Cutler Elementary School Addendum No. 1
Groton, Connecticut May 24, 2019 Page 1
CUTLER ELEMENTARY SCHOOLPHASE 1 - SITE IMPROVEMENTS
GROTON, CONNECTICUTSTATE PROJECT NO. 059-0188 DV/N
ADDENDUM NO. 1May 24, 2019
THE BID DUE DATE FOR BID PACKAGE 1.01 - SANITARYRELOCATION REMAINS JUNE 6, 2019 @ 2:00 P.M.
PLEASE SUBMIT ONE ORIGINAL AND ONE COPY OF YOUR BID. THE FOLLOWINGDOCUMENTS MUST BE INCLUDED IN YOUR BID, OR YOUR PROPOSAL WILL BEDEEMED NON-RESPONSIVE:1. FORM OF PROPOSAL2. BID SECURITY (BID BOND OR CERTIFIED CHECK)3. CTDAS UPDATE STATEMENT (if bid exceeds $500,000.00)
I. REVISIONS TO SPECIFICATIONS
1. Specification Section 00 2413 - Bid Packages
a. Bid Package 1.01 - Sanitary Relocation
I. SCOPE OF WORK
B. SPECIFIC
Revise “Draft Phase II Environmental Site Investigation Report” to “FinalPhase II Environmental Site Investigation Report”
II. SPECIAL INSTRUCTIONS
Revise the following Special Instruction:
13. In the first sentence, replace the word “Draft” with “Final.” The contractor shallnote that the Final report has been uploaded to SmartBidNet.
II. REVISIONS TO TECHNICAL SPECIFICATIONS
None.
III. REVISIONS TO DRAWINGS
1. Drawing C101 - Sanitary Relocation Details
a. Replace this drawing with revised drawing, attached to this Addendum No. 1.
IV. ATTACHMENTS TO ADDENDUM
Drawing Pages
C101 - Sanitary Relocation Details 1
END OF ADDENDUM NO. 1
![Page 2: THE BID DUE DATE FOR BID PACKAGE 1.01 - SANITARY … · DIRTBAG PUMPED SILT CONTROL SYSTEM NOT TO SCALE SIDE VIEW TOP VIEW Addendum No. 1, May 24, 2019. Author: lynnb Created Date:](https://reader031.fdocuments.in/reader031/viewer/2022013018/5d1741a488c99313688b55a5/html5/thumbnails/2.jpg)
677 Washington Blvd, Suite 101Stamford, CT 06901T. +1 203 251 7400F. +1 203 251 7474
SCALE:
SEAL
DRAWING TITLE:
PROJECT TITLE:
PROJECT No:
DATENO. ISSUE
Owner:
Construction Manager:
Civil / Site:
Structural:
Mechanical, Electrical, Plumbing & Fire Protection:
Food Service:
Landscape:
Acoustical Consultant:
Sustainability Consultant:
Owner's Representative:
Technology and Security
SANITARY RELOCATIONDETAILS
74450
CUTLERELEMENTARYSCHOOL
APRIL 17, 2019
C-101
160 Fishtown RoadMystic, CT 06355
DESIGN DEVELOPMENT DOCUMENTS
Owner Address
O & G Industries
112 Wall StreetTorrington, CT 06790 860.489.9261
Milone & MacBroom
99 Realty DriveChesire, CT 06410 203.271.1773
BVH Integrated Services
50 Griffen Road SouthBloomfield, CT 06002 860.286.9171
Diversified Technology Consultants
2321 Whitney Avenue, Suite 301Hamden, CT 06518 203.239.4200
Foodservice Facilities International
137 Elm PlaceNew Canaan, CT 06840 203.972.1605
Richter & Cegan
Avon Park North P.O. Box 567, 8B Canal Court,Avon, CT 06001 860.678.0669
Acentech
33 Moulton StreetCambridge, MA 02138 617.499.8000
Atelier Ten
798 Chapel StreetNew Haven, CT 06510 203.777.1400
Arcadis
207 Main Street, Suite 200Hartford, CT 06106 860.906.1577
D'Agostino & Associates
1266 E. Main StreetStamford, CT 06902 203.539.6164
NOT TO SCALE
SEDIMENT FILTER FENCE
FENCE POST (TYPICAL)
AMOCO PROPEX SILT STOP
SEDIMENT CONTROL FABRIC OR
APPROVED EQUAL (GEOTEXTILE)
EXISTING
GRADE
BURY END OF GEOTEXTILE
MIN. 6" INTO SOIL
FLOW
NOT TO SCALE
1
0
0
°
36"±
12" MIN.
E
D
G
E
R
O
A
D
W
A
Y
COMPACTED SUBGRADE
GEOTEXTILE FABRIC ON
5
0
'
M
I
N
.
2
0
'
M
I
N
.
A
S
R
E
Q
U
I
R
E
D
CONSTRUCTION ENTRANCE PAD
NOT TO SCALE
NOTE:
1. CONSTRUCTION ENTRANCE PAD SHALL
BE INSTALLED AND MAINTAINED DURING
OPERATIONS WHICH PROMOTE
VEHICULAR TRACKING OF MUD
4" THICK
CDOT NO.3
BROKEN OR
CRUSHED
STONE
1 5/14/2019 ADDENDUM #12 5/22/2019 ADDENDUM #1
BAG PLACED ON AGGREGATE OR STRAW
DIRTBAG
®
LENGTH
WID
TH
SEWN IN SPOUT
HIGH STRENGTH STRAPPING FOR
HOLDING HOSE IN PLACE
WATER FLOW FROM PUMP
PUMP DISCHARGE HOSE
OPENING ACCOMMODATES UP TO 4"
DISCHARGE HOSE
HIGH STRENGTH DOUBLE STITCHED "J"
TYPE SEAMS
DIRTBAG PUMPED SILT CONTROL SYSTEM
NOT TO SCALE
SIDE VIEW
TOP VIEW
Addendum No. 1, May 24, 2019