www.gl-nobledenton.com Applied Intelligence Thanet Offshore Wind Farm

Transcript of Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates...

Page 1: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

www.gl-nobledenton.com Applied Intelligence

Thanet Offshore Wind Farm

Page 2: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Thanet History

• Crown Estates Round 2

� 100 x 3MW WTGs to provide 300MW

� 33kV Array to Substation – 132kV to Shore

� Two Export Cables to Richborough Power Station

• July 2005

� GL commenced engineering for Warwick Energy

• September 2007

� CRC acquired TOW

• November 2008

� Vattenfall Wind Power acquired TOW

11/05/2010 2

Page 3: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Thanet Location

11/05/2010 3

Page 4: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Challenge

Financial Closure

through

Project Execution

to

Project Completion

11/05/2010 4

Page 5: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

11/05/2010 5

Thanet Offshore Wind Farm

Vattenfall Wind Power - Client

- Principal Contractor

GL Noble Denton - Project Management Services

- CDM Coordinator

- Marine Warranty Surveyor

- Foundations Installation

Management

Page 6: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

CDM 2007

• Construction Phase Plan (CPP)

• CPP Supporting Procedures

• Principal Contractor

• CDM Coordinator

• Procedures and Risk Assessments

• Authority to Commence Work

11/05/2010 6

Page 7: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Contract Status

• Form of Contract – e.g. Lump Sum

• HSE

• Document Control

• Planning

• Cost Control

• Interfaces

• Risk Management

• Package management

• QA / QC

11/05/2010 7

Page 8: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Level 1 Schedule

11/05/2010 8

Page 9: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Project Organogram

11/05/2010 9

Steering Group / SponsorTBA

Project Director

Ole Bigum Nielsen

Project Engineer

Gordon Clark

Commercial Manager

Chris Hughes-Rees

Construction Manager

Ray Guy

Cost / Contracts

Engineer

Peter Watson

Legal

VAB / ND Consultants

Insurance

MARSH Brokers

Project Support

Sarah Eastmond

Quality

Steve Mason /

Peter McGrath

Programme

Interfaces

Naval Sondhi/

Andy Reed

Foundation Installation

Management

Garry Blowers

Management of all

Foundation Installation

Management Contracts

Document Control

Karolina Kolacynska

Project Assistant

Hanne Kongstad

HS&E Manager

Peter Butler

CDM Practitioner

Kellie Field

Marine Warranty

Noble Denton

Consultants

Certification

DNV

Economic Control

Thomas Olofsson

O&M Site Manager

Jimmy Hansson

QHSE

Gordon Clark

PR & Communications

Mandy Broughton

Offshore Sub-Station

Martin Rendell

Jacket and Piles

Topsides

Loadout / Transportation

Installation and Hook-Up

Services

Risk Management

Peter Butler

Wind Turbines

Poul-Erik Larsen

WTG Installation

Find V Poulsen

SCADA

Lars Højholt

Power Plant Control

Jesper Runge Kristensen

Consents

Royal Haskoning

Kit Hawkins

Electrical

Stig Holm Sørensen

Cable Installation

Stig Holm Sørensen

Export CablesDavid Smail

Foundations

Naval Sondhi

Ramboll Foundations

Design

Transition

Pieces

Monopiles

Andy ReedHS&E

Andy Walker

Marine Coordination

SeaRoc

Port Technicians

Port of Ramsgate

Stephen Reynolds

Client Project Manager

Gordon Clark

Risk Management

Chris Hughes-Rees /

Peter Watson

Inter Array CablesGlen Evertsen

Site ManagerSøren Thor

Cardiff PowerDafydd Rickard

Garrad HassanTerry Foster

Array Cable Reps

• Polar Prince

• Normand Mermaid

Head of HSE

Kevin Lennon

Diving & Tower Crews

• Osiris

• Subocean

Export Cable Reps

• UR101• Shore End Ops

• Discoverer

SAP

John Harrison

Page 10: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Current Status

11/05/2010 10

Monopiles / TPs 100

Cables 89

WTGs 65

Substations 2

Export Cables 1 of 2

Strings Energised 2 of 10

Contracts Placed 77

Operations Building 1

Page 11: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Monopiles in Fabrication

11/05/2010 11

Page 12: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Sea Jack – Used for Monopile and TP Installation

11/05/2010 12

Page 13: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

MPs in Installed with Navigation Aids

11/05/2010 13

Page 14: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

TPs in Yard

11/05/2010 14

Page 15: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

TP Installation

11/05/2010 15

Page 16: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Resolution – Used for TP and WTG Installation

11/05/2010 16

Page 17: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Sea Jack installing TPs

11/05/2010 17

Page 18: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Ramsgate Site

11/05/2010 18

Page 19: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Ramsgate Site Layout

11/05/2010 19

Page 20: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Onshore Substation Richborough

11/05/2010 20

Page 21: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Onshore Export Cable Works - A256

11/05/2010 21

Page 22: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Polar Prince DP Vessel for Cable Lay

11/05/2010 22

Page 23: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Normand Mermaid – Cable Lay

11/05/2010 23

Page 24: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

UR101 – Export Cable Lay

11/05/2010 24

Page 25: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Cable Plough

11/05/2010 25

Page 26: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Euro Duct

11/05/2010 26

Page 27: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Offshore Substation Topsides Construction

11/05/2010 27

Page 28: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Offshore Substation Jacket Construction

11/05/2010 28

Page 29: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Stanislav Yudin – Offshore Substation Installation

11/05/2010 29

Page 30: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Installation of Offshore Substation by Yudin

11/05/2010 30

Page 31: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Offshore Substation Installation by Yudin

11/05/2010 31

Page 32: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Vessels working in the Field – things get busy at times

11/05/2010 32

Page 33: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Offshore Substation Installed

11/05/2010 33

Page 34: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Excalibur – Used for Offshore Substation Hook-up

11/05/2010 34

Page 35: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Met Mast Installation on Offshore Substation

11/05/2010 35

Page 36: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Marine Mammal Observation - 11th April 2009

11/05/2010 36

Page 37: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Installation of WTGs by Resolution

11/05/2010 37

Page 38: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

WTG Installation by Resolution

11/05/2010 38

Page 39: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Lessons Learnt

• Project Management

• CDM 2007

• Contract Status

• Marine Operations

• Design Optimisation

11/05/2010 39

Page 40: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

11/05/2010 40

Project Management

• HSE

• Document Control

• Planning

• Cost Control

• Interfaces

• Risk Management

• Package Management

• QA / QC

Page 41: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Typical Project Management

REDS Diving Support

ABJV Pile Gripper personnel

Dutch Heavy Lift Refurbishment of Pile Gripper

Densit Grouting Services

Fugro Seacore Drilling

IHC Hydrohammer Hammer Rental

IHC Handling Pile Lifting Tool (Rental)

NCS Positioning Base Station

Gardline Marine Mammal Observation

Sea Contractors Harbour Tug Hire

OWPMS Crew Vessel Charter

Gardline Crew Vessel Charter

Subacoustech Noise Monitoring

Envrioserve Guard Vessel

VG Lift Engineering Lift Supervisors

Storm Weather Forecasting

Trinity House Rental of Marker Buoys

Brown and May Herring Survey

Jon Ford Bird Surveyor

Arie Dirk Bird Surveyor

11/05/2010 41

Page 42: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Cost Forecast

• Missing Items

• Accuracy

• Risk Assessment

11/05/2010 42

Page 43: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Marine Operations

• Onshore Site and Marine Support

• CDM-2007 – Safety File

• Construction Vessel Coordination

• Crew Vessel Coordination

• Weather

11/05/2010 43

Page 44: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Design Overview and Optimisation

• String Completion

• Common Monopile Diameters

• Design for Installations

• Cable Installation Methodology

11/05/2010 44

Page 45: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

Conclusions

• Plan the Work – Work the Plan

• Plan Early

• Appreciate Project Status

• Do Not Skimp on Project Management

• Identify and Manage Risk

11/05/2010 45

Page 46: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

11/05/2010 46

For further information visit www.gl-nobledenton.com

Thank you for your attention!

Page 47: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

11/05/2010 47

For further information visit www.gl-nobledenton.com

Thank you for your attention!

Page 48: Thanet Offshore Wind Farm - uni-hamburg.de · 2012. 11. 13. · Thanet History • Crown Estates Round 2 100 x 3MW WTGs to provide 300MW 33kV Array to Substation – 132kV to Shore

11/05/2010 48

For further information visit www.gl-nobledenton.com

Thank you for your attention!