Hostos Community College
Five Year Capital Plan Amounts in thousands/Projects in priority order by category
FY20-21 FY21-22 FY22-23 FY23-24 FY24-25 Fjye Year Need
Project Name Phase Need Phase 500 Grand Concourse Second Floor &
$0 CE Basement Renovations
Campus-Wide Roofing DC $5,000
Retaining Wall Reconstruction C $2,000
Need Phase Need Phase
$11,500 $0
$0 $0
$0 $0
Need Phase Need
$0 $0
$0 $0
$0 $0
Total
$11,500
$5,000
$2,000
Capital Renewal $1,0001 $11,soo $0 $0 $0 $1s,soo Project Name
Allied Health and Sciences Building Complex DC $100,000 C $100,000 E $40,994 $0 $0 $240,994
Strategic Initiatives $100,000 $100,000 $40,994 $0 $0 $240,99
City Share Five-Year Total
State Share Five-Year Total
$129,747
$129,747
Project Descriptions: Capital Renewal
500 Grand Concourse Second Floor & Basement Renovations This project will complete the phased, floor-by-floor renovation of the 500
Grand Concourse Building by upgrading the infrastructure of the second and
basement floors. This project will provide the necessary renovations to
ensure that both floors will provide a safe and healthy 1,11,,Qrking environment.
Each of the floors will be gut-renovated and reconfigured to make better use
of the space. The second floor houses classrooms, testing, Admissions
and Human Resources. The basement is occupied by receiving, the college
Print Shop and Mail Room, and Public Security.
Campus-Wide Roofing This project will replace the roofs of the 475 Grand Concourse Building and
the G Building; warranties on both of these roofs have expired. A future
phase will replace the East Academic Building roof within the next five years.
Retaining Wall Reconstruction This project will reconstruct the retaining wall behind the East Academic
Complex. A portion of the retaining wall separating the Hostos campus from
the railroad tracks below has collapsed. Stabilization 1,11,,Qrk has been
performed, but the wall continues to erode. A new structural wall and adjacent
paving and landscape 1,11,,Qrk are required.
Total Project Cost Prior Funding Five-Year Need
Anticipated Completion: January 2024
Total Project Cost Prior Funding Five-Year Need
Anticipated Completion: December 2023
Total Project Cost Prior Funding Five-Year Need
Anticipated Completion: December 2022
A= Acquisition, D= Design, C = Construction, E= Equipment
158
$19,200 $7,700
$11,500
$5,000 $0
$5,000
$2,000 $0
$2,000
Hostos Community College
City Reso-A Requests (City Council and Borough Presidents) Amounts in thousands
FY20-21
Projects in priority order Phase Need
Second Floor/ Basement Renovations 500 GC Building DCE
Video Projection Equipment E
City Reso-A Requests
Project Descriptions: Reso-A
$4,500
$300
$4,800
Second Floor/ Basement Renovations 500 GC Building Phase: DCE This project will complete the comprehensive, floor-by-floor renovation of 500
Grand Concourse, begun in 2000, which, when complete, will have upgraded all
of the academic and administrative space, made the bathrooms ADA
accessible, installed energy efficient windows and a new roof, and improved the
building systems. The 2nd Floor renovation will include new administrative
offices for Human Resources, an admissions lab, new academic testing
facilities and classrooms. Renovation of the Basement will include a modern,
state-of-the-art print shop and mailroom as vvell as support facilities for Public
Safety and Maintenance workers.
Video Projection Equipment Phase: E This project will insure that the Main and Repertory theaters have the
appropriate equipment to enable Hostos to offer students and the community a
state-of-the-art video/ movie theater experience that currently does not exist on
this scale in the South Bronx. These projectors and screens will not only offer
our students the opportunity to view films from around the world in a setting that
they vvere intended to be vievved, but it will also allow local film and video makers
the opportunity to share their work in a professional venue.
FY 2021 City Request: State Match:
Anticipated Completion: August 2024
FY 2021 City Request: State Match:
Anticipated Completion: December 2021
A= Acquisition, D= Design, C = Construction, E= Equipment
160
$4,500 $4,500
$300 $300