TG 3: Oil Mud Testing Procedures

29
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non-task group members are asked to hold questions and comments until the end of the meeting or when the chair opens the floor. Thank you for your cooperation! Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth, Texas January 25 - 26, 2011

description

Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth, Texas January 25 - 26, 2011. TG 3: Oil Mud Testing Procedures - PowerPoint PPT Presentation

Transcript of TG 3: Oil Mud Testing Procedures

Page 1: TG 3: Oil Mud Testing Procedures

January 26, 2011

TG 3: Oil Mud Testing Procedures

While we welcome open participation, non-task group members are asked to hold questions and comments until the end of the meeting or when the chair opens the floor.

Thank you for your cooperation!

Exploration & Production Winter Standards Meeting

Renaissance Worthington Hotel, Fort Worth, TexasJanuary 25 - 26, 2011

Page 2: TG 3: Oil Mud Testing Procedures

January 26, 2011

Hand out minutes from Washington, D.C. to TG3 members

•Task Group Charge•Roll Call•Previous Meeting Minutes – Approval•Work Group Reports

• WG1: Oil Mud Chemical Analysis• WG2: HPHT Direct Indicating Viscometers • WG3: Particle Size Distribution Testing of

OBM / SBM

Agenda

Page 3: TG 3: Oil Mud Testing Procedures

January 26, 2011

• Old Business• New Business • Action Items• Adjourn

Agenda (Continued)

Page 4: TG 3: Oil Mud Testing Procedures

January 26, 2011

Chairperson

Marvin Pless / Baker Hughes

TG Charge:

Recommend needed changes and develop test procedures for field and laboratory testing of oil-based drilling fluids (results usually published in API RP 13B-2 / ISO 10414-2 and RP 13I / ISO 10416)

TG3 Oil Mud Testing Procedures

Page 5: TG 3: Oil Mud Testing Procedures

January 26, 2011

• Marvin Pless / Baker Hughes – Chair• David Dino / Elementis – Secretary• Brent Estes/ Chevron• Larry Mitchell / OFITE• Paul Scott / ConocoPhillips• Tom Shumate / Baroid• Catalin Ivan / ExxonMobil• Tim Wilkin / M-I

TG3 Members / Role Call

Page 6: TG 3: Oil Mud Testing Procedures

January 26, 2011

Approval of minutes from June meeting in Washington, D.C. distributed to TG3 members:

•Motion made by:

•Seconded by:

•Result:

TG3 – Minutes

Page 7: TG 3: Oil Mud Testing Procedures

January 26, 2011

Chairperson

Tom Shumate / Baroid

Charge:

Revise existing OBM chemical analysis procedures for whole mud alkalinity, chloride and calcium.

TG3 / WG1Oil Mud Chemical Analysis

Page 8: TG 3: Oil Mud Testing Procedures

January 26, 2011

• No current activities

• WG in hibernation

• Chairman available to resolve questions related to ISO DIS voting

TG3 / WG1 Status

Page 9: TG 3: Oil Mud Testing Procedures

January 26, 2011

Chairperson

Keith Morton / Chevron

Charge:

Develop a recommended operating practice for concentric cylinder viscometers capable of viscosity measurements at pressures greater than 10,000 psig used to characterize the rheological properties of WBM and OBM at elevated temperatures.

TG3 / WG2 HPHT Direct Indicating Viscometer

Page 10: TG 3: Oil Mud Testing Procedures

January 26, 2011

TG3 / WG2 HPHT Direct Indicating Viscometer

• Document distributed to the TG members for final review / comment

• Edits have been received from TG members

• Document with edits sent back to WG / Keith Morton / Chairman for review

• Revised document will be emailed to TG for review and to SC13 for a vote at the summer 2011 meeting

Page 11: TG 3: Oil Mud Testing Procedures

January 26, 2011

Chairperson

Greg Perez

Charge:

Propose a method(s) for determining PSD’s of NAF’s to be included in API RP13I

TG3 / WG3 Particle Size Distribution Testing of

OBMs/SBMs

Page 12: TG 3: Oil Mud Testing Procedures

January 26, 2011

TG3 / WG3Particle Size Distribution Testing of

OBMs/SBMs • Greg Perez• Tim Wilkin• Nathan Tarver• Keith Morton• Carl LaCombe• Stephen Ward-Smith• Chris Steele• Saleh Al-Ammari

Page 13: TG 3: Oil Mud Testing Procedures

January 26, 2011

TG3 / WG3Particle Size Distribution Testing of

OBMs/SBMs

• Surveyed varied PSD instruments in global usage: Malvern, Beckmann Coulter, Cilas, Microtrac, as major parties

• Members discussed perceived relevant issues: dispersion solvents, dilution solvents, use of ultrasound, % obscuration, optical model selection, sample homogenization.

Page 14: TG 3: Oil Mud Testing Procedures

January 26, 2011

TG3 / WG3Particle Size Distribution Testing of

OBMs/SBMs

• Agreed that a clear description of what assumptions are inherent in the guidance given in the proposed RP will be necessary.

• Determined need to establish a basic lab prepared system for Round Robin testing.

Page 15: TG 3: Oil Mud Testing Procedures

January 26, 2011

TG3 / WG3Particle Size Distribution Testing of

OBMs/SBMs

• Members discussed wettability concerns of the wide possible variety of solids present in these fluids.

• Homogenization methods were discussed and the limits and expectations of sample uniformity was discussed.

Page 16: TG 3: Oil Mud Testing Procedures

January 26, 2011

TG3 / WG3Particle Size Distribution Testing of

OBMs/SBMs

• Found that % obscuration values were highly varied among users and may lead to agglomerated stated even when diluted.

• Members discussed limiting initial RP scope to fully dispersed state samples.

• Call for submission of individual methods for detailed comparison.

Page 17: TG 3: Oil Mud Testing Procedures

January 26, 2011

TG3 / WG3Particle Size Distribution Testing of

OBMs/SBMs

New Business:

• Request TG guidance on limiting initial RP scope to fully dispersed sample systems.

• Discuss new parameters to ensure proposed RP would be general enough in focus so as not to exclude any existing instruments in usage.

Page 18: TG 3: Oil Mud Testing Procedures

January 26, 2011

TG3 / WG3Particle Size Distribution Testing of

OBMs/SBMs

New Business (Continued):

• Discuss HSE issues regarding flammable solvent use in PSD measurements, including rig-site use.

• Request TG guidance on desired timeline for proposed RP delivery and any need to alter WG composition to meet.

Page 19: TG 3: Oil Mud Testing Procedures

January 26, 2011

TG3 / WG3Particle Size Distribution Testing of

OBMs/SBMs

New Business (Continued):

• Submit individual PSD methods for review and variability comparison.

• Distribute proposed Round Robin testing formulation for member review.

• Other items to be determined

Page 20: TG 3: Oil Mud Testing Procedures

January 26, 2011

TG3 / WG3Particle Size Distribution Testing of

OBMs/SBMs

Next meeting date and place – TBD

Page 21: TG 3: Oil Mud Testing Procedures

January 26, 2011

• Measurement of NAF Internal Phase Activity Modifiers: Brent Estes to meet with volunteers to discuss the WG “Charge” and report back to the TG3 at the winter meeting.

•Particle plugging test revision for inclusion in RP13B-2

Old BusinessAction Items From June Meeting In Washington, DC

Page 22: TG 3: Oil Mud Testing Procedures

January 26, 2011

Hand out revised SR3 to Task Group

Measurement of NAF Internal Phase Activity Modifiers

Page 23: TG 3: Oil Mud Testing Procedures

January 26, 2011

Background: Increased emphasis on environmental aspects of drilling fluids is driving fluid companies toward non-chloride internal phase activity modifiers for non-aqueous fluids

•Introduced at the 2010 winter meetings

•SR3 submitted to the Task Group at the 2010 summer meetings

•Tabled by Task Group for further refinement

Measurement of NAF Internal Phase Activity Modifiers

Page 24: TG 3: Oil Mud Testing Procedures

January 26, 2011

Actions assigned to the WG for consideration prior to winter standardization conference:

• Limit scope of materials to be addressed

• Inclusion of methodology for solids calculations into SR3 document / WG Charge

Measurement of NAF Internal Phase Activity Modifiers

Page 25: TG 3: Oil Mud Testing Procedures

January 26, 2011

Group of interested parties met on 12/7/2010 to discuss assignments from the Task Group•Activity modifiers to be considered

• Formates• Nitrates• Acetates• Glycol / Glycerols

• Agreed to include methodology for utilizing activity measurements to calculate corrected solids.

Measurement of NAF Internal Phase Activity Modifiers

Page 26: TG 3: Oil Mud Testing Procedures

January 26, 2011

Proposed Work Group Charge:

Develop procedure(s) for measurement of non-chloride activity modifiers in non-aqueous fluids and methodology to use those measurements in corrected solids calculations.

Vote to approve SR3 for submission to API

Measurement of NAF Internal Phase Activity Modifiers

Page 27: TG 3: Oil Mud Testing Procedures

January 26, 2011

Particle Plugging Test Revision for Inclusion in RP13B-2

• Meeting with TG4/WG2, Ceramic PPT Procedure Re-Write

• New procedure will be applicable to RP13B-1 and RP13B-2

• WG2 to submit procedure to TG4 for approval

• Following approval of draft in TG4, draft procedure to be distributed to TG3 members for approval

Page 28: TG 3: Oil Mud Testing Procedures

January 26, 2011

TG 3: Oil Mud Testing Procedures

Other new business from the floor

Page 29: TG 3: Oil Mud Testing Procedures

January 26, 2011

Adjournment