![Page 1: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/1.jpg)
TGTC-3
Date: 05.06.2014
Magnus Eikens (Connect LNG)
David Berstad (SINTEF Energy Research)
![Page 2: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/2.jpg)
2
3rd Trondheim Gas Technology Conference, 5th of June 2014
1. Small-Scale LNG Market Introduction
2. The Connect LNG technology (the UBS)
3. Preliminary results from Sintef Energy Research
OUTLINE
![Page 3: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/3.jpg)
3
3rd Trondheim Gas Technology Conference, 5th of June 2014
ENABLING LNG TERMINALS
![Page 4: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/4.jpg)
4
3rd Trondheim Gas Technology Conference, 5th of June 2014
For illustration purposes only. Not necessarily actual trading routes.
TRADING ROUTE
![Page 5: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/5.jpg)
5
3rd Trondheim Gas Technology Conference, 5th of June 2014
For illustration purposes only. Not necessarily actual trading routes.
Small-Scale
![Page 6: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/6.jpg)
6
3rd Trondheim Gas Technology Conference, 5th of June 2014
EMERGING MARKET Existing LNG terminals
Emerging Small
Scale LNG Markets
![Page 7: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/7.jpg)
7
3rd Trondheim Gas Technology Conference, 5th of June 2014
Jetty CAPEX
Jetty CAPEX
Storage&Regas
Storage&Regas
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
320.000 m3 20.000 m3
Large Scale Terminal Small Scale Terminal
Reduce Payback
Time Payback time: 8 years 12 years
TOO LONG PAYBACK TIME
Te
rmin
al
Inv
estm
en
t c
ost
Source: EU Feasibility Report (2011) & Energy and Power (2012)
![Page 8: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/8.jpg)
8
3rd Trondheim Gas Technology Conference, 5th of June 2014
TOO LONG CONSTRUCTION TIME
Available Solution: Jetty or dredging of large seabed volumes
![Page 9: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/9.jpg)
9
3rd Trondheim Gas Technology Conference, 5th of June 2014
UNIVERSAL BUOYANCY
SYSTEM (UBS)
Interface
Floating Cryogenic Hoses
Buoy Mooring
System
Applicable for:
• LNG Loading
• LNG Discharge
• LNG Bunkering
![Page 10: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/10.jpg)
10
3rd Trondheim Gas Technology Conference, 5th of June 2014
Existing LNG
terminals
Multi buoy
mooring
Floating flexible
cryogenic hoses
Buoy
Small-scale terminal
LNGC carrier (1000-
30.000 m3)
• Mobile: can be Relocated if change in market
• Combined with IMO-C tanks, even higher mobility
• Low CAPEX compared to alternative
• Up to 6 x times faster construction time
FLEXIBLE TERMINALS
LNG Carrier (1000-
30.000 m3)
Pressurized Tanks
(1000-15.000 m3)
• Designed for in-shore weather
conditions
• System stored near shore
when not in operation
![Page 11: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/11.jpg)
11
3rd Trondheim Gas Technology Conference, 5th of June 2014
FOCUS ON HYDRODYNAMIC
SIMULATIONS
![Page 12: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/12.jpg)
12
3rd Trondheim Gas Technology Conference, 5th of June 2014
Three Model Tests
MODEL TEST 3
ATTACHMENT SYSTEM
MODEL TEST 2
HOSE CONFIGURATION
MODEL TEST 1
UBS V 1.0
MC-LAB MARINTEK,
OCTOBER 2012 OCEAN BASIN MARINTEK, MAY 2013
MC-LAB, MARINTEK,
FEBRUARY 2014
![Page 13: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/13.jpg)
13
3rd Trondheim Gas Technology Conference, 5th of June 2014
CRYOGENIC HOSE
TECHNOLOGIES
Third party expert opinion:
Hose Alternatives
Vacuum Insulated hoses
Composite Hoses
Cryogel Hoses
![Page 14: TGTC-3 Date: 05.06 - SINTEF · 10 3rd Trondheim Gas Technology Conference, 5th of June 2014 Existing LNG terminals Multi buoy mooring Floating flexible cryogenic hoses Buoy Small-scale](https://reader035.fdocuments.in/reader035/viewer/2022071214/60434e6e83465d2b9700a642/html5/thumbnails/14.jpg)
14
3rd Trondheim Gas Technology Conference, 5th of June 2014
INDUSTRY CONCERNS
a) How much boil-off will the UBS add during LNG discharge/loading?
b) What will the pressure loss through the UBS be?
c) What is the optimal flow-rate and inner diameter to minimize BOG?