The electricians have first to mark the walls so they know where to cut tracks for the conduit and...

19
The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing can take place

Transcript of The electricians have first to mark the walls so they know where to cut tracks for the conduit and...

The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing can take place

Walls marked for switch positions

Walls marked for plugs and BT

Walls marked for oil burner connections

Framing for stud walls

Getting ready for first fix plumbing

Initial stage of waste fixings

Drilling the wall for waste outlet

The soil pipe in position with other service ducts

Cutting access holes for pipes

Almost ready for a radiator

Fitting neatly in the corner

A start to plumbing first fix

More plumbing fixings

More of a plumbers work

Walls tracked ready for electrical first fix

Conduit and wiring in place

First fix electrical finished

Where all the wiring ends for now