Tg06

32
Introduction to Information Technology Turban, Rainer and Potter John Wiley & Sons, Inc. Copyright 2005

Transcript of Tg06

Page 1: Tg06

Introduction to Information Technology Turban, Rainer and Potter John Wiley & Sons, Inc.Copyright 2005

Page 2: Tg06

A Technical View of System Analysis and

Design

Page 3: Tg06

TG 6 3“ Copyright 2005 John Wiley & Sons Inc.”

Chapter Outline

Developing an IT architectureOverview the Traditional SDLCAlternative methods and tools for systems developmentComponent- based development and web services

Page 4: Tg06

TG 6 4“ Copyright 2005 John Wiley & Sons Inc.”

Learning Objectives

Describe the hierarchy and steps of IT architecture.Describe the SDLC and its advantages and limitations.Describe the major alternative methods and tools for building information systems.Describe the use of component- based development and web services.

Page 5: Tg06

TG 6 5“ Copyright 2005 John Wiley & Sons Inc.”

TG6.1 Developing an IT Architecture

Koontz (2000) suggested a six-step process for developing an IT architecture

Step1: Business goals and vision. The system analyst reviews the relevant business goals and vision.

Step 2 : Information architecture. A company analyst defines the information necessary to fulfil the objectives of step 1.

Step 3: Data architecture. What data you have and what you want to get form customers, including Web-generated data.

Page 6: Tg06

TG 6 6“ Copyright 2005 John Wiley & Sons Inc.”

Step 4: Application architecture. Define the components or modules of the applications that will interface with the required data. Build the conceptual framework of an application, but not the infrastructure that will support it.

Step 5: Technical architecture. Formally examine the specific hardware and software required to support the analysis in previous step.

Step 6: Organizational architecture. An organizational architecture deals with the human resources and procedure required by steps 1 through 5

Page 7: Tg06

TG 6 7“ Copyright 2005 John Wiley & Sons Inc.”

TG6.2 Overview of SDLC

Systems development life cycle (SDLC) is a structured framework used for large IT projects, that consists of sequential processes by which information systems are developed.

Page 8: Tg06

TG 6 8“ Copyright 2005 John Wiley & Sons Inc.”

An eight- stage system development life cycle (SDLC)

Page 9: Tg06

TG 6 9“ Copyright 2005 John Wiley & Sons Inc.”

Waterfall approach. SDLC approach in which tasks in one stage were completed before the work proceeded to next stage Systems analysts. IS professionals who specialize in analyzing and designing information systems.Programmers. IS professionals who modify existing computer programs or write new computer programs to satisfy user requirements.Technical specialist. Experts on a certain type of technology, such as databases or telecommunications

Page 10: Tg06

TG 6 10“ Copyright 2005 John Wiley & Sons Inc.”

Systems stakeholders

All people who are affected by changes in information systems

Page 11: Tg06

TG 6 11“ Copyright 2005 John Wiley & Sons Inc.”

Systems investigation begins with the business problem (or business opportunity).

The next task in the systems investigation stage is the feasibility study that gauges the probability of success of a proposed project and provides rough assessment of the project's feasibility.

Systems investigation

Page 12: Tg06

TG 6 12“ Copyright 2005 John Wiley & Sons Inc.”

Technical feasibility: Assessment of whether hardware, software and communications components can be developed and /or acquired to solve a business problem.

Economic feasibility: Assessment of whether a project is an acceptable financial risk and if the organization can afford the expense and time needed to complete it.

Feasibility study

Page 13: Tg06

TG 6 13“ Copyright 2005 John Wiley & Sons Inc.”

Return on investment. The ratio of the net income attributable to a project divided by the average assets invested in the project.Net present value. The net amount by which project benefits exceed project costs of capital and the time value of money.Breakeven analysis. Method that determines the point at which the cumulative cash flow from a project equals the investment made in the project.

Economic feasibility

Page 14: Tg06

TG 6 14“ Copyright 2005 John Wiley & Sons Inc.”

Organizational feasibility . organization’s ability to access the proposed project.Behavioural feasibility. Assessment of the human issues involved in a proposed project, including resistance to change and skills and training needs.

Feasibility study cont…

Page 15: Tg06

TG 6 15“ Copyright 2005 John Wiley & Sons Inc.”

Systems analysis

The examination of the business problem that the organization plans to solve with an information system. This stage defines the business problem, identifies its causes, specifies the solution and identifies the information requirements that the solution must satisfy

Page 16: Tg06

TG 6 16“ Copyright 2005 John Wiley & Sons Inc.”

Organization have three basic solutions to any business problem relating to an information system:

Do nothing and continue to use the existing system unchanged,

Modify or enhance the existing system,

Develop a new system.

Systems Analysis cont…

Page 17: Tg06

TG 6 17“ Copyright 2005 John Wiley & Sons Inc.”

There are problems associated with eliciting information requirement, regardless of the method used by the analyst.

The business problem may be poorly defined The users may not know exactly what the problem is, what they want or what they need.Users may disagree with each other about business procedures or even about the business problem. The problem may not be information related, but may require other solutions, such as a change in management or additional training.

Page 18: Tg06

TG 6 18“ Copyright 2005 John Wiley & Sons Inc.”

The system analysis stage produces the following information: Strengths and weaknesses of the existing system Functions that the new system must have to

solve the business problem. User information requirements for the new

system.

Page 19: Tg06

TG 6 19“ Copyright 2005 John Wiley & Sons Inc.”

System analysis describes what a system must do to solve the business problem and systems design describes how the system will accomplish this task . The deliverable of the systems design phase is the technical design that specifies the following :System outputs, inputs and user interfacesHardware, software, databases, telecommunications, personnel and proceduresHow these components are integrated

This output represents the set of system specification

Systems design

Page 20: Tg06

TG 6 20“ Copyright 2005 John Wiley & Sons Inc.”

System design encompasses two major aspects of the new system:

Logical system design: states what the system will do, using abstract specifications.

Physical system design: states how the system will perform its functions, with actual physical specification.

Page 21: Tg06

TG 6 21“ Copyright 2005 John Wiley & Sons Inc.”

The translation of a system’s design specification into computer code.

Programming

Page 22: Tg06

TG 6 22“ Copyright 2005 John Wiley & Sons Inc.”

Testing check to see if the computer code will produce the expected and desired results under certain conditions

Testing is designed to delete errors (bugs) in the computer code. These errors are of two types . Syntax errors ( e.g., misspelled word or a misplaced comma) and logic errors that permit the program to run but result in incorrect output

Testing

Page 23: Tg06

TG 6 23“ Copyright 2005 John Wiley & Sons Inc.”

Implementation or deployment is the process of converting from the old system to the new system. Organizations use four major conversion strategies ; parallel , direct , pilot and phased.

Parallel conversion. Implementation process in which the old system and the new system operate simultaneously for a period of time.

Direct conversion. Implementation process in which the old system is cut off and the new system turned on at a certain point in time.

Implementation

Page 24: Tg06

TG 6 24“ Copyright 2005 John Wiley & Sons Inc.”

Pilot conversion. Implementation process that introduces the new system in one part of the organization on a trial basis, when new system is working property, it is introduced in other parts of the organization.Phased conversion. Implementation process that introduces components of the new system in stages, until the entire new system is operational.

Implementation cont…

Page 25: Tg06

TG 6 25“ Copyright 2005 John Wiley & Sons Inc.”

Operation and maintenance

Systems need several types of maintenance.

Debugging: A process that continues throughout the life of the system.

Updating: updating the system to accommodate changes in business conditions.

Maintenance: that adds new functionally to the system –adding new features to the existing system without disturbing its operation.

Page 26: Tg06

TG 6 26“ Copyright 2005 John Wiley & Sons Inc.”

Prototyping

Joint application design (JAD)

Rapid application development (RAD)

Object- oriented development

Other methods

TG6.3 Alternative methods and tools for systems development

Page 27: Tg06

TG 6 27“ Copyright 2005 John Wiley & Sons Inc.”

Prototyping. Approach that defines an initial list of user requirements, builds a prototype system and then improves the system in several iterations based on users’ feedback.

Joint application design (JAD). A group –based tool for collecting user requirements and creating system designs.

Alternative methods cont…

Page 28: Tg06

TG 6 28“ Copyright 2005 John Wiley & Sons Inc.”

Rapid application development . A development method that uses special tools and an iterative approach to rapidly produce a high-quality system.

Computer-aided software engineering (CASE). Development approach that uses specialized tools to automate many of the tasks in the SDLC; upper CASE tools in SDLC automate the early stages of the SDLC, and lower case tools automate the later stages.

Alternative methods cont…

Page 29: Tg06

TG 6 29“ Copyright 2005 John Wiley & Sons Inc.”

Integrated Computer Assisted software Engineering (ICASE) Tools . CASE tools that provide links between upper CASE and lower CASE tools.

Object- oriented development. Begins with aspects of the real world that must be modelled to perform a task.

Alternative methods cont…

Page 30: Tg06

TG 6 30“ Copyright 2005 John Wiley & Sons Inc.”

CBD: A method that uses pre-programmed components to develop application.

Web service in system development: Self-contained, self-describing business and consumer modular applications, delivered over the Internet, that users can select and combine through almost any device.

TG6.4 Component-based development (CBD) and web service

Page 31: Tg06

TG 6 31“ Copyright 2005 John Wiley & Sons Inc.”

Web services advantages and limitations

Advantage Disadvantage

Greater interoperability and lower costs due to universal, open, text-based standards

Standards still being defined

Enable software running on different platforms to communicate with each other

Require programming skill to implement

Promote modular programming and reuse of existing software.

Security: applications may be able to bypass security barriers

Operate on existing Infrastructure, so are easy and inexpensive to implement.

Can be implemented incrementally

Page 32: Tg06

TG 6 32“ Copyright 2005 John Wiley & Sons Inc.”

All rights reserved. Reproduction or translation of this work beyond that permitted in section 117 of the United States Copyright Act without express permission of the copyright owner is unlawful. Request for information should be addressed to the permission department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The publisher assumes no responsibility for error, omissions, or damages caused by the use of these programs or from the use of the information herein.