th S.L.C. MEETING HELD ON 25/01/2018 AT 10.00 A.M. IN … · The list of the Members who attended...
Transcript of th S.L.C. MEETING HELD ON 25/01/2018 AT 10.00 A.M. IN … · The list of the Members who attended...
DRAFT MINUTES OF THE 17th
S.L.C. MEETING HELD ON 25/01/2018 AT 10.00 A.M. IN THE CONFERENCE HALL OF
COMMISSIONERATE OF INDUSTRIES, 1st FLOOR, GOVERNMENT OF PRINTING PRESS BUILDINGS, MUTYALAMPADU,
VIJAYAWADA.
The list of the Members who attended the Meeting.
Sl.
No. Members
Name & Designation of Member /
Representative
Sri / Smt.
1. Chairman, State Level Committee. Siddharth Jain, IAS., Chairman of SLC / Commissioner of Industries.
2. Deputy Director to Governemnt, Industries & Commerce Department
D. Ramadevi Deputy Secretary, Industries & Commerce Department.
3. The Commissioner, Commercial Taxes, AP. M. Pampapathi, Addl. Commissioner (CT).
4. The Manager Director, APSFC R.Prabhakar Goud, General Manager.
5. The President, FAPSIA K. Subba Rao, President
6. The Commissioner, Transport Department K. Sankarachari, Asst. Secretary
7. The Commissioner & Inspector General, Registration Stamps Department.
P. Ramalakshmi Patnaik, Asst. Inspector General.
8. The Chief Engineer (Commercial) APTRANSCO B. Sreedhar, DE/Commercial.
9. The Deputy General Manager, SBI G. Venkataramulu, CM CR
10. The President, ALEAP K. Kanaka Durga
11. The Chairman, C.I.I Y. V. Krishna Mohan, Convenor MSME
12. The Chairman, AP Spinning Mill Assosiation. D. Prasad, Chairman.
13. The Managing Director, APIIC M. Venkateswara Rao, GM
14. The Conviner, SLBC, Andhra Bank. KV Rao, AGM
15. The President, DICCI, (AP) K. Sarath, Procurement State Head.
16. The President, FSME APK Reddy, President.
17. The President, AP Chambers of Commerce & Industry Fadaration. T. Parthasaradhi, Executive Director.
18. Member-Convenor, State Level Committee. K. Vijaya Ratnam, Convenor of SLC / Joint Director (II).
The Chairperson of the SLC welcomed the participating members and Special Invitees. The Chairperson requested all the members to introduce themselves. After introduction, the Chairperson explained the initiatives taken up by the Government for the benefits of the entrepreneurs. The SLC observed that the Operational guidelines of IDP 2015-20, issued vide G.O.Ms.No.108 Dated:14.11. 2015 of Industries and Commerce (P&I) department, dated: 14/11/2015, the Interest Subsidy is being sanctioned to various units by following two methods:
:: 2 ::
a) In case of general Micro Small Enterprises, a minimum 3% interest per annum should be borne by the Enterprise. Over and above 3% interest per annum, reimbursement will be done to the extent of maximum 9% for a period of 5 years.
b) In case of textiles, Interest Subsidy provided by Government after taking into account the assistance from all sources, (Centrally Sponsored
TUF scheme, Industrial Policy of the state etc.) shall be capped at 12.5% per annum in a way that maximum Interest Subsidy provided by Government will be up to 8% per annum for Weaving (with or without preparatory), Dyeing & Processing, Knitting, Garment/Made-ups Machine Carpeting, Machine Embroidery, Technical Textiles and any other activities/process like crimping, texturing, twisting, winding, sizing etc. within the textile value chain and up to 7.5% for Spinning & Modern Ginning.
In few cases, where the Textile units have availed Term Loan @11.50% from the Financial Institution and 4% of Interest rebate under TUF scheme, they can avail maximum Interest subsidy @7.50 % resulting the effective interest as 0% only on Term loan utilised. The SLC decided that the issue should brought to the notice of the Government that Micro and Small Enterprises are bearing a minimum of 3% Interest per annum and there is no such minimum rate to be borne by the Textile units. The State Level Committee has also observed that as per para no. (5.4.7) of IIPP 2010-15, “the base annual consumption will be either average annual power consumption of previous three financial years of the Expansion/Diversification project as certified by Chartered Accountant or power consumption for 75% of installed capacity utilization of the original industrial enterprise, whichever is higher. Power consumed over and above the base consumption will be eligible for reimbursement of power cost. If the Enterprise/Industry taken up expansion/diversification in the same year, the base power consumption will be calculated proportionately.”
Where as in the IDP 2015-20 policy, the para No. 5.6.8 indicates that “the base annual consumption will be either average annual power consumption of previous three financial years of the expansion / diversification project as certified by Chartered Accountant or power consumption for 75% of connected power load of the original Industrial Enterprise, whichever is higher. Power consumed over and above the base consumption will be eligible for reimbursement of power cost. If the Enterprise /Industry has taken up expansion/diversification in the same year, the base power consumption will be calculated proportionately.” The SLC observed that connected load will always more than the actual power consumed because the connected load is calculated as the total electric power-consuming rating of all devices (as lamps or motors) connected to a distribution system and it is being computed for 24 hours in a day and 350 days in a year (connected load in KVA X 24 hours X 350 days). Hence in all cases, the 75% of the connected load will be the maximum value which has to be fixed as base annual consumption. Therefore the committee observed that the connected load may not be taken in to consideration for fixing the base consumption.
Item wise decision of the 16th State Level Committee is as follows:
Agenda
Item Brief Description of the issue Decision of the Committee
1 Follow up action on the minutes of the previous Meeting
held on 29/12/2017.
Noted.
:: 3 ::
Brief Description of the issue SVC Opinion Decision of the Committee
2.
Change of name and Management fro,
M/s.Bogeashavara Polymers Private Limited to
M/s.Pavani Polymers Private Limited, Gadigirevula (V),
Gadivemula (M), Kurnool.
Opined to accord permission
for change of management &
name subject to executing the
agreement bond to the
satisfaction of the Commercial
Tax Department by both the
managements.
SLC discussed the issue in
detailed and agreed the opinion
of SVC.
3 Clarification on Power Cost reimbursement to
M/s.Amara Raja Batteries Limited, Chittoor District
SVC examined the issue in
detailed and opined that SLC
may take a view as it is policy
decision.
SLC examined the issue in
detailed and decided to sanction
the reimbursement of power cost
from the date of power
connection changed to the
M/s.Amara Raja Batteries
Limited.
4 Clarification on release of Incentives to M/s.Jaypee
Balaji Cement Plant, Budawada (V), Jaggaiahpeta (M),
Krishna Dist.
SVC examined the issue in
detailed and opined that as
Ultra Tech Cement Ltd. has
given NOC, incentives may be
released to M/s.Jaypee Balaji
Cement Plant.
Deferred. SLC advised to the
both the representatives to submit
their openion along with Board
resolution for authoring the
representatives.
5 Permission for change of Name and Management from
M/s.Sai Manasa Spintex India Limited to M/s. Hetro
Spinners Limited
SVC opined that permission
may be accorded for change of
management & unit’s name
subject to executing the
agreement bond to the
satisfaction of the Commercial
Tax Department by both the
managements.
SLC discussed the issue in
detailed and agreed the opinion
of SVC.
6 Permission for change of Name from M/s. Teamec
Chlorate Limited to M/s. Chemfab Alkalis Limited.
SVC opined that the industry
may be accorded permission
for change of unit’s name.
without change of
management.
SLC discussed the issue in
detailed and agreed the opinion
of SVC.
:: 4 ::
7
Rejection for sanction of various incentives:
S.
No
Name & Address of the
Unit filed claims in
Meeseva
No. of
claims Reason
1 M/s Naga Sindhu
Spinning Mills Pvt.
Ltd (Expansion)
1-Power Repeated
claim
2 M/s NG Fertilizers and
Chemicals Pvt. Ltd,
3-Sales Tax Repeated
claims
3 M/s Swarnalatha
Spintex Pvt. Ltd.,
1-Interest Repeated
claim
4 M/s Laila
Nutraceuticals
(Expansion)
4- Power Short falls
not filed
since long
time
5 M/s Godrej Agrovet
Limited, Krishna
District
1–Stamp
duty Land is on
other
unit’s
name
SVC opined to reject all the
proposals except Sl.No.(4)
where it is advised to issue final
notice for submission of claims.
SLC discussed the issue in
detailed and agreed the opinion
of SVC. Further, SLC advised to
issue final notice to M/s Laila
Nutraceuticals (Expansion) for
submission of required
shortfall documents within 15
days from the date of shortfall
notice received.
Further, the SLC advised the
representatives of M/s Godrej
Agrovet Limited, Krishna
District to approach after
transfer of the land documents
on the Company’s name for
sanction of reimbursement of
Stamp duty.
2 Claim applications for sanction / rejection of Reimbursement of Interest Subsidy, Reimbursement of Power Cost,
Reimbursement of sales tax, Mortgage duty & Stmp duty under IIPP – 2005-10, IIPP 2010-15 & IDP 2015-20 scrutinised &
recommended by the SVC to the SLC in its Meeting held on 14/09/2017, 14/11/2017 & 04/01/2018, the details are as follows:
ABSTRACT
Type of
Incentives
No. of
claims
No. of
Industries
Amount
Recommended by
SVC in Rs.
Amount
sanctioned by
SLC
Interest Subsidy 19 14 13,55,92,529 13,55,92,529
Mortgage Duty 2 2 2,65,665 2,65,665
Power cost 131 43 36,46,73,735 36,04,73,735
Sales Tax 13 11 17,40,32,090 17,40,32,090
Stamp Duty 2 2 13,41,620 13,41,620
:: 5 ::
Total 167 72 67,59,05,639 67,17,05,639
Rs. in Crores 67.59 67.17 67.59
(the proposal of M/s Samyu Glass is diferred)
DISTRICT WISE ABSTRACT
S.No. District No. of Claims
No. of industries Amount sanctioned by
SLC Rs. in crores
1 Chittoor 13 1 4.07
2 East Godavari 1 1 0.56
3 Guntur 102 32 33.36
4 Kadapa 3 2 0.14
5 Krishna 8 5 2.30
6 Kurnool 3 1 0.16
7 Nellore 4 3 11.52
8 Prakasam 14 7 3.68
9 Srikakulam 3 1 6.07
10 Visakhapatnam 4 3 1.90
11 Vizianagaram 1 1 1.57
12 West Godavari 11 6 1.83
Total 167 63 67.17
:: 6 ::
LIST OF UNIT WISE PROPOSALS PLACED BEFORE SLC MEETING HELD ON 25/01/2018
Sl.
No.
Date of
receipt
of claim
Name & address of
the Industry District
Line of
activity
Date of
Commence
ment of
commercial
production
Nature of
incentives Policy
SCV recommened
amount
Quarter
/ half
year
Year Decision of
SLC
1 30/12/12 India Metal One Steel
Plate Processing (P)
Ltd., SEZ, Sricity,
Chittoor District
Chittoor Fabricated
Structures
Products of
Iron & Steel
01/08/12 Stamp Duty IIPP
2010-15
Rs. 10,68,850/-
(Rupees ten lakhs sixty
eight thousand eight
hundred and fifty only)
2012-13 Agreed
2 12/07/13 India Metal One Steel
Plate Processing (P)
Ltd., SEZ, Sricity,
Chittoor District
Chittoor Fabricated
Structures
Products of
Iron & Steel
01/08/12 Power cost IIPP
2010-15
Rs. 14,409/- (Rupees
fourteen thousand four
hundred and nine only)
1st half
year 2012-13 Agreed
3 12/07/13 India Metal One Steel
Plate Processing (P)
Ltd., SEZ, Sricity,
Chittoor District
Chittoor Fabricated
Structures
Products of
Iron & Steel
01/08/12 Power cost IIPP
2010-15
Rs. 5,44792/- (Rupees
five lakhs forty four
thousand seven
hundred and ninety
two only)
2nd
half
year
2012-13 Agreed
4 12/07/13 India Metal One Steel
Plate Processing (P)
Ltd., SEZ, Sricity,
Chittoor District
Chittoor Fabricated
Structures
Products of
Iron & Steel
01/08/12 Sales Tax IIPP
2010-15
Rs. 6,40,990/- (Rupees
six lakhs forty
thousand nine hundred
and ninety only)
2012-13 Agreed
5 28/10/13 The KCP Limited,
KCP Cement unit-II,
Kuktyala Vikkage,
Jaggaiapeta (M),
Krishna Dist
Krishna Cement 29/10/11 Power cost IIPP
2010-15
Rs. 51,51,482/-
(Rupees fifty one lakhs
fifty one thousand four
hundred and eighty
two only)
1st
quarter
(defere
nce
amount
)
2013-14 Agreed
6 22/03/14 India Metal One Steel
Plate Processing (P)
Ltd., SEZ, Sricity,
Chittoor District
Chittoor Fabricated
Structures
Products of
Iron & Steel
01/08/12 Power cost IIPP
2010-15
Rs. 10,00,335/-
(Rupees ten lakhs three
hundred and thirty five
only)
1st half
year 2013-14 Agreed
7 22/03/14 India Metal One Steel
Plate Processing (P)
Ltd., SEZ, Sricity,
Chittoor District
Chittoor Fabricated
Structures
Products of
Iron & Steel
01/08/12 Power cost IIPP
2010-15
Rs. 7,67075/- (Rupees
seven lakhs sixty seven
thousand and seventy
five only)
2nd
half
year
2013-14 Agreed
8 25/08/14 NSL Textiles Ltd,
APIIC, Near JNTU,
Pulivendula , Kadapa
Dist
Kadapah Cotton
Yarn
31/03/10 Sales Tax IIPP
2005-10
Rs. 12,17,881/-
(Rupees twelve lakhs
seventeen thousand
eight hundred and
eighty one only)
2013-14 Agreed
:: 7 ::
9 15/09/14 India Metal One Steel
Plate Processing (P)
Ltd., SEZ, Sricity,
Chittoor District
Chittoor Fabricated
Structures
Products of
Iron & Steel
01/08/12 Sales Tax IIPP
2010-15
Rs. 23,12,942/-
(Rupees twenty three
lakhs twelve thousand
nine hundred and forty
two only)
2013-14 Agreed
10 21/10/14 Godrej Agrovet Ltd.,
Rs.276, Kanuru,
Bapulapadu (M),
Krishna District
Krishna Other
animal &
Bird feed
16/05/14 Power cost IIPP
2010-15
Rs. 11,54,355/-
(Rupees eleven lakhs
fifty four thousand
three hundred and fifty
five only)
1st half
year 2014-15 Agreed
11 05/11/14 India Metal One Steel
Plate Processing (P)
Ltd., SEZ, Sricity,
Chittoor District
Chittoor Fabricated
Structures
Products of
Iron & Steel
01/08/12 Power cost IIPP
2010-15
Rs. 10,81,560/-
(Rupees ten lakhs
eighty one thousand
five hundred and sixty
only)
1st half
year 2014-15 Agreed
12 25/12/14 Bogeshwara Polymers
(P) Ltd., Gadigarevula
(V) & (M), Kurnool
District
Kurnool PP Woven
Sacks
07/07/14 Power cost IIPP
2010-15
Rs. 2,54,390/- (Rupees
two lakhs fifty four
thousand three hundred
and ninety only)
1st half
year 2014-15 Agreed
13 24/03/15 Sai Manasa Spintex
(India) Ltd.,
(Expansion)G.T.
Road, Martur (V&M),
Prakasam District
Prakasam Cotton
Yarn
01/07/14 Power cost IIPP
2010-15
Rs. 6,69,350/- (Rupees
six lakhs sixty nine
thousand three hundred
and fifty only)
1st half
year 2014-15 Agreed
14 24/03/15 Sai Manasa Spintex
(India) Ltd (Existing).,
G.T. Road, Martur
(V&M), Prakasam
District
Prakasam Cotton
Yarn
14/01/11 Power cost IIPP
2010-15
Rs. 30,59,170/-
(Rupees thirty lakhs
fifty nine thousand one
hundred and seventy
only)
2nd
half
year
2015-16 Agreed
15 06/05/15 Aurabindo Pharma
Ltd.(Unit-XI
expansion),
Pydibheemavaram
(V), Ranstalam (M),
Srikakulam District:
Srikakulam Bulk drugs 18/08/11 Power cost IIPP
2010-15
Rs. 79,32,470/-
(Rupees seventy nine
lakhs thirty two
thousand four hundred
and seventy only)
2nd
half
year
2014-15 Agreed
16 16/05/15 Godrej Agrovet Ltd.,
Rs.276, Kanuru,
Bapulapadu (M),
Krishna District
Krishna Other
animal &
Bird feed
16/05/14 Power cost IIPP
2010-15
Rs. 19,01,535/-
(Rupees nineteen lakhs
one thousand five
hundred and thirty five
only)
2nd
half
year
2014-15 Agreed
17 10/06/15 Seeds Intimate
Apparel India (P)
Ltd., Plot No.11,
BIAC, SEZ,
Visakhapat
nam
Lingerie
(Bralette)
04/07/11 Power cost IIPP
2010-15
Rs. 11,86,980/-
(Rupees eleven lakhs
eighty six thousand
nine hundred and
2nd
half
year
2014-15 Agreed
:: 8 ::
Pudimadaka Road,
Athuthapuram (M),
Visakhapatnam
District
eighty only)
18 27/06/15 Bogeshwara Polymers
(P) Ltd., Gadigarevula
(V) & (M), Kurnool
District
Kurnool PP Woven
Sacks
07/07/14 Power cost IIPP
2010-15
Rs. 7,33,901/- (Rupees
seven lakhs thirty three
thousand nine hundred
and one only)
2nd
half
year
2014-15 Agreed
19 09/09/15 India Metal One Steel
Plate Processing (P)
Ltd., SEZ, Sricity,
Chittoor District
Chittoor Fabricated
Structures
Products of
Iron & Steel
01/08/12 Power cost IIPP
2010-15
Rs. 14,58,015/-
(Rupees fourteen lakhs
fifty eight thousand
and fifteen only)
2nd
half
year
2014-15 Agreed
20 11/09/15 India Metal One Steel
Plate Processing (P)
Ltd., SEZ, Sricity,
Chittoor District
Chittoor Fabricated
Structures
Products of
Iron & Steel
01/08/12 Sales Tax IIPP
2010-15
Rs. 54,91,289/-
(Rupees fifty four
lakhs ninety one
thousand two hundred
and eighty nine only)
2014-15 Agreed
21 16/10/15 India Metal One Steel
Plate Processing (P)
Ltd., SEZ, Sricity,
Chittoor District
Chittoor Fabricated
Structures
Products of
Iron & Steel
01/08/12 Power cost IIPP
2010-15
Rs. 18,54,517/-
(Rupees eighteen lakhs
fifty four thousand five
hundred and seventeen
only)
1st half
year 2015-16 Agreed
22 23/10/15 Aurabindo Pharma
Ltd.(Unit-XI
expansion),
Pydibheemavaram
(V), Ranstalam (M),
Srikakulam District:
Srikakulam Bulk drugs 18/08/11 Power cost IIPP
2010-15
Rs. 2,69,28,358/-
(Rupees two crores
sixty nine lakhs twenty
eight thousand three
hundred and fifty eight
only)
1st half
year 2015-16 Agreed
23 27/10/15 Sai Manasa Spintex
(India) Ltd.,
(Expansion)G.T.
Road, Martur (V&M),
Prakasam District
Prakasam Cotton
Yarn
01/07/14 Power cost IIPP
2010-15
Rs. 16,22,041/-
(Rupees sixteen lakhs
twenty two thousand
and forty one only)
1st half
year 2015-16 Agreed
24 15/12/15 Ravali Spinners Pvt
Ltd. (Expn-3), 13-
194,, Khandavalli (V),
Peravali (M), West
Godavari District
West
Godavari
Cotton
Yarn
14/05/15 Stamp Duty IDP
2015-20
Rs. 2,72,770/- (Rupees
two lakhs seventy two
thousand seven
hundred and seventy
only)
2015-16 Agreed
25 15/12/15 Ravali Spinners Pvt
Ltd. (Expn-3), 13-
194,, Khandavalli (V),
Peravali (M), West
Godavari District
West
Godavari
Cotton
Yarn
14/05/15 Mortgage
Duty
IDP
2015-20
Rs. 72,155/- (Rupees
seventy two thousand
one hundred and fifty
five only)
2015-16 Agreed
26 17/12/15 Seeds Intimate Visakhapat Lingerie 04/07/11 Power cost IIPP Rs. 15,08,940/- 1st half 2015-16 Agreed
:: 9 ::
Apparel India (P)
Ltd., Plot No.11,
BIAC, SEZ,
Pudimadaka Road,
Athuthapuram (M),
Visakhapatnam
District
nam (Bralette) 2010-15 (Rupees fifteen lakhs
eight thousand nine
hundred and forty
only)
year
27 29/12/15 Uma Spintex India
Pvt Ltd, (Expansion)
Rs No: 523 to 526,
Tamirisa (V),
Nandivada (M),
Krishna Dist
Krishna Cotton
Yarn
27/05/15 Mortgage
Duty
IDP
2015-20
Rs. 1,93,510/- (Rupees
one lakh ninety three
thousand five hundred
and ten only) 2015-16 Agreed
28 26/03/16 Growel Processors (P)
Ltd., Rs.No.8/5 & 8/6,
Main Road,
Singarayapalem,
Mudinepalli (M),
Krishna District
Krishna Processing
of Fish
shrimp
09/05/15 Power cost IDP
2015-20
Rs. 9,91,914/- (Rupees
nine lakhs ninety one
thousand nine hundred
and fourteen only)
1st half
year 2015-16 Agreed
29 29/03/16 Sai Manasa Spintex
(India)
Ltd.(Expansion), G.T.
Road, Martur (V&M),
Prakasam District
Prakasam Cotton
Yarn
01/07/14 Interest
Subsidy
IIPP
2010-15
Rs. 12,63,351/-
(Rupees twelve lakhs
sixty three thousand
three hundred and fifty
one only)
1st half
year 2015-16 Agreed
30 29/03/16 Sai Manasa Spintex
(India) Ltd., G.T.
Road, Martur (V&M),
Prakasam District
Prakasam Cotton
Yarn
14/01/11 Interest
Subsidy
IIPP
2010-15
Rs. 33,23,131/-
(Rupees thirty three
lakhs twenty three
thousand one hundred
and thirty one only)
1st half
year 2015-16 Agreed
31 30/03/16 Godrej Agrovet Ltd.,
Rs.276, Kanuru,
Bapulapadu (M),
Krishna District
Krishna Other
animal &
Bird feed
16/05/14 Power cost IIPP
2010-15
Rs. 25,20,750/-
(Rupees twenty five
lakhs twenty thousand
seven hundred and
fifty only)
1st half
year 2015-16 Agreed
32 30/03/16 Sri Lakshmi Godavari
Spinning Mills
Ltd.(2nd expansion),
S.No.113, Chebrolu
(V&M), Guntur
District
Guntur Cotton
Yarn
22/03/13 Interest
Subsidy
IIPP
2010-15
Rs. 1,17,69,529/-
(Rupees one crore
seventeen lakhs sixty
nine thousand five
hundred and twenty
nine only)
1st half
year 2015-16 Agreed
33 30/03/16 Sri Venkata Lakshmi
Narasimha Spinning
Mills (P) Ltd.
(Expansion),
Guntur Cotton
Yarn
20/11/14 Interest
Subsidy
IIPP
2010-15
Rs. 29,28,145/-
(Rupees twenty nine
lakhs twenty eight
thousand one hundred
1st half
year 2015-16 Agreed
:: 10 ::
S.No.176/4, Near
Reddy Palem Donda,
Chebrolu (M), Guntur
District
and forty five only)
34 30/03/16 Sri Venkata Siva
Parvathi Spinning
Mills (P) Ltd. (Unit-
II), S.No.414/1,2,3,
Pathareddy Palem
(V), Chebrolu (M),
Guntur District
Guntur Cotton
Yarn
10/05/12 Interest
Subsidy
IIPP
2010-15
Rs. 1,34,81,354/-
(Rupees one crore
thirty four lakhs eighty
one thousand three
hundred and fifty four
only)
1st half
year 2015-16 Agreed
35 31/03/16 Anjalee Granites (P)
Ltd, Plot No: 32,
BPSEZ, Annagi (V),
Maddipadu (M),
Prakasam dist
Prakasam Granite
Cutting and
Polishing
16/01/11 Power cost IIPP
2010-15
Rs. 21,32,570/-
(Rupees twenty one
lakhs thirty two
thousand five hundred
and seventy only)
1st half
year 2015-16 Agreed
36 31/03/16 Bogeshwara Polymers
(P) Ltd., Gadigarevula
(V) & (M), Kurnool
District
Kurnool PP Woven
Sacks
07/07/14 Power cost IIPP
2010-15
Rs. 6,29,355/- (Rupees
six lakhs twenty nine
thousand three hundred
and fifty five only)
1st half
year 2015-16 Agreed
37 31/03/16 Krishna Sai Exports,
Maddepadu, Prakasam
District
Prakasam Polished
Granite
16/03/11 Power cost IIPP
2010-15
Rs. 9,43,190/- (Rupees
nine lakhs forty three
thousand one hundred
and ninety only)
1st half
year 2015-16 Agreed
38 29/04/16 Aurabindo Pharma
Ltd.(Unit-XI
expansion),
Pydibheemavaram
(V), Ranstalam (M),
Srikakulam District:
Srikakulam Bulk drugs 18/08/11 Power cost IIPP
2010-15
Rs. 2,58,85,782/-
(Rupees two crores
fifty eight lakhs eighty
five thousand seven
hundred and eighty
two only)
2nd
half
year
2015-16 Agreed
39 03/05/16 India Metal One Steel
Plate Processing (P)
Ltd., SEZ, Sricity,
Chittoor District
Chittoor Fabricated
Structures
Products of
Iron & Steel
01/08/12 Power cost IIPP
2010-15
Rs. 18,71,302/-
(Rupees eighteen lakhs
seventy one thousand
three hundred and two
only)
2nd
half
year
2015-16 Agreed
40 16/05/16 Krishna Sai Exports,
Maddepadu, Prakasam
District
Prakasam Polished
Granite
16/03/11 Power cost IIPP
2010-15
Rs. 6,84,870/- (Rupees
six lakhs eighty four
thousand eight hundred
and seventy only)
2nd
half
year
2015-16 Agreed
41 17/05/16 Samyu Glass (P) Ltd.,
Plot No.11, ID Park,
Sy.No.526, 531, 532
& 533,
Gundlamadugu (V),
Kadapah Glass &
Glass
products
28/02/11 Power cost IIPP
2010-15
Rs. 42,03,950/-
(Rupees forty two
lakhs three thousand
nine hundred and fifty
only)
2nd
half
year
2015-16
Deferred
and advised
the GM,
DIC to
submit a
:: 11 ::
Thondur (M), Kadapa
District
detailed
report on
the working
status of the
unit.
42 17/05/16 Teamec Chlorates
Ltd., Plot No:558
&559, Industrial
Growth Centre,
Gundlapalli (V),
Maddipadu(M),
Prakasam District
Prakasam Sodium
Chloride &
Hydrogen
21/02/12 Power cost IIPP
2010-15
Rs. 1,52,30,370/-
(Rupees one crore fifty
two lakhs thirty
thousand three hundred
and seventy only)
2nd
half
year
2015-16 Agreed
43 20/05/16 J.C. Biotech Private
Limited, Plot No.548
To 550, Igc,
Gundlapadu (V),
Maddipadu (M),
Prakasam District
Prakasam Bio
Pharmacetic
als
25/05/11 Sales Tax IIPP
2010-15
Rs. 16,08,850/-
(Rupees sixteen lakhs
eight thousand eight
hundred and fifty only) 2015-16 Agreed
44 13/06/16 My Home Industries
Ltd. (Expansion),
Mulakalapalli (V),
Yelamanchi (M),
Visakhapatnam
District:
Visakhapat
nam
Cement 23/03/12 Sales Tax IIPP
2010-15
Rs. 1,52,28,208/-
(Rupees one crore fifty
two lakhs twenty eight
thousand two hundred
and eight only)
2015-16 Agreed
45 14/07/16 India Metal One Steel
Plate Processing (P)
Ltd., SEZ, Sricity,
Chittoor District
Chittoor Fabricated
Structures
Products of
Iron & Steel
01/08/12 Sales Tax IIPP
2010-15
Rs. 2,25,61,050/-
(Rupees two crores
twenty five lakhs sixty
one thousand and fifty
only)
2015-16 Agreed
46 28/07/16 Sai Manasa Spintex
(India) Ltd.,
(Expansion)G.T.
Road, Martur (V&M),
Prakasam District
Prakasam Cotton
Yarn
01/07/14 Power cost IIPP
2010-15
Rs. 22,70,309/-
(Rupees twenty two
lakhs seventy thousand
three hundred and nine
only)
2nd
half
year
2015-16 Agreed
47 19/08/16 South India Krishna
Oil And Fats Private
Limited,
275,279,280,281,
Epuru Bit-
1b,Nellore,,524344
Nellore Refined
Vegetable
Oil And
Margarine
28/09/11 Sales Tax IIPP
2010-15
Rs. 7,64,27,964/-
(Rupees Seven Crores
Sixty Four Lakhs
Twenty Seven
Thousand Nine
Hundred and Sixty
Four only)
2015-16 Agreed
48 15/09/16 KP Polyolefin Sacks
Pvt., Ltd., ,
913,Padamati Nagula
Nellore Plastics 03/08/12 Power cost IIPP
2010-15
Rs. 22,11,304/-
(Rupees Twenty Two
Lakhs Eleven
2nd
half
year
2015-16 Agreed
:: 12 ::
Doruvu,Nellore,,5243
23
Thousand Three
Hundred and Four
only)
49 23/09/16 KP Polyolefin Sacks
Pvt., Ltd., ,
913,Padamati Nagula
Doruvu,Nellore,,5243
23
Nellore PP Woven
Sacks,
Tarpaulin
And Fabric
03/08/12 Sales Tax IIPP
2010-15
Rs. 34,31,226/-
(Rupees Thirty Four
Lakhs Thirty One
Thousand Two
Hundred and Twenty
Six only)
2015-16 Agreed
50 24/09/16 NSL Textiles Limited,
371 To
382,Kunchalavaripale
m,Kuncharlavaripale
m,,522311
Guntur Weaving,
Yarn Dying
And
Procesing
31/03/10 Sales Tax IIPP
2005-10
Rs. 9,87,411/- (Rupees
Nine Lakhs Eighty
Seven Thousand Four
Hundred and Eleven
only)
2015-16 Agreed
51 24/09/16 NSL Textiles Limited,
APIIC,Near
Jntuec,Pulivendula,,51
6390
Kadapa Spinning 31/03/10 Sales Tax IIPP
2005-10
Rs. 2,95,685/- (Rupees
Two Lakhs Ninety
Five Thousand Six
Hundred and Eighty
Five only)
2015-16 Agreed
52 25/09/16 Growel Processors (P)
Ltd., Rs.No.8/5 & 8/6,
Main Road,
Singarayapalem,
Mudinepalli (M),
Krishna District
Krishna Processing
of Fish
shrimp
09/05/15 Power cost IIPP
2010-15
Rs. 22,81,635/-
(Rupees Twenty Two
Lakhs Eighty One
Thousand Six Hundred
and Thirty Five only)
2nd
half
year
2015-16 Agreed
53 26/09/16 Sri Srinivasa Spintex
India Ltd – Expansion
- I, 8-104,
Pedatadepalli,
Tadepalligudem,,5341
01
West
Godavari
Cotton
Yarn
01/01/11 Power cost IIPP
2010-15
Rs. 15,52,602/-
(Rupees Fifteen Lakhs
Fifty Two Thousand
Six Hundred and Two
only)
3rd
quarter 2015-16 Agreed
54 26/09/16 Krishnapatnam Oils
And Fats Pvt Ltd, 292
317, Pantapalem,
Muthukur,,524323
Nellore Refining
Cum
Fractionatio
n Of
Vegetable
Oils
22/06/10 Sales Tax IIPP
2005-10
Rs. 3,31,15,992/-
(Rupees Three Crores
Thirty One Lakhs
Fifteen Thousand Nine
Hundred and Ninety
Two only)
2015-16 Agreed
55 27/09/16 Kanoria Chemicals &
Industries Limited,
Visakhapatnam
Visakhapat
nam
Chemicals 06/01/11 Power cost IIPP
2010-15
Rs. 10,46,379/-
(Rupees Ten Lakhs
Forty Six Thousand
Three Hundred and
Seventy Nine only)
2nd
half
year
2015-16 Agreed
56 27/09/16 Yindu Textiles Private
Limited, 46,
Krishna Cotton
Spinning
03/11/15 Interest
Subsidy
IDP
2015-20
Rs. 87,70,609/-
(Rupees Eighty Seven
2nd
half 2015-16 Agreed
:: 13 ::
Tirumalagiri,
Tirumalagiri,,521178
Lakhs Seventy
Thousand Six Hundred
and Nine only)
year
57 28/09/16 Hues Granites Private
Limited, Plot
26,Bpsez
Annangi,Annangi,,52
3211
Prakasam Granite
Cutting
And
Polishing
27/10/14 Power cost IIPP
2010-15
Rs. 6,90,543/- (Rupees
Six Lakhs Ninety
Thousand Five
Hundred and Forty
Three only)
1st half
year 2015-16 Agreed
58 28/09/16 Sree Satyanarayana
Spinning Mills
Limited, Pb
No.3,Srinivasa
Talkiies
Road,Tanuku,,534215
West
Godavari
Cotton
Yarn
30/09/15 Interest
Subsidy
IDP
2015-20
Rs. 39,32,987/-
(Rupees Thirty Nine
Lakhs Thirty Two
Thousand Nine
Hundred and Eighty
Seven only)
2nd
half
year
2015-16 Agreed
59 28/09/16 Anjalee Granites (P)
Ltd, Plot No: 32,
BPSEZ, Annagi (V),
Maddipadu (M),
Prakasam dist
Prakasam Granite
Cutting and
Polishing
16/01/11 Power cost IIPP
2010-15
Rs. 10,16,140/-
(Rupees Ten Lakhs
Sixteen Thousand One
Hundred and Forty
only)
3rd
quarter 2015-16 Agreed
60 28/09/16 NSL Textiles Limited,
253,Budampadu,Gunt
ur,,522017
Guntur Garmenting 30/06/10 Sales Tax IIPP
2005-10
Rs. 5,31,908/- (Rupees
Five Lakhs Thirty One
Thousand Nine
Hundred and Eight
only)
2015-16 Agreed
61 29/09/16 Jyotirmaye Textiles
Private Limited, 41/1
And 41/3,
Ramireddypet,
Narasaraopet,,522601
Guntur Cotton
Yarn
18/06/15 Interest
Subsidy
IDP
2015-20
Rs. 1,35,75,885/-
(Rupees One Crore
Thirty Five Lakhs
Seventy Five
Thousand Eight
Hundred and Eighty
Five only)
2nd
half
year
2015-16 Agreed
62 29/09/16 Jyotirmaye Textiles
Pvt Ltd, 41/1 And
41/3, Gorijavolu,
Narasaraopet,,522601
Guntur Cotton
Yarn
04/02/11 Interest
Subsidy
IIPP
2010-15
Rs. 52,52,735/-
(Rupees Fifty Two
Lakhs Fifty Two
Thousand Seven
Hundred and Thirty
Five only)
2nd
half
year
2015-16 Agreed
63 29/09/16 Rayani Spintex
Private Limited , 82-
1b,Dhullipalla,Satena
palle,,522412
Guntur Cotton
Yarn
Spinning
16/11/11 Interest
Subsidy
IIPP
2010-15
Rs. 47,93,809/-
(Rupees Forty Seven
Lakhs Ninety Three
Thousand Eight
Hundred and Nine
only)
2nd
half
year
2015-16 Agreed
64 29/09/16 Sri Naga Malleswara Guntur Cotton 03/04/12 Interest IIPP Rs. 51,09,923/- 2nd 2015-16 Agreed
:: 14 ::
Spintex (India) Pvt
Ltd, 229/28
26,Rajupalem
Village,Rajupalem,,52
2412
Yarn
Spinning
Subsidy 2010-15 (Rupees Fifty One
Lakhs Nine Thousand
Nine Hundred and
Twenty Three only)
half
year
65 30/09/16 Royale Marine Imp
Ex Private Limited,
37/2b,37/4,42/4,Tulasi
Nagar, Kavurivari
Palem,
Chirala,,523166
Prakasam Prawn
Processing,
Frozen
Shrimp
22/12/14 Power cost IIPP
2010-15
Rs. 22,78,390/-
(Rupees Twenty Two
Lakhs Seventy Eight
Thousand Three
Hundred and Ninety
only)
2nd
half
year
2015-16 Agreed
66 30/09/16 Sri Lakshmi Godavari
Spinning Mills Ltd,
113,Chebrolu,Guntur,,
522212
Guntur Cotton
Yarn
Spinning
22/03/13 Interest
Subsidy
IIPP
2010-15
Rs. 1,11,86,411/-
(Rupees One Crore
Eleven Lakhs Eighty
Six Thousand Four
Hundred and Eleven
only)
2nd
half
year
2015-16 Agreed
67 30/09/16 Sri Sai Balaji Spintex
(India) Private
Limited, 403a,403b,
Unnava,
Guntur,,522233
Guntur Cotton
Yarn
Spinning
14/04/11 Interest
Subsidy
IIPP
2010-15
Rs. 85,25,118/-
(Rupees Eighty Five
Lakhs Twenty Five
Thousand One
Hundred and Eighteen
only)
2nd
half
year
2015-16 Agreed
68 30/09/16 Steel Exchange India
Limited, 88-
4p.....,Srirampuram
Village,Vizianagaram,
,535161
Vizianagara
m
Iron & Steel 01/10/10 Sales Tax IIPP
2010-15
Rs. 1,5671,983/-
(Rupees One Crore
fifty Six Lakhs
Seventy One Thousand
Nine Hundred and
Eighty Three only)
2nd
half
year
2015-16 Agreed
69 30/09/16 Thatavarthi Apparels
Ltd, 104b
104c,Appapuram
Road, Kavuru
Village,Chilakaluripet
,,522611
Guntur Cotton
Yarn
Spinning
20/05/11 Interest
Subsidy
IIPP
2010-15
Rs. 71,39,055/-
(Rupees Seventy One
Lakhs Thirty Nine
Thousand and Fifty
Five only)
2nd
half
year
2015-16 Agreed
70 30/09/16 Lohiya Edible Oils
Pvt Ltd, 25,I D A
Vakalapudi,
Kakinada, 533005
East
Godavari
Edible Oil
Refinery
03/07/10 Power cost IIPP
2010-15
Rs. 56,49,416/-
(Rupees Fifty Six
Lakhs Forty Nine
Thousand Four
Hundred and Sixteen
only)
2015-16 Agreed
71 18/10/16 Sri Dhanalakshmi
Cotton And Rice
Mills Pvt Ltd,
Guntur Cotton
Yarn
04/01/14 Power cost IIPP
2010-15
Rs. 63,98,379/-
(Rupees Sixty Three
Lakhs Ninety Eight
2nd
half
year
2015-16 Agreed
:: 15 ::
460,Maruthi Nagar,
Boppudi,Chilakalurip
et,,522626
Thousand Three
Hundred and Seventy
Nine only)
72 25/10/16 Sri Venkata
Umasankar Spintex
Private Ltd, 33
35/1,Nrt
Road,Vemavaram,,52
2529
Guntur Cotton
Yarn
Spinning
29/06/13 Interest
Subsidy
IIPP
2010-15
Rs. 76,93,131/-
(Rupees Seventy Six
Lakhs Ninety Three
Thousand One
Hundred and Thirty
One only)
2nd
half
year
2015-16 Agreed
73 28/10/16 Gajavelli Spinning
Mills Private Limited,
1216/1 2,Chebrolu
Village,Guntur,,52221
2
Guntur Cotton
Yarn
19/09/11 Interest
Subsidy
IIPP
2010-15
Rs. 52,65,387/-
(Rupees Fifty Two
Lakhs Sixty Five
Thousand Three
Hundred and Eighty
Seven only)
2nd
half
year
2015-16 Agreed
74 29/10/16 Sri Ravichandra
Textiles Private
Limited, S9/D1,
9/D3,10, 11/1,11/3,
Ponnekallu,
Guntur,,522018
Guntur Cotton
Yarn
Spinning
05/11/12 Interest
Subsidy
IIPP
2010-15
Rs. 62,04,549/-
(Rupees Sixty Two
Lakhs Four Thousand
Five Hundred and
Forty Nine only)
2nd
half
year
2015-16 Agreed
75 31/10/16 Sri Venkata Lakshmi
Narasimha Spinning
Mill Private Limited,
176/4,Gbc Road,
Chebrolu Village,
Chebrolu,,522212
Guntur Cotton
Yarn
Spinning
20/11/14 Interest
Subsidy
IIPP
2010-15
Rs. 27,41,082/-
(Rupees Twenty Seven
Lakhs Forty One
Thousand and Eighty
Two only)
2nd
half
year
2015-16 Agreed
76 31/10/16 Sri Venkata Siva
Parvathi Spinning
Mills Private Limited
Unit-Ii, 414/1,2,3,
Pathareddypalem,
Chebrolu,Chebrolu
Guntur Cotton
Yarn
Spinning
10/05/12 Interest
Subsidy
IIPP
2010-15
Rs. 1,26,36,339/-
(Rupees One Crore
Twenty Six Lakhs
Thirty Six Thousand
Three Hundred and
Thirty Nine only)
2nd
half
year
2015-16 Agreed
77 31/10/16 Vasanthaindustries
Ltd (1st expansion), 4-
383/2, Thimmapuram,
Guntur,,522233
Guntur Cotton
Yarn
04/12/09 Power cost IIPP
2005-10
Rs. 22,62,289/-
(Rupees Twenty Two
Lakhs Sixty Two
Thousand Two
Hundred Eighty Nine
only)
4th
quarter 2015-16 Agreed
78 09/01/17 Nandivardhana
Textile Mills Limited,
257/C, 256/D,
Thimmapuram,
Thimmapuram,
Guntur Cotton
Spinning
15/11/06 Power cost IIPP
2005-10
Rs. 13,89,990/-
(Rupees Thirteen
Lakhs Eighty Nine
Thousand Nine
Hundred and Ninety
4th
quarter 2015-16 Agreed
:: 16 ::
Guntur,522233 only)
79 11/01/17 Chowdary Spinners
Limited, 1-
168,Chivatam,Tanuku
,,534216
West
Godavari
Cotton
Yarn
29/01/07 Power cost IIPP
2005-10
Rs. 12,26,131/-
(Rupees Twelve Lakhs
Twenty Six Thousand
One Hundred and
Thirty One only)
2nd
quarter 2015-16 Agreed
80 12/01/17 Chowdary Spinners
Limited, 1-
168,Chivatam,Tanuku
,,534216
West
Godavari
Cotton
Yarn
29/01/07 Power cost IIPP
2005-10
Rs. 14,54,465/-
(Rupees Fourteen
Lakhs Fifty Four
Thousand Four
Hundred and Sixty
Five only)
3rd
quarter 2015-16 Agreed
81 13/01/17 The Gowthami
Solvent Oils Ltd
Spinning Unit Tetali,
7,Tetali, Tanuku,
534211
West
Godavari
Cotton
Yarn
Spinning
04/07/07 Power cost IIPP
2005-10
Rs. 46,85,940/-
(Rupees Forty Six
Lakhs Eighty Five
Thousand Nine
Hundred and Forty
only)
2nd
quarter 2015-16 Agreed
82 13/01/17 Chowdary Spinners
Limited, 1-
168,Chivatam,Tanuku
,,534216
West
Godavari
Cotton
Yarn
31/07/07 Power cost IIPP
2005-10
Rs. 9,11,079/- (Rupees
Nine Lakhs Eleven
Thousand and Seventy
Nine only)
4th
quarter 2015-16 Agreed
83 24/01/17 Sri Srinivasa Spintex
India Ltd – Expansion
- I, 8-104,
Pedatadepalli,
Tadepalligudem,,5341
01
West
Godavari
Cotton
Yarn
01/01/11 Power cost IIPP
2010-15
Rs. 31,05,204/-
(Rupees Thirty One
Lakhs five Thousand
Two Hundred and
Four only)
4th
quarter 2015-16 Agreed
84 26/01/17 PVR Spinning And
Weaving Limited,
110/2, 108/2, 108/3,
108/4, Kondayaplem
Road,Tetali
Village,,534218
West
Godavari
Yarn 27/08/10 Power cost IIPP
2010-15
Rs. 5,19,138/- (Rupees
Five Lakhs Nineteen
Thousand One
Hundred and Thirty
Eight only)
1st half
year 2015-16 Agreed
85 26/01/17 PVR Spinning And
Weaving Limited,
110/2, 108/2, 108/3,
108/4, Kondayaplem
Road,Tetali
Village,,534218
West
Godavari
Yarn 26/05/07 Power cost IIPP
2005-10
Rs. 6,04,732/- (Rupees
Six Lakhs Four
Thousand Seven
Hundred and Thirty
Two only)
1st
quarter 2015-16 Agreed
86 27/01/17 Siva Swati Textile
Private Limited,
168,169,170c4,170c,G
anapavaram,Chilakalu
Guntur Cotton and
PV Yarn
01/03/06 Power cost IIPP
2005-10
Rs. 29,03,739/-
(Rupees Twenty Nine
Lakhs Three Thousand
Seven Hundred and
1st
quarter 2014-15 Agreed
:: 17 ::
ripet,,522619 Thirty Nine only)
87 29/01/17 Sakku Spinning Mills
Private Limited, NH-
5,Chinakondrupadu
Village,
Chinakondrupadu
Village
Guntur Cotton
Yarn
26/08/07 Power cost IIPP
2005-10
Rs. 20,83,940/-
(Rupees Twenty Lakhs
Eighty Three
Thousand Nine
Hundred and Forty
only)
3rd
quarter 2015-16 Agreed
88 29/01/17 Sakku Spinning Mills
Private Limited, NH-
5,Chinakondrupadu
Village,
Chinakondrupadu
Village
Guntur Cotton
Yarn
26/08/07 Power cost IIPP
2005-10
Rs. 16,56,465/-
(Rupees Sixteen Lakhs
Fifty Six Thousand
Four Hundred and
Sixty Five only)
4th
quarter 2015-16 Agreed
89 30/01/17 Viswateja Spinning
Mills Private Limited,
219, Boyapalem,
Guntur,,522233
Guntur Cotton
Yarn
09/04/05 Power cost IIPP
2005-10
Rs. 9,96,980/- (Rupees
Nine Lakhs Ninety Six
Thousand Nine
Hundred and Eighty
only)
1st
quarter 2013-14 Agreed
90 30/01/17 Siva Swati Textile
Private Limited,
168,169,170c4,170c,G
anapavaram,Chilakalu
ripet,,522619
Guntur Cotton and
PV Yarn
01/03/06 Power cost IIPP
2005-10
Rs. 29,03,739/-
(Rupees Twenty Nine
Lakhs Three Thousand
Seven Hundred and
Thirty Nine only)
2nd
quarter 2014-15 Agreed
91 30/01/17 Siva Swati Textile
Private Limited,
168,169,170c4,170c,G
anapavaram,Chilakalu
ripet,,522619
Guntur Cotton and
PV Yarn
01/03/06 Power cost IIPP
2005-10
Rs. 29,03,739/-
(Rupees Twenty Nine
Lakhs Three Thousand
Seven Hundred and
Thirty Nine only)
3rd
quarter 2014-15 Agreed
92 30/01/17 Siva Swati Textile
Private Limited,
168,169,170c4,170c,G
anapavaram,Chilakalu
ripet,,522619
Guntur Cotton and
PV Yarn
01/03/06 Power cost IIPP
2005-10
Rs. 29,03,739/-
(Rupees Twenty Nine
Lakhs Three Thousand
Seven Hundred and
Thirty Nine only)
4th
quarter 2014-15 Agreed
93 30/01/17 Siva Swati Textile
Private Limited,
168,169,170c4,170c,G
anapavaram,Chilakalu
ripet,,522619
Guntur Cotton and
PV Yarn
01/03/06 Power cost IIPP
2005-10
Rs. 29,03,739/-
(Rupees Twenty Nine
Lakhs Three Thousand
Seven Hundred and
Thirty Nine only)
1st
quarter 2015-16 Agreed
94 30/01/17 Siva Swati Textile
Private Limited,
168,169,170c4,170c,G
anapavaram,Chilakalu
ripet,,522619
Guntur Cotton and
PV Yarn
01/03/06 Power cost IIPP
2005-10
Rs. 29,03,739/-
(Rupees Twenty Nine
Lakhs Three Thousand
Seven Hundred and
Thirty Nine only)
2nd
quarter 2015-16 Agreed
95 30/01/17 Siva Swati Textile Guntur Cotton and 01/03/06 Power cost IIPP Rs. 29,03,739/- 3rd 2015-16 Agreed
:: 18 ::
Private Limited,
168,169,170c4,170c,G
anapavaram,Chilakalu
ripet,,522619
PV Yarn 2005-10 (Rupees Twenty Nine
Lakhs Three Thousand
Seven Hundred and
Thirty Nine only)
quarter
96 30/01/17 Siva Swati Textile
Private Limited,
168,169,170c4,170c,G
anapavaram,Chilakalu
ripet,,522619
Guntur Cotton and
PV Yarn
01/03/06 Power cost IIPP
2005-10
Rs. 23,50,646/-
(Rupees Twenty Three
Lakhs Fifty Thousand
Six Hundred and Forty
Six only)
4th
quarter 2015-16 Agreed
97 31/01/17 Supriya Spinning
Mills Private Limited,
4 And 6,Vunnava
Road,Boyapalem,Edla
padu,,522233
Guntur Cotton
Yarn
13/08/06 Power cost IIPP
2005-10
Rs. 22,05,000/-
(Rupees Twenty Two
Lakhs and Five
Thousand only)
1st
quarter 2015-16 Agreed
98 31/01/17 Supriya Spinning
Mills Private Limited,
4 And 6,Vunnava
Road,Boyapalem,Edla
padu,,522233
Guntur Cotton
Yarn
13/08/06 Power cost IIPP
2005-10
Rs. 22,05,000/-
(Rupees Twenty Two
Lakhs and Five
Thousand only)
2nd
quarter 2015-16 Agreed
99 31/01/17 Supriya Spinning
Mills Private Limited,
4 And 6,Vunnava
Road,Boyapalem,Edla
padu,,522233
Guntur Cotton
Yarn
13/08/06 Power cost IIPP
2005-10
Rs. 22,05,000/-
(Rupees Twenty Two
Lakhs and Five
Thousand only)
3rd
quarter 2015-16 Agreed
100 31/01/17 Supriya Spinning
Mills Private Limited,
4 And 6,Vunnava
Road,Boyapalem,Edla
padu,,522233
Guntur Cotton
Yarn
13/08/06 Power cost IIPP
2005-10
Rs. 22,05,000/-
(Rupees Twenty Two
Lakhs and Five
Thousand only)
4th
quarter 2015-16 Agreed
101 02/02/17 Viswateja Spinning
Mills Private Limited,
219, Boyapalem,
Guntur,,522233
Guntur Cotton
Yarn
Spinning
26/09/07 Power cost IIPP
2005-10
Rs. 34,46,519/-
(Rupees Thirty Four
Lakhs Forty Six
Thousand Five
Hundred and Nineteen
only)
3rd
quarter 2015-16 Agreed
102 02/02/17 Viswateja Spinning
Mills Private Limited,
219, Boyapalem,
Guntur,,522233
Guntur Cotton
Yarn
Spinning
26/09/07 Power cost IIPP
2005-10
Rs. 51,63,816/-
(Rupees Fifty one
Lakhs Sixty Three
Thousand Eight
Hundred and Sixteen
only)
4th
quarter 2015-16 Agreed
103 07/02/17 Siva Swati Textile
Private Limited,
168,169,170,Ganapav
Guntur Cotton and
PV Yarn
01/04/07 Power cost IIPP
2005-10
Rs. 59,37,852/-
(Rupees Fifty Nine
Lakhs Thirty Seven
1st
quarter 2015-16 Agreed
:: 19 ::
aram,Chilakaluripet,,5
22619
Thousand Eight
Hundred and Fifty
Two only)
104 07/02/17 Siva Swati Textile
Private Limited,
168,169,170,Ganapav
aram,Chilakaluripet,,5
22619
Guntur Cotton and
PV Yarn
01/04/07 Power cost IIPP
2005-10
Rs. 46,91,129/-
(Rupees Forty Six
Lakhs Ninety One
Thousand One
Hundred and Twenty
Nine only)
2nd
quarter 2015-16 Agreed
105 07/02/17 Siva Swati Textile
Private Limited,
168,169,170,Ganapav
aram,Chilakaluripet,,5
22619
Guntur Cotton and
PV Yarn
01/04/07 Power cost IIPP
2005-10
Rs. 70,74,370/-
(Rupees Seventy
Lakhs Seventy Four
Thousand Three
Hundred and Seventy
only)
3rd
quarter 2015-16 Agreed
106 07/02/17 Siva Swati Textile
Private Limited,
168,169,170,Ganapav
aram,Chilakaluripet,,5
22619
Guntur Cotton and
PV Yarn
01/04/07 Power cost IIPP
2005-10
Rs. 84,90,984/-
(Rupees Eighty Four
Lakhs Ninety
Thousand Nine
Hundred and Eighty
Four only)
4th
quarter 2015-16 Agreed
107 09/02/17 Kallam Brothers
Cottons Private
Limited, 160B,
DHULLIPALLA,
Sattenapalli,,522412
Guntur Cotton
Yarn
Spinning
27/04/07 Power cost IIPP
2005-10
Rs. 13,17,058/-
(Rupees Thirteen
Lakhs Seventeen
Thousand and Fifty
Eighty only)
1st
quarter 2015-16 Agreed
108 09/02/17 Sri Nukala Rama
Koteswara Rao
Textiles Pvt. Ltd., 1-
223,Chebrolu,Guntur,,
522212
Guntur Cotton
Yarn
Spinning
11/12/06 Power cost IIPP
2005-10
Rs. 18,58,640/-
(Rupees Eighteen
Lakhs Fifty Eight
Thousand Six Hundred
and Forty only)
1st
quarter 2015-16 Agreed
109 09/02/17 Kallam Brothers
Cottons Private
Limited, 160B,
DHULLIPALLA,
Sattenapalli,,522412
Guntur Cotton
Yarn
Spinning
27/04/07 Power cost IIPP
2005-10
Rs. 13,16,458/-
(Rupees Thirteen
Lakhs Sixteen
Thousand Four
Hundred and Fifty
Eight only)
2nd
quarter 2015-16 Agreed
110 09/02/17 Kallam Brothers
Cottons Private
Limited, 160B,
DHULLIPALLA,
Sattenapalli,,522412
Guntur Cotton
Yarn
Spinning
27/04/07 Power cost IIPP
2005-10
Rs. 19,74,687/-
(Rupees Nineteen
Lakhs Seventy Four
Thousand Six Hundred
and Eighty Seven
only)
3rd
quarter 2015-16 Agreed
111 09/02/17 Kallam Brothers Guntur Cotton 27/04/07 Power cost IIPP Rs. 22,59,919/- 4th 2015-16 Agreed
:: 20 ::
Cottons Private
Limited, 160B,
DHULLIPALLA,
Sattenapalli,,522412
Yarn
Spinning
2005-10 (Rupees Twenty Two
Lakhs Fifty Nine
Thousand Nine
Hundred and Nineteen
only)
quarter
112 12/02/17 Sri Nukala Rama
Koteswara Rao
Textiles Pvt. Ltd., 1-
223,Chebrolu,
Guntur,,522212
Guntur Cotton
Yarn
Spinning
11/12/06 Power cost IIPP
2005-10
Rs. 18,58,640/-
(Rupees Eighteen
Lakhs Fifty Eight
Thousand Six Hundred
and Forty only)
3rd
quarter 2015-16 Agreed
113 12/02/17 Sri Nukala Rama
Koteswara Rao
Textiles Pvt. Ltd., 1-
223,Chebrolu,
Guntur,,522212
Guntur Cotton
Yarn
Spinning
11/12/06 Power cost IIPP
2005-10
Rs. 18,58,640/-
(Rupees Eighteen
Lakhs Fifty Eight
Thousand Six Hundred
and Forty only)
4th
quarter 2015-16 Agreed
114 13/02/17 Sri Nukala Rama
Koteswara Rao
Textiles Pvt. Ltd., 1-
223,Chebrolu,
Guntur,,522212
Guntur Cotton
Yarn
Spinning
11/12/06 Power cost IIPP
2005-10
Rs. 18,58,640/-
(Rupees Eighteen
Lakhs Fifty Eight
Thousand Six Hundred
and Forty only)
2nd
quarter 2015-16 Agreed
115 14/02/17 Sri Sesha Sai
Spinning Mills Private
Limited, 188, 189/1,
189/3, Reddypalem
Road, Chebrolu,
Guntur,,522212
Guntur Cotton
Yarn
Spinning
01/11/06 Power cost IIPP
2005-10
Rs. 12,03,850/-
(Rupees Twelve Lakhs
Three Thousand Eight
Hundred and Fifty
only)
3rd
quarter 2014-15 Agreed
116 14/02/17 Sri Sesha Sai
Spinning Mills Private
Limited, 188, 189/1,
189/3, Reddypalem
Road, Chebrolu,
Guntur,,522212
Guntur Cotton
Yarn
Spinning
01/11/06 Power cost IIPP
2005-10
Rs. 12,85,732/-
(Rupees Twelve Lakhs
Eighty Five Thousand
Seven Hundred and
Thirty Two only)
1st
quarter 2015-16 Agreed
117 14/02/17 Sri Sesha Sai
Spinning Mills Private
Limited, 188, 189/1,
189/3, Reddypalem
Road, Chebrolu,
Guntur,,522212
Guntur Cotton
Yarn
Spinning
01/11/06 Power cost IIPP
2005-10
Rs. 14,80,035/-
(Rupees Fourteen
Lakhs Eighty
Thousand and Thirty
Five only)
2nd
quarter 2015-16 Agreed
118 14/02/17 Sri Sesha Sai
Spinning Mills Private
Limited, 188, 189/1,
189/3, Reddypalem
Road, Chebrolu,
Guntur,,522212
Guntur Cotton
Yarn
Spinning
01/11/06 Power cost IIPP
2005-10
Rs. 14,19,600/-
(Rupees Fourteen
Lakhs Nineteen
Thousand and Six
Hundred only)
3rd
quarter 2015-16 Agreed
:: 21 ::
119 16/02/17 Kalpataruvu Spinning
Mills Limited,
210,211a,
Thimmapuram,
Guntur,,522233
Guntur Cotton
Yarn
18/04/07 Power cost IIPP
2005-10
Rs. 18,26,820/-
(Rupees Eighteen
Lakhs Twenty Six
Thousand Eight
Hundred and Twenty
only)
1st
quarter 2015-16 Agreed
120 16/02/17 Kalpataruvu Spinning
Mills Limited,
210,211a,
Thimmapuram,
Guntur,,522233
Guntur Cotton
Yarn
18/04/07 Power cost IIPP
2005-10
Rs. 18,26,820/-
(Rupees Eighteen
Lakhs Twenty Six
Thousand Eight
Hundred and Twenty
only)
2nd
quarter 2015-16 Agreed
121 16/02/17 Kalpataruvu Spinning
Mills Limited,
210,211a,
Thimmapuram,
Guntur,,522233
Guntur Cotton
Yarn
18/04/07 Power cost IIPP
2005-10
Rs. 18,26,820/-
(Rupees Eighteen
Lakhs Twenty Six
Thousand Eight
Hundred and Twenty
only)
3rd
quarter 2015-16 Agreed
122 16/02/17 Kalpataruvu Spinning
Mills Limited,
210,211a,
Thimmapuram,
Guntur,,522233
Guntur Cotton
Yarn
18/04/07 Power cost IIPP
2005-10
Rs. 18,26,820/-
(Rupees Eighteen
Lakhs Twenty Six
Thousand Eight
Hundred and Twenty
only)
4th
quarter 2015-16 Agreed
123 18/02/17 Sri Venkata
Sivaparvathi Spinning
Mills Pvt.Ltd.,
123,Gbc
Road,Chebrole,,52221
2
Guntur Cotton
Yarn
Spinning
10/01/07 Power cost IIPP
2005-10
Rs. 15,30,902/-
(Rupees Fifteen Lakhs
Thirty Thousand Nine
Hundred and Two
only)
1st
quarter 2015-16 Agreed
124 18/02/17 Sri Venkata
Sivaparvathi Spinning
Mills Pvt.Ltd.,
123,Gbc
Road,Chebrole,,52221
2
Guntur Cotton
Yarn
Spinning
10/01/07 Power cost IIPP
2005-10
Rs. 15,30,902/-
(Rupees Fifteen Lakhs
Thirty Thousand Nine
Hundred and Two
only)
2nd
quarter 2015-16 Agreed
125 18/02/17 Sri Venkata
Sivaparvathi Spinning
Mills Pvt.Ltd.,
123,Gbc
Road,Chebrole,,52221
2
Guntur Cotton
Yarn
Spinning
10/01/07 Power cost IIPP
2005-10
Rs. 15,30,902/-
(Rupees Fifteen Lakhs
Thirty Thousand Nine
Hundred and Two
only)
3rd
quarter 2015-16 Agreed
126 18/02/17 Sri Venkata
Sivaparvathi Spinning
Guntur Cotton
Yarn
10/01/07 Power cost IIPP
2005-10
Rs. 15,30,902/-
(Rupees Fifteen Lakhs
4th
quarter 2015-16 Agreed
:: 22 ::
Mills Pvt.Ltd.,
123,Gbc
Road,Chebrole,,52221
2
Spinning Thirty Thousand Nine
Hundred and Two
only)
127 25/02/17 Prasuna Vamsikrishna
Spinning Mills Private
Limited, 135/A,
123/B,Nh-5, G T
Road,,
Ganapavram,,522619
Guntur Cotton
Yarn
21/12/06 Power cost IIPP
2005-10
Rs. 23,46,734/-
(Rupees Twenty Three
Lakhs Forty Six
Thousand Seven
Hundred and Thirty
Four only)
1st
quarter 2015-16 Agreed
128 25/02/17 Prasuna Vamsikrishna
Spinning Mills Private
Limited, 135/A,
123/B,Nh-5, G T
Road,,Ganapavram,,5
22619
Guntur Cototn
Yarn
21/11/05 Power cost IIPP
2005-10
Rs. 11,83,701/-
(Rupees Eleven Lakhs
Eighty Three
Thousand Seven
Hundred and One
only)
1st
quarter 2015-16 Agreed
129 25/02/17 Prasuna Vamsikrishna
Spinning Mills Private
Limited, 135/A,
123/B,Nh-5, G T
Road,,
Ganapavram,,522619
Guntur Cotton
Yarn
21/12/06 Power cost IIPP
2005-10
Rs. 26,07,294/-
(Rupees Twenty Six
Lakhs Seven Thousand
Two Hundred and
Ninety Four only )
2nd
quarter 2015-16 Agreed
130 25/02/17 Prasuna Vamsikrishna
Spinning Mills Private
Limited, 135/A,
123/B,Nh-5, G T
Road,,
Ganapavram,,522619
Guntur Cototn
Yarn
21/11/05 Power cost IIPP
2005-10
Rs. 11,83,701/-
(Rupees Eleven Lakhs
Eighty Three
Thousand Seven
Hundred and One
only)
2nd
quarter 2015-16 Agreed
131 25/02/17 Prasuna Vamsikrishna
Spinning Mills Private
Limited, 135/A,
123/B,Nh-5, G T
Road,,
Ganapavram,,522619
Guntur Cotton
Yarn
21/12/06 Power cost IIPP
2005-10
Rs. 22,22,401/-
(Rupees Twenty Two
Lakhs Twenty Two
Thousand Four
Hundred and One
only)
3rd
quarter 2015-16 Agreed
132 25/02/17 Prasuna Vamsikrishna
Spinning Mills Private
Limited, 135/A,
123/B,Nh-5, G T
Road,,Ganapavram,,5
22619
Guntur Cototn
Yarn
21/11/05 Power cost IIPP
2005-10
Rs. 7,89,134/- (Rupees
Seven Lakhs Eighty
Nine Thousand One
Hundred and Thirty
Four only)
3rd
quarter 2015-16 Agreed
133 25/02/17 Prasuna Vamsikrishna
Spinning Mills Private
Limited, 135/A,
123/B,Nh-5, G T
Guntur Cotton
Yarn
21/12/06 Power cost IIPP
2005-10
Rs. 23,11,457/-
(Rupees Twenty Three
Lakhs Eleven
Thousand Four
4th
quarter 2015-16 Agreed
:: 23 ::
Road,,
Ganapavram,,522619
Hundred and Fifty
Seven only)
134 27/02/17 Sri Aanantha Lakshmi
Spinning Mills
Pvt.Ltd, 59/1,Nh-5,
Boyapalem,
GUNTUR,,522006
Guntur Spinning 01/01/06 Power cost IIPP
2005-10
Rs. 18,68,550/-
(Rupees Eighteen
Lakhs Sixty Eight
Thousand Five
Hundred and Fifty
only)
1st
quarter 2015-16 Agreed
135 27/02/17 Sri Aanantha Lakshmi
Spinning Mills
Pvt.Ltd, 59/1,Nh-5,
Boyapalem,
GUNTUR,,522006
Guntur Spinning 01/01/06 Power cost IIPP
2005-10
Rs. 18,68,550/-
(Rupees Eighteen
Lakhs Sixty Eight
Thousand Five
Hundred and Fifty
only)
2nd
quarter 2015-16 Agreed
136 27/02/17 Sri Aanantha Lakshmi
Spinning Mills
Pvt.Ltd, 59/1,Nh-5,
Boyapalem,
GUNTUR,,522006
Guntur Spinning 01/01/06 Power cost IIPP
2005-10
Rs. 18,68,550/-
(Rupees Eighteen
Lakhs Sixty Eight
Thousand Five
Hundred and Fifty
only)
3rd
quarter 2015-16 Agreed
137 01/03/17 Vasundhara Cotton
Mills Private Limited,
24 Abcde,
Boyapalem,
Guntur,,522233
Guntur Cotton
Yarn
Spinning
01/06/07 Power cost IIPP
2005-10
Rs. 3,32,500/- (Rupees
Three Lakhs Thirty
Two Thousand and
Five Hundred only)
1st
quarter 2015-16 Agreed
138 01/03/17 Vasundhara Cotton
Mills Private Limited,
24 Abcde,
Boyapalem,
Guntur,,522233
Guntur Cotton
Yarn
Spinning
01/06/07 Power cost IIPP
2005-10
Rs. 15,75,000/-
(Rupees Fifteen Lakhs
and Seventy Five
Thousands only)
2nd
quarter 2015-16 Agreed
139 01/03/17 Vasundhara Cotton
Mills Private Limited,
24 Abcde,
Boyapalem,
Guntur,,522233
Guntur Cotton
Yarn
Spinning
01/06/07 Power cost IIPP
2005-10
Rs. 15,75,000/-
(Rupees Fifteen Lakhs
and Seventy Five
Thousands only)
3rd
quarter 2015-16 Agreed
140 01/03/17 Vasundhara Cotton
Mills Private Limited,
24 Abcde,
Boyapalem,
Guntur,,522233
Guntur Cotton
Yarn
Spinning
01/06/07 Power cost IIPP
2005-10
Rs. 15,75,000/-
(Rupees Fifteen Lakhs
and Seventy Five
Thousands only)
4th
quarter 2015-16 Agreed
141 07/03/17 Sri Venkata Lakshmi
Narasimha Spinning
Mills Private Limited,
176/4,Gbc Road,
Guntur Cotton
Yarn
Spinning
31/12/06 Power cost IIPP
2005-10
Rs. 13,21,016/-
(Rupees Thirteen
Lakhs Twenty One
Thousand and Sixteen
3rd
quarter 2015-16 Agreed
:: 24 ::
Chebrolu
Village,Chebrolu,,522
212
only)
142 12/03/17 Kallam Spinning
Mills Limited,
105,106, Nh-5,
Chowadavaram,
Guntur,,522019
Guntur Cotton
Yarn
Spinning
21/11/06 Power cost IIPP
2005-10
Rs. 6,01,338/- (Rupees
Six Lakhs One
Thousand Three
Hundred and Thirty
Eight only)
3rd
quarter 2014-15 Agreed
143 12/03/17 Kallam Spinning
Mills Limited,
105,106, Nh-5,
Chowadavaram,
Guntur,,522019
Guntur Cotton
Yarn
Spinning
21/11/06 Power cost IIPP
2005-10
Rs. 15,41,327/-
(Rupees Fifteen Lakhs
Forty One Thousand
Three Hundred and
Twenty Seven only)
4th
quarter 2014-15 Agreed
144 12/03/17 Kallam Spinning
Mills Limited,
105,106, Nh-5,
Chowadavaram,
Guntur,,522019
Guntur Cotton
Yarn
Spinning
21/11/06 Power cost IIPP
2005-10
Rs. 47,34,509/-
(Rupees Forty Seven
Lakhs Thirty Four
Thousand Five
Hundred and Nine
only)
1st
quarter 2015-16 Agreed
145 12/03/17 Kallam Spinning
Mills Limited,
105,106, Nh-5,
Chowadavaram,
Guntur,,522019
Guntur Cotton
Yarn
Spinning
21/11/06 Power cost IIPP
2005-10
Rs. 44,05,594/-
(Rupees Forty Four
Lakhs Five Thousand
Five Hundred and
Ninety Four only)
2nd
quarter 2015-16 Agreed
146 12/03/17 Kallam Spinning
Mills Limited,
105,106, Nh-5,
Chowadavaram,
Guntur,,522019
Guntur Cotton
Yarn
Spinning
21/11/06 Power cost IIPP
2005-10
Rs. 41,61,747/-
(Rupees Forty One
Lakhs Sixty One
Thousand Seven
Hundred and Forty
Seven only)
3rd
quarter 2015-16 Agreed
147 12/03/17 Kallam Spinning
Mills Limited,
105,106, Nh-5,
Chowadavaram,
Guntur,,522019
Guntur Cotton
Yarn
Spinning
21/11/06 Power cost IIPP
2005-10
Rs. 53,54,539/-
(Rupees Fifty Three
Lakhs Fifty Four
Thousand Five
Hundred and Thirty
Nine only)
4th
quarter 2015-16 Agreed
148 20/03/17 NSL Textiles Limited,
Nh - 5, Guntur Road,
Edlapadu,
Edlapadu,,522233
Guntur Spinning 01/04/06 Power cost IIPP
2005-10
Rs. 45,86,130/-
(Rupees Forty Five
Lakhs Eighty Six
Thousand One
Hundred and Thirty
only)
2015-16 Agreed
149 21/03/17 NSL Textiles Limited,
Nh - 5, Guntur
Guntur Spinning 01/04/06 Power cost IIPP
2005-10
Rs. 92,14,692/-
(Rupees Ninety Two 2015-16 Agreed
:: 25 ::
Road,Edlapadu,Edlap
adu,,522233
Lakhs Fourteen
Thousand Six Hundred
and Ninety Two only)
150 26/03/17 Sri Lakshmi Godavari
Spinning Mills Ltd,
Survey No113,
Chebrolu,
Guntur,,522212
Guntur Cotton
Yarn
Spinning
21/10/07 Power cost IIPP
2005-10
Rs. 13,30,290/-
(Rupees Thirteen
Lakhs Thirty Thousand
Two Hundred and
Ninety only)
3rd
quarter 2015-16 Agreed
151 26/03/17 Sri Lakshmi Godavari
Spinning Mills Ltd,
Survey No113,
Chebrolu,
Guntur,,522212
Guntur Cotton
Yarn
Spinning
21/10/07 Power cost IIPP
2005-10
Rs. 19,95,435/-
(Rupees Nineteen
Lakhs Ninety Five
Thousand Four
Hundred and Thirty
Five only)
4th
quarter 2015-16 Agreed
152 28/03/17 Krishnamurthy
Spinning Mills
Pvt.Ltd., 141,
Nadendla Road,
Thimmapuram
Village,
Chilakaluripet
Guntur Cotton
Yarn
Spinning
06/10/07 Power cost IIPP
2005-10
Rs. 10,68,467/-
(Rupees Ten Lakhs
Sixty Eight Thousand
Four Hundred and
Sixty Seven only)
3rd
quarter 2015-16 Agreed
153 28/03/17 Krishnamurthy
Spinning Mills
Pvt.Ltd., 141,
Nadendla Road,
Thimmapuram
Village,
Chilakaluripet,,52223
3
Guntur Cotton
Yarn
Spinning
06/10/07 Power cost IIPP
2005-10
Rs. 13,82,813/-
(Rupees Thirteen
Lakhs Eighty Two
Thousand Eight
Hundred and Thirteen
only)
4th
quarter 2015-16 Agreed
154 06/04/17 Idupulapadu Cotton
Mills Pvt Ltd,
206a,Cinima Hall
Road,Ganapavaram,,5
22619
Guntur Cotton
Yarn
01/11/06 Power cost IIPP
2005-10
Rs. 12,61,298/-
(Rupees Twelve Lakhs
Sixty One Thousand
Two Hundred and
Ninety Eight only)
3rd
quarter 2014-15 Agreed
155 06/04/17 Idupulapadu Cotton
Mills Pvt Ltd,
206a,Cinima Hall
Road,Ganapavaram,,5
22619
Guntur Cotton
Yarn
01/11/06 Power cost IIPP
2005-10
Rs. 2,80,712/- (Rupees
Two Lakhs Eighty
Thousand Seven
Hundred and Twelve
only)
4th
quarter 2014-15 Agreed
156 06/04/17 VRV Textiles
Limited,
16/6a,17/1b,Kakuman
u,Kakumanu,,522112
Guntur Cotton
Yarn
05/01/07 Power cost IIPP
2005-10
Rs. 10,58,283/-
(Rupees Ten Lakhs
Fifty Eight Thousand
Two Hundred and
Eighty Three only)
1st
quarter 2015-16 Agreed
:: 26 ::
157 06/04/17 VRV Textiles
Limited, 16/6a,17/1b,
Kakumanu,
Kakumanu,,522112
Guntur Cotton
Yarn
05/01/07 Power cost IIPP
2005-10
Rs. 15,64,455/-
(Rupees Fifteen Lakhs
Sixty Four Thousand
Four Hundred and
Fifty Five only)
2nd
quarter 2015-16 Agreed
158 06/04/17 VRV Textiles
Limited, 16/6a,17/1b,
Kakumanu,
Kakumanu,,522112
Guntur Cotton
Yarn
05/01/07 Power cost IIPP
2005-10
Rs. 17,83,208/-
(Rupees Seventeen
Lakhs Eighty Three
Thousand Two
Hundred and Eighty
only)
3rd
quarter 2015-16 Agreed
159 06/04/17 VRV Textiles
Limited, 16/6a,17/1b,
Kakumanu,
Kakumanu,,522112
Guntur Cotton
Yarn
05/01/07 Power cost IIPP
2005-10
Rs. 20,38,949/-
(Rupees Twenty Lakhs
Thirty Eight Thousand
Nine Hundred and
Forty Nine only)
4th
quarter 2015-16 Agreed
160 07/04/17 Idupulapadu Cotton
Mills Pvt Ltd,
206a,Cinima Hall
Road,Ganapavaram,,5
22619
Guntur Cotton
Yarn
01/11/06 Power cost IIPP
2005-10
Rs. 32,03,862/-
(Rupees Thirty Two
Lakhs Three Thousand
Eight Hundred and
Sixty Two only)
1st
quarter 2015-16 Agreed
161 07/04/17 Idupulapadu Cotton
Mills Pvt Ltd,
206a,Cinima Hall
Road,Ganapavaram,,5
22619
Guntur Cotton
Yarn
01/11/06 Power cost IIPP
2005-10
Rs. 32,03,862/-
(Rupees Thirty Two
Lakhs Three Thousand
Eight Hundred and
Sixty Two only)
2nd
quarter 2015-16 Agreed
162 07/04/17 Idupulapadu Cotton
Mills Pvt Ltd,
206a,Cinima Hall
Road,Ganapavaram,,5
22619
Guntur Cotton
Yarn
01/11/06 Power cost IIPP
2005-10
Rs. 32,03,862/-
(Rupees Thirty Two
Lakhs Three Thousand
Eight Hundred and
Sixty Two only)
3rd
quarter 2015-16 Agreed
163 07/04/17 Idupulapadu Cotton
Mills Pvt Ltd,
206a,Cinima Hall
Road,Ganapavaram,,5
22619
Guntur Cotton
Yarn
01/11/06 Power cost IIPP
2005-10
Rs. 32,03,862/-
(Rupees Thirty Two
Lakhs Three Thousand
Eight Hundred and
Sixty Two only)
4th
quarter 2015-16 Agreed
164 13/05/17 Vasanthaindustries
Ltd, 4-383/2,
Thimmapuram,
Guntur,,522233
Guntur Cotton
Yarn
29/01/07 Power cost IIPP
2005-10
Rs. 32,93,631/-
(Rupees Thirty Two
Lakhs Ninety Three
Thousand Six Hundred
and Thirty One only )
1st
quarter 2015-16 Agreed
165 13/05/17 Vasanthaindustries
Ltd, 4-383/2,
Thimmapuram,
Guntur Cotton
Yarn
29/01/07 Power cost IIPP
2005-10
Rs. 32,93,631/-
(Rupees Thirty Two
Lakhs Ninety Three
2nd
quarter 2015-16 Agreed
:: 27 ::
The SLC observed that all the above claims filed in time as per the respective policies i.e IIPP 2005-10, IIPP 2010-15, IDP 2015-
20 and extended policy vide G.O. Ms. No. 168, Industries &Commerce (Prog-II) Department, dt.30/11/2016.
Commissioner of Industries & Chariman of SLC.
Guntur,,522233 Thousand Six Hundred
and Thirty One only )
166 13/05/17 Vasanthaindustries
Ltd, 4-383/2,
Thimmapuram,
Guntur,,522233
Guntur Cotton
Yarn
29/01/07 Power cost IIPP
2005-10
Rs. 32,93,631/-
(Rupees Thirty Two
Lakhs Ninety Three
Thousand Six Hundred
and Thirty One only )
3rd
quarter 2015-16 Agreed
167 13/05/17 Vasanthaindustries
Ltd, 4-383/2,
Thimmapuram,
Guntur,,522233
Guntur Cotton
Yarn
29/01/07 Power cost IIPP
2005-10
Rs. 38,60,277/-
(Rupees Thirty Eight
Lakhs Sixty Thousand
Two Hundred and
Seventy Seven only)
4th
quarter 2015-16 Agreed