NE + SE Study Groups:
Eastside Trail
Extension Updates
June 1, 2017
@atlantabeltline
@atlantabeltline
@atlantabeltline
Eastside Trail from Edgewood Ave
Between Irwin St & Edgewood Ave
• Irwin St will be closed for ramp repair from June 5-12
• All traffic will be detoured
• The sidewalk and trailhead on the northside of Irwin St will remain open
Between Irwin St & Edgewood Ave
• Planting and
sodding will
take place in
the next 2
weeks,
weather
permitting
Between Irwin St & Edgewood Ave
• Lighting installation is underway this week and next week
• Center lines will be cut into the trail and completed within 2 weeks
Krog St Tunnel
• Partial
closures of
lanes will take
place in the
Krog Street
tunnel
Krog St Tunnel
• Northbound:
June 12-30
• Southbound:
July 1-21
• Between 9:30
a.m. and 3:30
p.m. each day
Wylie Street
• Planting is
ongoing
Wylie Street
• Lighting
should be on
in 3 weeks
Between Wylie St & Kirkwood Ave
• Lighting will
be complete
by Friday
Between Wylie St & Kirkwood Ave
• Bioswales will
be the last
item to
complete in
Phase I
• Planting will
be complete
by the end of
June
General
• The
remaining
trees will be
planted next
fall
General
• Signage will
be installed
by the end of
June