th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of...
Transcript of th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of...
![Page 1: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/1.jpg)
ZENTECH ENGINEERING CO., LTD.
16th March 2009
![Page 2: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/2.jpg)
ZENTECH ENGINEERING CO., LTD.
List of ContentsList of Contents
1. Out Line of a New Technique Installation Methodology1. Out Line of a New Technique Installation Methodology1.1 Back Ground1.1 Back Ground1.2 A New Technique Installation Methodology1.2 A New Technique Installation Methodology
2. Installation of a New Technique Methodology2. Installation of a New Technique Methodology2.1 2.1 Concept of 2Nos F/Crane Installation Methodology
2.2 2.2 Concept of super lift/skidding Installation Methodology
3. Sequence of a New Technique Installation Methodology3. Sequence of a New Technique Installation Methodology3.1 2Nos Floating crane Installation Methodology3.2 Super lifting & skidding Installation Methodology
![Page 3: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/3.jpg)
ZENTECH ENGINEERING CO., LTD.
1.1. Outline of a New Technique Outline of a New Technique Installation MethodologyInstallation Methodology
![Page 4: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/4.jpg)
ZENTECH ENGINEERING CO., LTD.
1.1 Back Ground1.1 Back Ground
A. In the last several years, the floating-type offshore structures showed an overall increase in market share in offshore construction field.
B. Topside of FSRU where is planning are accomplished at module of extra-large size. So, installation and constructions are difficult and not safely which uses land crane and goliath crane.
C. In such cases, it is usually difficult for both part to incorporate any design change or modification required by the client in total project schedule.
D. Considering the foregoing, there is a need to develop a new technique construction methodology to replace conventional construction method.
E. Therefore, hereby we have developed a new technique construction methodology for a heavy modularization Topside of FSRU.
![Page 5: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/5.jpg)
ZENTECH ENGINEERING CO., LTD.
1.2 A New Technique installation Methodology1.2 A New Technique installation Methodology
New technique installation and construction methodology for a heavy modularization Topside of FSRU
§ 2(two) Nos floating crane Installation methodology§ 2(two) Nos floating crane Installation methodology
§ Super lifting & Side skidding Installation methodology§ Super lifting & Side skidding Installation methodology
![Page 6: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/6.jpg)
ZENTECH ENGINEERING CO., LTD.
2. Installation of a New Technique2. Installation of a New TechniqueMethodologyMethodology
![Page 7: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/7.jpg)
ZENTECH ENGINEERING CO., LTD.
2.1 Concept of 2Nos F/Crane Installation methodology2.1 Concept of 2Nos F/Crane Installation methodology
For the achievement of the 2Nos Floating Crane method, The 2Nos Floating Crane lift Operation shall be required for the integration of Hull and Topsides. The 2 F/Crane method consists of 4 major sequence as the below.
Lift&
Installation
Sequence 1 : Block Handling or Transportation of Topsides at the Quay side
Sequence 2 : Spread frame fabrication and connection the crane hook
Sequence 3 : Lifts a topside module with F/Crane
Sequence 4 : Puts down on the FSRU hull
![Page 8: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/8.jpg)
ZENTECH ENGINEERING CO., LTD.
uMain facilities for 2Nos F/Crane Installation MethoduMain facilities for 2Nos F/Crane Installation Method
LIFTING SPREAD FRAME
The following items will be used during topside installation
3600TON FLOATING CRANE
3000TON FLOATING CRANE
PARTICULAR
Length O.A : 110m, B.P : 110m
Breadth (MLD) : 48m , Depth (MLD) : 7.5m
Draft (Max.) : 6.0m
Crane Type : 2 truss jib luffing type
Rate Load : 3600ton (900t x 4sets)
PARTICULAR
Length O.A : 110m, B.P : 110m
Breadth (MLD) : 45m , Depth (MLD) : 7.0m
Draft (Max.) : 4.4m
Crane Type : 2 truss jib luffing type
Rate Load : 3000ton (750t x 4sets)
PARTICULAR
Length : 68m
Breadth : 34m
Depth (MLD) : 6.0m
![Page 9: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/9.jpg)
ZENTECH ENGINEERING CO., LTD.
2.2 Concept of superlift/skidding Installation Methodology2.2 Concept of superlift/skidding Installation Methodology
For the achievement of the 2 F/Crane method, The 2 F/Crane lift Operation shall be required for the integration of Hull and Topsides. The 2 F/Crane method consists of 4 major sequence as the below.
Sequence 1 : Side skidding from yard to lifting beam (uses strand jack)
Sequence 2 : Super lifting (lifting height is same with hull deck)
Sequence 3 : Side skidding on the hull deck
Sequence 4 : Puts down on the FSRU hull
Side skidding
&Super lifting
![Page 10: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/10.jpg)
ZENTECH ENGINEERING CO., LTD.
uMain facilities for Superlift/Skidding Installation MethoduMain facilities for Superlift/Skidding Installation Method
STRAND JACK STOPPER
The following items will be used during Super lifting & Side skidding Operation
SKID BEAM
ACTIVE SHOE
JACKING LEG
STRAND JACK
PARTICULAR
Support Cap. : 1200ton(600t x 2strand jack)
LIFTING FRAME
PARTICULAR
Width : 1.2m
Length : 12.0m
Depth : 1.0m
PARTICULAR
Width : 0.65m
Length : 6.0m
Depth : 1.2 ~ 1.45m
Hydro Jack : 200ton x 4set
Stroke : 250mm
PARTICULAR
Height : 29.0m (Assume)
Lift Cap. : 1200ton (600t x 2strand jack)
PARTICULAR
Length : 40.0m (Assume)
Width : 2.0m
Depth : 3.0m
Lifting Cap. : 4800ton (1200t x 4 jacking leg)
PARTICULAR
Capacity : 600Ton
Stroke : 500mm
![Page 11: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/11.jpg)
ZENTECH ENGINEERING CO., LTD.
33. Sequence of a New Technique . Sequence of a New Technique Installation MethodologyInstallation Methodology
![Page 12: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/12.jpg)
ZENTECH ENGINEERING CO., LTD.
33.1 2Nos Floating Crane.1 2Nos Floating CraneInstallation MethodologyInstallation Methodology
![Page 13: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/13.jpg)
ZENTECH ENGINEERING CO., LTD.
3.1 2Nos Floating Crane Installation methodology3.1 2Nos Floating Crane Installation methodology
§ READY TO INSTALLATION & ARRANGEMENT§ READY TO INSTALLATION & ARRANGEMENT
Floating Crane(3000Ton)
Floating Crane(3600Ton)
LiftingSpread Frame
Top sideModule
FSRU Hull
![Page 14: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/14.jpg)
ZENTECH ENGINEERING CO., LTD.
§ 2 F/CRANE MOVE TO THE QUAY SIDE§ 2 F/CRANE MOVE TO THE QUAY SIDE
F/Crane Move
F/Crane Move
3.1 2Nos Floating Crane Installation methodology3.1 2Nos Floating Crane Installation methodology Sq. 1Sq. 1
![Page 15: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/15.jpg)
ZENTECH ENGINEERING CO., LTD.
§ SLING CONNECT AND LIFTING OF MODULE§ SLING CONNECT AND LIFTING OF MODULE
Sling connectSling
connect
Lift
Sq. 2Sq. 23.1 2Nos Floating Crane Installation methodology3.1 2Nos Floating Crane Installation methodology
![Page 16: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/16.jpg)
ZENTECH ENGINEERING CO., LTD.
§ 2 F/CRANE MOVE TO SEA SIDE§ 2 F/CRANE MOVE TO SEA SIDE
F/Crane move
F/Crane move
Sq. 3Sq. 33.1 2Nos Floating Crane Installation methodology3.1 2Nos Floating Crane Installation methodology
![Page 17: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/17.jpg)
ZENTECH ENGINEERING CO., LTD.
§ FSRU HULL MOVE TO INSTALLATION LOCATION§ FSRU HULL MOVE TO INSTALLATION LOCATION
FSRU Hull Move
FSRU Hull Move
Sq. 4Sq. 43.1 2Nos Floating Crane Installation methodology3.1 2Nos Floating Crane Installation methodology
![Page 18: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/18.jpg)
ZENTECH ENGINEERING CO., LTD.
§ PUT DOWN ON THE STOOL AND SLING DISCONNECT§ PUT DOWN ON THE STOOL AND SLING DISCONNECT
DownDown
Sq. 5Sq. 53.1 2Nos Floating Crane Installation methodology3.1 2Nos Floating Crane Installation methodology
![Page 19: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/19.jpg)
ZENTECH ENGINEERING CO., LTD.
§ FSRU HULL MOVE BACK§ FSRU HULL MOVE BACK
FSRU Hull Move
FSRU Hull Move
Sq. 6Sq. 63.1 2Nos Floating Crane Installation methodology3.1 2Nos Floating Crane Installation methodology
![Page 20: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/20.jpg)
ZENTECH ENGINEERING CO., LTD.
§ RECYCLE INSTALLATION OF EACH MODULE§ RECYCLE INSTALLATION OF EACH MODULE
Recycle installation of each module
Recycle installation of each module
Sq. 7Sq. 73.1 2Nos Floating Crane Installation methodology3.1 2Nos Floating Crane Installation methodology
![Page 21: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/21.jpg)
ZENTECH ENGINEERING CO., LTD.
§ LIVING QUART AND HELIDECK INSTALLATION§ LIVING QUART AND HELIDECK INSTALLATION
Living Quart&
HelideckInstallation
Sq. 8Sq. 83.1 2Nos Floating Crane Installation methodology3.1 2Nos Floating Crane Installation methodology
![Page 22: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/22.jpg)
ZENTECH ENGINEERING CO., LTD.
§ FLARE TOWER INSTALLATION§ FLARE TOWER INSTALLATION
Flare towerInstallation
Sq. 9Sq. 93.1 2Nos Floating Crane Installation methodology3.1 2Nos Floating Crane Installation methodology
![Page 23: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/23.jpg)
ZENTECH ENGINEERING CO., LTD.
33.2 Super lifting.2 Super lifting&&
Side skidding InstallationSide skidding InstallationMethodologyMethodology
![Page 24: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/24.jpg)
ZENTECH ENGINEERING CO., LTD.
3.2 Super lift&skidding Installation methodology3.2 Super lift&skidding Installation methodology
§ EQUIPMENT & FACILITY ARRANGEMENT§ EQUIPMENT & FACILITY ARRANGEMENT
Stool
Jacking leg
Lifting Frame
Skid Beam
Con’c Mat
Active Shoe
Top sideModule
Skid Beam
![Page 25: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/25.jpg)
ZENTECH ENGINEERING CO., LTD.
SkiddingSkidding
§ MODULE SIDE SKIDDING TO THE ON LIFTING FRAME§ MODULE SIDE SKIDDING TO THE ON LIFTING FRAME
Sq. 1Sq. 13.2 Super lift&skidding Installation methodology3.2 Super lift&skidding Installation methodology
![Page 26: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/26.jpg)
ZENTECH ENGINEERING CO., LTD.
Jackingleg
Jackingleg
Jackingleg
Jackingleg
§ JACKING LEG INSTALLATION§ JACKING LEG INSTALLATION
Sq. 2Sq. 23.2 Super lift&skidding Installation methodology3.2 Super lift&skidding Installation methodology
![Page 27: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/27.jpg)
ZENTECH ENGINEERING CO., LTD.
SuperLifting
SuperLifting
SuperLifting
SuperLifting
SuperLifting
SuperLifting
SuperLifting
SuperLifting
§ SUPER LIFTING § SUPER LIFTING
Sq. 3Sq. 33.2 Super lift&skidding Installation methodology3.2 Super lift&skidding Installation methodology
![Page 28: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/28.jpg)
ZENTECH ENGINEERING CO., LTD.
SkiddingSkidding
§ 2ND SIDE SKIDDING TO THE ON STOOL§ 2ND SIDE SKIDDING TO THE ON STOOL
Sq. 4Sq. 43.2 Super lift&skidding Installation methodology3.2 Super lift&skidding Installation methodology
![Page 29: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/29.jpg)
ZENTECH ENGINEERING CO., LTD.
§ PUTS DOWN ON STOOL§ PUTS DOWN ON STOOL
PutDown
Sq. 5Sq. 53.2 Super lift&skidding Installation methodology3.2 Super lift&skidding Installation methodology
![Page 30: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/30.jpg)
ZENTECH ENGINEERING CO., LTD.
§ RECYCLE INSTALLATION OF EACH MODULE§ RECYCLE INSTALLATION OF EACH MODULE
SuperLifting
SuperLifting
Skidding
Skidding
Skidding
Skidding
Sq. 6Sq. 63.2 Super lift&skidding Installation methodology3.2 Super lift&skidding Installation methodology
![Page 31: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/31.jpg)
ZENTECH ENGINEERING CO., LTD.
§ COMPLETION§ COMPLETION
Sq. 7Sq. 73.2 Super lift&skidding Installation methodology3.2 Super lift&skidding Installation methodology
![Page 32: th March 2009 - ZENTECH B.Topside of FSRU where is planning are accomplished at module of extra-large size. ... Microsoft PowerPoint - FSRU topside installation.ppt Author:](https://reader034.fdocuments.in/reader034/viewer/2022052608/5a78a8547f8b9a1f128e413c/html5/thumbnails/32.jpg)
ZENTECH ENGINEERING CO., LTD.
THANK YOU6Fl, Chung-Am Bldg, 843-46 Yeoksam Dong,
Gangnam Gu, Seoul #135-080, Korea.Tel No. : (82)-2-556-0781,0782
Fax No. : (82)-2-556-0796E-mail : [email protected],kr
Contact personnel : B.R.CHOI