The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

24
1 Workshop on Quality Control and Quality Assurance of Greenhouse Gas Inventories and the Establishment of National Inventory Systems 2-3 September 2004 European Environment Agency The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen National Environmental Research Institute Department of Policy Analysis Denmark

description

Workshop on Quality Control and Quality Assurance of Greenhouse Gas Inventories and the Establishment of National Inventory Systems 2-3 September 2004 European Environment Agency. The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen - PowerPoint PPT Presentation

Transcript of The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

Page 1: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

1

Workshop on Quality Control and Quality Assurance of Greenhouse Gas Inventories and the Establishment of

National Inventory Systems

2-3 September 2004European Environment Agency

The Danish QA/QC programme and plan

Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

National Environmental Research Institute

Department of Policy Analysis

Denmark

Page 2: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

2

Transparency in data presentationhandling and calculations

Consistency from year to year and the methodological approach in general

Accuracy for the emission estimates

The IPCC Good Practice Guidance will be followedBased on defined levels in data/inventory hierarchy as defined on the

next slide

QA/QC programme and planDescription and elements of the national QA/QC program

Page 3: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

3

QA/QC programme and plan

Description and elements of the national QA/QC program

1. Review of existing data structure2. Review of existing methods3. Review of the uncertainty calculations3. Modifying data structure4. Filling up methodological gabs5. Writing manuals6. Setting up control measures

Page 4: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

4

Level 4

Level 2

Level 5

Inventory modelE, E

Calculation based on emissionfactors

Calculation based on source statistic

Source unitS,S

Source strengthSS,SS

Activity unitA,A

Activity strengthAS,AS

External data sources

Data Compilation

Level 3

Sub model predictions

Level 1

Review of data

Review of data

Review of data

Review of interpretation

Review of interpretation

Review of interpretation

Repport E, E

QC/QA activities

Strategy for implementation of a QA/QC plan: Bottom up !

Page 5: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

5

QA/QC programme and plan

Stage of development

Many aspects of the QA/QC work are already implemented in the emission inventories and two sectors are selected for review and full QA/QC development for 2004:

Stationary combustion

Agriculture

The following will primary be based on specifically the stationary combustion

Page 6: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

6

Check of time series of the IPCC and SNAP source categories as they are found in the CORINAIR database.

Comparison to inventory of the previous year, both for totals and for every larger source

Total emissions when aggregated to IPCC source categories are compared to totals based in SNAP source categories.

QA/QC programme and plan

Stage of development

Page 7: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

7

QA/QC programme and plan

Stage of development

A manual log table have been introduced in the emission databases to collect information about recalculations

Verification using the IPCC reference approach

Tier 1 uncertainty calculations

Page 8: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

8

Automated checks in the database:

- Units for fuel rate, emission, factor and plant specific emissions

- Emission factors for larger point sources

- Database consistency i different ways

-Incorporation of the emission factors in the database itself

QA/QC programme and plan

Stage of development

Page 9: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

9

Quality Control

How is the requirements of the IPCC Tier 1 general inventory level QCProcedure implemented ?

Many aspects in Tier 1 is already addressed, however, the following will be strengthen:

- Check the integrity of database files- Check for consistency in data between source categories

- Check that uncertainties in emissions and removalsare estimated or calculated correctly- Undertake review of internal documentation

Database and inventory calculationprogramming

Included in the procedure

Page 10: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

10

Quality Control

Which institutions are routinely conducting QC checks ? At which frequency ?What tools are used ? How are the checks documented ?

NERI is conducting all QC as a integrated part of the inventory work. Tools are partly manually inspection and partly automated as Access database programming. The documentation takes place in the inventory report.

Are electronic or automated checks used and if yes what type of checks ?

Yes, as Access database programming

Page 11: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

11

How are the requirements of the IPCC Tier 2 source category-specific QC procedures implemented (for emissions data, activity data and uncertainty estimates)?

Quality Control

A Tier 2 approach is implemented for the quantification of emission factor, where plant specific conditions are taken into account for the major sources.

The reference approach are used for fuel combustion

The uncertainty analysis is at Tier 1, however, the rather limited uncertainty does not seem to induced a strong need for more complicated uncertainty techniques.

Page 12: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

12

How is the inventory agency dealing with QC checks for emission estimates prepared by external institutions (e.g. statistical offices) or data collected by external agencies, companies or consultants?

Quality Control

Template under development for external data sources:1. Explicit link and contact person2. Establishment of solid (written) agreements for future data supply3. Archiving of data in a transparent way4. Evaluation of QC

Page 13: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

13

Which approaches exist for the assessment of the applicability of IPCC or CORINAIR default emission factors to national circumstances?

Non, but for all major sources country-specific emission factors are used

Quality Control

Page 14: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

14

How are QC checks for country-specific emission factors conducted?

Quality Control

The country-specific emission factors are compared to IPCC or CORINAR default emission factors and differences will be explained

The main part of the country-specific emission factors comes form companies accredited for air emission measurements

Annual environmental reports are kept for subsequently control of plant specific emission data

What are the results of QC checks which are already implemented?

Page 15: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

15

Quality assurance

What review procedures are in place by personnel not directly involved in the inventory development/compilation process (e.g. expert peer review, audits)?

The emission inventory for the various sectors are documented in reports and the reports are send to national expert not involved in the inventory work

The report for stationary combustion plants has been send to an expert at the CHEC (Combustion and Harmful Emission Control) Research Centre, the Technical University of Denmark

What are the results of QA procedures which are already implemented?

The results are not available yet

Page 16: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

16

Verification

What external verification processes were implemented or planned by personnel not involved in the inventory development/compilation process?

A project is just initiated in where emission intensity values will be compared with values for similar countries

Was the inventory compared with other data available, e.g. from other national or international inventories?

A comparison with inventories of other nationalities is under process.

Page 17: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

17

Quality Manual

Was a Quality manual elaborated? Which elements does it contain?

Is under development based on the data flow structure outlined above

Quality management systems

What definitions and standards are used?How is quality management integrated into the inventory preparation (QC, QA, improvement process / national inventory system)?

Under development !

Page 18: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

18

Documentation, archiving

How are requirements for documentation and archiving implemented?

Templet under development for external data sources:1. Explicit link and contact person2. Establishment of solid (written) agreements for future data supply3. Archiving of data in a transparent way4. Evaluation of QC

Clear system for references as an integrated part of the database structure

Page 19: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

19

Resources required

For the national QA/QC planFor the development and implementation of a quality management systemFor the QA/QC training (the kind of training should be specified)

Not specified !

Page 20: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

20

National Inventory Systems

Which organisations and institutions are involved

• Responsible institute: The National Environmental Research Institute

• Other Institute involved: The Danish Energy Authority, The Danish Environmental Protection Agency, The Statistics Denmark, The Danish Institute of Agricultural Sciences, The Road Directorate, The Danish Centre for Forest, Landscape and Planning, The Civil Aviation Agency of Denmark, The Danish Railways and Danish companies

• Providing of data from other institutes: Until now it has been on a voluntary basis but more formal agreements are now being worked out.

Page 21: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

21

National Inventory Systems

What type of electronic database systems and/or software systems are used for the inventory preparation?

The background data (activity data and emission factors) for estimation the Danish emission inventories is stored in central databases placed at NERI. The databases are in Access format and handled with software developed by the European Environmental Agency and NERI

Page 22: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

22

How and by whom is an inventory improvement plan compiled?

National Inventory Systems

By NERI and is base on a project evaluating the improvements

necessary in order to fulfil the obligations according to

the Kyoto-protocol

Which institutions are responsible for acquiring additional resources related to the establishment of the national inventory system?

NERI - the same institute responsible for the emission inventory preparation

How is the QA/QC system integrated into the national inventory system?

Page 23: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

23

Uncertaintyanalysis forAgriculturalactivity

MonteCarlo

Page 24: The Danish QA/QC programme and plan Peter Borgen Sørensen, Jytte Boll Illerup & Malene Nielsen

24

Quality manual and management system

Will be made explicitly for every sector during 2004 and 2005