VENTIA –COMPANY INTRODUCTION
A market leading service provider in each of its key sectors, with specialist capabilities in operating and maintaining large scale essential infrastructure
VENTIA –ENVIRONMENTAL SERVICESFull suite of environmental services and expertise including remediation of soil, groundwater and sediment, asbestos, environmental monitoring and occupational health and hygiene services
Remediation Environmental Monitoring Occupational Hygiene
Australia’s industrial past has left a legacy of
contamination that is impacting on
communities and the environment.
Our services include:• Development of Remediation Strategies
• Regulatory engagement, approvals and Permitting
• Design, Construction & implementation of
Remediation Technologies
• Community and stakeholder engagement
Water is a very precious resource in Australia
and its critical that we accurately measure
and track the quantity and quality of our
water.
Our services include: • Groundwater monitoring
• Data collection and management
• Flood monitoring System
• Metrological Monitoring Stations
• Smart application solutions to capture data quickly
and accurately
Monitoring the environment to ensure the safety
of workers and the community.
Our services include:• Occupational Health and Hygiene Program
development
• Airborne exposure monitoring for dusts, fumes, mists,
vapours and gases
• Occupational noise investigations and surveys, noise
control engineering and noise management plans
HMAS Platypus, NSW (aerial view)
M9 at Otway, VIC HMAS Platypus, NSW
VENTIA –ENVIRONMENTAL SERVICES
Industry leading position
• Australasia's most experienced remediation contractor
• Australia's largest environmental monitoring team
• Occupational health and hygiene expertise to facilitate in hazardous workplaces
Unrivalled track record of project execution
• Successfully completed over 140 remediation jobs over 30+ years
• This includes Australasia’s largest and most complex environmental projects including:
– The Hunter River Remediation Project
– Union Carbide and Allied Feeds sites including Homebush Bay Cheoy Lee Shipyards – Hong Kong
– Botany Carpark Waste Encapsulation Project
– Mortlake Gasworks Remediation
– Macdonaldtown Gasworks Remediation
– Cox Peninsula Stages 1&2
– HMAS Platypus (Gasworks) Remediation
– Highett Gasworks Remediation
– Toowoomba Gasworks Remediation
Highly skilled workforce
• ~150 employees consisting mostly of technically qualified personnel
• Extremely low turn over rate with the average employee having over 7 years of service
Award wining team
• 40 + industry awards including:
– Australian Engineering Excellence Awards (Sydney) –Macdonaldtown gasworks remediation
– ALGA and SuRF Excellence Awards (2012 and 2016)
– United Nations Association of Australia World Environment – Environmental Best Practice Program
– Engineers Australia, Engineering Excellence Awards Environmental Pidgeon Close Gasworks Remediation Project
– National Safety Council of Australia’s National Safety Awards of Excellence 2011– Excellence in Innovative Environmentally Sustainable Work Practices Award
Kananook Creek, VIC
Rhodes Peninsula, NSW
HMAS Platypus, NSW
Olympics Precinct, NSW
REMEDIATION IN AUSTRALIA
AUSTRALIAN REMEDIATION MARKET DRIVERS
The current Australian environmental services market is largely driven by:
• land redevelopment
• regulatory compliance
Community pressures help drive demand for quality remediation.
Emerging contaminants such as Per-and Polyfluoroalkyl Substances (PFAS) are causing national problem for Commonwealth agencies.
REMEDIATION TECHNOLOGIES AND SOLUTIONS
REMEDIATION APPROACHES
• Various strategies should be considered
• Generally the “do nothing” approach is considered the cheapest, however be aware of “consultant creep”
• “Dig and Dump” is quick but can be costly
• “Contain” can be more cost effective but could limit future development
• Treatment is generally costly but deals with the “legacy of contamination”
• “Bio” is inexpensive but can be unreliable
CASE STUDY – CHEEOY LEE SHIPYARDS DISNEYLAND HK
FAST TRACK SCHEDULE
• Commenced demolition/excavation Oct 2002
• Finished excavation/validation May 2003
• Thermal plant construction March – June 2003
• Completion April 2004
JAMES COLE
EXECUTIVE MANAGER –ENVIRONMENTAL SERVICES
T: + 61 (2) 9375 3535
M: +61 409 777 784
W: www.ventia.com