The Birmingham Gateway Project:Feasibility and implementation of CHP Feasibility and implementation of CHP
Azhar QuaiyoomAzhar Quaiyoom
![Page 2: The Birmingham Gateway Project: Feasibility and implementation of CHP Azhar Quaiyoom](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815858550346895dc5b3d3/html5/thumbnails/2.jpg)
2
Birmingham City Centre and New StreetStation – current station
![Page 3: The Birmingham Gateway Project: Feasibility and implementation of CHP Azhar Quaiyoom](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815858550346895dc5b3d3/html5/thumbnails/3.jpg)
AtriumAtrium
Extension to Extension to footbridgefootbridge
Iconic claddingIconic cladding
4x concourse4x concourse
Opening of walkwaysOpening of walkways
Improved Improved connectionsconnections
3 new 3 new entrancesentrances
2121stst century feel century feel
Enhanced platformsEnhanced platforms
Enhanced retailEnhanced retail
Support 150% growthSupport 150% growth
Airport style lounges Airport style lounges
Improved platform Improved platform connectivityconnectivity
The Proposed StationThe Proposed Station - £600M refurbishment - 5 year construction programme
![Page 4: The Birmingham Gateway Project: Feasibility and implementation of CHP Azhar Quaiyoom](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815858550346895dc5b3d3/html5/thumbnails/4.jpg)
Date 00.00.00 4
Moor Street Link
![Page 5: The Birmingham Gateway Project: Feasibility and implementation of CHP Azhar Quaiyoom](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815858550346895dc5b3d3/html5/thumbnails/5.jpg)
Date 00.00.00 5
North West Entrance
![Page 6: The Birmingham Gateway Project: Feasibility and implementation of CHP Azhar Quaiyoom](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815858550346895dc5b3d3/html5/thumbnails/6.jpg)
6
View through Atrium to allow natural daylight
![Page 7: The Birmingham Gateway Project: Feasibility and implementation of CHP Azhar Quaiyoom](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815858550346895dc5b3d3/html5/thumbnails/7.jpg)
7
Drivers and approach to SustainabilityDrivers and approach to Sustainability
Environment / NR Policy
• NR & Mace sustainability PolicyNR & Mace sustainability Policy
• New builds – BREEAM ‘Excellent,’ refurb ‘Very Good’ – GATEWAY PROJECT
• Pollution and climate change
Economic
• Payback / IRR / NPV
• Whole Life costs
• Drive for efficiency
• Rising cost of fuel
• Cost/benefit Social responsibility
• Community engagement
• Design with future in mind
• Carbon footprint reduction
• Social inclusion
Legislation
• Building Regulations
• Planning Policies
• EU Buildings Directives
• CRC / RHI
Design/EngineeringDesign/Engineering
![Page 8: The Birmingham Gateway Project: Feasibility and implementation of CHP Azhar Quaiyoom](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815858550346895dc5b3d3/html5/thumbnails/8.jpg)
8
Challenges & Constraints of Refurbishment• Limited insulation with existing façade
retained
• Accessibility for passengers increases open areas to outside – issue for thermal comfort
• 28 new escalators, 31 new lifts – increase of energy demand – from 9GWhr to 14 GWhr/Year
• Open track area below concourse with Overhead Lines – limited areas to insulate
• Limited space for renewables ideas (i.e. Biomass space and sub-surface regs) and many third party interfaces
![Page 9: The Birmingham Gateway Project: Feasibility and implementation of CHP Azhar Quaiyoom](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815858550346895dc5b3d3/html5/thumbnails/9.jpg)
9
Low / Zero Carbon Technology Study• Consultant Atkins carry out a study to establish viability
of low carbon technology (Sep’t 09’)• Solar Photovoltaic Solar Photovoltaic • CHP – (reduce CO2 & costs)• Ground Source Heat Pumps• Solar thermal• Biomass Boilers
![Page 10: The Birmingham Gateway Project: Feasibility and implementation of CHP Azhar Quaiyoom](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815858550346895dc5b3d3/html5/thumbnails/10.jpg)
Challenges for CHP• Complicated contract for ESCO – Works and
maintenance elements• Unfamiliar contract and risk to Network Rail• Integrate design & operation into a complex Gateway
project• High electrical load / low heat demand• Asset Protection for station operations
• Long terms contracts – 25 years typical• Asset owners and RAMS acceptance is critical• Third party access rights and protocol required
![Page 11: The Birmingham Gateway Project: Feasibility and implementation of CHP Azhar Quaiyoom](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815858550346895dc5b3d3/html5/thumbnails/11.jpg)
Possible Routes – use of sub platform tunnel Networks
![Page 12: The Birmingham Gateway Project: Feasibility and implementation of CHP Azhar Quaiyoom](https://reader035.fdocuments.in/reader035/viewer/2022062520/56815858550346895dc5b3d3/html5/thumbnails/12.jpg)
Benefits for CHP at New Street• Significant reduction in Carbon emissions >3,000Ton/yr
& supports BCC carbon reduction targets
• Provide model case for role out to other managed stations
• Reduction in energy bills
• Use of strategic tunnel network avoiding disruptive infrastructure works around the city
• Potential for significant expansion of the system with heat provision to adjacent buildings
• Provision for South side to be ‘CHP ready’
• CRC benefits to Network Rail