Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr...

14
Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design Engineer Drafting Engineer Systems Engineer Aero Engineer Stress Simulation Engineer Controls Engineer Electronics Engineer Project Manager Facilitator Pilot Purchaser Publisher Communications Publisher

Transcript of Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr...

Page 1: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

Tethered Glider - Base StationGroup P16462

Sarah CollmusLaura ArciniegasKevin CollinsAleksandr KimMichael OstaszewskiKevin LarkinSukmin Lee

Design EngineerDrafting EngineerSystems EngineerAero EngineerStress Simulation EngineerControls Engineer Electronics Engineer

Project ManagerFacilitatorPilotPurchaserPublisherCommunicationsPublisher

Page 2: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

• Background• Problem Statement and Deliverables• Use Scenarios• Customer Needs• Engineering Requirements• Project Plan• Risk Management• Questions

Agenda

Page 3: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

• Current wind gathering systems cannot go much higher due to cost constraints associated with the base

• An alternate method would be to use a glider tethered to a base station

• Potential to reach higher altitudes• Potential to reduce costs in base

construction

Background - Need for Project

http://nared.org/wind-power/wind-turbine/

Page 4: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

Background - Similar ProjectsAmpyx Power Makani Power

● Comparable energy generation with a 90% reduction in materials

● Glider travels in random flight path● Weather sensor information to decide if lanch / land

needed● Automated launch and land capabilities● Grounded generator turned by tether reeling in and out

● Generates 50% more energy with 90% less material● Kite simulates tip of turbine blade (vertical flight path)● Computers use GPS to find optimal flight path ● Rotors act as propellers to launch kite● In flight, rotors allowed to free-rotate, and send energy

down tether to generator

http://www.fastcoexist.com/3022596 http://archive.datacenterdynamics.com

Page 5: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

Background - Previous MSD groupsCurrent project is the 3rd iteration of the Wind Energy System focused on horizontal flight paths - previous two attempted a vertical path

● P14462 - Wind Energy Base Station○ Glider gradually lost altitude with every cycle

● P15462 - Wind Energy Glider○ Glider was not able to attain desired flight path

Recommendations by previous groups● Two point bridle system● Some form of automation to fly or a skilled pilot

Page 6: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

Problem Statement

Page 7: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

• Create the base station to that a purchased glider would be

tethered to

• The base should be designed to be portable and 360 degree

motion about a vertical axis.

• Base station must have a reel system to reel in/out the glider

while maintaining a taut tether

• Video recordings of all official trials

Deliverables

Ampyx Technology Concept

Page 8: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

Use ScenariosGoal of this project is more of a “proof of concept.” Further research will be

required before the system can be cleared for use..

Page 9: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

Customer Requirements

Page 10: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

Engineering Requirements

Page 11: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

Project Plan - Phase I

Phase 1: Problem Definition TasksDate Complete Reason not Completed

Push to Phase II?

Send out PO for the plane and other materials if not included with the plane 9/10/2015 - -Meet with graduate student Glen Gavi 9/3/2015 - -

Gather & run Gavi's simulations -Program not acquirable until week 1 of Phase II, Glen out of town Yes

Translate simulation data -Program not acquirable until week 1 of Phase II, Glen out of town Yes

Talk to Dr. Kempski about acquiring a transmitter and an ESC - New plane comes with transmitter No

Final Date for all Phase 1 tasks 9/10/2015

Page 12: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

Project Plan - Phase II

Phase 2: Systems Design Tasks

Set A - Plane FlightDate complete Set B - Design and Programming Date complete

Assemble the plane Gather & run Gavi's simulationsFind a place in Rochester to test flights Translate simulation data

Practice Untethered FlightLearn basic computer coding program for flight simulationResearch on reel systemsDetermine how to keep tether taught upon launchResearch launch and land systems of RC planesConcept designs of base

Final Date for all Phase 2 tasks 10/1/2015

Page 13: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

Risk Management

1=least 4=most

Page 14: Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

Thank you!

Questions?