July 2013
The Bayovar 12 Phosphate Project
Northern Peru
The Bayovar 12 Phosphate Project
Northern Peru
April 2014
March 11, 2011
2
March 11, 2011
2
2
Forward Looking Statements This presentation may contain forward-looking statements including, but not limited to, comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, and other related matters. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Focus Ventures Ltd’s projects in Peru & Colombia are at an early stage and all estimates and projections are based on limited and possibly incomplete data. More work is required before the mineralization and the projects’ economic aspects can be confidently modeled. Actual results may differ materially from those currently anticipated in this presentation. No representation or prediction is intended as to the results of future work, nor can there be any promise that the estimates and projections herein will be sustained in future work or that the project will otherwise prove to be economic. Some assay results shown in this presentation are historical in nature and the Company has not completed verification of the accuracy of these results and therefore they cannot be relied upon. Qualified Person Under the terms of NI 43-101, David Cass, B.Sc., M.Sc., P.Geo., is Focus' Qualified Person responsible for ensuring that the technical information given in this presentation is an accurate summary of the results reported by Focus.
Cautionary Notes
March 11, 2011
3
March 11, 2011
3
3
Focus Ventures Ltd
Resource Drilling
1st Class Logistics
The Right Address
Short Timeline
The Bayovar 12 project is a low-risk entry opportunity into a world-class phosphate district.
Bayovar 12 adjoins Vale’s Bayovar Mine & Hochschild’s Fospac project Resource drilling underway: maiden resource anticipated mid-2014
Power, road access & port available. Skilled labour force From signed deal to resource drilling in less than 6 months
A small cap company, drilling a potentially major sedimentary phosphate asset
Management Experienced team, strong local knowledge & low cost approach
March 11, 2011
4
March 11, 2011
4
4
Drilling underway at Bayovar 12
Drilling at the Bayovar12 concession, March 2014
March 11, 2011
5
March 11, 2011
5
5
Bayovar 12 Location
• Bayovar 12, Peru – a low-risk, low price
entry opportunity into a resource definition stage project located in a world class phosphate district
• Bayovar 12 has moved from signing of
the option agreement to resource drilling in less than 6 months.
Bayovar 12 is Focus’ Key project
March 11, 2011
6
March 11, 2011
6
6
Project History
11950s
Phosphate discovered in the
Sechura basin during oil drilling
2007
JPQ acquires Bayovar 12 concession for gypsum
in Peruvian government auction
Mid 2013
JPQ and Focus begin negotiations for option
agreement covering Bayovar 12. LOI signed
Sept 2013.
Jan 2014
Definitive option agreement signed. Drill
permit application submitted.
March 2014
Drill permit granted. FCV moves straight to resource
definition drilling.
From signed option agreement to resource drilling in less than 6 months.
March 2014, Bayovar: Focus’ drill core.
March 11, 2011
7
March 11, 2011
7
7
Port
Highway
25 km
Illescas Peninsula
Virrila Estuary
Sechura Depression
BAYOVAR 12 (FOCUS)
12,500 hectares
Juan Paulo Quay
Bayovar 12 Project, Northern Peru
Bayovar (Vale)
Phosphate Mine / Deposit
Piura City 70 km
Salt Flats
Lima 940 km
JPQ Port owned by Bayovar 12 owners
Piura
Lima
P E R U
* Mineable Reserves (dry density): Source: Fosfatos del Pacifico EIA Sept 2013 ** Vale 2010 Annual Report
The Bayovar District
Fosfatos del Pacifico Deposit (Feasibility)
Hochschild– Mitsubishi *130 MT @ 17.5% P205
Bayovar Mine (in Production)
Vale – Mosaic –Mitsui Reserves **295 MT @
15.9 % P2O5
• Located close to Vale’s Bayovar Mine, Hochschild’s Fosfatos del Pacifico & the Fosyeiki mine.
• Excellent logistics and infrastructure
• 40km from port owned by project owners JPQ
• Arid desert, no communities living on property
• Possible to work all year
• Project partly derisked by 5 historic holes
Vale
Americas Petrogas / IFFCO
Hochschild Group JV
Mineral Claims
Fosyeiki Mine (in Production)
March 11, 2011
8
March 11, 2011
8
8
Port Facilities owned by Bayovar 12 claim holders
500 tonnes / hr Shiploader Pier 182m, for Cargo 24,000 DWT
>15,000 m2 for stockpiling
March 11, 2011
9
March 11, 2011
9
9
Phosphate Deposit Resource Size Comparison
March 11, 2011
10
March 11, 2011
10
10
Bayovar Mine and Fosfatos del Pacifico
Bayovar Mine Fosfatos Del Pacifico
Status In operation since 2012 Full feasibility
Reserves / Resources 239Mt @ 17.2% P2O5 130Mt @ 17.5% P2O5
Ownership Vale 40%, Mosaic 35%, Mitsui 25% Hochschild group / Mitsubishi
CAPEX est. $530M? ~$600M?
Mining Method Open pit using loaders & trucks Open pit using surface miners
Processing Washing, gravity separation & drying Washing / Flotation / Drying
Annual Production (Mt cons pa.)
3.9Mt 2.5Mt
Mining at Bayovar Proposed mining method at Fosfatos
Mosaic & Mitsui acquired 60% of Bayovar in Q1 2010 for $660M ($4.60/t)
Mitsubishi acquired 30% of Fosfatos for $45M million in Q4 2011 ($1.10 - $1.20/t)
March 11, 2011
11
March 11, 2011
11
11
• Simple processing at site
• Soft, friable ore
• Washing , gravity separation using seawater
• No chemicals used
• Dried and loaded on ships for export to USA and Brazil
Vale: Mining & Processing
Vale’s Port
The Fosyeiki mine
Free digging material, Vale’s mine
March 11, 2011
12
12
Diana Formation phosphate bed exposed in Fosyeiki open cut mine
March 11, 2011
13
13
Phosphate
Diatomite
Close up of Phosphate, Fosyeiki open cut mine
March 11, 2011
14
March 11, 2011
14
14
JPQ-04 QQ 04040
JPQ-06
JPQ-05 Q 05050
JPQ-07
QQQQ-0606006060JPQ-08 JPQ-03
T1 – 11.3 P205
T2 – 9.7 P205
T3 – 6.7 P205
T4 – 9.6 P205
T5 – 6.3 P205
T7 – 8.2 P205 T8 – 10.3 P205 T6 – 9.6 P205
Bayovar 12 12,500 hectares
•5 holes drilled in 2012 at 1.5km spacing
•Multiple phosphate units drilled in all holes from 36m depth, average grade 12 – 16% P2O5
S A L T F L A T S
S E C H U R A D E P R E S S I O N
Bayovar 12 Drilling & Trenching
Surface trenching, phosphate unit in all trenches, average around 10% P205
20 km
A A’
Section A – A’ Next slide
DRILLHOLE WITH P2O5
TRENCH WITH P2O5
DRILLHOLE NO P2O5
Former Gypsum Operations
Planned 20 yr pit outline
Aprox.pit outline 2010
March 11, 2011
15
March 11, 2011
15
15
Legend Aeolian Quaternary
Diatomite Sandstone Phosphate Beds
Scale: 1:20,000
20
0
- 20
- 40
- 60
- 80
JPQ-06 JPQ-08
A A’
JPQ-04 Gypsum deposit
3 km
Schematic Profile Bayovar 12 (western area)
Exploration Target* 100-150 MT grading 12% – 16% P2O5
*The potential quantity and grade is conceptual in nature, and there has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource. Calculation based on 6 phosphate beds averaging 0.75m, S.G. 1.7, area 14km2
March 11, 2011
16
March 11, 2011
16
16
Focus’ Exploration Program
• Surface outcrop on the concession is limited to non-existent, so Focus’ work to date consists of
-logging 5 historic holes, -visiting nearby P2O5 projects - -laying out a new drill grid in the southwest of Bayovar 12. -completion of first phase DD program on an 800m by 800m grid.
• Drill spacing may permit completion of an Inferred Resource estimation from first 20 holes
• Initial results expected mid-late Q2 2014. First pass target size: 100-150MT target* @ 12 - 16% P2O5
*Exploration Target : The potential quantity and grade is conceptual in nature, and there has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource. Calculations based on 6 phosphate beds each averaging 0.75m thickness, S.G. 1.7 x area
March 11, 2011
17
March 11, 2011
17
17
Drill Plan
Historic hole
Current program
2nd phase infill holes
Gypsum Mine
March 11, 2011
18
18 Phosphate in Focus’ drill core.
March 11, 2011
19
March 11, 2011
19
19
• Coarse irregular pale pellets • Finer grained spherical black
pellets forming matrix • Fossil Fragments
Phosphate in Focus’ drill core
March 11, 2011
20
March 11, 2011
20
20
Estimated Timelines
March 11, 2011
21
March 11, 2011
21
21
Estimated Budget to end 2014
Cash option payments
Logistics, permits, G&A
Completion of drilling, assays, met testing and resource calculations
$750k
Potential cash from warrants* $4.7M
$2.0-2.3M
$500k
Est’ budget to end 2014 ~$3.6M
*Includes 3 million 26.5c warrants issued in April 2014 financing
March 11, 2011
22
March 11, 2011
22
22
Objectives Next 12 Months
Deliver A Resource
Strategic Partner
Option Milestones
Research Coverage
Pre-Feas Engineering
Finance & complete req’d cash payments ($3.75m) by Feb 2015
Deliver 1st resource mid-2014, upgrade to M&I resource by end 2014
Secure investment or offtake from a strategic partner
Initiation of research analyst coverage from one or more institutions
Pre-feas engineering underway by end 2014 / early 2015
March 11, 2011
23
March 11, 2011
23
23
Share Structure & Price History
March 11, 2011
24
March 11, 2011
24
24
Phosphorous: a key ingredient in fertilizer and an essential nutrient for plant life Phosphate is naturally occurring, found mainly in sedimentary and igneous deposits >40% of world food production uses fertilizer Major consumers of fertilizer: China, India, Brazil Major phosphate producers are Morocco, China and the US
World Phosphate Rock Reserves
Contact Us
David Cass, President & Director Ralph Rushton, Business Development & Director
Suite 650-200 Burrard Street Vancouver, BC
Canada V6C 3L6
Phone : 604 688 5288 [email protected]
March 11, 2011
25
March 11, 2011
25
25
Appendices
March 11, 2011
26
March 11, 2011
26
26
Board & Senior Management
www.focusventuresltd.com Phone : 604 688 5288
David Cass President & Director
Simon Ridgway Chairman & CEO
Ralph Rushton V.P. Corporate Development & Director
Mr. Cass is a geologist with over 21 years' international experience in mineral exploration and mining for precious and base metals, spent with major mining company Anglo American plc. He held positions of increasing responsibility in Turkey, Iran, Eastern Europe and the America's, including 4 years as Senior Geologist in Peru, and 6 years as Exploration Manager for North America. Since 2006, Mr. Cass has worked for junior exploration companies exploring in Canada, Mexico, Central America and Peru. He has a Masters of Science degree in Mineral Exploration and Mining Geology from the University of Leicester, UK (1990). He is a practicing member (P.Geo) of the Association of Professional Engineers and Geoscientists of British Columbia.
Ralph has a B.Sc. in geology from Portsmouth University in the UK, a Master's degree in economic geology from the University of Alberta, and a Certificate in Business Communications from Simon Fraser University. Much of his 20 years' experience in mining and exploration was gained working as a geologist for the Anglo American group in Southern Africa, the Middle East and Eastern Europe. Ralph has been working with the Gold Group of companies for the past 10 years.
Mr. Ridgway is a successful prospector and mining financier, gaining his initial experience with grass roots mineral exploration. Starting out as a prospector in the Yukon Territory in the 70's, Simon and the teams under his guidance have discovered gold deposits in Honduras, Guatemala and Nicaragua and silver deposits in Mexico. Simon is a founder and the Chairman of Fortuna Silver Mines, and Founder and CEO of Cordoba Minerals, Medgold Resources and Focus Ventures.
Mr. Szotlender holds a degree in international relations and is fluent in several languages. He has successfully directed Latin American affairs for numerous private and public companies over the past 20 years, specializing in developing new business opportunities and establishing relations within the investment community. He was President of Mena Resources Inc. until it was purchased by Rusoro Mining Ltd., of which he was also President. In addition to being a Director of Radius Gold Inc., Mr. Szotlender is a Director of Endeavour Silver Corp. and Fortuna Silver Mines Inc. He also consults to other public companies and to several private exploration companies.
Mario Szotlender Director
March 11, 2011
27
March 11, 2011
27
27
Phosphate
Phosphate, used as fertilizer, is the irreplaceable engine powering modern agriculture.
Bloomberg BusinessWeek Magazine
P2O5 90% of all phosphate rock is used to make fertilizers.
10% is used in livestock feed, pesticides, detergents, water treatment chemicals and food additives.
40% of modern agricultural yield can be directly linked to the use of phosphate fertilisers
March 11, 2011
28
2011
28
28 March 11, 2
Latin America: Crop-Rich, Phosphate Poor
* The Hague Centre for Strategic Studies
Produces 11% of the world’s food
Consumes >12% of global phosphate
Produces <2% of global phosphate
March 11, 2011
29
March 11, 2011
29
29
Bayovar 12 Deal Terms
Focus has the right to acquire a 70% interest in JPQ, the titleholder of the Bayovar 12 concession, by:
– spending up to $15-million in exploration and drilling, including $1-million within 12 months of receipt of its exploration permit from the Peruvian authorities,
– completing a positive prefeasibility study by the 4th anniversary;
– and paying JPQ $4-million (U.S.) cash staged instalments;
$50,000 on signing of the LOI (paid); $200,000 on signing of the formal option agreement (paid); $750,000 six months after receiving the exploration permits (due August 2014);$3-million on the first anniversary of receiving the permits (due February 2014). $1 million per year for every additional year until the completion of the prefeasibility study
March 11, 2011
30
March 11, 2011
30
30
Bayovar Stratigraphy
Bayovar 12 Holes JPQ 4 – 8
Upper Diatomite Wider but lower grade
Phosphate Beds
Lower Diatomite Well sorted, high grade
phosphate beds
Surface Bayovar 12
• Phosphate hosted in a sequence of Diatomites*
• Highest grades found in the Diana Ore Zone in the Lower Diatomite Series
• At least 7 individual phosphate beds within the 35m – 40m thick Diana Ore Zone
• Units vary from 0.3m - to 2m wide
• Average width of beds approx 0.7m
* Diatomite is a naturally occurring soft siliceous sedimentary rock composed of the shells of diatoms (hard shelled algae) and used in filters and mild abrasives
March 11, 2011
31
March 11, 2011
31
31
Hole From To Sampled Interval
% P2O5
JPQ N 04 58.85 59.5 0.65 11.26 JPQ N 04 68.2 68.79 0.59 13.67 JPQ N 04 74.3 75.4 1.1 7.53 JPQ N 04 78.7 79.7 1.0 15.32 JPQ N 04 86.48 86.8 0.32 12.01 JPQ N 04 92.4 92.9 0.5 13.17 JPQ N 04 96.9 97.32 0.42 18.07 JPQ N 04 97.68 98.85 1.17 13.2
JPQ N 05 55.2 55.58 0.38 15.42
JPQ N 05 64.34 64.7 0.36 12.98 JPQ N 05 66.7 67.07 0.37 20.75 JPQ N 05 68.4 68.68 0.28 12.65 JPQ N 05 70.75 71.32 0.57 10.24 JPQ N 05 74.0 74.7 0.7 18.10 JPQ N 05 82.7 83.45 0.75 14.96 JPQ N 05 89.02 89.42 0.40 10.62 JPQ N 05 93.47 94.08 0.61 14.05 JPQ N 05 94.92 96.01 1.09 19.35
JPQ-04 78.7m – 79.7m –15.32 % P205
JPQ-05 74.0m – 74.7m –18.1 % P205
Bayovar 12 mineralization in historic drill hole
Mineralized widths are likely minimums: sampling was limited to visually-estimated hi grade zones