The Connectathon Process, Test Plan and
Responsibilities of Participants
The Connectathon Process, Test Plan and
Responsibilities of Participants
Steve MooreMallinckrodt Institute of Radiology
Technical Project Manager: ITI, Rad, PCC
![Page 2: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/2.jpg)
June 28-29, 2005 Interoperability Strategy Workshop2
Treatment Planning DisclaimerTreatment Planning Disclaimer
• This talk does not really cover Treatment Planning domain/demonstration
• See separate breakout
![Page 3: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/3.jpg)
June 28-29, 2005 Interoperability Strategy Workshop3
Technical ManagersTechnical Managers
Domain Manager
Cardiology Teri Sippel Schmidt
IT Infrastructure Steve Moore
Patient Care Coordination Steve Moore
Radiology Larry Tarbox
Radiation Oncology Bruce Curran
![Page 4: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/4.jpg)
June 28-29, 2005 Interoperability Strategy Workshop4
Demonstration ManagerDemonstration Manager
Demonstration Manager
ACC 2006 Teri Sippel Schmidt
HIMSS 2006 John Donnelly
ASTRO 2006 Jennifer Padberg
![Page 5: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/5.jpg)
June 28-29, 2005 Interoperability Strategy Workshop5
How Do I Recognize a Project How Do I Recognize a Project Manager?Manager?
![Page 6: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/6.jpg)
June 28-29, 2005 Interoperability Strategy Workshop6
Educational WorkshopParticipant Workshop
Connectathon
MESA Tests
DemonstrationProduct
![Page 7: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/7.jpg)
June 28-29, 2005 Interoperability Strategy Workshop7
How Do I Participate as a Vendor?How Do I Participate as a Vendor?
• Read/understand Technical Framework(s)
• Register for ACC Demonstration (paper)
• Register for HIMSS Demonstration (paper)
• Register for Connectathon (electronic)
• Pass pre-Connectathon tests
• Pass Connectathon tests
• Attend demonstration(s)
![Page 8: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/8.jpg)
June 28-29, 2005 Interoperability Strategy Workshop8
Participant WorkshopParticipant Workshop
• Oct 6-7: Rosemont, IL• Only for Demonstration Participants
– HIMSS/ACC, not ASTRO
• 25% Connectathon/Demo logistics• 75% Work through demonstration scenarios
with partners
• If Connectathon only, do not attend
![Page 9: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/9.jpg)
June 28-29, 2005 Interoperability Strategy Workshop9
Participant Workshop RequirementsParticipant Workshop Requirements
• One technical representative for each system in each demonstration– If bringing the same system to ACC and HIMSS, you
need two (2) representatives
• Technical rep needs to understand:– Technical details of Integration Profile
– Details of your application. For example, you should know what kind of documents your system can produce (discharge summary, referral note).
![Page 10: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/10.jpg)
June 28-29, 2005 Interoperability Strategy Workshop10
What if Connectathon Only?What if Connectathon Only?
• Do not attend the Participant Workshop
• We will host a Webex conference call to go over Connectathon responsibilities
![Page 11: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/11.jpg)
June 28-29, 2005 Interoperability Strategy Workshop11
Pre-Connectathon TestsPre-Connectathon Tests
• Software funded by sponsors
• Software simulates peers in IHE profiles
• Sends IHE transactions to your system; receives transactions from your system
• Evaluates content of your messages
• Required for you to participate
![Page 12: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/12.jpg)
June 28-29, 2005 Interoperability Strategy Workshop12
Point of Emphasis for 2005-2006: Point of Emphasis for 2005-2006: MiddlewareMiddleware
• IHE profiles define actors that usually perform a clinical function
• IHE Integration Profiles are designed to describe end products
• Middle-ware is often necessary to adapt existing applications to IHE profiles
• Middle-ware only software will not be tested this year
• Partner with an application vendor
![Page 13: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/13.jpg)
June 28-29, 2005 Interoperability Strategy Workshop13
Point of Emphasis for 2005-2006: Point of Emphasis for 2005-2006: Product/Prototype/FlotsamProduct/Prototype/Flotsam
• IHE has always been about products and not possibilities
• Connectathon and demonstrations are intended for products and prototypes that eventually become products
• Systems that are clearly “less than prototype” will not be successfully tested. For example, you’re your user interface to import a CD is 5 separate command line programs, you will not qualify
• Is this something you would show as “beta” to a customer?
![Page 14: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/14.jpg)
June 28-29, 2005 Interoperability Strategy Workshop14
What Is or Is Not Acceptable?What Is or Is Not Acceptable?
• JACOBELLIS v. OHIO, 378 U.S. 184 (1964)• Justice Potter• “I shall not today attempt further to define the
kinds of material I understand to be embraced within that shorthand description; and perhaps I could never succeed in intelligibly doing so. But I know it when I see it, and the motion picture involved in this case is not that. “
![Page 15: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/15.jpg)
June 28-29, 2005 Interoperability Strategy Workshop15
Connectathon HighlightsConnectathon Highlights
• 5 days of intense work to test with many peers
• Some time will be reserved to prepare for demonstration
• Project Managers will write test definitions; participants will follow the program
• You must be present and available during all scheduled hours
![Page 16: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/16.jpg)
June 28-29, 2005 Interoperability Strategy Workshop16
Connectathon Management Web Connectathon Management Web ToolTool
• Developed by IHE-Europe
• Handles many management tasks for pre-Connectathon tests and Connectathon tests
• Use this to register for Connectathon
• Demonstration to follow by Eric Poiseau
![Page 17: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/17.jpg)
June 28-29, 2005 Interoperability Strategy Workshop17
Project Manager HandoutsProject Manager Handouts
• IHE U.S. Connectathon and Demonstration Participation Handbook– What you have to do to get through this cycle.
• Connectathon and Demonstration Rulebook– All of the nit-picky rules that we can think of.
Similar to the rulebook you get at your local elementary school.
![Page 18: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/18.jpg)
June 28-29, 2005 Interoperability Strategy Workshop18
IHE Knute Rockne SpeechIHE Knute Rockne Speech
• If you don’t allocate sufficient resources today, you will be the worst performer at the Connectathon– You risk failure
• The return on investment for pre-Connectathon and Connectathon testing is that you do not discover these problems in the field
• The Connectathon is a friendlier environment than a customer site, but don’t show up unprepared
![Page 19: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/19.jpg)
June 28-29, 2005 Interoperability Strategy Workshop19
![Page 20: The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,](https://reader036.fdocuments.in/reader036/viewer/2022062618/55149246550346f06e8b52c6/html5/thumbnails/20.jpg)
June 28-29, 2005 Interoperability Strategy Workshop20
More information….More information….
• IHE Web sites: www.ihe.net• Technical Frameworks, Supplements
– Fill in relevant supplements and frameworks
• Non-Technical Brochures :• Calls for Participation
• IHE Fact Sheet and FAQ
• IHE Integration Profiles: Guidelines for Buyers
• IHE Connect-a-thon Results
• Vendor Products Integration Statements