The Demand Response Baseline Alberta Electric System Operator – Demand Response Working Group...

16
The Demand Response Baseline Alberta Electric System Operator – Demand Response Working Group December 9, 2008 Kenneth D. Schisler Senior Director, Regulatory Affairs and Public Policy

Transcript of The Demand Response Baseline Alberta Electric System Operator – Demand Response Working Group...

The Demand Response Baseline

Alberta Electric System Operator – Demand Response Working GroupDecember 9, 2008

Kenneth D. SchislerSenior Director, Regulatory Affairs and Public Policy

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution2

EnerNOC: Overview

EnerNOC provides demand-side capacity, energy, and ancillary services to an aging North American electricity grid

Our technology-enabled commercial and industrial demand response solutions operate on a national scale in both regulated and restructured markets

– 1,760 MW under management*

– 3,400 sites under management*

– Nearly 10% of the Fortune 500**

Assets roughly equivalent to 17 100-MW peaking power plants, with less environmental impact

In addition to demand response, EnerNOC offers a suite of energy management solutions including efficiency and procurement

Active EnerNOC DR markets

EnerNOC Office *As of 9/30/08

**As of 6/30/08

EnerNOC is a leading technology-enabled, commercial & industrial-focused demand response and energy management solutions provider

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution3

Why Baselines Matter

A properly designed baseline is perhaps the most important determinant of success for any DR program.

To measure DR performance, actual facility load must be compared with ‘business as usual’ load or what the load would have been but for the curtailment measures.

‘Business as usual’ is estimated using a baseline methodology.

DR performance measurement is entirely dependent on this theoretical baseline figure.

Dozens of calculation methodologies have arisen representing a broad range of qualities.

Ultimately, a well-designed baseline should benefit all stakeholders, including end-use participants, aggregators, utilities, grid operators and ratepayers.

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution4

Four Key Baseline Qualities

Baseline must provide customers with credit for no more and no less than their actual curtailment.

Baseline calculations must not encourage nor be influenced by manipulation.

Baseline and performance calculations must be simple enough for all stakeholders to calculate.

Baseline design must facilitate performance in line with goals and the interests of all stakeholders.

Integrity

Accuracy

Simplicity

Alignment

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution5

Baseline Qualities – Finding the Right Balance

Simplicity

AlignmentIntegrity

Accuracy

Consider a regression calculation:

Accuracy - Maximized– Statistical analysis of extensive data delivers

regression equation and parameters incorporating day-of conditions.

Integrity - Maximized– Complexity minimizes opportunity for manipulation or

gaming.

Simplicity - Compromised– Substantial resources required to meet data and

analysis needs while complexity limits availability of real-time performance info.

Alignment - Compromised– Lack of transparency between actual end-user actions

and baseline calculation undermines DR performance.

When considering different approaches, an effective baseline methodology must balance the four key qualities.

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution6

Calculating ‘Business as Usual’

Baseline shape

– Does the baseline reflect the dynamic nature of demand across granular time intervals, or is it flat?

Baseline window and exclusion rules

– Does baseline data come from a time window that sufficiently approximates normal operations across ‘like’ days?

Baseline adjustments

– Does the baseline capture the day-of realities inherent in a customer load profile, or is it based entirely on historic data?

While baseline calculations include a wide range of potential components, we believe the following three are most important:

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution7

Baseline Shape – Profile Example

CBL Performance

0 kW

50 kW

100 kW

150 kW

200 kW

250 kW

300 kW

350 kW

400 kW

0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00

Time

De

ma

nd

Meter

Baseline

Committed Capacity

Event StartNotification Event End

Average Performance: Profile Performance

4-hr Eventwindow

Nomination: 50 kW

Performance: 65 kW

Profile Baseline

– Also called a Customer Baseline or CBL.

– Mimics the dynamic shape of customer demand across granular time intervals.

– Baseline (red line) closely follows actual demand (blue line) leading up to the event.

– Performance is calculated as the difference between baseline and actual demand measured at the meter, in this case 65kW.

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution8

Baseline Shape – Static Example

Static Baseline

– Sometimes called Average Peak Monthly Demand (APMD).

– Average of the peak demand from each month in a delivery season (e.g. previous summer).

– Result is a flat baseline regardless of time interval.

– Baseline (red line) in this case far greater than the actual pre-event load (blue line).

– Performance is calculated as the difference between baseline and actual demand measured at the meter, in this case 83kW.

APMD Performance

0 kW

50 kW

100 kW

150 kW

200 kW

250 kW

300 kW

350 kW

400 kW

0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00

Time

De

ma

nd

Meter

Baseline

Committed Capacity

Event StartNotification Event End

Average Performance: Static Performance

Nomination: 50 kW

Incidental Performance: 32 kW

4-hr Eventwindow

Performance: 83 kW

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution9

Baseline Shape – What We’ve Learned

A static baseline (such as APMD) maximizes simplicity, with a single flat baseline across time intervals.

While simple, the flat shape of the APMD approach presents problems:

– Inaccuracy versus the natural variations in demand over the course of a multi-hour event; resulting in…

– … misalignment of customer actions and rewards.

APMD creates other issues as well:– Potential for overstated performance due to reliance on

peak demand numbers for all data points.– Historic nature of data can facilitate manipulation:

• Consider a closed facility receiving credit based on comparison to prior year’s demand.

Simplicity

Alignment

Integrity

Accuracy

Profile baselines represent the true shape of a customer’s demand curve while appropriately balancing accuracy, integrity, simplicity and alignment.

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution10

Baseline Window and Exclusion Rules

High ‘X’ of ‘Y’ Baseline Methodology– ‘Y’ represents the Baseline Window, for example a two week period. – ‘X’ represents the exclusion rule, for example the 5 highest weekday, non-

holiday, non-event demand days within the Baseline Window.

There is growing consensus around the balanced qualities of a High 5 of 10 approach for resource adequacy or capacity DR programs.

– A 10 day window is short enough to reflect the most recent operating conditions, but long enough to prevent undue emphasis on extreme short-term variations, and long enough to limit manipulation.

– Because DR events occur on the highest demand days, a baseline that averages all of the window’s recent demand history will consistently understate performance. Exclusion rules mitigate this understatement.

For Economic or Energy Programs (responsive to price, not peak demand), we recommend a High 4 of 5 approach.

– Contemporary data best mimics the economic conditions driving the event.– Because peak demand is not the primary consideration, less exclusion is

required. Furthermore, because such a program uses a shorter Baseline Window, the exclusion of few days emphasizes integrity.

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution11

Baseline Window and Exclusion Rules – What We’ve Learned

Exclusion rules can be applied at the individual or the portfolio level

Applying exclusion rules at the portfolio level is problematic.

– All constituents become dependent on portfolio calculations in order to evaluate performance, undermining simplicity.

– From the customer’s perspective, randomly assigned days drive performance, blurring the relationship between actions and incentives, undermining alignment.

Customers with Individual Top Demand Days Matching Portfolio Top Demand Days

Number % of Total3 Days Matching 20 9%2 Days Matching 103 45%1 Day Matching 71 31%0 Days Matching 37 16%Total 231

* Data from actual EnerNOC event in CA, March 2008

Actual data from a March 2008 DR event employing a High 3 of 10 method:

– 91% of participants high 3 demand days did not align with portfolio’s high 3 demand days.

Applying Exclusion Rules at the individual customer level is critical.

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution12

Baseline Adjustments

Customer demand is often heavier on event-days than on ‘like’ days alone.

– For example, the first day of the season that requires air conditioning is likely to exhibit a different demand profile than prior cooler days.

Capturing day-of realities in a customer baseline is essential to delivering accurate performance calculations.

A recent LBNL study of baselines compared actual demand with High 3 of 10 baselines with (“BLP3”) and without (“BLP3n”) adjustments, concluding that “applying a morning adjustment factor significantly reduces the bias and improves the accuracy of all baseline load profiles”.1 This is consistent with our experience.

1 Lawrence Berkeley National Laboratory, “Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non-Residential Buildings in California”, January 2008, page 25

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution13

Baseline Adjustments – What We’ve Learned

Adjustments can reflect demand conditions symmetrically (up and down) or asymmetrically (only adjusted up).

From an alignment perspective, downward adjustments represent real concerns:

– When day-of adjustment calculation includes time intervals subsequent to notification (such as with day-ahead events), participants can end up focusing on counter-productive behavior such as keeping load online.

– Arguably most important, anticipatory actions are penalized (see graph).

HE

1

HE

3

HE

5

HE

7

HE

9

HE

11

HE

13

HE

15

HE

17

HE

19

HE

21

HE

23

HE

1

HE

3

HE

5

HE

7

HE

9

HE

11

HE

13

HE

15

HE

17

HE

19

HE

21

HE

23

Asymmetric Baseline

Symmetric Baseline

Actual Demand

Adjustment Period

Event Start

Event End

Event from 2-4pm, anticipatory action reduces performance from 700kW to less than 100kW

Upward adjustments prevent the perverse outcomes associated with downward corrections for day-of demand conditions.

Anticipatory Action

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution14

Recommended Baseline Methodology – A Curtailment Service Provider’s Perspective

Profile baseline reflecting dynamic nature of customer load curve.

Exclusion rules applied at the individual customer level.

Application of upward adjustment to reflect day-of event conditions.

Simplicity

Alignment

IntegrityAccuracy

The balance between accuracy, integrity, simplicity and alignment in a baseline methodology is critical to the success of a DR program.

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution15

Questions?

© 2008 EnerNOC, Inc. All Rights Reserved - Permission Required for Distribution16

16

EnerNOC, Inc.75 Federal Street, Suite 300

Boston, MA 02110617.224.9900

EnerNOC, Inc.24 West 40th Street, 16th Floor

New York, NY 10018212.624.0000

EnerNOC, Inc.594 Howard Street, Suite 400

San Francisco, CA 94105415.227.4390

EnerNOC, Inc.321 Research Parkway

Meriden, CT 06450203.379.0121

EnerNOC, Inc.200 Pinegrove Cres

Waterloo, ON N2L 4V1226.220.1222