![Page 1: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/1.jpg)
The Alaskan Way ViaductThe Alaskan Way Viaduct
Steve Kramer
University of Washington
Seattle, Washington
![Page 2: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/2.jpg)
The Alaskan Way ViaductThe Alaskan Way Viaduct
Steve Kramer
University of Washington
Seattle, Washington
(The interesting stuff, not the structural stuff)
![Page 3: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/3.jpg)
Alaskan Way ViaductAlaskan Way Viaduct
• 2.2 miles long• 86,000 vehicles per day• North of Yesler
Designed by City of Seattle
Constructed in 1950• South of Yesler
Designed by Washington State DOH
Constructed in 1956
![Page 4: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/4.jpg)
Alaskan Way ViaductAlaskan Way Viaduct
© 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping
SeattleSeattleSeattleSeattleSeattleSeattleSeattleSeattleSeattle
Yesler TerraceYesler TerraceYesler TerraceYesler TerraceYesler TerraceYesler TerraceYesler TerraceYesler TerraceYesler Terrace
Elliott BayElliott BayElliott BayElliott BayElliott BayElliott BayElliott BayElliott BayElliott Bay
999999999999999999
Harborview HospitalHarborview HospitalHarborview HospitalHarborview HospitalHarborview HospitalHarborview HospitalHarborview HospitalHarborview HospitalHarborview Hospital
U S Marina HospitalU S Marina HospitalU S Marina HospitalU S Marina HospitalU S Marina HospitalU S Marina HospitalU S Marina HospitalU S Marina HospitalU S Marina Hospital
Mason HospitalMason HospitalMason HospitalMason HospitalMason HospitalMason HospitalMason HospitalMason HospitalMason Hospital
Union DepotUnion DepotUnion DepotUnion DepotUnion DepotUnion DepotUnion DepotUnion DepotUnion DepotKing Street StationKing Street StationKing Street StationKing Street StationKing Street StationKing Street StationKing Street StationKing Street StationKing Street Station
Seattle UniversitySeattle UniversitySeattle UniversitySeattle UniversitySeattle UniversitySeattle UniversitySeattle UniversitySeattle UniversitySeattle University
1ST
4TH
BO
RE
N
E MADISON
RAIN
IER AVE S
S 1
ST
STEW
ART
YESLER WAY
I-5
RAMP
I-90
© 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping
AWV
![Page 5: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/5.jpg)
© 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping
SeattleSeattleSeattleSeattleSeattleSeattleSeattleSeattleSeattle
Yesler TerraceYesler TerraceYesler TerraceYesler TerraceYesler TerraceYesler TerraceYesler TerraceYesler TerraceYesler Terrace
Elliott BayElliott BayElliott BayElliott BayElliott BayElliott BayElliott BayElliott BayElliott Bay
999999999999999999
Harborview HospitalHarborview HospitalHarborview HospitalHarborview HospitalHarborview HospitalHarborview HospitalHarborview HospitalHarborview HospitalHarborview Hospital
U S Marina HospitalU S Marina HospitalU S Marina HospitalU S Marina HospitalU S Marina HospitalU S Marina HospitalU S Marina HospitalU S Marina HospitalU S Marina Hospital
Mason HospitalMason HospitalMason HospitalMason HospitalMason HospitalMason HospitalMason HospitalMason HospitalMason Hospital
Union DepotUnion DepotUnion DepotUnion DepotUnion DepotUnion DepotUnion DepotUnion DepotUnion DepotKing Street StationKing Street StationKing Street StationKing Street StationKing Street StationKing Street StationKing Street StationKing Street StationKing Street Station
Seattle UniversitySeattle UniversitySeattle UniversitySeattle UniversitySeattle UniversitySeattle UniversitySeattle UniversitySeattle UniversitySeattle University
1ST
4THALA
SKA
N W
AY
BO
RE
N
E MADISON
RAIN
IER AVE S
S 1
ST
STEW
ART
YESLER WAY
I-5
RAMP
I-90
© 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping © 1993 DeLorme Mapping
Seattlesection
WSDOTsection
Alaskan Way ViaductAlaskan Way Viaduct
![Page 6: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/6.jpg)
Alaskan Way ViaductAlaskan Way Viaduct
![Page 7: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/7.jpg)
Alaskan Way ViaductAlaskan Way Viaduct
Seattlesection
WSDOTsection
![Page 8: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/8.jpg)
Alaskan Way ViaductAlaskan Way Viaduct
Seattle Section
![Page 9: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/9.jpg)
Alaskan Way ViaductAlaskan Way Viaduct
WSDOT Section
![Page 10: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/10.jpg)
Seismic Vulnerability ConcernsSeismic Vulnerability Concerns
• Loma Prieta earthquake
M=7.1
100 km south of Oakland
• Cypress Structure
Highway 17 in Oakland
Double-deck reinforced concrete structure
Similar age
Similar design requirements
Pile supported due to soft surficial soils
![Page 11: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/11.jpg)
Cypress StructureCypress Structure
![Page 12: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/12.jpg)
Cypress StructureCypress Structure
![Page 13: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/13.jpg)
Alaskan Way Viaduct InvestigationsAlaskan Way Viaduct Investigations
• 1990 WSDOT internal review
• 1991-92 UW review
• 1993-95 UW/WSDOT investigation
• 1995-96 WSDOT seawall investigation
![Page 14: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/14.jpg)
UW / WSDOT InvestigationUW / WSDOT Investigation
WSDOT Seawall InvestigationWSDOT Seawall Investigation
• Structural Engineering Aspects
• Geotechnical Engineering Aspects
• Seawall performance
• Effects on AWV
• Remediation strategies
![Page 15: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/15.jpg)
Geotechnical Engineering InvestigationGeotechnical Engineering Investigation
• Site characterization
• Seismic hazard analysis
• Ground response analyses
• Foundation response characteristics
• Evaluation of liquefaction hazards
![Page 16: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/16.jpg)
Site CharacterizationSite Characterization
• Review of historical records
• Review of previous subsurface investigations
• Supplemental subsurface investigations
SPT
CPT
Seismic cone
Downhole seismic
![Page 17: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/17.jpg)
Seattle, 1888Seattle, 1888Historical RecordsHistorical Records
![Page 18: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/18.jpg)
Seattle, 1884Seattle, 1884Historical RecordsHistorical Records
Lake Washington
Yesler
I-5
![Page 19: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/19.jpg)
Looking NW fromBeacon Hill
![Page 20: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/20.jpg)
Looking north along waterfront
![Page 21: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/21.jpg)
Looking eastfrom Elliot Bay
![Page 22: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/22.jpg)
Seattle Regrading ActivitiesSeattle Regrading Activities
![Page 23: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/23.jpg)
Tideflats, 1896
Tideflat ReclamationTideflat Reclamation
![Page 24: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/24.jpg)
Tideflat ReclamationTideflat Reclamation
![Page 25: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/25.jpg)
Railroad Avenue - 1920sRailroad Avenue - 1920s
![Page 26: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/26.jpg)
Railroad Avenue - 1920sRailroad Avenue - 1920s
![Page 27: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/27.jpg)
Seattle SeawallSeattle Seawall
• 12,000 lb/ft lateral thrust
• Four different wall types
- Timber pile-supported relieving platform (2)
- Pile-supported concrete wall
- Fill and rip rap wall
• Total cost: $1.4 million
![Page 28: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/28.jpg)
Type B Seawall SectionType B Seawall Section
![Page 29: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/29.jpg)
Type B Seawall SectionType B Seawall Section
Precast Section
Master Pile
Timber Relieving Platform
BatterPiles (12)
VerticalPiles (6)
![Page 30: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/30.jpg)
Pile/Platform ConnectionPile/Platform Connection
![Page 31: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/31.jpg)
Seawall ConstructionSeawall Construction
![Page 32: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/32.jpg)
Seawall ConstructionSeawall Construction
![Page 33: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/33.jpg)
40
50
-30
-40
-50
-60
-70
-80
-90
-100
-110
-120
-130
-140
-150
-160
250240230220210200190180170160150140130120110100908070605040302010010203040
CL
5060708090100110120130140150160170180190200210220230240250260270280290300310320330340350360370380
60
70
1.25:1
70
60
50
40
30
-90
-100
-110
-120
-130
-140
-150
0
0788737694084927850/4"78/6"
B-7 B-2
R-3 R-4-72-72
Projected117' NW
6541/6"012114450/4"50/3"50/6"
4788/11"50/5"
758950/6"50/4"
9342
1/18"
43765
H-3-93
Projected157' NW
73
8516100+
R-16-82
Projected
55125510100+
R-17-82
Projected
DATE
SCALE VERT.
HORIZ.
SHEET OF
DRAWN BY
JOB S.R. C.S.
WASHINGTON STATE
DEPARTMENT OF TRANSPORTATION
MATERIALS BRANCHMATERIALS ENGINEER
TRANSPORTATION COMMISSION
CITY OF SEATTLE DATUM
ALASKAN WAY VIADUCT
D. C. JACKSON
1"=40'1"=40'
FEB. 1996
FILL2
22
11213281346351/6"
5160/6"84/6"
R-5-68
Projected85' SE
R-6-68
171491612114/10"65/6"
6974100/2"
Projected147' NW
Projected154' NW
H-35-96
Projected 38' SE25' SE
0
42/18"1/12"1/24"
1/60"
20
10
Hole terminateddue to
contaminated soil
MS-2494 99 1102
22' NW
?
?
?
??
TILL
TILLTILL
TILL
CPT38
VIC. BENT 97
VIADUCT STA. 86+15
200' SOUTH OF CLOF YESLER WAY
500
Qc (tsf)
WATER LINE
'
ALASKAN WAY VIADUCT1 1
LSH
FIGURE 6: SECTION E - E'
Fill and Rip Rap Wall SectionFill and Rip Rap Wall Section
![Page 34: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/34.jpg)
Alaskan Way ViaductAlaskan Way Viaduct
• History
-Originally intended as downtown bypass
- Design began in 1948, bids opened 1949
- Seattle section opened April 4, 1953
- WSDOT section opened Sept 3, 1959
- Seneca Street off-ramp opened 1961
- Columbia Street on-ramp opened 1966
• Facts
- 7,600 ft long
- 58,867 yards of concrete, 7,460 tons of rebar
- 171,410 ft of piling
![Page 35: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/35.jpg)
36 ft
22 ft
70 ft
Typical Elevation (WSDOT Section)Typical Elevation (WSDOT Section)
57 ft57 ft
![Page 36: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/36.jpg)
36 ft
22 ft
47 ft
Typical Interior Bent (WSDOT Section)Typical Interior Bent (WSDOT Section)
![Page 37: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/37.jpg)
FoundationsFoundations
WSDOT Section Seattle Section
![Page 38: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/38.jpg)
2’
2.5’
FoundationsFoundations
Seattle Section WSDOT Section
17’
13.5’
12’
12’
3.5’
![Page 39: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/39.jpg)
Seattle Section WSDOT Section
Originally intended to use only H-piles
Contractor requested change
Steel piles - 48 tons
All other piles - 40 tons
![Page 40: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/40.jpg)
S. Massachusetts St.
Columbia St.University
St.
Yesler Way
S. Royal Brougham Way
Blanc
hardSubsurfaceSubsurface
DataData
Stewar
t St.
50 shallow borings by SED in 1948
17 deep borings by WSDOH in mid-1950s
Various borings by others
8 borings with SPT
16 CPT soundings with seismic cone
2 deep borings with downhole seismic
![Page 41: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/41.jpg)
100
50
0
-50
-100
-150
Ele
vaio
n (f
t)
Ele
vatio
n (f
t)
100
0
50
-50
-100
-150
Waterfront FillTideflat Deposit
Till
1000 ft
Bla
nch
ard
Ste
war
t
Uni
vers
ity
Yes
ler
Mas
sach
use
tts
Roy
al B
roug
ham
Subsurface ProfileSubsurface Profile
![Page 42: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/42.jpg)
0
50
100
150
0 10 20 30 40 50
Existing Data
SupplementalSubsurfaceInvestigation
Standard Penetration Resistance (blows/ft)
De
pth
(ft)
Uncorrected SPT ResistanceUncorrected SPT Resistance
![Page 43: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/43.jpg)
Uncorrected CPT Tip ResistanceUncorrected CPT Tip ResistanceD
ep
th (
ft)
0
50
100
150
0 100 200 300 400
Cone Penetration Tip Resistance (tsf)
![Page 44: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/44.jpg)
De
pth
Be
low
To
p o
f T
ill (
ft)
Vs (ft/sec)
0
100
150
200
250
50
0 1000 2000 3000
Shear Wave Velocity (ft/sec)
De
pth
Bel
ow
Top
of T
ill (
ft) FederalBuilding
B-1
B-2
Till StiffnessTill Stiffness
Average
![Page 45: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/45.jpg)
-0.5
0
0.5
0 20 40 60 80
Input MotionsInput Motions
• PSHA (10% in 50 yrs = 475-year return period)- Peak acceleration- Spectral velocities- Bracketed duration
• Design-level response spectrum
• Quasi-synthetic time histories
• Deconvolution to produce 3 “bedrock” motions
Acc
eler
atio
n (g
)
Time (sec)
![Page 46: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/46.jpg)
Ground Response AnalysisGround Response Analysis
• Equivalent linear analyses (SHAKE)
• Nonlinear, effective stress analyses (TESS, DESRA)
• Numerous soil profiles
![Page 47: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/47.jpg)
0 20 30 40 5010
Time (sec)
0.6
0.0
-0.6
0.6
0.0
-0.6
0.6
0.0
-0.6
Acc
eler
atio
n (g
)A
ccel
erat
ion
(g)
Acc
eler
atio
n (g
)
10 ft soft soil
50 ft soft soil
100 ft soft soil
Ground Surface MotionsGround Surface Motions
![Page 48: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/48.jpg)
0.0
Period (sec)
1.0 2.0 3.0 4.0 5.00.0
1.0
2.0
0.5
1.5
2.5
S (g)a
Ground Surface Response SpectraGround Surface Response Spectra
10 ft soft soil
50 ft soft soil
100 ft soft soil
![Page 49: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/49.jpg)
Waterfront FillTideflat DepositTill
Waterfront Fill
Tideflat Deposit
Till
100
50
0
-50
-100
-150
Ele
va
tio
n (
ft)
1000'
Pe
ak
Ac
ce
lera
tio
n (
g)
a max
0.0
0.5
Peak AccelerationsPeak Accelerations
![Page 50: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/50.jpg)
Liquefaction SusceptibilityLiquefaction Susceptibility
• Historical evidence
- Sand boils in 1949 and 1965
- Broken pipes in 1949 and 1965
- Lateral movements in 1965
• Construction techniques
- Hydraulic filling
- Dumping through water
• Previous investigations
- Mabey and Youd (1991)
- Grant et al. (1992)
![Page 51: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/51.jpg)
Scenario Earthquake #1 Scenario Earthquake #2
M 7.5 7.5
a max 0.30 g 0.15 g
Displacement (in.)
>100 14 - 100
84 - 100 6 - 48
45 - 84 2 - 12
10 - 45 0 - 4
Little liquefaction susceptibility but in areas with
steep slopes. Liquefaction is unlikely, but if it
were to occur, large displacements are
possible.
No displacement likely due to liquefaction.
Mabey and Youd (1991)
![Page 52: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/52.jpg)
0
10
20
0 5 10 15 20 25 30 35D
epth
(ft
)
(N )1 60
(N )1 60required to prevent
liquefaction
Liquefaction EvaluationLiquefaction EvaluationStandard Penetration Test
![Page 53: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/53.jpg)
0
10
20
30
40
50
0 5 10 15 20 25 30 35
(N )1 60
Dep
th (
ft)
(N )1 60
required to prevent liquefaction
Liquefaction EvaluationLiquefaction EvaluationStandard Penetration Test
![Page 54: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/54.jpg)
0
10
20
30
40
50
60
70
0 0.25 0.5 0.75 1 1.25
FS L
Dep
th (
ft)
SPT-Based Factor of SafetySPT-Based Factor of Safety
![Page 55: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/55.jpg)
Dep
th (
ft)
(q )c 1
(q )c 1required to prevent
liquefaction
(tsf)
0
10
20
0 100 200 300 400 500
Liquefaction EvaluationLiquefaction EvaluationCone Penetration Test
![Page 56: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/56.jpg)
Dep
th (
ft)
(q )c 1 (tsf)
Liquefaction EvaluationLiquefaction EvaluationCone Penetration Test
0
10
20
30
40
50
0 100 200 300 400 500
(q )c 1required to prevent
liquefaction
![Page 57: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/57.jpg)
0
10
20
0 5 10 15 20 25 30 35D
epth
(ft
)
(N )1 60
Design-levelground motion
Liquefaction EvaluationLiquefaction EvaluationComparison with 1965 observations
![Page 58: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/58.jpg)
Dep
th (
ft)
(N )1 60
0
10
20
0 5 10 15 20 25 30 35
Design-levelground motion
1965groundmotion
Liquefaction EvaluationLiquefaction EvaluationComparison with 1965 observations
![Page 59: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/59.jpg)
0
10
20
30
40
50
0 5 10 15 20 25 30 35
(N )1 60
Dep
th (
ft)
Design-levelground motion
Liquefaction EvaluationLiquefaction EvaluationComparison with 1965 observations
![Page 60: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/60.jpg)
0
10
20
30
40
50
0 5 10 15 20 25 30 35
(N )1 60
Dep
th (
ft)
Design-levelground motion
1965groundmotion
Liquefaction EvaluationLiquefaction EvaluationComparison with 1965 observations
![Page 61: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/61.jpg)
0
10
20
30
40
50
60
70
0 1 2 3
FS L
De
pth
(ft)
SPT-Based Factor of SafetySPT-Based Factor of Safety
1965groundmotion
![Page 62: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/62.jpg)
Effects of LiquefactionEffects of Liquefaction
• Sand boils - expected over most of length
• Post-earthquake settlement
- Up to 1” in fill above water table
- Up to 25” in soft, saturated soils
• Vertical pile movement
- Tip capacity reached at r = 0.6
- Tips of southernmost piles in liquefiable soil
• Lateral pile movement
- Depends on lateral soil movement
- 10”-12” expected to cause bending failure
- Lateral soil movement depends on seawall movement
u
All movements variable due to variability of soil profile
![Page 63: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/63.jpg)
Seawall InvestigationSeawall Investigation
• Transverse profile characterization
- 5 additional borings (2 offshore)
- 3 additional CPT soundings
• Seawall structure characterization
- Member sizes
- Member properties
- Connection strengths
• Computational model
- Soil
- Seawall
- Soil-seawall interaction
Estimation of permanent deformations due to liquefaction
FLAC
![Page 64: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/64.jpg)
FLACFLAC
Fast Lagrangian Analysis of Continua
• Explicit finite difference code• Large-strain capabilities• Several soil constitutive models• Structural elements (beams, piles, cables)• Interface elements (normal and shear)• Coupled stress-deformation and flow capabilities• Incremental construction modeling• Graphical display of results• Dynamic option• Creep option• FISH programming language
![Page 65: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/65.jpg)
Alaskan Way Viaduct
Type B Wall ModelType B Wall Model
Entire Section
![Page 66: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/66.jpg)
Alaskan Way Viaduct
Type B Wall ModelType B Wall Model
Entire Section
3400 soil elements610 structural elements
![Page 67: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/67.jpg)
Type B Wall ModelType B Wall Model
![Page 68: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/68.jpg)
Precast Section
Master Pile
Timber Relieving Platform
BatterPiles (12)
VerticalPiles (6)
Type B Wall ModelType B Wall Model
![Page 69: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/69.jpg)
Modeling ApproachModeling Approach
Strain
Stress
G G fi
Strain due to softening
• Primary effects of liquefaction
- Reduction of soil strength
- Reduction of soil stiffness
• Stiffness reduction approach1. Analyze with pre-liquefaction properties
2. Analyze with post-liquefaction properties
3. Subtract pre-liquefaction displacements from post-liquefaction displacements
![Page 70: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/70.jpg)
DisplacementsDisplacements
MaximumDispl = 0.71 ft
![Page 71: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/71.jpg)
Deformed ShapeDeformed Shape
Deformations magnified by factor of 5
![Page 72: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/72.jpg)
Bending MomentsBending Moments
![Page 73: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/73.jpg)
Type B WallType B Wall
Beforeliquefaction
![Page 74: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/74.jpg)
Type B WallType B Wall
Duringliquefaction
![Page 75: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/75.jpg)
Type B WallType B Wall
Afterliquefaction
![Page 76: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/76.jpg)
Fill and Rip Rap WallFill and Rip Rap Wall
Beforeliquefaction
![Page 77: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/77.jpg)
Fill and Rip Rap WallFill and Rip Rap Wall
Duringliquefaction
![Page 78: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/78.jpg)
Fill and Rip Rap WallFill and Rip Rap Wall
Afterliquefaction
![Page 79: The Alaskan Way Viaduct Steve Kramer University of Washington Seattle, Washington.](https://reader036.fdocuments.in/reader036/viewer/2022062322/56649d9f5503460f94a8ae53/html5/thumbnails/79.jpg)
Columbia St.
Madison St.University St.
S. Washington St.
Zones of Large Lateral MovementsZones of Large Lateral Movements