The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative...

36
The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR Engineering, Inc.

Transcript of The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative...

Page 1: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

The Alternative of Alternative Delivery:

Progressive Design Build Larry Johnson, HDR Engineering, Inc.

Mike Zeltner, HDR Engineering, Inc.

Page 2: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Agenda

•  Traditional Project Delivery Model

•  Alternative Delivery Models

•  Progress Design Build Delivery Model

•  Legislation

•  Discussion

Page 3: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Traditional Project Delivery Model

Page 4: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Design-Bid-Build Contract  

Communica+on  

Owner  

Builder  Designer  

Qualifica+ons  >  Designer                                                                  Low  Bid  Price  >  Builder    

Page 5: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Design-Bid-Build

Advantages

•  Familiar delivery method

•  Regulations well understood

•  Project is competitively bid

Disadvantages

•  Low-bid contractor selection –  Increases risk of change orders, disputes, and claims

•  Multiple contracts for owner to manage

•  Owner bears majority of risk

•  No collaboration between designer & builder during design

The  high  cost  of  low  bid  

Page 6: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Shift Towards Alternative Delivery

•  Why are Owners looking for other options? –  Single point of responsibility

•  Reduce change orders •  Avoid Claims

–  Reduce project schedule

–  Selection not only based on price

–  Early collaboration between Designer and Builder

–  New legislation that allows other delivery methods

Page 7: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Market Trends

0.0  

20.0  

40.0  

60.0  

80.0  

100.0  

120.0  

140.0  

160.0  

180.0  

200.0  

2004   2005   2006   2007   2008   2009   2010   2011   2012   2013   2014   2015   2016   2017  

CMAR  Revenues   DB  Revenues   Future  Projec?on  

Value,  $Billion

s  

Source:  ENR,  June  2012  

Page 8: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Alternative Project Delivery Methods

GC/CM    CM/GC  CMAR  

DBO    DBOF    PPP  LUMP  SUM  DB  

ALLIANCE    EPC  PROGRESSIVE  

Page 9: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Construction Management at Risk

Involves  the  Contractor  Early  in  the  Progress  

Page 10: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Equipment  Suppliers  

Trade  Subcontractors  

“Design-­‐Assist”  collabora+on  

Owner  

CMAR  Designer  

GC/CM, CM/GC, CMAR Contract  

Communica+on  

Page 11: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

CMAR, CM/GC, GC/CM

Advantages

•  Utilize some non-cost factors for contractor selection

•  Increased collaboration

•  Maintain traditional relationship with designer

Disadvantages

•  No single-point accountability

•  Multiple contracts for owner to manage

•  Cost for construction is not known at the time of initial contract signing

Page 12: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Lump Sum Design Build

Includes  Price  in  Selec?on  with  LiOle  Project  Defini?on  

Page 13: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Lump Sum Design Build

Owner  

Design-­‐Builder  

Risk  Control  

Contract  

Communica+on  

Page 14: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Lump Sum Design Build Approach

Final  Design,  Construc?on  &  QC  

Accept  Project  

•   Review  SubmiOals  •   Conduct  Field  QA  •   Pay  Es?mates  •   RFIs  

Select  Owner’s  Rep.  

Define  Project  Concepts  &  Perf.  Criteria  

Produce  Contract    Docs  at  10%  -­‐  30%  

Design  

Select  Design-­‐Builder  

Owner  Owner’s  Rep  Design-­‐Builder  

Review  &  Recommend  Selec?on  

Prepare  &  Submit  Proposal  

Page 15: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Identify the best Design-Builder partner for the Owner

Step 1

Request  for  Qualifica+ons  (RFQ)  

Evaluate  

Shortlist  

Statements  of  Qualifica+ons  

Evaluate  

Select  Design-­‐Builder  

Proposal  &  Interview  

Request  for  Proposals  (RFP)  

Step 2

Award  Contract  

Page 16: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Lump Sum Design Build

Advantages

•  Lump sum price is known at contract signing

•  Schedule and scope are fixed at contract signing

•  Public acceptance tends to be high

Disadvantages

•  Lump sum price may not reflect final project cost

•  Owner involvement is limited once price is established

•  Increased potential for change orders or claims if owner wants changes after contract signing

•  Lengthy and costly process to develop thorough D-B procurement documents

Page 17: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Progressive Design Build

Primarily  Qualifica?ons  Based  Selec?on  

Page 18: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Progressive Design Build

Equipment    Suppliers  

Trade  Subcontractors  

Owner  

Design-­‐Builder  

Risk  Control  

Page 19: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Progressive Design Build Approach

Construc+on  by  Design-­‐Builder  

Accept  Project  

Select  Design-­‐Builder  

Design  to  30%  

Design  to  100%  

Cost  Es+mates  

Value  Engineering  

Design  to  60%  

Constructability  Review  

Design  to  90%  

Approve  GMP  

Compe++vely  Bid  &  Submit  

GMP  

Establish  Budget  

Compare  to  TP  

Compare  to  TP  

Set  Target  Price    (TP)  

Owner  

Owner  and  DB  

Design-­‐Builder  (DB)  

Page 20: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Work Packages

D-B bids out

work packages

Work Packages P-1,2,3,4… Equipment Packages

Work Package S-1 Work Package Structural / Mechanical

Work Package S-2 Pipelines

Work Package S-4 Buildings

Work Package S-6 Electrical & I&C

Work Package S-3 Civil / Site Work

Work Package S-5 Landscaping

Designed  to  meet  specific  project  needs  

Page 21: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Components of a Guaranteed Maximum Price (GMP)

Subcontract  and  Equipment  packages  

Design  &  Design  Services  During  Construc+on  

Project  Management  &  Supervision  

General  Condi+ons  

Design-­‐Builder  Con+ngency  

Fee  on  Cost  of  Work  

GMP  is  an  open  book  process  and  transparent  to  Owner  

Page 22: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Progress Design Build

Advantages

•  Simple and inexpensive procurement process can be completed in a short timeframe

•  Project can be implemented in phases or task orders to save time or keep the project moving

•  Maximizes owner flexibility, involvement and control of the project

Page 23: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Progress Design Build

Disadvantages

•  Cost for construction is not known at the time of initial contract signing

•  Cost is determined through combination of negotiated and competitive processes

•  An effective owner education program may be needed to overcome concerns with final construction cost determination

Page 24: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Legislation

•  Design Build is permitted by ID, OR, and WA state agencies

Page 25: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Design Build Procurement Laws

•  Idaho –  DB may be used for construction, repair, or improvement

of public works, buildings, places or other work

•  Oregon –  DB is approved for public projects.

•  Washington –  DB is approved for projects larger than $10M.

–  Project Review Committee •  Established by Capitol Project Advisory Review Board

•  Certifies entities that wish to use DC •  Reviews and approves projects for DB

Engage  Your  Legal  Counsel  Early  in  the  Process  

Page 26: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Discussion

Larry Johnson [email protected] (925) 974-2538

Mike Zeltner

[email protected]

(208) 387-7089

Page 27: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

For more information on legal interpretation of design-build rules, contact:

Richard Thomas Vice President, Advocacy & External Affairs

Design-Build Institute of America

1100 H Street, Suite 500, NW

Washington DC 20005

202.454.7516 (Phone) 703.999.1977 (Cell)

[email protected]

Page 28: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

ADDITIONAL SLIDES

Page 29: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Subcontract & Equipment Packages

•  Typically  2/3  to  3/4  of  GMP  

•  Actual  cost  of  compe++ve  bids  

•  Minimum  3  bids  per  package  

Page 30: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Design & Design Services During Construction

•  All  engineering  and  design  services  

•  Plans  &  specifica+ons  

•  Design  services  during  construc+on  

•  Record  drawings  

Page 31: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Project Management & Supervision

•  Project  management    

•  Inspec+on    •  Supervision  of  subs  and  vendors  

Page 32: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

General Conditions

•  Bonds  •  Insurance  •  Warranty  

•  Field  office,  vehicles,  chemical  toilets,  expendables  

•  Surveying  &  materials  tes+ng  services  

•  Project-­‐related  Health  &  Safety  costs  

Page 33: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Design-Builder Contingency

•  For  scope  gaps  &  omissions  

•  Derived  from  risk  register  and  trend  log  

•  Can  include  allowances  

•  Unspent  con+ngency  returned  to  Owner  or  shared  with  D-­‐B  

Page 34: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Fee on Cost of Work

•  Design-­‐Builder’s  overhead  and  profit  

•  Nego+ated  or  proposed  prior  to  D-­‐B  selec+on  

•  Generally  expressed  as  a  %  of  “Cost  of  Work”  

Page 35: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Legislation (ID and OR)

Page 36: The Alternative of Alternative Delivery: Progressive ... · The Alternative of Alternative Delivery: Progressive Design Build Larry Johnson, HDR Engineering, Inc. Mike Zeltner, HDR

Legislation (WA)