The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation Workshop 2006 May 5, 2006 Allegory: expression using symbolic fictional generalizations about human experience x symbolic representation

Transcript of The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering...

Page 1: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

The APS Vacuum SystemAn Allegory for Accelerator Vacuum System Design

John NoonanAPS Engineering Support Division

Argonne National Laboratory

Beam Instrumentation Workshop 2006May 5, 2006

Allegory: expression using symbolic fictional generalizations about human experience

x symbolic representation

Page 2: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

2

Talk Outline

The APS

Vacuum System Design Criteria

APS Accelerator Vacuum Systems, Chambers, Absorbers

Materials, Cleaning, Pumping, Flanging, Magnetic Permeability

Advantages, Problems

Modern Materials and Processes

Summary: 100 % Complete

Page 3: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

3

The Advanced Photon Source

Page 4: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

4

APS parameters

The APS is a third generation, hard x-ray, synchrotron light source

– The storage ring operates at 7 GeV, 100 mA

– The nominal stored electrons/ bunch is 2.3 x 1012

– The natural emittance is 2.5 nm-rad

There are 70 beamline ports, for which there are ~ 40 beamlines operating during a run.

The APS consistently operates at >98.5 % availability, and currently is above 99%.

Page 5: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

5

The design criteria for accelerator vacuum systems is verysimple:

Q = SP

where Q is the gas load, S is the pumping speed, and P is system pressure.

Q = Q thermal outgassing + Q stimulated desorption

1/S = 1/Spump + 1/C , where C is the pipe conductance

and P is the design criteria

Page 6: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

6

Gas Loads

Thermal Outgassing:

Typical outgassing rates are in the literature, such as NASA publication 1124, rev. 2, Outgassing Data for Selecting Spacecraft Materials, W. A. Campbell, Jr. and John J. Scialdene, c 1990.

For example, after 24 hrs, unbaked Al has Q ~ 1 x 10-10 torr-l/s/cm2

• baked Al Q ~ 5 x 10-13

Stimulated desorption

•N = 1.82 X 1021 photons/sec at 7 GeV, 300 mA

So Q = N* (ηγ)*K, ηγ = 2 x 10-7 mol/photon, K = 3.11 x 10-20

torr-l/mol

Page 7: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

7

LINAC

The LINAC has two vacuum systems, the accelerating structures, and the transmission waveguide.

Both systems are unbaked, ion pump systems using ConFlat flanges in the accelerating linac, but Varian flanges in waveguide.

The problem is high RF power producing arcing and multipactoring

Page 8: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

8

LINAC design

The LINAC water load has a vacuum-to-water joint

To isolate the water load from accelerating structures, we have installed ceramic RF windows to isolate one section from another. However now pumps are needed on both sides of the window

As a result there are more pumps than required for a design pressure of 10-7, so the linac operates at < 5 x 10-9 torr.

The second major criteria is elimination of arcing and multi-pactoring. The obvious solution is smooth surfaces and rounded, not sharp corners.

Page 9: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

9

Input and output to accelerating structure

Page 10: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

10

Storage Ring design

The design criteria for the storage ring vacuum system was 20 hour residual gas lifetime, which led to 1 x 10-9 torr.

The original criteria was to absorb x-rays on the walls of the vacuum chambers, therefore, distributed pumping was included in the design.

As will be discussed later, photon absorbers are needed to shield vacuum components, such as ends of chambers. To capture the gas desorbed by the photons, pumps were installed below the absorbers.

The pumps at the absorbers are closer together than the 1 ntorr criteria. As a result, the storage ring base pressure is 3 x 10-11 , and the operating pressure at 100 mA beam is 2 x 10-10 torr.

Page 11: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

11

Storage ring sector

Page 12: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

12

Aluminum vacuum chamber design

Machined Al extrusion has beam chamber and antechamber for neg pump

Welded plates and equipment ports

Neg carrier inserted into slot

Water channels are also part of extrusion

Page 13: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

13

Details of storage ring vacuum chamber

RF BPM ports machined into the chamber

One fixed support in ~ middle, two supports at end

Turbo pump installed in each sector for rapid recovery of venting

Fluorescence from absorbers is greater than expected

Tolerance gap between chamber and magnet is 3 mm

Page 14: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

14

Insertion device vacuum chamber

The insertion device vacuum uses the same technology as the sector chambers, but there are significant differences

The standard interior vertical dimension is 8 mm, with 1 mm walls. There is one 5 mm gap chamber in the storage ring.

The large holes are to maintain material flow balance in the extrusion dye.

Page 15: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

15

The x-ray fan from bending magnets are calculated for a storage ring sector. A single absorber does notstop the radiation fan because it would extend to far into the beam chamber, creating a large aperturechange, and large beam impedance.

95% of the power is absorbed in the storage ring vacuum system. Only 5% is transported to theexperimental beam lines. Nevertheless, they are still among the most intense bending magnet beamlinesoperating today.

Absorbers: ray tracing

Page 16: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

16

Bending magnet x-ray absorbers

The APS bending magnets generate enormous photon power density,

One of the engineering achievements at APS was the design of a simple structure that could withstand ~13 kW of power.*

The device could be installed through a 10” port, and had several novel design features, including glid-cop brazing, EDM water channels, and had a temperature rise to ~270 C.

*I.C. Sheng, S. Sharma, E. Rotela and J. Howell, PAC 1995

Page 17: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

17

Booster and PAR

Page 18: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

18

Materials

Aluminum Easily extruded Thickest chamber wall• Low Cost Large eddy current• Efficient heat removal High secondary e yield• Low resistivity Yield strength fails at < 1700 C

Cu Can be extruded Material cost increasing Efficient heat removal Eddy current Low resistivity Yield strength maintained through 2500 C anneal

Stainless Steel Thinnest wall chamber High costHigh strength Poor heat removalLow eddy current High resistanceAnneal to > 4500 C

Page 19: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

19

Chambers

The APS used extruded 6063 T6 alloy Al, this Al strengthened by Si and Mg for the storage ring vacuum chambers

The end plates and flanges were 2219 alloy Al, which is strengthened by Cu. This is the most compatible alloy for welding to 6063.

( In a development with LBNL, Argonne developed a technology to weld 6063 to 6063 using high Mg doped Al weld rod.)

Page 20: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

20

Flanging

The chambers were flanged using ConFlat technology, but with Al flanges.

The Al ConFlat flanges were bolted to stainless steel flanges, such as bellows, spool pieces, pumps, etc.

The original joint failure rate was 1 %, but this lead to 2 leaks for every 3 bakes. Using the procedure, the failure rate is < 10-4 leaks per bake.

A special bake-out procedure was developed to maintain vacuum integrity between the Al and stainless steel:

– The bake temperature was ramped at <10 degrees per hour.

– The temperature across the joint was kept < 12 degrees

– The temperature in the flange plane was uniform to <2 degrees.

Page 21: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

21

Pumping

All of the accelerator vacuum systems use all metal seals and are ion pumped.

So the system is isolated from atmosphere

There was a plan to have turbo-molecular pumps on the RF cavities operating all of the time. There are turbo’s on the RF cavities, but they are operated only for high gas load times.

The storage ring has additional non-evaporable getter pumps

A distributed neg strip

Concentrated 250 l/s and 1000 l/s pumps at the absorbers

The gas loads are sufficiently low, that the neg pumps are only used after sectors are vented to atmospheric pressure (dry nitrogen purge). This helps to reduce the thermal outgassing load.

Page 22: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

22

Cleaning vacuum surfaces for UHV compatibility

Cleaning accelerator vacuum chambers required acids and caustics until recently. SLAC and CERN have prescriptions for cleaning copper, stainless, aluminum, etc for vacuum pipes. Solvents were used to clean parts. The cost of large tanks of alcohols, acetone, and especially, trichloroethylene was prohibited and difficult to manage with modern pollution restrictions.

Modern detergents were used to clean small parts for vacuum service. The APS (I believe) is the first to clean the whole system for UHV service

The detergents have been approved for environmental compatibility.

Detergent cleaning is not a panacea. Different materials require different detergents, e.g. Ritoline (Almeco) for Al and Citranox for Cu and SS.

Heavy organics and silicone contamination are not removed with the standard detergents. The way to deal with organics is to review the complete manufacturing process so that the detergents can clean the cutting fluids, etc.

Page 23: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

23

Carbon-to-Copper XPS ratio

The detergent cleaning was developed, and monitoredusing XPS.

Citranox cleaning of Cu and Ritoline (Almeco) cleaning ofAl are compared with other detergents.

Heated water and ultrasonic transducers are essential for detergent cleaning.

New materials must be tested to find the best detergent,bath temperature and ultrasonic power.

Coatings are special problems, since the two materialsMight not be mutually compatible.

Page 24: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

24

Magnetic Permeability

Type As-received AnnealedAfter

Machining and Forming

Manual TIG

Welding

Final Machining

316 LN 1.003 1.003 1.003 1.004 1.008310S 1.057 1.036 1.033 1.042 1.051

20Cb-3 1.008 1.015 1.015 1.011 1.018Nitronic 33 1.002 1.022 1.03 1.03 1.126Nitronic 40 1.004 1.004 1.005 1.052 1.081

Preliminary Permeability Results

from “Magnetic Properties of Undulator Vacuum Chamber Materials for the Linac Coherent Light Source” by SH Lee presented at FEL2005

Permeability measurement results of 20Cb-3 (Alloy 20) at ANL Central Shops by SH Lee on 4/7/04

Plate: 1.010~1.012 – 19 mm thk (most points 1.010)

Sheet: 1.004~1.006 – 1.5 mm thk (most points 1.005), after correcting for thickness the values are 1.008~1.012 with an average of 1.010.

Page 25: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

25

Advantages

The vacuum system uptime is ~99.9%. The mean time between failures is > 8,000 hours.

Bremstrahlung radiation is well below predictions. The radiation transported to beamlines is shielded to mrem levels.

The low operating pressures allows for special operating modes.

Top up injection times are 2 minutes, which allows enough time for

Most experimental scans to be completed.

Low emittance beam operation is achieveable.

In principle, these should mitigate residual gas lifetimes; however, for low lifetimes, the electron gun must generate more charge per bunch.

Page 26: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

26

Problems

Water Corrosion– Copper cooling lines blocked– Al-SS fittings corroded

Al-to-SS flange leak after bake

Neg strip carrier shorted out– Carrier connection failed

reducing the distance between stand-offs

– New carrier cannot override another and there is an insulating strip to prevent shorting.

Chamber microwave resonance interferes with BPM measurement

Page 27: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

27

New technologies for the next “APS”

Manufacturing has advanced significantly since the APS was built.

The pictures show two advantages of a new technology, ultrasonic bonding to fabricate a solid.

– Metal foil is ultrasonically bonded to produce near-bulk density solids

– Water channels can be integrated into the part

– Sensors, such as thermocouples and optical fiber can be integrated into the part

– Strengthening layers can be built in also

Page 28: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

28

New Technologies

Computer controlled machining centers allow designers to think beyond mills and lathes. Using solid model CAD, complex shapes can now be fabricated.

Y.C. Chae is developing a database of impedance calculations for different apertures. By contouring aperture changes, chamber impedances can be reduced significantly.

Curved chambers can also be designed using computer controlled machines. Fabrication costs can be reduced. For example, forming curved chambers for the booster cost over $ 150K. Using a new tube forming machine, the quotation was $30K (that includes the die)

Page 29: The APS Vacuum System An Allegory for Accelerator Vacuum System Design John Noonan APS Engineering Support Division Argonne National Laboratory Beam Instrumentation.

29

Summary

The APS accelerator vacuum systems met or exceeded the original design specifications

The x-ray beam absorbers can withstand 13 kW of power—in fact they can withstand significantly more power before reaching the fatique failure

Environmentally safe cleaning techniques were developed and have been shown to be UHV compatible, even for large systems

Baking the storage ring greatly improves the base pressure, and is essential to special machine operating modes

It was not until I had to deal with the APS vacuum systems that I learned what “100% complete” really meant.