify that the system is tested if the Department or County determines that:

- there has been a failure to comply with the release detection requirements - a release detection device, well, or method indicates that a discharge of a

regulated substance has occurred, and the discharge was not previously reported, or

- groundwater contamination that is not associated with previously known contamination is present in the vicinity of the system and the system is likely to be a source of the contamination.

Verify that within 3 days of the discovery of a discharge, the following steps are

initiated:

- a test on the system, if the test is necessary to confirm a discharge - if found to be leaking, placement of the system out-of-service until repaired,

replaced or closed.

Verify that contaminated soil excavated, disposed of, or stockpiled on site during the closure of a storage tank system is managed in accordance with FAC 62-770 (see the POL Management chapter, section PO.100.FL.).

Page 512: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-69 Storage Tank Management

Page 513: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-70 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.90. UST DOCUMENTATION

(NOTE: See Appendix 10-6 for exemptions from these requirements.)

ST.90.1.FL. Federal facilities with storage tank systems must meet specific recordkeeping requirements (FAC 62-761.710) [Added May 1999].

Verify that all records are dated, maintained in permanent form, and available for inspection by the Department or County.

(NOTE: If records are not kept at the facility, they will be made available at the facility or another agreed upon location upon 5 working days notice.)

Verify that site access to the facility is provided for compliance inspections conducted at reasonable times.

Verify that records of the following are kept for 2 yr:

- measurements and reconciliations of inventory, as applicable - repair, operation, and maintenance records - release detection results, including electronic test results, regardless of the

frequency, and monthly visual inspections (the presence of a regulated substance's odor, sheen, or free product will be recorded for each sampling event)

- release detection response level descriptions - a copy of all test data and results gathered during tightness tests, pressure

tests, and breach of integrity tests, and the name and type of the test - records of types of fuels stored per tank - the repair or replacement of gaskets, valve packings, valves, flanges, and

connection/disconnection fittings for bulk product piping if the repair or replacement is performed in response to a discharge or loss of regulated substances.

Verify that records of the following, generated after 13 July 1998, are maintained

for the life of the storage tank system:

- results of internal inspections and non-destructive testing - any performance claims for release detection equipment described in writing

by the equipment manufacturer or installer - records of storage tank system installations, replacements, and upgrades - records of installation, maintenance, inspections, and testing of cathodic

protection systems in accordance with NACE standards - site suitability determinations - vapor monitoring plans and all records kept pursuant to the plan - closure assessment reports if the location continues as a facility - verification from a Certified Contractor of the existence of a single check

valve beneath the suction pump for suction piping systems.

Page 514: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-71 Storage Tank Management

Page 515: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-72 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.95. CHANGES IN SERVICE OR CLOSURE OF USTs

(NOTE: See Appendix 10-6 for exemptions from these requirements.)

ST.95.1.FL. Field-erected storage tank systems temporarily taken out-of-service must meet specific requirements (FAC 62-761.800(1)) [Added May 1999].

Verify that field-erected storage tank systems taken temporarily out-of-service continue to operate and maintain corrosion protection.

Verify that, if the field-erected storage tank systems taken temporarily out-of-service has an external release detection method, the system continues to perform release detection monthly.

Verify that field-erected storage tank systems taken temporarily out-of-service continue leave venting systems open and functioning.

ST.95.2.FL. Storage tank systems temporarily taken out-of-service must meet specific requirements (FAC 62-761.800(2)(a)) [Added May 1999].

Verify that storage tank systems that are taken out-of-service continue to operate and maintain corrosion protection.

Verify that storage tank systems that are taken out-of-service perform external release detection for sites without contamination, as applicable, every six months.

Verify that storage tank systems that are taken out-of-service leave vent lines open and functioning.

Verify that storage tank systems that are taken out-of-service empty the system and cap or secure all lines, pumps, manways, and ancillary equipment, as applicable.

Verify that storage tank systems that are taken out-of-service secure or close off the system to outside access.

Verify that, if the storage tank system is required to be upgraded during the time that it is out-of-service, it is upgraded or replaced before it is returned to service.

(NOTE: Systems with secondary containment installed and operated in accordance with this chapter may remain in a continuous out-of-service status for ten years. After this period, the system will be returned to service or closed.)

Verify that lightness, pressure, or other tests are performed in accordance with FAC 62-761.640(3) (see Appendix 10-5) as applicable, on any systems being returned to service.

ST.95.3.FL. UST systems Verify that, before being returned to service, the following tests are performed in

Page 516: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-73 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

temporarily taken out-of-service must meet specific requirements (FAC 62-761.800(2)(b)) [Added May 1999].

accordance with FAC 62-761.640(3) (see Appendix 10-5) for systems that are taken out-of-service for more than 180 days:

- a tightness test for single-walled systems, or - a breach of integrity test for double-walled Category-C systems.

Verify that single-walled systems that are taken out-of-service are not kept out-of-service longer than 2 yr for corrosion-protected systems or 1 yr for unprotected bare steel systems.

(NOTE: After the end of these time periods, the systems will either be upgraded or permanently closed.)

ST.95.4.FL. Closure of storage tank systems must meet specific standards (FAC 62-761.800(3)(a)) [Added May 1999].

Verify that the closure of storage tank systems is performed by:

- removing all liquids and accumulated sludges - disconnecting and capping, or removing, all integral piping - securing manways to prevent access - conducting a closure assessment.

(NOTE: After closure, storage tank systems may be used to store materials or substances other than regulated substances in accordance with all applicable Department reference standards, (for example, API 1604). Owners and operators are advised that other federal, state, or local requirements may apply to these activities.)

Verify that monitoring wells associated with closed systems that are not being used for release detection or site assessment purposes are closed.

ST.95.5.FL. UST systems must be closed under certain circumstances, and according to specific standards (FAC 62-761.800(3)(b)) [Added May 1999].

Verify that unmaintained systems are permanently closed within 90 days of discovery.

Verify that system removal, closure in-place, and disposal are performed:

- in accordance with API RP 1604 and NFPA 30 - by a Certified Contractor if the system is removed from the ground (unless it

is closed in place by filling it with a solid inert material of sufficient density to prevent a structural collapse of the closed system).

ST.95.6.FL. Closure of storage tank systems must

Verify that, at time of closure, replacement, installation of secondary containment, or change in service from a regulated substance to a non-regulated substance, an

Page 517: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-74 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

meet closure assessment requirements (FAC 62-761.800(4)) [Added May 1999].

assessment is performed to determine if a discharge from the system or system components has occurred.

Verify that, if a Site Rehabilitation Completion Order (SRCO) or a Monitoring Only Plan (MOP) Approval Order has been issued by the Department for a contaminated area of a site, a closure assessment is performed for any subsequent storage tank system removal, replacement, or installation of secondary containment

(NOTE: Tanks, pipes, or other system components in contact with soil at any site are subject to closure assessment requirements.)

(NOTE: A closure assessment is not required for: - sites with documented contamination requiring a site assessment in

accordance with Chapter 62-770, FAC, including those that are eligible for the Early Detection Incentive Program (EDI), the Florida Petroleum Liability and Restoration Insurance Program (FPLRIP), and the Petroleum Cleanup Participation Program (PCPP), pursuant to Sections 376.3071 and 376.3072, F.S.

- systems initially installed with secondary containment, provided that no unexplained positive response of an interstitial release detection device or method occurred during the operational life of the system, or the secondary containment passed a breach of integrity test prior to closure

- systems upgraded with secondary containment that have closed interstitial spaces, where a closure assessment was performed prior to installation of secondary containment, provided that the secondary containment passed a breach of integrity test

- double-walled shop-fabricated aboveground tanks - aboveground systems with storage capacities less than 1100 gallons that are

upgrading with secondary containment, and that are elevated from and not in contact with the soil (instead of performing a closure assessment, a visual inspection may be performed of the system and the ground surface underneath it for signs of a discharge; written certification will be provided to the County within 10 days after installation of the secondary containment, documenting that there has been no discharge).)

Verify that closure assessment sampling and analysis is conducted according to the

Department's "Storage Tank System Closure Assessment Requirements."

Verify that a closure assessment report is submitted to the County within 60 days of completion of a closure, replacement, installation of secondary containment, or change in service from a regulated substance to a non-regulated substance.

Verify that the report includes sample types, sample locations and measurement methods, a site map, methods of maintaining quality assurance and quality control, and any analytical results obtained during the assessment in accordance with the

Page 518: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-75 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Department's "Storage Tank System Closure Assessment Requirements."

(NOTE: Persons are advised that contaminated soil excavated, disposed of, or stockpiled on site during the closure of a storage tank system is regulated by FAC 62-770 (see the POL Management chapter, section PO.100.FL.).)

Page 519: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-76 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.120. FLAMMABLE COMBUSTIBLE LIQUID STORAGE TANKS

ST.120.1.FL. [Deleted May 1999].

(NOTE: Regulation repealed May 1999.)

ST.120.2.FL. [Deleted May 1999].

(NOTE: Regulation repealed May 1999.)

ST.120.3.FL. [Deleted May 1999].

(NOTE: Regulation repealed May 1999.)

ST.120.4.FL. [Deleted May 1999].

(NOTE: Regulation repealed May 1999.)

ST.120.5.FL. [Deleted May 1999].

(NOTE: Regulation repealed May 1999.)

ST.120.6.FL. [Deleted May 1999].

(NOTE: Regulation repealed May 1999.)

ST.120.7.FL. [Deleted May 1999].

(NOTE: Regulation repealed May 1999.)

Page 520: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-77 Storage Tank Management

Page 521: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-78 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ST.155. OTHER STORAGE TANKS/LOCATIONS

Mineral Acid Storage Tanks (NOTE: The requirements of this rule apply to owners and operators of a facility with an aboveground storage tank with a storage capacity of more than 110 gal that contains mineral acids. The following systems are exempt from the requirements of this rule:

- any mobile or skid tank that is moved at least every 180 days - any tank containing mineral acids that are less than 20 percent by weight of

the solution - any tank of 110 gallons or less capacity that contains mineral acids - any flow-through process tank - any tank containing mineral acids that are regulated as hazardous wastes

under Subtitle C of the Resource Conservation and Recovery Act.)

ST.155.1.FL. Mineral acid storage tanks must meet registration and notification requirements (FAC 62-761.890(3) and (5)(a) and (b)) [Added May 1999].

Verify that the owner of any tank containing mineral acids register the tank with the Department on Form 62-761.900(2).

Verify that a completed registration form is submitted to the Department by 1 July 1992, or no later than 30 days after mineral acids are put into a new storage tank.

(NOTE: Each facility will receive a registration placard upon payment of all applicable fees. The placard will be available for inspection by the Department and filed with records.)

Verify that the Department is notified of the following items on Form 62-761.900(2):

- the date and method of closure, at least 30 days before closure of a tank - any change in ownership of a tank, no later than 30 days after ownership has

been transferred - upgrading of a tank, at least 10 days before upgrading occurs, except for

emergency replacements of tanks or connected piping required by an actual or anticipated discharge (notification of emergency replacement will be provided within 10 days after the emergency replacement)

- any change in registration form information, including any change in the identity of the material being stored.

Verify that the Department is notified of the certification of the Containment and

Integrity Plan or the secondary containment system on Form 62-761.890(1) within 10 days of the completion of the form.

Verify that the Containment and Integrity Plan Certification Form is signed by a

Page 522: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-79 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

professional engineer registered in the State of Florida.

ST.155.2.FL. Mineral acid storage tanks must meet reporting requirements (FAC 62-761.890(5)(c) and (6)) [Added May 1999].

Verify that within 3 working days of discovery, the Department is notified of any release into a secondary containment system of a mineral acid in excess of 110 gallons, or the reportable quantity in effect on 1 July 1991, under the Comprehensive Environmental Response Compensation and Liability Act of 1980, whichever is greater.

Verify that within 24 hr of discovery, or before the close of the next business day, Form 62-761.900(1) is used to report any discharge exceeding:

- 100 pounds of hydrobromic or hydrofluoric acid - 1000 pounds of sulfuric acid, or - 5000 pounds of hydrochloric or phosphoric acid.

ST.155.3.FL. Mineral acid storage tanks must meet specific performance standards (FAC 62-761.890(7)) [Added May 1999].

Verify that existing mineral acid storage facilities that were in operation after 1 January 1992, have either a Containment and Integrity Plan (CIP) or secondary containment.

Verify that new or replacement mineral acid tanks installed after 1 July 1992 have secondary containment.

Verify that a CIP includes procedures and requirements to minimize the risk of spills, releases, and discharges from tanks.

Verify that a CIP is reviewed and updated at least every 2 yr by a professional engineer registered in the State of Florida, made available for inspection by the Department, and addresses:

- an inspection and maintenance program - materials of construction for each tank and compatibility of the mineral acid

with the construction materials - secondary containment of tanks, if applicable - location of surface water bodies near the tank and the potential for discharges

to enter the surface water body or to move off-site - discharge response procedures for containment and abatement - cleanup procedures.

Verify that, for tanks without secondary containment, the CIP also addresses:

- procedures and equipment for treating spill wastes - procedures for disposing of spill wastes - containment and diversionary structures to prevent discharges from entering

the nearby surface water bodies or moving off-site

Page 523: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-80 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- a demonstration of corrosion protection of the tank if the tanks are in contact with the soil.

(NOTE: In place of the CIP, a certification may be provided to the Department by

a professional engineer registered in the State of Florida that: - no mineral acid tank at the facility is in direct contact with the ground

- a secondary containment system has been placed under and around each tank, and sealed to its supports.)

Verify that tanks installed after 1 July 1992, have secondary containment and meet

the requirements of this section before the tank is placed into active service.

Verify that liners used for secondary containment that are installed after 13 July 1998 meet the requirements of FAC 62-761.500(1)(e)1. - 3 (see ST.30.6.FL.).

Verify that a professional engineer registered in the State of Florida has certified that:

- the tanks covered by the CIP for that facility have been inspected and maintained in accordance with the CIP and that the integrity and containment of the tanks has not been compromised, or

- the tank or tanks have secondary containment in accordance with this subsection.

ST.155.4.FL. Mineral acid storage tanks must meet specific recordkeeping requirements (FAC 62-761.890(8)) [Added May 1999].

Verify that copies of the following are maintained and made available for inspection by the Department at reasonable times:

- the Containment and Integrity Plan, or - the certification of secondary containment.

ST.155.5.FL. Mineral acid storage tanks must meet specific discharge response requirements standards (FAC 62-761.890(8)) [Added May 1999].

Verify that, when evidence of a discharge from a tank is discovered and reported, the owner or operator:

- removes as much of the mineral acid from the tank as necessary to prevent further discharge

- repairs the tank in accordance with original design specifications - if the storage tank cannot be repaired, all mineral acid are removed from the

tank and the tank is permanently closed. Verify that any owner or operator of a facility discharging mineral acids immediately undertakes to contain, remove, neutralize, or otherwise abate the discharge.

Page 524: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-81 Storage Tank Management

COMPLIANCE CATEGORY:

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Page 525: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-82 Storage Tank Management

Appendix 10-1

Applicability of UST Regulations (Source: FAC 62-761.300) [Added May 1999]

Underground storage tank systems: The requirements of this chapter, unless specified otherwise, apply to owners and operators of facilities, or owners and operators of UST systems with individual storage tank capacities greater than 110 gallons, that contain or contained:

1. Vehicular fuel, subject to Chapter 17-61, FAC, after May 21, 1984; 2. Pollutants or hazardous substances after December 10, 1990; or 3. Regulated substances in unmaintained storage tank systems.

Exemptions: General: The following underground systems are exempt from the requirements of this Chapter:

1. Any storage tank system storing any hazardous waste listed or identified under Subtitle C of the Resource Conservation and Recovery Act, or a mixture of such hazardous waste and other regulated substances;

2. Any storage tank system regulated under the Toxic Substances Control Act (15 U.S.C. 2065); 3. Any pesticide waste degradation system regulated under chapter 62-660, FAC; 4. Storage tank systems used solely for temporary storage of mixtures of pesticides and diluent for

reapplication as pesticides; 5. Any storage tank system with a storage capacity of less than 30,000 gallons used for the sole purpose of

storing heating oil for consumptive use on the premises where stored; 6. Any tank that contains asphalt or asphalt products not containing other regulated substances; 7. Any storage tank system storing regulated substances that are solid or gaseous at standard temperature and

pressure; 8. Any storage tank containing LP gas; 9. Any storage tank system that contains small quantities (de minimis, as per 40 CFR Section 280.10(b)(5))

of regulated substances; 10. Any wastewater treatment tank system that is part of a wastewater treatment facility regulated under

Section 402 or 307(b) of the Clean Water Act; 11. Any septic tank system; 12. Any stormwater or wastewater collection system; 13. Any surface impoundment, pit, pond, or lagoon; 14. Any agricultural storage tank system of 550 gallons or less capacity; 15. Any residential storage tank system; 16. Any emergency spill or overflow containment storage tank system that is emptied as soon as possible

after use, and that routinely remains empty; 17. Any flow-through process tank system. For industrial and manufacturing facilities, integral piping is

considered to terminate at the forwarding pump or valve used to transfer regulated substances to process, production, or manufacturing points of use or systems within the facility;

18. Any storage tank system, liquid trap or associated gathering lines directly related to oil or gas production and gathering operations regulated by Chapter 377, F.S.;

19. Equipment or machinery that contains regulated substances for operational purposes, such as hydraulic lift or fluid tank systems and electrical equipment tank systems;

20. Any pipeline facilities; 21. Any storage tank system containing radionuclides or that is part of an emergency generator system for

nuclear power generation at facilities regulated by the Nuclear Regulatory Commission under 10 CFR Part 50 Appendix A;

22. Vapor recovery holding tanks and associated vapor recovery piping systems; or

Page 526: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-83 Storage Tank Management

23. Any rail or tanker truck loading or unloading operations (loading racks) specified in Chapter 5 of NFPA 30.

Page 527: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-84 Storage Tank Management

Appendix 10-2

Applicability of AST Regulations (Source: FAC 62-761.300) [Added May 1999]

General Requirements: Aboveground storage tank systems: The requirements of this chapter, unless specified otherwise, apply to owners and operators of facilities, or owners and operators of aboveground stationary storage tank systems with individual storage tank capacities greater than 550 gallons, that contain or contained:

1. Vehicular fuel, subject to Chapter 17-61, FAC, after May 21, 1984; 2. Pollutants after March 12, 1991; or 3. Pollutants in unmaintained storage tank systems.

Exemptions: General: The following aboveground systems are exempt from the requirements of this Chapter:

1. Any storage tank system storing any hazardous waste listed or identified under Subtitle C of the Resource Conservation and Recovery Act, or a mixture of such hazardous waste and other regulated substances;

2. Any storage tank system regulated under the Toxic Substances Control Act (15 U.S.C. 2065); 3. Any pesticide waste degradation system regulated under chapter 62-660, FAC; 4. Storage tank systems used solely for temporary storage of mixtures of pesticides and diluent for

reapplication as pesticides; 5. Any storage tank system with a storage capacity of less than 30,000 gallons used for the sole purpose of

storing heating oil for consumptive use on the premises where stored; 6. Any tank that contains asphalt or asphalt products not containing other regulated substances; 7. Any storage tank system storing regulated substances that are solid or gaseous at standard temperature and

pressure; 8. Any storage tank containing LP gas; 9. Any storage tank system that contains small quantities (de minimis, as per 40 CFR Section 280.10(b)(5))

of regulated substances; 10. Any wastewater treatment tank system that is part of a wastewater treatment facility regulated under

Section 402 or 307(b) of the Clean Water Act; 11. Any septic tank system; 12. Any stormwater or wastewater collection system; 13. Any surface impoundment, pit, pond, or lagoon; 14. Any agricultural storage tank system of 550 gallons or less capacity; 15. Any residential storage tank system; 16. Any emergency spill or overflow containment storage tank system that is emptied as soon as possible

after use, and that routinely remains empty; 17. Any flow-through process tank system. For industrial and manufacturing facilities, integral piping is

considered to terminate at the forwarding pump or valve used to transfer regulated substances to process, production, or manufacturing points of use or systems within the facility;

18. Any storage tank system, liquid trap or associated gathering lines directly related to oil or gas production and gathering operations regulated by Chapter 377, F.S.;

19. Equipment or machinery that contains regulated substances for operational purposes, such as hydraulic lift or fluid tank systems and electrical equipment tank systems;

20. Any pipeline facilities; 21. Any storage tank system containing radionuclides or that is part of an emergency generator system for

nuclear power generation at facilities regulated by the Nuclear Regulatory Commission under 10 CFR Part 50 Appendix A;

22. Vapor recovery holding tanks and associated vapor recovery piping systems; or

Page 528: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-85 Storage Tank Management

23. Any rail or tanker truck loading or unloading operations (loading racks) specified in Chapter 5 of NFPA 30.

Aboveground storage tank systems: The following AST systems are exempt form the requirements of this Chapter:

1. Drip irrigation systems that: a. Are not in contact with the soil; b. Are constructed of corrosion resistant materials; c. Are compatible with the products stored; d. Contain less than 80 percent concentration of fertilizer materials by volume; and e. Are applied on site;

2. Systems used exclusively for the storage of aqueous solutions of sodium hypochlorite; 3. Any mobile tank; 4. Any system located entirely within an industrial occupancy building; 5. Any storage tank system located entirely within an enclosed building or vault with an adequate roof and

walls to prevent rainwater from reaching the system and with an impervious floor containing no valves, drains, or other openings that would permit pollutants to be discharged from the system that were constructed before 13 July 1998; or

6. Any mobile double-wall tank, regardless of how long it is located at a facility, that is connected with a power module system that is used for the emergency or supplemental generation of electrical power by an electric utility as defined in Chapter 366, Florida Statutes. This exemption is limited to tanks that are designed and constructed to be moved to other service locations, and the relocation within a facility or from site to site is inherent in its use.

Page 529: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-86 Storage Tank Management

Appendix 10-3

Performance Standards for Category-A and Category-B Storage Tanks (Source: FAC 62-761.510) [Added May 1999]

General. This section provides deadlines for Category-A and Category-B storage tank systems to meet the standards for Category-C storage tank systems in accordance with Rule 62-761.500,FAC Installation: 1. Installation shall be completed by the deadlines specified in Table UST and Table AST. However, if installation or upgrade activities are initiated before the deadlines, work can continue after the deadlines, provided that all work is completed within 90 days of:

a. Contract execution; or b. Receipt of construction approval or permits.

2. Installation is considered to have begun if: a. All federal, state, and local approvals or permits have been obtained or applied for to begin physical

construction for installation of the system; or b. Contractual obligations have been made for installation of the system which cannot be canceled or

modified without substantial economic loss, provided that such obligations are pursued diligently in good faith to achieve the requirements of this rule.

Table UST

Year Tank or Integral Piping

Installed

1989

1992

1995

1998

2004

2009

+Before 1970 0 B ACFL D E +1970 - 1975 SBL ACF D E +1976 - 1980 B SL ACF D E +1981 - 09/01/84

B ACFL D E

+09/02/84 - 06/30/92

B ACFL D E

+Other* B ACFL D E Key to Table UST * = All systems with a capacity of between 110 gal to 550 gal, all marine fueling facilities as defined in

Section 376.031, F.S., and those systems of greater than 550 gal capacity that use less than 1000 gal/mo or 10,000 gal/yr.

Page 530: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-87 Storage Tank Management

A = (1) Small diameter piping that was protected from corrosion by June 30, 1992, shall have: (a) For pressurized piping, line leak detectors with automatic shutoff, or flow restriction in

accordance with Rule 62-761.640(3)(d), FAC; or (b) For suction integral piping:

1. Secondary containment in accordance with Rule 62-761.500(1)(e), FAC; 2. A single check valve installed in accordance with Rule 62-761.610(4)(a)3., FAC; 3. An annual line tightness test in accordance with Rule 62-761.610(4)(a)1., FAC; or

4. External monthly monitoring or release detection in accordance with Rule 62-761.610(4)(a)1.b., FAC

(2)Bulk product piping in contact with soil shall be upgraded with secondary containment unless the piping is:

(a) Constructed of corrosion resistant materials or upgraded with cathodic protection; and (b) Tested on an annual basis in accordance with API RP 1110, ASME B31.4, or an equivalent

method approved by the Department in accordance with Rule 62-761.850, FAC

B = Vehicular fuel petroleum storage tank systems shall be upgraded with spill containment.

C = Secondary containment in accordance with Rule 62-761.500(1)(e), FAC, shall be required for the following:

(1) Concrete storage tanks; (2) Hazardous substance storage tank systems; and (3) For pollutant storage tank systems, the storage tank or small diameter piping not protected

from corrosion by 30 June 1992.

D = (1) Secondary containment shall be installed for small diameter piping extending over surface waters. (2) Secondary containment for remote fill-pipes associated with Category-A and Category-B systems.

E = Pollutant storage tanks and small diameter piping protected from corrosion on or before 30 June 1992, and all manifolded piping, shall be upgraded with secondary containment.

F = (1)Storage tank systems, excluding vehicular fuel petroleum storage tank systems, shall be upgraded with spill containment, dispenser liners (as applicable), and overfill protection.

(2)Unless contained within secondary containment, swing-joints and flex-connectors that are not protected from corrosion shall be protected from corrosion. Facilities that have pressurized small diameter piping and that have not met the foregoing standard on or before 13 July 1998 shall protect the submersible turbine pump from corrosion or provide corrosion protection for the submersible turbine pump if the pump is not installed within secondary containment. Corrosion protection is not required for the submersible turbine pump riser.

L = (1)Category-A USTs and their integral piping systems that contain vehicular fuel, and that are not

protected from corrosion, shall have secondary containment, or be upgraded with secondary containment in accordance with Rule 62-761.500, FAC

(2)Dispenser liners and overfill protection equipment shall be installed at UST Category-A systems containing vehicular fuel.

O = UST Category-A vehicular fuel storage tank systems subject to Chapter 17-61, FAC, (1984), shall be

retrofitted for corrosion protection.

S = Secondary containment for storage tanks and integral piping not protected from corrosion.

Table AST

Page 531: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-88 Storage Tank Management

Year Tank or Integral Piping

Installed

1993

2000

2005

2010

+Before July 13, 1998

P TVX W U

Key to Table AST P = With the exception of high viscosity bulk product piping, bulk product piping in contact with soil and not

in secondary containment shall be tested in accordance with API RP 1110, ASME B31.4, or an equivalent method approved by the Department in accordance with Rule 62-761.850, FAC Such testing shall be performed annually thereafter.

T = (1)With the exception of siting and material construction standards, Category-A and Category-B systems shall meet the performance standards of Rule 62-761.500, FAC In addition:

(a) Storage tank system construction standards that include cathodic protection remain applicable; and

(b) Storage tanks where the entire bottom of the tank is in contact with concrete do not have to seal the concrete beneath the tank until such time that the tank bottom is replaced. However, concrete secondary containment systems designed in accordance with Rule 62-761.500(1)(e)3., FAC, do not have to be sealed.

(2)Category-A bulk product piping in contact with the soil shall be upgraded with secondary containment, unless:

(a) A structural evaluation is performed in accordance with API 570, as specified in "U" (2)(b), of Table AST, and results of the structural evaluation indicate that the bulk product piping has remaining useful life; or

(b) The integral piping conveys high viscosity regulated substances, that are exempt from secondary containment in accordance with Rule 62-761.500(4)(e)4., FAC; or

(c) The integral piping is protected from corrosion and is tested annually in accordance with ASME B31.4, API 1110, or an equivalent method approved by the Department in accordance with Rule 62-761.850, FAC This piping shall have secondary containment by 1 January 2010, in accordance with "U" of Table AST.

(3)Initial internal and external inspections, examinations, and tests for each tank shall be performed in accordance with API Standard 653, and an appropriate reinspection interval for each tank shall be established in accordance with API Standard 653. If any deficiency is discovered during the inspections, the person performing the evaluation of the tank in accordance with API 653 must verify that the tank is ready for service before the storage tank is put back into service. This verification must be documented in the internal inspection records. Future tests for each tank shall be performed in accordance with the inspection interval established in accordance with API 653 (1996). Baseline inspections already conducted according to the API Standard 653 (1991) will be accepted.

(4)As an alternative to installing secondary containment underneath an AST Category-A or Category-B storage tank, the interior bottom of the tank and at least 18 in. up the sides may be internally lined in accordance with API RP 652. Secondary containment must nonetheless be installed in the dike field area and be continuously bonded to the perimeter of the tank foundation.

Page 532: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-89 Storage Tank Management

U = (1)All internally lined single bottom storage tanks, with the exception of tanks exempt under Rule 62-761.500(3)(c)1., FAC, shall be upgraded with secondary containment.

(2)All AST Category-A bulk product piping in contact with the soil, except for piping exempt from secondary containment requirements under Rule 62-761.500(4)(e)4., FAC, shall be:

(a) Upgraded with secondary containment in accordance with Rule 62-761.500(1)(e), FAC; or (b) Instead of being upgraded with secondary containment, be evaluated for structural

integrity by: 1. Establishing and maintaining the piping inspection intervals in accordance with API 570,

Section 4-2, by 1 January 2000; 2. Determining the remaining life of the system in accordance with API 570, Section 5.0, by

1 January 2000. If the determination indicates that the piping: a. Must be repaired, then the piping shall be repaired within 3 mo of the determination

in accordance with API 570 and Rule 62-761.700, FAC; b. Is leaking, then the piping must be immediately taken out of operation. If the piping

cannot be repaired, it must be closed or upgraded with secondary containment within one year of the determination;

c. Is not leaking, but has corroded to a point where it no longer has structural integrity, then the piping shall be closed, or upgraded with secondary containment by 1 January 2000; or

d. Has remaining useful life, then the piping shall be closed or upgraded with secondary containment when the API 570 inspection and remaining life determination data indicates that closure or replacement is necessary.

3. Providing a certification by a professional engineer registered in the State of Florida that the evaluation meets the above criteria.

V = (1)Secondary containment for cut and cover or concrete storage tanks.

(2)Spill containment in accordance with Rule 62-761.500(1)(c), FAC (3)Dispenser liners for shop-fabricated tanks in accordance with Rule 62-761.500(3)(e), FAC (4)Secondary containment in accordance with Rule 62-761.500(1)(e) and (3)(c), FAC, for dike field

areas of facilities with shop-fabricated tanks having dike field area secondary containment that is constructed of concrete or installed with synthetic liners not meeting these requirements.

W = (1)Secondary containment in accordance with Rule 62-761.500(1)(c) and (3)(c), FAC, for dike field

areas of facilities with field-erected tanks having dike field area secondary containment that is constructed of concrete or installed with synthetic liners not meeting these requirements.

(2)Secondary containment for small diameter piping extending over surface waters. (3)Secondary containment for small diameter petroleum contact water piping in contact with the soil.

X = Deadline to determine integrity of single wall bulk product piping with an API 570 structural integrity evaluation in accordance with the option for Category-A systems in "U" of Table AST.

.

.

Page 533: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-90 Storage Tank Management

Appendix 10-4

Release Detection Methods (Source: FAC 62-761.610) [Added May 1999]

(NOTE: The numbering of the original regulation is retained to facilitate cross-referencing.) (1) General.

(a) Category-A and Category-B systems. Release detection methods shall be one of the methods specified in this section, and shall meet the performance standards contained in Rule 62-761.640, FAC

(b) Category-C systems. Release detection methods shall be either interstitial or visual monitoring of secondary containment in accordance with Rule 62-761.640, FAC Small diameter pressurized piping shall have a line leak detector in accordance with Rule 62-761.640(3)(d)1., FAC A breach of integrity test shall be performed every five years for Category-C storage tank systems with closed interstitial spaces, unless the test is a continuous test.

(2) Underground storage tank systems. Category-A and Category-B USTs shall be equipped with one or more of the following release detection systems:

(a) An interstitial monitoring system between the walls of a double-walled tank; (b) Interstitial monitoring involving a single monitoring well or vapor detector located within a liner that

meets the standards in Rule 62-761.500(1)(e), FAC, provided the well or detector is placed at the low point of the liner so that collected liquids will drain to the monitoring point,

(c) A continuously operating release detection system placed around a tank in an excavation or in the secondary containment in accordance with the manufacturer's requirements;

(d) A network of groundwater or vapor monitoring wells installed or verified in accordance with Rule 62-761.640(2)(a) - (d), FAC, as applicable;

(e) Automatic tank gauge systems. 1. An automatic tank gauge system with a tightness test of the storage tank every three years; or 2. A continuous automatic tank gauge system;

(f) A statistical inventory reconciliation system with a tightness test of the storage tank every three years; (g) Manual tank gauging shall be performed as specified in Table MTG in Rule 62-761.640(3)(c), FAC, for

tanks of 550 gallons or less nominal capacity, and for tanks 551-1000 gallons with known diameters of 48 or 64 inches;

(h) Manual tank gauging may be used for tanks of 551 to 2000 gallons nominal capacity provided that a tank tightness test is performed:

1. Every 12 months for tanks not protected from corrosion by June 30, 1992; or 2. Every five years for tanks installed with corrosion protection, or for tanks upgraded with corrosion

protection by June 30, 1992. However, this method is only available for the first 10 years after: a. A tank is upgraded with cathodic protection; b. A single-walled corrosion-protected tank is installed; or c. Until December 22, 1998, whichever is later;

(i) An annual tank test in conjunction with inventory control performed in accordance with Rule 62-761.640, FAC This method can only be used until:

1. Ten years after the date of installation of a single-walled corrosion protected tank; 2. Ten years after the tank is upgraded with corrosion protection or internal lining; or 3. December 22, 1998, whichever is later.

(3) Aboveground storage tank systems.

(a) Tanks. Category-A and Category-B ASTs shall be equipped with one or more of the following release detection systems:

1. Tanks with secondary containment shall have an interstitial monitoring system: a. Between the walls of a double-walled tank; b. In the interstice between the tank and any liner used for secondary containment;

Page 534: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-91 Storage Tank Management

c. Between the tank bottom and the secondary containment for double-bottomed tanks; 2. Tanks without secondary containment or that are exempt from secondary containment shall have a

visual inspection performed in accordance with Rule 62-761.610(3)(b), FAC 3. Tanks with internal lining and cut and cover tanks shall have a method of release detection that meets

the requirements of Rule 62-761.640(2), FAC (b) Visual inspections of tank systems. A visual inspection of the exterior of each tank, the aboveground

integral piping system, the secondary containment within the dike field area (if applicable), the dike field area, and any other storage system components shall be conducted and documented at least once a month, but not exceeding 35 days.

(4) Integral piping.

(a) Small diameter piping in contact with the soil. Single-walled piping that is in contact with soil shall be equipped with one of the following release detection systems:

1. Suction or gravity piping shall have: a. An annual line tightness test; or b. An external monthly monitoring or release detection method meeting the requirements of Rule

62-761.640(2), FAC, if designed to detect a discharge from any portion of the integral piping. 2. By December 31, 1998, pressurized piping shall have:

a. Mechanical line leak detectors meeting the requirements of Rule 62-761.640(3)(d), FAC, and either an annual line tightness test, or an external release detection method meeting the requirements of Rule 62-761.640(2)(a) - (d),FAC; or

b. Electronic line leak detectors meeting the requirements of Rule 62-761.640(1)(a), FAC 3. Exemptions. Release detection is not required for piping associated with:

a. Suction pumps, provided that a single check valve is installed directly below the suction pump, and the piping is sloped so that the contents of the pipe will drain back to the tank if the suction is broken. Written verification shall be provided by a certified contractor that no other check valves exist between the dispenser and the tank, and that the above criteria are met. Any subsequent modification of the piping which involves disconnection shall be recertified by a Certified Contractor that these conditions are still being met; and

b. Manifold piping systems. (b) Small diameter piping not in contact with the soil, or that is exempt from secondary containment. These

systems shall be visually inspected in accordance with Rule 62-761.610(3)(b), FAC (c) Small diameter piping with secondary containment that is in contact with the soil. Double-walled piping,

or single-walled piping with secondary containment shall be equipped with the following release detection systems:

1. Interstitial monitoring; 2. A method of testing for a breach of integrity that meets the requirements of Rule 62-761.640(3)(a)2.,

FAC, for Category-C systems, as applicable; and 3. A line leak detector that restricts or shuts off flow or a continuously operating interstitial monitoring

device that meets the requirements of Rule 62-761.640(3)(d)1.e., FAC, for pressurized piping connected to a UST, by December 31, 1998.

(d) Bulk product and hydrant piping. 1. Single-walled piping in contact with the soil:

a. Shall be pressure tested annually in accordance with Rule 62-761.640(3)(e), FAC; or b. Instead of annual testing, a monthly release detection system meeting the requirements of Rule

62-761.640(2) FAC, may be installed. 2. Piping not in contact with the soil, or that is exempt from secondary containment, shall be visually

inspected in accordance with Rule 62-761.640(3)(b), FAC 3. Piping with secondary containment that is in contact with the soil, such as double-walled piping or

single-walled piping with secondary containment, shall be equipped with the following release detection systems:

a. Interstitial monitoring; and, if applicable,

Page 535: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-92 Storage Tank Management

b. For Category-C systems, a method of testing for a breach of integrity that meets the requirements of Rule 62-761.640(3)(a)2., FAC, for piping with closed interstitial spaces.

Page 536: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-93 Storage Tank Management

Appendix 10-5

Performance Standards for Release Detection (Source: FAC 62-761.640) [Added May 1999]

(NOTE: The numbering of the original regulation is retained to facilitate cross-referencing.) (1) General. Methods of release detection shall:

(a) Be capable of detecting a release of 0.2 gallons per hour or 150 gallons within 30 days with a probability of detection of 0.95, and a probability of false alarm of 0.05, with the exception of:

1. Tightness testing requirements in Rule 62-761.640(3)(c)4. and (3)(d)2., FAC; 2. Visual inspections in Rule 62-761.640(2)(e), FAC; 3. Groundwater or vapor monitoring in Rule 62-761.640(2), FAC; and 4. Manual tank gauging in Rule 62-761.640(3)(c)1., FAC

(b)With the exception of bailers and monitoring wells, be approved in accordance with Rule 62-761.850(2), FAC

(c) Have a release detection response level described in writing for each method or combination of methods.

(2) External release detection methods. (a) Well construction standards.

1. Monitoring well requirements. Monitoring wells shall be constructed and installed by a licensed water well contractor when required by Chapter 62-531, FAC Monitoring wells shall:

a. Be a minimum of two inches in interior diameter, b. Be slotted from the bottom to two feet below ground surface; c. Have a minimum slot size of 0.010 inch; d. Be backfilled with clean sand or a gravel filter pack to prevent blockage of the slots; e. Be constructed of at least schedule 40 PVC without any joints, or of another corrosion protected

material; f. Be grouted into the borehole from the surface to the top of the filter pack plug with neat cement

grout or other equivalent materials. Grouting shall not extend below the top of the well slotting. Bentonite slurry grouts shall not be used;

g. Unless the monitoring well has an extended exterior casing, be equipped with a minimum six inch diameter manhole designed to prevent water intrusion with a one inch minimum grade increase above the surrounding surface. The well opening shall extend at least one inch above the bottom of the manhole;

h. Be equipped with a watertight cap. The well shall be kept locked or secured to prevent tampering at all times except when the monitoring well is being sampled or maintained. Monitoring wells shall be marked in accordance with API RP 1615;

i. Extend no deeper than 20 feet below ground surface. If such a depth penetrates a confining layer below the excavation, the monitoring well shall extend no deeper than to within six inches of the confining layer. Any well that penetrates a confining layer shall immediately be properly abandoned in accordance with Rule 62-632.500, FAC; and

j. If installed within a secondary containment liner system, extend no deeper than six inches from the liner.

2. Groundwater monitoring wells shall: a. Extend at least five feet below the normal groundwater surface level; and b. Be properly developed by the licensed water well contractor before the initial sampling.

3. Vapor monitoring wells shall meet the requirements specified in DEP's "Guidelines for Vapor Monitoring."

4. Electronic sensors, probes, or fiber-optic systems shall be tested at least annually to verify that they operate in accordance with the Department's approval given pursuant to Rule 62-761.850(2), FAC

Page 537: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-94 Storage Tank Management

5. Groundwater and vapor monitoring wells using the placement of sensors or probes in vertical, horizontal, or directionally-drilled wells shall be designed and installed in accordance with the equipment approval for that system granted in Rule 62-761.850(2), FAC

(b) Site suitability determinations. 1. A site suitability determination shall be performed for each facility using groundwater or vapor

monitoring. The site suitability determination shall be performed in accordance with DEP's "Guidelines for Site Suitability Determinations for External Monitoring" by a Professional Geologist registered in the State of Florida, If the site is not suitable for external monitoring, another method of release detection must be used.

2. The following facilities having Category-A and Category-B USTs and ASTs that use external monitoring are not required to perform site suitability determinations:

a. Facilities located in counties having rules more stringent than the Department as specified in Chapter 376.317, F.S.

b. Facilities with monitoring wells located in the tank excavation, provided that a demonstration can be made that the excavation contains sand or gravel backfill, and the wells were properly constructed and installed within the backfill.

(c) Groundwater monitoring. 1. The regulated substance shall be immiscible in water and have a specific gravity of less than one. 2. Groundwater monitoring shall not be used for release detection after free product or a sheen is

discovered in a monitoring well, unless: a. A Site Rehabilitation Completion Order has been issued by the Department following the

remediation of the free product or sheen, and there is no longer any free product in the monitoring well; or

b. Free product or sheen is not present and has not been observed in the well within the previous thirty (30) months, as demonstrated by records of at least six (6) monthly ground water monitoring sampling events, and within the previous two years, the system has been tested tight with tank and line piping tests or another internal method of release detection performed in accordance with Rule 62-761.640(3), FAC

3. Another method of release detection specified in Rule 62-761.610, FAC, other than groundwater monitoring, shall be used when:

a. There is less than one foot of groundwater present in the well; or b. The groundwater level is above the slotted portion of the well.

4. Records. The following information shall be maintained in accordance with the recordkeeping requirements of this chapter

a. Date of sampling; b. Depth of well; c. Depth to groundwater; d. Any presence of odor of stored regulated substances; and e. Any sheen or free product found.

(d) Vapor monitoring. 1. Vapor monitoring can only be used to monitor regulated substances that are sufficiently volatile to be

detected in soils or groundwater by vapor monitoring equipment 2. The measurement of vapors in a vapor monitoring well shall not be rendered inoperative by

groundwater, rainfall, soil moisture or other known interferences so that a discharge could go undetected for more than 30 days.

3. Sampling equipment shall be capable of detecting: a. A vapor concentration of 500 parts per million total petroleum hydrocarbons, as measured by a

flame ionization detector, for storage tank systems containing gasoline or equivalent petroleum substances;

b. A vapor concentration of 50 parts per million total petroleum hydrocarbons, as measured by a flame ionization detector, for storage tank systems containing kerosene, diesel or equivalent petroleum substances;

Page 538: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-95 Storage Tank Management

c. Vapor concentrations of hazardous substances or their constituents that would indicate a release; or

d. Vapor concentrations of tracer compounds used for release detection. 4. Vapor monitoring shall not be used for release detection if existing contamination interferes

with the ability to detect a new release. 5. The vapor monitoring plan shall be developed and performed in accordance with DEP's "Guidelines

for Vapor Monitoring." The plan shall include a description of monitoring wells or probes, the method of sampling, the establishment of a release detection response level and the data management procedures. Facilities with monitoring wells located in the tank excavation do not, have to meet the requirements for DEP's "Guidelines for Site-Suitability Determinations for External Monitoring," provided that a demonstration can be made that the excavation contains sand or gravel backfill, and the wells were properly constructed and installed within the backfill.

(c) Visual inspections. Any visual inspection of the storage tank system or its secondary containment that reveals signs of corrosion, cracks, structural damage, leakage, or other similar problems shall be noted. Repairs shall be made in accordance with the requirements of Rule 62-761.700, FAC

(3) Internal release detection methods.

(a) Interstitial monitoring for UST and AST systems. 1. Interstitial monitoring for double-walled tanks, double-walled integral piping, dispenser liners, piping

sumps, and other secondary containment systems, shall be designed and constructed to allow monitoring of the space between the primary and secondary containment. One or more of the following methods of interstitial monitoring shall be used:

a. Manual sampling of, or visual monitoring for, liquids; b. Continuous electronic sensing equipment; c. Hydrostatic monitoring systems; or d. Vacuum monitoring.

2. Breach of integrity tests for Category-C systems. A test shall be performed for a breach of integrity of the interstice for double-walled USTs, double-bottomed ASTs, and for double-walled integral piping that is in contact with the soil and that is connected to ASTs or USTs. Double-walled shop-fabricated ASTs, piping sumps, and dispenser liners are not required to perform a breach of integrity test. The test shall be performed to determine the integrity of the inner and outer wall, is required only for tanks and integral piping with closed interstices, and does not apply to open-interstice systems with liners. The test shall be performed at the time of installation, and every five years from the date of installation, unless the test is a continuous test If a UST is totally submerged in groundwater, monthly monitoring of the interstice for the presence of water shall be conducted. The breach of integrity test may be performed by using at least one of the following methods:

a. A continuous hydrostatic system approved by the Department in accordance with Rule 62-761.850(2), FAC;

b. A continuous vacuum system, pursuant to Rule 62-761.640(3)(a), FAC, that is approved by the Department in accordance with Rule 62-761.850(2), FAC;

c. Testing of the interstice for liquid tightness in accordance with manufacturer's installation instructions; or

d. Another method in accordance with Rule 62-761.850(2), FAC 3. Vacuum monitoring of the interstice shall meet the following requirements:

a. Liquid-filled gauges and air-filled gauges shall be calibrated in accordance with the National Institute of Standards and Technology. The gauges shall be operational at all times.

b. Vacuum monitoring may be used as a continuous method of release detection provided that the vacuum system is equipped with an audible or visual alarm. The alarm shall indicate when the minimum vacuum level allowed is reached as provided in the equipment approval granted in accordance Rule 62-761.850(2), FAC

c. Vacuum readings shall be recorded monthly. Upon discovery of any significant vacuum level decrease, or any loss of vacuum exceeding 20 percent of the initial level, or any loss in excess of the levels established in the test protocols provided in the third party certification for the test

Page 539: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-96 Storage Tank Management

method, the tank manufacturer shall be contacted and the vacuum refreshed in accordance with the storage tank system's equipment approval in Rule 62-761.850(2), F.A.C, If the loss of vacuum persists, an investigation shall be initiated and an incident reported in accordance with Rule 62-761.450(2), FAC The source of the loss shall be repaired in accordance with Rule 62-761.700, FAC

4. Interstitial monitoring for storage tanks and integral piping equipped with liners shall be designed and constructed to allow monitoring of the space between the primary and secondary containment and shall:

a. Be capable of detecting a release through the inner wall into the interstice; b. Be constructed and installed so that groundwater, rainfall, or soil moisture will not render the

testing or sampling method used inoperative; and c. Be equipped with an external release detection method meeting the standards of Rule 62-

761.640(2)(a) - (d), FAC, except for the groundwater level and excavation zone assessment requirements; or

d. Be visually inspected in accordance with Rule 62-761.640(2)(e), FAC; or e. Be equipped with a monitoring device approved in accordance with Rule 62-761.850(2), FAC,

installed at the monitoring point within the liner. (b) Inventory control.

1. General. a. Inventory control shall be maintained for each single-walled tank that contains vehicular fuel. b. Storage tank systems that are elevated above the soil or that have secondary containment are

exempt from inventory control requirements. ASTs that rest on an impervious surface are also exempt.

2. Inventory control for USTs and shop-fabricated ASTs shall be performed and recorded in accordance with APIRP 1621, as applicable. Manifolded tanks may be treated as a single tank for the purposes of inventory control. Inventory control shall be performed in the following manner.

a. Volume measurements for product inputs, withdrawals, and the amount remaining in each tank shall be recorded each operating day;

b. Measurements of product levels shall be recorded to the nearest one-eighth of an inch; c. Product inputs shall be reconciled with delivery receipts by measurement of the tank product

volume before and after delivery; d. Product dispensed shall be metered as required by Chapters 525 and 531, F.S., and in

accordance with the standards established by the Florida Department of Agriculture and Consumer Services in Chapter 5F-2, FAC;

e. The measurement of water level in the bottom of the tank shall be made at least once a week to the nearest one-eighth of an inch; and

f. The significant loss or gain of product shall be calculated for each month. 3. Inventory control requirements for USTs. Water fluctuations exceeding one inch not attributed to

deliveries shall be investigated in the following manner: a. The accessible parts of the storage system shall be inspected for damage or openings; b. Release detection systems shall be checked for signs of a discharge; and c. If, within a week, the investigation does not reveal the source of the water fluctuation, the entire

storage tank system shall be tested in accordance with Rule 62-761.640(3), FAC 4. Inventory control requirements for field-erected ASTs.

a. Bulk product facilities may use product inventory control for multiple tanks provided that a demonstration of equivalent protection is made in accordance with Rule 62-761.850(1), FAC

b. Inventory measurements for field-erected systems, manifolded systems, and non-manifolded systems with a capacity of 30,000 gallons or greater shall be reconciled to detect the presence of a significant loss or gain. The equipment and method used shall be capable of accurately measuring the level or. volume, of product over the full range of the tank's usable storage capacity, to the nearest one fourth of an inch.

5. Investigation procedures for significant loss or gain. An investigation shall be initiated immediately to determine the source of a significant loss or gain. The entire storage tank system, excluding the

Page 540: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-97 Storage Tank Management

vent, but including piping connections and remote fill lines, shall be tested or inspected to determine if the system is product tight. The investigation shall continue until the source has been found, using the following investigative procedure:

a. Inventory records shall be checked for errors in arithmetic, data recording, and measurement; b. If the significant loss or gain is not reconcilable or cannot be affirmatively demonstrated to be

the result of theft, the accessible parts of the storage system shall be checked for damage or leaks;

c. Release detection systems shall be checked for signs of a discharge; d. Calibration of the inventory measuring system and dispensing system shall be verified; e. If the investigation does not reveal the source of the significant loss or gain within one week for

USTs, and two weeks for ASTs, or if the Department or County determines that it is necessary to investigate based on evidence that the significant loss or gain could result in potential harm to the environment, the storage tank system shall be tested in accordance with the manufacturer's guidelines, if applicable, and Rule 62-761.640(3) and (4), FAC; and

f. If a discharge is discovered, the leaking or defective component of the storage tank system shall be repaired in accordance with Rule 62-761.700, F.A.C, If the storage tank system cannot be repaired, it shall be closed in accordance with Rule 62-761.800(3), FAC

(c) Underground storage tanks. 1. Manual tank gauging. Manual tank gauging for tanks of 2000 gallons or less containing regulated

substances shall meet the following requirements: a. Tank liquid level measurements shall be taken weekly at the beginning and ending of a period

between 36 hours and 58 hours in accordance with Table MTG, during which no liquid is added to or removed from the tank;

b. Level measurements shall be based on an average of two consecutive stick readings taken at both the beginning and ending of the period; and

c. The equipment used shall be capable of measuring the level of product over the full range of the tank's height to the nearest one-eighth of an inch.

d. Readings exceeding the standards described in Table MTG shall be investigated in accordance with Rule 62-761.820, FAC

Table MTG

Nominal tank capacity

Minimum duration of test

Weekly standard (one test)

Monthly standard (4 test avg)

550 gal or less 36 hours 10 gallons 5 gallons 551 - 1000 gal (tank diameter less than or equal to 64")

44 hours 9 gallons 4 gallons

551 - 1000 gal (tank diameter less than or equal to 48")

58 hours 12 gallons 6 gallons

551 - 1000 gal (tank diameter unknown)

36 hours 13 gallons 7 gallons

1001 - 2000 gal 36 hours 26 gallons 13 gallons

2. Automatic tank gauge systems. a. Automatic tank gauge systems that do not analyze data in a continuous manner shall be placed

in a test mode at least once every 30 days. b. Automatic tank gauge systems that continuously analyze the data collected by the system shall

be operated in continuous test mode at all times and shall provide test results daily. 3. Statistical Inventory Reconciliation (SIR). SIR shall be conducted according to the following

requirements:

Page 541: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-98 Storage Tank Management

a. Data submitted for SIR analysis must be gathered in accordance with the requirements of Rule 62-761.640(3)(b)1.a. - e., FAC;

b. Results of each monthly analyses must include the calculated results from the data set for leak threshold, the minimum detectable leak rate, the calculated leak rate, and a determination of whether the result of the test was "Pass," "Fail," or "Inconclusive." For the purposes of this section, the "leak threshold" is defined as the specific leak threshold of the SIR method approved in accordance with Rule 62-761.850(2), FAC, to meet the release detection level specified in Rule 62-761.640(1)(a), FAC,;

c. "Pass" means that the calculated leak rate for the data set is less than the leak threshold and the minimum detectable leak rate is less than or equal to the certified performance standard (0.2 gph);

d. "Fail" means that the calculated leak rate for the data set is equal to or greater than the leak threshold;

e. "Inconclusive" means that the minimum detectable leak rate exceeds the certified performance standard (0.2 gph) and the calculated leak rate is less than the leak threshold. If for any other reason the test result is not a "Pass" or "fail," the result is "inconclusive";

f. An Incident Notification Form shall be submitted to the County when a monthly SIR report of "Fail" is received;

g. An Incident Notification Form shall be submitted to the County after the receipt of two consecutive monthly SIR reports of "Inconclusive." An investigation shall be performed in accordance with the Incident Response requirements specified in Rule 62-761.820, FAC However, if at the end of the fourteen day investigation period provided in Rule 62-761.820(1), FAC, the SIR data from the previous month is still inconclusive, a tightness test of the system shall be performed;

h. A data set shall consist of at least one month of valid data gathered over a time period not exceeding 35 days. A minimum of 20 data points over this 35 day period shall be used to calculate the leak rate unless the vendor of the SIR system approved under Rule 62-761.850(2), FAC, has provided a third party determination that a lesser number of data points is capable of detecting a release of 0.2 gph or 150 gallons within 30 days with a probability of detection of 0.95 and a probability of false alarm of 0.05; and

i. Results of monthly evaluations shall be recorded on Form 62-761.900(8), FAC, or on another similar form that provides the same information. These forms shall be kept as records in accordance with Rule 62-761.710, FAC

4. Tightness testing. a. Tightness testing for all tanks shall be capable of detecting a 0.1 gph leak rate with a probability

of detection of 0.95 and a probability of false alarm of 0.05 from any portion of the tank. Tightness testing shall account for the effects of thermal expansion or contraction of the regulated substance, vapor pockets, tank deformation, evaporation or condensation, and the location of the water table.

b. If any volumetric tank tightness test is conducted at a level lower than the overfill protection device set point, a non-volumetric test shall also be used to test the ullage portion of the tank. When volumetric tests are conducted, there must be a minimum pressure differential of plus or minus one psig (pounds per square inch gauge), measured at the bottom of the tank, between the product hydrostatic pressure inside the tank and the hydrostatic pressure due to the external water table. When using this method, positive field verification of the depth of the water table must be performed, and the minimum liquid level of product in the tank shall be at least 30 percent of tank capacity, provided that the third party evaluation for the test method verifies detection capability at this level. If the water table depth cannot be verified, the minimum liquid level for volumetric tank testing shall be 65 percent of tank capacity.

c. Tank and line tightness testing shall be performed in accordance with Chapter 4 of NFPA 329. d. Overfill protection and spill containment devices shall be inspected before a tightness test is

performed to ensure that these devices do not interfere with the test, and after the test to ensure that the devices are operating properly.

Page 542: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-99 Storage Tank Management

(d) Small diameter integral piping in contact with the soil. 1. Line leak detectors for USTs. Line leak detectors shall:

a. Be capable of detecting a discharge of 3.0 gph with a probability of detection of 0.95 and a probability of false alarm of 0.05 at a line pressure of 10 psi within one hour,

b. Have an annual test of the operation of the leak detector conducted in accordance with the manufacturer's requirements by an individual certified or trained by the manufacturer to determine whether the device is functioning as designed. Remote testing of the leak detector can be performed by the manufacturer if the remote test is approved under Rule 62-761.850(2), FAC;

c. Restrict flow within one hour if designed with mechanical flow restriction; d. When a discharge of 3.0 gph is detected, shut off power to the pump if designed with automatic

electronic shutoff. When in test mode, line leak detectors with automatic electronic shutoff shall also be able to detect a discharge of 0.2 gph at a line pressure of 150 percent of operating pressure, or an equivalent leak rate, with a probability of detection within a one month period of at least 0.95 and a probability of false alarm of no more than 0.05. When a discharge of 0.2 gph is detected, the leak detector shall provide audible or visual alarms that can be clearly heard or seen by the operator of the facility, or if monitored remotely on a real time basis, the alarm condition must be immediately transmitted from the remote location to the facility operator, and

e. Instead of using a line leak detector as a method of release detection for pressurized small diameter piping associated with double-walled integral piping, a continuously operating interstitial monitoring device can be used. Continuously operating interstitial monitoring devices shall be capable of detecting a release of 10 gallons within one hour and shutting off the pump.

2. Tightness testing. Tightness testing for pressurized piping in contact with the soil shall be capable of detecting a 0.1 gallon per hour leak rate at one and one-half times the operating pressure with a probability of detection of 0.95 and a probability of false alarm of 0.05.

(e) Bulk product piping. 1. An annual test shall be performed of single-walled bulk product piping in contact with the soil. Prior

to testing the piping system, a leak tightness evaluation of all exposed components shall be performed through visual inspection, or by another method approved by the Department in accordance with Rule 62-761.850, FAC The evaluation shall be verified and recorded. One of the following methods shall be used for the annual test.

a. A bulk product piping test method approved in accordance with Rule 62-761.850(2), FAC; b. An API RP 1110 hydrostatic test; or c. An ASME B3 1.4 hydrostatic test

2. Double-walled bulk product and hydrant piping, and other bulk product piping equipped with secondary containment shall have methods of release detection and testing for a breach of integrity that meet the requirements of Rule 62-761.6.40(3)(a)2. or 4., FAC, as applicable.

Records of all test results shall be maintained in accordance with the Appendix-Test Records of API RP 1110, or Chapter VI of ASME B31.4, as applicable, pursuant to Rule 62-761.710(1), FAC

Page 543: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-100 Storage Tank Management

Appendix 10-6

Exemptions for ASTs and USTs (Source: FAC 62-761.300) [Added May 1999]

(a) General: The following aboveground and underground systems are exempt from the requirements of this Chapter:

1. Any storage tank system storing any hazardous waste listed or identified under Subtitle C of the Resource Conservation and Recovery Act, or a mixture of such hazardous waste and other regulated substances;

2. Any storage tank system regulated under the Toxic Substances Control Act (15 U.S.C. 2065); 3. Any pesticide waste degradation system regulated under chapter 62-660, FAC; 4. Storage tank systems used solely for temporary storage of mixtures of pesticides and diluent for

reapplication as pesticides; 5. Any storage tank system with a storage capacity of less than 30,000 gallons used for the sole purpose of

storing heating oil for consumptive use on the premises where stored; 6. Any tank that contains asphalt or asphalt products not containing other regulated substances; 7. Any storage tank system storing regulated substances that are solid or gaseous at standard temperature and

pressure; 8. Any storage tank containing LP gas; 9. Any storage tank system that contains small quantities (de minimis, as per 40 CFR Section 280.10(b)(5))

of regulated substances; 10. Any wastewater treatment tank system that is part of a wastewater treatment facility regulated under

Section 402 or 307(b) of the Clean Water Act; 11. Any septic tank system; 12. Any stormwater or wastewater collection system; 13. Any surface impoundment, pit, pond, or lagoon; 14. Any agricultural storage tank system of 550 gallons or less capacity; 15. Any residential storage tank system; 16. Any emergency spill or overflow containment storage tank system that is emptied as soon as possible

after use, and that routinely remains empty; 17. Any flow-through process tank system. For industrial and manufacturing facilities, integral piping is

considered to terminate at the forwarding pump or valve used to transfer regulated substances to process, production, or manufacturing points of use or systems within the facility;

18. Any storage tank system, liquid trap or associated gathering lines directly related to oil or gas production and gathering operations regulated by Chapter 377, F.S.;

19. Equipment or machinery that contains regulated substances for operational purposes, such as hydraulic lift or fluid tank systems and electrical equipment tank systems;

20. Any pipeline facilities; 21. Any storage tank system containing radionuclides or that is part of an emergency generator system for

nuclear power generation at facilities regulated by the Nuclear Regulatory Commission under 10 CFR Part 50 Appendix A;

22. Vapor recovery holding tanks and associated vapor recovery piping systems; or 23. Any rail or tanker truck loading or unloading operations (loading racks) specified in Chapter 5 of NFPA

30. (b) Aboveground storage tank systems: The following AST systems are exempt from the requirements of this Chapter:

1. Drip irrigation systems that: a. Are not in contact with the soil; b. Are constructed of corrosion resistant materials; c. Are compatible with the products stored; d. Contain less than 80 percent concentration of fertilizer materials by volume; and e. Are applied on site;

Page 544: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

10-101 Storage Tank Management

2. Systems used exclusively for the storage of aqueous solutions of sodium hypochlorite; 3. Any mobile tank; 4. Any system located entirely within an industrial occupancy building; 5. Any storage tank system located entirely within an enclosed building or vault with an adequate roof and

walls to prevent rainwater from reaching the system and with an impervious floor containing no valves, drains, or other openings that would permit pollutants to be discharged from the system that were constructed before July 13, 1998; or

6. Any mobile double-wall tank, regardless of how long it is located at a facility, that is connected with a power module system that is used for the emergency or supplemental generation of electrical power by an electric utility as defined in Chapter 366, Florida Statutes. This exemption is limited to tanks that are designed and constructed to be moved to other service locations, and the relocation within a facility or from site to site is inherent in its use.

Page 545: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

SECTION 11

TOXIC SUBSTANCES MANAGEMENT

Florida Supplement, June 2000

This section covers the state requirements for Toxic Substances Management and is intended to supplement the U.S. TEAM Guide. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

Definitions

• Asbestos - the asbestiform varieties of serpentinite (chrysotile), riebeckite (crocidolite), cummingtonite-grunerite, anthophyllite, and actinolite-tremolite, including trade acronyms products such as amosite (FAC 62-257.200).

• Asbestos-Containing Material (ACM) - any materials that contain more than 1 percent asbestos as determined by

polarized light microscopy (FAC 62-257.200). • Asbestos Removal Project - a renovation or demolition operation in a facility that involves the removal of a

threshold amount of regulated asbestos-containing material (FAC 62-257.200) [Revised May 1999]. • Certified Person or Certified Individual - a certified radon measurement specialist, certified radon measurement

business, certified radon measurement technician, certified radon mitigation business, certified radon mitigation specialist or certified radon mitigation technician as defined by this part (FAC 64E-5.1202(3)).

• Certified Radon Measurement Business - a commercial business which provides on-site measurement services

for radon or radon progeny and which meets the requirements for certification provided by this part. For the purpose of this section, an analytical service provider which does not perform on-site measurement services directly to the public is not considered a radon measurement business (FAC 64E-5.1202(4)).

• Certified Radon Measurement Specialist - an individual who performs on-site radon or radon progeny

measurements; provides professional advice on such radon or radon progeny measurements, health risks, radon-related exposure, radon entry routes, and other radon-related activities; and meets the requirements for certification provided by this part (FAC 64E-5.1202(5)).

• Certified Radon Measurement Technician - an individual who performs on-site radon or radon progeny

measurement activities, provides information on measurement results, and meets the requirements for certification provided by this part. Such an individual can perform these activities only under the supervision of a certified radon measurement specialist (FAC 64E-5.1202(6)).

• Certified Radon Mitigation Business - a commercial business which designs or installs systems in existing

buildings to mitigate radon or radon progeny contamination and which meets the requirements for certification provided by this part (FAC 64E-5.1202(7)).

• Certified Radon Mitigation Specialist - an individual who performs or evaluates diagnostic tests to determine

appropriate radon or radon progeny mitigation strategies for a building, designs and installs mitigation systems, and meets the requirements for certification provided by this part (FAC 64E-5.1202(8)).

• Certified Radon Mitigation Technician - an individual who installs or supervises the installation of radon or

radon progeny mitigation techniques on existing buildings and meets the requirements for certification provided by this part. Such an individual can perform these activities only under the supervision of a certified radon mitigation specialist (FAC 64E-5.1202(9)).

Page 546: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

• Department - the Florida Department of Environmental Protection (FAC 62-257.200). • Division - the Division of Safety of the Department of Labor and Employment Security at 2002 Old Saint

Augustine Road, Building E, Suite 45, Tallahassee, Florida 32399-0663, and its approved representatives (FAC 38I-40.002).

Page 547: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

TOXIC SUBSTANCES MANAGEMENT GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: PCB Management

Missing Checklist Items T1.2.1.FL. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements. Asbestos Management

Missing Checklist Items T2.2.1.FL. Renovation and Demolition of Asbestos Containing Structures

T2.5.1.FL.

Radon Gas T3.1.1.FL. and T3.1.2.FL. Missing Checklist Items T3.2.1.FL.

Lead-Based Paint Management Missing Checklist Items T4.2.1.FL.

Refer to the U.S. TEAM Guide and the DOD Component Supplements for DOD and service-specific requirements.

Page 548: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

COMPLIANCE CATEGORY: TOXIC SUBSTANCES MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PCB MANAGEMENT T1.2. Missing Checklist Items

T1.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 549: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

COMPLIANCE CATEGORY: TOXIC SUBSTANCES MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ASBESTOS MANAGEMENT T2.2. Missing Checklist Items

T2.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 550: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

COMPLIANCE CATEGORY: TOXIC SUBSTANCES MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ASBESTOS MANAGEMENT

T2.5. Renovation And Demolition Of Asbestos-Containing Structures

T2.5.1.FL. The Department must be notified of asbestos removal projects (FAC 62-257.301).

Verify that the Department is notified before any asbestos removal project is begun.

Page 551: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

COMPLIANCE CATEGORY: TOXIC SUBSTANCES MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

T3.1 RADON GAS

T3.1.1. Radon testers and mitigators are required to be certified (FAC 64E-5.1203(2), 5.1204, and 5.1205) [Revised July 1998].

(NOTE: Certification requirements do not apply to installations/CW facilities that subcontract radon measurements to a certified radon business when the complete radon report from the certified radon business is provided to the client and interpretations of the results are provided by the certified business.)

Verify that radon mitigation and measurement technicians/specialists are certified.

Verify that certified individuals own, be employed by, or be retained as a consultant to a certified radon measurement or certified radon mitigation business prior to performing radon measurement or radon mitigation services, including sample collection, analysis, or interpretation of measurement results.

T3.1.2. Specific buildings must be tested for radon (FAC 64E-5.1208(1)) [Cite Revised July 1998].

Verify that public or private school buildings housing students K-12 are tested for radon.

Verify that state-owned, state-operated, state-regulated, or state-licensed 24-h care facilities are tested for radon.

Verify that state-licensed day care centers for children or minors are tested for radon.

Page 552: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

COMPLIANCE CATEGORY: TOXIC SUBSTANCES MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

RADON GAS MANAGEMENT T3.2. Missing Checklist Items

T3.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 553: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

COMPLIANCE CATEGORY: TOXIC SUBSTANCES MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

LEAD-BASED PAINT MANAGEMENT T4.2. Missing Checklist Items

T4.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 554: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-1 Wastewater Management

SECTION 12

WASTEWATER MANAGEMENT

Florida Supplement, June 2000 This section covers the state requirements for Wastewater Management and is intended to supplement the U.S. TEAM Guide. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements. The Following Federal regulations are adopted by reference [Revised July 1998]:

40 CFR Chapter I, Subchapter N (Categorical Pretreatment Standards). 40 CFR 141, sections 80 through 91, (1995) (National Primary Drinking Water Regulations for the Control of

Lead and Copper). Chapter 7, U.S. Environmental Protection Agency, Process Design Manual for Land Application of Sewage

Sludge and Domestic Septage. 40 CFR 401, 405, 407 through 447, 454, 455, 457 through 461, 463 through 469, and 471 (Industrial Effluent

Limitations, Guidelines and Standards). 40 CFR 503, subpart D, sections 503.32 and 503.33 (Pathogen and Vector Attraction Reduction

Requirements), revised as of October 25, 1995, except for the site restrictions in section 503.32(b)(5), the septage requirements in section 503.32(c), and the vector attraction reduction requirements in sections 503.33(b)(11) and (12).

Definitions

• Activity - any action that results in a discharge of wastes into waters of the state or that is reasonably expected to be a source of water pollution (Florida Administrative Code (FAC) Title 62, Chapter 600, Section .200(1), (FAC 62-620.200).

• Aerobic Treatment Unit - a sewage treatment unit that introduces air into sewage to provide aerobic biochemical

stabilization within a treatment receptacle (FAC 64E-6.002(2)). • Aerosol - suspension of ultramicroscopic solid or liquid particles in air (FAC 62-640.200). • Agricultural Use Plan - a formal document submitted to the Department which describes the controlled use of

residuals as part of a planned agricultural operation (FAC 62-640.200) [Revised May 1999]. • Alternative System - any approved onsite sewage treatment and disposal system used in lieu of, including

modifications to, a standard subsurface system (FAC 64E-6.002(3)). • Approved Maintenance Entity - any person or business entity which has been issued a written permit by the

Department of Health county public health unit to provide maintenance services associated with approved onsite aerobic treatment units (FAC 64E-6.002(7)).

• Bypass - the intentional diversion of wastewater streams from any portion of an industrial user's treatment

facility (FAC 62-625.200(2)). • Carbonaceous Biochemical Oxygen Demand (CBOD(5)) - the quantity of oxygen utilized in the carbonaceous

biochemical oxidation of organic matter present in water or wastewater, reported as a 5-day value determined using approved methods (FAC 62-600.200).

Page 555: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-2 Wastewater Management

• Class F-I Groundwater - potable water use, groundwater in a single source aquifer which has a total dissolved

solids content of less than 3000 mg/L and was specifically reclassified as Class F-I by the Commission. The single source aquifer is the surficial aquifers in northeast Flagler County included in the area bounded on the east by the Atlantic Ocean; on the west by Intracoastal Waterway; on the north by the north line of Sections 8 and 39, Township 10 South; and on the south from a line running due east and west from a point along the east-west boundary of Sections 9 and 10, Township 11 South, where that point intersects the northern extension of the mean high water line of Fox's Cut (FAC 62-520.410(1) and .460(1)).

• Class G-I Groundwater - potable water use, groundwater in single source aquifers which has a total dissolved

solids content of less than 3000 mg/L (FAC 62-520.410(1)). • Class G-II Groundwater - potable water use, groundwater in aquifers which has a total dissolved solids content

of less than 10,000 mg/L, unless otherwise classified by the Commission (FAC 62-520.410(1)). • Class G-III Groundwater - nonpotable water use, groundwater in unconfined aquifers which has a total

dissolved solids content of 10,000 mg/L or greater or which has total dissolved solids of 3000 to 10,000 mg/L and either has been reclassified by the Commission as having no reasonable potential as a future source of drinking water, or has been designated by the Department as an exempted aquifer (FAC 62-520.410(1)).

• Class G-IV Groundwater - nonpotable water use, groundwater in confined aquifers which has a total dissolved

solids content of 10,000 mg/L or greater (FAC 62-520.410(1)). • Coastal Waters - All estuarine, gulf, or ocean waters that are not classified as open ocean waters (FAC 62-

600.200). • Collection/Transmission Systems - sewers, pipelines, conduits, pumping stations, force mains, and all other

facilities used for collection and transmission of wastewater from individual service connections to facilities intended for the purpose of providing treatment prior to release to the environment (FAC 62-604.200(1)).

• Commercial Wastewater - nontoxic, nonhazardous wastewater from commercial facilities that is usually similar

in composition to domestic wastewater, but which may occasionally have one or more of its constituents exceed typical domestic ranges. Included in this definition are wastewaters from commercial and institutional food service operations, commercial laundry facilities with no more than four washing machines, animal holding facilities (such as kennels, veterinary hospitals, and animal grooming facilities), and beauty salons, provided that toxic, hazardous, or industrial wastes are not introduced into the system (FAC 62-620.200).

• Commission - the Environmental Regulation Commission (FAC 62-600.200). • Concentrate - see “Demineralization Concentrate.” • Concentrated Animal Feeding Operation - a feeding operation at which more animals are confined than are

specified in the following categories (FAC 62-670.200): 1. 1000 slaughter and feeder cattle 2. 700 mature dairy cattle (whether milked or dry cows) 3. 2500 swine weighing over 55 lb each 4. 500 horses 5. 10,000 sheep or lambs 6. 55,000 turkeys 7. 100,000 laying hens or broilers (if the facility has continuous overflow watering) 8. 30,000 laying hens or broilers (if the facility has a liquid manure handling system) 9. 5000 ducks

Page 556: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-3 Wastewater Management

10. 1000 animals units.

Any animal feeding operation that contains process wastewater and runoff from the 25-yr, 24-h storm event is not considered a concentrated animal feeding operation regardless of the number of animals at the facility (FAC 62-670.200).

• Control Authority - any public utility that administers a pretreatment program which has been approved by the

approval authority in accordance with the requirements of 62-625.510, FAC. In cases where categorical or significant noncategorical industrial users discharge to domestic wastewater facilities that are not included in an approved pretreatment program, the Department functions as the control authority until an approved pretreatment program has been established by the public utility (FAC 62-625.200(4)).

• Cull Tomatoes - tomatoes that are removed from the packaging process because of damage or other reasons that

make the tomatoes unsuitable for packaging (FAC 62-660.805(2)(a)). • Culture Container - any tank or vessel used to grow or maintain marine bivalves, including, but not limited to,

upwellers, downwellers, and raceways (FAC 62-660.821(2)(a)). • Dairy Farm - any operation as defined in FAC 5D-1.01(49) and regulated by the Florida Department of

Agriculture and Consumer Services (FAC 62-670.200). • Demineralization Concentrate - the concentrated byproduct water, brine, or reject water produced by ion

exchange or membrane separation technologies (such as reverse osmosis, membrane softening, ultra-filtration, membrane filtration, electrodialysis, and electrodialysis reversal) used for desalinization, softening, or reducing total dissolved solids during water treatment for public water supply purposes. Within this chapter, demineralization concentrate will also be referred to as concentrate (FAC 62-610.200) [Added June 2000].

• Department - may be one of the following:

1. the State of Florida Department of Environmental Protection (FAC 62-620.200(11) 2. the Department of Health including authorizing agents of the individual county public health units (FAC

64E-6.002(14)). • Detention Facility - any facility designed to temporarily store production unit discharge waters so as to provide

for treatment through physical, chemical, or biological processes with subsequent gradual release of the water (FAC 62-660.820(2)(b)).

• Developed Areas - areas in or adjacent to residential, commercial, or residentially or commercially-zoned areas

(FAC 62-600.200). • Discharge of Wastes - the introduction or addition to waters of sewage, industrial wastes, and all other liquid,

gaseous, solid, radioactive, or other substances that may pollute or tend to pollute any waters of the state. The term includes the discharge of a pollutant and the discharge of stormwater (FAC 62-620.200).

• Disinfection - the selective destruction of pathogens in wastewater effluents, reclaimed water, and domestic

wastewater residuals (FAC 62-600.200). • Disposal - the discharge of effluent to injection wells, effluent outfalls, subsurface drain systems, and other

facilities utilized strictly for the release of effluents into the environment (FAC 62-610.200). • Distribution and Marketing - is the giveaway or sale of residuals or a product derived from residuals, either

packaged or in bulk form, by owners or operators of treatment works or by a person who receives residuals or residual products from treatment works (FAC 62-640.200) [Revised May 1999].

Page 557: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-4 Wastewater Management

• Domestic Sewage Waste - human body waste and wastewater, including bath and toilet waste, residential

laundry waste, residential kitchen waste, and other similar waste from appurtenances at a residence or establishment (FAC 64E-6.002(15)).

• Domestic Wastewater - wastewater derived principally from dwellings, business buildings, institutions, and the

like, commonly referred to as sanitary wastewater or sewage (FAC 62-600.200). • Domestic Wastewater Residuals or Residuals - the solid, semisolid, or liquid residue generated during the

treatment of domestic wastewater in a domestic wastewater treatment facility. Not included is the treated effluent or reclaimed water from a domestic wastewater treatment plant. Also not included are solids removed from pump stations and lift stations, screenings and grit removed from the preliminary treatment components of domestic wastewater treatment facilities, other solids as defined in Rule 62-640.200, FAC, and generated during the incineration of residuals (FAC 62-640.200) [Revised May 1999].

• Drainage Ditch - a trench dug for the purpose of draining water from the land or for transporting water for use

on the land. Swales are excluded from this definition (FAC 64E-6.002(16)). • Drainfield - a system of open-jointed or perforated piping, approved alternative distribution units, or other

treatment facilities designed to distribute effluent for filtration, oxidation, and absorption by the soil within the zone of aeration (FAC 64E-6.002(17)).

• Edible Crops - crops that are intended for human consumption (FAC 62-610.200). • Effluent - water that is not reused after flowing out of any wastewater treatment facility or other works used for

the purpose of treating, stabilizing, or holding wastes (FAC 62-600.200). • Egg Wash Wastewater - wastewater generated as a result of cleaning, sorting, and preserving eggs (FAC 62-

670.200). • Establishment - a housing, commercial, or institutional development, including, but not limited to, a place of

business, assembly, or residence, whether multiple or single family. The term includes all buildings, structures, mobile homes, and appurtenant lands (FAC 62-600.200).

• Existing Installation - any installation which has filed a complete application for a water discharge permit on or

before 1 January 1983, or which submitted a groundwater monitoring plan no later than 6 mo after the date required for that type of installation and a plan was subsequently approved by the Department, or which was in fact an installation reasonably expected to release contaminants into the groundwater on or before 1 July 1982 and operated consistently with statutes and rules relating to groundwater discharge in effect at the time of the operation (FAC 62-522.200(1)).

• Fecal Coliforms - members of the coliform group capable of producing gas from lactose at 44.5 = BOC, as

determined using approved methods (FAC 62-600.200). • Fee-Fishing Operations - facilities for which the public is charged a fee to harvest fish by hook and line (FAC

62-660.820(2)(c)). • Fish Farm - any facility at which fish are grown for commercial, research, or stock enhancement purposes in

fresh water with a chloride concentration less than 1500 mg/L (FAC 62-660.820(2)(d)).

Page 558: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-5 Wastewater Management

• Food Establishment Sludge - oils, fats, greases, food scraps, and other grease interceptor contents generated by a food operation or institutional food preparation facility using an onsite sewage treatment and disposal system (FAC 64E-6.002(26)).

• Hatchery - a facility where juvenile marine bivalves are grown in batch culture tanks from larvae to juveniles up

to 2 mm in size. The hatchery may include facilities to maintain and condition up to 2000 adult marine bivalves as brood stock and facilities to produce algal cultures as feed for the marine bivalves in the hatchery (FAC 62-660.821(2)(c)).

• High Intensity Use Area - all areas of concentrated animal density generally associated with milking barns,

feedlots, holding pens, travel lanes, and contiguous milk herd pasture where the permanent vegetative cover is equal to or less than 80 percent, under average annual worst case conditions, as determined by USDA Soil Conservation Service methods (FAC 62-670.200).

• Holding Pond - a storage tank or artificial impoundment or pond constructed above, on, below, or partly below

the ground surface that is designed and maintained to store a specific volume of fluid and minimize fluid losses other than those primarily occurring by evaporation (FAC 62-600.200).

• Industrial User - a source of discharge (FAC 62-625.200(6)). • Industrial Wastewater -

1. Process and nonprocess wastewater from manufacturing, commercial, and silvicultural facilities or activities, including the runoff and leachate from areas that receive pollutants associated with industrial or commercial storage, handling, or processing, and all other wastewater not otherwise defined as domestic wastewater (FAC 62-620.200).

2. Wastewater not otherwise defined as domestic wastewater, including the runoff and leachate from areas that receive pollutants associated with industrial or commercial storage, handling, or processing (FAC 62-600.200).

• Innovative System - an onsite sewage treatment and disposal system that, in whole or in part, employs materials,

devices, or techniques which are novel or unique, are not specifically described, and have not been successfully field-tested under sound scientific and engineering principles under climatic and soil conditions found in Florida (FAC 64E-6.002(28)).

• Interference - a discharge that, alone or in conjunction with a discharge or discharges from other sources, both:

1. inhibits or disrupts the wastewater facility, its treatment processes or operations, or its domestic wastewater residuals processes, use or disposal

2. is a cause of a violation of any requirement of the wastewater facility's permit (including an increase in the magnitude or duration of a violation) or prevents use or disposal of domestic wastewater residuals in compliance with local regulations or rules of the Department (FAC 62-625.200(7)).

• Lake Okeechobee Drainage Basin - the drainage basin consisting of the following subdrainage basins (FAC 62-

670.200): 1. lower Kissimmee River basin below structure S-65 2. Taylor Creek--Nubbin Slough basin 3. Fish Eating Creek basin 4. Indian Prairie and Harney Pond basins 5. C-41A basin 6. Nicodemus Slough basin 7. drainage areas tributary to the South Florida Water Management District Pump Stations designated as

S-127, S-129, S-131, S-133, S-135, S-2, S-3, and S-4.

Page 559: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-6 Wastewater Management

The geographical boundaries of these subbasins are as designated by the South Florida Water Management District in its Technical Publication 81-2, May 1981.

• Land Application - the reuse of reclaimed water or the utilization or disposal of effluents or wastewater residuals

on, above, or into the surface of the ground through spray irrigation, land spreading, or other methods (FAC 62-600.200).

• Land Application Site - an area of land used for treatment and disposal of wastewater by spray irrigation at

predetermined rates necessary to prevent degradation of surface and groundwaters (FAC 62-660.805(2)(b)). • Liquid Manure System - a system for conveyance of manure which uses water (FAC 62-670.200). • Major Egg Production Facility - an egg production facility that has one of the following:

1. more than 100,000 laying hens 2. more than 30,000 laying hens when the facility has a liquid manure system 3. onsite facilities that process at least the number of eggs produced by 100,000 laying hens, not necessarily

from onsite hens, on a daily basis (FAC 62-670.200). • Marine Bivalve Facility - any facility located outside of waters of the state at which marine bivalves are held or

grown for commercial, research, or stock enhancement purposes and includes hatchery, nursery, depuration, and wet storage facilities (FAC 62-660.821(2)(d)).

• New Source - Includes the following (FAC 62-625.200(9):

1. Any building, structure, facility or installation from which there is or may be a discharge, the construction of which commenced after the publication of proposed pretreatment standards under section 307(c) of the CWA which will be applicable to such source if such standards are thereafter promulgated in accordance with that section, provided that one of the following conditions are met:

a. The building, structure, facility or installation is constructed at a site at which no other source is located

b. The building, structure, facility or installation totally replaces the process or production equipment that causes the discharge of pollutants at an existing source

c. The production or wastewater generating processes of the building, structure, facility or installation are substantially independent of an existing source at the same site. In determining whether these are substantially independent, factors such as the extent to which the new facility is integrated with the existing plant, and the extent to which the new facility is engaged in the same general type of activity as the existing source shall be considered.

2. Construction on a site at which an existing source is located results in a modification rather than a new source if the construction does not create a new building, structure, facility or installation meeting the criteria of (a)2. or (a)3. above but otherwise alters, replaces, or adds to existing process or production equipment

3. Construction of a new source, as defined in this chapter, has commenced if the owner or operator has met one of the following conditions:

a. Begun, or caused to begin as part of a continuous on-site construction program b. Entered into a binding contractual obligation for the purchase of facilities or equipment which are

intended to be used in its operation within a reasonable time. Options to purchase or contracts which can be terminated or modified without substantial loss, and contracts for feasibility, engineering, and design studies do not constitute a contractual obligation under this rule.

• Ocean Outfall - the outlet or structure through which effluent is finally discharged to the marine environment

which includes the territorial sea, contiguous zone, and the ocean (FAC 62- 600.200(55)).

Page 560: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-7 Wastewater Management

• Onsite Sewage Treatment and Disposal System - a sewage treatment and disposal facility, that contains a standard subsurface, filled, or mound drainfield system, an aerobic treatment unit, a graywater system tank, a laundry wastewater system tank, a septic tank, a grease interceptor, a dosing tank, a solids or effluent pump, waterless, incinerating or organic waste composting toilets, or a sanitary pit privy that is installed or proposed to be installed beyond a building sewer on land of the owner or on other land to which the owner or owners have the legal right to install a system. This term does not include package sewage treatment facilities and other treatment works. Appurtenances installed within the building sewer prior to a treatment receptacle are not included in this definition (FAC 64E-6.002(38)).

• Open Ocean Waters - all surface waters extending seaward from the most seaward natural 90-ft isobath (FAC

62-600.200). • Operator - any person who is principally engaged in and is in charge onsite of the actual treatment plant

operation and includes the person who is in charge of treatment plant operation for a shift or period of operation during any part of the day, as certified in accordance with 62-602, FAC (FAC 62-600.200).

• Outstanding Florida Waters - waters designated by the Environmental Regulation Commission as worthy of

special protection because of their natural attributes (FAC 62-302.200(17)). • Outstanding National Resource Waters - waters designated by the Environmental Regulation Commission that

are of such exceptional recreational or ecological significance that water quality should be maintained and protected under all circumstances, other than temporary lowering and the lowering allowed under Section 316 of the Federal Clean Water Act (FAC 62-302.200(18)).

• Pass Through - a discharge that exits the wastewater facility into waters of the state or of the United States in

quantities or concentrations which, alone or in conjunction with a discharge or discharges from other sources, is a cause of a violation of any requirement of the wastewater facility's permit (including an increase in the magnitude or duration of a violation) (FAC 62-625.200(10)).

• Pathogens or Pathogenic Organisms - disease-causing organisms. These include certain bacteria, protozoa,

viruses, and viable helminth ova and any other organisms that cause disease (FAC 62-640.200) [Revised May 1999].

• Percolation Pond - an artificial impoundment similar to a holding pond for which the design and operation

provides for fluid losses through percolation/seepage in addition to evaporative losses (FAC 62-610.200). • Point Source - any discernible, confined, and discrete conveyance, including any pipe, ditch, channel, tunnel,

conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, landfill leachate collection system, vessel, or other floating craft from which pollutants are or may be discharged. This term does not include return flows from irrigated agriculture or agricultural stormwater runoff (FAC 62-620.200).

• Pond - any excavation or impoundment designed to hold water, including production ponds, detention facilities,

and retention facilities (FAC 62-660.820(2)(g)). • Preapplication Waste Treatment - that level of treatment provided prior to application of reclaimed water or

effluent to a land application system (FAC 62-600.200). • Pretreatment - the reduction of the amount of pollutants, the elimination of pollutants, or the alteration of the

nature of pollutant properties in wastewater prior to or in lieu of discharging or otherwise introducing such pollutants into a wastewater facility (FAC 62-625.200(12)).

Page 561: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-8 Wastewater Management

• Process Wastewater - any process generated wastewater and any precipitation that comes into contact with any manure, litter of bedding, or any other raw material or intermediate product used in or resulting from the production of animals, poultry, or direct products (FAC 62-670.200).

• Production Unit - any pond or tank where fish are cultured for commercial purposes, excluding the containers

used in hatchery and shipping operations (FAC 62-660.820(2)(h)). • Public Access Area - an area that is intended to be accessible to the general public; such as golf courses,

cemeteries, parks, landscape areas, hotels, motels, and highway medians. Public access areas include private property that is not open to the public at large, but is intended for frequent use by many persons. Public access areas also include residential dwellings. Presence of authorized farm personnel or other authorized treatment plant, utilities system, or reuse system personnel does not constitute public access. Irrigation of exercise areas and other landscape areas accessible to prisoners at penal institutions are considered as irrigation of public access areas (FAC 62-610.200).

• Public Utility - any state, county, or municipality owning, managing, controlling, or operating a domestic

wastewater facility, or proposing to construct a domestic wastewater facility that provides or proposes to provide wastewater service (FAC 62-625.200(16)).

• Reclaimed Water - water that has received at least secondary treatment and is reused after flowing out of a

wastewater treatment facility (FAC 62-600.200). • Residential Car Wash - any facility located in a single-family or multifamily housing development, that is

designed specifically for the purpose of vehicle washing (FAC 62-660.803(3)(a)). • Retention Facility - any facility designed to prevent the release of all production unit discharges into surface

waters of the state by complete onsite storage, while retaining the runoff and direct rainfall from an event up to and including a 25-yr, 24-h storm (FAC 62-660.820(2)(l)).

• Reuse - the deliberate application of reclaimed water for a beneficial purpose. Where appropriate, these uses

may encompass: 1. landscape irrigation, such as golf courses, cemeteries, highway medians, parks, playgrounds, etc., 2. agricultural irrigation, such as irrigation of food, fiber, fodder, and seed crops, nurseries, etc. 3. aesthetic uses, such as decorative ponds and fountains 4. groundwater recharge 5. industrial uses, such as cooling water, process water, and wash waters 6. environmental enhancement of surface waters resulting from discharge of reclaimed water having received

at least advanced wastewater treatment or from discharge of reclaimed water for wetlands restoration 7. fire protection 8. other useful purpose.

Land application systems (overland flow, rapid-rate, and others) - septic tanks, and groundwater disposal systems using Class I wells injecting effluent or wastes into Class G-IV waters are excluded from the definition of this term (FAC 62-600.200).

• Rinse Water - the treated or fresh water sprayed on the car after washing (for car wash recycle systems) (FAC

62-660.803(3)(b)). • Rollover Car Wash - a car wash at which the vehicle remains stationary while the washing, rinsing, waxing, and

drying equipment passes over the car (FAC 62-660.803(3)(c)).

Page 562: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-9 Wastewater Management

• Septage - a mixture of sludge, fatty materials, human feces, and wastewater removed during the pumping of an onsite sewage treatment and disposal system. Excluded from this definition are the contents of portable toilets, holding tanks, and grease interceptors (FAC 64E-6.002(44)).

• Septic Tank - a watertight receptacle constructed to promote separation of solid and liquid components of

wastewater, to provide limited digestion of organic matter, to store solids, and to allow clarified liquid to discharge for further treatment and disposal into a drainfield (FAC 64E-6.002(45)).

• Sewage from Vessels - human body wastes and the wastes from toilets and other receptacles intended to receive

or retain body wastes that are discharged from vessels and regulated under Section 312 of CWA(FAC 62-620.200).

• Significant Industrial User - the following:

1. all industrial users subject to categorical pretreatment standards under Rule 62-625.410, FAC, and 40 CFR Chapter I, Subchapter N

2. any other industrial user that discharges an average of 25,000 gpd or more of process wastewater to the wastewater facility (excluding domestic wastewater, noncontact cooling, and boiler blowdown wastewater); contributes a process waste stream which makes up 5 percent or more of the average dry weather hydraulic or organic capacity of the treatment plant; or, is designated as such by the control authority on the basis that the industrial user has a reasonable potential for adversely affecting the wastewater facility's operation or for violating any pretreatment standard or requirement in accordance with 62-625.500(2)(e) (FAC 62-625.200(20)).

• Silvicultural Facilities or Activities - any discernible, confined, and discrete conveyances related to rock

crushing, gravel washing, log sorting, or log storage facilities that are operated in connection with silviculture and from which pollutants are discharged into waters. The terms do not include nonpoint source silvicultural activities such as nursery operations, site preparation, reforestation and subsequent cultural treatment, thinning, prescribed burning, pest and fire control, harvesting operations, surface drainage, or road construction and maintenance from which there is natural runoff. As used in this definition, rock crushing and gravel washing facilities are facilities that process crushed and broken stone, gravel, and riprap. Log sorting or log storage facilities are facilities whose discharges result from the holding of unprocessed wood, logs, or roundwood with or without bark, held in self-contained mill or log ponds or stored on land where water is applied intentionally on the logs (FAC 62-620.200).

• Slug Discharge - any discharge of a nonroutine, episodic nature (FAC 62-625.200(21)). • Spent Process Water - the water contained in the system (tanks, pumps, and piping) that is no longer suitable for

use, because of the long-term buildup of salts or other contaminants (for car wash recycle systems) (FAC 62-660.803(3)(d)).

• Stormwater - the flow of water which results from, and which occurs immediately following, a rainfall event

(FAC 62-25.020(13)). • Stormwater Discharge Facility - a stormwater management system which discharges stormwater into surface

waters of the state (FAC 62-25.020(14)). • Surface Water - water upon the surface of the earth, whether contained in bounds created naturally or artificially

or diffused. Water from natural springs is classified as surface water when it exits from the spring onto the earth's surface (FAC 62-600.200).

• Surface Water Management System (System) - any stormwater management system, dam, impoundment,

reservoir, appurtenant work, or works or any combination thereof. The terms "surface water management

Page 563: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-10 Wastewater Management

system" or "system" include areas created by filling or by dredging as those terms are defined in subsections 373.403(13) and 373.403(14), F.S. (FAC 40D-45.021).

• Total Suspended Solids (TSS) - solids that either float on the surface of, or are suspended in, water or wastewater

(FAC 62-600.200). • Toxic Pollutant - any pollutant listed as toxic in 40 CFR 401.15 (FAC 62-620.200). • Treatment - any method, technique, or process that changes the physical, chemical, or biological character or

composition of wastewater and thereby reduces its potential for polluting waters of the state (FAC 62-600.200). • Treatment Plant - any plant or other works used for the purpose of treating, stabilizing, or holding wastes (FAC

62-600.200). • 25-Yr, 24-H Storm Event - the amount of rainfall within 24 h that is likely to be exceeded on the average only

once in 25 yr, as published by the U.S. Weather Bureau in Technical Paper 40 Rainfall Maps for 24-hour Rainfall Amounts for the Coterminous United States (FAC 62-670.200).

• Underground Injection - effluent disposal or reuse by well injection into underground geologic formations (FAC

62-600.200). • Upset - an exceptional incident in which there is unintentional and temporary noncompliance with categorical

pretreatment standards because of factors beyond the reasonable control of the industrial user (FAC 62-625.200(23)).

• Wand Car Wash - a self-service car wash at which the vehicle remains stationary and the car is washed using a

high pressure stream of water from a hand-held wand (FAC 62-660.803(3)(f)). • Wash Water - the water containing detergent used to remove dirt from the car (for car wash recycle systems).

The water used to clean and transport tomatoes before packaging (for tomato washing operations) (FAC 62-660.803(3)(g) and .805(2)(d)).

• Wastes-Sewage - industrial wastes, and all other liquid, gaseous, solid, radioactive, or other substances which

may pollute or tend to pollute any waters of the state (FAC 62-600.200). • Wastewater - the combination of liquid and water-carried pollutants from residences, commercial buildings,

industrial plants, and institutions together with any groundwater, surface runoff, or leachate that may be present (FAC 62-600.200).

• Wastewater Facility - any facility that discharges wastes into waters of the state or which can reasonably be

expected to be a source of water pollution and includes any or all of the following: the collection and transmission system, the wastewater treatment works, the reuse or disposal system, and the residuals management facility (FAC 62-620.200).

• Wellhead Protection Area - an area designated by the Department consisting of a 500-ft radial setback distance

around a potable water well where groundwater is provided the most stringent protection measures to protect the groundwater source for a potable water well and includes the surface and subsurface area surrounding the well (FAC 62-521.200(7)).

Page 564: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-11 Wastewater Management

WASTEWATER MANAGEMENT GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: Missing Checklist Items WA.2.1.FL. Discharges to the Environment WA.5.1.FL. and WA.5.3.FL. NPDES Permits NOTE: Florida has not assumed control of the NPDES permitting program. EPA Region IV issues NPDES permits with the state's approval. Permits NOTE: Surface water discharges not subject to the Federal NPDES are issued permits by the state and by the water management districts. The Florida DEP has stormwater permit and enforcement authority in the Northwest Water Management District. The other Districts, Southwest Florida, Suwannee River, St. Johns River, and South Florida, administer their own stormwater programs. Water Management Districts may delegate authority to counties for wastewater and stormwater permits. State Permits WA.15.1.FL. through WA.15.7.FL. Treatment Works

Permits WA.20.1.FL. Operation and Maintenance WA.20.2.FL. Treatment WA.20.3.FL. through WA.20.8.FL. Monitoring WA.20.9.FL. Collection Systems and Transmission

Facilities WA.20.10.FL. through WA.20.12.FL.

Pretreatment WA.20.13.FL. and WA.20.14.FL. Discharges to a POTW/FOTW

General WA.25.1.FL. and WA.25.2.FL. Pretreatment Standards WA.30.1.FL. Industrial Users WA.35.1.FL. Documentation/Reporting to the POTW WA.40.1.FL. through WA.40.3.FL.

Effluent Limitations for Steam Electric Power Generating Sources

Existing Sources WA.55.1.FL. Other Discharges and Dischargers WA.95.1.FL. through WA.95.17.FL. Individual Sewage Systems

Septic Tanks WA.100.1.FL. Other: Onsite Sewage Treatment and

Disposal Systems WA.100.2.FL. through WA.100.7.FL.

Land Application of Sludge General:

Miscellaneous WA.105.1.FL. through WA.105.5.FL. Domestic Septage or Other Onsite

Wastewater Sludges WA.105.6.FL. through WA.105.8.FL.

Domestic Wastewater Treatment Facilities

WA.105.9.FL. and WA.105.10.FL.

Domestic Wastewater Treatment Facilities: Slow-Rate Land Application Systems with Public Access Restricted

WA.105.11.FL. through WA.105.13.FL.

Domestic Wastewater Treatment Facilities: Slow-Rate Land

WA.105.14.FL. through WA.105.19.FL.

Page 565: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-12 Wastewater Management

WASTEWATER MANAGEMENT

GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: Application Systems for Public Access Areas, Residential Irrigation, and Edible Crops

Domestic Wastewater Treatment Facilities: Rapid-Rate Land Application Systems

WA.105.20.FL. and WA.105.21.FL.

Domestic Wastewater Treatment Facilities: Overland Flow Systems

WA.105.22.FL. and WA.105.23.FL.

Permits WA.105.24.FL. through WA.105.25.FL. Domestic Wastewater Residuals WA.105.26.FL. through WA.105.32.FL.

Vectors and Pathogens WA.110.1.FL. and WA.110.2.FL. Monitoring WA.120.1.FL. through WA.120.4.FL. Recordkeeping and Reporting WA.125.1.FL. through WA.125.5.FL. State-Specific Requirements

Storage WA.130.1.FL. through WA.130.7.FL. Distribution and Marketing WA.130.8.FL.

Watershed Protection Programs/Recharge Programs Wellhead Protection WA.150.1.FL.

WASTEWATER MANAGEMENT

GUIDANCE FOR FLORIDA APPENDIX USERS

REFER TO APPENDIX NUMBERS: REFER TO APPENDIX TITLES:

12-1 Exemptions to Environmental Resource Permit Requirements 12-2 Aquaculture Operations Not Permitted by Rule 12-3 Groundwater Monitoring Required for Major Egg Production

Facilities 12-4 Location Requirements for Onsite Sewage Treatment and

Disposal Systems 12-5 Setback Distances for Slow-Rate Land Application Systems 12-6 Setback Distances for Rapid-Rate Land Application Systems

Page 566: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-13 Wastewater Management

Page 567: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-14 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WA.2. MISSING CHECKLIST ITEMS

WA.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 568: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-15 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WA.5. DISCHARGES TO THE ENVIRONMENT

WA.5.1.FL. Federal facilities which discharge to groundwater must meet specific discharge restrictions (FAC 62-522.300, .400(1) and (3), and .410(3)) [Citation Revised July 1998].

Verify that no Federal facility directly or indirectly discharges into groundwater any contaminant which causes a violation of water quality standards and criteria for the receiving of groundwater, except within a zone of discharge established by permit or rule.

(NOTE: No zone of discharge is allowed under any of the following circumstances:

- discharges through wells or sinkholes that allow direct contact with Class G-I and Class G-II groundwater, except for projects designed to recharge aquifers with surface water of comparable quality, or projects designed to transfer water across or between aquifers of comparable quality for the purpose of storage or conservation

- discharges that may cause an imminent hazard to the public or the environment through contamination of underground supplies of drinking water or surface water affected by the groundwater

- discharges into Class G-I groundwater, except that domestic effluent or reclaimed water and stormwater discharge sites authorized by Department permit or rule must have zones of discharge extending no more than 100 ft from the site boundary or to the installation/facility's property boundary, whichever is less, unless a smaller zone of discharge is necessary to protect the designated use of adjacent waters outside the zone of discharge.)

(NOTE: Drinking water facilities which dispose nonhazardous concentrates from membrane separation technologies (such as reverse osmosis, membrane softening, ultra-filtration, and electrodialysis) through land application operations are exempt from obtaining a zone of discharge in order to discharge to groundwater provided that the applicant demonstrates that the receiving unconfined aquifer exhibits a natural background TDS concentration exceeding 1500 mg/l.)

(NOTE: Drinking water facilities discharging nonhazardous concentrates from membrane separation technologies to unconfined aquifers must not cause a violation of primary or secondary drinking water standards at any private or public water supply well outside of the drinking water facility’s property boundary.)

(NOTE: Existing facilities discharging to Class G-II groundwater are exempt from compliance with secondary standards outside of a zone of discharge obtained by Department permit or rule except where compliance is required by the Department (see 62-520.520 FAC).)

Verify that facilities authorized to discharge to groundwater at the time of its reclassification to Class G-I by the Commission meet the same requirements as

Page 569: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-16 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

existing Federal facilities in G-II groundwater.

(NOTE: Agricultural fields, ditches and canals, waste management systems for animal feeding operations exempted from permitting, and stormwater facilities are not required to obtain a permit establishing a zone of discharge. These Federal facilities must have a zone of discharge of 100 ft from the site or to the property boundary.)

WA.5.2.FL. Federal facilities which discharge to groundwater must meet monitoring and reporting requirements (FAC 62-522.600(1), (2)(a), (5), (7), and (9) through (11)) [Revised July 1997].

Verify that Federal facilities which discharge to groundwater have a Department-approved monitoring program unless otherwise exempted.

Verify that facilities begin the monitoring program within 90 days of the date the permit is issued.

Verify that discharges to Class G-III groundwater are monitored to assure compliance with the standards in 62-520.400, FAC.

(NOTE: The following facilities are exempt from monitoring requirements: - domestic sewage treatment installations with less than 100,000 gpd design

capacity - stormwater facilities - agricultural fields, ditches, and canals - waste management systems for animal feeding operations exempted from

permitting - wastewater impoundments containing effluent or reclaimed water, cooling

water, or other discharge waters.)

Verify that new domestic wastewater facilities which discharge to groundwater with less than 100,000 gpd design capacity (excluding onsite sewage disposal systems) which filed a complete permit application after 1 July 1994 install and analyze samples from one downgradient monitor well designed to evaluate the impact of the facility on groundwater quality and one groundwater sample from within the upper 20 ft of the zone of saturation semiannually.

Verify that Federal facilities required to monitor submit the following reports:

- within 90 days of approved monitoring plan implementation, a report stating the volume and chemical, physical, and microbiological composition of the discharge

- on a quarterly basis thereafter, or such frequency specified in the permit, reports on all monitoring wells

- the Department is notified when there is a change in the permitted volume, location, or chemical, physical, and microbiological composition of the discharge plume.

Page 570: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-17 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WA.5.3.FL. Industrial waste dischargers must meet minimum treatment requirements (FAC 62-660.400(1)(e), (n), (o), and (p)) [Moved from WA.95.1 July 1998].

(NOTE: The Department has adopted by reference the effluent limitations for industrial waste contained in 40 CFR 401, 405, 407 through 415, 417 through 436, 439, 440, 443, 446, 447, 454, 455, 457 through 461, 463 through 469, and 471.)

Verify that sources of industrial waste reasonably expected to be sources of water pollution and which are not contained in the classes or categories covered in the adopted Federal regulations provide a minimum of secondary treatment for the total untreated waste produced by a given plant.

Verify that industrial wastes discharged into groundwaters receive treatment and meet water quality standards specified in WQ.115.

Verify that sources of industrial waste reasonably expected to be sources of water pollution to Class G-II or G-IV waters and which are not contained in the classes or categories covered in the adopted Federal regulations provide minimum treatment so that the discharged waste does not:

- affect the mechanical integrity of the well - jeopardize the integrity of the confining zone - alter the hydrologic characteristics of the injection zone to the point of

endangering the underground sources of drinking water.

Page 571: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-18 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WA.15. STATE PERMITS

(NOTE: WA.15 applies to domestic or industrial wastewater facilities, activities which discharge wastes into waters, discharges from mobile point sources such as seafood processing rigs, seafood processing vessels, and aggregate plants, and stormwater discharges from domestic and industrial wastewater facilities. WA.15 does not apply to septic tank drainfield systems and other onsite sewage treatment and disposal systems with subsurface disposal if:

- the system serves the complete wastewater needs of an establishment with a design capacity of 10,000 gpd or less of domestic wastewater

- the system serves the complete wastewater needs of a commercial establishment with a design capacity of 5000 gpd or less of commercial wastewater.

In addition, WA.15 does not apply to any single individual service connection from a single building to a pretreatment system, any single individual gravity service connection, with no pretreatment, to a collection system sized and intended to serve a single building, or sewage discharges from vessels regulated by the U.S. Coast Guard.) (FAC 62-620.100)

WA.15.1.FL. Domestic or industrial wastewater facilities and activities which discharge wastes into waters must meet permit requirements (FAC 62- 620.300(1) through (4)).

Verify that domestic or industrial wastewater facilities and activities which discharge wastes into waters have a discharge permit.

Verify that domestic or industrial wastewater facilities and activities which discharge wastes into waters have a permit to operate, construct, or modify the facility.

Verify that domestic or industrial wastewater facilities and activities which discharge wastes into waters have a wastewater permit prior to operation, construction, or modification.

Verify that water is not discharged into any industrial or domestic wastewater which, by itself or in combination with wastes of other sources, reduces the quality of the receiving waters below the classification established for them.

WA.15.2.FL. Domestic or industrial wastewater facilities and activities which discharge wastes into waters must meet recordkeeping requirements (FAC 62-620.350).

Verify that, unless the wastewater permit specifically indicates an alternate location, the following records are maintained onsite at the permitted facility:

- records of all compliance monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation

- copies of applicable laboratory certification - copies of all reports required by the permit for at least 3 yr

- records of all data used to complete the permit application for at least 3 yr

Page 572: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-19 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- monitoring information related to residuals use and disposal activities, including a copy of the laboratory certification showing the certification number, for at least 3 yr

- the current permit - the current operation and maintenance manual - any required record drawings - copies of the licenses of the current certified operators if the facility is

required to have certified operators - logs and schedules showing plant operations and equipment maintenance for

3 yr.

WA.15.3.FL. Existing manufacturing, commercial, and silvicultural wastewater facilities or activities discharging into surface waters must meet notification requirements (FAC 62-620.625(1)) [Revised July 1997].

Verify that existing manufacturing, commercial, and silvicultural wastewater facilities or activities discharging into surface water notify the Department as soon as they know or have reason to believe the following:

- that any activity has occurred or will occur which would result in the discharge, on a routine or frequent basis, of any toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the following levels:

- 100 micrograms/L - 200 micrograms/L for acrolein and acrylonitrile - 500 micrograms/L for 2,4-dinitrophenol and 2-methyl-4,6-dinitrophenol - 1 mg/L for antimony - five times the maximum concentration value reported for a pollutant in

the permit application - the level in the permit which exceeds these levels

- that any activity has occurred or will occur which would result in any discharge, on a nonroutine or infrequent basis, of a toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the following levels:

- 500 micrograms/L - 1 mg/L for antimony - 10 times the maximum concentration value reported for that pollutant in

the permit application - the level in the permit that exceeds these levels.

WA.15.4.FL. Domestic wastewater facilities and permitted reuse systems must meet notification requirements (FAC 62-620.625(2) through (4)).

Verify that domestic wastewater facilities notify the Department of any new introduction of pollutants into the facility from an industrial discharger.

Verify that domestic wastewater facilities notify the Department of any substantial change in the volume or character of pollutants being introduced into that facility by a source which was identified in the permit application and known to be discharging at the time the permit was issued.

Page 573: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-20 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

discharging at the time the permit was issued.

Verify that these notices include information on the quality and quantity of effluent introduced into the facility and any anticipated impact of the change on the quality and quantity of effluent discharged from the facility.

WA.15.5.FL. [Moved to WA.95.26.FL. July 1998].

WA.15.6.FL. Stormwater dischargers must meet construction permit requirements (FAC 62-25.035,.040(2),.801(2)(e), and (f)).

Verify that the following types of new stormwater dischargers are constructed pursuant to a general permit:

- facilities which discharge into a stormwater discharge facility which is permitted or which was previously approved (this does not authorize discharge to the permitted or exempt facility without the facility owner's prior written consent)

- facilities which provide retention, or detention with filtration, of the runoff from the first 1 in. of rainfall or, for projects or project subunits with drainage areas less than 100 acres, facilities which provide retention, or detention with filtration, of the first 0.5 in. of runoff

(NOTE: Facilities which directly discharge to Outstanding Florida Waters must

provide additional treatment.) - facilities of stormwater management systems that include a combination of

management practices including, but not limited to, retention basins, swales, pervious pavement, landscape, or natural retention storage that will provide for the percolation of the runoff from a 3-yr 1-h design storm.

Verify that construction of a new facility which discharges stormwater is not undertaken without a valid construction permit.

Verify that after construction completion an as-built certification is submitted to the Department within 30 days that the new stormwater discharge facility was built as specified by the general permit.

(NOTE: The general permit does not relieve the permittee of the responsibility for obtaining a dredge and fill permit where it is required.)

WA.15.7.FL. Surface water management systems must meet permit requirements

Verify that (unless expressly exempt by law or District rule) an Environmental Resource Permit has been obtained from the District prior to any of the following:

Page 574: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-21 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

(FAC 40D-4.041) [Added July 1998].

- the construction and operation of any new surface water management system - the alteration, abandonment, or removal of any surface water management

system - the establishment of a mitigation bank.

(NOTE: Environmental Resource Permit exemptions are listed in Appendix 12-1.)

Verify that the following otherwise exempt surface water management systems obtain a permit from the Department if the master drainage plan is altered so as to have an adverse impact on off site water resources in the District:

- any project, work, or activity which has received all governmental approvals necessary to begin construction and was under construction prior to 1 October 1984

- any phased or long term build out project, including a development of regional impact, planned unit development, development with a master plan or master site plan, or similar project, which has received local or regional approval prior to 1 October 1984.

Verify that a Standard General Permit for Minor Surface Water Management

Systems has been obtained for a surface water management system, otherwise exempt from permitting under exemptions 4 and 6 through 8 in Appendix 12-1.

(NOTE: The Standard General Permit for Minor Surface Water Management Systems requirement does not apply to systems which are exempt by statute or rule from storm water quality regulation or has received storm water quality review and approval by the District or by a DEP permit, license or certification.)

Verify that an Environmental Resource Permit has been obtained prior to any dredging or filling.

Page 575: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-22 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WA.20. TREATMENT WORKS

(NOTE: The following are exempt from the requirements in WA.20:

- any domestic wastewater facility with a design capacity of 2000 gpd, or less, which serves the complete wastewater treatment and disposal needs of a single establishment

- septic tank drainfield systems and other onsite sewage systems with subsurface disposal and a design capacity of 5000 gpd, or less, which serve the complete wastewater disposal needs of a single establishment (except restaurant facilities that have a design capacity greater than 3000 gpd), those defined as industrial facilities, and all commercial laundry facilities

- other means of individual waste treatment or disposal which are otherwise subject to state regulation

- any single individual service connection from a single establishment to a pretreatment system, or any single individual gravity service connection, with no pretreatment, to a collection system sized and intended to serve such a structure.)

Permits

WA.20.1.FL. Domestic wastewater treatment, reuse, and disposal facilities must meet permit requirements (FAC 62-600.700(1), (6), .725(1), (3) through (5), .750(1), and (3)).

Verify that domestic wastewater treatment, reuse, and disposal facilities have a permit prior to construction or modification of wastewater treatment plants.

Verify that domestic wastewater treatment, reuse, and disposal facilities have an operation permit prior to commencing operation.

(NOTE: A facility may be operated for up to 6 mo under a construction permit. During this 6-mo period, discharge of reclaimed water or effluent must meet applicable standards. The facility must be operated under the supervision of a certified operator during this period. Effluent data obtained during this period must be submitted to the Department on a monthly basis.)

Verify that the Department is notified orally within 24 h of any breakdown or malfunction which causes noncompliance with permit conditions.

(NOTE: Operators of treatment facilities under a 10-yr permit must report any breakdown or malfunction in writing within 48 h of discovery.)

Operation And Maintenance

Page 576: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-23 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WA.20.2.FL. Domestic wastewater treatment, reuse, and disposal facilities must meet operation and maintenance requirements (FAC 62-600.410(1), (5) through (8), and (11)).

Verify that domestic wastewater treatment plants are operated and maintained so that reclaimed water or effluent quality requirements are met and the appropriate domestic wastewater residuals management criteria are met.

Verify that all treatment plants are operated under the supervision of a certified operator.

Verify that all facilities and equipment necessary for the treatment, reuse, and disposal of domestic wastewater and residuals are maintained so that they function as intended.

Verify that all treatment plants facilities are safe in terms of public health and safety at all times, including periods of inactivation or abandonment.

Verify that the Department is notified at least 60 days prior to inactivation or abandonment of a treatment plant and that safety precautions are specified.

Verify that corrective action is taken in the event that the treatment facilities or equipment no longer function as intended, are no longer safe in terms of public health and safety, or odor, noise, aerosol drift, or lighting adversely affect neighboring developed areas.

Verify that the following are maintained at all facilities or other sites acceptable to the Department:

- the Department permit - record drawings - the approved operation and maintenance manual - schedules and logs - all recorded operating data.

Treatment (NOTE: Treatment requirements are to be met prior to discharge into holding ponds, reuse systems, disposal systems, or surface waters.)

WA.20.3.FL. Domestic wastewater treatment facilities must meet secondary treatment requirements for surface water disposal, excluding ocean outfalls (FAC 62-600.420(1)(a)).

Verify that domestic wastewater facilities provide, at a minimum, secondary treatment.

Verify that new facilities and modifications of existing facilities are designed to achieve an effluent after disinfection containing not more than 20 mg/L CBOD(5) and 20 mg/L TSS, or 90 percent removal of each of these pollutants from the wastewater influent, whichever is more stringent.

Page 577: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-24 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that all facilities are operated to achieve, at a minimum, the specified effluent limitations (20 mg/L).

WA.20.4.FL. Domestic wastewater treatment facilities must meet secondary treatment requirements for surface water disposal via ocean outfalls (FAC 62-600.420(1)(b)).

Verify that all domestic wastewater treatment plants discharging to Class III coastal waters meet, at a minimum, the secondary treatment requirements specified in WA.20.3.FL.

Verify that all domestic wastewater treatment plants discharging to open ocean waters provide, at a minimum, secondary treatment.

Verify that new treatment plants and modifications of existing plants are designed to achieve an effluent prior to discharge containing not more than 30 mg/L CBOD(5) and 30 mg/L TSS, or 85 percent removal of these pollutants from the wastewater influent, whichever is more stringent.

Verify that all facilities, whether new or existing, are operated to achieve, at a minimum, the specified effluent limitations (30 mg/L).

WA.20.5.FL. Domestic wastewater treatment facilities must meet secondary treat-ment requirements for reuse, land application, and ground-water discharge, excluding underground injection, (FAC 62-600.420(1)(c)).

Verify that all preapplication wastes meet, at a minimum, the secondary treatment requirements specified in WA.20.3.FL., for all facilities, whether new or existing.

(NOTE: For overland flow and certain underdrained slow-rate land application systems, preapplication concentrations of CBOD(5) and TSS in the effluent prior to discharge onto application sites are not required to be in conformance with this secondary treatment standard. However, this standard, at a minimum, must be met prior to final effluent release to surface waters via facilities designed for operational control of effluent.)

WA.20.6.FL. Domestic wastewater treatment, reuse, and disposal facilities must meet specific treatment requirements (FAC 62-600.420(2)(a)).

Verify that treatment is provided so that Department-specified reclaimed water or effluent limitations are met after disinfection.

Verify that reclaimed water or effluent discharge meets water quality standards (FAC 62-600.430).

(NOTE: Mixing zones are prohibited.)

Verify that reclaimed water or effluent discharge receive high-level disinfection.

Verify that reclaimed water or effluent discharge does not exceed 10 mg/L total nitrogen.

Page 578: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-25 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that reclaimed water or effluent contains maximum pollutant levels less than those specified for community water systems in WQ.35 and WQ.40.

WA.20.7.FL. Domestic wastewater treatment, reuse, and disposal facilities must meet disinfection require-ments (FAC 62-600.440(1), (4)(a), (5)(a), (6)(a), and (7)(a)).

Verify that all wastewater treatment facilities provide disinfection to the extent necessary to protect public health and that microbiological pollutant criteria from WQ.15 and WA.20 is not violated in any receiving waters.

Verify that basic disinfection facilities are designed to result in a fecal coliform of not more than 200/100 mL of reclaimed water or effluent sample.

Verify that high-level disinfection facilities include additional TSS control, beyond secondary treatment levels, to maximize disinfection effectiveness and are designed to result in a reclaimed water or effluent in which fecal coliform values, per 100 mL, are below detectable limits.

Verify that intermediate disinfection facilities are designed to result in a fecal coliform of not more than 14/100 mL of reclaimed water or effluent sample.

Verify that low-level disinfection facilities are designed to result in an effluent containing a fecal coliform of not more than 2400/100 mL of sample.

WA.20.8.FL. Domestic wastewater treatment, reuse, and disposal facilities must meet pH requirements (FAC 62-600.445).

Verify that all facilities are designed and operated to maintain a pH of 6.0 to 8.5 in the reclaimed water or effluent, after disinfection.

Monitoring

WA.20.9.FL. Domestic wastewater treatment, reuse, and disposal facilities must meet monitoring requirements (FAC 62-601.300(1), (6), .400(1), (3), .700(1), (4), and (5)).

Verify that wastewater treatment facilities monitor the flow, the influent for CBOD(5) and suspended solids, and the reclaimed water or effluent for all limitations which are identified in the construction or operation permit.

Verify that operating records for the preceding 5 calendar years are maintained.

Verify that field testing, sample collection and preservation, and laboratory testing are in accordance with methods approved by the Department and the USEPA.

Verify that, after 1 July 1993, any laboratory tests are performed by a certified

Page 579: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-26 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

laboratory.

Verify that wastewater treatment facilities with a permitted capacity of 100,000 gpd, or more, which are designed so that some or all of the reclaimed water or effluent may enter groundwaters, provide groundwater monitoring.

Verify that groundwater monitoring results are submitted to the Department.

Verify that monitoring wells are pumped prior to groundwater sampling.

Collection Systems and Transmission Facilities

(NOTE: Any single, individual service connection from a single establishment to a pretreatment system, or any single individual gravity service connection, with no pretreatment, to a collection system sized and intended to serve such a structure is exempted from these requirements.)

WA.20.10.FL. Domestic wastewater collection/ transmission systems and reuse distribution systems must meet specific restrictions (FAC 62-604.130(1) through (5)).

Verify that domestic wastewater collection/transmission systems and reuse distribution systems do not release or dispose of untreated excreta, sewage, or other wastewaters or sludge.

Verify that these systems are constructed according to Department-approved plans.

Verify that stormwater in any amount is not deliberately introduced into collection/transmission systems designed solely for the introduction and conveyance of domestic/industrial wastewater.

Verify that stormwater is not deliberately introduced into collection/transmission systems designed for the introduction or conveyance of combinations of storm and domestic/industrial wastewater in amounts which may reduce the efficiency of pollutant removal by the treatment plant.

Verify that operating authorities of collection/transmission systems or permittees of treatment plants do not accept connections of wastewater discharges which have not received necessary pretreatment or which contain materials or pollutants:

- which may cause fire or explosion hazards - which may cause excessive corrosion or other deterioration of wastewater

facilities due to chemical action or pH levels - which are solid or viscous and obstruct flow or otherwise interfere with

wastewater facility operations or treatment - which result in treatment plant discharges having temperatures above 40 οC.

Verify that equipment is maintained in a condition which enables the intended

Page 580: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-27 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

function.

WA.20.11.FL. Domestic wastewater collection/ transmission systems and reuse distribution systems must meet operation and maintenance requirements (FAC 62-604.500 and 550(1) through (3)).

Verify that new collection/transmission systems have Department approval prior to being placed into operation.

Verify that collection/transmission systems are operated and maintained so that uninterrupted service is provided.

Verify that all equipment for the collection/transmission of domestic wastewater is maintained so as to function as intended and that corrective action is taken when necessary.

Verify that copies of record drawings and the approved operation and maintenance manual are maintained at a site approved by the Department.

Verify that the Department is notified orally within 24 h and in writing within 72 h of any breakdown or malfunction which causes noncompliance with permit conditions.

(NOTE: Operators of treatment facilities under a 10-yr permit must report any breakdown or malfunction in writing within 48 h of discovery.)

WA.20.12.FL. Domestic wastewater collection/ transmission systems and reuse distribution systems must meet permit requirements (FAC 62-604.600(1), (2), and .700(2)).

Verify that collection/transmission systems involving innovative design or having features not complying with design/performance criteria have a construction permit.

Verify that all other collection/transmission systems have a general permit by rule.

Verify that collection/transmission systems have Departmental approval prior to being placed into operation.

Verify that systems with a general permit by rule submit a copy of the plans and specifications for the system as-built upon construction completion.

(NOTE: The general permit by rule does not relieve the permittee of the responsibility for obtaining a dredge and fill permit where it is required.)

Pretreatment (NOTE: These requirements apply to the discharge of pollutants from nondomestic sources covered by pretreatment standards which are discharged into, transported by truck or rail, or otherwise introduced into wastewater facilities and to public utilities which receive wastewater from sources subject to pretreatment

Page 581: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-28 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

standards and that discharge to surface waters of the state, or public utilities required to implement a pretreatment program. These requirements do not apply to industrial wastewater facilities that accept wastewater from another facility for cotreatment, reuse, or disposal, unless the facility discharges to a public utility.)

WA.20.13.FL. Public utilities must meet pretreatment program development requirements (FAC 62-625.400(3)(a), (b), .500(1)(a), (c), and (2)(b) through (e)).

Verify that any wastewater facility, or combination of facilities operated by the same public utility, with a total design flow greater than 5 million gpd and receiving pollutants from industrial users which pass through or interfere with the operation of the wastewater facility, or are otherwise subject to pretreatment standards, establishes a pretreatment program.

Verify that any wastewater facility providing reclaimed water to public access facilities develops a pretreatment program, unless the public utility can affirm that the facility has no significant industrial users.

Verify that public utilities develop and implement procedures to ensure compliance with the requirements of the pretreatment program.

Verify that public utilities required to have a pretreatment program develop and enforce specific limits to implement the requirements specified in WA.35.1.FL. for industrial users.

Verify that all other public utilities develop and enforce specific effluent limits which, together with appropriate changes in the treatment plant or operation, are necessary to ensure compliance with the wastewater facility's permit, domestic wastewater residuals use, or disposal practices.

Verify that public utilities develop local limits or submit documentation to the Department that they are not necessary.

Verify that public utilities develop and implement an enforcement response plan.

Verify that public utilities prepare a list of its significant industrial users and the criteria applicable to each and submit it to the Department.

WA.20.14.FL. Control Authorities must meet reporting and recordkeeping requirements ((FAC 62-625.600(8) and (14)).

Verify that Control Authorities provide the Department with a report which briefly describes the program activities no later than 1 yr after pretreatment program approval and at least annually thereafter.

Verify that Control Authorities maintain monitoring records for a minimum of 3 yr.

Verify that Control Authorities maintain reports submitted by industrial users for a

Page 582: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-29 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

minimum of 3 yr.

Page 583: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-30 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

DISCHARGES TO A POTW/FOTW

WA.25. GENERAL

WA.25.1.FL. Industrial users must meet upset requirements (FAC 62-625.840(3) and (4)).

Verify that industrial users demonstrate the following in the event of an upset:

- the industrial user can identify the cause of the upset - the industrial user's facility was, at the time of the upset, being properly

operated - the industrial user has orally submitted the following information to the

Control Authority within 24 h of awareness of the upset, with a written submission within 5 days:

- a description of the discharge and cause of noncompliance - period of noncompliance - steps being taken or planned to reduce, eliminate, and prevent

recurrence of the noncompliance.

Verify that industrial users control production or all discharges to the extent necessary to maintain compliance with categorical pretreatment standards upon reduction, loss, or failure of the treatment facility until the facility is restored or an alternative method of treatment is provided.

(NOTE: This requirement applies in the situation where the primary source of power of the treatment facility is reduced, lost, or fails.)

WA.25.2.FL. Industrial users must meet bypass require-ments (FAC 62-625.860).

(NOTE: Industrial users may allow any bypass to occur that does not cause pretreatment standards to be violated, but only if it is for essential maintenance to assure efficient operation. These bypasses are not subject to the following requirements.)

Verify that, if an industrial user knows in advance of the need for a bypass, it submits a notice to the Control Authority at least 10 days before the bypass date.

Verify that, if an industrial user does not know of the need for a bypass 10 days prior to the bypass, then the user notifies the Control Authority immediately upon knowledge of the need for the bypass.

Verify that industrial users submit oral notice of an unanticipated bypass which

Page 584: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-31 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

exceeds applicable pretreatment standards to the Control Authority within 24 h and submits a written notice within 5 days.

(NOTE: Bypass is prohibited unless it was unavoidable to prevent loss of life, personal injury, severe property damage, there were no technically feasible alternatives, and the industrial user has submitted the two required notices.)

Page 585: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-32 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

DISCHARGES TO A POTW/FOTW

WA.30. PRETREATMENT STANDARDS

WA.30.1.FL. Existing sources with categorical pretreatment standards must meet them by specific deadlines (FAC 62-625.410(3) and (5)) [Revised July 1997].

(NOTE: 40 CFR Chapter I, Subchapter N (Categorical Pretreatment Standards) is adopted by reference.)

Verify that existing sources with categorical pretreatment standards meet them within 3 yr of the date the standard is effective in 40 CFR Chapter I, Subchapter N.

(NOTE: Existing sources that become industrial users subsequent to promulgation of an applicable categorical pretreatment standard are considered existing industrial users except when these sources meet the definition of a new source (as defined in 62-625.200(9)).)

Verify that new sources install, have in operating condition, and start up all pollution control equipment required to meet applicable pretreatment standards prior to beginning to discharge.

Verify that new sources meet all applicable pretreatment standards within 90 days of initiating discharge.

Verify that industrial users do not ever increase the use of process water, or in any other way, attempt to dilute a discharge as a partial or complete substitute for adequate treatment.

Page 586: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-33 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

DISCHARGES TO A POTW/FOTW

WA.35. INDUSTRIAL USERS

WA.35.1.FL. Industrial users must meet specific discharge restrictions (FAC 62-625.400(1)(a) and (2)).

Verify that industrial users do not introduce into a wastewater facility any pollutant which causes pass through or interference.

Verify that the following pollutants are not introduced into a wastewater facility:

- pollutants which create a fire or explosion hazard in the wastewater facility - pollutants which will cause corrosive structural damage to the wastewater

facility, but in no case discharges with pH lower than 5.0, unless the facility is specifically designed to accommodate such discharges

- solid or viscous pollutants in amounts that will cause obstruction to the flow in the wastewater facility resulting in interference

- any pollutant released in a discharge at a flow rate or pollutant concentration which will cause interference with the wastewater facility

- heat in amounts that will inhibit biological activity in the wastewater facility resulting in interference, but in no case heat which results in the discharge from the treatment plant having a temperature exceeding 40 οC (104 οF)

- petroleum oil, nonbiodegradable cutting oil, or products of mineral oil origin in amounts that will cause interference or pass through

- pollutants which result in the presence of toxic gases, vapors, or fumes within the wastewater facility in a quantity that will cause acute worker health and safety problems

- any trucked or hauled pollutants, except at discharge points designated by the Control Authority.

Page 587: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-34 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

DISCHARGES TO A POTW/FOTW

WA.40. DOCUMENTATION/ REPORTING TO THE POTW

WA.40.1.FL. Industrial users subject to categorical pretreatment standards must meet reporting requirements (FAC 62-625.600(1), (3), (4)(a), (5), (9)) [Revised July 1997].

Verify that, within 180 days after the effective date of a categorical pretreatment standard, existing industrial users submit a report to the Control Authority with the following information:

- identifying information, including the name and address of the facility and the name and address of the owner/operators

- pollution control permits held - description of operations - flow measurement

- pollutant measurement - certification of standard compliance - compliance schedule.

Verify that, at least 90 days prior to discharge commencement, new sources and

sources that become industrial users subsequent to the promulgation of an applicable categorical pretreatment standard submit a report to the Control Authority with the following information:

- identifying information - pollution control permits held - description of operations - flow measurement - pollutant measurement.

Verify that industrial users submit periodic compliance reports in June and

December and, within 90 days following the date for final compliance with a standard, a report certifying compliance to the Control Authority.

Verify that all categorical and significant noncategorical industrial users notify the Control Authority and wastewater facility immediately of all discharges that could cause problems to the wastewater facility, including slug discharges and prohibited discharges.

Verify that industrial users notify the Control Authority in advance of any change

Page 588: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-35 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

in the volume or character of pollutants in their discharge that may result in pass through or interference at the wastewater facility.

WA.40.2.FL. Industrial users not subject to categorical pretreatment standards must meet reporting requirements (FAC 62-625.600(7)(a)).

Verify that significant noncategorical industrial users submit to the Control Authority a description of the nature, concentration, and flow of the pollutants at least once every 6 mo.

WA.40.3.FL. Industrial users must meet recordkeeping requirements (FAC 62-625.600(14)(a) and (b)).

Verify that industrial users maintain monitoring records for a minimum of 3 yr.

Page 589: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-36 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

EFFLUENT LIMITATIONS FOR STEAM ELECTRIC POWER GENERATING SOURCES

WA.55. EXISTING SOURCES

WA.55.1. Steam electric generating plants existing or licensed by 1 July 1984 must meet specific effluent limitations (FAC 62- 660.400(1)(q)).

Verify that steam electric generating plants existing or licensed by 1 July 1984 provide treatment so that the following effluent requirements are met:

- the quality of nonthermal components of discharges from nonrecirculated cooling water systems is as high as the quality of the makeup waters

- the quality of nonthermal components of discharges from nonrecirculated cooling water systems is no lower than is allowed for blowdown from these systems

- the quality of noncooling system discharges which receive makeup water from a receiving body of water that does not meet applicable Department water quality standards is as high as the quality of the receiving body of water.

Page 590: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-37 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WA.95. OTHER DISCHARGES AND DISCHARGERS

WA.95.1.FL. Laundromat wastewater disposal systems must meet general permit requirements (FAC 62-660.801(1)(a), (d), (e), (g), and (2) through (4)(a)).

(NOTE: Laundromat wastewater disposal system construction and operation are permitted by rule provided the general permit requirements are met.)

Verify that, within 30 days of completion of laundromat wastewater disposal system construction, the engineer of record, or another registered professional engineer, certifies to the Department that construction permitted by the general permit is complete and usable and done according to approved plans and specifications.

Verify that there is no discharge of dry cleaning materials.

Verify that laundromat wastewater disposal system design flow is less than 10,000 gpd.

Verify that all design calculations and drawings were submitted to the Department and that laundromat wastewater disposal systems use either a trickling filter or a sand filter system.

Verify that laundromat wastewater disposal systems have a chlorination tank designed for a minimum 30 min contact time and that a chlorine residual of at least 0.5 mg/L is maintained at all times.

Verify that laundromat wastewater is dispensed to either an absorption field or to a percolation pond.

WA.95.2.FL. Pesticide waste degradation systems must meet general permit require-ments (FAC 62-660.802(1), (2)(a), (5), and (6)).

(NOTE: Pesticide waste degradation system construction and operation are permitted by rule provided the general permit requirements are met. These systems are for the evaporation and degradation of pesticide rinse water generated in the cleaning of pesticide application equipment.)

Verify that pesticide waste degradation systems meet the following general requirements:

- there is no discharge of water or pesticide from the system to the surface or groundwater or to soil out side of the tank

- the system owner charges no fee for use of the system - the system owner notifies the appropriate Department District Office within 2

Page 591: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-38 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

working days in the event of a leak or spill in excess of 25 gal, or within 30 days in the event that facility ownership changes

- the permittee owns the land upon which the system is to be built or provides a copy of a legal agreement with the land owner which specifies that the owner will be responsible for the proper operation and closure of the system

- the rinse water discharged to the system consists of dilute pesticide solutions generated from cleaning of the pesticide application equipment or from empty pesticide containers.

Verify that pesticide waste degradation systems meet the following location requirements:

- systems are not placed in the 100-yr flood plain of a river - systems are not within 100 ft of a lake, pond, wetland system, or flowing

stream - systems are not within 75 ft of a drinking water well - systems are not within 25 ft of a property boundary.

Verify that pesticide waste degradation systems meet the following operation requirements:

- prior to the first discharge of pesticide rinse water to the system, clean water is added to the system, including the storage and evaporation tanks, and the system is inspected for leaks

- water pumped or drained to the tank enters the tank media properly - sumps are pumped dry at the end of each working day - vegetation does not block air flow across the tank surface or obstruct

inspection of the tank - in-ground tanks have leak detection systems which operate continuously and

which are inspected for proper operation weekly - evaporation tanks and accumulation tanks are inspected for leaks on a daily

basis while in use - evaporation tanks are not filled to within 1 in. of the top edge during

operation - auxiliary tanks are made available to transfer the evaporation tank or

accumulation tank contents should either of these tanks develop a lead or need to be repaired.

Verify that pesticide waste degradation systems meet the following closure requirements:

- the appropriate Department District Office is notified that the facility is to be dismantled

- media in the tank is disposed of as specified in 40 CFR 262, which is adopted by reference

- disposal of system components and media does not contaminate surface or groundwater.

Page 592: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-39 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WA.95.3.FL. Car wash treatment, disposal, and recycle systems must meet general permit requirements (FAC 62-660.803(1), (2)(c), (4), and (5)).

(NOTE: Car wash treatment, disposal, and recycle system construction and operation are permitted by rule provided the general permit requirements are met. Residential car washes discharging 4000 gal or less of wastewater per week are exempt from the requirement to obtain this general permit or a Department industrial wastewater permit. General permits by rule are not valid for truck wash facilities.)

Verify that car washes which do not qualify for either a general permit by rule or an exemption have an industrial wastewater permit or are connected to a domestic wastewater treatment facility capable of treating the car wash wastewater.

Verify that, within 30 days of construction completion, the engineer of record, or another registered professional engineer, certifies to the Department that the construction permitted by the general permit is complete and usable and done according to approved plans and specifications.

Verify that car wash treatment, disposal, and recycle systems meet the following requirements:

- no engine degreasing solvents are used at the facility - no oil or engine coolant or other solid wastes are disposed of at the facility - there is no discharge of wastewaters from the systems to surface waters - spent process water is disposed of at a Department-permitted wastewater

treatment facility or a pretreatment facility connected to a Department-permitted wastewater treatment facility

- solids from sedimentation tanks and used filter material are disposed of at a Class I or II landfill authorized by the Department to accept solid wastes

- any waste oil collected from oil/water separators are disposed of by a licensed used oil recycler

- wand or rollover car wash systems using the general permit by rule install and use a total recycle system that recycles both wash water and rinse water with no discharge of wastewater to waters of the state

- all facilities that provide wax, add drying agents or other additives, or have water softening equipment install a total recycle system that recycles both wash water and rinse water, with no discharge of wastewater to waters of the state.

WA.95.4.FL. Treatment and disposal systems for wash water from the packaging of fresh market tomatoes with a wash tank discharging

(NOTE: Construction and operation of treatment and disposal systems for wash water from the packaging of fresh market tomatoes with a wash tank discharging between 5000 and 50,000 gpd are permitted by rule provided the general permit requirements are met. General permits by rule are not valid for tomato canning facilities.)

Page 593: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-40 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

between 5000 and 50,000 gpd must meet general permit requirements (FAC 62-660.805(1)(a) through (d), (g), (3)(a), and (4)).

facilities.)

Verify that tomato wash water disposal systems discharging greater than 50,000 gpd, or systems not otherwise meeting general permit by rule requirements, have an industrial wastewater discharge permit.

(NOTE: Any tomato wash water disposal system with a wash tank discharging less than 5000 gpd is exempt from the requirement to obtain a Department industrial wastewater permit if:

- the disposal of the system's wash water does not cause a violation of any Department standard for surface or groundwater quality

- wash water is not discharged directly to surface waters or to groundwaters through wells or sinkholes that allow direct contact with Class G-I or G-II groundwaters.

Systems that discharge to publicly or privately owned wastewater treatment facilities permitted by the Department are exempt from industrial wastewater permit requirements and general permit by rule requirements.)

Verify that, within 30 days of construction completion, the engineer of record, or another registered professional engineer, certifies to the Department that the construction permitted by the general permit is complete and usable and done according to approved plans and specifications.

Verify that tomato wash water disposal systems include a screening system or a sedimentation system which filters out leaves, twigs, and other floating objects to prevent clogging of the spray nozzles.

Verify that solids from the screenings or sedimentation systems with are disposed of with cull tomatoes or in an approved landfill or solid waste management facility.

(NOTE: See WA.105.1.FL. for land application requirements.)

WA.95.5.FL. Fish farms must meet general permit requirements (FAC 62-660.820(1), (3) through (5)(a), and (8)).

(NOTE: Fish farm construction and operation are permitted by rule provided the general permit requirements are met. General permit by rule requirements are not valid for the aquaculture operations specified in Appendix 12-2. These operations must have a permit to construct or operate an industrial wastewater treatment facility.)

(NOTE: The following types of aquaculture operations are exempt from industrial wastewater permitting requirements if the farm's discharge does not cause or contribute to new violations of water quality standards or to continuation of existing violations and the farm does not discharge to Outstanding Florida Waters [undefined]:

Page 594: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-41 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- fee-fishing operations with a standing crop of less than 1000 lb of fish per acre

- fish farms that grow only native fish, have less than 10 acres of production ponds, and produce less than 10,000 lb of fish per year

- fish farms that produce less than 10,000 lb of fish per year and do not discharge production unit waters to surface waters of the state.)

Verify that, in individual production units which discharge through a detention

facility with a 1-day residence time, feed application rates are limited to 180 lb of dry feed/acre/day and the standing crop is limited to 6000 lb of fish/acre.

Verify that, in individual production units which discharge to a retention facility or a detention facility with a 5-day residence time, feed application rates are limited to 360 lb of dry feed/acre/day and the standing crop is limited to 12,000 lb of fish/acre.

(NOTE: Limitations on the feed application rate and the standing crop do not apply in individual production units that discharge to a retention facility if the bottom and sides of the production unit are constructed of impermeable synthetic materials or lined with at least 12 in. of soil with a hydraulic conductivity of less than 10-7 cm/s.)

Verify that only chemicals registered or allowed by the USEPA, USFDA, or the Florida Department of Agriculture and Consumer Services for aquatic uses are applied to the pond water and that application rates are as specified on the product label.

Verify that no registered chemicals are applied at fish farms constructed after 30 April 1992 to ponds located within 200 ft of offsite drinking water supply wells.

Verify that fertilizer application rates are limited to those recommended by the Institute of Food and Agricultural Sciences in Fact Sheet FA-17, which is adopted by reference.

Verify that diesel fuel or motor oil is not applied to any pond on the fish farm.

Verify that, with the exception of bait, no feeds or fertilizers are applied within a fish farm's detention facility.

Verify that all production unit discharges are routed to a retention or detention facility and that there are no direct discharges of production unit water to surface waters of the state or to G-I or G-II aquifers through sink holes or wells

(NOTE: Fish farms constructed before 30 April 1992 may be exempt from this requirement.)

Page 595: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-42 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that, except for storm-induced discharges, no chemically treated production unit waters are discharged to a detention facility within the holding time required on the product label or prior to chemical deactivation as required on the product label.

Verify that the timing of production unit discharges is planned to maintain the required residence time in the detention facility.

Verify that all detention facilities are adequately maintained to provide required storage capacity.

(NOTE: Fish farms constructed before 30 April 1992 may be exempt from this requirement.)

Verify that discharges from fish farms do not cause or contribute to new violations of water quality standards or to continuation of existing violations.

Verify that dead fish collected from the production units, ditches, detention facilities, or retention facilities are disposed of in a landfill permitted by the Department, used as fish or livestock feed, composted, or buried onsite and immediately covered with sufficient dirt to control odor and vector problems such as flies.

Verify that fish farms do not allow the escape of nonnative fish or their eggs into waters of the state.

WA.95.6.FL. Marine bivalve facilities must meet general permit requirements (FAC 62-660.821(1), (3), (4), and (8)).

(NOTE: Marine bivalve facility construction and operation are permitted by rule provided the general permit requirements are met. General permit by rule requirements are not valid for the following types of facilities and these facilities must have a permit to construct or operate an industrial wastewater treatment facility:

- facilities growing or holding nonnative species of marine bivalves - facilities that, within a contiguous tract of land owned or leased by one

person or corporation, discharge more than 1 million gpd - facilities that add supplemental algal cultures to the nonhatchery component

of the facility and discharge to surface waters of the state. Nonpumping marine bivalve facilities located in waters of the state on a shellfish

or aquaculture lease authorized by the Department and facilities that do not discharge to waters of the state are exempt from industrial wastewater permitting requirements if the facility does not cause or contribute to violations of water quality standards.)

Verify that only chemicals registered or allowed by the USEPA, USFDA, or the Florida Department of Agriculture and Consumer Services for aquatic uses are applied to the pond water and that application rates are as specified on the product

Page 596: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-43 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

label.

Verify that fertilizer application is limited to the batch algae culture tanks in hatchery facilities.

Verify that, if chlorine is used to sanitize culture containers or to treat water used to grow larvae, any rinsate from the containers is collected and either dechlorinated prior to discharge to waters of the state or disposed of in a sanitary sewer system or septic tank.

Verify that at least one of the following practices are done when cleaning and rinsing culture containers:

- waters discharged during cleaning and rinsing operations are passed through a filter, screen, hydroclone, or centrifuge

- a wet vacuum or scoop is used to remove settled solids directly from the culture container

- waters discharged during cleaning and rinsing operations are routed through an in-line sand filter, an inline settling basin, or an off-line settling tank

- flow to settling facilities is shut off during sediment removal and hydraulic methods are not used to wash accumulated sediments from the settling facility.

Verify that there are no direct discharges of water to G-I, G-II, or G-III aquifers through sink holes or wells.

Verify that no chemically treated waters are discharged before the holding time required on the product label.

Verify that only native algae species are cultured as feed for the marine bivalves held or grown within hatchery facilities and that algal culture production is limited to 500 gpd.

Verify that discharges from the marine bivalve facility do not cause or contribute to violations of water quality standards.

Verify that any dead bivalves collected from the facility are disposed of in a Department-permitted sanitary landfill, composted, or buried onsite and covered with sufficient dirt to control odor and vector problems such as flies.

WA.95.7.FL. Fish farms and marine bivalve facilities must meet recordkeeping require-ments ((FAC 660.820(8)(d)

Verify that fish farms and marine bivalve facilities maintain detailed records for at least 5 yr of all usage of registered chemicals, including the application rate, date of application, chemical used, and pond identification number.

Page 597: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-44 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

and 821.(8)(a)).

WA.95.8.FL. Fish farms and marine bivalve facilities must meet sludge management requirements (62-660.820(8)(l) and 821(8)(h)).

Verify that any sludge collected from fish farms and marine bivalve facilities is disposed of in a sanitary landfill permitted by the Department, used as a soil amendment, or disposed of onsite via land application (see WA.105.3.FL. for land application requirements).

WA.95.9.FL. Concentrated animal feeding operations must meet permitting requirements (FAC 62-670.400(1) and (4)).

Verify that, if required by the Department, concentrated animal feeding operations have a permit.

Verify that the terms and conditions of the permit have been met.

WA.95.10.FL. Dairy farms in the Lake Okeechobee drainage basin must meet operation requirements (FAC 62-670.500(3) and .510(1) through (3)).

Verify that dairy farm wastewater discharge and runoff to waters of the state do not cause or contribute to a violation of water quality standards.

Verify that dairy cattle, including dry cows and heifers, are fenced away from all water courses, or drainage ditches with a drainage area of 100 acres or more, which will transport storm runoff to surface waters.

Verify that new and replacement fences are located no closer than 25 ft from the top of the side slopes of the drainage or from the stream bank of natural watercourses.

(NOTE: The area between the fence and the watercourses or drainage ditches may be used for forage crop production and must be managed so as to attenuate the nutrient loads carried to surface waters.)

Verify that the high intensity use area is managed so as to encourage congregation of the milk herd in the area and that permanent structures and watering/feeding facilities are located in contiguous high intensity use areas, whenever practicable, to promote maximum waste/runoff collection.

Verify that wastes and flushings from milking barns and runoff from high intensity use areas are centrally collected for storage and disposal by land application, or treated prior to discharge.

Verify that storage facilities are cleaned periodically to remove accumulated sludge, debris, or other solids and that the bottom of the storage facilities is sealed,

Page 598: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-45 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

when necessary, to prevent leakage of the contents to surrounding groundwater.

(NOTE: See WA.105.4.FL. for land application requirements.)

WA.95.11.FL. Dairy farms in the Lake Okeechobee drainage basin originating after 3 June 1987 must meet minimum setback distance and permit requirements (FAC 62-670.520(1) and .540(2)).

Verify that dairy farms originating after 3 June 1987 maintain the following minimum setback distances between storage and treatment facilities, or high intensity areas and the following:

- drinking water supply wells, 300 ft - natural watercourses, 200 ft - drainage ditches, 100 ft.

Verify that dairy farms originating after 3 June 1987 submit an application to the Department for a construction permit together with a management plan.

WA.95.12.FL. Major egg production facilities discharging process wastewater and runoff to groundwater must meet permitting, operation, and monitoring requirements (FAC 62-670.600(1)(a), (2)(a), (d), (4)(a)(1), (4)(a)(3), (4)(b), and (5)).

(NOTE: Discharge of process wastewater and runoff from any major egg production facility to surface waters is prohibited except in the event of a 25-yr, 24-h storm event. The following requirements to not apply to major egg production facilities with dry manure systems that combine egg wash wastewater with the dry manure and dispose of it in accordance with an approved Soil and Water Conservation District Board Plan. Facilities without a Plan must have a permit.)

Verify that major egg production facilities which generate wastewater have treatment, containment, and disposal facilities permitted by the Department prior to their construction or operation.

(NOTE: Facilities not defined as major egg production facilities are exempt from permitting, provided all process wastewater and runoff from a 25-yr, 24-h storm event is contained, unless it is reasonable to expect that facilities will cause or contribute to water quality violations.)

(NOTE: See WA.105.5.FL. for land application requirements.)

Verify that egg wash water combined with chicken manure in a liquid manure system is routed to regularly maintained settling basins prior to disposal via ponds or lagoons and that the ponds/lagoons can contain process water and runoff from a 25-yr, 24-h storm event.

Verify that ponds lined sufficiently to prevent groundwater pollution are used for onsite treatment or storage when a G-I or G-II aquifer may be subject to contamination.

Page 599: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-46 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that major egg production facilities perform the groundwater monitoring specified in Appendix 12-3 and submit groundwater monitoring plans.

WA.95.13.FL. Groundwater recharge and indirect potable reuse systems must meet discharge requirements (FAC 62-610.550, .554, .555, and .563) [Revised June 2000].

(NOTE: A groundwater recharge type of reuse system involves the planned use of reclaimed water to augment Class F-I, G-I, or G-II groundwaters. Types of groundwater recharge systems include:

- injection of reclaimed water into Class F-I, G-I, or G- II groundwaters - rapid-rate land application systems - use of reclaimed water to create barriers to the landward or upward migration

of salt water within Class F-I, G-I, or G-II groundwaters - discharge to surface waters which are directly connected to Class F-I, G-I, or

G-II ground waters.)

(NOTE: Rapid-rate land application or injection facilities may be used for salinity barrier control. The designated use of G-I, F-I, and G-II groundwaters is as potable water. As a result, it is likely that there may be elements of indirect potable reuse associated with existing and proposed ground water recharge projects. An indirect potable reuse system involves the planned use of reclaimed water to augment surface water resources which are used or will be used for public water supplies. Indirect potable reuse systems include discharges to Class I surface waters and discharges to other surface waters which are directly or indirectly connected to Class I surface waters.)

(NOTE: Discharge to Class I waters is allowed. Discharges of reclaimed water to Class I waters shall be considered as being reused for indirect potable purposes.)

Verify that discharges of reclaimed water or effluent to waters contiguous to or tributary to Class I waters, discharges upstream of Class I waters, and reclaimed water meets the following principal treatment and disinfection requirements:

- secondary treatment standards and high-level disinfection - no more than 5.0 mg/L of total suspended solids before application of the

disinfectant - filtration for total suspended solids control - total nitrogen limited to 10 mg/L as nitrogen as a maximum annual average

limitation - TOC (total organic carbon) does not exceed 3.0 mg/L as the monthly

average, with no single sample exceeding 5..0 mg/L. Verify that the reclaimed water meets the primary and secondary drinking water standards.

(NOTE: The parameters listed as primary drinking water standards will be applied as maximum single sample permit limits. The primary drinking water standard for asbestos do not apply. The primary drinking water standards for bacteriological

Page 600: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-47 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

parameters will be applied as the disinfection standard, except that public notification requirements do not apply. The primary drinking water standard for sodium will be applied as a maximum annual average permit limitation. Except for pH, the parameters listed as secondary drinking water standards will be applied as maximum annual average permit limits. All pH observations in the reclaimed water shall fall within the pH range established in the secondary drinking water standards.)

(NOTE: The fecal coliform limitations associated with high-level disinfection will not apply.)

Verify that discharges to surface waters meet reclaimed water or effluent limits.

Verify that there are no mixing zones.

Verify that the reclaimed water is sampled and analyzed for TOC.

Verify that reclaimed water and treatment facilities shall meet the treatment, disinfection, and other requirements for rapid-rate land application systems for discharges to waters contiguous to or tributary to Class I waters.

(NOTE: Surface water discharges located greater than 24 hr travel time to Class I waters are not considered as indirect potable reuse. Discharges located greater than 24 hr travel time to Class I waters are not subject to regulation under this section.)

WA.95.14.FL. Groundwater recharge and indirect potable reuse systems must meet staffing requirements (FAC 62-610.567) [Revised June 2000].

Verify that a minimum of Class I reliability is provided at all domestic wastewater treatment facilities providing reclaimed water for groundwater recharge and indirect potable reuse systems.

(NOTE: Class I reliability is not required if a permitted alternate treatment or discharge system exists which has sufficient capacity to handle any reclaimed water flows which do not meet the performance criteria established for the reuse system. However, covered facilities for which full treatment and disinfection are required are not allowed this variance.)

Verify that domestic wastewater treatment facilities which are not required to provide full treatment and disinfection are staffed by a Class C or higher operator 24 hr/day, 7 days/week, with the lead/chief operator at minimum Class B or higher.

(NOTE: The minimum staffing requirement at the wastewater treatment facility will be reduced to staffing by a Class C or higher operator 6 hr/day, 7 days/week, unless other regulations require additional operator presence or a higher level of operator. The lead/chief operator will be at minimum Class C. This minimum

Page 601: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-48 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

staffing requirement will be allowed only in conjunction with at least one of the following:

- diversion of acceptable quality reclaimed water to the reuse system only during periods of operator presence

- other provisions for increased reliability.) Verify that domestic wastewater treatment facilities which are required to provide full treatment and disinfection are staffed by a Class C or higher operator 24 hr/day, 7 days/week, with the lead/chief operator at minimum Class A.

(NOTE: No reductions in this operator staffing requirement are allowed.)

WA.95.15.FL. Groundwater recharge and indirect potable reuse systems must meet monitoring requirements (FAC 62-610.568).

Verify that reclaimed water limitations are met before injection to groundwater or discharge to surface waters.

Verify that, for projects requiring high-level disinfection, the total suspended solids limitation is achieved before disinfection, regardless of the actual reclaimed water compliance monitoring location.

Verify that the treatment facility includes continuous online monitoring for turbidity before application of the disinfectant and that continuous monitoring for chlorine residual or for residual concentrations of other disinfectants, if used, is provided at the compliance monitoring point.

Verify that instruments for continuous online monitoring are routinely calibrated and maintained.

Verify that groundwater is monitored as specified for slow-rate land application systems with restricted public access and that an approved groundwater monitoring plan is followed.

(NOTE: Sampling in the receiving surface waters is not required.)

WA.95.16.FL. Groundwater recharge and indirect potable reuse systems must meet access control and setback distance requirements (FAC 62-610.571 and .574) [Revised June 2000].

Verify that the access control requirements for rapid-rate land application systems are met.

Verify that outfalls for surface water discharges are not located within 500 ft of existing or approved, but no yet constructed, potable water intakes within Class I surface waters.

Verify that where zones of discharge are allowed, the zone of discharge does not extend closer than 500 ft to a potable water supply well.

Page 602: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-49 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that there is a 1000-ft setback distance from the injection well to potable water supply wells for injection wells used for salinity barrier control.

(NOTE: Unless specifically stated otherwise, all setback distances are measured horizontally.)

WA.95.17.FL. Stormwater dischargers must meet operation requirements (FAC 62-25.025(1), (4), (6), (8), and (9)).

Verify that discharges of stormwater do not cause or contribute to a violation of water quality standards in waters of the state.

Verify that detention basins provide the capacity for the specified treatment volume of stormwater within 72 h following a storm event and that retention basins provide the capacity for the given volume of stormwater within 72 h following the storm event.

Verify that the additional storage volume is provided by a decrease of stored water caused only by percolation through soil, evaporation, or evapotranspiration.

Verify that permanently wet retention and detention basins are either fenced or other wise restrict public access or contain side slopes that are no steeper than 4:1 (horizontal: vertical) out to a depth of 2 ft below the control elevation.

Verify that all side slopes are stabilized by either vegetation or other materials to minimize erosion and subsequent sedimentation of the basins.

Verify that dischargers of stormwater which receive stormwater from areas which are a potential source of oil and grease contamination in concentrations exceeding applicable water quality standards include a baffle, skimmer, grease trap, or other mechanism suitable for preventing oil and grease from leaving the stormwater discharge facility in concentrations that would cause or contribute to violations of applicable water quality standards in the receiving waters.

Verify that stormwater dischargers which directly discharge to Outstanding Florida Waters include an additional level of treatment equal to 50 percent of the treatment criteria required.

Page 603: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-50 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WA.100. INDIVIDUAL SEWAGE SYSTEMS

Septic Tanks

WA.100.1.FL. Septic tank contractors must meet registration requirements (FAC 64E-6.019) [Revised July 1998].

Verify that septic tank contractors (pumping and septage disposal service) are registered by the Department.

Verify that corporations, partnerships, or associations which offer septic tank contracting services have a certificate from the Department.

(NOTE: Companies which only provide portable toilet or temporary holding tank services are not required to be registered under these regulations.)

Other: Onsite Sewage Treatment and Disposal Systems

(NOTE: Approved alternative systems (performance-based systems) may be utilized in circumstances where standard subsurface systems are not suitable or where alternative systems are more feasible. Unless otherwise noted, all rules pertaining to siting, construction, and maintenance of standard subsurface systems apply to alternative systems.)

WA.100.2.FL. Onsite sewage treatment and disposal systems must meet permitting and inspection requirements (FAC 64E-6.003(1), (2), and (5), 64E-6.027(1), (4), (5), and 64E-6.015(1)) [Revised July 1998]

Verify that onsite sewage treatment and disposal systems and performance-based treatment systems have obtained an Onsite Sewage Treatment and Disposal System Construction Permit prior to any construction, alteration, modification, repair, replacement, or installation.

Verify that property owners who personally perform construction, maintenance, or repairs to a system serving their own owner-occupied, single-family residence have a construction permit.

Verify that onsite sewage treatment and disposal systems are inspected by the Department of Health and have a Construction Approval notice prior to being covered with earth and placed into service.

Verify that repaired systems are inspected by the Department of Health or a master septic tank and a final approval is obtained from the Department prior to final

Page 604: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-51 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

covering of the system.

Verify that an operating permit is obtained by any business occupying a building served by an onsite sewage treatment and disposal system, if the building is located in an area zoned or used for industrial or manufacturing purposes or its equivalent, and meets one of the following conditions:

- where a business will generate commercial sewage waste - where an aerobic treatment unit is used.

Verify that property owners, or their authorized agent's have an annual operating

permit.

Verify that property owners using aerobic treatment systems installed on or after 1 July 1991 have an annual operating permit.

Verify that all repairs made to a failing onsite sewage treatment and disposal system are made only with prior knowledge and approval from the Department of Health county public health unit having jurisdiction over the system.

WA.100.3.FL. Onsite sewage treatment and disposal systems must meet installation and location requirements (FAC64E-6.005(1) and (7)) [Revised July 1998].

Verify that onsite sewage treatment and disposal systems are located and installed so that with proper maintenance the systems function in a sanitary manner, do not create sanitary nuisances or health hazards, and do not endanger the safety of any domestic water supply, groundwater, or surface water.

Verify that sewage waste and effluent from onsite sewage treatment and disposal systems is not discharged onto the ground surface or directly or indirectly discharged into ditches, drainage structures, groundwaters, surface waters, or aquifers.

Verify that onsite sewage treatment and disposal systems are installed where a sewerage system is not available.

(NOTE: Onsite graywater tank and drain field systems may, at the homeowners' discretion, be utilized provided blackwater is disposed into a sanitary sewerage system, when available. Graywater systems may, at the homeowners' discretion, be utilized in conjunction with an onsite blackwater system when a sewerage system is not available for blackwater disposal.)

Verify that the location requirements specified in Appendix 12-4 are met.

WA.100.4.FL. Onsite sewage treatment and disposal

Verify that persons servicing a septic tank, grease interceptor, privy, portable toilet, holding tank, or other receptacle associated with an onsite sewage treatment

Page 605: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-52 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

systems must meet permit and septage disposal requirements (FAC 64E-6.0100(1), (3) through (7)) [Citation Revised July 1998].

and disposal system has an up to date permit.

Verify that the permit number, the name of the company, its phone number, and the gallon capacity of the truck are prominently and permanently displayed on the service truck in contrasting colors with 3 in. or larger letters.

(NOTE: Use of removable magnetic signs is not considered permanent display of vehicle identification information.)

Verify that, after septage is removed from an onsite waste disposal system, the original lid of the tank is put back in place, or is replaced with a new lid if the original lid is broken and that the tank lid is completely sealed and secured and the ground backfilled and compacted so that the site is left in a nuisance-free condition.

Verify that untreated food establishment sludges, portable toilet waste, holding tank waste, and septage are transported to an approved treatment facility in a manner so that there is no leakage, spillage, or the creation of a sanitary nuisance.

Verify that treated septage and sludges are transported to the disposal site in a manner so that there is no leakage, spillage, or the creation of a sanitary nuisance.

Verify that the food establishment sludge and contents from onsite waste disposal systems is disposed of at an approved site and by an approved disposal method.

(NOTE: Untreated domestic septage or food establishment sludges must not be applied to the land. Portable toilet wastes and the contents from holding tanks are not considered to be septage.)

WA.100.5.FL. Onsite sewage treatment and disposal systems must meet system abandonment requirements (FAC64E-6.011(1) and (2)) [Revised July 1998].

Verify that, whenever the use of an onsite sewage treatment and disposal system is discontinued following connection to a sanitary sewer, following condemnation, demolition, removal, or destruction of a building, property, or discontinuing the use of a septic tank and replacement with another septic tank, the system is abandoned within 90 days.

(NOTE: However, if the Department of Environmental Protection or its designee approves the use of the retention tank when the tank is to become an integral part of a sanitary sewer system or stormwater management system, the septic tank need not be abandoned.)

Verify that the property owner or agent has a permit from the Department to abandon the existing onsite sewage system and conducts the following closure procedures:

Page 606: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-53 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- the tank is pumped out - the bottom of the tank is opened or the entire tank is collapsed - the tank is filled with clean sand or other suitable material and completely

covered with soil.

WA.100.6.FL. Aerobic onsite sewage treatment and disposal systems must meet specific construction, operation, and maintenance requirements (FAC 64E-6.012(2)(a) through (d), (f), (g), (l), (4) through (5)) [Revised July 1998].

Verify that aerobic treatment units are used for treating 1500 gpd or less domestic and commercial sewage waste meet the following requirements:

- an appropriate mechanism is provided to make access ports vandal, tamper, and child resistant

- there is a minimum of a 4 in. diameter sampling access port located between the tank outlet and the drainfield

- a visual and audio warning device is installed in a conspicuous location so that activation of the warning device will alert property occupants of aerobic unit malfunction or failure

- all warning devices are wired separately from the aerobic unit so that disconnecting the aerobic unit from electricity will activate the warning device

- if installed outside, the alarm is waterproof - each unit is designed or equipped so that, regardless of unusual patterns or

frequencies of sewage flow into the system, effluent discharged to the drainfield will be in compliance with Class I effluent quality standards.

Verify that there is no bypass capability designed into the system which will allow

waste to be discharged to the drainfield without undergoing all the treatment processes necessary to achieve the desired effluent quality.

(NOTE: Bypassing, removing, or excluding any component or components of a system after the system has received final installation approval is prohibited.)

Verify that effluent from an aerobic treatment unit is disposed of on the owner's property and that effluent quality which is found to not meet Class I standards is reported to the maintenance entity for correction within 10 working days.

Verify that a copy of the signed maintenance agreement between the property owner or property lessee and an approved maintenance entity is provided to the Department of Health county public health unit by the maintenance entity.

Verify that aerobic treatment units are serviced or repaired by permitted persons or entities engaged in an aerobic treatment unit maintenance service.

Verify that emergency service necessary to prevent or eliminate an imminent sanitary nuisance condition caused by failure of a mechanical component of any aerobic treatment unit is reported by the approved aerobic unit maintenance entity, in writing, to the Department of Health county public health unit no later than 5

Page 607: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-54 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

working days after the date of the emergency service.

Verify that anaerobic treatment units used for treating domestic sewage flows in excess of 1500 gal per day, but not exceeding 10,000 gal per day are certified by a Florida state registered engineer and meets the following additional requirements:

- the owner or lessee has a system maintenance agreement with a permitted aerobic unit maintenance entity with a minimum of a Class D state certified operator

- semi-annual samples for CBOD(5), suspended solids and fecal coliform are collected and analyzed by an approved laboratory

- written sample analysis reports are submitted to the Department of Health county health department by the 15th of the month following sampling

- the county health department is notified within 24 hr if the sampling analysis for CBOD(5) or suspended solids exceed secondary treatment standards by more than 100 percent.

WA.100.7.FL. Onsite sewage treatment and disposal system contractors must meet registration requirements and practice standards (FAC 64E-6.019(1) and 6.003(1)) [Cite Revised July 1998].

Verify that contractors are registered with the Department.

Verify that contractors have a permit prior to constructing, altering, modifying, repairing, or installing an onsite sewage treatment and disposal system.

Verify that contractors maintain service records.

Page 608: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-55 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

LAND APPLICATION OF SLUDGE

WA.105. GENERAL

Miscellaneous

WA.105.1.FL. Treatment and disposal systems for wash water from the packaging of fresh market tomatoes, with a wash tank discharging between 5000 and 50,000 gpd, permitted by rule must meet land application requirements (FAC 62-660.805(3)(b), (5)(a), and (5)(c) through (7)).

(NOTE: Runoff from the land application site to surface waters is prohibited from all storm events up to and including a 10-yr, 1-h storm event.)

Verify that the hydraulic loading rate of the land application site is no more than 0.66 in./day and that the hydraulic loading rate does not cause toxicity to the cover crop.

Verify that a minimum setback distance of 10 ft is maintained between the wetted perimeter and the permittee's property boundary.

Verify that the wetted perimeter is not located within 100 ft of shallow water supply wells or Class I surface waters.

Verify that land application sites are graded and bermed as necessary to prevent runoff of stormwater resulting from all storm events up to and including a 10-yr, 1-h storm event.

Verify that a minimum of 10 spray nozzles are used per wetted acre of land and that spray nozzles promote volatilization of the wash water and minimize spray drift off the land application site.

Verify that the following land application site operation and maintenance requirements are met:

- a cover crop of grass is maintained and mowed regularly during the operating season to prevent matting of the grass

- ponding of the spray wash water is prevented - routine maintenance is performed to ensure optimal operation of spray heads,

rinsers, or other distribution equipment.

Verify that the records of the following are maintained for 5 yr:

Page 609: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-56 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- the number of days and the dates of operation of the land application site each year

- the volume of wash water disposed of each day - the amount of tomatoes (in boxes, pounds, or tons) processed each week.

WA.105.2.FL. Fish farms permitted by rule must meet land application of sludge requirements (FAC 62-660.820(8)(l)(1) through (5)).

Verify that the following land application requirements are met for sludge collected from fish farm production units, ditches, detention facilities, or retention facilities:

- sludge is not applied to land growing rootcrops, leafy vegetables, tobacco, and vegetables to be eaten raw

- no more than 4 dry tons of sludge are applied per acre per year - the sludge land application area is located no closer than 3000 ft from any

Class I water body or 200 ft from any other natural body of water, unless a physical barrier is provided that prevents runoff from the area from reaching the surface water of concern within the distance requirements.

- sludge land application is not conducted during rain storms or during periods in which surface soils of the application area are saturated

- sludge is not applied within 200 ft of solution cavities, fractures, sink holes, drainage wells, or drinking water supply wells.

WA.105.3.FL. Marine bivalve facilities permitted by rule must meet land application of sludge requirements (FAC 62-660.821(8)(h)(1) through (4)).

Verify that the following land application requirements are met for sludge collected from culture containers or settling facilities and filtered materials from cleaning and rinsing operations:

- sludge is not applied to land growing rootcrops, leafy vegetables, tobacco, and vegetables to be eaten raw

- the land application area is located no closer than 3000 ft from any Class I water body or 200 ft from any other natural body of water, unless a physical barrier prevents runoff from the application area from reaching the surface water of concern within the distance requirements

- sludge land application is not conducted during rain storms or during periods in which surface soils of the application area are saturated

- sludge is not applied within 200 ft of solution cavities, fractures, sink holes, drainage wells, or drinking water supply wells.

WA.105.4.FL. Dairy farms in the Lake Okeechobee drainage basin must meet land application of waste requirements (FAC 62-

Verify that land application of all wastes (solids, sludge, runoff, and wastewater) is managed so as to maximize water quality benefits derived from plant uptake of nutrients.

Verify that nutrient content of all wastes is determined at least quarterly before

Page 610: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-57 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

670.510(4), .520(2), and .530).

spreading and that the wastewater and runoff are applied to meet nutrient requirements of the crops.

(NOTE: If the nutrient analyses show consistent results, the analysis frequency may be reduced. The degree of consistency required and the specific changes in the analysis frequency are specified in the permit.)

Verify that all sources of nutrients applied do not exceed the annual nutrient requirements of the grasses or crops in the area.

Verify that when wastes are land applied the water table is 18 in. or deeper below the normal ground surface.

Verify that irrigation with wastewater and runoff is managed so that no irrigation water is discharged to the surface waters of the state.

Verify that the frequency and rate of land application is managed so that there are no secondary environmental problems such as severe odors, insect and pest problems, and other nuisance conditions.

Verify that dairy farms which originated after 3 June 1987 maintain the following buffer zones between land application areas and the following:

- drinking water supply wells, 200 ft - natural watercourses, 50 ft - drainage ditches, 50 ft.

Verify that groundwater near the storage ponds and land application areas are

monitored for the following parameters on a quarterly basis:

- total nitrogen - nitrate nitrogen - total phosphorus - ortho phosphorus.

Verify that background water quality is monitored on wells up gradient of

groundwater flow to the storage ponds and land application sites.

(NOTE: Monitoring frequency may be reduced to semiannual if more than six consecutive samples show no increase in the concentration of that parameter.)

WA.105.5.FL. Major egg production facilities discharging process wastewater and runoff to

Verify that egg wash wastewater receives pretreatment prior to spray irrigation or other land disposal systems approved by the Department.

Verify that pretreatment systems are designed, operated, and monitored so that

Page 611: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-58 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

groundwater must meet land application requirements (FAC 62-670.600(3)(a) and (b)(2) through (b)(6)(a)).

aerobic conditions are maintained at the soil surface of the sprayfield and that long-term operation does not result in ponding or runoff of applied wastewater.

Verify that the following minimum pretreatment requirements are met:

- sedimentations using a settling tank or clarifier to reduce settleable solids and, if needed, scum removal using skimming devices to reduce floating solids prior to discharge to the sprayfield

- aeration adequate to maintain an aerobic condition within the pretreatment system

- neutralization or adjustment of treated effluent to a pH between 6.5 and 8.5 - additional treatment necessary to ensure that oils, detergents, solvents,

cleaners, or other substances are not present in the pretreated effluent in quantities or concentrations which interfere with the spray irrigation system.

Verify that hydraulic loading, application rates, and application methods are such

that odors are not generated beyond the property boundary of the facility and ponding or soil binding does not occur under normal operating conditions.

Verify that long-term sprayfield operation (land disposal) provides for crop harvesting as needed to maintain nutrient removal and to maximize performance.

Verify that routine maintenance of sprayheads, risers, or other distribution equipment is performed as needed to assure optimal operation.

(NOTE: Storage of pretreated wastes are not required if the sprayfield had adequate hydraulic capacity to accept waste during wet-weather periods. If runoff will occur during wet-weather periods, adequate storage is required.)

Verify that there is no spray irrigation in areas where the seasonal high groundwater level is 18 in. or less.

Verify that the following buffer zones are maintained between land application areas and the following:

- drinking water supply wells, 200 ft - natural watercourses, 50 ft - drainage ditches, 50 ft.

Domestic Septage or Other Onsite Wastewater Sludges

WA.105.6.FL. Land application requirements must be met for domestic septage

Verify that a permit is obtained prior to land application of domestic septage and sludges and that the septage and sludges have been properly treated by an approved septage-stabilization process, including lime stabilization.

Page 612: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-59 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

or other domestic onsite wastewater sludges (FAC 64E-6.010(7)(a) through (c), (g), (k), (n), and (p)) [Revised July 1998].

approved septage-stabilization process, including lime stabilization.

Verify that facilities approved for septage treatment do not receive and treat more than 20,000 gal of septage, or combined septage, grease interceptor, portable toilet, or other receptacle waste associated with an onsite sewage treatment and disposal system, on any one day and do not exceed a monthly average of 10,000 gal of septage or septage and combined domestic waste per day.

Verify that stabilized septage or food service sludge is not applied to land until the following conditions have been met:

- the site has been inspected and approved by Department personnel - an agricultural use plan has been completed for the proposed application site.

Verify that domestic septage or other domestic onsite wastewater sludges are not

land applied on playgrounds, parks, golf courses, lawns, hospital grounds, or other unrestricted public access areas where frequent human contact is likely to occur.

Verify that domestic septage or other domestic onsite wastewater sludge land application is limited to sod farms, pasture lands, forests, highway shoulders and medians, plant nursery use, land reclamation projects, and soils used for growing human food chain crops.

Verify that land application is conducted in a manner which will disperse the treated septage uniformly over the land application site.

Verify that pasture vegetation on which stabilized septage or sludge has been applied is not cut for hay or silage nor grazed for a period of 30 days from the last application.

Verify that no human food chain crops except hay, silage, or orchard crops are harvested from a land application area for a period of 60 days following the last application of septage or sludges.

Verify that domestic septage or sludge is not used for the growing or cultivation of tobacco, root crops, leafy vegetables, or vegetables to be eaten raw.

Verify that vegetables and fruits which come in contact with the ground surface are not grown on land used for septage application for a period of 18 mo after the last application of septage or sludge.

Verify that, when applied to unvegetated soils, stabilized domestic septage or sludge is incorporated into the soil within 48 h of application.

Verify that contractors or septage disposal services which dispose of domestic septage or sludges or engage in a septage disposal service are approved to provide

Page 613: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-60 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

contracted services.

Verify that domestic septage or sludge has received approved treatment, and approved disposal methods are used to land apply.

(NOTE: Lime stabilization in the tank of a septage hauling vehicle or in the tank of an onsite sewage treatment and disposal system is not an approved septage treatment method.)

Verify that domestic wastewater systems residuals are not mixed with septage for treatment and disposal at Department-approved sites.

Verify that septage or sludge is not applied during rain events of sufficient magnitude to cause runoff, or during periods in which surface soils of the land application area are saturated.

Verify that facilities are operated to prevent nuisance conditions and avoid site runoff.

Verify that land application of septage or sludge does not violate Florida water quality criteria for groundwater and surface water.

Verify that the maximum annual surface application rate of total nitrogen is 500 lb/acre during any 12-mo period.

WA.105.7.FL. Land application of domestic septage or other domestic onsite wastewater sludges must meet location requirements (FAC 64E-6.010(7)(i), (l), (m)) [Cite [Cite revised July 1998].

Verify that the land application area is not located closer than 3000 ft to any Class I water body or Outstanding Florida Water or 200 ft closer to any surface water, except canals or bodies of water used for irrigation purposes which are located completely within and not discharging from the site.

Verify that the land application area is not located closer than 500 ft to any shallow public water supply wells, nor closer than 300 ft to any private drinking water supply well.

Verify that the application area is no closer than 300 ft to any habitable building and is a minimum of 75 ft from property lines and drainage ditches.

Verify that land application area topographic grades do not exceed 8 percent.

Verify that the land application area and an area 200 ft wide adjacent to, and exterior of, the land application area boundary contains no subsurface fractures, solution cavities, sink holes excavation core holes, abandoned holes, or an other natural or manmade conduits which allow contamination of groundwater.

Page 614: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-61 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WA.105.8.FL. Land application requirements must be met for food establishment sludges (FAC 64E-6.010(7)(s) through (u)) [Cite revised July 1998].

(NOTE: Food establishment sludges may be discharged into permitted domestic wastewater treatment facilities. Application of food establishment sludge to the land is permitted if the sludge has been properly treated by lime stabilization, or by any other process which produces similar kills of microorganisms and has been approved by the State Health Office.)

Verify that unstabilized food establishment sludge is not mixed with stabilized septage prior to land application.

Verify that food establishment sludge is blended with septage and treated prior to land application and that the ratio of food establishment sludge to septage is no greater than 1:1.

Domestic Wastewater Treatment Facilities

WA.105.9.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treat-ment facilities must meet land application operation and maintenance requirements (FAC 62-610.320(1) through (5)(a), and (6)(a) through (c) and (f)) [Revised June 2000].

Verify that land application systems are operated and maintained to achieve applicable waste treatment requirements before final release of reclaimed water or effluent to the environment.

Verify that, where all land used as part of the treatment/reuse/disposal system is under the direct control of the permittee for the useful life of the facilities, an operator performs the duties for which he is certified.

Verify that the permittee maintains control over, and is responsible for, all activities inherent to all reuse and land application systems (e.g., crop removal) to ensure that the entire reuse or waste treatment system operates as approved by the Department.

Verify that, when the wastewater treatment plant permittee reuses reclaimed water or disposes of effluent using property owned by another party, a binding agreement between the involved parties exists to ensure that construction, operation, maintenance, and monitoring requirements are met.

(NOTE: Such binding agreements are required for all reuse or disposal sites not owned by the permittee.)

Verify that reuse and land application systems designed to use crops for the uptake of nutrients from applied reclaimed waters or effluents provide for removal of the crop at appropriate intervals, as described in the engineering report and as approved by the Department.

Page 615: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-62 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that for each report on groundwater quality the permittee verifies to the Department (based on groundwater elevations) the direction(s) of groundwater movement from the land application site.

Verify that reuse or land application system facilities are safe in terms of public health and safety at all times, including periods of inactivation or abandonment.

Verify that the Department is notified at least 60 days before inactivation or abandonment of a reuse or land application system and that the notification specifies what steps will be taken to safeguard public health and safety.

Verify that an operation and maintenance manual or an addition to the treatment plant operation and maintenance manual or stand-alone instructional booklet, as appropriate, is published for all reuse or land application systems.

Verify that an operating protocol is approved by the Department before the initial part, portion, or phase of the reuse system is placed into operation.

Verify that any revision to the operating protocol is reviewed and approved by the Department.

(NOTE: Operating protocols are required for the following types of projects: - reuse systems regulated under Part III of FAC 62-610 featuring reclaimed

water that has received high-level disinfection: reuse systems that involve the irrigation of areas that are intended to be accessible to the public, such as residential lawns, golf courses, cemeteries, parks, landscape areas, and highway medians, and private property that is not open to the public at large, but is intended for frequent use by many persons; reclaimed water may also be made available for fire protection, aesthetic purposes (such as decorative ponds or fountains), irrigation of edible crops, dust control on construction sites, or other reuse activities

- projects involving blending of concentrate with reclaimed water (for blending projects regulated under Part III of this chapter, two operating protocols are required (one governing compliance with high-level disinfection requirements and a second governing the blending operation)

- projects regulated under Part V of FAC 62-610: reuse systems that involve the planned use of reclaimed water to augment Class F-I, G-I, or G-II ground waters.)

WA.105.10.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater

Verify that a pretreatment program is developed and implemented for regulated reuse projects, if the wastewater facility receives discharges from significant industrial users.

(NOTE: Pretreatment program requirements apply only to public utilities.)

Page 616: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-63 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

treatment facilities must meet land application pretreatment requirements (FAC 62-610.330) [Revised June 2000].

(NOTE: A pretreatment program is not required for slow-rate (Part III) and rapid-rate (Part IV) reuse projects, if the wastewater facility has no significant industrial users and no significant industrial users are anticipated during the next 5-yr permit period.)

Verify that, within 60 days of learning of the intent of a significant industrial user to discharge to a permitted wastewater facility, the system notifies the Department of the proposed discharge.

Domestic Wastewater Treatment Facilities: Slow-Rate Land Application Systems with Public Access Restricted

(NOTE: Slow-rate land application systems involve the application of reclaimed water to a vegetated land surface with the applied reclaimed water being treated as it flows through the plant-soil matrix. A portion of the flow percolates to the ground water and some is used by the vegetation. offsite surface runoff of the applied reclaimed water is generally avoided. Surface application techniques include ridge-and-furrow and border strip flooding. Spray irrigation systems can use fixed risers or moving systems, such as center pivots. These systems generally involve the reuse of reclaimed water that has received secondary treatment and basic disinfection.)

WA.105.11.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with public access restricted slow-rate land application systems must meet waste treatment and disinfection requirements (FAC 62-610.400(2) through (4) and .410).

(NOTE: Public access must be restricted. Subsurface application systems may be used if they preclude saturated conditions at the ground surface. Reclaimed water may be applied to pastures and areas used to grow feed, fodder, fiber, or seed crops. Trees, including managed hardwood or softwood plantations, may be irrigated.)

Verify that, for all slow-rate systems involving irrigation of sod farms, forests, fodder crops, pasture land, or similar areas for which it is intended that public access is restricted, preapplication waste treatment results in reclaimed water meeting, at a minimum, secondary treatment and basic disinfection levels before the land application.

Verify that, in systems using subsurface application systems, reclaimed water does not contain more than 10 mg/L of TSS at all times, unless the application system has been designed to provide specific flexibility and reliability in operation and maintenance of the system.

WA.105.12.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from

Verify that appropriate advisory signs are posted around the site boundaries to designate the nature of the project area.

(NOTE: Fencing around the site boundary is not required, but storage ponds must be enclosed with a fence or otherwise designed with appropriate features to

Page 617: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-64 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

domestic wastewater treatment facilities with public access restricted slow-rate land application systems must meet access control and setback distance requirements (FAC 62-610.418, .421, and .425) [Revised June 2000].

discourage the entry of animals and unauthorized persons. Public access to the land application site may be allowed if a subsurface application system is used. Subsurface application systems may be used to irrigate residential properties.)

Verify that the setback distances in Appendix 12-5 are met.

Verify that, for a period of 15 days from the last application of reclaimed water, land application areas are not used for grazing cattle whose milk is intended for human consumption.

(NOTE: No waiting period is required if high-level disinfection is provided. There are no restrictions on the grazing of other cattle.)

WA.105.13.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with public access restricted slow-rate land application systems must meet application/distribution system and cross-connection control requirements (FAC 62-610.419) [Revised July 1997].

Verify that new reclaimed water application/distribution systems (and replacements of existing systems) meet the following requirements:

- drawdown of holding ponds is accomplished as soon as is appropriate - damage from the use of maintenance equipment or harvesting machinery does

not occur - clogging of the system with algae is prevented - exposed pipes are labeled - spray equipment is designed and located to minimize aerosol carry-over from

the application area (e.g., low pressure sprays) to areas beyond the setback distances

- there are no above ground hose bibbs (spigots or other hand-operated connections.

(NOTE: Subsurface application systems may be used if the reclaimed water is made available to the plant root zone.)

Verify that there are no cross-connections to potable water systems.

Verify that there are readily identifiable nonpotable notices, marking, or coding on application/distribution facilities and appurtenances.

Domestic Wastewater Treatment Facilities: Slow-Rate Land Application Systems for Public Access Areas, Residential Irrigation, and Edible Crops

(NOTE: This type of reuse system involves the irrigation of areas that are intended to be accessible to the public, such as residential lawns, golf courses, cemeteries, parks, landscape areas, and highway medians. Public access areas may include private property that is not open to the public at large, but is intended for frequent use by many persons. Reclaimed water may also be made available for fire protection, aesthetic purposes (such as decorative ponds or fountains), irrigation of edible crops, dust control on construction sites, or other reuse activities. These

Page 618: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-65 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

reuse systems feature reclaimed water that has received high-level disinfection.)

WA.105.14.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with slow-rate land application systems for public access, residential irrigation, and edible crops must meet waste treatment and disinfection requirements (FAC 62-610.460).

Verify that preapplication waste treatment results in a reclaimed water which meets, at a minimum, secondary treatment and high-level disinfection.

Verify that the reclaimed water does not contain more than 5.0 mg/L of suspended solids before the application of the disinfectant.

Verify that an operating protocol is developed and implemented.

Verify that filtration is provided for total suspended solids control.

Verify that chemical feed facilities for coagulant, coagulant aids, or polyelectrolytes are provided.

(NOTE: The chemical feed facilities may be idle if the total suspended solids limitation is being achieved without chemical addition.)

Verify that a pretreatment program is prepared and implemented.

WA.105.15.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with slow-rate land application systems for public access, residential irrigation, and edible crops must meet staffing requirements (FAC 62-610.462(2) and (3)).

Verify that the wastewater treatment facility is staffed by a Class C or higher operator 24 h/day, 7 days/wk and that the lead/chief operator is, at minimum, Class B or higher.

(NOTE: The minimum staffing requirement at the wastewater treatment facility may be reduced to staffing by a Class C or higher operator 6 h/day, 7 days/wk.)

WA.105.16.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with slow-

Verify that the public is notified of the use of reclaimed water by posting advisory signs designating the nature of the reuse project area where reuse is practiced, notes on scorecards, or by other methods.

(NOTE: Use of purple as a prominent color on advisory signs and written notices related to a reuse project is recommended, but is not required.)

Page 619: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-66 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

rate land application systems for public access, residential irrigation, and edible crops must meet access control and setback distance requirements (FAC 62-610.468 and .471) [Revised June 2000].

Verify that advisory signs include the following text in English and Spanish: “Do not drink,” together with the equivalent standard international symbol.

Verify that advisory signs are posted adjacent to lakes or ponds used to store reclaimed water that are not located at the domestic wastewater treatment facilities, and at decorative water features that use reclaimed water.

Verify that advisory signs at storage ponds or decorative water features include the following text in English and Spanish: “Do not drink” and “Do not swim,” together with the equivalent standard international symbols.

Verify that users of reclaimed water are informed about the origin, nature, and characteristics of reclaimed water, the manner in which reclaimed water can be safely used, and limitations on the use of reclaimed water.

Verify that notification is provided at the time of initial connection to the reclaimed water distribution system and annually after the reuse system is placed into operation.

Verify that the details of the public notification program are included in the engineering report and with each permit application, and that a description of ongoing public notification activities is included in the annual reuse report.

Verify that there is a setback distance of 75 ft from the edge of the wetted area of the public access land application area to potable water supply wells that are existing or have been approved by the Department or by the Department of Health (but not yet constructed).

(NOTE: This setback distance requirement does not apply to closed loop heating or air conditioning return wells. No setback distance is required to any nonpotable water supply well.)

Verify that a 75-ft setback distance is provided from a reclaimed water transmission facility to a public water supply well.

(NOTE: No setback distance is required to other potable water supply wells or to nonpotable water supply wells. Setback distances for potable water supply wells are applied only for new or expanded reuse facilities. Setback distances are not required for surface waters or developed areas.)

Verify that, within 100 ft from outdoor public eating, drinking, and bathing facilities, low trajectory nozzles, or other means to minimize aerosol formation, are used.

(NOTE: No setback distances are required for private swimming pools, hot tubs, spas, saunas, picnic tables, or barbecue pits or grills.)

Page 620: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-67 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that a setback distance of 100 ft is maintained from indoor aesthetic features (such as decorative pools or fountains) using reclaimed water to adjacent indoor public eating and drinking facilities where the aesthetic features and eating and drinking facilities are within the same room or building space.

Verify that a setback distance of 200 ft is provided from unlined storage ponds to potable water supply wells.

(NOTE: Unless specifically stated otherwise, all setback distances are measured horizontally.)

WA.105.17.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treat-ment facilities with slow-rate land application systems for public access, residential irrigation, and edible crops must meet application/ distribution system and cross-connection control require-ments (FAC 62-610.469) [Revised July 1997; Revised June 2000].

Verify that application of reclaimed water on public access facilities is controlled by agreement with the wastewater management entity or by local ordinance.

Verify that there are no above ground hose bibbs (spigots or other hand operated connections) and that hose bibbs are located in locked vaults, service boxes, or compartments which are clearly labeled as being of nonpotable quality and bearing the words “Do not drink” in English and Spanish, together with the equivalent standard international symbol.

(NOTE: Hose bibbs which can only be operated by a special tool may be placed in nonlockable vaults, service boxes, or compartments clearly labeled as nonpotable water. Vaults, service boxes, and compartments meeting the requirements of this rule may be located above or below grade.)

Verify that reclaimed water is not be used to fill swimming pools, hot tubs, or wading pools.

(NOTE: Reclaimed water may be used to irrigate landscaped areas with a tank truck only if the following requirements are met:

- the truck used to transport and distribute reclaimed water is not used to transport potable water that is used for drinking water

- the truck used to transport and distribute reclaimed water is not used to transport substandard waters or other fluids, unless the tank has been evacuated and properly cleaned prior to the addition of the reclaimed water.)

(NOTE: Existing water lines, sewers, and wastewater transmission lines may be

converted for use as reclaimed water transmission lines.)

Verify that there are no cross-connections to potable water systems.

Verify that reclaimed water does not enter a dwelling unit or a building containing a dwelling unit except as allowed by Reuse of Reclaimed Water and Land Application regulations concerning toilet flushing and fire protection and aesthetic

Page 621: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-68 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

purposes (62-610.476 and 62-610.479, FAC).

Verify that maximum obtainable separation of reclaimed water lines and domestic water lines shall be practiced.

Verify that a minimum horizontal separation of 3 ft (outside to outside) is maintained between reclaimed water lines and either potable water mains or sewage collection lines.

(NOTE: This separation distance requirement applies to transmission and distribution systems located in rights-of-ways. A similar separation distance is recommended, but are not required on properties where reclaimed water is being used.)

Verify that all reclaimed water valves and outlets are appropriately tagged or labeled (bearing the words “Do not drink” in English and Spanish, together with the standard international symbol) to warn the public and employees that the water is not intended for drinking and that all piping, pipelines, valves, and outlets are color coded, or otherwise marked, to differentiate reclaimed water from domestic or other water.

(NOTE: Underground piping that is not manufactured of metal or concrete, must be color coded for reclaimed water distribution systems using Pantone Purple 522C using light stable colorants. Underground metal and concrete pipe must be color coded or marked using purple as a predominant color. If tape is used to mark the pipe, the tape must be permanently affixed to the top and each side of the pipe (three locations parallel to the axis of the pipe). For pipes less than 24 in. in diameter, a single tape may be used along the top of the pipe. Visible, above-ground portions of the reclaimed water distribution system must be clearly color coded or marked. New systems and expansions of existing systems for which permit applications are submitted to the Department on or after 1 January 1996, must comply with this color coding standard. It is recommended, but is not required, that distribution and application facilities located on private properties, including residential properties, be color coded using Pantone Purple 522C.)

Verify that the return of reclaimed water to the reclaimed water distribution system after the reclaimed water has been delivered to a user does not occur.

Verify that inspections are conducted within the reclaimed water service area to verify proper connections, monitor proper use of reclaimed water, and minimize the potential for cross-connections when customers first connect to the reclaimed water distribution system and periodic inspections are conducted as specified in the cross-connection control and inspection program.

Page 622: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-69 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WA.105.18.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with slow-rate land application systems for public access, residential irrigation, and edible crops must meet edible crop irrigation requirements (FAC 62-610.475(1) through (5)).

Verify that only the following edible crops are irrigated:

- those which will be peeled, skinned, cooked, or thermally processed before consumption (direct contact of the reclaimed water with such edible crops is allowed)

- tobacco or citrus (direct contact of the reclaimed water with tobacco or citrus is allowed, including citrus used for fresh table fruit, processing into concentrate, or other purposes)

- those which will not be peeled, skinned, cooked, or thermally processed before consumption, if an indirect application method that will preclude direct contact with the reclaimed water (such as ridge and furrow irrigation, drip irrigation, or a subsurface distribution system) is used.

Verify that irrigation of those edible crops which will not be peeled, skinned, cooked, or thermally processed before consumption using an application method that allows for direct contact of the reclaimed water on the crop does not occur.

Verify that an inventory of commercial agricultural operations using reclaimed water to irrigate edible crops is maintained and that it is submitted to the Department at least 30 days before any agricultural operation which will use reclaimed water for irrigation of edible crops will be added to the reuse system.

Verify that the inventory of edible crop irrigation is submitted annually to the Department along with the annual report of reclaimed water utilization.

WA.105.19.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with slow-rate land application systems for public access, residential irrigation, and edible crops must meet toilet flushing and fire protection requirements (FAC 62-610.476).

(NOTE: Reclaimed water may be used for toilet flushing in commercial or industrial facilities or buildings.)

Verify that reclaimed water pipes are color coded.

Verify that reclaimed water is not used for toilet flushing in any residential property or dwelling unit where the residents have access to the plumbing system for repairs or modifications.

(NOTE: Reclaimed water may be used to provide water for fire protection. Reclaimed water may be supplied to fire hydrants.)

Verify that hydrants supplied with reclaimed water are color coded and have no connection to the potable water supply.

(NOTE: Reclaimed water may be used to provide water for fire protection in sprinkler systems located in commercial or industrial facilities or buildings. Reclaimed water may be used to provide water for fire protection in sprinkler systems located in motels, hotels, apartment buildings, and condominiums where the individual guests or residents do not have access to the plumbing system for

Page 623: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-70 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

repairs or modifications.)

Verify that sprinkler systems are color coded and supplied only by reclaimed water.

Verify that fire protection systems using reclaimed water are designed and operated in accordance with local fire protection codes, regulations, or ordinances.

Domestic Wastewater Treatment Facilities: Rapid-Rate Land Application Systems

(NOTE: These are rapid infiltration basins (RIBs) and absorption fields. RIBs involve reuse of reclaimed water by spreading in a system of basins, RIBs, or percolation ponds (cells) which may be underlain with subsurface drains. The percolation area are divided into two or more basins, RIBs, or cells (each of which need not have identical size and shape) to allow for alternate loading and resting. Absorption field method of land application involves reuse of domestic reclaimed water through discharge to absorption fields. This method involves high rates of application of reclaimed water and loading to subsurface absorption fields, and is distinguished from drip irrigation. Facilities are designed so that portions of the absorption field are isolated for alternate loading and resting without interrupting application of reclaimed water. The application/distribution system is designed with appropriate materials and dimensions compatible with the physical (particularly soil) conditions at the specific site.)

WA.105.20.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with rapid-rate land application systems must meet waste treatment and disinfection requirements (FAC 62-610.500).

Verify that, at a minimum, preapplication waste treatment results in a reclaimed water meeting secondary treatment and basic disinfection levels prior to spreading into the rapid infiltration basins or absorption field system.

Verify that the nitrate concentration in the applied reclaimed water does not exceed 12 mg/L (as nitrogen) unless reasonable assurance is provided that nitrate will not exceed 10 mg/L or background levels in the receiving ground water, whichever is less stringent.

Verify that, for absorption field systems, the reclaimed water contains no more than 10 mg/L total suspended solids prior to discharge to the application/distribution system, unless the absorption field and the application/distribution system have been designed to provide specific flexibility and reliability in operation and maintenance of the system.

WA.105.21.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed

Verify that appropriate advisory signs are posted around the site boundaries to designate the nature of the project area.

Page 624: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-71 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

water or effluent from domestic wastewater treatment facilities with rapid-rate land application systems must meet access control and setback distance requirements (FAC 62-610.521).

(NOTE: Fencing around the entire site boundary is not required.)

Verify that RIBs, percolation ponds, or trenches, and storage ponds are enclosed with a fence or otherwise designed with appropriate features to discourage the entry of animals and unauthorized persons.

(NOTE: Public access to absorption field sites is allowed.)

Verify that the setback distances in Appendix 12-6 are met.

Domestic Wastewater Treatment Facilities: Overland Flow Systems

(NOTE: This method of land application involves treatment of domestic wastewater to meet effluent limitations for discharge to surface waters. Wastewater is applied by sprinkling or flooding upper reaches of terraced, sloped, vegetated surfaces, such as sod farms, forests, fodder crops, pasture lands, and similar areas. A runoff conveyance system is provided at the ends of the sloped surfaces.)

WA.105.22.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with overland flow systems must meet waste treatment and disinfection requirements (FAC 62-610.610(2)).

Verify that preapplication treatment processes produce an effluent prior to discharge to holding ponds or to the application/distribution system containing not more than 40 to 60 mg/L of CBOD(5) and 40 to 60 mg/L of total suspended solids and which meets the low-level disinfection criteria of 2400 fecal coliforms/100 mL.

WA.105.23.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with overland flow systems must meet access control and setback distance requirements (FAC 62-610.618 and .621) [Revised June 2000.

Verify that the access control requirements in WA.105.12.FL. are met.

Verify that setback distances are maintained between the wetted site area subject to land application and surface waters and potable water supply wells to ensure compliance with water quality and drinking water standards and to protect the public health, safety, and welfare.

Verify that systems minimize adverse effects resulting from noise, lighting, aerosol drift, and odors.

Verify that an adequate site area is provided for operation and maintenance and for controlling emergency discharges.

Page 625: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-72 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that overland flow land application systems maintain a distance of 100 ft from the edge of the wetted area of the land application area to buildings that are not part of the treatment facilities, utilities system, or municipal operations, or to the site property line, and to potable water supply wells, which are not potable water wells, that are existing or have been approved by the Department or by the Department of Health (but not yet constructed).

Verify that a setback distance of 500 ft is provided from the edge of the wetted area to Class I surface waters, Class II surface waters, or to potable water wells that are existing or have been approved by the Department or by the Department of Health (but not yet constructed).

(NOTE: Setback distance requirements apply to all Class II waters, regardless of Department classification (such as open, closed, approved, conditionally approved, restricted, conditionally restricted, prohibited, or unclassified.)

Verify that a 100-ft setback distance is provided from a reclaimed water transmission facility to a public water supply well.

(NOTE: No setback distance is required to other potable water supply wells or to nonpotable water supply wells. Setback distances to potable water supply wells shall be applied only for new or expanded overland flow systems.)

(NOTE: Unless specifically stated otherwise, all setback distances are measured horizontally.)

Permits

WA.105.24.FL. Reuse and land application systems must meet permit requirements (FAC 62-610.800(1), (7)(a), .860(1), .880(2)(c), and 701.802).

Verify that reuse and land application systems have a permit prior to construction, modification, or operation.

Verify that slow-rate land applications systems for public access areas, residential irrigation, and edible crops have approval from the Department prior to placing the initial part, portion, or phase or a reuse system into operation.

Verify that a permit is obtained for limited wet weather discharges.

Verify that persons intending to land apply Grade II domestic wastewater treatment sludge apply for a general permit and, within 14 days of notice to the Department, publish in a newspaper of general circulation in the area affected a notice of the intended land application of Grade II sludge.

Verify that residuals management facilities are permitted to treat either residuals or

Page 626: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-73 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

combinations of residuals, domestic septage, food establishment sludges, wastes removed from portable toilets, and wastes removed from holding tanks associated with boats, marina pumpout, and other onsite systems.

Verify that the disposal or use of other solids (see definitions) is permitted.

WA.105.25.NJ. Applicators of water treatment plant residuals must meet permit requirements (FAC 62-640.300(1)) [Added July 1998; Revised May 1999].

(NOTE: See Appendix 12-8 for applicability and exemptions from FAC 62-640.)

Verify that residuals are applied to an application site only if the facility generating or treating the residuals has a valid Department permit that includes an approved Agricultural Use Plan for the site.

Residuals (NOTE: See Appendix 12-8 for applicability and exemptions from FAC 62-640.)

WA.105.26.FL. [Moved to WA.15.7.FL. July 1998].

WA.105.27.FL. Land application of residuals must meet general restrictions (FAC 62-640.400(1) through (4) and (6) through (9)) [Revised July 1998; Revised May 1999].

Verify that there is no ocean disposal of residuals, or disposal of residuals in any natural or artificial body of water, including direct discharge to ground water.

Verify that residuals that do not meet Class A stabilization requirements are not used on playgrounds, parks, golf courses, lawns, hospital grounds, or other unrestricted public access areas where frequent human contact with the soil is likely to occur and may not be sold or given away in a distribution and marketing program.

Verify that residuals which are hazardous waste are not applied to land.

Verify that residuals are not disposed of into a collection or transmission system without prior consent of the owner of that system.

Verify that the treatment, use or land application of residuals does not cause or contribute to a nuisance odor.

Verify that residuals are not used for the cultivation of tobacco or leafy vegetables, except for AA residuals.

Verify that the treatment of residuals or septage for the purpose of meeting

Page 627: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-74 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

pathogen reduction or vector attraction reduction requirements is not conducted in the tank of a hauling vehicle and only takes place at the permitted facility.

Verify that residuals that do not meet the requirements for Class AA designation are not shipped into Florida unless shipped to a Department permitted facility that has legally agreed in writing to accept responsibility for proper treatment, management, use and land application of the residuals.

WA.105.28.FL. Land application of domestic wastewater residuals must meet operating requirements (FAC 62-640.700(1), (2)(c) and (d), (3), (5), and (7)) [Revised July 1998; Revised May 1999].

Verify that residuals are applied to land only if concentrations of all parameters listed in Appendix 12-7, do not exceed ceiling concentrations in any sample, and the residuals meet the pathogen and vector attraction reduction requirements for the intended site use.

Verify that the total cumulative loading of each parameter identified in Column II of Appendix 12-7 which is applied to each application zone on an application site is determined and provided to the Department in the annual summary submitted on Department Form 62-640.210(2)(b).

Verify that the application of residuals to application zones which accept residuals that meet the ceiling concentration limits (Column I in Appendix 12-7), but do not meet the requirements of FAC 62-640.850(3)(a) (see Column III in Appendix 12-7) are restricted to the cumulative application limits in Column II of Appendix 12-7.

(NOTE: Application zones which only receive residuals that meet the parameter concentration limits in Column III of Appendix 12-7 are not subject to the cumulative application limits in Column II. Beginning with the first application of residuals that do not meet the parameter concentration limits in Column III, the zone is subject to the cumulative application limits Column II, and all applications of residuals, except Class AA, will be used to determine the cumulative loading of parameters applied to the zone.)

Verify that, if one or more zone(s) at an application site changes ownership or becomes part of a different application site, the cumulative loading determination for the affected zone(s) will account for the prior applications of residuals.

Verify that, if residuals that are subject to the cumulative loading limitations of Column II of Appendix 12-7 have been applied to an application zone, and the cumulative loading amount of one or more pollutants is not known, no further applications of residuals are made to that application zone.

Verify that the pH of the residuals soil mixture is 5.0 or greater at the time domestic wastewater residuals are applied.

Verify that residuals are not land applied during rains which cause runoff from the

Page 628: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-75 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

site or when surface soils are saturated.

Verify that residuals are applied with appropriate techniques and equipment to assure uniform application over the application zone.

Verify that the spraying of liquid domestic wastewater residuals is conducted so that the formation of aerosols is minimized.

Verify that topographic grades of the land application zone are 8 percent or less.

(NOTE: If site slopes exceed 2 percent in one or more application zones, a conservation plan will be provided with the Agricultural Use Plan which demonstrates that suitable soil infiltration rates and stormwater control measures exist at the site to retain runoff generated by a 10-year recurrence interval 1-hour duration storm event. Berms will be placed for this purpose if necessary.)

WA.105.29.FL. Land application of residuals must meet general site restriction requirements (FAC 62-640.700(2) and (4)) [Revised July 1998; Revised May 1999].

Verify that Florida water quality standards are not violated in waters as a result of land application of residuals.

Verify that residuals are stored in a manner that will not cause runoff or seepage from stored residuals, objectionable odors, or vector attraction.

Verify that storage areas are fenced or otherwise provided with appropriate features to discourage the entry of animals and unauthorized persons.

Verify that, at the time of land application, the stored residuals meet the general criteria of WA.105.27.FL. for parameter concentrations, pathogen and vector attraction reduction, and cumulative application.

Verify that residuals storage facilities at land application sites are used only for temporary storage of stabilized residuals for no more than 30 days during periods of inclement weather or to accommodate agricultural operations, unless a longer storage period is specified in the approved agricultural use plan for the site.

Verify that residuals application sites are posted with appropriate advisory signs identifying the nature of the project area.

Verify that domestic wastewater residuals land application areas are not located closer than 1000 ft to any Class I water body, Outstanding Florida Water, or Outstanding National Resource Water or 200 ft from any other surface water except canals or bodies of water used for irrigation that are located completely within the site and will not discharge from the site at any time.

Verify that the setback area is vegetated.

Page 629: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-76 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

(NOTE: The 200 ft setback distance requirement may be reduced to 100 ft if domestic wastewater residuals are injected into the soil, or a conservation plan is provided which demonstrates that stormwater runoff generated by storms up to a 10-yr, 1-h storm event will be prevented from entering or leaving the land application area. Berms must be placed for this purpose if necessary. Recovery time of the system should be specified in the plan with a maximum retention time of 72 h. Back slope protection as well as other safety features should be included.)

Verify that domestic wastewater residuals land application areas are not located closer than 300 ft from any shallow private water supply well or 500 ft from any shallow public water supply well.

Verify the land application area and an area 200 ft wide adjacent to the area contains no visible evidence of subsurface fractures, solution cavities, sink holes, excavation core holes, abandoned wells, or any other natural or manmade conduits that could allow direct contamination of groundwater.

Verify that Class B residuals are not applied within 300 ft of a building occupied by the general public (or 100 ft if the residuals are injected into the soil).

WA.105.30.FL. Land application of residuals must meet specific requirements for groundwater protection (FAC 62-640.700(6)) [Revised July 1998].

Verify that a minimum unsaturated soil depth of two feet above the water table level exists at the time residuals are applied to the soil.

Verify that a minimum of 200 ft setback is provided between land application areas and any visible evidence of natural or man-made conduits that could allow direct contamination of ground water

WA.105.31.FL. Land application of residuals to agricultural sites must meet agronomic rates for nitrogen requirements (FAC 62-640.750(2)) [Added July 1998].

Verify that the land application of residuals to agricultural sites is limited to agronomic rates based on the site vegetation as identified in the Agricultural Use Plan.

WA.105.32.FL. Land application of residuals to reclamation sites must meet specific requirements (FAC

Verify that residuals are applied to land reclamation sites only if they meet the pathogen and vector attraction reduction requirements (WA.110.2.FL.), site use restrictions (see ST.110.1.FL.), criteria for land application residuals (see WA.105.27.FL. through WA.105.29.FL.), and the requirements of this section are

Page 630: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-77 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

62-640.800) [Added May 1999].

met.

Verify that the maximum total application quantity is 50 dry tons/acre, with such one-time reclamation project to be accomplished within a one-year period on any acre of a land reclamation site.

(NOTE: When composted residuals or residuals blended with other soil amendment materials are used, only the residuals portion of the blended product counts toward the 50 dry tons/acre limitation.)

Verify that, except for Class A residuals, the applied material is incorporated into the soil within the same day as application.

Verify that seed or turf-forming grass is planted as soon as possible but in no case later than 3 months after the application of residuals.

Verify that Florida water quality standards are not violated as a result of land application of residuals.

Verify that slopes are 8 percent or less before and after application.

Verify that topographical grading is completed before application begins.

Verify that, in addition to the above requirements, land reclamation projects at mining reclamation sites are in compliance with any other applicable Department rules concerning mining reclamation.

Page 631: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-78 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

LAND APPLICATION OF SLUDGE

WA.110. VECTORS AND PATHOGENS

(NOTE: See Appendix 12-8 for applicability and exemptions from FAC 62-640.)

WA.110.1.FL. Land application of domestic wastewater residuals must meet specific site restriction requirements (FAC 62-640.600(3)) [Revised July 1998; Revised May 1999].

(NOTE: These requirements are the same as the Federal regulations see the US TEAM Guide (WA.100) for specifics. The following regulations are in addition to or different from the Federal regulations).

(NOTE: Class A residuals may be used on unrestricted public access areas such as playgrounds, parks, golf courses, lawns, and hospital grounds.)

Verify that the application site of Class B residuals meets the following requirements:

- the residuals are not used on unrestricted public access areas such as playgrounds, parks, golf courses, lawns, and hospital grounds

- use is limited to restricted public access areas such as agricultural sites, forests, and roadway shoulders and medians; the public is restricted from the application zone for 12 mo after the last application of residuals

- plant nursery use of Class B residuals is limited to plants which will not be sold to the public for 12 months after the last application of residuals

- use of Class B residuals on roadway shoulders and medians is limited to restricted public access roads

- food crops with harvested parts that touch the residuals/soil mixture and are totally above the land surface are not harvested for 14 months after the last application

- food crops with harvested parts below the surface of the land are not harvested for 20 months after application of Class B residuals when the residuals remain on the land surface for four months or longer before incorporation into the soil

- food crops with harvested parts below the surface of the land are not harvested for 38 months after application of Class B residuals when the residuals remain on the land surface for less than four months before incorporation into the soil

- food crops, feed crops, and fiber crops are not harvested for 30 days following the last application of Class B residuals

- animals are not grazed on the land for 30 days after application of Class B residuals

- sod which will be distributed or sold to the public or used on unrestricted

Page 632: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-79 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

public access areas is not harvested for 12 months after the last application of Class B residuals

Verify that a minimum setback distance of 300 ft (100 ft if the residuals are

injected into the soil) is provided between a land application area where Class B residuals are applied, and a building occupied by the general public.

WA.110.2.FL. Land application of residuals must meet vector attraction requirements (FAC 62-640.600(2) [Added July 1998; Revised May 1999].

(NOTE: The vector attraction reduction requirements for Classes A and B residuals are the same as the Federal 40 CFR 503.32(b), except for 503.33(b)(11) and (b)(12), see the US TEAM Guide (WA.110.2 through WA.110.4) for specifics)

(NOTE: Septage management facilities may satisfy vector attraction requirements by meeting the following requirements.)

Verify that septage management facilities regulated by the Department which do not treat any amount of residuals, at a minimum, satisfy vector attraction reduction requirements by the addition of lime in sufficient amounts to maintain pH levels at or above 11 until the septage is applied, but less than 12.5 at the time of application, and meets one of the following at the time of lime addition:

- a pH of 12 for a minimum of 2 hours - a pH of 12.5 for a minimum of 30 minutes.

Page 633: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-80 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

LAND APPLICATION OF SLUDGE

WA.120. MONITORING

WA.120.1.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with slow-rate land application systems for public access, residential irrigation, and edible crops must meet staffing requirements (FAC 62-610.412(1), (2)(a), and 62-610.463) [Revised June 2000].

Verify that waste treatment limitations are met after disinfection and before discharge to system storage ponds or to reuse systems.

Verify that an approved groundwater monitoring program is established.

Verify that reclaimed water limitations are met after disinfection and before discharge to holding ponds or reuse systems and that the total suspended solids limitation is achieved before disinfection, regardless of the actual reclaimed water compliance monitoring location.

Verify that the treatment facility includes continuous online monitoring for turbidity before application of the disinfectant and that continuous online monitoring of total chlorine residual or for residual concentrations of other disinfectants, if used, is provided at the compliance monitoring point.

Verify that instruments for continuous online monitoring of turbidity and disinfectant residuals are equipped with an automated data logging or recording device.

Verify that instruments for continuous on-line monitoring are maintained according to the manufacturers operation and maintenance instructions.

Verify that the facility has an approved operating protocol designed to ensure that the high level disinfection criteria will be met before the reclaimed water is released to the system storage or to the reclaimed water reuse system which is reviewed and updated.

Verify that reclaimed water produced at the treatment facility which fails to meet the criteria established in the operating protocol is not discharged into system storage or to the reuse system and that this substandard reclaimed water (reject water) is either stored for subsequent additional treatment or is discharged to another permitted reuse system requiring lower levels of preapplication treatment or to a permitted effluent disposal system.

Verify that a groundwater monitoring well is located adjacent to unlined storage ponds or lakes, unless the facility provides an affirmative demonstration that

Page 634: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-81 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

reclaimed water stored in the pond will not percolate to ground water.

Verify that treatment plants having capacities of 1.0 mgd or larger sample the reclaimed water for Cryptosporidium and Giardia as follows:

- sampling is conducted at one time during each 2-yr period, and intervals between sampling are not greater than 2 yr

- samples are taken at a point immediately following the disinfection process. Verify that treatment plants having capacities less than 1.0 mgd sample the reclaimed water for Cryptosporidium and Giardia as follows:

- sampling is conducted at one time during each 5-yr period, and intervals between sampling are not greater than 5 yr

- samples are taken at a point immediately following the disinfection process.

WA.120.2.FL. [Deleted June 2000].

(NOTE: Regulation repealed.)

WA.120.3.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with overland flow systems must meet monitoring requirements (FAC 62-610.613(1) and (2)).

Verify that preapplication waste treatment limitations are met after disinfection and before discharge to holding ponds or to the overland flow system.

Verify that final effluent monitoring is accomplished after the overland flow system and any additional treatment or disinfection and before release to the environment.

WA.120.4.FL. Land application of residuals must meet monitoring requirements (FAC 62-640.650(1)(a), (c) through (e) and (g) through (h)) [Revised July 1998].

(NOTE: See Appendix 12-8 for applicability and exemptions from FAC 62-640.)

Verify that the monitoring for pathogen and vector attraction reduction and parameters complies with permit requirements.

Verify that residuals that are distributed and marketed are monitored on a monthly basis.

Verify that monitoring for residuals other than monitoring for pathogen, vector attraction reduction, parameters, and monitoring of residuals for distribution and marketing meet the following monitoring frequencies:

Page 635: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-82 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- facilities which generate less than 320 dry tons per year monitor once per year

- facilities which generate 320 dry tons but less than 1,653 dry tons per year monitor once per quarter

- facilities which generate 1,653 but less than 16,535 dry tons per year monitor once per 60 days

- facilities which generate 16,535 dry tons or more per year monitor once per month.

Verify that all residuals sampled are representative of the residuals used, land

applied, or distributed and marketed, and are taken after final treatment of the residuals but before use or distribution and marketing.

Verify that grab samples are used for pathogens and determinations of percent volatile solids.

Verify that composite samples are used for metals.

Verify that any soil testing of a residuals land application site is performed as specified in the approved Agricultural Use Plan for the site tested.

Verify that all laboratory tests are performed by a laboratory certified by the Department of Health.

Page 636: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-83 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

LAND APPLICATION OF SLUDGE

WA.125. RECORDKEEPING AND REPORTING

WA.125.1.FL. Recordkeeping and reporting requirements must be met for land application of domestic septage or other domestic onsite wastewater sludges (FAC 10D-6.052(7)(e), (f), and (q)) [Cite Revised July 1997].

Verify that all septage and septage-related haulers maintain a collection and hauling log at the treatment site or at the main business location.

Verify that a summary of the total volume of septage applied to each site is submitted to the Department of Health county public health unit on a quarterly basis.

Verify that permanent records of actual application areas and application rates are maintained for 5 yr and include the following information:

- dates of septage or sludge land application - weather conditions when applied

- location of septage or sludge application site - amounts of septage or sludge applied - specific area of the site where septage or sludge was applied - pH of stabilized septage or sludge being applied - soil groundwater table when septage was applied - vegetational status of application area.

Verify that an annual summary of the total septage or sludge applied is provided with the annual update to the Agricultural Use Plan.

WA.125.2.FL. Reuse systems with a permit for a limited wet weather discharge must meet reporting requirements (FAC 62-610.860(9)).

Verify that reuse system with a permit for a limited wet weather discharge report the following to the Department monthly:

- a list of days on which limited wet weather discharge to the surface receiving water body occurred

- the stream flow in the receiving water body upstream of the limited wet weather discharge on the days of discharge

- the flow rate of the limited wet weather discharge on the days of discharge - the resulting stream dilution ratio (stream flow divided by limited wet

weather discharge flow) for each day of discharge - the CBOD(5) and total kjeldahl nitrogen concentrations of the effluent being

Page 637: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-84 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

discharged - an explanation of any factors contributing to the limited wet weather

discharge - the cumulative number of days during the calendar year during which the

limited wet weather discharge was activated - the month's rainfall and the cumulative rainfall during the calendar year

during which the limited wet weather discharge was activated.

WA.125.3.FL. Reuse systems must meet annual reporting requirements (FAC 62-610.870(3)) [Revised June 2000].

Verify that domestic wastewater treatment facilities (new and existing) having permitted capacities of at least 0.1 mgd that discharge all or part of their reclaimed water to reuse systems submit an annual report to the appropriate Department district office.

(NOTE: This reporting requirement also applies to all permittees responsible for operation of reuse authorities. Domestic wastewater permits issued by the Department identify portions of domestic wastewater projects that are categorized as reuse.)

Verify that one copy of the annual report is submitted to each of the following addresses:

- Florida Department of Environmental Protection, Reuse Coordinator, Mail Station 3540, 2600 Blair Stone Road, Tallahassee, Florida 32399-2400.

- the appropriate Department of Environmental Protection district office. - the appropriate water management district.

Verify that the annual report is delivered or mailed to these addresses on or before January 1 of each year.

Verify that the report include estimates of the annual average utilization (expressed in mgd) of reclaimed water for beneficial purposes and estimates of the annual average flows (expressed in mgd) sent to effluent disposal systems for the previous federal fiscal year (October 1 through September 30).

(NOTE: These are intended to be estimates. Detailed flow monitoring for all individual uses and users is not required. Data obtained will be used to maintain an inventory of reuse activity in Florida.)

Verify that reuse systems which include commercial agricultural operations using reclaimed water to irrigate edible crops attach their inventory of edible crop irrigation to the annual reuse report.

(NOTE: Form 62-610.300(4)(a)2 will be used for these annual reports.)

Page 638: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-85 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that the inventory of storage facilities is attached to the annual report.

Verify that facilities making reclaimed water available for activities in public areas attach a summary of their public notification program (including copies of public notification materials).

WA.125.4.FL. Land applica-tion of residuals must meet recordkeeping requirements (FAC 62-640.650(2)) [Revised July 1998].

(NOTE: See Appendix 12-8 for applicability and exemptions from FAC 62-640.)

Verify that records of application areas and rates are maintained by the wastewater treatment facility.

Verify that the following records are maintained in perpetuity:

- dates of application of residuals - location of the application site - identification of each application zone used by the permittee at the

application site and the acreage of each zone - amounts of residuals applied or delivered to each application zone - cumulative loading for each application zone.

Verify that the following records are maintained for a period of 5 yr:

- the names of all other wastewater facilities using each of the application zones

- the methods of incorporation of residuals, if any - measured pH of the residuals soil mixture at the time the residuals are

applied, tested at least annually as required - unsaturated depth of soil above the water table level at the time of application - concentration of parameters in the residuals and date of last analysis - results of any soil testing

(NOTE: The distribution and marketing of Class AA residuals is exempt from

these record keeping requirements.)

WA.125.5.FL. Land application of residuals must meet reporting requirements (FAC 62-640.650(3)) [Revised July 1998; Revised May 1999].

(NOTE: See Appendix 12-8 for applicability and exemptions from FAC 62-640.)

Verify that all monitoring results and analytical laboratory results are submitted to the Department with the facility’s Discharge Monitoring Reports.

Verify that permittees using application sites submit an annual summary of residuals application active at the sites to the appropriate District Office of the Department or the delegated Local Program.

Page 639: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-86 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that any facility which produces Class AA residuals in or delivers Class AA residuals to Florida submits a Monthly Residuals Distribution and Marketing Report to the Department.

Verify that the appropriate District Office of the Department is notified of any of the following orally within 24 and in then in writing within 7 days of the time the permittee becomes aware of the condition:

- if an alternate application site is used - surface or ground water violations are discovered . - any discrepancy that occurs in the inventory of residuals leaving a wastewater

treatment facility and arriving at a residuals management facility.

Verify that the Department and all affected parties are notified in writing at least 60 days before ceasing operation of residuals management facilities.

Verify that the Department’s Domestic Wastewater Section in Tallahassee, is notified in writing Department's at least 30 days before beginning importation of Class AA residuals from outside the state for distribution and marketing or land application.

Page 640: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-87 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

LAND APPLICATION OF SLUDGE

WA.130. STATE-SPECIFIC REQUIREMENTS

Storage

WA.130.1.FL. Land application of domestic septage or other domestic onsite wastewater sludges must meet storage requirements (FAC 10D-6.052(7)(k), (8), and (9)).

Verify that the land application area has sufficient buffer areas or stormwater management structures to retain the runoff from a 10-yr, 1-h storm on the site.

Verify that sufficient septage storage capacity is provided for periods of inclement weather and equipment failure.

(NOTE: Stabilization tanks and septage storage tanks may be located at regional stabilization facilities, at sites owned by the disposal service, or at sites owned by the owner or lessee of the septage land application site.)

Verify that potable water supplies located at the stabilization tank and septage storage tank site are provided with back flow prevention devices to prevent potential contamination of water supplies.

WA.130.2.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with public access restricted slow-rate land application systems must meet storage requirements (FAC 62-610.414(1) through (5), (7) through (9), and .417(1)).

(NOTE: System storage ponds as described herein are not required where it is documented in the engineering report that an alternative system (e.g., permitted surface water discharge, deep wells) is incorporated into the system design to ensure continuous facility operation. If system storage is not required, provision of flow equalization or storage must be evaluated in the engineering report to ensure that reclaimed water flows will match the demand pattern during a diurnal cycle.)

Verify that storage ponds have the following capacities:

- have sufficient storage capacity to assure the retention of the reclaimed water under adverse weather conditions, harvesting conditions, maintenance of irrigation equipment, or other conditions which preclude land application

- storage capacity or a limited wet weather discharge system is provided for wet weather conditions which preclude land application

- at a minimum, system storage capacity is the volume equal to three times that

Page 641: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-88 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

portion of the average daily flow of the reuse capacity for which no alternative reuse or disposal system is permitted.

Verify that storage ponds and tanks are designed for continuous flow-through or off-line storage of the reclaimed water from the treatment plant.

Verify that, for continuous flow-through, the pond or tank is designed so that reclaimed water can be retained for the required storage period.

Verify that, for off-line ponds or tanks, the reclaimed water transmission system is designed so that all produced reclaimed water can be diverted to the pond or tank and retained for the required storage period under conditions which preclude land application.

Verify that storage ponds are lined or sealed to prevent measurable seepage.

(NOTE: Storage ponds may be unlined if designed to provide both storage and percolation functions and if high-level disinfection is provided.)

Verify that storage holding ponds provide a minimum 3 ft of freeboard and are provided with an emergency discharge or overflow device of sufficient capacity to discharge excess flows and to prevent water levels from rising closer than 1 ft to the top of the embankment or berm.

Verify that algae and mosquito breeding is controlled.

Verify that there is a minimum pond depth (excluding freeboard but including the design operating range) of 6 ft, with inside bank side slopes steeper than 3:1 (horizontal to vertical), but no steeper than 1:1, to discourage growth of rooted aquatic weeds.

Verify that pond water depth is at least 18 in.

Verify that ponds are sited to avoid areas of uneven subsidence, sinkholes, pockets of organic matter, or other unstable soils unless provisions are made for their correction.

Verify that entrance of surface runoff to land application sites is prevented.

WA.130.3.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treat-

(NOTE: System storage is not required where another permitted reuse system or effluent disposal system is incorporated into the system design to ensure continuous facility operation. If system storage is not required, provision of flow equalization or storage should be evaluated to ensure that reclaimed water flows will match the demand pattern during a diurnal cycle.)

Page 642: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-89 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

ment facilities with slow-rate land application systems for public access, residential irrigation, and edible crops must meet storage require-ments (FAC 62-610.464) [Revised June 2000].

Verify that storage ponds have the following capacities:

- storage pond capacity as specified for public access restricted slow-rate land application systems in WA.130.2.FL.

- system storage or a limited wet weather discharge authorization for wet weather conditions is obtained

- at a minimum, storage capacity is the volume equal to three times that portion of the average daily flow of the total reuse capacity for which no alternative reuse or disposal system is permitted

Verify that a separate, off-line system for storage of reject water is provided, unless another permitted reuse system or effluent disposal system is capable of discharging the reject water.

Verify that reject water storage has sufficient capacity to ensure the retention of reclaimed water of unacceptable quality and that, at a minimum, this capacity is the volume equal to one day flow at the average daily design flow of the treatment plant or the average daily permitted flow of the reuse system, whichever is less.

Verify that storage and reject water holding ponds meet the requirements contained in WA.130.2.FL, with the following exceptions:

- system storage ponds do not have to be lined - reject storage ponds are lined or sealed to prevent measurable seepage.

(NOTE: Existing or proposed lakes or ponds (such as golf course ponds) are appropriate for storage of reclaimed water and stormwater management if all Department rules are met and the use of lakes or ponds for reclaimed water storage will not impair the ability of the ponds to function as a stormwater management system.)

Verify that an inventory of storage systems is maintained, and that the inventory is submitted to the Department at least 30 days before reclaimed water is introduced into any new storage system, and annually with the annual reuse report.

WA.130.4.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with rapid-rate land application systems must meet storage requirements (FAC 62-

(NOTE: System storage is not required for rapid-rate land application systems. However, it must be demonstrated that percolation ponds (cells), RIBs, or absorption fields will function adequately under high ground water conditions and that reclaimed water storage or other discharge provisions are not required.)

Verify that, where holding ponds are provided for reclaimed water storage, the requirements of WA.130.2.FL. are met.

Verify that RIBs or percolation ponds are designed to provide a minimum of 3 ft of freeboard in order to protect the integrity of pond embankments and that

Page 643: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-90 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

610.514 and .516). percolation ponds and RIBs are provided with an approved emergency discharge device, with sufficient capacity to discharge potential excess flows, to prevent water levels from rising closer than 1 ft from the top of the embankment or berm.

WA.130.5.FL. Domestic wastewater treatment facilities and reuse and land application systems receiving reclaimed water or effluent from domestic wastewater treatment facilities with overland flow systems must meet storage requirements (FAC 62-610.614 and .617).

Verify that system storage ponds have sufficient storage capacity to assure the retention of the preapplication wastewaters under adverse climatic conditions, harvesting conditions, maintenance of irrigation equipment, or other conditions which preclude land application.

Verify that, at a minimum, this capacity is the volume equal to 1.5 days flow at the annual average daily design flow of the treatment plant or the average daily permitted flow of the disposal system, whichever is less.

Verify that additional storage capacity (beyond the minimum requirement) is provided based on the need for flow equalization to maintain design hydraulic loading rates or to comply with mass discharge effluent limitations.

Verify that storage holding ponds meet the requirements specified in WA.130.2.FL. and that surface runoff control requirements therein are also met.

WA.130.6.FL. Storage lakes, ponds, and aquifers must meet permit requirements (FAC 62-610.830(1), (3), and (5), and .466) [Revised June 2000].

Verify that storage lakes discharging intermittently or continuously to waters of the state are permitted.

(NOTE: Discharge of reclaimed water to isolated storage lakes which do not discharge to waters of the state do not require a permit. Lakes, ponds, and other surface waters may be used to store reclaimed water as part of permitted reuse systems. These lakes include golf course lakes, stormwater ponds, and other lakes or ponds used as decorative features.)

Verify that aquifer storage and recovery systems meet the technical and permitting requirements of the Departments underground injection control (UIC) program, as well as the permit requirements of this Wastewater Quality chapter.

WA.130.7.FL. Land application of residuals must meet storage requirements (FAC 62-640.700(3)(e) and (4)(e)).

(NOTE: See Appendix 12-8 for applicability and exemptions from FAC 62-640.)

Verify that residuals storage facilities at land applications sites are used only for temporary storage of residuals for no more than 1 mo during periods of inclement weather or to accommodate agricultural operations.

Verify that residuals storage prevents site runoff.

Page 644: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-91 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Distribution and Marketing

(NOTE: See Appendix 12-8 for applicability and exemptions from FAC 62-640.)

WA.130.8.FL. Residuals for land application or residual products must meet distribution and marketing requirements (FAC 62-640.850) [Revised May 1999].

Verify that residuals or residual products meet the Class A pathogen reduction standards and one of the vector attraction reduction requirements.

Verify that residuals or residual products are analyzed as specified in WA.120.5.FL. and that the residuals or final blended residuals product have parameter concentrations less than or equal to all of the following criteria:

- arsenic, 41 mg/kg dry weight - cadmium, 39 mg/kg dry weight - copper, 1500 mg/kg dry weight - mercury, 17 mg/kg dry weight - lead, 300 mg/kg dry weight - nickel, 420 mg/kg dry weight - selenium, 100 mg/kg dry weight - zinc, 1800 mg/kg dry weight.

Verify that generators of Class AA residuals, who produce the residuals in Florida or who deliver the residuals to Florida, file quarterly residuals analysis reports and quarterly residuals shipping and sales reports with the Domestic Waste Section of the Department.

Verify that the quarterly residuals analysis report includes the concentrations of the parameters listed above.

(NOTE: If residuals are blended with other soil conditioning materials, the blending will be conducted by a Department-permitted domestic wastewater treatment facility or residuals management facility before the residuals are marketed or distributed.)

Verify that the quarterly residuals shipping and sales report includes the total amount of residuals (dry tons) delivered and the counties to which the residuals were delivered or in which the residuals were applied.

Verify that the following residuals analysis information is made available to the users by the manufacturer by product labels or other means:

- total nitrogen - total phosphorous - total potassium - recommended application rate.

Page 645: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-92 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Page 646: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-93 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WA.150. WATERSHED PROTECTION PROGRAMS/

WA.150.1.FL. Groundwater protection measures in wellhead protection areas must be met (FAC 62-521.400(1) through (3)).

Verify that the following restrictions within a wellhead protection area are met:

- new domestic wastewater treatment facilities are provided with Class I reliability and flow equalization

- new wastewater ponds, basins, and similar facilities are lined or sealed to prevent measurable seepage

- new reuse and land application projects are prohibited except for permitted new projects permitted

- new domestic wastewater residuals land application sites are prohibited - new discharges to groundwater of industrial wastewater is prohibited except:

- all noncontact cooling water discharges (without additives) - discharges specifically allowed within a wellhead protection area

- new phosphogypsum stack systems are prohibited - new Class I and Class III underground injection control wells are prohibited - new Class V underground injection control wells are prohibited except:

- thermal exchange process wells (closed-loop without additives) for use at single family residences

- aquifer storage and recovery systems wells, where the injected fluid meets the applicable drinking water quality standards

- new solid waste disposal facilities are prohibited - new generators of hazardous waste meet secondary containment requirements

specified in 40 CFR 264, Subpart I (1994) - new hazardous waste treatment, storage, disposal, and transfer facilities

requiring permits are prohibited - new aboveground and underground tankage of hazardous wastes is prohibited - underground storage tanks are not installed 90 days 13 July 1995.

(NOTE: Replacement of an existing underground storage tank system within the

same excavation, or addition of new underground storage tanks at a facility with other such underground storage tanks is exempt from this provision, provided that the replacement or new underground storage tank system is installed with secondary containment.)

(NOTE: Replacement or upgrading of an existing aboveground storage tank or addition of new aboveground storage tanks at a facility with other such aboveground storage tanks is exempt from this provision. Storage tanks that meet the auxiliary power provisions for operation of a potable water well and storage tanks for substances used for the treatment of potable water are exempt from the

Page 647: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-94 Wastewater Management

COMPLIANCE CATEGORY: WASTEWATER MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

provisions of this rule.)

(NOTE: Emergency equipment, including storage tanks, which is necessary to provide power to ensure a continuous supply on an emergency basis of public water supply, electrical power, sewer service, telephone service, or other essential services that are of a public benefit are exempt from the provisions of this chapter. Discharge to groundwater from Department-approved remedial corrective actions for contaminated sites located within wellhead protection areas are not subject to these discharge restrictions.)

Page 648: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-95 Wastewater Management

Appendix 12-1 Exemptions from Environmental Resource Permitting Requirements

(40D-4.051 and 40D-3.041(3)) [Added July 1998]

(NOTE: A permit may be required, if the master drainage plan is altered so as to have an adverse impact on the off site water resources in the District, for surface water management systems exempt under regulations applicable to one of the following

- any project, work, or activity which has received all governmental approvals necessary to begin construction and is under construction prior to 1 October 1984

- any phased or long term build out project, including a development of regional impact, planned unit development, development which has received local or regional approval prior to 1 October 1984 (40D-4.051(3) or (6)).)

The following activities are exempt from permitting under this chapter:

1. The activities specified in Section 373.406, Florida Statutes. 2. The construction, alteration, or operation of a surface water management system for agricultural or

silvicultural activities which satisfies the following requirements: a. The total land area does not equal or exceed 10 acres b. The area of impervious surface will not equal or exceed 2 acres c. The activities will not be conducted in wetlands d. The activities will not be conducted in existing lakes, streams, or other watercourses e. The surface water management system will not utilize drainage pumps or operable discharge

structures f. The activities will not utilize storm drainage facilities larger than one 24-inch diameter pipe, or its

hydraulic equivalent g. Discharges from the site will meet applicable state water quality standards, as set forth in chapter 17-3

and Rule 17-4.242 h. The activities are part of a conservation plan prepared or approved by a local Soil and Water

Conservation District Board organized pursuant to Chapter 582, Florida Statutes, (S.C.S.). If the S.C.S. conservation plan is not implemented according to its terms, the exemption created in this subsection does not apply

i The activities can otherwise reasonably be expected not to have significant adverse water resource impacts

j. The surface water management system can be effectively maintained. 3. Any project, work or activity which has received all governmental approvals necessary to begin

construction and is under construction prior to 1 October 1984. 4. Any project, work or activity which received a surface water management permit from the District prior to

1 October 1984. 5. Any project, work or activity which did not require a surface water management permit from the District

and had received all other necessary governmental approvals to begin construction or operation prior to 1 October 1984.

6. Any phased or long term build out project, including a development of regional impact, planned unit development, development with a master plan or master site plan, or similar project, which has received local or regional approval prior to 1 October 1984, if:

a. The approval process requires a specific site plan and provides for a master drainage plan approved prior to the issuance of a building permit, and

b. The developer has notified the District of its intention to rely upon this exemption on or before 1 April 1985.

Projects exempt under this subsection shall continue to be subject to the District's surface water management rules in effect prior to 1 October 1984.

Page 649: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-96 Wastewater Management

7. All normal and necessary farming and forestry operations as are customary for the area, which can be

conducted without the construction or alteration of a surface water management system. In order to qualify for this exemption, such operations and facilities shall not impede or divert the flow of surface waters entering or leaving the operation or intrude into or otherwise substantially and adversely impact significant wetlands.

8. Phosphate mining and mining related surface water management systems are exempt from the requirements of this chapter, provided that all conditions for exemption in Rule 40D-4.053(1) are met. However, nothing in this section is intended to exempt phosphate mining from the Department of Environmental Protection's authority.

9. Phosphate mine reclamation and restoration conducted in accordance with Chapter 16C-16, the Mine Reclamation rules of the Florida Department of Environmental Protection, is exempt from the requirements of this chapter provided that all conditions for exemption in Rule 40D-4.053(2) are met.

10. Construction or private use of a single family dwelling unit, duplex, triplex or quadruplex that is not part of a larger common plan of development or sale and does not involve wetlands or other surface waters.

11. Routine maintenance of a surface water management system; however, maintenance of surface water management systems will be considered in conjunction with the applications for construction, alteration, or operation.

12. In accordance with the provisions of Section 403.813(2), F.S., no permit shall be required under Chapters 40D-4, 40D-40 or 40D-400, Florida Administrative Code for the following activities:

a. The repair or replacement of existing functional pipes or culverts the purpose of which is the discharge or conveyance of stormwater. In all cases, the invert elevation, the diameter, and the length of the culvert shall not be changed. However, the material used for the culvert may be different from the original material. This exemption does not authorize the repair, replacement, or alteration of dams, spillways or appurtenant works, nor construction activities or procedures that cause a violation of water quality standards as set forth in Chapter 62-302 and Rule 62-4.242, FAC

b. The installation, replacement or repair of mooring pilings and dolphins associated with private docking facilities.

c. The installation of private docks of 1000 square feet or less of surface area over wetlands or other surface waters or 500 square feet or less of surface area over wetlands or other surface waters for docks which are located in Outstanding Florida Waters. This exemption shall include the construction of structures above the dock area, such as gazebos and boat shelters, provided such structures are not enclosed with walls and doors, are not used for living, commercial purposes, or storage of materials other than those associated with recreational use and provided the structures do not exceed, together with the docking facility, the total area limitations above. To qualify for this exemption, any such dock and associated structure:

(1) shall be used for recreational, non-commercial activities; and (2) shall be constructed or held in place by pilings, including floating docks, so as not to involve

filling or dredging other than necessary to install the pilings; and (3) shall not substantially impede the flow of water or create a navigational hazard; and (4) shall be the sole dock constructed pursuant to this exemption as measured along the shoreline

for a minimum distance of 65 feet, unless the parcel of land or individual lot as platted is less than 65 feet in length along the shoreline, in which case there may be one exempt dock allowed per parcel or lot. For the purposes of this rule, multi-family living complexes and other types of complexes or facilities associated with the proposed private dock shall be treated as one parcel of property regardless of the legal division of ownership or control of the associated property. Construction of a private dock under this exemption does not obligate the District to issue a subsequent permit to construct a channel to provide navigational access to the dock. Activities associated with a private dock shall include the construction of the structures attached to the pier which are only suitable for the mooring or storage of boats (i.e., boatlifts). Nothing in this paragraph shall prohibit the Department from taking appropriate enforcement action pursuant to Chapter 403, F.S., to abate or prohibit any activity otherwise exempt from permitting

Page 650: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-97 Wastewater Management

pursuant to this paragraph if the Department can demonstrate that the exempted activity has caused water pollution in violation of Chapter 403, F.S.

d. The performance of maintenance dredging of existing manmade canals, channels, basins, berths, and

intake and discharge structures, where the spoil material is to be removed and deposited on a self-contained, upland spoil site which will prevent the escape of the spoil material and return water from the spoil site into wetlands or other surface waters, provided no more dredging is performed than is necessary to restore the canal, channels, basins, berths, and intake and discharge structures to original design specifications, and provided that control devices are used at the dredge site to prevent turbidity and toxic or deleterious substances from discharging into adjacent waters during maintenance dredging. This exemption shall apply to all canals constructed before April 3, 1970, and to those canals constructed on or after April 3, 1970, pursuant to all necessary state permits. This exemption shall not apply to the removal of a natural or manmade barrier separating a canal or canal system from adjacent wetlands or other surface waters. Where no previous permit has been issued by the Board of Trustees of the Internal Improvement Trust Fund, the Department, the District or the United States Army Corps of Engineers for construction or maintenance dredging of the existing manmade canal, channel, basin, berth or intake or discharge structure, such maintenance dredging shall be limited to a depth of no more than 5 feet below mean low water.

e. The installation and maintenance to design specifications of boat ramps on artificial bodies of water where navigational access to the proposed ramp exists, or the installation and maintenance to design specifications of boat ramps open to the public in any wetlands or other surface waters where navigational access to the proposed ramp exists and where the construction of the proposed ramp will be less than 30 feet wide and will involve the removal of less than 25 cubic yards of material from the wetlands or other surface waters and the installation of docks with an area of 500 square feet or less over wetlands or other surface waters that are associated with and adjoining the boat ramps constructed pursuant to this exemption. All material removed shall be placed upon a self-contained upland site so as to prevent the escape of the spoil material and return water from the spoil site into the wetlands or other surface waters. For the purpose of this exemption artificial bodies of water shall include, residential canal systems, canals permitted by a District created under Section 373.069, Florida Statutes, and artificially created portions of the Florida Intracoastal Waterway.

f. Construction of seawalls or riprap, including only that backfilling needed to level the land behind seawalls or riprap, in artificially created waterways where such construction will not violate existing water quality standards, impede navigation or adversely affect flood control. An artificially created waterway is defined as a body of water that has been totally dredged or excavated and which does not overlap natural wetlands or other surface waters. For the purpose of this exemption, artificially created waterways shall also include existing residential canal systems. This exemption does not apply to the construction of vertical seawalls in estuaries or lagoons unless the proposed construction is within an existing man-made canal where the shoreline is currently occupied in whole or in part by vertical seawalls.

g. Construction of private docks in artificially created waterways where construction will not violate water quality standards, impede navigation, or adversely affect flood control.

h. The replacement or repair of existing docks and moorings piles provided that no fill material other than the piles is to be used, and provided that the replacement or the repaired dock or mooring pile is in the same location and of the same configuration and dimensions as the dock or mooring pile being replaced or repaired. A dock or mooring pile must be functional and able to provide access to boats moored at the dock or pile before this exemption may be used unless the dock or mooring pile has been rendered nonfunctional by a discreet event such as a storm, collision or fire.

i. The restoration of a seawall or riprap at its previous location, upland of its previous location, or within one foot waterward of its previous location. No filling can be performed except in the actual restoration of the seawall or riprap. No construction shall be undertaken without necessary title or leasehold interest, especially where private and public ownership boundaries have changed as a result of natural occurrences such as accretion, reliction and natural erosion. Restoration and repair shall be performed using the criteria set forth in Section 373.414(5), Florida Statutes. This

Page 651: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-98 Wastewater Management

exemption shall be limited to functioning seawalls or riprap. This exemption shall not affect the permitting requirements of Chapter 161, Florida Statutes.

j. The maintenance of functioning insect control structures, and the maintenance of functioning dikes and functioning irrigation and drainage ditches, including roadway ditches, provided that the spoil material is deposited on a self-contained upland spoil site which will prevent the escape of the spoil material and return water into wetlands or other surface waters. In the case of insect control structures, if the cost of using a self-contained upland spoil site is so excessive as determined by the Department of Agriculture and Consumer Services, pursuant to subsection 403.088(1), Florida Statutes, that it will inhibit the proposed insect control, existing spoil sites or dikes may be used, upon notification to the District. In the case of insect control where upland spoil sites are not used pursuant to this exemption, turbidity control devices shall be used to confine the spoil material discharge to that area previously disturbed when the receiving body of water is used as a potable water supply, is designated as approved, conditionally approved, restricted or conditionally restricted waters for shellfish harvesting by the Department, or functions as a habitat for commercially or recreationally important shellfish or finfish. In all cases, no more dredging is to be performed than is necessary to restore the dike or irrigation or drainage ditch to its original design specifications. This exemption shall apply to man-made trenches dug for the purpose of draining water from the land or for transporting water for use on the land and which are not built for navigational purposes.

k. The restoration of less than 100 feet in length of existing insect control impoundment dikes and the connection of such impoundments to tidally influenced waters. Such impoundments shall be connected to tidally influenced waters for at least 6 months each year, beginning September 1, and ending February 28, if feasible, or operated in accordance with an impoundment management plan approved by the District. The connection shall be of sufficient cross-sectional area to allow beneficial tidal influence. Restoration shall involve no more dredging than needed to restore the dike to original design specifications, and such that the final elevation of the dredge area shall be within 2 feet of immediately adjacent bottom elevations. For the purposes of this paragraph, restoration shall not include maintenance of impoundment dikes of insect control impoundments.

l. The installation of subaqueous transmission and distribution lines laid on, or embedded in, the bottoms of wetlands or other surface waters, except in Class I and Class II waters and aquatic preserves, provided that no dredging or filling is necessary.

m. The replacement or repair of subaqueous transmission and distribution lines laid on or embedded in, the bottoms of wetlands or other surface waters.

n. The construction of private vertical seawalls in wetlands or other surface waters, other than in an estuary or lagoon, and the construction of riprap revetments, where such construction is between and adjoins at both ends existing seawalls or riprap, follows a continuous and uniform construction line with the existing seawalls or riprap, is no more than 150 feet in length, and does not violate existing water quality standards, impede navigation adversely or affect flood control. However, this shall not affect the permitting requirements of Chapter 161, Florida Statutes. Construction shall be in accordance with subsection 373.414(5), Florida Statutes.

o. The replacement or repair of existing open-trestle foot bridges and vehicular bridges that are 100 feet or less in length and two lanes or less in width, provided that no more dredging or filling in wetlands or other surface waters is performed than that necessary to replace or repair pilings and that the structure to be replaced or repaired is the same length, the same configuration, and in the same location as the original bridge. No debris from the original bridge shall be allowed to remain in wetlands or other surface waters.

13. The following activities shall not be required to obtain a permit under chapters 40D-4, 40D-40, or 40D-400, FAC:

a. Activities necessary to preserve, restore, repair, remove, or replace an existing communication or power pole or line, provided that work does not involve dredge or fill activities other than the removal of the existing structure and the installation of the new structure, and in the case of a power pole or line, the activity does not increase the voltage of existing power lines. An activity does not qualify to use this exemption if it results in relocation of an existing structure or facility more than 10

Page 652: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-99 Wastewater Management

feet in any direction from its original location, or if it involves the construction of new power or telephone lines or the repair and replacement of existing structures that require dredge or fill activities to provide access to the site.

b. The installation, removal, and replacement of utility poles that support telephone or communication cable lines, or electric distribution lines of 35 kV or less, together with the bases and anchoring devices to support those poles, as specified below. For the purpose of this exemption, "anchoring device" shall mean steel guy wires fastened to the ground and "base" shall mean a concrete or steel foundation not exceeding four feet in radius, used to support a utility pole. This exemption shall be subject to the following conditions:

(1) no more than 15 utility poles may be installed, removed, or replaced in wetlands; (2) this exemption shall not apply in surface waters other than wetlands; (3) the temporary disturbance to wetlands shall be limited to a length of 0.5 miles, an aerial extent

of 0.5 acre, and a width of 30 feet to access the site to actually install, remove, or replace the utility poles, thereafter, maintenance of the utility right of way in wetlands shall be limited to a cleared corridor that does not exceed a total width of 15 feet and a total area of 0.25 ac.;

(4) this exemption shall not apply in forested wetlands located within 550 feet from the mean or ordinary high water line of a named waterbody that is designated as an Outstanding Florida Water or an Outstanding National Resource Water, or to activities in any aquatic preserves;

(5) there shall be no permanent placement of fill other than utility poles and anchoring devices; (6) there shall be no dredging or filling of fill pads or access roads except for temporary mats,

which may be used to access pole installation sites, and all temporary mats shall be removed within thirty days after the installation, removal or replacement of the utility poles, associated bases, and anchoring devices;

(7) the installation of the utility pole(s) and associated bases and anchoring devices shall not interfere with navigation or impede water flow in wetlands;

(8) turbidity, sedimentation, and erosion shall be controlled during and after construction to prevent violations of state water quality standards due to construction related activities;

(9) except for the permitted structures, pre-construction ground elevations and the contours of all soils that are disturbed by construction activities, including vehicle ruts in wetlands, shall be restored within 30 days of completion of the installation of the utility line or cable, and restored grades shall be stabilized within 72 hours following completion of elevation and contour restoration to minimize erosion;

(10) vehicle usage in wetlands shall be conducted so as to minimize tire rutting and erosion impacts;

(11) water jets shall not be used except for those which are a pre-engineered part of the pole, and provided that the water for the jets is either recirculated on site or is discharged in a self contained upland disposal site;

(12) vehicular access in wetlands shall be limited to existing roads, trails, rights-of-way or easements, and to other previously disturbed corridors where they exist; and

(13) the permittee shall provide an annual report to the District which summarizes the activities conducted under this exemption for the period from January 1 to December 31 of each year, including: the acreage of temporary impacts in wetlands resulting from the use of temporary mats and the clearing of wetland vegetation; the extent of permanent impacts to wetlands including the number of poles and structures in wetlands and the acreage of clearing in wetlands; the voltage of all electric lines that are installed; the number of times this exemption is used; the specific location of each line that is installed (including the county, the section, township, and range, and the identity of permanent landmarks such as roads and named wetlands and other surface waters within or adjacent to the work location), and the number of times and locations where water jets are used.

c. The installation of aids to navigation, including bridge fender piles, "No Wake" and similar regulatory signs, and buoys associated with such aids, provided that the devices arc marked in accordance with Section 327.40, Florida Statutes.

Page 653: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-100 Wastewater Management

d. The use of rotenone, by the Florida Game and Fresh Water Fish Commission, in conducting tests related to its responsibility regarding fish management. The chemical selected shall be used at no more than the strength approved by the EPA label, or a lesser strength than the EPA approved label. In addition, the chemical shall be used only under the direct on-site supervision of a staff member of the Florida Game and Fresh Water Fish Commission.

e. Maintenance of minor silvicultural surface water management systems as described in subsection 40D-400.500(4), FAC, which were permitted under Part IV of Chapter 373, F.S. or were constructed prior to the requirements for a permit under this part, provided such maintenance is conducted in accordance with the performance standards set forth in subsection 40D-400.500(5), FAC

f. The construction or maintenance of culverted driveway or roadway crossings and bridges of artificial waterways, subject to the following provisions:

(1) This exemption shall apply only to wholly artificial, non-navigable drainage conveyances. (2) The construction project area shall not exceed one acre, and the construction shall be for a

discrete project that is not part of a larger plan of development which requires permitting under Chapters 40D-40, 40D-400, FAC, or this chapter.

(3) The artificial waterway in existing condition shall be not more than 4 feet deep, measured from the top of bank to the bottom of the artificial waterway.

(4) The person performing the exempt activity shall ensure that the size and capacity of the culvert(s) will be adequate to pass normal high water stages of the artificial waterway without causing adverse impacts to upstream or downstream property, but the culvert(s) shall not be larger than one 24 inch diameter pipe, or its equivalent; and in no instance shall the culvert(s) provide a smaller cross-sectional area or discharge capacity than any upstream culvert.

(5) The elevation of the culvert invert shall be at the existing bottom grade of the artificial waterway.

(6) The length of the driveway or roadway crossing the waterway shall not exceed 30 feet from top of bank to top of bank.

(7) The top width of the driveway or roadway shall not exceed 20 feet, the toe to toe width shall not exceed 40 feet, and side slopes shall be no steeper than 3 feet horizontal to 1 foot vertical.

(8) Clean fill used for the crossing shall be obtained from an upland borrow pit or from a dredge site that is in compliance with the regulatory requirements of Part IV, Chapter 373, F.S., either through a permit, or an exemption.

(9) There shall be no additional dredging, filling, or construction activities within the artificial waterway or project area, except those directly involved in the construction or operation and maintenance of the culverted crossing and those exempted from regulation under Part IV, Chapter 373, F.S.

(10) All temporary fill in construction areas shall be removed and regraded to original elevations and revegetated.

(11) The person performing the exempt activity shall implement measures for erosion and pollution control using best management practices, including turbidity curtains or similar devices and other site specific practices, in strict adherence to the Florida Department of Transportation's "Standard Specifications for Road and Bridge Construction," and Chapter 6 of the Department's "Florida Development Manual," to prevent violations of state water quality standards. Temporary erosion controls shall be implemented prior to and during construction, and permanent erosion control measures for all exposed soils shall be completed within 7 calendar days of the most recent construction activity.

(12) Any spoil material from construction or maintenance shall be used or disposed of on an upland portion of the property or shall be transported off site and deposited on a self-contained upland spoil site that is in compliance with the permitting requirements of Chapters 40D-4 and 40D-40, FAC, as applicable.

(13) If dewatering is performed, all temporary fill dikes and dewatering discharges shall be installed and constructed so that no upstream flooding or impoundment occurs and to prevent siltation, erosion or turbid discharges into waters of the State in violation of state water quality standards. Any temporary works shall be completely removed, and all areas upstream and

Page 654: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-101 Wastewater Management

downstream from the crossing shall be restored to grades, elevations and conditions which existed before the construction.

14. This exemption shall apply only to a maximum of 2 crossings on a given total land area of property with a minimum distance of 500 feet between crossings.

15. This exemption shall not apply to activities involving relocation or other alteration of all or part of the artificial waterway, or construction for other than the proposed culvert crossing, except as exempted by Chapter 373, F.S., or this section.

g. Construction of freshwater fish attractors by Florida Game and Fresh Water Fish Commission, U.S. Forest Service, and county and municipal governments, provided that the material to be used shall be clean concrete, rock, brush, logs, or trees, and shall be free of soils, preservatives, oil, grease, debris, litter, putrescible substances, "white goods," asphalt material, tires, or other pollutants, and shall be firmly anchored to the bottom of the waterbody. The size of an individual fish attractor shall not exceed one quarter acre in area. The material shall be placed so that the top of the fish attractor is at least three (3) feet below the surface of the water at ordinary low water and shall be outside any posted navigational channels. No fish attractor material shall be placed on or in areas vegetated by native aquatic vegetation. The site shall be marked with a buoy or buoys to ensure that no material is deposited outside of the site.

h. Installation of piling support structures associated with water testing or monitoring equipment by the Department or the Districts, provided that flow or navigation are not impeded.

14. Surface Waters or Wetlands Created by Mosquito Control Activities. Construction, alteration, operation, maintenance, removal, and abandonment of stormwater management systems, dams, impoundments, reservoirs, appurtenant works, or works, in, on, or over lands that have become surface waters or wetlands solely because of mosquito control activities undertaken as a part of a governmental mosquito control program, and which lands were neither wetlands nor other surface water before such activities, shall be exempt from the provisions in this Chapter adopted by the District to implement subsections 373.414(1) through (6); 373.414(7) regarding any authority granted pursuant to section 373.414, F.S. (1991); 373.414(8) and 373.414(10), F.S.

15. Exemptions for Treatment or Disposal Systems. a. Alteration and maintenance of the following shall be exempt from the provisions in Chapter 40D-4,

FAC, implementing subsections 373.414(1) through 373.414(6), 373.414(8), and 373.414(10), F.S.; and subsection 373.414(7), F.S., regarding any authority to apply state water quality standards within any works, impoundments, reservoirs, and other watercourses described in this subsection and any authority granted pursuant to section 373.414, F.S. (1991):

(1) Works, impoundments, reservoirs, and other watercourses constructed and operated solely for wastewater treatment or disposal in accordance with a valid permit reviewed or issued under sections 17-28.700, 17-302.520 or Chapters 17-17, 17-600, 17-610, 17-640, 17-650, 17-660, 17-670, 17-671, 17-673, 17-701, FAC, or section 403.0885, F.S., or rules implementing section 403.0885, F.S., except for treatment wetlands or receiving wetlands permitted to receive wastewater pursuant to 17-611, FAC, or section 403.0885, F.S. or its implementing rules.

(2) Works, impoundments, reservoirs, and other watercourses constructed solely for wastewater treatment or disposal before a construction permit was required under chapter 403, F.S., and operated solely for wastewater treatment or disposal in accordance with a valid permit reviewed or issued under sections 17-28.700, 17-302.520, or chapters 17-17, 17-600, 17-610, 17-640, 17-650, 17-660, 17-670, 17-671, 17-673, or 17-701, FAC; or section 403.0885, F.S., or rules implementing section 403.0885, F.S., except for treatment wetlands or receiving wetlands permitted to receive wastewater pursuant to Chapter 17-611, FAC, or section 403.0885, F.S. or its implementing rules;

(3) Works, impoundments, reservoirs, and other watercourses of less than 0.5 acres in combined area on a project-wide basis, constructed and operated solely for stormwater treatment in accordance with a noticed exemption under Chapter 17-25, FAC, or a valid permit issued under Chapters 17-25 (excluding Rule 17-25.042), 17-330, 40D-4, FAC, except those permitted as wetland stormwater treatment systems.

Page 655: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-102 Wastewater Management

(4) Works, impoundments, reservoirs, and other watercourses of less than 0.5 acres in combined area on a project-wide basis, constructed and operated solely for stormwater treatment before a permit being required under Chapters 17-25, 40D-4, FAC

b. Alteration and maintenance of the following shall be exempt from the provisions in Chapter 40D-4, FAC, adopted to implement subsections 373.414(1), 373.414(2)(a), 373.414(8), and 373.414(10), F.S.; and subsections 373.414(3) through 373.414(6), F.S.; and subsection 373.414(7), F.S., regarding any authority to apply state water quality standards within any works, impoundments, reservoirs, and other watercourses described in this subsection and any authority granted pursuant to 373.414, F.S. (1991), except for authority to protect threatened and endangered species in isolated wetlands:

(1) Works, impoundments, reservoirs, and other watercourses of 0.5 acre or greater in combined area on a project-wide basis, constructed and operated solely for stormwater treatment in accordance with a noticed exemption under Chapter 17-25, FAC, or a valid permit issued under Chapters 17-25 (excluding Rule 17-25.042), 17-330, 40D-4, FAC, except those permitted as wetland stormwater treatment systems.

(2) Works, impoundments, reservoirs, and other watercourses of 0.5 acres or greater in combined area on a project-wide basis, constructed and operated solely for stormwater treatment before a permit was required under Chapters 17-25, 40D-4, FAC

c. The exemptions in paragraphs (a) and (b) above shall not apply to works, impoundments, reservoirs or other watercourses that are:

(1) currently wetlands which existed before construction of the stormwater treatment system and were incorporated in it;

(2) being altered through expansion into wetlands or other surface waters; or (3) wetlands created, enhanced or restored as mitigation for wetland or surface water impacts

under a permit issued by the Department or the District. d. Alterations and maintenance of works, impoundments, reservoirs and other watercourses exempt

Under this subsection shall not be considered in determining whether the wetland permitting thresholds in Chapters 40D-4 or 40D-40, FAC, are met or exceeded.

e. Works, impoundments, reservoirs and other watercourses exempt under this subsection, other than isolated wetlands in systems described in paragraph (b) above, shall not be delineated under Section 373.421, F.S.

f. this exemption shall not affect the application of state water quality standards, including those applicable to Outstanding Florida Waters, at the point of discharge to waters as defined in subsection 403.031(13), F.S.

g. As used in this subsection, "solely for" means the reason for which a work, impoundment, reservoir, or other watercourse is constructed and operated, and such construction and operation would not have occurred but for the purposes identified in paragraphs (a) and (b) above. Furthermore, the phrase does not refer to a work, impoundment, reservoir, or other watercourse constructed or operated for multiple purposes. Uses, such as occasional recreational uses, will not render the exemption inapplicable, so long as the incidental uses are not part of the original planned purpose of the work, impoundment, reservoir or other watercourse. However, for those works, impoundments, reservoirs, or other watercourses described in subparagraphs (a)3. and (b)1., use of the system for flood attenuation, whether originally planned or unplanned, shall be considered an incidental use so long as the works, impoundments, reservoirs, and other watercourses are no more than two acres larger than the minimum area required to comply with the applicable stormwater treatment requirements of Chapters 17-25, 17-330, 40D-4, FAC For the purposes of this subsection, reuse from a work, impoundment, reservoir, or other watercourse is part of treatment or disposal.

16. The performance of activities pursuant to the provisions of the exemptions described above does not relieve the person or persons who are using the exemption or who are constructing or otherwise implementing the activity from meeting the permitting or performance requirements of other District rules.

Page 656: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-103 Wastewater Management

Page 657: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-104 Wastewater Management

Appendix 12-2

Aquaculture Operations Not Permitted By Rule (Source: FAC 62-660.820(4))

[Moved from Appendix 12-1 July 1998] The following aquaculture operations, new and existing, are not permitted by rule and must have a permit to construct or operate an industrial wastewater treatment facility:

1. Fish farms with flow-through or raceway production systems or with individual production units which, excluding storm-induced discharges, discharge to surface waters of the state more than 30 days/yr. This exclusion does not apply to farms that discharge to surface waters of the state only from fish hatchery facilities and fish shipping facilities.

2. Fish farms with any ponds or production units constructed in areas that are waters of the state on or after

30 April 1992. This exclusion does not apply if the construction was performed under a Department or Water Management District wetland resource permit.

3. Fish farms with any production ponds constructed after 30 April 1992 using ponds formed by impounding

surface waters of the state. 4. Fish farms with any ponds connected to Class G-I or G-II aquifers through wells or sink holes. 5. Fish farms growing or holding prohibited species of fish. 6. Fish farms that, within a contiguous tract of land owned or controlled by one person or corporation, have

more than 300 acres of production ponds. 7. Fish farms that discharge either production unit waters or detention pond waters directly to lakes,

estuaries, Class I, Class II, or Outstanding Florida Waters [undefined], or indirectly to these waters through intermittent water bodies if no dilution occurs prior to confluence. This exclusion for dischargers to Outstanding Florida Waters [undefined] does not apply if the fish farm existed before designation of the waters as an Outstanding Florida Water and has not increased its production or its discharge to the Outstanding Florida Water after the designation of the water as an Outstanding Florida Water.

8. Fish farms that discharge to surface waters of the state more than 30 days/yr and produce more than

100,000 lb of fish per year, or are otherwise required to obtain a NPDES permit.

Page 658: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-105 Wastewater Management

Appendix 12-3

Groundwater Monitoring Required for Major Egg Production Facilities (Source: FAC 62-670.600(5)(a) through (d))

[Moved from Appendix 12-2 July 1998] (a) Egg Wash Water Spray Sites. Monitor Wells Required Parameters Sampling Frequency One up gradient Total Nitrogen Quarterly One down gradient Nitrates Fecal Coliform Specific Conductance pH Depth to Ground Water Ground Water Elevation (b) Unlined Lagoon Systems.* Monitor Wells Required Parameters Sampling Frequency One up gradient Total Nitrogen Quarterly Three down gradient Nitrates Fecal Coliform Specific Conductance pH Depth to Ground Water Ground Water Elevation *In addition an inventory of all supply wells located within a ½ mile radius of the site must be provided. (c) Lined Lagoon Systems. Monitor Wells Required Parameters Sampling Frequency One down gradient Total Nitrogen Quarterly Nitrates Fecal Coliform Specific Conductance pH Depth to Ground Water Ground Water Elevation (d) Unlined Hen Houses. Monitor Wells Required Parameters Sampling Frequency One down gradient Total Nitrogen Quarterly Nitrates Fecal Coliform Specific Conductance pH Depth to Ground Water

Page 659: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-106 Wastewater Management

Ground Water Elevation

Page 660: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-107 Wastewater Management

Appendix 12-4 Location Requirements for Onsite Sewage Treatment and Disposal Systems

(Source: FAC 64E-6.005(1) through (3) and 6.007) [Revised and moved from Appendix 12-3 July 1998]

1. Systems are placed no closer than the minimum distances indicated for the following:

a. 75 ft from a private potable well b. 100 ft from a public drinking water well, if the well serves a facility with an estimated sewage flow

of 2000 gal or less per day c. 200 ft from a public drinking water well, if the well serves a facility with an estimated sewage flow

of more than 2000 gal per day d. 50 ft from a nonpotable water well e. 10 ft from a storm sewer pipe to the maximum extent possible, but no less than 5 ft f. 15 ft from the design high-water line of retention areas, detentions areas, or swales designed to

contain standing or flowing water for less than 72 hours after a rainfall or the design high-water level of normally dry drainage ditches or normally dry individual-lot stormwater retention areas.

2. Systems are not located under buildings or within 5 ft of building foundations (including pilings for

elevated structures), mobile home walls, swimming pool walls, or property lines, except when property lines abut utility easements which do not contain underground utilities, or where recorded easements are specifically provided for the installation of systems for service to more than one lot or property owner.

3. Sidewalks, decks, and patios are not subject to the 5 ft setback; however, drainfields are not to be installed

beneath these structures. Any tank located beneath a driveway has traffic lids. Concrete structures which are intended to be placed over a septic tank have a barrier of soil or plastic material placed between the structure and the tank so as to preclude adhesion of the structure to the tank.

4. Systems are not located within 10 ft of potable water lines unless the lines are sealed with a water proof sealant within a sleeve of similar material pipe to a distance of at least 10 ft from the nearest portion of the drainfield. In no case is the sleeved water line to be located within 24 in. of the onsite sewage treatment and disposal system. The sleeved water line is not located at an elevation lower than the drainfield absorption surface. Nonpotable water lines are not located within 24 in. of the system without backflow preventers or check valves being installed on the water line so as to preclude contamination of the water system.

(NOTE: A potable water line is considered any water line which is connected to a potable water supply source. Water distribution pipe material and installation requirements are regulated by each county's plumbing code.)

5. Systems have a minimum setback of 15 ft from groundwater interceptor drains. 6. Systems are not located laterally within 75 ft of the mean high water line of tidal water bodies or within 75

ft of the ordinary high water line of lakes, streams, canals, normally wet drainage ditches, retention areas designed to contain standing or flowing water for 72 h or more following a rainfall, marshes, or other nontidal surface waters. This requirement does not apply to swales that are designed to not contain water 72 h after a rainfall event. Systems are located a minimum of 15 ft from the design high water line of a retention or detention area designed to contain standing or flowing water for less than 72 h after a rainfall, or the design high water level of normally dry drainage ditches or normally dry individual lot storm water retention areas.

7. The absorption surface of the drainfield is not subject to flooding based on 10-yr flood elevations.

However, for lots or parcels created prior to 17 January 1990, if an applicant cannot construct a drainfield

Page 661: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-108 Wastewater Management

system with the absorption surface of the drainfield at an elevation equal to or above the 10-yr flood elevation, a permit for an onsite sewage treatment and disposal system within the 10-yr floodplain of rivers, streams, and other bodies of flowing water will be issued.

(NOTE: The use of fill or mounding to elevate a drainfield system out of the 10-yr floodplain of rivers,

streams, or other bodies of flowing water is prohibited if such a system lies within a regulatory floodway. In cases where the 10-yr flood elevation does not coincide with the boundaries of the regulatory floodway, the regulatory floodway extends, at a minimum, to the 10-yr flood elevation.)

Page 662: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-109 Wastewater Management

Appendix 12-5

Setback Distances for Slow-Rate Land Application Systems (Source: FAC 62-610.421)

[Moved from Appendix 12-4 July 1998]

1. Setback distances are maintained between the wetted site area subject to land application and surface waters and potable water supply wells to ensure compliance with water quality and drinking water standards, and to protect the public health, safety, and welfare. All systems are designed to minimize adverse effects resulting from noise, odor, lighting and aerosol drift. Adequate site area is provided for operation and maintenance, and for controlling emergency discharges.

2. Slow-rate land application systems maintain a distance of 100 ft from the edge of the wetted area to

buildings that are not part of the treatment facility, utilities system, or municipal operation; or to the site property line.

(NOTE: This distance is reduced to the following:

a. 50 ft if the setback is vegetated with trees or shrubs to create a continuous visual barrier at least 5 ft

high to minimize aerosol drift

b. 25 ft if high-level disinfection is provided in addition to the setback vegetation

c. 50 ft if only low trajectory, low pressure nozzles or surface application techniques are used within the outermost 50 ft of the application area

d. 25 ft if high-level disinfection is also provided.

If subsurface application systems are used, no setback distances to buildings are required. If subsurface

application systems are used, the setback distance to the site property line is reduced to 30 ft. If subsurface application systems are used and if high-level disinfection is provided, the setback distance to the site property line is reduced to 10 ft. This onsite setback distance is reduced to 50 ft if high-level disinfection is provided.)

3. A 500-ft setback distance is provided from the edge of the wetted area to potable water supply wells that

are existing or have been approved by the Department or by the Department of Health (but not yet constructed); Class I surface waters; or Class II surface waters.

(NOTE: This distance is reduced to 200 ft if facility Class I reliability. This distance is reduced to 100 ft if

facility Class I reliability is provided and if high-level disinfection is provided. Reductions in the 500-ft setback distance to potable water wells are not be allowed. Setback distance requirements apply to all Class II waters, regardless of Department classification (such as open, closed, approved, conditionally approved, restricted, conditionally restricted, prohibited, or unclassified.)

4. No setback distance is required to any nonpotable water supply well.

5. A 100-ft setback distance is provided from a reclaimed water transmission facility to a public water

supply well. No setback distance is required to other potable water supply wells or to nonpotable water supply wells.

6. Setback distances for potable water supply wells are applied only for new or expanded reuse facilities.

Page 663: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-110 Wastewater Management

7. The edge of the wetted area of the land application system is at least 100 ft from outdoor public eating, drinking, and bathing facilities.

8. A 500-ft setback distance is provided from new unlined storage ponds to potable water wells.

Page 664: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-111 Wastewater Management

Appendix 12-6

Setback Distances for Rapid-Rate Land Application Systems (Source: FAC 62-610.521)

[Moved from Appendix 12-5 July 1998]

1. Setback distances are maintained between the wetted site area subject to land application and surface waters and potable water supply wells to ensure compliance with water quality and drinking water standards, and to protect the public health, safety, and welfare. All systems are designed to minimize adverse effects resulting from noise, lighting, aerosol drift, and odors. Adequate site area is provided for operation and maintenance, and for controlling emergency discharges.

2. A setback distance of 500 ft is provided from the edge of the RIB, percolation pond, basin, or trench embankments, or from the edge of an absorption field to potable water supply wells that are existing or have been approved by the Department or by the Department of Health (but not yet constructed); Class I surface waters; or Class II surface waters.

(NOTE: The setback distance to Class I and II surface waters is reduced to 100 ft if high-level disinfection is provided. Setback distance requirements apply to all Class II waters, regardless of Department classification (such as open, closed, approved, conditionally approved, restricted, conditionally restricted, prohibited, or unclassified). The setback distance to potable water supply wells, which are not potable water wells, is reduced to 200 ft if all of the following requirements are met:

a. Class I reliability is provided b. high-level disinfection is provided c. the applicant provides information in the engineering report dealing with soils, hydrogeologic

conditions, the depth and casing characteristics of such wells, proposed hydraulic loading rates, quality of reclaimed water, and expected travel time of the groundwater to the potable water supply wells that provides reasonable assurance that applicable water quality standards will not be violated at the point of withdrawal.)

3. No setback distance is required to any nonpotable water supply well. 4. Setback distances for potable water supply wells are applied only for new or expanded reuse facilities. 5. Minimum setback distances to other classes of surface waters are sufficient to provide reasonable

assurance of compliance with applicable water quality standards. 6. A setback distance of at least 100 ft is maintained from the edge of the RIBs, percolation pond, basin,

embankments, or absorption field to buildings that are not part of the treatment facility, utilities system, or municipal operations; or to the site property line.

(NOTE: This onsite setback distance is reduced to 50 ft if the following requirements are met: a. the reuse site is adjacent to a right-of-way b. the engineering report demonstrates that operation of the reuse system, including groundwater

mounding, will not adversely affect the intended use of the right-of-way c. information in the engineering report dealing with soils, hydrogeologic conditions, proposed

hydraulic loading rates, quality of reclaimed water, and expected travel time of groundwater to the site property line provides reasonable assurance that applicable water quality standards will not be violated.

This onsite setback distance is reduced to 25 ft if high-level disinfection is provided. This onsite setback distance shall be reduced to 50 ft if the following requirements are met: a. high-level disinfection is provided

d. information in the engineering report dealing with soils, hydrogeologic conditions, proposed hydraulic loading rates, quality of reclaimed water, and expected travel time of groundwater to the site property line provides reasonable assurance that applicable water quality standards will not be violated.)

7. A 100-foot setback distance is provided from a reclaimed water transmission facility to a public water supply well. No setback distance is required to other potable water supply wells or to nonpotable water supply wells.

Page 665: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-112 Wastewater Management

8. The minimum setback distances described above are only to be used if there is reasonable assurance that applicable water quality standards will not be violated.

9. For RIBs, percolation ponds, basins, and trenches, setback distances are measured beginning at the inside top of the berm surrounding the pond. For absorption fields, setback distances are measured from the outer-most edge of the absorption field trench.

10. A 500-ft setback distance is provided from new unlined storage ponds to potable water wells

Page 666: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-113 Wastewater Management

Appendix 12-7 Maximum Heavy Metal Concentrations and Cumulative Application

Levels for Residuals (Source: FAC 62-640.700 and 640.850(3)(a))

[Added July 1998; Revised May 1999]

Column I

Ceiling concentrations for wastewater residuals in

mg/kg dry weight.

Column II

Maximum cumulative heavy metals in lb/acre.

Column III

Class AA residuals concentration monthly average limits in mg/kg

dry weight. Arsenic 75 36.6 41 Cadmium 85 34.8 39 Copper 4300 1340 1500 Lead 840 268 300 Mercury 57 15.2 17 Molybdenum 75 - - Nickel 420 375 420 Selenium 100 89.3 100 Zinc 7500 2500 2800

Page 667: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-114 Wastewater Management

Appendix 12-8

Applicability of Regulations on Domestic Wastewater Residuals (Source: FAC 62-640.100(6)) [Added May 1999]

(a) Requirements in this chapter shall apply to domestic wastewater treatment facilities, residuals management facilities, and septage management facilities that generate residuals or septage which are to be applied to agricultural sites or reclamation sites, or which are distributed and marketed.

(b) The requirements in this chapter shall also apply to appliers or distributors of residuals or residuals products, and to owners or operators of agricultural sites or reclamation sites which receive residuals.

(c) Unless specifically provided otherwise in this chapter, requirements in this chapter shall apply to all facilities which generate residuals or apply residuals to agricultural sites or reclamation sites, or which distribute and market residuals or operate an agricultural site or reclamation site, for which complete permit applications were received after December 1, 1997.

(d) Unless specifically provided otherwise in this chapter, requirements in this chapter shall apply to all septage management facilities that treat more then 10,000 gallons per day monthly average daily flow or more than 20,000 gallons in a single day, and that apply septage to agricultural sites or reclamation sites. The requirements of this chapter shall also apply to appliers of septage, and to operators or owners of an agricultural site or reclamation site which has had septage from facilities permitted under this chapter applied to the land after December 1, 1997.

(e) Unless specifically provided otherwise in this chapter, requirements in this chapter that apply to residuals shall also apply to septage from facilities regulated by the Department, and to products derived from such septage, or residuals, or combinations thereof.

(f) Unless specifically provided otherwise in this chapter, requirements in this chapter shall apply to composting facilities, as defined by this chapter, which use yard trash, wood chips, or similar bulking agents, and applying the resulting compost to land or distribute and market the resulting compost after December 1, 1997.

(g) Facilities which have submitted a complete wastewater permit application or which have received an initial permit before December 1, 1997, are considered to be existing facilities and shall meet the requirements of this chapter in accordance with subsection (h) below.

(h) Existing facilities in Florida shall comply with these requirements at the time of renewal or substantial revision of the wastewater permit, whichever occurs first. Existing facilities may choose to comply with the requirements of this chapter prior to the time specified in this rule by obtaining a permit revision under Chapter 62-620, FAC

(i) Until such time as the wastewater permit is renewed or a new permit is issued for expansion or substantial modification of the facility, the facility shall comply with the requirements for land application of residuals or septage in the existing permit.

(j) Residuals or residual products which are generated outside of Florida but imported to Florida are subject to the provisions of this chapter beginning December 1, 1997.

(k) The following activities are excluded from the requirements of this chapter:

1. Regulation of septage management facilities that treat 10,000 gallons per day or less on a monthly average daily flow basis and no more than 20,000 gallons in a single day. These facilities are regulated by the Department of Health in accordance with Chapter 64E-6, FAC

2. Land application of septage treated by facilities which are regulated by the Department of Health in accordance with Chapter 64E-6, FAC

Page 668: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

12-115 Wastewater Management

3. Disposal of residuals, septage, and other solids in a solid waste landfill. Disposal of these materials shall be in accordance with Chapter 62-701, FAC

4. Disposal of residuals by placement on land for purposes other than soil conditioning or fertilization, such as at a monofill, surface impoundment, waste pile, or dedicated site. Disposal in such cases shall be in accordance with Chapter 62-701, FAC

5. Incineration of residuals. Incineration of residuals shall meet the requirements of Chapters 62-210, 62-212, 62-213, 62-272, 62-273, 62-275, 62-296, and 62-297, FAC, and the Resource Conservation and Recovery Act.

6. Co-composting of residuals with solid waste other than yard trash, wood chips or similar bulking agents. Co-composting of residuals with solid waste materials shall be in accordance with Chapter 62-709, FAC

7. Treatment, management, or disposal of industrial sludges or septage, air treatment sludges, and water supply treatment sludges.

8. Disposal of screenings and grit from the preliminary treatment components of wastewater treatment facilities, solids from sewer line cleaning operations, and solids from lift stations and pump stations. Disposal of these materials shall be in accordance with Chapter 62-701, FAC

Page 669: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-1 Water Quality Management

SECTION 13

WATER QUALITY MANAGEMENT

Florida Supplement, June 2000 This section covers the state requirements for Water Quality Management and is intended to Supplement the U.S. TEAM Guide. Refer to the U.S. TEAM Guide and the DOD Component Supplements for Federal, DOD, and service-specific requirements.

Definitions

• Action Level - the concentration of lead or copper in water which determines the treatment requirements that a system is required to complete (Florida Administrative Code (FAC) Title 62, Chapter 551, Section 200(1) (FAC 62-551.200(1)).

• Ambient (Natural) Temperature of a Receiving Body of Water - the existing temperature of the

receiving water at a location which is unaffected by manmade thermal discharges and a location which is also of a depth and exposure to winds and currents which typify the most environmentally stable portions of the receiving body of water (FAC 62-302.520(3)(a)).

• Background - the condition of waters in the absence of the activity or discharge under consideration,

based on the best scientific information available to the Department (FAC 62-520.200(3)). • Class F-I Groundwater - potable water use, groundwater in a single source aquifer which has a total

dissolved solids content of less than 3000 mg/L and was specifically reclassified as Class F-I by the Commission. The single source aquifer is the surficial aquifers in northeast Flagler County included in the area bounded on the east by the Atlantic Ocean; on the west by Intracoastal Waterway; on the north by the north line of Sections 8 and 39, Township 10 South; and on the south from a line running due east and west from a point along the east-west boundary of Sections 9 and 10, Township 11 South, where that point intersects the northern extension of the mean high water line of Fox's Cut (FAC 62-520.410(1) and 62-520.460(1)).

• Class G-I Groundwater - potable water use, groundwater in single source aquifers which has a total

dissolved solids content of less than 3000 mg/L (FAC 62-520.410(1)). • Class G-II Groundwater - potable water use, groundwater in aquifers which has a total dissolved solids

content of less than 10,000 mg/L, unless otherwise classified by the Commission (FAC 62-520.410(1)).

• Class G-III Groundwater - nonpotable water use, groundwater in unconfined aquifers which has a total

dissolved solids content of 10,000 mg/L or greater or which has total dissolved solids of 3000 to 10,000 mg/L and either has been reclassified by the Commission as having no reasonable potential as a future source of drinking water, or has been designated by the Department as an exempted aquifer (FAC 62-520.410(1)).

• Class G-IV Groundwater - nonpotable water use, groundwater in confined aquifers which has a total

dissolved solids content of 10,000 mg/L or greater (FAC 62-520.410(1)). • Class I Injection Wells - one of the following:

1. wells used by generators of hazardous wastes or owners or operators of hazardous waste management facilities to inject hazardous waste beneath the lowermost formation containing, within 0.25 mi of the well bore, an underground source of drinking water

Page 670: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-2 Water Quality Management

2. other industrial and municipal (publicly or privately owned) disposal wells which inject fluids beneath the lowermost formation containing, within 0.25 mi of the well bore, an underground source of drinking water (FAC 62-528.300(1)(a)).

• Class IV Injection Wells - wells used by generators of hazardous wastes or of radioactive wastes, by

owners or operators of hazardous waste management facilities, or by owners or operators of radioactive waste disposal sites to dispose of hazardous wastes or radioactive wastes:

1. into or above a formation which, within 0.25 mi of the well, contains either an underground source of drinking water, or an exempted aquifer

2. which cannot be classified as a Class I well (FAC 62-528.300(1)(d)). • Class V Injection Wells - only injection wells not included in Class I, II, III, or IV are Class V wells.

Generally, wells covered by this definition inject nonhazardous fluids into or above formations that contain underground sources of drinking water. This definition also includes wells not covered in Class IV that inject natural and manmade radioactive materials, provided these concentrations do not exceed current drinking water standards. Various types of Class V wells that exist or may exist in Florida are grouped together in order to facilitate the determination of permitting, operating, and monitoring requirements for these wells. The groups are:

1. Group 1, wells associated with thermal energy exchange processes, which include air-conditioning return flow wells and cooling water return flow wells. Air-conditioning return flow wells and cooling water return flow wells may be part of an open-loop or closed-loop system, with or without additives.

2. Group 2, recharge wells, saltwater intrusion barrier wells, connector wells, and subsidence control wells.

3. Group 3, wells that are part of domestic wastewater treatment systems, including septic system wells receiving domestic wastewater.

4. Group 4, nonhazardous industrial and commercial disposal wells, that include laundry waste wells, dry wells, injection wells associated with aquifer remediation projects, desalination process concentrate wells, and nuclear disposal wells used to inject radioactive wastes, provided the concentrations of the waste do not exceed drinking water standards.

5. Group 5, wells associated with mining or mineral extraction operations including wells used to inject spent brine into the same formation from which it was withdrawn after extraction of halogens or their salts, sand backfill wells, and injection wells used for in situ recovery of phosphate, uraniferous sandstone, clay, sand, and other minerals extracted by the borehole slurry mining method.

6. Group 6, lake level control and stormwater drainage wells. 7. Group 7, wells associated with an aquifer storage and recovery system. 8. Group 8, wells including exploratory wells, geothermal wells, experimental technology wells,

swimming pool drainage wells, and other wells (FAC 62-528.300(1)(e) and 62-528.600). • Coastal Waters - all waters in the state which are not classified as fresh waters or as open waters (FAC

62-302.520(3)(b)). • Commission - the Environmental Regulation Commission (FAC 62-520.200(4)). • Community Water System - a public water system which serves at least 15 service connections used by

year-round residents or regularly services at least 25 year-round residents (FAC 62-550.200(9)). • Compliance Cycle - the 9-yr cycle during which public water systems must monitor. Each compliance

cycle consists of three 3-yr compliance periods. The first compliance cycle begins 1 January 1993 and ends 31 December 2001; the second begins 1 January 2002 and ends 31 December 2010; the third begins 1 January 2011 and ends 31 December 2019 (FAC 62-550.200(10)).

Page 671: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-3 Water Quality Management

• Compliance Period - a 3-yr period within a compliance cycle. Each compliance cycle has three 3 yr compliance periods. Within the first compliance cycle, the first compliance period runs from 1 January 1993 to 31 December 1995; the second from 1 January 1996 to 31 December 1998; the third from 1 January 1999 to 31 December 2001 (FAC 62-550.200(11)).

• Confirmation Sample - a sample analysis or analyses taken to verify the results of an original analysis.

Each sample for the analysis must be taken or measured at the same location in the water system as the original sample. The results of the confirmation samples must be averaged with the original sample to determine compliance (FAC 62-550.200(12)).

• Contaminant - any physical, chemical, biological, or radiological substance or matter in water (FAC

62-550.200(14)). • Cooling Pond - a body of water enclosed by natural or constructed restraints which has been approved

by the Florida Department of Environmental Protection for purposes of controlling heat dissipation from thermal discharges (FAC 62-302.520(3)(c)).

• Cross-Connection - any physical arrangement whereby a public water supply is connected, directly or

indirectly, with any other water supply system, sewer, drain, conduit, pool, storage reservoir, plumbing fixture, or other device which contains or may contain contaminated water, sewage or other waste, or liquid of unknown or unsafe quality which may be capable of imparting contamination to the public water supply as the result of backflow. By-pass arrangements, jumper connections, removable sections, swivel or changeable devices, and other temporary or permanent devices through which or because of which backflow could occur are considered to be cross-connections (FAC 62-550.200(16)).

• Delineated Area - a surface area identified by the Department within which groundwater

contamination is known to exist or which encompasses vulnerable areas or areas in which the Department provides a subsidy for restoration or replacement of contaminated drinking water supplies (FAC 62-524.200(2)).

• Department - the Department of Environmental Protection (FAC 62-532.200(5)). • Designated Use - the present and future most beneficial use of a body of water as designated by the

Environmental Regulation Commission (FAC 62-520.200(7)). • Disinfection - a process which inactivates pathogenic organisms in water by chemical oxidants or

equivalent agents (FAC 62-550.200(23)). • District - a water management district created by the Department (FAC 62-532.200(7)). • Emergency Disposal Method - an effluent disposal method that, after prior Department approval and

receipt of all appropriate authorizations or permits, is available for short term discharges under emergency conditions when the primary disposal method is inoperable (FAC 62-528.200(21)).

• Filtration - a process for removing particulate matter from water by passage through porous media

(FAC 62-550.200(27)). • Fresh Waters - all waters of the state which are contained in lakes and ponds or are in flowing streams

above the zone in which tidal actions influence the salinity of the water and where the concentration of chloride ions is normally less than 1500 mg/L (FAC 62-302.520(3)(e)).

• Gross Alpha Particle Activity - the total radioactivity due to alpha particle emission as inferred from

measurements on a dry sample (FAC 62-550.200(29)).

Page 672: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-4 Water Quality Management

• Gross Beta Particle Activity - the total radioactivity due to beta particle emission as inferred from measurements on a dry sample (FAC 62-550.200(30)).

• Groundwater - water beneath the surface of the ground within a zone of saturation, whether or not

flowing through known and definite channels (FAC 62-520.200(10)). • Heated Water Discharges - the effluents from commercial or industrial activities or processes in which

water is used for the purpose of transporting waste heat and which constitute heat sources of 1MBtu/h or greater (FAC 62-302.520(3)(h)).

• Injection Well - a well into which fluids are being or will be injected, by gravity flow or under pressure

(FAC 62-528.200(37)). • Injection Well System - the portion of the disposal system from the effluent side or pressure side of the

injection pump to the bottom of the injection well (FAC 62-528.200(38)). • Lead Service Line - a service line made of lead that connects the water main to the building inlet and

any lead pigtail, gooseneck or other fitting which is connected to such a lead line (FAC 62-551.200(6)).

• Manmade Beta Particle and Photon Emitters - all radionuclides emitting beta particles or photons

listed in Maximum Permissible Body Burdens and Maximum Permissible Concentration of Radionuclides in Air or Water for Occupational Exposure, NBS Handbook 69, except the daughter products of thorium-232, uranium-235, and uranium-238 (FAC 62-550.200(39)).

• Maximum Contaminant Level (MCL) - the maximum permissible level of a contaminant in water

which is delivered to any user of a public water system (FAC 62-550.200(40)). • Medium System - a water system that serves greater than 3300 and less than or equal to 50,000 people

(FAC 62-551.200(7)). • Municipal Injection Well - an injection well, publicly or privately owned, which is used to inject fluids

that have passed through the head of a permitted domestic wastewater treatment facility and received at least secondary treatment (FAC 62-528.200(43)).

• New Potable Water Well - any excavation that is drilled, bored, or converted from nonpotable water

use, after delineation in an area delineated by the Department when the intended use of the excavation is for the location and acquisition of groundwater which supplies water for human consumption. This does not include repair of an existing potable water well (FAC 62-524.200(4)).

• Noncommunity Water System - a public water system that provides piped water for human

consumption to at least 15 service connections or which serves at least 25 individuals at least 60 days out of the year but which is not a community water system. The difference between community water systems and noncommunity water systems is that the former serves inhabitants whereas the latter serves transients or nonresidents who otherwise do not inhabit the building served by the system (FAC 62-550.200(43)).

• Nontransient, Noncommunity (NTNC) Water System - a public water system that is not a community

water system and that regularly serves at least 25 of the same persons over 6 mo/yr(FAC 62-550.200(44)).

• Open Waters - all waters in the state extending seaward from the most seaward 18-ft depth contour line

(3-fathom bottom depth contour), which is offshore from any island; exposed or submerged bar or reef; or mouth of any embayment or estuary which is narrowed by headlands. Contour lines are determined from Coast and Geodetic Survey Charts (FAC 62-302.520(3)(f)).

Page 673: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-5 Water Quality Management

• Optimal Corrosion Control Treatment - the corrosion control treatment that minimizes the lead and

copper concentrations at users' taps while ensuring that the treatment does not cause the system to violate any national primary drinking water regulations (FAC 62-551.200(8)).

• Outstanding Florida Waters - waters designated by the Environmental Regulation Commission as

worthy of special protection because of their natural attributes (FAC 62-302.200(17)). • Outstanding National Resource Waters - waters designated by the Environmental Regulation

Commission that are of such exceptional recreational or ecological significance that water quality should be maintained and protected under all circumstances, other than temporary lowering and the lowering allowed under Section 316 of the Federal Clean Water Act (FAC 62-302.200(18)).

• Plugging - the act or process of stopping the flow of water, oil, or gas into or out of a formation

through a borehole or well penetrating that formation (FAC 62-528.200(50)). • Point of Discharge for a Heated Water Discharge - primarily that point at which the effluent

physically leaves its carrying conduit (open or closed) and discharges into the waters of the state, or, in the event it is not practicable to measure temperature at the end of the discharge conduit, a specific point designated by the Florida Department of Environmental Protection for that particular thermal discharge (FAC 62-302.520(3)(g)).

• Public Water System - a system that provides piped water to the public for human consumption, if it

has at least 15 service connections or regularly serves at least 25 individuals daily at least 60 days out of the year. A public water system is a community water system, a noncommunity water system, or a NTNC water system (FAC 62-550.200(50)).

• Repair - any action which involves the physical alteration or replacement of any part of a well, but

does not include the alteration or replacement of any portion of a well which is above ground surface (FAC 62-532.200(13)).

• Single-Family Structure - a building constructed as a single-family residence that is currently used as

either a residence or a place of business (FAC 62-551.200(10)). • Small System - a water system that serves 3300 people or less (FAC 62-551.200(11)). • Supplier of Water - any person who owns or operates a public water system (FAC 62-550.200(60)). • Surface Water - water upon the surface of the earth, whether contained in bounds created naturally or

artificially or diffused. Water from natural springs is classified as surface water when it exits from the spring onto the earth's surface (FAC 62-520.200(18)).

• Total Trihalomethanes (TTHM) - the sum of the concentration in milligrams per liter of the

trihalomethane compounds: trichloromethane (chloroform), dibromochloromethane, bromodichloromethane, tribromomethane (bromoform), rounded to two significant figures (FAC 62-500.200(64)).

• Treatment Technique - the technology, when installed in a public water system, which leads to the

reduction of contaminant levels (FAC 62-550.200(65)). • Underground Source of Drinking Water - an aquifer or its portion which supplies drinking water for

human consumption, is classified as Class F-I, GI or G-II groundwater, or contains a total dissolved solids concentration of less than 10,000 mg/L and which is not an exempted aquifer (FAC 62-528.200(60)).

Page 674: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-6 Water Quality Management

• Water Well - any excavation that is drilled, cored, bored, washed, driven, dug, jetted, or otherwise constructed when the intended use of excavation is for the location, acquisition, development, or artificial recharge of groundwater, but the term does not include any well for the purpose of obtaining or prospecting for oil, natural gas, minerals, or products of mining or quarrying; for inserting media to dispose of oil brines or to repressure oil-bearing or natural gas-bearing formation; for storing petroleum, natural gas, or other products; or for temporary dewatering of subsurface formation for mining, quarrying, or construction purposes (FAC 52-532.200(15)).

• Water Well Contractor - an individual who is responsible for the construction, repair, or abandonment

of a water well and who is licensed to engage in this business (FAC 62-531.200(7)). • Well - a bored, drilled or driven shaft, or a dug hole, which has a depth greater than the diameter of the

largest surface dimension (FAC 62-528.200(61)). • Works - those projects and works including, but not limited to, structures, watercourses, together with

the appurtenant facilities and accompanying lands that have been officially adopted by the Governing Board as works of that District (FAC 40A-6.021(2)).

• Zone of Discharge - a volume underlying or surrounding the site and extending to the base of a

specifically designated aquifer or aquifers, within which an opportunity for the treatment, mixture or dispersion of wastes into receiving groundwater is afforded (FAC 62-520.200(23)).

Page 675: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-7 Water Quality Management

WATER QUALITY MANAGEMENT GUIDANCE FOR FLORIDA CHECKLIST USERS

REFER TO CHECKLIST ITEMS: Missing Checklist Items WQ.2.1.FL. Public Water Systems

General WQ.10.1.FL. through WQ.10.8.FL. Monitoring/Sampling WQ.15.1.FL. through WQ.15.5.FL. Disinfection and Filtration WQ.20.1.FL. Notification and Reporting Requirements WQ.30.1.FL. and WQ.30.2.FL.

Community Water Systems

Standards WQ.35.1.FL. through WQ.35.5.FL. Monitoring/Sampling WQ.40.1.FL. through WQ.40.10.FL. Lead and Copper WQ.50.1.FL. through WQ.50.12.FL.

Noncommunity Water Systems

Standards WQ.60.1.FL. Monitoring/Sampling WQ.65.1.FL.

Nontransient, Noncommunity Water Systems

Standards WQ.76.1.FL. through WQ.76.5.FL. Monitoring/Sampling WQ.77.1.FL. through WQ.77.8.FL. Lead and Copper WQ.78.1.FL. through WQ.78.12.FL.

State Specific Categories of Water Systems Private/Other WQ.85.1.FL. through WQ.85.5.FL.

Drinking Water Wells WQ.90.1.FL. through WQ.90.6.FL. Recharge Wells WQ.105.1.FL. through WQ.105.5.FL. Injection Control Wells WQ.110.1.FL. through WQ.110.7.FL.

Water Quality Standards

Groundwater WQ.115.1.FL. through WQ.115.5.FL. Surface Water WQ.115.6.FL. through WQ.115.8.FL.

Water Use Permits WQ.120.1.FL. through WQ.120.12.FL.

WATER QUALITY MANAGEMENT

GUIDANCE FOR FLORIDA APPENDIX USERS

REFER TO APPENDIX NUMBERS: REFER TO APPENDIX TITLES:

13-1 Exemptions from Environmental Resource Permitting Requirements

13-2 Monitoring Schedule 13-3 Secondary Maximum Contaminant Levels

Page 676: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-8 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.2. MISSING CHECKLIST ITEMS

WQ.2.1.FL. Federal facilities are required to comply with all applicable state regulatory requirements not contained in this checklist (a finding under this checklist item will have the citation of the applied regulation as a basis of finding).

Determine whether any new regulations have been issued since the finalization of the manual.

Determine whether the Federal facility has activities or facilities that are regulated but not addressed in the checklists.

Verify that the Federal facility is in compliance with all applicable and newly issued regulations.

Page 677: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-9 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PUBLIC WATER SYSTEMS

WQ.10. GENERAL

WQ.10.1.FL. Public water systems must meet general contaminant requirements (FAC 62-550.330).

Verify that no contaminant which creates or has the potential to create an imminent and substantial danger to the public is introduced into a public water system.

WQ.10.2.FL. Public water systems must use certified laboratories (FAC 62-550.550(1)).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements.)

WQ.10.3.FL. Public water systems must meet auxiliary power and meter requirements (FAC 62-555.320(6)(a), (c), (e), and (8)).

Verify that community systems which serve 350 or more persons, or have 150 or more service connections, provide auxiliary power for operation of the source, treatment units, and pumps at a rate equal to one-half maximum daily flow.

Verify that the auxiliary power source is operated at least once per month continuously for a minimum of 4 h under load to ensure dependability.

Verify that community water systems maintain a written auxiliary power plan that details how they meet auxiliary power requirements.

Verify that community water systems are equipped with a metering device which accurately indicates pumpage of finished water.

Verify that noncommunity and NTNC systems are equipped with at least an elapsed time clock or other device in conjunction with field calibration of the pump which permits determination of flow.

WQ.10.4.FL. Public water systems must not use lead pipes, solder, or flux (FAC

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide (WQ.25.1) for specific requirements.)

Page 678: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-10 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

62-555.322).

WQ.10.5.FL. Public water systems must meet fluoridation permit and sample analysis requirements (FAC 62-555.325(1), (2), and (4)(a)).

Verify that systems obtain a permit prior to installing and placing into service fluoridation equipment.

Verify that systems practicing fluoridation collect a raw, an effluent, and four distribution systems samples at monthly intervals and then split them and send them to a laboratory of the Department of Health and Rehabilitative Services or another certified laboratory for analysis.

Verify that analysis results are submitted to the Department of Health and Rehabilitative Services State Dental Health Office.

(NOTE: The optimum fluoride level should be maintained at approximately 0.8 mg/L.)

WQ.10.6.FL. Public water systems must meet permit, construction certification, and clearance requirements (FAC 62-555.345, .510(1), 520(1), and .540).

Verify that a permit is obtained prior to construction or alteration of a public water supply well.

(NOTE: A general permit by rule is granted to any person for the construction of an extension to a public water system provided that:

- design criteria are met - the Department is notified - the treatment facility to which the system will be connected has the capacity

to provide the potable water supply required by this system and meets water quality requirements

- upon construction completion, certification that records drawings for the project are available is submitted to the Department

- a copy of record drawings are submitted to the Department if there is any deviation from the construction permit and approved plans.)

Verify that, upon completion of construction, alteration, or extension, the engineer

of record or the system's professional engineer who was responsible for overseeing construction submits a certification of completion letter to the Department.

Verify that new or altered public water systems or components are not placed into operation without prior Department approval or clearance.

WQ.10.7.FL. Public water systems must meet equipment operation and maintenance

Verify that suppliers of water maintain all equipment in good operating condition and keep in operation all equipment designed for the purification of the water supply.

Page 679: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-11 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

requirements (FAC 62-555.350(1), (3), and (4)).

supply.

Verify that suppliers maintain a minimum free chlorine residual of 0.2 mg/L or its equivalent throughout the distribution system at all times.

Verify that the capacity of the treatment plant and distribution facilities, including pumps and pipes, is increased as system demand is increased to maintain a minimum pressure of 20 psi throughout the distribution system, except in extenuating circumstances.

Verify that system are maintained and operated in accordance with the rules of the Department and the approved plans.

Verify that no new source of water is introduced into the system and no purification process or protection provision is altered or discontinued unless the operator secures written approval from the Department.

Verify that, in case of a breakdown in purification or protective works, a break in a main transmission line causing a major interruption in service, or any suspicious circumstance, abnormal taste, or abnormal odor occurring in connection with a public water supply, the person responsible for the operation of the works or the treatment plant operator notifies the Department or the Approved County Public Health Unit, if applicable, by wire or telephone within 24 h of the occurrence.

Verify that a maintenance log of all water plant equipment which directly affects the quality of treatment is maintained onsite by the plant's lead operator and is available at all times at all water treatment plants that treat water for a community water system.

Verify that log information includes, as a minimum, all maintenance performed, date performed, and problems encountered with equipment.

WQ.10.8.FL. Public water systems must meet cross connection control require-ments (FAC 62-555.360(1) through (4)).

Verify that there are no cross-connections.

(NOTE: However, a person who owns or manages a public water system may interconnect to another public water system if that system meets the cross-connection control requirements.)

Verify that community water systems, and all public water systems which have service areas that are also served by reclaimed water systems, establish a routine cross-connection control program to detect and prevent cross connections that create, or may create, an imminent and substantial danger to public health.

Verify that, upon discovery of a prohibited cross-connection, public water systems either eliminate the cross connection by installing one of the following backflow prevention devices acceptable to the Department or discontinue service until the

Page 680: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-12 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

contaminant source is eliminated:

-air gap separation -reduced pressure backflow preventer -atmospheric vacuum breaker -pressure vacuum breaker -double check valve assembly.

Page 681: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-13 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PUBLIC WATER SYSTEMS

WQ.15. MONITORING/ SAMPLING

WQ.15.1.FL. Public water systems must meet treatment technique requirements for acrylamide and epichloro-hydrin (FAC 62-550.325(1)).

Verify that systems annually provide written certification to the Department, using third party or manufacturer's certification, that when acrylamide and epichlorohydrin are used in drinking water systems, the combination, or product, of dose and monomer level does not exceed the following levels:

-acrylamide = 0.05 percent dosed at 1 ppm (or equivalent) -epichlorohydrin = 0.01 percent dosed at 20 ppm (or equivalent).

WQ.15.2.FL. Public water systems must meet routine total coliform monitoring requirements (FAC 62-550.310(3) and .518(1) through (6)).

(NOTE: The regulations for microbiological MCLs are essentially the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements. See the following requirements for additions or modifications to the requirements of the U.S. TEAM Guide.)

(NOTE: The regulations for community and public water system total coliform monitoring frequency are essentially the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements.)

Verify that systems collect total coliform samples at sites representative of water throughout the distribution system and at the source (raw water), according to a written sample siting plan.

Verify that noncommunity water systems serving 1000 or fewer persons monitor at the rate of two samples in each calendar quarter during which water is provided to the public and one raw sample is collected each month.

WQ.15.3.FL. Public water systems which exceed the total coliform MCL must meet repeat total coliform monitoring and reporting requirements (FAC 62-550.518(7) through (9), (11), and (12)).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements. See the following requirements for additions or modifications to the requirements of the U.S. TEAM Guide.)

Verify that systems exceeding the MCL report the violation to the Department no later than the end of the next business day after awareness of the violation and notify the public.

Page 682: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-14 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.15.4.FL. Public water systems must meet iron and manganese monitoring requirements (FAC 62-550.325(2)).

(NOTE: Suppliers of water may use sequestering agents in lieu of meeting the MCL for iron and manganese when the maximum iron and manganese concentration does not exceed 1.0 mg/L.)

Verify that agents and additives and their dosage rate are approved for potable water use.

Verify that suppliers of water report the dosage rate and water concentration level of the sequestering agent in treated water to the Department annually.

WQ.15.5.FL. Public water systems must meet specific monitoring and repeat monitoring requirements (FAC 62-550.500(2), (3)(c) through (e), (5) through (8)).

(NOTE: The regulations for general monitoring locations and Department notification of MCL exceedances are essentially the same as the Federal regulations.)

Verify that systems monitor as specified in Appendix 13-2.

Verify that systems monitoring for a contaminant every 3 yr adhere to the following schedule:

- community water systems that serve more than 3300 persons monitor during the first year of each compliance period

- community water systems that serve 3300 or fewer persons monitor during the second year of each compliance period

- NTNC water systems monitor during the third year of each compliance period.

Verify that systems monitoring for a contaminant every 9 yr monitors during the

first 3-yr compliance period of each 9-yr compliance cycle following the same schedule as above.

(NOTE: In the event the population of a small community system increases to more than 3300 persons, the system must continue to monitor on the schedule originally prescribed for the remainder of the 9-yr compliance cycle. At the beginning of the next 9-yr cycle, the system must begin monitoring in the prescribed year according to its current size or classification.)

Verify that systems take confirmation samples whenever a sample exceeds the MCL for nitrate or nitrite or whenever an unregulated contaminant is detected.

Verify that compliance samples are taken at the same sampling point as soon as possible after the initial sample was taken, but not to exceed 2 weeks.

Verify that systems taking more than one sample per year determine compliance by running an annual average of all samples taken at each sampling point.

Page 683: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-15 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

by running an annual average of all samples taken at each sampling point.

Page 684: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-16 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PUBLIC WATER SYSTEMS

WQ.20. DISINFECTION AND FILTRATION

WQ.20.1.FL. Public water systems must meet disinfection, filtration, and reporting requirements (FAC 62-550.560, .730(3), 62-555.320(4), .340, .620, and .630).

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements. See the following requirements for additions or modifications to the requirements of the U.S. TEAM Guide.)

Verify that systems have continually effective disinfection measures employed on the water which the system distributes.

Verify that, in order to use a well with raw water quality that does not meet bacteriological requirements, groundwater systems that use free chlorine as a disinfectant provide a minimum of 15 min of disinfectant contact time prior to distribution at peak flow rates and that, when other disinfectants are used, the contact time provides for 99.99 percent (4 log) removal or inactivation of viruses.

Verify that groundwater systems which do not meet the raw water bacteriological requirements meet disinfectant residual monitoring requirements specified in the U.S. TEAM Guide.

Verify that supplier of water do not put into service or resume the use of any plant, pumping station, main standpipe, reservoir, tank, or other pipe or structure through which water is delivered to consumers for drinking and household purposes until these items have been effectively disinfected and approved for operation by the Department.

(NOTE: This prohibition may not necessarily apply to mains, reservoirs, tanks, or other structures that contain water before it is treated.)

Page 685: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-17 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

PUBLIC WATER SYSTEMS

WQ.30. NOTIFICATION AND REPORTING REQUIREMENTS

WQ.30.1.FL. Public water systems must meet recordkeeping requirements (FAC 62-550.720, .730(1)(a), (d), and (e)).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements.)

Verify that monthly operation reports for a system are submitted to the Department within 15 days after the month of operation.

WQ.30.2.FL. Public water systems must meet public notification requirements (FAC 62-560.410).

(NOTE: The regulations for systems that violate an MCL, treatment technique requirement, or a schedule for a variance or exemption are essentially the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements. See the following requirements for additions or modifications to the requirements of the U.S. TEAM Guide.)

Verify that systems which violate monitoring requirements, testing procedures, or are subject to a variance or exemption meet the following public notification requirements:

- give public notice within 3 mo of the violation or granting of a variance or exemption

- give notice in a daily newspaper of general circulation or by publication in a weekly newspaper of general circulation if there is no daily paper

- give notice by hand delivery or by continuous posting, for as long as the violation, variance, or exemption exists, in conspicuous places within the area served by the system if there is no daily or weekly newspaper of general circulation

- following the initial notice, give notice at least once every 3 mo by mail delivery or by hand delivery for as long as the violation, variance, or exemption exist.

Verify that community water systems give a copy of any notice published within

the last 6-mo period to all new billing units or new hookups, prior to or at the time service begins.

Verify that each public notice meets the following general content requirements:

Page 686: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-18 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- provides a clear and readily understandable explanation of the violation lists any potential adverse health effects - specifies the population at risk - identifies the steps that the system is taking to correct the violation - indicates the necessity for seeking alternative water supplies, if any - specifies any preventative measures the consumer should take until the

violation is corrected - each notice is conspicuous and does not contain unduly technical language,

unduly small print, or similar problems that frustrate the purpose of the notice

- each notice includes the address and telephone number of the owner, operator, or designee of the system as a source of additional information concerning the notice

- systems which serve a substantial number [undefined] of non-English speaking persons give the notice in the primary language(s) of the customers

- uses the mandatory health effects language specified in the Department publication, Mandatory Health Effects Language for Certain contaminants Regulated in Chapters 62-550, 62-551, 62-555, and 62-560, FAC 1994.

Page 687: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-19 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

COMMUNITY WATER SYSTEMS

WQ.35. STANDARDS

WQ.35.1.FL. Community water systems must meet inorganic chemical (IOC) MCL requirements (FAC 62-550.310(1)).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements.)

(NOTE: The MCL for sodium is 160 mg/L.)

Verify that, if a nitrate level of up to 20 mg/L is allowed by the Department, the following are met:

- the water is distributed by the water system is not available to children under 6 mo of age or to lactating mothers

- there is continuous public notification of what the nitrate level is and what the potential health effects of exposure are

- monitoring every 3 mo as long as the MCL is exceeded.

WQ.35.2.FL. Community water systems must meet volatile organic chemical (VOC) MCL requirements (FAC 62-550.310(2)(b)).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements. See the following note for additions or modifications to the requirements of the U.S. TEAM Guide.)

(NOTE: The MCL for the following are different that those in the U.S. TEAM Guide:

- 1,2-dichloroethane, 0.003 - benzene, 0.001 - carbon tetrachloride, 0.003 - dichloromethane, 0.005 - tetrachloroethylene, 0.003 - trichloroethylene, 0.003 - vinyl chloride, 0.001.)

WQ.35.3.FL. Community water systems must meet synthetic organic chemical (SOC) MCL requirements (FAC 62-550.310(2)(c)).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements. See the following note for additions or modifications to the requirements of the U.S. TEAM Guide.)

(NOTE: The MCL for ethylene dibromide is 0.00002 mg/L.)

Page 688: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-20 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.35.4.FL. Community drinking water systems must meet MCL requirements for radiological contaminants (FAC 62-550.310(4)).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements. See the following requirements for additions or modifications to the requirements of the U.S. TEAM Guide.)

Verify that systems meet the following MCLs for radiological contaminants:

- 20,000 pCi/L for tritium - 8 pCi/L for strontium-90.

WQ.35.5.FL. Community drinking water systems must meet secondary water standards (FAC 62-550.320(1)).

Verify that the secondary MCLs in Appendix 13-3 are met.

Page 689: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-21 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

COMMUNITY WATER SYSTEMS

WQ.40. MONITORING/ SAMPLING

WQ.40.1.FL. Community water systems must meet asbestos monitoring requirements (FAC 62-550.511(1), (6), and (7)).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements.)

(NOTE: If the initial monitoring for asbestos was completed between 1 January 1990 and 31 December 1992 and the results did not exceed the MCL then the system may submit those results to the Department in lieu of monitoring during the first compliance cycle.)

(NOTE: Compositing of samples is allowed.)

Verify that systems monitor as specified in Appendix 13-2.

WQ.40.2.FL. Community water systems must meet monitoring requirements for nitrates and nitrites (FAC 62-550.512(1), (3), and (4)).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements.)

(NOTE: Compositing of samples is allowed.)

Verify that systems monitor as specified in Appendix 13-2.

WQ.40.3.FL. Community water systems must meet monitoring frequency requirements for antimony, arsenic, barium, beryllium, cadmium, chromium, cyanide, fluoride, mercury, nickel, selenium, sodium, and thallium (FAC 62-550.513(1), (3), and (4)).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements.)

(NOTE: Compositing of samples is allowed.)

Verify that systems monitor as specified in Appendix 13-2.

WQ.40.4.FL. Community (NOTE: The regulations for TTHM MCL and minimum sampling are essentially

Page 690: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-22 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

water systems must meet general sampling requirements for TTHMs (FAC 62-550.310(2)(a), .514(1) through (3)(a), (3)(c), (4), and 62-555.320(1)).

the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements. See the following requirements for additions or modifications to the requirements of the U.S. TEAM Guide.)

Verify that systems base the number of samples taken on the number of treatment plants used by the systems and that all samples required within a calendar quarter are collected within a 24-h period.

Verify that systems perform analyses for TTHMs at quarterly intervals on at least four water samples for each treatment plant used by the systems

Verify that at least 25 percent of the samples are collected at locations within the distribution system reflecting the maximum residence time of the water in the system and that the remaining 75 percent are collected at representative locations in the distribution system, taking into account the following:

- number of persons served - different sources of water - different treatment methods employed.

(NOTE: The Department may allow a system to reduce monitoring frequency to a minimum of one sample analyzed for TTHMs per quarter collected at a location within the distribution system reflecting the maximum residence time of the water in the system. If any time during this reduced monitoring the results from any analysis exceed 0.10 mg/L of TTHMs and the results are confirmed by at least one check sample taken promptly after the results are received or if the system makes any significant change to its source of water or treatment program, the system is required to immediately begin monitoring at the prereduced frequency level and does so for at least 1 yr before the frequency may be reduced again.)

Verify that systems determine compliance with the TTHM MCL based on a running annual average of quarterly samples.

Verify that, before a system makes any significant modifications to its treatment process to achieve compliance with the TTHM MCL, the system obtains Department approval of a detailed plan setting forth its proposed modification and the safeguards it will implement to ensure that the bacteriological quality of its drinking water is not adversely affected by the modification.

WQ.40.5.FL. Community water systems must meet VOC monitoring requirements(FAC 62-550.515).

Verify that systems monitor as specified in Appendix 13-2.

Verify that systems which detect a VOC in excess of 0.0005 mg/L in any sample report to the Department within 7 days and monitor quarterly at each sampling point which resulted in a detection.

Page 691: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-23 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

(NOTE: If the Department determines the system is reliably and consistently below the MCL, the system may be allowed to monitor annually during the quarter that previously yielded the highest analytical result.)

Verify that systems which exceed any VOC MCL notify the public, begin quarterly monitoring, and take corrective action as approved by the Department.

(NOTE: If monitoring data collected between 1 January 1988 and 1 January 1993, for purposes of satisfying the initial monitoring requirement, are generally consistent with monitoring requirements in the U.S. TEAM Guide, then the system may be allowed to use a single sample rather than four quarterly samples to satisfy the initial monitoring requirement.)

(NOTE: Compositing of samples is allowed.)

WQ.40.6.FL. Community water systems must meet SOC monitoring and analytical requirements (FAC 62-550.516).

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.40.6.) for specific requirements. See the following require-ments for additions or modifications to the requirements of the U.S. TEAM Guide.)

Verify that systems monitor as specified in Appendix 13-2.

Verify that systems which exceed any SOC MCL notify the Department within 7 days after receiving the laboratory results and monitors quarterly at each sampling point where a contaminant was detected.

(NOTE: After a minimum of four quarterly samples show the system is in compliance and the Department determines the system is reliably and consistently below the MCL, the system must monitor annually during the quarter that previously yielded the highest analytical result.)

(NOTE: If monitoring data collected after 1 January 1990, for purposes of satisfying the initial monitoring requirement, are generally consistent with monitoring requirements in the U.S. TEAM Guide, then the system may be allowed to use a single sample rather than four quarterly samples to satisfy the monitoring requirement for the initial compliance period.)

(NOTE: Compositing of samples is allowed.)

WQ.40.7.FL. Community drinking water systems must meet MCL requirements for radiologic contaminants (FAC

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.40.11.) for specific requirements.)

Page 692: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-24 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

62-550.519).

WQ.40.8.FL. Community water systems must meet the secondary MCL for fluoride and specific public notification requirements (FAC 62-550.520 and 62-560.430).

(NOTE: The regulations for the secondary fluoride MCL are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.45.1.) for specific requirements.)

Verify that systems exceeding the secondary MCL for fluoride provide notice to the following:

- all billing units annually - all new hookups or new billing units before or at the time service begins - the state Public Health Officer.

Verify that the notice contains the language found in the Department publication, Mandatory Health Effects Language for Certain Contaminants Regulated in Chapters 62-550, 62-551, 62-555, and 62-560, FAC 1994.

WQ.40.9.FL. Community water systems must meet monitoring and public notification requirements for unregulated organic contaminants (FAC 62-550.521(2) through (5) and 62-560.440(2)).

(NOTE: The regulations for specific organic contaminants are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.40.7) for specific requirements. Florida includes 1,1-dichloropropylene, dibromochloromethane, dichlorodifluoromethane, and trichlorofluoromethane in the list. Two contaminants are included in the Federal regulations but not the state, chlorodibromomethane and 1,1-dichloropropene.)

Verify that systems monitor for the following contaminants by collecting one sample at each sampling point and reporting the results to the Department:

- 2-methyl-4,6-dinitrophenol - 2-chlorophenol - 2,4-dinitrotoluene - butyl-benzyl-phthalate - di-n-butylphthalate - diethylphthalate - dimethylphthalate - dioctylphthalate - isophorone - phenol.

Verify that, if a sample shows the presence of an unregulated contaminant, a confirmation sample is collected and the Department is notified within 7 days after the result of the confirmation sample is received.

Verify that suppliers of water notify persons served by the system of the availability of the results of sampling by including a notice in the first set of water

Page 693: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-25 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

bills issued by the system after the receipt of the results or by written notice within 3 mo of the receipt of the results.

Verify that the public notice identifies a person and supplies the telephone number to phone for information on the monitoring results.

WQ.40.10.FL. Community water systems with consecutive water systems must meet specific monitoring requirements (FAC 62-550.540).

(NOTE: When one system receives all of its water from another system, the recipient system is the consecutive system. If a system receives only part of its water from another system, the recipient is not a consecutive system.)

Verify that consecutive systems provide microbiological and chlorine residual monitoring.

Verify that consecutive systems meet control of lead and copper and asbestos monitoring requirements.

(NOTE: Additional monitoring of the contaminants listed in WQ.40.9.FL. is required of consecutive systems which have a potential threat of contamination within their distribution system that is not corrected by the treatment provided.)

Page 694: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-26 Water Quality Management

Page 695: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-27 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

COMMUNITY WATER SYSTEMS

WQ.50. LEAD AND COPPER

WQ.50.1.FL. Community water systems with consecutive water systems must meet approval requirements to consolidate lead and copper monitoring requirements (FAC 62-551.300(2)).

(NOTE: Consecutive systems are systems that receive 100 percent of their potable water from another system, which is called the primary system. Consecutive systems not exceeding an action level after completion of the two initial 6-mo monitoring periods may consolidate their sampling, monitoring, treatment, and reporting requirements with that of another consecutive system or its primary system. Consecutive systems that exceed an action level may only consolidate corrosion control and reporting requirements and source water monitoring, treatment, and reporting requirements with that of its primary system.)

Verify that consecutive systems have written approval from the Department prior to any consolidation.

WQ.50.2.FL. Community water systems must meet lead and copper action level requirements (FAC 62-551.300(3)).

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.50.2.) for specific requirements.)

WQ.50.3.FL. Community water systems must meet corrosion control treatment requirements (FAC 62-551.300(4), .320, .330, .550(1), .510, .530(1) through (4), and .540).

(NOTE: The regulations for corrosion control treatment requirements are the same as the Federal regulations. See the following requirements for additions or modifications to the requirements of the U.S. TEAM Guide (WQ.50.3.).)

Verify that systems properly [undefined] install and operate throughout the distribution system the optimal corrosion control treatment designated by the Department.

Verify that systems maintain water quality parameter values at or above minimum values, or within ranges designated by the Department, in each sample collected for monitoring after implementation of corrosion control treatment.

Verify that, within 36 mo after installing corrosion control treatment, systems submit a report to the Department explaining how corrosion control has been installed and how it is being maintained to ensure minimal lead and copper

Page 696: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-28 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

concentrations at consumers' taps.

WQ.50.4.FL. Community water systems exceeding the lead or copper action level must meet specific corrosion control treatment require-ments(FAC 62-551.500(2) and .550).

(NOTE: The regulations for corrosion control treatment requirements are essentially the same as the Federal regulations. See the following requirements for additions or modifications to the requirements of the U.S. TEAM Guide (WQ.50.4).)

Verify that small and medium-size water systems exceeding the lead or copper action level recommend installation of one or more of the corrosion control treatments which the system believes constitutes optimal corrosion control for that system.

Verify that, if required by the Department, these systems complete the corrosion control treatment steps, unless they have optimized corrosion control, and complete applicable corrosion control treatment requirements (see the U.S. TEAM Guide (WQ.50.4.) for these steps and requirements).

(NOTE: Any small and medium-size water systems that must complete the corrosion control steps because of exceeding the lead or copper action levels may stop implementing the treatment steps whenever both action levels are met during each of two consecutive monitoring periods after submitting the results to the Department. If these systems exceed the lead or copper action levels during any monitoring period, they must recommence progress on the applicable treatment steps, beginning with the first treatment step which was not previously completed in its entirety.)

WQ.50.5.FL. Community water systems exceeding specific lead and copper level limits must meet source water treatment requirements (FAC 62-551.610(1)(a) and (4)).

Verify that systems which exceed the lead or copper action level recommend to the Department the installation and operation of one of the following source water treatments:

- ion exchange - reverse osmosis - lime softening - coagulation/filtration.

Verify that systems install and operate the source water treatment designated by the Department.

Verify that systems maintain lead and copper levels below 0.005 mg/L and 0.5 mg/L, respectively, at each sampling point monitored.

Verify that systems operate in compliance with Department-specified maximum permissible lead and copper source water levels and continue source water

Page 697: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-29 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

monitoring.

Verify that systems monitor tap water during two consecutive 6-mo periods and monitor source water as specified in WQ.50.9.FL. within 36 mo after notification by the Department to install source water treatment.

Verify that systems operate source water treatment facilities in a manner which ensures that the maximum source water levels specified by the Department are not exceeded for 6 mo after completion.

WQ.50.6.FL. Community water systems must meet monitoring requirements for lead and copper in tap water (FAC 62-551.400(2), (3), 410, .420, .440, and .450)

(NOTE: The regulations for sample site location, number of samples, and timing of monitoring are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.50.6.) for specific requirements. See the following requirements for additions or modifications to the requirements of the U.S. TEAM Guide.)

Verify that, 30 days prior to the date for the start of lead and copper monitoring, systems submit a Sampling Plan for Lead and Copper Tap Samples and Water Quality Parameters to the Department.

Verify that systems submit a revised Sampling Plan for approval prior to any reduced monitoring and prior to any 6-mo monitoring period when the selected sampling site locations or sites in the sampling pool are changed.

Verify that systems use the information on lead, copper, and galvanized steel when conducting a materials evaluation.

Verify that, when a materials evaluation is insufficient to locate the requisite number of lead and copper sampling sites that meet the targeting criteria, systems review the sources of information listed below in order to identify a sufficient number of sampling sites and seeks to collect this information where possible in the course of its normal operations:

- all plumbing codes, permits, and records in the files of the building department(s) which indicate the plumbing materials that are installed within publicly and privately owned structures connected to the distribution system

- all inspections and records of the distribution system that indicate the material composition of the service connections that connect a structure to the distribution system

- all existing water quality information, including the results of all prior analyses of the system or individual structures connected to the system, indicating locations that may be particularly susceptible to high lead or copper concentrations.

Verify that systems with lead service lines contained in the distribution system

draw 50 percent of samples from sites that contain lead pipes, or copper pipes with lead solder, and 50 percent of the samples from sites served by a lead service

Page 698: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-30 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

line.

Verify that systems which cannot identify a sufficient number of sampling sites served by a lead service line document in the Sampling Plan why they were unable to do so and that the systems collect lead service line samples from all of the sites identified as being served by such lines.

Verify that community water systems with too few tier one through tier three sites complete the sampling pool with tier four sites which are identified as susceptible to lead or copper contamination.

Verify that systems with a Sampling Plan which does not consist exclusively of tier one sites document in its Plan why they were unable to locate a sufficient number of sites by the date tap monitoring for lead and copper is required to begin.

Verify that systems replace sampling sites where plumbing modifications at the site have changed the sampling pool tier.

WQ.50.7.FL. Community water systems must meet sample collection require-ments for lead and copper in tap water (FAC 62-551.430).

Verify that each first-draw tap sample for lead and copper is 1 L and stood motionless in the plumbing system of each sampling site for at least 6 h.

Verify that first-draw samples from:

- residential housing are collected from the cold-water kitchen tap or bathroom sink tap

- nonresidential buildings are collected at an interior tap from which water is typically drawn for consumption.

(NOTE: First-draw samples may be collected by the system or the residents after

instruction on sampling procedures. Acidification of first-draw samples may be done up to 14 days after the sample is collected. If the sample is not acidified immediately after collection, the sample must stand in the original container for at least 28 h after acidification. If a system allows residents to perform sampling, the system may not challenge the accuracy of sampling results.)

Verify that each service line sample is 1 L and stood motionless in the lead service line for at least 6 h.

Verify that service line samples are collected in one of the following ways:

- at the tap after flushing the volume of water between the tap and the lead service line

- tapping directly into the lead service line - if the sampling site is a building constructed as a single-family residence,

allowing the water to run until there is a significant change in temperature,

Page 699: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-31 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

which would be indicative of water that has been standing in the lead service line.

Verify that systems collect each first-draw tap sample from the same sampling site

from which it collected a previous sample.

(NOTE: If for any reason the system cannot gain entry to a sampling site in order to collect a follow-up tap sample, the system may collect the follow-up tap sample from another sampling site in its sampling pool as long as the new site meets the same targeting criteria and is within reasonable proximity of the original site.)

WQ.50.8.FL. Community water systems must meet monitoring requirements for water quality parameters (FAC 62-551.460 and .470).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide (WQ.50.7.) for specific requirements.)

WQ.50.9.FL. Community water systems must meet monitoring requirements for lead and copper in source water (FAC 62-551.600).

Verify that systems, except consecutive systems, conduct source water monitoring for lead and copper as specified in WQ.50.2.FL. and WQ.50.3.FL.

Verify that systems which exceed the lead or copper action levels collect one sample from each entry point to the distribution system within 6 mo after the exceedance.

(NOTE: Consecutive systems may use the results of sampling performed by its primary system to meet this requirement.)

Verify that systems which install source water treatment collect an additional sample from each entry point to the distribution system during two consecutive 6-mo monitoring periods after treatment is installed.

Verify that systems monitor at the frequency specified below in cases where the Department determines that the system is not required to install source water treatment:

- systems using only groundwater collect samples once during the 3-yr compliance period in effect when the Department determination is made and once during each subsequent compliance period

- systems using surface water, or a combination of surface and groundwater, collect samples once during each year.

Verify that systems using surface water, or a combination of surface and

groundwater, monitor for lead annually, as specified in WQ.50.2.FL. and

Page 700: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-32 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.50.3.FL. and annually for copper as well.

(NOTE: Source water samples may be composited.)

WQ.50.10.FL. Community water systems must meet lead service line replacement requirements (FAC 62-551.700 and .710).

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.50.5.) for specific requirements.)

WQ.50.11.FL. Community water systems which exceed the lead action level must meet public education and Department-notification requirements (FAC 62-551.810, .830, .840, and 940).

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.50.8.) for specific requirements.)

WQ.50.12.FL. Community water systems must meet lead and copper reporting requirements (FAC 62-551.900, .910, .920, and .930).

(NOTE: The reporting regulations for tap monitoring, water quality parameter monitoring, source water monitoring and treatment, corrosion control treatment, and lead service line replacement are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.50.9.) for specific requirements.)

Page 701: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-33 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

NONCOMMUNITY WATER SYSTEMS

WQ.60. STANDARDS

WQ.60.1.FL. Noncommunity water systems must meet IOC MCL requirements(FAC 62-550.310(1)).

Verify that, if a nitrate level of up to 20 mg/L is allowed by the Department, the following are met:

- the water is distributed by the water system is not available to children under 6 mo of age or to lactating mothers

- there is continuous public notification of what the nitrate level is and what the potential health effects of exposure are

- monitoring every 3 mo as long as the MCL is exceeded.

Page 702: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-34 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

NONCOMMUNITY WATER SYSTEMS

WQ.65. MONITORING/ SAMPLING

WQ.65.1.FL. Noncommunity water systems must meet monitoring requirements for nitrates and nitrites (FAC 62-550.512(2), (3), and (4)).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide (WQ.600.1.) for specific requirements.)

(NOTE: Compositing of samples is allowed.)

Page 703: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-35 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

NONTRANSIENT NONCOMMUNITY WATER SYSTEMS

WQ.76. STANDARDS

WQ.76.1.FL. NTNC water systems must meet IOC MCL requirements (FAC 62-550.310(1)).

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.76.1.) for specific requirements.)

(NOTE: The MCL for sodium is 160 mg/L.)

Verify that, if a nitrate level of up to 20 mg/L is allowed by the Department, the following are met:

- the water is distributed by the water system is not available to children under 6 mo of age or to lactating mothers

- there is continuous public notification of what the nitrate level is and what the potential health effects of exposure are

- monitoring every 3 mo as long as the MCL is exceeded.

WQ.76.2.FL. NTNC water systems must meet VOC MCL requirements (FAC 62-550.310(2)(b)).

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide for specific requirements. See the following note for additions or modifications to the requirements of the U.S. TEAM Guide (WQ.76.1.).)

(NOTE: The MCL for the following analytes are different that those in the U.S. TEAM Guide:

- 1,2-dichloroethane: 0.003 mg/L - benzene: 0.001 mg/L - carbon tetrachloride: 0.003 mg/L - dichloromethane: 0.005 mg/L - tetrachloroethylene: 0.003 mg/L - trichloroethylene: 0.003 mg/L - vinyl chloride: 0.001 mg/L.)

Page 704: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-36 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.76.3.FL. NTNC water systems must meet SOC MCL requirements (FAC 62-550.310(2)(c)).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide (WQ.76.1.) for specific requirements. See the following note for additions or modifications to the requirements of the U.S. TEAM Guide.)

(NOTE: The MCL for ethylene dibromide is 0.00002 mg/L.)

WQ.76.4.FL. NTNC drinking water systems must meet MCL requirements for radiologic contaminants (FAC 62-550.310(4)).

Verify that systems meet the following MCLs for radiological contaminants:

- 20,000 pCi/L for tritium - 8 pCi/L for strontium-90.

WQ.76.5.FL. NTNC drinking water systems must meet secondary water standards (FAC 62-550.320(1)).

Verify that the secondary MCLs in Appendix 13-3 are met.

Page 705: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-37 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

NONTRANSIENT NONCOMMUNITY WATER SYSTEMS

WQ.77. MONITORING/ SAMPLING

WQ.77.1.FL. NTNC water systems must meet asbestos monitoring requirements (FAC 62-550.511(1), (6), and (7)).

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide (7WQ.77.2.) for specific requirements.)

(NOTE: If the initial monitoring for asbestos was completed between 1 January 1990 and 31 December 1992 and the results did not exceed the MCL then the system may submit those results to the Department in lieu of monitoring during the first compliance cycle.)

(NOTE: Compositing of samples is allowed.)

Verify that systems monitor as specified in Appendix 13-2.

WQ.77.2.FL. NTNC water systems must meet monitoring requirements for nitrates and nitrites (FAC 62-550.512(1), (3), and (4)).

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.77.4.) for specific requirements.)

(NOTE: Compositing of samples is allowed.)

Verify that systems monitor as specified in Appendix 13-2.

WQ.77.3.FL. NTNC water systems must meet monitoring frequency requirements for antimony, arsenic, barium, beryllium, cadmium, chromium, cyanide, fluoride, mercury, nickel, selenium, sodium, and thallium (FAC 62-550.513(1), (3), and (4)).

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.77.3.) for specific requirements.)

(NOTE: Compositing of samples is allowed.)

Verify that systems monitor as specified in Appendix 13-2.

Page 706: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-38 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.77.4.FL. NTNC water systems must meet VOC monitoring requirements (FAC 62-550.515).

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.77.5.) for specific requirements.)

Verify that systems monitor as specified in Appendix 13-2.

Verify that systems which detect a VOC in excess of 0.0005 mg/L in any sample report to the Department within 7 days and monitor quarterly at each sampling point which resulted in a detection.

(NOTE: If the Department determines the system is reliably and consistently below the MCL, the system may be allowed to monitor annually during the quarter that previously yielded the highest analytical result.)

Verify that systems which exceed any VOC MCL notify the public, begin quarterly monitoring, and take corrective action as approved by the Department.

(NOTE: If monitoring data collected between 1 January 1988 and 1 January 1993, for purposes of satisfying the initial monitoring requirement, are generally consistent with monitoring requirements in the U.S. TEAM Guide, then the system may be allowed to use a single sample rather than four quarterly samples to satisfy the initial monitoring requirement.)

(NOTE: Compositing of samples is allowed.)

WQ.77.5.FL. NTNC water systems must meet SOC monitoring and analytical requirements (FAC 62-550.516).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide (WQ.77.6) for specific requirements. See the following requirements for additions or modifications to the requirements of the U.S. TEAM Guide.)

Verify that systems monitor as specified in Appendix 13-2.

Verify that systems which exceed any SOC MCL notify the Department within 7 days after receiving the laboratory results and monitors quarterly at each sampling point where a contaminant was detected.

(NOTE: After a minimum of four quarterly samples show the system is in compliance and the Department determines the system is reliably and consistently below the MCL, the system must monitor annually during the quarter that previously yielded the highest analytical result.)

(NOTE: If monitoring data collected after 1 January 1990, for purposes of satisfying the initial monitoring requirement, are generally consistent with monitoring requirements in the U.S. TEAM Guide, then the system may be allowed to use a single sample rather than four quarterly samples to satisfy the monitoring requirement for the initial compliance period.)

Page 707: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-39 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

(NOTE: Compositing of samples is allowed.)

WQ.77.6.FL. NTNC drinking water systems must meet MCL requirements for radiologic contaminants (FAC 62-550.519).

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide standards for community system monitoring for radiologic contaminants (WQ.40.11) for specific requirements applicable to nontransient noncommunity water systems.)

WQ.77.7.FL. NTNC water systems must meet monitoring and public notification requirements for unregulated organic contaminants (FAC 62-550.521(2) through (5) and 62-560.440(2)).

(NOTE: The regulations for specific organic contaminants are essentially the same as the Federal regulations. See the U.S. TEAM Guide WQ.40.7 for specific requirements. Florida includes 1,1-dichloropropylene, dibromochloromethane, dichlorodifluoromethane, and trichlorofluoromethane in the list. Two contaminants are included in the Federal regulations but not the state, chlorodibromomethane and 1,1-dichloropropene.)

Verify that systems monitor for the following contaminants by collecting one sample at each sampling point and reporting the results to the Department:

- 2-methyl-4,6-dinitrophenol - 2-chlorophenol - 2,4-dinitrotoluene - butyl-benzyl-phthalate - di-n-butylphthalate - diethylphthalate - dimethylphthalate - dioctylphthalate - isophorone - phenol.

Verify that, if a sample shows the presence of an unregulated contaminant, a confirmation sample is collected and the Department is notified within 7 days after the result of the confirmation sample is received.

Verify that suppliers of water notify persons served by the system of the availability of the results of sampling by including a notice in the first set of water bills issued by the system after the receipt of the results or by written notice within 3 mo of the receipt of the results.

Verify that the public notice identifies a person and supplies the telephone number to phone for information on the monitoring results.

Page 708: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-40 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.77.8.FL. NTNC water systems with consecutive water systems must meet specific monitoring requirements (FAC 62-550.540).

(NOTE: When one system receives all of its water from another system, the recipient system is the consecutive system. If a system receives only part of its water from another system, the recipient is not a consecutive system.)

Verify that consecutive systems provide microbiological and chlorine residual monitoring.

Verify that consecutive systems meet control of lead and copper and asbestos monitoring requirements.

(NOTE: Additional monitoring of the contaminants listed in WQ.40.9.FL. is required of consecutive systems which have a potential threat of contamination within their distribution system that is not corrected by the treatment provided.)

Page 709: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-41 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

NONTRANSIENT, NONCOMMUNITY WATER SYSTEMS

WQ.78. LEAD AND COPPER

WQ.78.1.FL. NTNC water systems with consecutive water systems must meet approval requirements to consolidate lead and copper monitoring requirements (FAC 62-551.300(2)).

(NOTE: Consecutive systems are systems that receive 100 percent of their potable water from another system, which is called the primary system. Consecutive systems not exceeding an action level after completion of the two initial 6-mo monitoring periods may consolidate their sampling, monitoring, treatment, and reporting requirements with that of another consecutive system or its primary system. Consecutive systems that exceed an action level may only consolidate corrosion control and reporting requirements and source water monitoring, treatment, and reporting requirements with that of its primary system.)

Verify that consecutive systems have written approval from the Department prior to any consolidation.

WQ.78.2.FL. NTNC water systems must meet lead and copper action level require-ments (FAC 62-551.300(3)).

(NOTE: These regulations are the same as the Federal regulations. See the U.S. TEAM Guide (WQ.78.2.) for specific requirements.)

WQ.78.3.FL. NTNC water systems must meet corrosion control treatment require-ments (FAC 62-551.300(4), (5), .320, .330, .550(1), .510, .530(1) through (4), and .540).

(NOTE: The regulations for corrosion control treatment requirements are the same as the Federal regulations. See the following requirements for additions or modifications to the requirements of the U.S. TEAM Guide (WQ.78.3.).)

Verify that systems properly [undefined] install and operate throughout the distribution system the optimal corrosion control treatment designated by the Department.

Verify that systems maintain water quality parameter values at or above minimum values, or within ranges designated by the Department, in each sample collected for monitoring after implementation of corrosion control treatment.

Page 710: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-42 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that, within 36 mo after installing corrosion control treatment, systems submit a report to the Department explaining how corrosion control has been installed and how it is being maintained to ensure minimal lead and copper concentrations at consumers' taps.

(NOTE: Systems may replace faucets and fixtures containing lead, lead-lined water coolers, lead pipe, lead-based solder and flux, and other plumbing components containing lead in lieu of performing the corrosion control treatment steps specified in the U.S. TEAM Guide. After performing these remedial actions, systems must not exceed the lead or copper action levels for two successive, 6-mo monitoring periods. The Department deems such systems in compliance with corrosion control requirements until the lead or copper action levels are exceeded.)

WQ.78.4.FL. NTNC water systems exceeding the lead or copper action level must meet specific corrosion control treatment requirements (FAC 62-551.500(2) and .550).

(NOTE: The regulations for corrosion control treatment requirements are the same as the Federal regulations in the U.S. TEAM Guide (WQ.78.4.). See the following requirements for additions or modifications to the requirements of the U.S. TEAM Guide.)

Verify that small and medium-size water systems exceeding the lead or copper action level recommend installation of one or more of the corrosion control treatments which the system believes constitutes optimal corrosion control for that system.

Verify that, if required by the Department, these systems complete the corrosion control treatment steps, unless they have optimized corrosion control, and complete applicable corrosion control treatment requirements (see the U.S. TEAM Guide for these steps and requirements).

(NOTE: Any small and medium-size water systems that must complete the corrosion control steps because of exceeding the lead or copper action levels may stop implementing the treatment steps whenever both action levels are met during each of two consecutive monitoring periods after submitting the results to the Department. If these systems exceed the lead or copper action levels during any monitoring period, they must recommence progress on the applicable treatment steps, beginning with the first treatment step which was not previously completed in its entirety.)

Page 711: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-43 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.78.5.FL. NTNC water systems exceeding specific lead and copper level limits must meet source water treatment requirements (FAC 62-551.610(1)(a) and (4)).

Verify that systems which exceed the lead or copper action level recommend to the Department the installation and operation of one of the following source water treatments:

- ion exchange - reverse osmosis - lime softening - coagulation/filtration.

Verify that systems install and operate the source water treatment designated by the Department.

Verify that systems maintain lead and copper levels below 0.005 mg/L and 0.5 mg/L, respectively, at each sampling point monitored.

Verify that systems operate in compliance with Department-specified maximum permissible lead and copper source water levels and continue source water monitoring.

Verify that systems monitor tap water during two consecutive 6-mo periods and monitor source water as specified in WQ.78.9.FL. within 36 mo after notification by the Department to install source water treatment.

Verify that systems operate source water treatment facilities in a manner which ensures that the maximum source water levels specified by the Department are not exceeded for 6 mo after completion.

WQ.78.6.FL. NTNC water systems must meet monitoring requirements for lead and copper in tap water (FAC 62-551.400(2), (3), .410, .420, .440, and .450)

(NOTE: The regulations for sample site location, number of samples, and timing of monitoring are essentially the same as the Federal regulations. See the U.S. TEAM Guide (WQ.78.6.) for specific requirements. See the following requirements for additions or modifications to the requirements of the U.S. TEAM Guide.)

Verify that, 30 days prior to the date for the start of lead and copper monitoring, systems submit a Sampling Plan for Lead and Copper Tap Samples and Water Quality Parameters to the Department.

Verify that systems submit a revised Sampling Plan for approval prior to any reduced monitoring and prior to any 6-mo monitoring period when the selected sampling site locations or sites in the sampling pool are changed.

Verify that systems use the information on lead, copper, and galvanized steel when conducting a materials evaluation.

Page 712: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-44 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that, when a materials evaluation is insufficient to locate the requisite number of lead and copper sampling sites that meet the targeting criteria, systems review the sources of information listed below in order to identify a sufficient number of sampling sites and seeks to collect this information where possible in the course of its normal operations:

- all plumbing codes, permits, and records in the files of the building department(s) which indicate the plumbing materials that are installed within publicly and privately owned structures connected to the distribution system

- all inspections and records of the distribution system that indicate the material composition of the service connections that connect a structure to the distribution system

- all existing water quality information, including the results of all prior analyses of the system or individual structures connected to the system, indicating locations that may be particularly susceptible to high lead or copper concentrations.

Verify that systems with lead service lines contained in the distribution system

draw 50 percent of samples from sites that contain lead pipes, or copper pipes with lead solder, and 50 percent of the samples from sites served by a lead service line.

Verify that systems which cannot identify a sufficient number of sampling sites served by a lead service line document in the Sampling Plan why they were unable to do so and that the systems collect lead service line samples from all of the sites identified as being served by such lines.

Verify that systems with too few tier two sites complete the sampling pool with tier three sites which are susceptible to high lead or copper concentrations.

Verify that systems with a Sampling Plan which does not consist exclusively of tier one sites document in its Plan why they were unable to locate a sufficient number of sites by the date tap monitoring for lead and copper is required to begin.

Verify that systems replace sampling sites where plumbing modifications at the site have changed the sampling pool tier.

Page 713: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-45 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.78.7.FL. NTNC water systems must meet sample collection requirements for lead and copper in tap water (FAC 62-551.430).

Verify that each first-draw tap sample for lead and copper is 1 L and stood motionless in the plumbing system of each sampling site for at least 6 h.

Verify that first-draw samples from:

- residential housing are collected from the cold-water kitchen tap or bathroom sink tap

- nonresidential buildings are collected at an interior tap from which water is typically drawn for consumption.

(NOTE: First-draw samples may be collected by the system or the residents after

instruction on sampling procedures. Acidification of first-draw samples may be done up to 14 days after the sample is collected. If the sample is not acidified immediately after collection, the sample must stand in the original container for at least 28 h after acidification. If a system allows residents to perform sampling, the system may not challenge the accuracy of sampling results.)

Verify that each service line sample is 1 L and stood motionless in the lead service line for at least 6 h.

Verify that service line samples are collected in one of the following ways:

- at the tap after flushing the volume of water between the tap and the lead service line

- tapping directly into the lead service line - if the sampling site is a building constructed as a single-family residence,

allowing the water to run until there is a significant change in temperature which would be indicative of water that has been standing in the lead service line.

Verify that systems collect each first-draw tap sample from the same sampling site

from which it collected a previous sample.

(NOTE: If for any reason the system cannot gain entry to a sampling site in order to collect a follow-up tap sample, the system may collect the follow-up tap sample from another sampling site in its sampling pool as long as the new site meets the same targeting criteria and is within reasonable proximity of the original site.)

WQ.78.8.FL. NTNC water systems must meet monitoring requirements for water quality parameters (FAC 62-551.460 and .470).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide(WQ.78.7.) for specific requirements.)

Page 714: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-46 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.78.9.FL. NTNC water systems must meet monitoring requirements for lead and copper in source water (FAC 62-551.600).

Verify that systems, except consecutive systems, conduct source water monitoring for lead and copper as specified in WQ.78.2.FL. and WQ.78.3.FL.

Verify that systems which exceed the lead or copper action levels collect one sample from each entry point to the distribution system within 6 mo after the exceedance.

(NOTE: Consecutive systems may use the results of sampling performed by its primary system to meet this requirement. Source water samples may be composited.)

Verify that systems which install source water treatment collect an additional sample form each entry point to the distribution system during two consecutive 6-mo monitoring periods after treatment is installed.

Verify that systems monitor at the frequency specified below in cases where the Department determines that the system is not required to install source water treatment:

- systems using only groundwater collect samples once during the 3-yr compliance period in effect when the Department determination is made and once during each subsequent compliance period

- systems using surface water, or a combination of surface and groundwater, collect samples once during each year.

Verify that systems using surface water, or a combination of surface and

groundwater, monitor for lead annually, as specified in WQ.78.2.FL. and WQ.78.3.FL. and annually for copper as well.

WQ.78.10.FL. NTNC water systems must meet lead service line replacement requirements (FAC 62-551.700 and .710).

(NOTE: These regulations are essentially the same as the Federal regulations. See the U.S. TEAM Guide (WQ.78.5.) for specific requirements.)

Page 715: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-47 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.78.11.FL. NTNC water systems which exceed the lead action level must meet public education and Department-notification requirements (FAC 62-551.820, .830, and .940).

(NOTE: The regulations for education material content and Department-notification are essentially the same as the Federal regulations. See the U.S. TEAM Guide (WQ.78.1) for specific requirements.)

Verify that, within 60 days after exceedance of the lead action level, systems deliver public education materials as follows:

- post informational posters, no smaller than 8.5 in. By 11 in. with 10 point or larger type, on lead in drinking water, including the results of any tap samples for lead that exceed the action level, in a public place or common area in each of the buildings served by the system

- distribute informational pamphlets or brochures on lead in drinking water to each person served by the system.

Verify that these tasks are repeated at least once during each calendar year in

which the system exceeds the lead action level.

(NOTE: Systems may discontinue delivery of public education materials if the lead action level is met during the most recent 6-mo monitoring period. Systems must recommend public education if they subsequently exceed the lead action level during any monitoring period.)

WQ.78.12.FL. NTNC water systems must meet lead and copper reporting requirements (FAC 62-551.900, .910, .920, and .930).

(NOTE: The reporting regulations for tap monitoring, water quality parameter monitoring, source water monitoring and treatment, corrosion control treatment, and lead service line replacement are essentially the same as the Federal regulations. See the U.S. TEAM Guide (WQ.78.2.) for specific requirements.)

Page 716: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-48 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

STATE SPECIFIC CATEGORIES OF WATER SYSTEMS WQ.85. PRIVATE/OTHER

(NOTE: A “limited use public water system” is a public water system not regulated by the Florida Safe Drinking Water Act or Rules 62-550, 62-555, or 62-560 of the Florida Administrative Code. They are further specified as “limited use commercial public water systems” which provide piped potable water to one or more non-residential establishments, and “limited use community public water systems” which provide piped potable water to five or more private residences or two or more rental residences (FAC 64E-6.002).)

WQ.85.1.FL. Limited use public water systems must meet permitting and approval requirements (FAC 64E-8.003(3) and 64E-8.004(1) and (6)) [Added June 2000].

Verify that all limited use systems have annual permits.

(NOTE: Annual operating permits expire September 30.)

(NOTE: Suppliers of limited use Commercial Public Water Systems that do not make tap water available for public consumption are exempt from obtaining annual operating permits, provided they have registered the system by submitting a $15 registration fee and a completed registration application Form DH 4095 to the county health department, and met other requirements specified by the county health department.)

Verify that prior to the construction or alteration of a multi-family water system, a complete Form DH 4092B, 9/97, is submitted to the county health department, and approval on Form DH 4093, 8/97 is received.

Page 717: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-49 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.85.2.FL. Private water systems and multi-family water systems must meet general construction requirements (FAC 64E-8.001(4), .002(2)(a), (b)(1) and (3), and .003(1) and (2)) [Added June 2000].

Verify that all potable wells serving private water systems and multi-family water systems, are constructed at least 75 ft from any on-site sewage treatment and disposal system.

Verify that wells are constructed upgradient of contaminant sources, unless the Department determines otherwise.

(NOTE: A “contaminant source" is any minor source such as abandoned water wells, flooded areas, reclaimed water distribution systems, sewage collection systems excluding plumbing, onsite sewage treatment and disposal systems, underground pollutant or petroleum storage and piping facilities or other minor sources recognized by well permitting agencies; and major sources such as animal feedlots, sewage treatment systems, sewage, septage or wastewater treatment plant residuals disposal areas, and solid waste disposal facilities.)

Verify that distances between contaminant sources and all potable water supply wells are maintained as described below:

- 25 ft from a building foundation when the soil has been chemically treated for pests (wells that are installed through impervious strata of clay, hardpan, or rock and that are constructed in accordance with regulatory guidelines of this Rule may be placed no less than 15 ft from a chemically treated building foundation.)

- other setback distances as established by rule chapters 62-524, Delineated Areas; 62-532, "Water Well Permitting and Construction Requirements"; 62-600, Domestic Waste; 62-610, Reclaimed Water; 62-640, Waste Residuals; 62-660, Industrial Waste; 62-670, Feedlots; 62-701, Solid Waste; 62-730, Hazardous Waste; and 62-761, F.A.C., Underground Storage Tanks.

Verify that private and multi-family water systems construct a 2 ft square concrete apron 4 in. thick centered on the well.

Page 718: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-50 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.85.3.FL. Permitted limited use systems must meet specific operating and maintenance requirements (FAC 64E-8.005) [Added June 2000].

Verify that all components of the system function properly at all times.

Verify that, should the system shut down, the supplier take steps to restore it immediately, and alert all users in advance of maintenance that will cause pressure loss or water quality change.

Verify that the system alerts the county health department 24 hr in advance where possible, but no later than the next business day after any shutdown or treatment failure.

Verify that disinfection equipment maintains a free available chlorine residual between 0.2 mg/L and 4.0 mg/L free available chlorine residual or 5.0 mg/L total chlorine residual throughout the entire system, or the equivalent of these limits as determined by the department.

Verify that a functional disinfectant concentration test kit is kept on site at all times.

Verify that all components are in good repair and used as intended.

Verify that replacement of components is with new or like-new products, equal to those originally approved.

Verify that the vicinity within 5 ft of the system and well is free of vegetation, debris and hazards which could prevent or hinder inspection.

Verify that, if an emergency alteration occurs, the supplier submits a completed Form DH 4092B to the department the next business day.

Verify that the supplier posts maintenance/repair dates and types in a log kept on the premises.

Verify that systems vulnerable to vandalism are secured, but any enclosure does not restrict visibility or authorized access for inspection.

Verify that the upper end of the well casing is watertight except for vents which are directed downward and protected with 20-mesh screen.

Verify that any chemical which could contaminate the water supply is not stored within 25 ft of the well head unless the chemical container is in an additional, above-ground containment structure capable of containing the full volume of the chemical.

Page 719: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-51 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.85.4.FL. Limited use systems must meet specific water quality and monitoring requirements (FAC 64E-8.006) [Added June 2000].

Verify that samples collected for compliance with this rule, except chlorine residuals, are analyzed by a laboratory certified for the contaminant by the department using a department-certified method for analyzing drinking water samples, in accordance with the referenced methods required in Chapter 64E-1, F.A.C., Clinical and Water Testing Laboratories.

Verify that limited use systems do not violate the following MCLs (Maximum Contaminant Levels):

- lead: 0.015 mg/L, one liter first flush sample collected from an indoor tap after water has been plumbing for at least 6 hr

- nitrate as N: 10.0 mg/L, sample representative of the water being consumed. - microbiological MCL:

- a total coliform MCL violation occurs when a total coliform test reveals the presence of total coliform bacteria in any compliance and repeat sample

- a fecal coliform MCL violation occurs when a fecal coliform or Escherichia coli test reveals the presence of fecal coliform bacteria or E. coli in any compliance or repeat sample, providing the repeat test also reveals the presence of coliform bacteria.

Verify that the supplier collect a repeat sample on the first business day following notification that coliform bacteria were present in the previous sample

(NOTE: Unless coliform bacteria are present, a result of too numerous to count (TNTC), confluent, or turbid with the absence of gas or acid, is invalid and the supplier will collect a replacement sample on the next business day after notification of the invalid results.)

Verify that, for newly constructed limited use systems the supplier collects and has analyzed one source water sample per day for five days within 23 consecutive days, and that no more than one of these five samples and neither of the last two of these samples reveal the presence of coliform bacteria.

(NOTE: Collection of two samples per day is permitted if collected 6 hr apart and the pump is run at rated capacity 15 min before each collection.

Verify that upon completing system construction and disinfection, the supplier clears all residual disinfectant from the system and collects, and has analyzed one satisfactory, remote distribution microbiological sample per day for two consecutive days.

Verify that systems conduct analysis for the chemicals listed in this checklist item every 36 months for Limited Use Community Systems, or every 60 months for Limited Use Commercial Systems,

Verify that microbiological analysis of a minimum of one remote sample of finished water is conducted every calendar quarter.

(NOTE: When treatment includes disinfection, a source water microbiological sample must also be collected on the same day as the finished water sample.0

Verify that all system owners report analysis results, except for daily chlorine residuals, to the department within five days of receipt.

Verify that multi-family water systems are sampled for one distribution microbiological test a two-consecutive-day source water microbiological test and

Page 720: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-52 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.85.5.FL. Limited use systems must take corrective actions in response to violations (FAC 64E-8.007) [Added June 2000].

Verify that, for chemical MCL violations, the supplier conducts a confirmation sample analysis within 30 days of receipt of the initial results.

Verify that if an MCL is exceeded again, the supplier:

- applies to the department for system alteration on Form DH 4092B within 30 days of receipt of the confirmation test results, or

- constructs a new well within 90 days of permitting and conducts repeat water quality tests for the contaminants immediately after system alteration and once per year for 3 yr.

Verify that when a chemical or fecal coliform MCL violation occurs, immediate action by the supplier is taken to prevent consumer exposure, including:

- provision of temporary access to an approved alternative source of water, or provision of one gallon per day per person of a state permitted brand of bottled water to consumers until a permanent solution is completed, and

- written public notice to consumers that alerts them of the acute or chronic health risk and the supplier's corrective actions.

Verify that for coliform MCL violations in the well, the supplier disinfects the well, conducts a five sample microbiological well survey, and if the results are unsatisfactory, then applies for system alteration on Form DH 4092B within 10days of receipt of the confirmation test results.

Verify that, for coliform MCL violations in the system, the supplier verifies the water quality of the system by collecting one source water sample and one repeat sample within the system at the same location that revealed the bacteria; then, if the system still contains water violating the coliform MCL:

- immediately disinfects the system - conducts another two consecutive day microbiological survey, and, if the

system cannot be cleared, applies for system alteration on Form DH 4092B within ten days of receipt of the test results.

Verify that, when a fecal coliform or Escherichia coli MCL is violated, the supplier immediately prevent consumer exposure to the water, interrupts service and maintains a 50 mg/L solution of free available chlorine, or its equivalent, throughout the system for 3 hrs, and reduces the concentration to 4.0 mg/L prior to service being restored.

Page 721: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-53 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.90. DRINKING WATER WELL

WQ.90.1.FL. Drinking water wells must meet permitting requirements (FAC 62-532.400(1), (4), 524.650(1), .700, and 531.450(4)(e)).

Verify that a permit is obtained prior to construction, repair, or abandonment of any water well.

Verify that the permit is available for inspection at the well site during construction or repair.

Verify that new potable water wells in Department-delineated areas have a letter of clearance prior to use for human consumption.

Verify that new potable water wells in Department-delineated areas have a construction permit prior to installation or conversion.

WQ.90.2.FL. Drinking water well contractors must meet licensing requirements (FAC 62-531.380(2) .390(1), .450(2)(a), and (3)).

Verify that water well contractors have an active license.

Verify that a licensed water well contractor supervises business entities engaging in water well contracting or the performance of any activity for which a license is required.

Verify that contractor license numbers are continuously displayed in a conspicuous place on both sides of each piece of drilling equipment owned, leased, or operated by the contractor.

Verify that the license number is easily readable by a person with normal vision, is in a color which will contrast with its background, and is presented in numerals not less than 2 in. high.

(NOTE: A water well contractor license is not required for a person to construct a well that meets all of the following criteria:

- the well is 2 in. or less in diameter - the well is constructed on his/her own land or leased property - the well is intended for use only in a single family house that is his/her

residence or is intended for use only for farming purposes on his/her farm and the waters to be produced are not intended for use by the public or any residence other than his/her own.)

Page 722: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-54 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.90.3.FL. Drinking water wells must meet specific construction requirements (FAC 62-532.410, .500(3)(a)(1), (3)(a)(2), (3)(a)(4), 524.550(2)(f) through (h), and 531.450(2)(b)).

Verify that within 30 days of construction or repair completion a report is filed.

Verify that, whenever there is an interruption in the work on the well (such as overnight shutdown, the well opening is sealed with a tamper resistant cover.

Verify that, except for those areas of a district designated by the Department, wells in which pumping equipment is installed seasonally or periodically are capped with steel or a reinforced concrete cover or valve whenever pumping equipment is not installed.

Verify that any unused well is capped in a watertight manner with a threaded, welded, or bolted cover or valve and that well vents extend at least 2 ft above land surface.

Verify that casing extends a minimum of 1 ft above land surface.

Verify that a raw water tap is provided to allow sampling of the well before exposure to storage or treatment.

Verify that the well casing is visibly and permanently marked above the land surface with the latitude and longitude and the permit number for that well.

Verify that construction, repair, or abandonment of a water well, or operation of drilling equipment for these purposes, is supervised by a licensed water well contractor.

WQ.90.4.FL. Drinking water wells must meet monitoring and reporting requirements (FAC 62-524.740(1)(b) and .910(1)).

Verify that new potable water wells in Department-delineated areas are tested for water quality prior to use for human consumption.

Verify that data on each new potable water well in Department-delineated areas are reported to the Department within 60 days after receipt of the analytical results.

WQ.90.5.FL. Drinking water wells must meet minimum setback distance requirements (FAC 62-555.312(1) through (5)).

(NOTE: The following setback distances around public drinking water supply wells apply to newly constructed wells. However, the 100 and 200 ft setback distances which have been in effect since 9 November 1977 and 13 December 1983, respectively, remain in effect.)

Verify that public drinking water supply wells which serve water systems having total sewage flows greater than 2000 gpd are placed no closer than 200 ft from onsite sewage disposal systems (septic tanks) other than land application of reclaimed water areas.

Page 723: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-55 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that public drinking water supply wells serving water systems having total sewage flows of less than or equal to 2000 gpd are placed no closer than 100 ft from onsite sewage disposal systems (septic tanks) other than land application of reclaimed water areas.

Verify that public drinking water supply wells are not placed within setback distances specified for reuse of reclaimed water and land application of reclaimed water in WA Appendices 12-4 and 12-5.

Verify that public drinking water supply wells are not constructed within 300 ft of storage and treatment facilities (high intensity areas) of dairy farms.

Verify that public drinking water supply wells are located no closer than 100 ft from other sanitary hazards.

Verify that public drinking water supply wells are located on ground least subject to localized flooding, and as far as is practical when the direction of groundwater slope or movement is known, wells are located on the upstream side of sanitary hazards.

WQ.90.6.FL. Supply and test wells which may later be used for drinking water wells must meet general requirements (FAC 62-555.315(1) and (2)(f)).

Verify that a minimum of two drinking water supply wells are provided for all community water systems that will serve 350 or more persons or have more than 150 service connections.

Verify that a conveniently accessible, down opening, smooth nosed, sampling tap (located a minimum distance of 12 in. above ground surface) is provided on the discharge side of each well pump on the upstream side of the check valve before the chlorine injection point so that samples of raw water may be obtained from the well.

Page 724: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-56 Water Quality Management

Page 725: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-57 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.100. MISCELLANEOUS WELLS

WQ.100.1.FL. Well construction, modification, repair, or abandonment activities require a permit (FAC 40D-3.041, 40D-3.051, and Florida Statutes (FS) 373.303(7)) [Added July 1998; Revised June 2000].

Verify that a permit is obtained from the Department prior to construction, repair, modification or abandonment of any water well including the following:

- water wells not in areas delineated pursuant to New Potable Water Well Permitting in Delineated Areas regulations (FAC 62-524)

- potable water wells in areas delineated pursuant to New Potable Water Well Permitting in Delineated Areas regulations (FAC 62-524)

- non-potable water wells in areas delineated pursuant New Potable Water Well Permitting in Delineated Areas regulations (FAC 62-524)

- dewatering wells for construction, mining or quarrying purposes that will be in existence for 6 months or longer

- public supply water wells - monitor wells - injection wells - abandoned wells - incomplete wells.

Verify that the permit is available at the well site during construction, repair,

modification or abandonment.

(NOTE: The following wells are exempt from these permit requirements:

Page 726: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-58 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- wells used for the purpose of obtaining or prospecting for oil, natural gas, minerals, or products of mining or quarrying

- wells used for inserting media to dispose of oil brines or to repressure oil-bearing or natural gas-bearing formation

- wells used for storing petroleum, natural gas, or other products - wells used for temporary dewatering of subsurface formations for mining,

quarrying , or constructions purposes - wells used for the purpose of temporary dewatering of subsurface formations

for construction, mining or quarrying purposes for a period of less than 6 months

- wells 2 inches or less in diameter and less than 20 feet in depth used for no more than 10 days for the purpose of obtaining shallow soil or water information.)

(NOTE: In emergency situations when compliance with these requirements will result in undue hardship, including those situations when an unexpected problem is encountered during the construction, repair or abandonment of a well, the Executive Director will authorize an exemption, by telephone, from the conditions required by a permit or rule requirements for a well. A Well Completion Report documenting the exemption will be submitted to the District in writing within 30 days of completion.)

(NOTE: Qualifying for one of the above exemptions does not relieve the applicant from obtaining any other applicable permits required by law or District rule.)

Page 727: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-59 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.105. RECHARGE WELLS

WQ.105.1.FL. [Deleted May 1999].

(NOTE: Regulation repealed.)

WQ.105.2.FL. Artificial recharge permit requirements must be met in the Suwannee River Water Management District (FAC 40B-5.0041, .011(1), .014, .023, .024(1), (10), .0411(3), and (4)).

Verify that written authorization is obtained from the Governing board prior to the construction of any artificial recharge project.

Verify that, if a person who obtains a permit to drill disposes of his/her interest in the disposal, connector, test, or storage well to a new owner while the well is being drilled or after well completion, a notice of change of ownership and a request for transfer of permits is submitted to the Suwannee River Water Management District.

(NOTE: Existing wells may change their status if an application for permission to do so has been filed with the Suwannee River Water Management District. Within 30 days after change of status completion, a complete record of the work performed is filed. Normal repair or maintenance of wells does not constitute a change in status.)

Verify that wells which cannot be completed are plugged unless converted to other use.

Verify that wells which are not confirmed or approved for use are plugged or converted to another use.

Verify that storage and disposal wells are periodically tested by the operator and that sufficient data is collected during each calendar year to facilitate analysis of static and injection formation pressures, storage zone limits or boundaries, changes in formation characteristics, and other information commonly derivable from such tests.

Verify that at the end of each calendar year a summary and analysis of this test data is submitted to the Suwannee River Water Management District.

Verify that anomalous behavior of a storage, connector, or disposal well is promptly reported to the Suwannee River Water Management District.

Verify that at least one observation well is provided for each disposal or storage well system.

Page 728: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-60 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that well drillers file all drilling logs, sample logs, and electric or radiation or other physical, chemical, or mechanical logs with the Suwannee River Water Management District within 60 days of drilling completion.

Verify that permittees obtain and transmit to the Suwannee River Water Management District the reports and logs of work done on wells by contractual service companies that specialize in logging or cementing or other special well treatment practices.

WQ.105.3.FL. Artificial recharge permit requirements must be met in the St. John's River Water Management District (FAC 40C-5.041 and .051(2)).

Verify that a permit is obtained prior to construction (initial drilling, repair, modification, or abandonment) on any well involving the artificial recharge of water containing sewage wastes or any well involving the intentional introduction of water containing sewage wastes into any underground formation.

(NOTE: No permit is required for septic tank systems or individual or single-family waste disposal systems.)

WQ.105.4.FL. Artificial recharge permit requirements must be met in the Southwest Florida Water Management District (FAC 40D-5.041).

Verify that a permit from the Southwest Florida Water Management District is obtained prior to construction of any project involving artificial recharge or the intentional introduction of water into any underground formation.

WQ.105.5.FL. Artificial recharge permit requirements must be met in the South Florida Water Management District (FAC 40E-5.041).

Verify that a permit from the South Florida Water Management District is obtained prior to construction of any project involving artificial recharge or the intentional introduction of water into any underground formation.

Page 729: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-61 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.110. INJECTION CONTROL WELLS

WQ.110.1.FL. Injection control wells must meet permitting requirements (FAC 62-528.345(4), .440(2)(a), (b), .455(1)(a), .630(1), (11), (12), .635(3), (4), .640(1)(a), .705(1), (2)(a), .710(1) and (2)) [Revised July 1998].

Verify that injection control wells with compliance schedules submit progress reports no later than 30 days following each interim date and the final compliance date.

Verify that underground injection by Class I and III wells are authorized by a permit.

Verify that Class I and III wells obtain permits prior to any construction, modification, operation, or abandonment.

Verify that each Class I well has a separate operation permit.

(NOTE: For multiwell injection systems, a separate underground injection control permit is not necessary for each well.)

Verify that Class V wells beginning operation after 1 April 1982 have permits prior to construction and operation.

(NOTE: The following Class V well groups are required to obtain a general operation permit:

- Groups 2, 7, and 8, except swimming pool drainage wells, unless the fluids being injected meet primary and secondary drinking water standards

- Groups 3 and 4 - Group 6, if injection is into an underground source of drinking water.)

Verify that, at least 30 days prior to sale or legal transfer of a Class V well, the new owner notifies the Department.

Verify that a separate underground injection control permit is obtained for each Class V well which is constructed and operated as part of a fluid treatment or disposal system permitted by the Department.

Verify that, upon completion of well construction, the water well contractor certifies to the Department that the construction was in accordance with the approved construction plan.

(NOTE: If the operation of the well will not adversely impact an underground source of drinking water, the Department will issue an authorization to use a Class V well, which is nonrenewable and nonexpiring for the following Class V groups or well types:

Page 730: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-62 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- Group 1 wells on a closed-loop system with no provisions for additives when the fluids being injected meet the primary and secondary drinking water quality standards, except those Group 1 wells receiving a general permit or which are exempt from permitting and pool drainage wells

- Group 6 wells unless injection is into an underground source of drinking water

- other Class V wells not specifically exempted must obtain an operation permit before injecting fluids into the well.)

Verify that, within 30 days of construction completion of closed-loop air-

conditioning return flow wells or noncontact, closed-loop thermal exchange system wells constructed under a general permit, the engineer of record certifies to the Department that construction is complete and was done according to the submitted plans.

Verify that, within 30 days of construction completion of swimming pool drainage wells constructed under a general permit, the engineer of record certifies to the Department that construction is complete and was done according to the submitted plans.

WQ.110.2.FL. Injection control wells must meet specific restrictions (FAC 62-528.400(1), (3), .510, .540(2)(a), and (c)) [Revised July 1998].

Verify that hazardous waste is not injected through any well or septic system.

(NOTE: The prohibition against the injection of hazardous waste does not apply to Class I wells permitted to inject hazardous wastes as of 1 January 1992.)

Verify that the hazardous waste injection requirements of 40 CFR 146, subpart G are met.

Verify that no Class IV injection control well is constructed or operated after 1 April 1982.

Verify that owners of Class IV injection wells provide postclosure care for at least 30 yr after closure completion.

(NOTE: Postclosure care consists of the following: - groundwater monitoring and reporting

- maintenance activities which ensure the integrity of the containment structure and the function of monitoring equipment

- use of property on or in which hazardous waste remains after closure does not disturb the integrity of any components of the containment system or the function of the monitoring systems, unless the disturbance is necessary to the use of the property and does not increase the potential hazard to human health or the environment or is necessary to reduce a threat to human health or the environment.)

Page 731: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-63 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.110.3.FL. Class I injection control wells must meet operation requirements (FAC 62-528.415(1)(c), (d), (f)(2), (f)(3), (3)(c), and (4)(a) through (c)).

Verify that the maximum sustained injection pressure does not exceed two-thirds of the most recent mechanical integrity test pressure.

Verify that there is no injection for disposal purposes.

Verify that the maximum injection velocity of a well which begins operation after 1 June 1985 does not exceed a peak hourly flow of 10 ft/s, unless the higher velocities will not compromise the integrity or operation of the well.

(NOTE: An injection system may be designed to allow an injection velocity not to exceed a peak hourly flow of 12 ft/s during planned testing, maintenance, or emergency conditions when one or more wells are taken out of service if there is reasonable assurance that the higher velocities will not compromise the integrity or operation of the well(s).)

Verify that a copy of the approved operation/maintenance manual is provided to the operators, maintenance personnel, technicians, laboratory personnel, and others, as appropriate, by the facility and that the manual(s) is available for reference at the facility or other approved site.

Verify that the Department is notified within 24 h in the event the Class I well is temporarily unable to comply with any of the conditions of a permit, due to breakdown of equipment, power outages, destruction by hazard of fire, wind, or by other cause.

Verify that a written report of any noncompliance is submitted to the appropriate district office within 5 days after its occurrence which describes the following:

- the nature and cause of the breakdown or malfunction - the steps being taken or planned to be taken to correct the problem and

prevent its reoccurrence - emergency procedures in use pending correction of the problem the time

when the well will again be operating in accordance with permit conditions.

Verify that, under emergency conditions in which the Class I well is unable to use the permitted primary disposal method, an emergency discharge is used only if a permit for the emergency method has been obtained prior to the emergency discharge.

Verify that Department office which issued the permit is notified whenever the emergency discharge has been used.

Verify that the emergency discharge is fully operational and the Class I well obtained all permits required to operate the emergency discharge prior to any emergency discharge.

Page 732: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-64 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.110.4.FL. Class I injection control wells must meet monitoring requirements (FAC 62-528.425(1)(a) through (d) and (f)).

Verify that the analysis of the injected fluids at a frequency specified in the operating permit to yield representative data on their characteristics.

Verify that Class I wells install and use continuous indicating, recording, and totalizing devices to monitor flow rate and volume, and install/use continuous indicating and recording devices to monitor the injection pressure and the pressure on the annulus between the tubing and the final or innermost string of casing, if there is an annulus.

Verify that there is a controlled injection test or a bottom hole pressure survey, if a long-term trend of increasing injection pressure is indicated.

Verify that mechanical integrity is demonstrated at least once every 5 yr during the life of the well and that the following monitoring requirements are met:

- as part of the baseline monitoring information, a video television survey from the surface to the bottom of the injection zone is run prior to injection but after completion of testing, except for those wells that inject through tubing or where it is physically impossible to do so, and every 5 yr thereafter, or more frequently if impairment of the integrity of the casing, tubing, or formation is suspected

- adequate provisions are made to centralize the camera in the borehole.

Verify that, before running the survey, adequate provisions are made to assure that fluid in both the casing and open borehole is of sufficient clarity to provide a baseline survey of a quality acceptable to the Department.

Verify that the background water quality of the injection zone and the monitoring zone(s) is determined prior to injection for both domestic wastewater and industrial Class I wells, including desalination process reject water.

WQ.110.5.FL. Class III wells must meet monitoring requirements ((FAC 62-528.425(2)(b), (d), (e), (g) and (h)(1) through (4)) [Added July 1998].

Verify that Class III wells use continuous recording devices to monitor the injection pressure, flow rate and volume.

Verify that Class III wells monitor for water quality parameters within the injection zone and fluid level on a weekly basis with sufficient frequency to yield representative data on its characteristics.

Verify that Class III wells monitor adjacent wells to detect any migration from the injection zone into an underground source of drinking water on a quarterly basis.

Page 733: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-65 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that a Class III permit holder continues monitoring after mining operations cease if site-specific factors or operational monitoring results indicate that there is a threat to an underground source of drinking water until no threat remains.

Verify that, where injection is into a formation which contains water with less than 10,000 mg/L total dissolved solids, monitoring wells are completed into the injection zone and into any underground sources of drinking water which could be affected by the mining operation.

Verify that wells are located so that they will not be physically affected where injection operations may be affected by subsidence or catastrophic collapse.

Verify that, where injection is into a formation which does not contain water with less than 10,000 mg/L total dissolved solids, monitoring wells are installed above and in the injection zone if necessary to protect underground sources of drinking water.

Verify that an adequate number of monitoring wells is completed into any underground source of drinking water which the injection well penetrates in areas subject to subsidence or catastrophic collapse in order to detect the movement of any of the following into the underground source of drinking water:

- injected fluids - process by-products - formation fluids.

Verify that Class III well operators monitor for subsidence if required by the

Department for the purpose of protecting property or underground sources of drinking water.

WQ.110.6.FL. Class I injection control wells must meet reporting requirements (FAC 62-528.430(2)(b), and (c)) [Revised and moved from WQ.110.5, July 1998].

Verify that all Class I injection facilities submit the following monthly to the Department:

- operating reports on: - the physical, chemical, and other relevant characteristics of injection

fluids - daily readings of the pressure and flow for each well

(NOTE: For each domestic effluent disposal well, a specific injectivity test is performed quarterly)

- monthly average, maximum, and minimum values for injection pressure, flow rate and volume, and annular pressure

monitoring results

Page 734: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-66 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- the results of the following within 3 mo of completion: - periodic tests of mechanical integrity

- any other test of the injection well conducted, if required by the Department

- any well work over.

Verify that Class I wells, other than municipal wells, conduct one pressure fall-off test annually.

WQ.110.7.FL. Class III injection control wells must meet reporting requirements (FAC 62-528.430(3)(a), (d) and (e)) [Added July 1998].

Verify that Class III injection well facilities submit the following reports to the Department:

- operating reports on the following: - driller's log - geophysical surveys - core analyses - lithologic logs - drill stem tests - withdrawal or aquifer tests - number of wells constructed, abandoned, in operation and recorded on

property deeds - results of post-closure monitoring - daily construction reports.

- quarterly reporting to the Department on required monitoring; - results of mechanical integrity and any other periodic test required by the

Department reported with the first regular quarterly report after the completion of the test.

Verify that the Class III injection well facility ) records with the property records

of the county courthouse the plugging method and location of each abandoned well abandoned during on a yearly basis or as required by permit.

WQ.110.8.FL. Class I and III wells must meet well abandonment reporting requirements (FAC 62-528.430(4)) [Added July 1998].

Verify that final abandonment reports with the following information for Class I and III wells are submitted to the Department within 90 days after completion of plugging and abandonment of a well or well field:

- certification of completion in accordance with approved plans and specifications by the engineer of record

- evidence, such as a sealed copy or certification from the county clerk, that a surveyor's plot of the location of the abandoned wells has been recorded in the county courthouse property records.

Page 735: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-67 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.110.9.FL. Class I and III injection control wells must meet plugging and abandonment requirements (FAC 62-528.435(2), (6), (10), (11), .460(2), and (6)) [Revised and moved from WQ.110.6, July 1998].

Verify that the Department is notified at least 180 days before conversion or abandonment of a Class I or III well, unless abandonment within a lesser period of time is necessary to protect the waters of the state.

Verify that injection facilities have approval prior to commencing plugging and abandonment operations.

Verify that, if fluid movement through channels adjacent to the injection well bore is suspected, mechanical integrity is tested prior to plugging of the injection well or monitor well which penetrates the injection zone or final confining unit.

Verify that, in the event a radioactive source tool has been irretrievably lost down an injection well, the Department is immediately notified and that the well is not plugged until all applicable Nuclear Regulatory Commission regulations have been satisfied.

Verify that within 90 days after the completion of plugging and abandonment documentation is provided which certifies that the well was properly abandoned.

Verify that all records concerning the nature and composition of injected fluid is maintained for 5 yr after completion of plugging and abandonment procedures.

WQ.110.10.FL. Class V injection control wells must meet construction, operation, and plugging and abandonment requirements (FAC 62- 528.605(4), (5), (8), (9), .610(1), .625(2), .645(1), and (2)) [Moved from WQ.110.7, July 1998].

Verify that Class V wells are constructed by a Florida licensed water well contractor.

Verify that a well completion report defining details of construction and describing various formations penetrated by the well is forwarded to the Department within 2 days after completion of the drilling operation.

Verify that Class V wells are not dynamited except with written permission from the Department.

Verify that test wells or borings are filled with cement within 5 days after completion of the testing for which it was drilled and that test wells or borings are not used as drainage wells unless a permit has been obtained.

Verify that Class V well use or operation does not present a hazard to an underground source of drinking water.

Verify that Class V wells submitted a plugging and abandonment plan to the Department and has a plugging and abandonment permit prior commencing procedures.

Verify that the engineer of record certifies upon completion plugging and abandonment was according to approved plans and specifications.

Page 736: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-68 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Page 737: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-69 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.115. WATER QUALITY STANDARDS

Groundwater

WQ.115.1.FL. Groundwater must meet general water quality requirements (FAC 62-520.300(5) through (7)).

Verify that discharges to groundwater do not impair the designated use of contiguous surface waters.

Verify that unfiltered groundwater samples are collected when conducting monitoring, unless a filtered sample is as or is more representative of the particular groundwater quality.

Verify that owners of federal facilities with a permit covering discharges as of 1 January 1983, or discharging pollutants to groundwater as of 1 July 1982, analyze the constituents of the waste stream when monitoring for compliance with WQ.115.2.FL.

WQ.115.2.FL. Groundwater must meet minimum water quality requirements (FAC 62-520.400(1), (2), and .520(8)).

Verify that all groundwater, at all places and at all times, is free from domestic, industrial, agricultural, or other man-induced nonthermal components of discharges in concentrations which, alone or in combination with other substances or components of discharges (whether thermal or nonthermal):

- are harmful to plants, animals, or organisms that are native to the soil and responsible for treatment or stabilization of the discharge relied upon by Department permits

- are carcinogenic, mutagenic, teratogenic, or toxic to human beings, unless specific criteria are established for such components

- are acutely toxic within surface waters affected by the groundwater - pose a serious danger to the public health, safety, or welfare - create or constitute a nuisance - impair the reasonable and beneficial use of adjacent waters.

(NOTE: The minimum criteria does not apply to Class G-IV groundwater, unless the Department determines there is a danger to the environment, public health, safety or welfare.)

(NOTE: Existing cooling ponds approved by the Department for treatment of thermal discharges to surface water are exempt from secondary standards so long as the cooling pond waters are monitored as specified in the permit to ensure that the pond does not impair the designated use of contiguous groundwaters and

Page 738: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-70 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

surface waters.)

WQ.115.3.FL. Groundwater must meet specific water quality requirements for Classes G-I and G-II (FAC 62-520.420(1) through (4) .520(1), and (6)).

Verify that waters classified as Class G-I and Class G-II groundwater meet the minimum groundwater quality requirements in WQ.115.2.FL. and the primary and secondary drinking water quality standards for public water systems, except that the total coliform bacteria standard is 4/100 mL and the primary drinking water standard for asbestos does not apply as a groundwater standard.

(NOTE: If the concentration for any constituent in the natural background quality of the groundwater is greater than the stated maximum, or in the case of pH is also less than the minimum, the representative natural background quality is the prevailing standard for Class G-I and Class G-II groundwater. Where natural background quality of the groundwater cannot be determined in the upgradient well, and the concentration for any constituent in the background quality of the groundwater is greater than the stated maximum, or for pH is also less than the minimum, the representative background quality is the prevailing standard for those Federal facilities.)

(NOTE: These standards do not apply within a permitted zone of discharge as provided.)

(NOTE: An existing federal facility discharging to Class G-II groundwater is exempt from meeting secondary drinking water standards, unless the Department determines otherwise. But, all Federal facilities discharging to Class G-II groundwater are prohibited from causing a violation of the secondary drinking water standards at any private or public water supply well outside the zone of discharge.)

WQ.115.4.FL. Groundwater must meet specific water quality requirements for Class G-III (FAC 62-520.430).

Verify that waters classified as Class G-III groundwater meet the minimum groundwater quality requirements in WQ.115.2.FL.

(NOTE: The minimum criteria do not apply to an underground injection facility that has received an aquifer exemption, unless there is a danger to the environment, public health, safety, or welfare. The minimum criteria applies to all other facilities discharging to an exempted aquifer.)

WQ.115.5.FL. Groundwater must meet specific water quality requirements for Class F-I (FAC 62.520.460(2), .461(1), and (3)).

Verify that waters classified as Class F-I groundwater meet the minimum groundwater quality requirements in WQ.115.2.FL. and the requirements in WQ.115.3.FL. pertaining to Classes G-I and G-II.

Verify that there are no zones of discharge into Class F-I groundwater, except as follows:

Page 739: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-71 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

follows:

- domestic effluent or reclaimed water and stormwater discharge sites authorized by Department permit or rule have zones of discharge extending no more than 100 ft from the site boundary or to the federal facility's property boundary, whichever is less, unless a smaller zone of discharge is necessary to protect the designated use of adjacent waters outside the zone of discharge

- federal facilities authorized to discharge to groundwater at the time of reclassification to F-I by the Commission meet the same requirements as existing federal facilities in Class G-II groundwater.

(NOTE: However, should existing installations wish to increase the discharge

volume or change the composition of the waste stream above permitted levels as of the date of F-I reclassification, the waste stream must be distinctly separate from the existing stream and must meet all provisions applicable to new installations discharging to Class F-I groundwater.)

Surface Water

(NOTE: Surface waters of the state have been classified according to designated uses as follows:

- Class I, potable water supplies - Class II, shellfish propagation or harvesting - Class III, recreation, propagation and maintenance of a health, well-balanced

population of fish and wildlife - Class IV, agricultural water supplies - Class V, navigation, utility, and industrial use.)

WQ.115.6.FL. Surface water must meet minimum water quality requirements (FAC 62-302.500).

Verify that all surface waters of the state, at all places and at all times, are free from the following:

- domestic, industrial, agricultural, or other man-induced, nonthermal components of discharges which, alone or in combination with other substances or in combination with other components of discharges (whether thermal or nonthermal):

- settle to form putrescent deposits or otherwise create a nuisance - float as debris, scum, oil, or other matter in such amounts as to form

nuisances -produce color, odor, taste, turbidity, or other conditions in such degree

as to create a nuisance - are acutely toxic - are present in concentrations that are carcinogenic, mutagenic, or

teratogenic to human beings or to significant, locally occurring, wildlife or aquatic species, unless specific standards are established for such components

Page 740: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-72 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- pose a serious danger to the public health, safety, or welfare - thermal components of discharges which, alone or in combination with other

discharges or components of discharges (whether thermal or nonthermal): - produce conditions so as to create a nuisance

- do not meet the requirements for thermal discharges in WQ.115.7.FL. - silver in concentrations above 2.3 micrograms/L in predominantly marine

waters.

WQ.115.7.FL. Surface water must meet thermal water quality requirements (FAC 62-302.520(1)(a), (b), (2), and (4)).

Verify that heated water discharges existing on 1 July 1972 meet the following requirements:

- do not increase the temperature of the receiving body of water so as to cause substantial damage or harm to the aquatic life or vegetation therein or interfere with beneficial uses assigned to the receiving body of water

- are monitored by the discharger.

Verify that new heated water sources discharging into receiving bodies of water controlled by the state do not increase the water temperature by more than the monthly temperature limits prescribed for the particular type and location of the receiving body of water.

(NOTE: New sources include all expansions, modifications, alterations, replacements, or repairs which result in an increased output of 10 percent or more of the level of energy production which existed on 1 March 1979.)

Verify that the specified monthly and maximum temperature limits are met in the following waters:

- fresh waters: - heated water with a temperature at the point of discharge more than 5 οF

higher than the ambient (natural) temperature of any stream is not discharged into the stream

- at all times under all conditions of stream flow the discharge temperature is controlled so that at least two-thirds of the width of the stream's surface remains at ambient (natural) temperature

- no more than one-fourth of the cross-section of the stream at a traverse perpendicular to the flow is heated by the discharge

- heated water with a temperature at the point of discharge more than 3 οF higher than the ambient (natural) temperature of any lake or reservoir is not discharged into the lake or reservoir

- no heated water with a temperature above 90 οF is discharged into any fresh waters in Northern Florida regardless of the ambient temperature of the receiving body of water

- in Peninsular Florida, heated waters above 92 οF are not discharged into fresh waters

- coastal waters:

Page 741: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-73 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- heated water with a temperature at the point of discharge more than 2 οF higher than the ambient (natural) temperature of the receiving body of water is not discharged into coastal waters in any zone during the months of June, July, August, and September

- during the remainder of the year, heated water with a temperature at the point of discharge more than 4 οF higher than the ambient (natural) temperature of the receiving body of water is not discharged into coastal waters in any zone

- during June, July, August, and September, no heated water with a temperature above 92 οF is discharged into coastal waters

- no heated water with a temperature above 90 οF is discharged into coastal waters during the period October through May

- heated water with a temperature at the point of discharge up to 17 οF above ambient (natural) temperature of the receiving body of open water may be discharged from an open or closed conduit into open waters under the following restraints:

- the surface temperature of the receiving body of water is not raised to more than 97 οF

- the point of discharge is sufficient distance offshore to ensure that the adjacent coastal waters are not heated beyond the temperatures permitted in such waters

- cooling ponds: - the temperature for heated water discharged from a cooling pond is

measured at the point of discharge from the pond and the temperature limitation are those specified for the receiving body of water.

WQ.115.8.FL. Surface water must meet water quality requirements for Outstanding Florida Waters and Outstanding National Resource Waters (FAC 62-302.700(1)).

Verify that water quality is not degraded in Outstanding Florida Waters or Outstanding National Resource Waters.

Page 742: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-74 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.120. WATER USE PERMITS

WQ.120.1.FL. Water use permit requirements must be met in the Northwest Florida Water Management District (FAC 40A-2.041(3)(a), (e), .051(1), (7), (8) and (9)) [Revised May 1999].

Verify that a water use permit is obtained from the Northwest Florida Water Management District prior to any use or withdrawal of water.

(NOTE: A general water use permit is granted by rule for all nonexempt ground and surface water uses not requiring an individual water use permit.)

Verify that the following surface water withdrawals have an individual water use permit:

- systems or single facilities withdrawing water from a lake, pond, impoundment, reservoir, river, stream, or other surface water courses and the withdrawal:

- exceeds an annual daily average of 100,000 gal - exceeds 1 million gal on any single day - is more than 10 percent of the base flow of the supplying water body.

- surface water withdrawals located within Gadsden county and the outside diameter of the withdrawal pipe or the sum of the outside diameters of the pipes is 4 in. or greater in size

- uses, regardless of withdrawal rate, for a public water supply system.

(NOTE: An individual Water Use Permit is not required for a single non-public supply well 4 in. or smaller in diameter, withdrawing an annual daily average of 15,000 gallons or less of water which is located in Gadsden County outside of the Upper Telogia Creek Water Resource Caution Area.)

(NOTE: Water use permits are not required for domestic water use. An individual water use permit is not required for groundwater used for heating and cooling systems which withdraw less than an annual daily average of 100,000 gal and provide for the return of nontreated uncontaminated water, by means of a closed system, to the same subsurface formation and supply source from which the water was obtained. An individual water use permit is not required for water obtained from holding ponds constructed in uplands for the purpose of storing runoff or reclaimed water.)

Page 743: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-75 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.120.2.FL. Permit requirements for use of works of the Northwest Florida Water Management District must be met (FAC 40A-6.041(1)).

Verify that a permit is obtained prior to connection to, withdrawal of water from, discharge of water into, placing construction with or across, or otherwise using, removing a use, or terminating a use of a work of the Northwest Florida Water Management District.

WQ.120.3.FL. Water use permit requirements must be met in the Suwannee River Water Management District (FAC 40B-2.041(1) and .051) [Revised July 1998].

Verify that a water use permit is obtained from the Suwannee River Water Management District prior to the withdrawal or diversion of water for any consumptive use.

(NOTE: No permit is required for the following: - withdrawal for domestic use - withdrawals of water used strictly for fire fighting purposes - withdrawals made for dewatering activities - withdrawals or diversions from manmade retention structures when they are

needed to facilitate repair or maintenance - withdrawals for self-supplied residential uses.)

WQ.120.4.FL. Permit requirements for use of works of the Suwannee River Water Management District must be met (FAC 40B-4.1070(2), (3), and .3010(1)(A)) [Revised July 1998] .

Verify that a permit is obtained prior to connection with, placing structures or works in or across, discharging to, or other development within a work of the Suwannee River Water Management District.

(NOTE: The following activities are exempt from permit requirements: - development within a work which is completed prior to 1 April 1986 or

which was authorized by permits issued by any other agency - temporary alterations to land topography for agriculture, silviculture,

floriculture, or horticulture, whether private or commercial - development within a work which meets requirements of a local government

ordinance - development associated with construction, reconstruction, improvement, or

maintenance of a single-family residence - construction or maintenance of docks, seawalls, bulkheads, mooring pilings,

or dolphins - development for an onsite sewage disposal system for a single-family

residence.)

(NOTE: A general permit may be granted to any person for the construction of a structure for single-family residential or agricultural use.)

Page 744: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-76 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.120.5.FL. Water use permit requirements must be met in the St. John's River Water Management District (FAC 40C-2.041(1), .042, .051(1), (3) through (7), and .401(1)) [Revised May 1999].

Verify that the following have an individual consumptive use permit:

- average annual daily withdrawals exceeding 100,000 gal average per day on an annual basis

- withdrawal equipment or another facility which have a capacity of more than 1 million gpd

- withdrawals from a well in which the outside diameter of the largest permanent water bearing casing is 6 in. or greater

- withdrawals from a well in which the outside diameter of the largest permanent water bearing casing is 3.5 in. or greater, within a delineated area

- freeze protection uses of water, within delineated areas - any secondary use which exceeds 100,000 gpd estimated on an average

annual basis.

(NOTE: A general consumptive use permit is established by rule for landscape, golf course, recreation, agriculture and nursery irrigation, and for aquaculture, ornamental and aerating fountains, and all other types of uses. However, this exemption does not apply to domestic uses of water by individuals, i.e. water used for the household purposes of drinking, bathing, cooking or sanitation. Persons using or proposing to use water in a manner not authorized under this section, must apply for a general permit pursuant to chapter 40C-20, F.A.C., or a modification of their individual permit pursuant to this chapter.)

(NOTE: No permit is required for the following water uses: - domestic consumption of water by individual users

- withdrawals of ground or surface water to facilitate construction on or below ground surface or to remove pollutants from contaminated water in the following circumstances:

- groundwater may be withdrawn if it is recharged onsite to the aquifer from which it was withdrawn by either infiltration or direct injection:

-surface water may be withdrawn only from wholly-owned impoundments or works which are no deeper than the lowest extent of the uppermost water-bearing stratus and which have no surface hydrologic connection off site, and the surface water must be recharge onsite to the uppermost water-bearing stratum by either infiltration or direct injection

- infiltration is accomplished by land application or by discharge to wholly-owned impoundments or works as long as there is no surface discharge off site

- withdrawals of groundwater for aquifer performance tests requested by St. John's River Water Management District staff

- withdrawals of surface water solely for flood control when: - the withdrawal is accomplished by and was approved as part of a

surface water management system which has received a management and storage of surface water permit

- the withdrawal is conducted by a municipality, county, agency of the executive branch of the state, or the Federal government

Page 745: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-77 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

- withdrawals of groundwater to irrigate residential landscape areas less than 1 acre in size

- water, whether withdrawn or diverted, when used for purposes of protection of fish and wildlife or the public health and safety when and where the Governing Board has reserved the water from use by permit applicants.)

Verify that identification tags issued with the permit are prominently displayed at

the withdrawal site by permanently affixing the tag to the pump, headgate, valve, or other withdrawal facility.

WQ.120.6.FL. General water use permit requirements must be met in the St. John's River Water Management District (FAC 40C-20.042(1) and (2)).

Verify that persons whose use of water is not exempt as specified in WQ.120.5.FL. obtain a general permit prior to commencing the use, withdrawal, or diversion of water.

Verify that no water use, withdrawal, or diversion commences until written authorization from the St. John's River Water Management District is received.

WQ.120.7.FL. Water use permit requirements must be met in the Southwest Florida Water Management District (FAC 40D-2.041(1), .051(1), and .401(1)).

Verify that a water use permit is obtained from the Southwest Florida Water Management District prior to withdrawal of water if any of the following thresholds are exceeded:

- total withdrawal capacity from any source or combined sources is greater than or equal to 1 million gpd

- annual average withdrawal from any source or combined sources is greater than or equal to 100,000 gpd

- withdrawal is from a well having an outside diameter of 6 in. or more at the surface

- withdrawal is from a surface water body and the outside diameter of the withdrawal pipe or the sum of the outside diameters of the pipes is 4 in. or greater

- withdrawal is from wells having a cumulative outside diameter greater than 6 in. at the surface which are constructed after 11 April 1994.

(NOTE: No permit is required for the following uses: - domestic consumption of water by individual users

- certified uses entitled Electrical Power Plant Siting - certified uses entitled Industrial Siting - temporary withdrawals for contamination cleanup - temporary withdrawals from test wells - temporary dewatering for construction of buildings or other foundations and

roadways or for installation of utility pipeline, cables, culverts, and catch basins.)

Page 746: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-78 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

Verify that identification tags issued with the permit are permanently affixed to the pump, headgate, valve, or other withdrawal facility.

WQ.120.8.FL. Permit requirements for use of works of the Southwest Florida Water Management District must be met (FAC 40D-6.041, .051(1) through (3), and .411).

Verify that a permit is obtained prior to connection to, withdrawal of water from, discharge of water into, placing construction with or across, or otherwise using, removing a use, or terminating a use of a work of the Southwest Florida Water Management District.

(NOTE: A permit is not required for the following: - to remove any dock, pier, piling, or boat house - to construct, alter, or remove any pumping facility withdrawing water from

any stream, lake, or pond for individual domestic use or for watering residential lawns and shrubs as long as the activity does not breach or alter the bank or shoreline or constitute a hindrance to the flow of any stream or other watercourse which is a work

- to temporarily (not to exceed 6 mo) dewater an area within the limits of a work for construction, alteration or repair of buildings or other foundations and roadways, or during installation, alteration, or repair of utility pipelines, cables, culverts, and catch basins.)

Verify that, within 30 days after construction or alteration completion, a statement

of completion is filed with the Southwest Florida Water Management District.

WQ.120.9.FL. Water use permit requirements must be met in the South Florida Water Management District (FAC 40E-2.041(1), .051, 20.042(1), and (2)).

Verify that a water use permit is obtained from the South Florida Water Management District prior to any use or withdrawal of water.

(NOTE: No permit is required for the following water uses: - water used strictly for domestic use at a single-family dwelling or duplex,

provided that the water is obtained form one withdrawal facility or each dwelling/duplex

- water used strictly for fire fighting purposes - water used at a single-dwelling or duplex including, but not limited to, home

lawn and ornamental irrigation, car washing, and other incidental uses, provided that the water is obtained form one withdrawal facility or each dwelling/duplex.)

(NOTE: All persons using or withdrawing water who are not exempt and do not

meet the requirements for individual permits are granted a general permit by rule to use and withdraw water. No use or withdrawal of water may commence until the permittee receives a written authorization to proceed from the South Florida Water Management District, except in instances of short-term dewatering when a notice of intent is submitted instead.)

Page 747: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-79 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.120.10.FL. Permit requirements for use of works or lands of the South Florida Water Management District must be met (FAC 40E-6.041(1), (4), and .051(1)).

Verify that an occupancy permit is obtained prior to connecting with, placing structures in or across, discharging into, or making use of the works of the South Florida Water Management District and any additional lands or real property interest owned by the South Florida Water Management District.

Verify that an occupancy permit is obtained prior to traveling on or across these works or lands, except when they are open to the public.

(NOTE: The planting or maintenance of grass is exempt from permitting where these activities will:

- not involve the reshaping or alteration of banks, berms, or other ground surfaces lying within South Florida Water Management District works or lands

- not have an adverse environmental impact, including adverse impacts on native species which exist onsite

- meet beautification criteria.)

WQ.120.11.FL. Permit requirements for use of works of the South Florida Water Management District Lake Okeechobee Drainage Basin must be met (FAC 40E-61.041(1), (2)(a)(1), and .051(1) through (4)).

(NOTE: Each parcel of land within the Lake Okeechobee Drainage Basin is presumed to connect to or make use of the works of the South Florida Water Management District.)

Verify that a permit is obtained prior to connecting to, making use of, altering, removing works from, or placing works within, on, or across the works of the South Florida Water Management District within the Lake Okeechobee Drainage Basin.

Verify that individual permits are obtained for land in the Lake Okeechobee Drainage basin which is used for improved pasture (including heifer farms and dairies) and vegetable crops (including row crops).

(NOTE: Unless included voluntarily in a management plan for a defined geographic area, a permit is not required for the following:

- activities of dairy farms that are subject to and operated and maintained in compliance with the requirements of a valid permit issued pursuant to the Department of Environmental Regulation Dairy Rule

- stationary installations regulated by the Department of Environmental Regulation

- land units less than 0.5 acre in size that cannot reasonably be expected to discharge water in noncompliance

- septic tanks, except for septic tanks that collectively create a local source of phosphorus that significantly impact Lake Okeechobee.)

Page 748: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-80 Water Quality Management

COMPLIANCE CATEGORY: WATER QUALITY MANAGEMENT

Florida Supplement

REGULATORY REQUIREMENTS:

REVIEWER CHECKS: June 2000

WQ.120.12.FL. Permit requirements for use of works of the South Florida Water Management District Everglades Regulatory Program (Everglades agricultural area) must be met (FAC 40E-63.110(1), .120(1), (2), and .130(1)).

(NOTE: The lands in the Everglades agricultural area release water that ultimately makes use of, connects to, is released to, or is discharged to the works of the South Florida Water Management District within the Everglades and a general permit, individual permit, or master permit must be obtained.)

(NOTE: Parcels of land that connect to or make use of the works of the South Florida Water Management District within the Everglades and that meet the following requirements are granted a general permit by rule to connect to and make use of the works:

- the property is less than 40 acres in size, is residential, and is not served by a central drainage system

- the property is less than 5 acres in size, is commercial or industrial, and is not served by a central drainage system.)

Verify that an individual permit is obtained for all structures which discharge or

release water to one of the works of the South Florida Water Management District within the Everglades, unless granted a general permit or included in a master permit.

Page 749: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-81 Water Quality Management

Appendix 13 -1

Exemptions from Environmental Resource Permitting Requirements (FAC 40D-4.051 and 40D-3.041(3))

[Added July 1998]

(NOTE: A permit may be required, if the master drainage plan is altered so as to have an adverse impact on the off site water resources in the District, for surface water management systems exempt under regulations applicable to one of the following:

1. any project, work or activity which has received all governmental approvals necessary to begin construction and is under construction prior to October 1, 1984,

2. any phased or long term build out project, including a development of regional impact, planned unit development, development which has received local or regional approval prior to October 1, 1984 (40D-4.051(3) or (6)).)

The following activities are exempt from permitting under this chapter:

1. The activities specified in Section 373.406, Florida Statutes. 2. The construction, alteration, or operation of a surface water management system for agricultural or

silvicultural activities which satisfies the following requirements: a. The total land area does not equal or exceed 10 acres; b. The area of impervious surface will not equal or exceed 2 acres; c. The activities will not be conducted in wetlands; d. The activities will not be conducted in existing lakes, streams, or other watercourses; e. The surface water management system will not utilize drainage pumps or operable discharge

structures; f. The activities will not utilize storm drainage facilities larger than one 24-inch diameter pipe, or

its hydraulic equivalent; g. Discharges from the site will meet applicable state water quality standards, as set forth in

chapter 17-3 and Rule 17-4.242; h. The activities are part of a conservation plan prepared or approved by a local Soil and Water

Conservation District Board organized pursuant to Chapter 582, Florida Statutes, (S.C.S.). If the S.C.S. conservation plan is not implemented according to its terms, the exemption created in this subsection does not apply;

i The activities can otherwise reasonably be expected not to have significant adverse water resource impacts; and

j. The surface water management system can be effectively maintained. 3. Any project, work or activity which has received all governmental approvals necessary to begin

construction and is under construction prior to October 1, 1984. 4. Any project, work or activity which received a surface water management permit from the District

prior to October 1, 1984. 5. Any project, work or activity which did not require a surface water management permit from the

District and had received all other necessary governmental approvals to begin construction or operation prior to October 1, 1984.

6. Any phased or long term build out project, including a development of regional impact, planned unit development, development with a master plan or master site plan, or similar project, which has received local or regional approval prior to October 1, 1984, if:

a. The approval process requires a specific site plan and provides for a master drainage plan approved prior to the issuance of a building permit, and

b. The developer has notified the District of its intention to rely upon this exemption on or before April 1, 1985.

Projects exempt under this subsection shall continue to be subject to the District's surface water management rules in effect prior to October 1, 1984.

Page 750: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-82 Water Quality Management

7. All normal and necessary farming and forestry operations as are customary for the area, which can

be conducted without the construction or alteration of a surface water management system. In order to qualify for this exemption, such operations and facilities shall not impede or divert the flow of surface waters entering or leaving the operation or intrude into or otherwise substantially and adversely impact significant wetlands.

8. Phosphate mining and mining related surface water management systems are exempt from the requirements of this chapter, provided that all conditions for exemption in Rule 40D-4.053(1) are met. However, nothing in this section is intended to exempt phosphate mining from the Department of Environmental Protection's authority.

9. Phosphate mine reclamation and restoration conducted in accordance with Chapter 16C-16, the Mine Reclamation rules of the Florida Department of Environmental Protection, is exempt from the requirements of this chapter provided that all conditions for exemption in Rule 40D-4.053(2) are met.

10. Construction or private use of a single family dwelling unit, duplex, triplex or quadruplex that is not part of a larger common plan of development or sale and does not involve wetlands or other surface waters.

11. Routine maintenance of a surface water management system; however, maintenance of surface water management systems will be considered in conjunction with the applications for construction, alteration, or operation.

12. In accordance with the provisions of Section 403.813(2), FS, no permit shall be required under Chapters 40D-4, 40D-40 or 40D-400, Florida Administrative Code for the following activities:

a. The repair or replacement of existing functional pipes or culverts the purpose of which is the discharge or conveyance of stormwater. In all cases, the invert elevation, the diameter, and the length of the culvert shall not be changed. However, the material used for the culvert may be different from the original material. This exemption does not authorize the repair, replacement, or alteration of dams, spillways or appurtenant works, nor construction activities or procedures that cause a violation of water quality standards as set forth in Chapter 62-302 and Rule 62-4.242, F.A.C.

b. The installation, replacement or repair of mooring pilings and dolphins associated with private docking facilities.

c. The installation of private docks of 1000 square feet or less of surface area over wetlands or other surface waters or 500 square feet or less of surface area over wetlands or other surface waters for docks which are located in Outstanding Florida Waters. This exemption shall include the construction of structures above the dock area, such as gazebos and boat shelters, provided such structures are not enclosed with walls and doors, are not used for living, commercial purposes, or storage of materials other than those associated with recreational use and provided the structures do not exceed, together with the docking facility, the total area limitations above. To qualify for this exemption, any such dock and associated structure:

(1) shall be used for recreational, non-commercial activities; and (2) shall be constructed or held in place by pilings, including floating docks, so as not to

involve filling or dredging other than necessary to install the pilings; and (3) shall not substantially impede the flow of water or create a navigational hazard; and (4) shall be the sole dock constructed pursuant to this exemption as measured along the

shoreline for a minimum distance of 65 feet, unless the parcel of land or individual lot as platted is less than 65 feet in length along the shoreline, in which case there may be one exempt dock allowed per parcel or lot. For the purposes of this rule, multi-family living complexes and other types of complexes or facilities associated with the proposed private dock shall be treated as one parcel of property regardless of the legal division of ownership or control of the associated property. Construction of a private dock under this exemption does not obligate the District to issue a subsequent permit to construct a channel to provide navigational access to the dock. Activities associated with a private dock shall include the construction of the structures attached to the pier which are only suitable for the mooring or storage of boats (i.e., boatlifts). Nothing in this paragraph shall prohibit the Department from taking appropriate enforcement action pursuant to Chapter 403, FS, to abate or prohibit any activity otherwise exempt from permitting pursuant to this paragraph if the

Page 751: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-83 Water Quality Management

Department can demonstrate that the exempted activity has caused water pollution in violation of Chapter 403, FS

d. The performance of maintenance dredging of existing manmade canals, channels, basins, berths, and intake and discharge structures, where the spoil material is to be removed and deposited on a self-contained, upland spoil site which will prevent the escape of the spoil material and return water from the spoil site into wetlands or other surface waters, provided no more dredging is performed than is necessary to restore the canal, channels, basins, berths, and intake and discharge structures to original design specifications, and provided that control devices are used at the dredge site to prevent turbidity and toxic or deleterious substances from discharging into adjacent waters during maintenance dredging. This exemption shall apply to all canals constructed before April 3, 1970, and to those canals constructed on or after April 3, 1970, pursuant to all necessary state permits. This exemption shall not apply to the removal of a natural or manmade barrier separating a canal or canal system from adjacent wetlands or other surface waters. Where no previous permit has been issued by the Board of Trustees of the Internal Improvement Trust Fund, the Department, the District or the United States Army Corps of Engineers for construction or maintenance dredging of the existing manmade canal, channel, basin, berth or intake or discharge structure, such maintenance dredging shall be limited to a depth of no more than 5 feet below mean low water.

e. The installation and maintenance to design specifications of boat ramps on artificial bodies of water where navigational access to the proposed ramp exists, or the installation and maintenance to design specifications of boat ramps open to the public in any wetlands or other surface waters where navigational access to the proposed ramp exists and where the construction of the proposed ramp will be less than 30 feet wide and will involve the removal of less than 25 cubic yards of material from the wetlands or other surface waters and the installation of docks with an area of 500 square feet or less over wetlands or other surface waters that are associated with and adjoining the boat ramps constructed pursuant to this exemption. All material removed shall be placed upon a self-contained upland site so as to prevent the escape of the spoil material and return water from the spoil site into the wetlands or other surface waters. For the purpose of this exemption artificial bodies of water shall include, residential canal systems, canals permitted by a District created under Section 373.069, Florida Statutes, and artificially created portions of the Florida Intracoastal Waterway.

f. Construction of seawalls or riprap, including only that backfilling needed to level the land behind seawalls or riprap, in artificially created waterways where such construction will not violate existing water quality standards, impede navigation or adversely affect flood control. An artificially created waterway is defined as a body of water that has been totally dredged or excavated and which does not overlap natural wetlands or other surface waters. For the purpose of this exemption, artificially created waterways shall also include existing residential canal systems. This exemption does not apply to the construction of vertical seawalls in estuaries or lagoons unless the proposed construction is within an existing man-made canal where the shoreline is currently occupied in whole or in part by vertical seawalls.

g. Construction of private docks in artificially created waterways where construction will not violate water quality standards, impede navigation, or adversely affect flood control.

h. The replacement or repair of existing docks and moorings piles provided that no fill material other than the piles is to be used, and provided that the replacement or the repaired dock or mooring pile is in the same location and of the same configuration and dimensions as the dock or mooring pile being replaced or repaired. A dock or mooring pile must be functional and able to provide access to boats moored at the dock or pile before this exemption may be used unless the dock or mooring pile has been rendered nonfunctional by a discreet event such as a storm, collision or fire.

i. The restoration of a seawall or riprap at its previous location, upland of its previous location, or within one foot waterward of its previous location. No filling can be performed except in the actual restoration of the seawall or riprap. No construction shall be undertaken without necessary title or leasehold interest, especially where private and public ownership boundaries have changed as a result of natural occurrences such as accretion, reliction and natural erosion. Restoration and repair shall be performed using the criteria set forth in Section 373.414(5),

Page 752: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-84 Water Quality Management

Florida Statutes. This exemption shall be limited to functioning seawalls or riprap. This exemption shall not affect the permitting requirements of Chapter 161, Florida Statutes.

j. The maintenance of functioning insect control structures, and the maintenance of functioning dikes and functioning irrigation and drainage ditches, including roadway ditches, provided that the spoil material is deposited on a self-contained upland spoil site which will prevent the escape of the spoil material and return water into wetlands or other surface waters. In the case of insect control structures, if the cost of using a self-contained upland spoil site is so excessive as determined by the Department of Agriculture and Consumer Services, pursuant to subsection 403.088(1), Florida Statutes, that it will inhibit the proposed insect control, existing spoil sites or dikes may be used, upon notification to the District. In the case of insect control where upland spoil sites are not used pursuant to this exemption, turbidity control devices shall be used to confine the spoil material discharge to that area previously disturbed when the receiving body of water is used as a potable water supply, is designated as approved, conditionally approved, restricted or conditionally restricted waters for shellfish harvesting by the Department, or functions as a habitat for commercially or recreationally important shellfish or finfish. In all cases, no more dredging is to be performed than is necessary to restore the dike or irrigation or drainage ditch to its original design specifications. This exemption shall apply to man-made trenches dug for the purpose of draining water from the land or for transporting water for use on the land and which are not built for navigational purposes.

k. The restoration of less than 100 feet in length of existing insect control impoundment dikes and the connection of such impoundments to tidally influenced waters. Such impoundments shall be connected to tidally influenced waters for at least 6 months each year, beginning September 1, and ending February 28, if feasible, or operated in accordance with an impoundment management plan approved by the District. The connection shall be of sufficient cross-sectional area to allow beneficial tidal influence. Restoration shall involve no more dredging than needed to restore the dike to original design specifications, and such that the final elevation of the dredge area shall be within 2 feet of immediately adjacent bottom elevations. For the purposes of this paragraph, restoration shall not include maintenance of impoundment dikes of insect control impoundments.

l. The installation of subaqueous transmission and distribution lines laid on, or embedded in, the bottoms of wetlands or other surface waters, except in Class I and Class II waters and aquatic preserves, provided that no dredging or filling is necessary.

m. The replacement or repair of subaqueous transmission and distribution lines laid on or embedded in, the bottoms of wetlands or other surface waters.

n. The construction of private vertical seawalls in wetlands or other surface waters, other than in an estuary or lagoon, and the construction of riprap revetments, where such construction is between and adjoins at both ends existing seawalls or riprap, follows a continuous and uniform construction line with the existing seawalls or riprap, is no more than 150 feet in length, and does not violate existing water quality standards, impede navigation adversely or affect flood control. However, this shall not affect the permitting requirements of Chapter 161, Florida Statutes. Construction shall be in accordance with subsection 373.414(5), Florida Statutes.

o. The replacement or repair of existing open-trestle foot bridges and vehicular bridges that are 100 feet or less in length and two lanes or less in width, provided that no more dredging or filling in wetlands or other surface waters is performed than that necessary to replace or repair pilings and that the structure to be replaced or repaired is the same length, the same configuration, and in the same location as the original bridge. No debris from the original bridge shall be allowed to remain in wetlands or other surface waters.

13. The following activities shall not be required to obtain a permit under chapters 40D-4, 40D-40, or 40D-400, F.A.C.:

a. Activities necessary to preserve, restore, repair, remove, or replace an existing communication or power pole or line, provided that work does not involve dredge or fill activities other than the removal of the existing structure and the installation of the new structure, and in the case of a power pole or line, the activity does not increase the voltage of existing power lines. An activity does not qualify to use this exemption if it results in relocation of an existing structure or facility more than 10 feet in any direction from its original location, or if it involves the construction of

Page 753: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-85 Water Quality Management

new power or telephone lines or the repair and replacement of existing structures that require dredge or fill activities to provide access to the site.

b. The installation, removal, and replacement of utility poles that support telephone or communication cable lines, or electric distribution lines of 35 kV or less, together with the bases and anchoring devices to support those poles, as specified below. For the purpose of this exemption, "anchoring device" shall mean steel guy wires fastened to the ground and "base" shall mean a concrete or steel foundation not exceeding four feet in radius, used to support a utility pole. This exemption shall be subject to the following conditions:

(1) no more than 15 utility poles may be installed, removed, or replaced in wetlands; (2) this exemption shall not apply in surface waters other than wetlands; (3) the temporary disturbance to wetlands shall be limited to a length of 0.5 miles, an areal

extent of 0.5 acre, and a width of 30 feet to access the site to actually install, remove, or replace the utility poles, thereafter, maintenance of the utility right of way in wetlands shall be limited to a cleared corridor that does not exceed a total width of 15 feet and a total area of 0.25 ac.;

(4) this exemption shall not apply in forested wetlands located within 550 feet from the mean or ordinary high water line of a named waterbody that is designated as an Outstanding Florida Water or an Outstanding National Resource Water, or to activities in any aquatic preserves;

(5) there shall be no permanent placement of fill other than utility poles and anchoring devices;

(6) there shall be no dredging or filling of fill pads or access roads except for temporary mats, which may be used to access pole installation sites, and all temporary mats shall be removed within thirty days after the installation, removal or replacement of the utility poles, associated bases, and anchoring devices;

(7) the installation of the utility pole(s) and associated bases and anchoring devices shall not interfere with navigation or impede water flow in wetlands;

(8) turbidity, sedimentation, and erosion shall be controlled during and after construction to prevent violations of state water quality standards due to construction related activities;

(9) except for the permitted structures, pre-construction ground elevations and the contours of all soils that are disturbed by construction activities, including vehicle ruts in wetlands, shall be restored within 30 days of completion of the installation of the utility line or cable, and restored grades shall be stabilized within 72 hours following completion of elevation and contour restoration to minimize erosion;

(10) vehicle usage in wetlands shall be conducted so as to minimize tire rutting and erosion impacts;

(11) water jets shall not be used except for those which are a pre-engineered part of the pole, and provided that the water for the jets is either recirculated on site or is discharged in a self contained upland disposal site;

(12) vehicular access in wetlands shall be limited to existing roads, trails, rights-of-way or easements, and to other previously disturbed corridors where they exist; and

(13) the permittee shall provide an annual report to the District which summarizes the activities conducted under this exemption for the period from January 1 to December 31 of each year, including: the acreage of temporary impacts in wetlands resulting from the use of temporary mats and the clearing of wetland vegetation; the extent of permanent impacts to wetlands including the number of poles and structures in wetlands and the acreage of clearing in wetlands; the voltage of all electric lines that are installed; the number of times this exemption is used; the specific location of each line that is installed (including the county, the section, township, and range, and the identity of permanent landmarks such as roads and named wetlands and other surface waters within or adjacent to the work location), and the number of times and locations where water jets are used.

c. The installation of aids to navigation, including bridge fender piles, "No Wake" and similar regulatory signs, and buoys associated with such aids, provided that the devices arc marked in accordance with Section 327.40, Florida Statutes.

d. The use of rotenone, by the Florida Game and Fresh Water Fish Commission, in conducting tests related to its responsibility regarding fish management. The chemical selected shall be

Page 754: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-86 Water Quality Management

used at no more than the strength approved by the EPA label, or a lesser strength than the EPA approved label. In addition, the chemical shall be used only under the direct on-site supervision of a staff member of the Florida Game and Fresh Water Fish Commission.

e. Maintenance of minor silvicultural surface water management systems as described in subsection 40D-400.500(4), F.A.C., which were permitted under Part IV of Chapter 373, FS or were constructed prior to the requirements for a permit under this part, provided such maintenance is conducted in accordance with the performance standards set forth in subsection 40D-400.500(5), F.A.C.

f. The construction or maintenance of culverted driveway or roadway crossings and bridges of artificial waterways, subject to the following provisions:

(1) This exemption shall apply only to wholly artificial, non-navigable drainage convey-ances.

(2) The construction project area shall not exceed one acre, and the construction shall be for a discrete project that is not part of a larger plan of development which requires permitting under Chapters 40D-40, 40D-400, F.A.C., or this chapter.

(3) The artificial waterway in existing condition shall be not more than 4 feet deep, measured from the top of bank to the bottom of the artificial waterway.

(4) The person performing the exempt activity shall ensure that the size and capacity of the culvert(s) will be adequate to pass normal high water stages of the artificial waterway without causing adverse impacts to upstream or downstream property, but the culvert(s) shall not be larger than one 24 inch diameter pipe, or its equivalent; and in no instance shall the culvert(s) provide a smaller cross-sectional area or discharge capacity than any upstream culvert.

(5) The elevation of the culvert invert shall be at the existing bottom grade of the artificial waterway.

(6) The length of the driveway or roadway crossing the waterway shall not exceed 30 feet from top of bank to top of bank.

(7) The top width of the driveway or roadway shall not exceed 20 feet, the toe to toe width shall not exceed 40 feet, and side slopes shall be no steeper than 3 feet horizontal to 1 foot vertical.

(8) Clean fill used for the crossing shall be obtained from an upland borrow pit or from a dredge site that is in compliance with the regulatory requirements of Part IV, Chapter 373, FS, either through a permit, or an exemption.

(9) There shall be no additional dredging, filling, or construction activities within the artificial waterway or project area, except those directly involved in the construction or operation and maintenance of the culverted crossing and those exempted from regulation under Part IV, Chapter 373, F.S.

(10) All temporary fill in construction areas shall be removed and regraded to original elevations and revegetated.

(11) The person performing the exempt activity shall implement measures for erosion and pollution control using best management practices, including turbidity curtains or similar devices and other site specific practices, in strict adherence to the Florida Department of Transportation's "Standard Specifications for Road and Bridge Construction," and Chapter 6 of the Department's "Florida Development Manual," to prevent violations of state water quality standards. Temporary erosion controls shall be implemented prior to and during construction, and permanent erosion control measures for all exposed soils shall be completed within 7 calendar days of the most recent construction activity.

(12) Any spoil material from construction or maintenance shall be used or disposed of on an upland portion of the property or shall be transported off site and deposited on a self-contained upland spoil site that is in compliance with the permitting requirements of Chapters 40D-4 and 40D-40, F.A.C., as applicable.

(13) If dewatering is performed, all temporary fill dikes and dewatering discharges shall be installed and constructed so that no upstream flooding or impoundment occurs and to prevent siltation, erosion or turbid discharges into waters of the State in violation of state water quality standards. Any temporary works shall be completely removed, and all areas

Page 755: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-87 Water Quality Management

upstream and downstream from the crossing shall be restored to grades, elevations and conditions which existed before the construction.

(14) This exemption shall apply only to a maximum of 2 crossings on a given total land area of property with a minimum distance of 500 feet between crossings.

(15) This exemption shall not apply to activities involving relocation or other alteration of all or part of the artificial waterway, or construction for other than the proposed culvert crossing, except as exempted by Chapter 373, F.S., or this section.

g. Construction of freshwater fish attractors by Florida Game and Fresh Water Fish Commission, U.S. Forest Service, and county and municipal governments, provided that the material to be used shall be clean concrete, rock, brush, logs, or trees, and shall be free of soils, preservatives, oil, grease, debris, litter, putrescible substances, "white goods," asphalt material, tires, or other pollutants, and shall be firmly anchored to the bottom of the waterbody. The size of an individual fish attractor shall not exceed one quarter acre in area. The material shall be placed so that the top of the fish attractor is at least three (3) feet below the surface of the water at ordinary low water and shall be outside any posted navigational channels. No fish attractor material shall be placed on or in areas vegetated by native aquatic vegetation. The site shall be marked with a buoy or buoys to ensure that no material is deposited outside of the site.

h. Installation of piling support structures associated with water testing or monitoring equipment by the Department or the Districts, provided that flow or navigation are not impeded.

14. Surface Waters or Wetlands Created by Mosquito Control Activities. Construction, alteration, operation, maintenance, removal, and abandonment of stormwater management systems, dams, impoundments, reservoirs, appurtenant works, or works, in, on, or over lands that have become surface waters or wetlands solely because of mosquito control activities undertaken as a part of a governmental mosquito control program, and which lands were neither wetlands nor other surface water before such activities, shall be exempt from the provisions in this Chapter adopted by the District to implement subsections 373.414(1) through (6); 373.414(7) regarding any authority granted pursuant to section 373.414, F.S. (1991); 373.414(8) and 373.414(10), F.S.

15. Exemptions for Treatment or Disposal Systems. a. Alteration and maintenance of the following shall be exempt from the provisions in Chapter

40D-4, F.A.C., implementing subsections 373.414(1) through 373.414(6), 373.414(8), and 373.414(10), F.S.; and subsection 373.414(7), F.S., regarding any authority to apply state water quality standards within any works, impoundments, reservoirs, and other watercourses described in this subsection and any authority granted pursuant to section 373.414, F.S. (1991):

(1) Works, impoundments, reservoirs, and other watercourses constructed and operated solely for wastewater treatment or disposal in accordance with a valid permit reviewed or issued under sections 17-28.700, 17-302.520 or Chapters 17-17, 17-600, 17-610, 17-640, 17-650, 17-660, 17-670, 17-671, 17-673, 17-701, F.A.C., or section 403.0885, F.S., or rules implementing section 403.0885, F.S., except for treatment wetlands or receiving wetlands permitted to receive wastewater pursuant to 17-611, F.A.C., or section 403.0885, F.S. or its implementing rules.

(2) Works, impoundments, reservoirs, and other watercourses constructed solely for wastewater treatment or disposal before a construction permit was required under chapter 403, F.S., and operated solely for wastewater treatment or disposal in accordance with a valid permit reviewed or issued under sections 17-28.700, 17-302.520, or chapters 17-17, 17-600, 17-610, 17-640, 17-650, 17-660, 17-670, 17-671, 17-673, or 17-701, F.A.C.; or section 403.0885, F.S., or rules implementing section 403.0885, F.S., except for treatment wetlands or receiving wetlands permitted to receive wastewater pursuant to Chapter 17-611, F.A.C., or section 403.0885, F.S. or its implementing rules;

(3) Works, impoundments, reservoirs, and other watercourses of less than 0.5 acres in combined area on a project-wide basis, constructed and operated solely for stormwater treatment in accordance with a noticed exemption under Chapter 17-25, F.A.C., or a valid permit issued under Chapters 17-25 (excluding Rule 17-25.042), 17-330, 40D-4, F.A.C., except those permitted as wetland stormwater treatment systems.

(4) Works, impoundments, reservoirs, and other watercourses of less than 0.5 acres in combined area on a project-wide basis, constructed and operated solely for stormwater treatment before a permit being required under Chapters 17-25, 40D-4, F.A.C.

Page 756: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-88 Water Quality Management

b. Alteration and maintenance of the following shall be exempt from the provisions in Chapter 40D-4, F.A.C., adopted to implement subsections 373.414(1), 373.414(2)(a), 373.414(8), and 373.414(10), F.S.; and subsections 373.414(3) through 373.414(6), F.S.; and subsection 373.414(7), F.S., regarding any authority to apply state water quality standards within any works, impoundments, reservoirs, and other watercourses described in this subsection and any authority granted pursuant to 373.414, F.S. (1991), except for authority to protect threatened and endangered species in isolated wetlands:

(1) Works, impoundments, reservoirs, and other watercourses of 0.5 acre or greater in combined area on a project-wide basis, constructed and operated solely for stormwater treatment in accordance with a noticed exemption under Chapter 17-25, F.A.C., or a valid permit issued under Chapters 17-25 (excluding Rule 17-25.042), 17-330, 40D-4, F.A.C., except those permitted as wetland stormwater treatment systems.

(2) Works, impoundments, reservoirs, and other watercourses of 0.5 acres or greater in combined area on a project-wide basis, constructed and operated solely for stormwater treatment before a permit was required under Chapters 17-25, 40D-4, F.A.C.

c. The exemptions in paragraphs (a) and (b) above shall not apply to works, impoundments, reservoirs or other watercourses that are:

(1) currently wetlands which existed before construction of the stormwater treatment system and were incorporated in it;

(2) being altered through expansion into wetlands or other surface waters; or (3) wetlands created, enhanced or restored as mitigation for wetland or surface water

impacts under a permit issued by the Department or the District. d. Alterations and maintenance of works, impoundments, reservoirs and other watercourses

exempt Under this subsection shall not be considered in determining whether the wetland permitting thresholds in Chapters 40D-4 or 40D-40, F.A.C., are met or exceeded.

e. Works, impoundments, reservoirs and other watercourses exempt under this subsection, other than isolated wetlands in systems described in paragraph (b) above, shall not be delineated under Section 373.421, F.S.

f. his exemption shall not affect the application of state water quality standards, including those applicable to Outstanding Florida Waters, at the point of discharge to waters as defined in subsection 403.031(13), F.S.

g. As used in this subsection, "solely for" means the reason for which a work, impoundment, reservoir, or other watercourse is constructed and operated, and such construction and operation would not have occurred but for the purposes identified in paragraphs (a) and (b) above. Furthermore, the phrase does not refer to a work, impoundment, reservoir, or other watercourse constructed or operated for multiple purposes. Uses, such as occasional recreational uses, will not render the exemption inapplicable, so long as the incidental uses are not part of the original planned purpose of the work, impoundment, reservoir or other watercourse. However, for those works, impoundments, reservoirs, or other watercourses described in subparagraphs (a)3. and (b)1., use of the system for flood attenuation, whether originally planned or unplanned, shall be considered an incidental use so long as the works, impoundments, reservoirs, and other watercourses are no more than two acres larger than the minimum area required to comply with the applicable stormwater treatment requirements of Chapters 17-25, 17-330, 40D-4, F.A.C. For the purposes of this subsection, reuse from a work, impoundment, reservoir, or other watercourse is part of treatment or disposal.

16. The performance of activities pursuant to the provisions of the exemptions described above does not relieve the person or persons who are using the exemption or who are constructing or otherwise implementing the activity from meeting the permitting or performance requirements of other District rules.

Page 757: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-89 Water Quality Management

Page 758: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-90 Water Quality Management

Appendix 13-2

Monitoring Schedule (Source: Rule 62-550.500(4), Table 9)

These general requirements shall apply unless other monitoring is required for a specific contaminant as specified in Rules 62-550.510 through 62-550.540, F.A.C. Monitoring Schedule. Each public water system shall monitor at the time designated by this part during each compliance cycle and compliance period. Table 9 summarizes when each public water system shall perform its monitoring.

1. Systems that monitor for a contaminant quarterly may do so any time during the quarter, except that samples taken in consecutive quarters shall be taken at least 30 days apart.

2. Systems that monitor for a contaminant annually may do so any time during the year, except that samples taken in consecutive years shall be taken at least 90 days apart.

3. Systems that monitor for a contaminant every three years shall adhere to the following schedule: a. Community water systems which serve more than 3,300 persons shall monitor during the

first year of each compliance period. b. Community water systems which serve 3,300 or fewer persons shall monitor during the

second year of each compliance period. c. Non-transient non-community water systems shall monitor during the third year of each

compliance period. 4. Systems that monitor for a contaminant every nine years shall monitor during the first three-year

compliance period of each nine-year compliance cycle following the same schedule as in paragraph (c) above.

5. In the event the population of a small community system increases to more than 3,300 persons, the system shall continue to monitor on the schedule originally prescribed in paragraphs (c) and (d) above for the remainder of the nine-year compliance cycle. At the beginning of the next nine-year compliance cycle, the system shall begin monitoring in the prescribed year according to its then current size or classification.

6. Upon request, small community systems and non-transient non-community systems shall be approved to monitor during earlier compliance periods than required by Table 9.

Page 759: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-91 Water Quality Management

Page 760: The Environmental Assessment and Management (TEAM) Guide ... · • Water Management Districts Suwannee River, St. Johns, Southwest Florida, and South Florida Water Management Districts

13-92 Water Quality Management

Appendix 13-3

Secondary Maximum Contaminant Levels (Source: FAC 62-550 Table 4)

Contaminant MCL (mg/L) Aluminum 0.2 Chloride 250 Copper 1 Fluoride 2 Iron 0.3 Manganese 0.05 Silver 0.1 Sulfate 250 Zinc 5 Color 15 color units Odor * 3 (threshold odor number) pH 6.5 8.5 Total dissolved solids 500 ** Foaming agents 0.5 * Levels of ethylbenzene exceeding 30 micrograms/L, toluene exceeding

40 micrograms/L, or xylenes exceeding 20 micrograms/L are considered equivalent to exceeding the drinking water secondary standard for odor.

** May be greater if no other MCL is exceeded.