The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

15
The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy

Transcript of The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

Page 1: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

The embassy of Lithuania in Finland

Ambassador

A. Jievaltas

Lithuanian Energy Policy

Page 2: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

National Energy Strategy – the road towards Lithuanian energy independence

Page 3: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

A responsible outlook to the future

By 2020 sustainable energy will be oriented towards the following most relevant targets:

• 23% of the final energy consumption will be produced from renewable energy sources:– 20% of electricity consumed mostly from biomass and wind. – 60% of the energy consumed for central heating (from

biomass)– 10% of biofuel in the transport sector

• The efficiency of energy consumption will be increased by 1.5% per year

• Saving in central heating systems will amount to 30-40%• CO2 emissions will be reduced.

Page 4: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

Implementation of the III EU energy package

Reasonable energy prices for consumers.

Strategic significance:•Liberalisation of energy market;•Access granted to alternative energy suppliers to join energy supply networks.

The principles of III EU energy package are being implemented successfully in Lithuania.

On 13 July 2011, H.E. D.Grybauskaitė signed new Natural Gas law and its implementation law.

Page 5: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

Dependency on a single gas supplier

Gas prices at the beginning of 2012:

PL – €386 per 1000 m³

LT – €371 per 1000 m³

UA – €315 per 1000 m³

< 50 % 50-80 %80-100 %

Sources: BP Statistical Review of World Energy, June 2010 Europe’s energy portal, 2010

Page 6: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

The structure of energy resources in Lithuania

N.B. After Ignalina NPP shutdown, Lithuania became 80% dependent on energy imports

from a single supplier.

Page 7: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

Strategic Projects – guarantee of Lithuanian energy independence

Page 8: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

Strategic projects: Natural gas, Renewables and energy efficiency

• Liquefied Natural Gas Terminal, Klaipeda (3 bn. m3/ year)

€ 342 M

• Underground Natural Gas Storage Syderiai, Lithuania (0.5 bn. m3)

€ 151 M

• Gas pipeline to Poland Amber pipeline (2.3 bn. m³/ year)

€ 485 M

Total: € 978 M

• New Renewable capacities for Electricity and Heat (to reach 23% target)

€ 1007 M

• Renovation of public buildings € 3028 M

• Housing modernization programme € 12114 M

Total: € 16149 M

Page 9: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

Strategic projects: Electricity networks and Electricity generation

• New Nuclear Power Plant (1350 MW) € 5035 M

• Poland –Lithuania electricity interconnection (1000 MW)

€ 238 M

• Additional network strengthening € 470 M

• Sweden – Lithuania electricity interconnection (700 MW)

€ 704 M

• Reconstruction of internal electricity grid € 363 M

Total: € 6810 M

• New CCGT (440 MW) € 363 M

• New gas-fired co-generation power plants (total 250 MW)

€ 363 M

• Modernization of Kruonis HPSP (2 units) € 251 M

Total: € 977 M

Grand Total: € 24914 M

Page 10: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

Lithuanian experience in nuclear energy

Ignalina NPP:• Unit 1 shut down in 2004;• Unit 2 shut down in 2009;• Closure process will end in 2029;• The general closure costs are appr. EUR

2,9 bn, i.e. too big for Lithuanian economy to hadle;

• The EU support for the period 2014-2020 will reach EUR 350 mln, instead of needed 870 mln.

Inter alia:

In the EU accession treaty Lithuania pledged to shut down Ignalina NPP and has successfully done that.

Lithuania expects that EU will maintain its commitment to provide adequate financial support needed to close Ignalina NPP.

Page 11: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

Meet Visaginas Nuclear Power Plant

Strategic significance: the new regional NPP is an assurance of stable energy security in Baltic region and the key to connection with European networks.

• Concession agreement in 2012;• Co-operation with “Hitachi-GE Nuclear

Energy“;• Construction begins in 2013/2014;• Unit 1 - opening in 2020;• Project costs EUR 3-5 bn.

N.B.

Visaginas NPP is one of the most advanced NPP projects in Europe, strongly supported by the EC. It will use Advanced Boiling Water Reactor, or the 3rd generation of improved security reactor technology.

Page 12: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

Visaginas NPP project is not the only one in the region

Kaliningrad Region• Plans to build two VVER-

1200 reactors, 1150 MW each;

• Unit 1 starts in 2017;• Unit 2 starts in 2018/19;• Construction supposed to be

started in November 2011;• Region’s energy demand

reaches 800 MW;• At the moment Kaliningrad

region is only interconnected with Lithuania;

• In order to export energy excess, new lines will have to be built.

Belarus• Plans to build two VVER-

1200 reactors, 1150 MW each;

• Unit 1 starts in 2017;• Unit 2 starts in 2018;• Construction at Astraviec

site (50km from Vilnius) started in November 2011;

• Lithuania is concerned about the place of this project, security, financial capability to build and maintain NPP.

Page 13: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.
Page 14: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

Strategic projects – term of Lithuanian energy security

Page 15: The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.

Thank you for your attention.