The bubble slideshow

21
Atrium Renovation Area July 6, 2010

Transcript of The bubble slideshow

Page 1: The bubble slideshow

Atrium Renovation Area July 6, 2010

Page 2: The bubble slideshow

Bird’s Eye View of Brickyard Bubble July 6, 2010

Page 3: The bubble slideshow

The Bubble will be 50x80 ft. July 6, 2010

Page 4: The bubble slideshow

Frame for Brickyard Bubble July 6, 2010

Page 5: The bubble slideshow

The Bubble will be to the left of D.H. Library July 6, 2010

Page 6: The bubble slideshow

Bubble will be Located Between Harrelson and Atrium July 6, 2010

Page 7: The bubble slideshow

Crews will Lay Utility Wire Under Bricks July 6, 2010

Page 8: The bubble slideshow

Outside Seating will Remain in Place July 6, 2010

Page 9: The bubble slideshow

Outside Seating Area and D.H. Hill July 6, 2010

Page 10: The bubble slideshow

Wall Dividing Construction Area and Temporary Serving Area July 6, 2010

Page 11: The bubble slideshow

Temporary Home of Li’l Dinos and Chick-fil-A July 6, 2010

Page 12: The bubble slideshow

Temporary Serving Area July 6, 2010

Page 13: The bubble slideshow

New Seating Area Open Fall 2011 July 6, 2010

Page 14: The bubble slideshow

Moving Along as Scheduled July 6, 2010

Page 15: The bubble slideshow

Bare Floors and Walls July 6, 2010

Page 16: The bubble slideshow

The 50x80 ft. Bubble Takes Shape July 13, 2010

Page 17: The bubble slideshow

Monday Marked the First Day of Assembly July 13, 2010

Page 18: The bubble slideshow

A View of the Bubble Including Harrelson July 6, 2010

Page 19: The bubble slideshow

Looking Through towards East Campus July 6, 2010

Page 20: The bubble slideshow

Overlooking the Top of the Bubble July 13, 2010

Page 21: The bubble slideshow

The Bubble Takes Up Limited Space in the Brickyard July 13, 2010