Benefits of CIM (Construction Information Management)
Compared the two-dimensional CAD and 3D product model
• Two-dimensional drawings : If civil engineer look the data(drawings),
he recognize and imagine the object.
• However, two-dimensional CAD is, mere "line", "curves and circle", a
collection of "character", "pattern data".
• It’s difficult to recognize the members to the computer.
• For 3D product model, based on object-oriented technology to
represent a member shape and attribute data in a text file that is
compatible.
• As a result, the data of 3D product model, the computer can
understand.
Ideal image of CIM (Construction Information Management)
Bidding system
CIM Model
Goal of ‘CIM’
・Data exchange and
linkage between
application
・Use to maintenance
Design books / Drawing Specification
Drawing
Maintenance
Integration
QTO
Structure calculation
and analysis
Measurement management
OM(observation Method)
Simulation
Consensus building
Additional research Such as ground information
Process management
Cost management
ICT Construction
Water resources utilization facility
• The structure information such as to be
buried using the aggregation maintains
the 3D model.
• In conjunction with local sensors (such
as an IC tag), the behavior can be easy to
understand.
• Inspection and maintenance history helps
to update plan.
Tunnel construction
• Product model manage the observation
information, the measurement information,
and feedback in the 3D model.
• The model have implemented the centralized
management of construction information.
• Since lining quality information such as
concrete also saved and can be used as a
maintenance model after completion.
Tunnel Navi. result Measurement result Face observations
Soil information
attributes
Tunnel Measurement
Fumbling situation with respect to CIM: construction of BIM initiatives
serve as a reference
However, civil engineering specific order form
In the short term, the "construction BIM"
And consider the medium- and
long-term to the data available in
consideration of the cooperation?
(Relationship, such as the right figure)
The current design and construction
will change
(Partially) design build?
PPP, BOT, DB
CIM challenges in Japan
How to proceed with the current project (Closed / Uncooperative)
Bidding system
Owner
Consultants
Contractor
Owner
Consultants
Contractor
Owner
Consul
tants
Contr
actor
Owner
Consulta
nts
Contract
or
Future project (Fiat / Open / Cooperative)
CIM of current situation,
search for ways to use the
three-dimensional data
Examination of the data
model is not performed Study session of rebar assembly
utilizing 3-dimensional data
Tunnel design data
Measurement data
• Cross-sectional
shape
• Planning line
• Shoring pattern
• Shoring section
length
• Progress
situation
• A measurement
data
• Cross section
measurement data
• Face image
• Topography data
• Geological
observation data
Current terrain data
Modelling
Viewing and
management
Data
management
Data
management
Process
management
Simulation Quantity calculation
Design books
Drawing
Construction Photos
Construction model
Confirmation and verification
Visualization of field
measurement data
CIM is being applied to the construction, but ...
Knowledge
database
Product
database
Accumulated material
Subcontractors
Equipment procurement
Construction results
Technical study materials
Human resources
Know-how Systematiz
ation of tacit
knowledge
Project
database Product
Database
Knowledge
database
Project
Database
Map (GIS)
database
Existing materials
Terrain Geology
Track record of similar
construction Other
Central
Registers
Electronic bidding
As build
database
3D (?)
Machine (AMC,AMG)Data
Shape
Quality Progress
Safety management
QTO
Create
construction data
External
data
system
IFC
IFC
ISO15143
Governme
nt
Registers
IFC
criteria Specification
Design books Construction-related books
Completed
data
IFC / XML (?)
Image of CIM (1/2)
3D (?)
Acts or materials
LandXML
【Change authority】
Knowledge
database
Systematization
of knowledge
FORUM8 ?
?
Structural Analysis
FEM
(Something)
Structural Analysis
NavisWork
s
4D Simulation
Visualization
OpenSim ??
3D Metaverse Review
SketchUp
Adobe
Acrobat
Model Review
UC-
win/ROAD ??
Virtual Reality
SXF/DWG
? 2D Plan Data
DWG/P21
DWG
NWC Civil 3D
AutoCAD
Conceptual Modeling
Revit
Structure
DWG
IFC/DWG
IFC/DWG
IFC
3DS
IFC
Excel
Progress / QTO
XML
IFC Knowledge management
ASTEA
MACS
Analysis of temperature stress
CSV
Image of CIM (2/2)
Use cases
PDES/STEP
Registry Manufacturing
ebXML
Registry
UDDI
Component
Registry
GCI
Registry
EAN
Registry
CPFR
Registry
RosettaNet
Registry
Business
Negotiation
Vender
Catalog
Shipper
Catalog
Business
Category
Shipping
Customer
Support
Consumer
Profile
CALS
Production Planning &
Procurement
System
Development
11179
Registry
However, if you do not think of the data exchange method within the now ...