The Best Run Schools Run SchoolDude! Kent Hudson CEO, Co-Founder, SchoolDude.com March 2012.
-
Upload
warren-paul -
Category
Documents
-
view
215 -
download
2
Transcript of The Best Run Schools Run SchoolDude! Kent Hudson CEO, Co-Founder, SchoolDude.com March 2012.
The Best Run Schools Run SchoolDude!
Kent HudsonCEO, Co-Founder, SchoolDude.com
March 2012
The Best Run Schools Run SchoolDude!
40’s,50’s & 60’s
1. Custodial operations
2. Maintenance operations
3. Grounds operations
4. Electrical / gas utility
5. Pest control (in-house)
6. Playground equipment
7. Roofs
8. Safety – general
9. School closings
10. Vandalism
1. Custodial operations2. Maintenance operations3. Grounds operations4. Electrical / gas utility5. Playground equipment6. Pest control (in-house)7. Roofs8. Safety – general9. School closings10. Vandalism11. Mold management12. Asbestos (AHERA)13. Carbon Dioxide testing14. Lead in water15. Natural gas volume purchasing16. Electrical volume purchasing17. CAD18. CMMS with preventive maintenance19. Electromagnetic emissions20. Emergency / disaster plans21. Energy management systems22. Energy education23. Data based custodial schedules24. Rentals, community usage25. ADA26. Owners Construction Rep.27. Indoor Air Quality28. Lead in paint29. Integrated Pest Management30. Privatized custodial
31. Purchased services management
32. Protective equipment & clothing 33. Radon Management 34. Recycle waste program 35. Re-locatable classrooms 36. Right to Know Act 37. Underground storage tanks 38. Computerization – technology support 39. Blood borne pathogens 40. Budget planning 41. Labor law issues 42. OSHA Logging & training 43. Custodial equipment management 44. Quality Assurance program 45. Hazardous Waste Removal 46. Emergency Backpacks 47. Building Backpack Supply 48. Defibrillator maintenance 49. Defibrillator training 50. Security systems 51. Green chemical management 52. Carbon footprint issues 53. Sustainability program 54. Life/Safety Planning 55. Playground management 56 . Expanded athletic programs 57. Swimming pool maintenance 58. Indoor track & field 59. Fertilization & weed control 60. Artificial athletic fields
Facility programs have increased dramatically but
many institutions have smaller
leadership teams
70’s,80’s,90’s,00’s & Now
The Increased Scope of Education Facility Management
Education Facility Managers are so over programmed that a complete program is rarely delivered
Copyright © 2010 Service Management Assist, LLC
The Best Run Schools Run SchoolDude!
The Challenges We Face Today
The Best Run Schools Run SchoolDude!
Issue #1: Stewardship is falling
The Best Run Schools Run SchoolDude!
Our backlogs are growing, and we fear that priorities are becoming more acute.
Issue #3: Severity of backlogs is increasing
The Best Run Schools Run SchoolDude!
What’s the impact?
The Best Run Schools Run SchoolDude!
ECON 101
If Customer Service is “Free with Unlimited Supply”– Demand will grow to consume all of your
supply– Limit levels will eventually be hit resulting in
customer dissatisfaction– Nothing will be left for stewardship
“Customers unwittingly steal resources from the long-term preservation of facilities. . . Customers must be served professionally but it should not be at the expense of all else. Better service delivery is key.”
APPA Maintenance Staffing Guidelines
The Best Run Schools Run SchoolDude!
Balancing Stewardship Vs. Service
Stewardship
Guardian of physical plant
• Preventive Maintenance
• Planned Maintenance
Service
Support to staff on request
• Events• Curriculum• Moves• Minor repairs
The Best Run Schools Run SchoolDude!
Best Practices Organization
Support Maintenance
25%
Preventive Maintenance
25%
Planned and Unplanned
Maintenance50%
APPA Maintenance Staffing Guidelines – Ch 3
The Best Run Schools Run SchoolDude!
It’s a brand new building, why do we need to maintain it?
We need to cut maintenance so we can “save” money.
The Best Run Schools Run SchoolDude!
BENEFITS OF A SUCCESSFUL PM PROGRAM
“Benefits of a Successful PM Program” is taken from Complete Building Equipment Maintenance Desk Book Second Edition, Edited by Sheldon J.
Fuchs, P.E. Page 19 in the chapter by Paul D. Tomlingson.
• Fewer Failures - A timely PM program usually uncovers problems before they become serious enough to cause equipment failures. Breakdowns can be reduced by 50 percent.
• More Planned Work - The timeliness of preventive maintenance inspections usually uncovers those major jobs that require planning. Sufficient lead time allows planning to be done.
• Fewer Emergencies - An effective PM program has every maintenance employee on the alert for things that cause problems. As a result, fewer problems that would cause an emergency situation escape detection. Emergency work can be reduced by half.
The Best Run Schools Run SchoolDude!
• Reduced Overtime - One of the largest contributing factors to overtime is the need to perform emergency work. A reduction in emergency work usually produces a corresponding decrease in overtime.
• Extended Equipment Life - PM invariably rewards its users by extending equipment life by as much as 20 percent and increasing dependability.
• Better Use of Maintenance Personnel - A job done under emergency conditions is 15 percent more costly in labor than a similar, well planned job. A maintenance department with a good PM program commits more staff to planned work. The result is more effective, productive use of this manpower.
• Improved Equipment Operation - Well-cared-for equipment is its own reward - it runs better.
• Less Downtime - Because the PM program can reduce emergency work, it follows that downtime can also be reduced.
The Best Run Schools Run SchoolDude!
Clichés
• Pay me now or pay me later• An ounce of prevention is worth a pound
of cure• Change the oil or change the engine – you
choose
Are they true?
The Best Run Schools Run SchoolDude!
Data Dudes
• Perspective over 6,000 clients live operational data (400+ Higher Ed Institutions)
• Partnership with SAS Institute, largest privately held software company in world
• Terabytes of data• Technology: Ability to mine for group gold
The Best Run Schools Run SchoolDude!
Recently published . . .
The Best Run Schools Run SchoolDude!
Methodology
• Data analysis across nearly 6,000 educational clients live operational data (400+ Higher Ed Institutions)
• Identification of “PM Masters”– Top deciles within peer group– Allocating high percentage of manpower to PM
(> 30%)– High completion rates (> 98%)– Been doing so for quite a while (> 3 years)
The Best Run Schools Run SchoolDude!
Key Questions
1. How does a PM program affect overall costs and emergencies?
2. What are the financial impacts to facility capital needs?
3. With utility costs comprising a large portion of the M&O budget, how can PM impact your energy use and building efficiencies?
4. How does PM affect other costs or risks, such as insurance claims?
The Best Run Schools Run SchoolDude!
Cost Impact
• 50% - 65% reduction in the rate of emergency work
• Lower cost per work order with the average cost per work order being 28.6% to 39.3% less
The Best Run Schools Run SchoolDude!
PM Reduces Corrective Work
• Over a 5-year period, a sampling of PM Masters garnered a 16% reduction in corrective maintenance work as a percent of the total work over the time period.
• Over a 20-organization sample across the 5-year time span, the corrective work as a percent of the total work is reduced from approximately 87% to 71% of the total work performed.
The Best Run Schools Run SchoolDude!
The Transition . . .
The Best Run Schools Run SchoolDude!
Reducing Emergency Work
The Best Run Schools Run SchoolDude!
PM Capital 101
• Value of roof (6%)• Value of HVAC (11%)
Total for just two systems: 17% of replacement value
Assuming 15 year life extended to 17 years with a PM program (very conservative)
Capital Budget Relief estimate: $0.25 per square foot per year
The Best Run Schools Run SchoolDude!
Energy Impact from PM
• Interviews with experts – performance contracting engineers
• HVAC related load– Often around 50% of load– Expected improvement from PM – 10%
improved– Estimated 5% energy bill reduction
The Best Run Schools Run SchoolDude!
Energy Cost Trend
17% increase from 2007. Cost is hard to control- but consumption is something you have some measure of control over.
The Best Run Schools Run SchoolDude!
The Data says…
~25% reduction in Electric consumption for institutions performing PM.
KWH/Sq. Foot
The Best Run Schools Run SchoolDude!
The Data says…
~30% reduction in Natural Gas consumption for institutions that are performing PM.
Therms/Sq. Foot
The Best Run Schools Run SchoolDude!
The Connection with Risk
• P&C Insurance company – private study– 18,000 schools with multiple years of claims
history.– 12,000 SchoolDude schools– 9,000 school overlap with at least minimal PM
activity
• Results:– 70% reduction in claims– 11% reduction in claims severity
The Best Run Schools Run SchoolDude!
Summary PM Benefits
• Reduce emergencies 50%• Reduce average cost per work order up to 40%• Reduce long term capital costs • Reduce disruption of the learning environment
All the data confirms investing in PM is the right
business decision!
The Best Run Schools Run SchoolDude!
Equipment Failure
Equipment Failure
Mean Time to Report
Problem IdentifiedAction Starts
Problem IdentifiedAction Starts
Technician AssignedTruck Rolls
Technician AssignedTruck Rolls
Mean Time to Respond
Mean Time to Repair
Mean Time Between Failure
Problem SolvedProblem Solved
Total Outage Time
Root Cause AnalysisBPR
Root Cause AnalysisBPR
Facility Management Work Order Model
The Best Run Schools Run SchoolDude!
Technology Assisted Maintenance
Buildings with BAS;Connect and move data to the Cloud
CloudData Depot(s)
SaaS Applications- Inforich Work Orders - PM Automation- Critical Alarm Auto.- Predictive Maintenance
The Best Run Schools Run SchoolDude!
Closing Remarks
• Master the art of selling the value of PM• Much information exists • Contact SchoolDude for more detailed
information on these resources• Heather May [email protected]