Testing,Adjusting&Balancing(TAB) and...

70
HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L . Testing, Adjusting & Balancing(TAB) and Building Systems Commissioning HANMI BLDG 283-38 NEUNG-DONG, GWANGJIN-GU, SEOUL, KOREA. TEL. 02)456-7033, FAX. 02)456-7133 T&C

Transcript of Testing,Adjusting&Balancing(TAB) and...

Page 1: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

Testing, Adjusting & Balancing(TAB)

and

Building Systems Commissioning

HANMI BLDG 283-38 NEUNG-DONG, GWANGJIN-GU,SEOUL, KOREA. TEL. 02)456-7033, FAX. 02)456-7133

T & C

Page 2: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

TABLE OF CONTENTS

. INTRODUCTIONⅠ 1

. BUSINESS FIELDⅡ 3

. COMPANY HISTORYⅢ 5

. CERTIFICATIONⅣ 7

. COMMERCIAL REGISTRATIONⅤ 14

. ORGANIZATION CHARTⅥ 19

. ENGINEERSⅦ 21

. TOOL & INSTRUMENT LISTⅧ 25

. WORKS COMPLETED LISTⅨ 40

. COMPANY LOCATIONⅩ 67

Page 3: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 1 -

Page 4: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 2 -

HANMI C&E Co., Ltd. is a Professional HVAC TAB service and Building System

Commissioning organization, certified by NEBB (National Environmental Balanci

-ng Bureau).

We are a highly disciplined team of professionals, capable of providing TAB &

Commissioning services for Building mechanical & Electrical systems.

Our personnel have been involved in the engineering and construction industry

many years with major international projects in institutional, industrial,

governmental, commercial buildings and projects both low and high-rise

stories buildings in part of design, construction, commissioning and operation

& maintenance.

HANMI C&E services provides qualified mechanical and electrical engineers

and technicians to guarantee that system installation and performance meets

all design criteria as applied by the design engineer.

Recognized standards (AABC, NEBB, SMACNA, ASHRAE, IES, CIBSE) as well

as LEED requirements are being followed in all TAB and commissioning

process, Individual project standards will be followed when specified.

The purpose of this brochure is to depict our overall operations and our

performance capabilities in considering what we can do for your company.

Please do not hesitate to consult HANMI C&E regarding your Building systems

under design or construction or for existing problem facilities.

We are always ready to meet client requirements.

Page 5: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 3 -

Page 6: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 4 -

◊ Testing, Adjusting and Balancing(TAB) of the building HAVC&R systems

◊ Commissioning of building systems

◊ Energy Audit by relative requirements

◊ System Evaluation of special equipments

◊ ESCO(Energy System Company) business and BRP(Building Retrofit Project)

business

◊ Constructions

◊ Products;

IAQ(Indoor Air Quality) Damper Control Units(Patented)

ZCD(Zone Control Damper) Units for VAV System

◊ Technical R&D

Page 7: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 5 -

Page 8: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 6 -

Jun 2012 Establishment Qatar Branch Office, TESTING & COMMISSIONINGW.L.L

Dec 2011 The Prime Minister Commendation

Oct 2008 Certification of Energy Saving Company by KEMCO

Dec 2006 Certification of Energy Audit by MKE

Jun 2005 Certification of Sound and Vibration Measurement by NEBB

Sep 2004 Certification of Building system commissioning by NEBB

5 Feb 2003 Certification of Excellent Quality (Machine, Mechanism & Materials)by the Ministry of Commerce, Industry and Energy (Cert. No.2003-006)

12 Apr 2001 Increase of capital (Cap. 500,000,000)₩

14 Dec 2000 Certification of Korean Technology Mark by the Ministry ofCommerce, Industry and Energy (Cert. No. 0992)

15 Mar 1999 Registration of Energy Service Company by the Ministry ofCommerce, Industry and Energy (No. 99-2-3)

1 Apr 1998 Certification of TAB by SAREK (The Society of Air-conditioningand Refrigerating Engineer of Korea)Cert. No. 98-04

11 Dec 1997 Certification of ISO 9001 - Provision of TAB (Testing, Adjusting,and Balancing) services for HVAC facilities of building, housing,and plant by LRQA, U.K. (Cert. No. K971060)

Apr 1996 Renewal certification to NEBB (National Environmental BalancingBureau) for TAB (Cert. No. 3008)

24 Jun 1993 Registration of the main body of activity to Korea EngineeringDevelopment Corporation (No. 01 - 008)

14 Nov 1986 Registration of Professional Technology Service by the Ministryof Science & Technology (No. 3 - 231)

20 Sep 1986 Registration of TAB Certification to NEBB (National EnvironmentalBalancing Bureau) Cert. No. 2645

12 Apr 1986 Foundation Hanmi (KOAM) Co., Ltd.

Page 9: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 7 -

Page 10: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 8 -

Page 11: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 9 -

Page 12: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 10 -

Page 13: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 11 -

Page 14: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 12 -

Page 15: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 13 -

Page 16: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 14 -

Page 17: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 15 -

Page 18: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 16 -

Page 19: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 17 -

Page 20: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 18 -

Page 21: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 19 -

Page 22: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 20 -

President             PresidentKim, ChunYong   Kim, DooSung

  

R&D Center     Audit  

                         

TAB/CxTeam 1

Administration Energy Audit

          

TAB/CxTeam 2

Accounting ESCO/BRP

          

TAB/CxOversea

Design/QTN Construction

  

TAB/CxOversea

Page 23: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 21 -

Page 24: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 22 -

POSITION NAME EDUCATION REGISTRATION & EXPERIENCE

President Kim, ChunYong

Mechanical Engineer,

BSME-Seoul National

University of

Technology

◊ Professional Engineer HVAC & Refrigeration,

◊ NEBB Certified TAB supervisor &

commissioning Administrator

◊ Thirty five(35) years engineering

experience,

- Construction field engineer, Test and

Commissioning chief Mechanical engineer, in

commercial building, Industrial facilities,

clean room and wide variety of projects.

President Kim, DooSung

Mechanical Engineer,

BSME-

Hanyang University

Professional Engineer HVAC & Refrigeration,◊

◊ Thirty six(36) years engineering experience

- Field mechanical engineering and

construction,

Project Management as consultant and

contractor,

Extensive experience in HVAC Installation

of an extremely wide variety of systems.

Engineer Jung, JongChun

Mechanical Engineer,

BSME-Seoul National

University of

Technology

◊ First grade engineer Construction &

equipment

◊ First grade engineer HVAC &

Refrigeration

◊ Twenty five(25) years engineering

experience

- Start-up and commissioning engineer,

automatic control engineer, TAB field

engineer of various projects.

Engineer Moon, DaeHee

HVAC & Ref.

Engineer,

College of Kaitech.

◊ Professional Engineer - HVAC &

Refrigeration

◊ Twenty two(22) years engineering

experience

- HVAC field engineer,

- Test & Commissioning engineer of

various projects

Engineer Jung, KyoungSinGyeonggi Technical

College

Professional Engineer HVAC & Refrigeration,◊

◊ Thirty two(32) years engineering experience.

- O&M services for various buildings.

- Building energy audit and analysis for

various projects.

Page 25: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 23 -

POSITION NAME EDUCATION REGISTRATION & EXPERIENCE

Engineer Ko, DongSung Korea Army Academy

◊ First grade engineer - Energy

Management

◊ Thirty two(32) years engineering

experience

- O&M services for various buildings.

- Building energy audit and analysis for

various projects.

Engineer Chang, HyunHo

Mechanical Engineer,

BSME-Hanyang

University

◊ First grade Engineer - Construction &

Equipment

◊ Twenty seven(27) years engineering

experience

- Test & Commissioning engineer of

various projects

Engineer Song, YeonHo

Building Service

Engineer,

Jungkyung College of

Technology.

◊ First grade engineer - HVAC &

Refrigeration

◊ Nineteen(19) years engineering

experience

- Test & Commissioning engineer of

various projects.

Engineer Kim, JaeKoo

Building Service

Engineer,

Suwon College of

Technology

◊ First grade engineer - Construction &

equipment

◊ Seventeen(17) years engineering

experience

- Test & Commissioning engineer of

various projects.

Engineer Woo, JunHa

Building Service

Engineer,

Suwon College of

Technology

◊ First grade engineer - Construction &

equipment

◊ Eighteen(18) years engineering experience

- Test & Commissioning engineer of

various projects.

Engineer Choi, HeeKoo

Electrical Engineer,

BSEE-

Donga University

◊ First grade engineer - Electric

◊ Twenty one(21) years engineering

experience

- Electrical facility installation field and

Retro-commissioning engineer of

various projects.

Engineer Han, DongHoon

Mechanical Engineer,

BSME-

Seoul National

University of

Technology

◊ First grade engineer - Construction &

equipment

◊ First grade engineer - HVAC &

Refrigeration

◊ Sixteen(16) years engineering

experience HVAC Field engineer,

- Test & Commissioning engineer of

various projects.

Page 26: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 24 -

POSITION NAME EDUCATION REGISTRATION & EXPERIENCE

Engineer Park, YoungSun

Energy Management

Engineer,

BSME-Incheon

University

◊ First grade engineer - Energy

management

◊ Ten(10) years engineering experience

- Energy audit, ESCO/BRP project

engineer of various projects.

Engineer Jung, Wonki

Building Service

Engineer,

Shinheung College

◊ First grade engineer - Construction &

equipment

◊ Nine(9) years engineering experience

- HVAC Field engineer,

- Test & Commissioning engineer of

various projects.

Engineer Kang, TaeSun

Building Service

Engineer,

Suwon College of

Technology

◊ Five(6) years engineering experience

- HVAC Field engineer,

- Test & Commissioning engineer of

various projects.

Engineer Kim, YoungWoon

Building Service

Engineer,

BSME-Kyeongwon

University

◊ First grade engineer - HVAC &

Refrigeration

◊ Five(5) years engineering experience

- Test & Commissioning engineer of

various projects.

Engineer An, KiKwang

Building Service

Engineer,

Woosong technical

College

◊ First grade engineer - Construction &

equipment

◊ Six(6) years engineering experience

- HVAC Field engineer,

- TAB field engineer of various projects.

Engineer Jeon, HyoSang

Building Service

Engineer,

Shinheung College

Three◊ (3) years engineering experience

- HVAC Field engineer,

- TAB field engineer of various projects.

Engineer Baeck, SeungHyeon

Building Service

Engineer,

Suwon College of

Technology

◊ Two(2) year engineering experience

- HVAC Field engineer,

- TAB field engineer of various projects.

Engineer Park, JongHeon

Building Service

Engineer,

Dealim College

◊ Five(5) years engineering experience

- HVAC Field engineer,

- TAB field engineer of various projects.

Page 27: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 25 -

POSITION NAME EDUCATION REGISTRATION & EXPERIENCE

Engineer Lee, DongJin

Building Service

Engineer,

Suwon College of

Technology

◊ First grade engineer - Construction &

equipment

Three◊ (3) years engineering experience

- HVAC Field engineer,

- TAB field engineer of various projects.

Engineer Ha, TaeJun

Building Service

Engineer,

BSME -Donga

University

◊ Three(3) years engineering experience

- HVAC Field engineer,

- TAB field engineer of various projects.

Engineer Lee, SeungJae

Building Service

Engineer,

MS- Yonsei

University

◊ Two(2) year engineering experience

- Building energy service engineer

Engineer Park, JoonHwi

Mechanical Engineer,

MS-Tokyo Institute of

Technology

◊ Two(2) year engineering experience

- Building energy service engineer

Engineer Kweun, OSeung

Building Service

Engineer,

Shinheung College

◊ Two(2) years engineering experience

- HVAC Field engineer,

- TAB field engineer of various projects.

Engineer Kim, HongBo

Building Service

Engineer,

Shinheung College

◊ One(1) years engineering experience

- HVAC Field engineer,

- TAB field engineer of various projects.

Engineer Kim, YouJeong

Building Service

Engineer,

Shinheung College

◊ One(1) years engineering experience

- HVAC Field engineer,

- TAB field engineer of various projects.

Page 28: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 26 -

Page 29: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 27 -

No. DESCRIPTION SPECIFICATION MANUFACTURER MODEL No. Q'TY REMARKS

01 FLOW HOOD 0~3,400CMH

ALNOR Instrument

Company.

U.S.A

6461

6463

6465

11

02AIRDATA

MULTIMETER

25~3,000FPM

25~2,500CFM

-65 250~ ℉

SHORTRIDGE

Instruments, Inc.

U.S.A

8400 2

03 VELOMETER0~10IN.WG

0~50M/Sec

ALNOR Instrument

Company.

U.S.A

Series6000 1

04ROTATINGVANE

0~2,000FPM

TAYLOR Company.

U.S.A

3132-A-4 2

05

ANEMOMETER

ROTATING

VANE

1~15 M/Sec

ASTO KEIRYOKI

Co.

JAPAN

26682 1

06DIGITAL

TACHOMETER0~99,999RPM

LUTRON Electronic

Enterprise Co.

TAIWAN

DT-2234A 13

07DIGITAL

TACHOMETER1~19,999RPM

TESTO Gmbh &

Co.

GERMANY

TESTO-4600 2

08

DUCTWORK

LEAKAGE

TESTER

189 /S(400CFM)ℓ

at 1,000Pa(4")

AIRFLOW

Developments Ltd.

ENGLAND

Low Pressure 2

09 MANOMETER 0~2 IN.WG

DWYER

Instruments, Inc.

U.S.A

400-2 4

10 MANOMETER 0~5 IN.WG

DWYER

Instruments,Inc.

U.S.A

400-5 5

11 MANOMETER 0~10 IN.WG

DWYER

Instruments,Inc.

U.S.A

400-10 8

12SLACK-TUBE

MANOMETER0~18 IN.H2O

DWYER

Instruments,Inc.

U.S.A

1211-36 2

13SLACK-TUBE

MANOMETER0~36 IN.H2O

DWYER

Instruments,Inc.

U.S.A

1211-72 1

Page 30: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 28 -

No. DESCRIPTION SPECIFICATION MANUFACTURER MODEL No. Q'TY REMARKS

14 PITOT TUBE8",24",36"

48",60"

DWYER

Instruments,Inc.

U.S.A

160-8,24,36

48,6029

15MAGNEHELIC

GAUGE0~10 IN.WG

DWYER

Instruments,Inc.

U.S.A

2000-25

2000-5010

16WATER

FLOW METER0~6 ㎧

TEKNO Transfer

(MICRONICS) Ltd.

ENGLAND

MK-Ⅱ 1

17

ULTRASONIC

FLOW

METER

0.3~32 FPS

0.1~ 8 MPS

POLYSONICS Inc.

U.S.A

MST-P 3

18

DIFFERENTIAL

PRESSURE

GAUGE

0~100 FEETH2O

TACO Inc.

U.S.A

788-1 2

19 PH METER0~14 PH

0~600℃

TESTO Gmbh & Co.

GERMANY

TESTO-2300 1

20WATER FLOW

METER0~30 FPS

BESTOBELL

Meteflow Ltd.

ENGLAND

PA-12 1

21CLAMPTESTER

0~200 AMP

0~750 VOLT

0~200 Ω

KYORITSU

Electronic Co.

JAPAN

2007 10

22ENERGIE

ANALYSATOR

105~460 VAC

12~1,200 A

20~600 ㎐

EL-CONTROL

Energie S.P.A

ITALY

Eb-1286 2

23DIGITAL

THERMOMETER-50~150℃

TESTO Gmbh & Co.

GERMANY

TESTO-1100 3

24DIGITAL

THERMOMETER-60~1000℃

TESTO Gmbh & Co.

GERMANY

TESTO-925 3

25 PSYCHRO-DYNE10~150 (DRY)℉

-20~60 (WET)℃

COLE PARMER Ins.

Company.

U.S.A

3312-40 6

26DIGITAL

ANEMOMETER

-40~1,000℃

0.4~40 ㎧

0~100 RH%

TESTO Gmbh & Co.

GERMANY

TESTO-4510 2

Page 31: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 29 -

No. DESCRIPTION SPECIFICATION MANUFACTURER MODEL No. Q'TY REMARKS

27HYGROTHERMOGRAPH

10~120℉

0~100 RH%

7Days Recorder

QUALIMETRICS,Inc.

U.S.A

5020 1

28PORTABLECOMBUSTIONOPTIMIZER

0~3,999 PPM

0~20.9 %

25~999℃

NEOTRONICS N.A.

Inc.

ENGLAND

1

29 VIBROMETER

0~1999 ㎛

0~19.99 /Sec㎝

0~19.99 G

KAWATETSU

Instruments

Co.,Ltd.

JAPAN

MK-10 1

30DIGITALAEROSOLMONITOR

0~99.99 /㎎ ㎥

KANOMAX I

International

Corporation.

JAPAN

3411 1

31SOUND &VIBRATIONANALYZER

SVANTECK SVAN947 1

32SOUND METERWITH OCTAVEBAND FILTER

31.5~8,000 ㎐

10~130 ㏈

KANOMAX

International

Corporation.

JAPAN

4030/4061 1

33SOUND METERWITH OCTAVE⅓BAND FILTER

20 ~140㏈ ㏈

±2 ㏈CESVA SC-30 1

34ULTRA-SONICLEAKDETECTOR

DAWE Instruments

Ltd.

ENGLAND

8902C 1

35ILLUMINATIONMETER

0.1~19,999Lux

TOKYO Optical Co.,

,Ltd.

JAPAN

IM-2D 1

36PRESSUREGAUGE

0~200 PSInt Division.

ASHCROFT

Instrument

30/60/100

U.S.A.

1082AS-02L-8

200PSI6

37C O M P O U N DPRESSUREGAUGE

-30~60 PSI

MARSHALL TOWN

Ins.

U.S.A

G-10223,4 2

38DIGITALDIFFERENTIALMETER

0.7~21kg/㎠SHORTRIDGE

INSTRUMENTS.INC.HDM-300 1

39DIFFERENTIALPRESSUREGAUGE

0~100kpa±0.5% F.S

WOOJIN

KOREAP-920 1

40PARTICLECOUNTER

0.1~1.0㎛PMS

U.S.A

L 110AⅡ

L 310AⅡ2

Page 32: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 30 -

No. DESCRIPTION SPECIFICATION MANUFACTURER MODEL No. Q'TY REMARKS

41INFRAREDTHERMALVIDEO

­20 600℃∼ ℃FLUKE

GERMANYTi-55 1

42 DATA LOGGERKB

80channel

HP-Agilen

U.S.A34970A34970A 1

43 DATA LOGGER 이상512 KBGraphtec

ITALYGL200 1

44COMBUSITIONGASANALAYZER

CO2, O2, CO,NOX

TESTO

GERMANY330-2 2

45ELECTICALPOWERANALAYZER

VOLT, AMP,POWER FACTOR

FLUKE

GERMANY434 1

Page 33: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 31 -

ITEM : FLOW HOOD

MANUFACTURE : ALNOR Instrument Co.

(U.S.A)

MODEL No. : 6461/6463/6465

SERVICE : Air Flow Rate at Terminal

0 3,400 CMH.~

ITEM : MANOMETER

MANUFACTURE : DWYER Instrument Inc.

(U.S.A)

MODEL No. : 400-10

SERVICE : Air Pressure, Air Velocity

ITEM : PITOT TUBES

MANUFACTURE : DWYER Instrument Inc.

(U.S.A)

MODEL No. : 160-8, 160-24, 160-36,

160-48, 160-60

SERVICE : Duct Pressures

Page 34: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 32 -

ITEM : ROTATING VANE

ANEMOMETER

MANUFACTURE : TAYLOR Co. (U.S.A)

MODEL No. : 3132

SERVICE : Air Velocity & Flow

0 1,000 FPM.~

ITEM : CLAMP TESTER

MANUFACTURE : SUHCHUN ELEC. Ins. Co.

(KOR)

MODEL No. : 5001 / 5002

SERVICE : Ampere, Volt, Resistance

ITEM : DIGITAL ANEMOMETER

MANUFACTURE : TESTOTERM GMBH & Co.

(W/GERMANY)

MODEL No. : 4510

SERVICE : Air Velocity, Temperature.

Humidity.

0.4 40 M/Sec, -40 1,000~ ~ ℃

Page 35: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 33 -

ITEM : DIGITAL THERMOMETER

MANUFACTURE : TESTOTERM Gmbh & Co.

(W/GERMANY)

MODEL No. : 2200

SERVICE : Temperature

-50 150~ ℃

ITEM : PSYCHROMETER

MANUFACTURE : COLE-PARMER

Instrument Co.

(U.S.A)

MODEL No. : 3312-40

SERVICE : Dry Bulb Temperature

Wet Bulb Temperature

10 120~ °F, -20 60~ ℃

ITEM : PORTABLE COMBUSTION

OPTIMIZER

MANUFACTURE : testo (GERMANY)

MODEL No. : testo 325-1

SERVICE : Boiler Efficiency, Gas Temp.

Page 36: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 34 -

ITEM : VIBROMETER

MANUFACTURE : KAWATETSU Instrument C.

(JAPAN)

MODEL No. : MK-10

SERVICE : Vibration Test (Displacement,

Velocity, Accelation)

ITEM : MAGNEHELIC GAGE

MANUFACTURE : DWYER Instrument Inc.

(U.S.A)

MODEL No. : 2010 AV

SERVICE : Air Pressure

0 10 IN.WG.~

ITEM : ULTRASONIC FLOW METER

MANUFACTURE : MICRONICS Ltd. (U.K)

MODEL No. : MK-Ⅱ

SERVICE : Liquid Velocity & Flow Rate

20mm 2000mm Dia.~

Page 37: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 35 -

ITEM : ENERGIE ANALYSTOR

MANUFACTURE : EBRO Co.(JAPAN)

MODEL No. : EBRO-1286

SERVICE : Electric Volt, AMP,

Power-Factor, KWH, EF

ITEM : DIGITAL TACHOMETER

MANUFACTURE : TESTOTERM Gmbh & Co

(W/GERMANY)

MODEL No. : 4600 / DT 2234A

SERVICE : RPM Test

5 99.999 RPM∼

ITEM : STANDARD THERMOMETER

MANUFACTURE : JUNO Co. (JAPAN)

MODEL No. : T 71061

SERVICE : Temperature

Page 38: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 36 -

Page 39: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 37 -

Page 40: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 38 -

ITEM : INFRARED THERMAL VIDEO

MANUFACTURE : FLUKE (GERMANY)

MODEL No. : Ti-55

SERVICE : ­20 +600℃ ~ ℃

280x1024 Pixels, 8X

5" Display, ± 2 °C

ITEM : DATA LOGGER

MANUFACTURE : HP-Agilent.

(U.S.A)

MODEL No. : 34970A

SERVICE : KB, 8Channel∞

ITEM : DATA LOGGER

MANUFACTURE : Graphtec

(ITALY)

MODEL No. : GL200

SERVICE : 3.5MB, 10Channel

Page 41: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 39 -

ITEM : COMBUSITION GAS ANALYSER

MANUFACTURE : TESTO (GERMANY)

MODEL No. : 330-2

SERVICE : CO2, O2, CO, NOX

ITEM : ELECTRICAL POWER ANALYSER

MANUFACTURE : FLUKE

(GERMANY)

MODEL No. : 434

SERVICE : VOLT, AMP,

POWER FACTOR

ITEM : BUILDING AIR LEAKAGE TESTER

MANUFACTURE : The Energy Conservatory

(U.S.A)

MODEL No. : Blower Door System & DG-700

SERVICE : Building Air Leakage Test

141 ~ 2,973 L/s, 0.75 HP

Page 42: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

- 40 -

Page 43: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HAMAD MEDICAL CITYDOHA, QATAR

QATAR GOVERNMENT HYUNDAI E&C 219,780 12.07~14.12

USARMY, YRP PYENGTEK,KOREA

COE, USA DAEWOO CONST. CO 12.07~14.09

KEPCO NEW OFFICE KEPCO, KOREA DAEWOO CONST. CO 92,400 12.07~14.08

LIFE SCIENCES. OSONGIN-HOUSE 04PRODUCTION LINES

LG BIOLOGY SERVEONE CO - 12.04~12.07

1A GUMI FACTORYHIRING CARRIER PERSONINNOTECH REMODELING

INNOTECH CO SERVEONE CO - 12.04~12.06

MAGOK DISTRICTHOUSING PROJECT

HANHWA CONST. CO HANHWA CONST. CO - 12.03~14.04

DIGITAL MEDIA CITYDIGITAL CUBE BUILDING

N&F CONSORTIUM DEALIM INDUST. CO 70,145 12.03~14.03

LS MTRON KNOWLEDGECENTER CONSTRUCTION

LS MTRON DAEWOO CONST. CO - 12.03~13.01

INOTECH GUMISEMICONDUCT FACTORY

INOTECH CO SERVEONE CO - 12.03~12.04

HWASUNG KISANAPARTMENT

SK CONST CO SK CONST. CO 165,122 12.01~14.01

SEJONG CITY PRIMEMINISTER HOUSE

KOREA GOVERNMENT JUNGYENG CONST. 3,036 12.01~12.10

ENERGY ZERO HOUSE SEOUL CITYDAEKYUNG CONST.CO

3,590 12.01~12.02

GAJOA STATION KOREA RAILROAD CO DONGBU CONST. CO 22,440 11.12~12.12

JUNGJADONG OFFICETEL - DAEWOO CONST. CO 11,484 11.12~12.02

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

- 41 -

Page 44: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

KOREAN MUSEUM KOREA GOVERNMENTSSANGYONG CONST.CO

11,319 11.11~13.03

YEONSE UNIVERSITYGLOBAL CAMPUS

YEONSE UNIVERSITY DAEWOO CONST. CO 95,083 11.11~13.02

GWANGJU PRISONBUILDING

KOREA GOVERNMENT HANWHA CONST. CO 49,500 11.10~14.11

ILSAN BLUEMINGOFFICETEL

CHUNGWON BYUKSAN CONST. CO 48,513 11.10~12.09

DEFENCE OO FACILITY MOD KYUNGNAM ENT. CO - 11.10~12.08

GARAK AGRICULTURAL &MARINE MARKET

SEOULAGRICULTURAL &MARINE MARKET

DEALIM INDUST. CO 210,959 11.09~14.10

SK COMMUNICATIONSHEAD OFFICE

- SK CONST. CO 49,701 11.09~13.07

SKYVAX ANDONG GMPFACTORY

SK CHEMICAL CO SK CONST. CO 23,100 11.09~13.04

AMORAE PACIFICRESIDENTIAL FACILITY

AMORAE PACIFIC DEALIM INDUST. CO 2,937 11.09~12.04

DUGI HIGH SCHOOL DUGI HIGH SCHOOLHYUDAI INDUSTRYDEVELOP. CO

14,061 11.09~12.02

YUNHAP FUNERALCENTER

NONGHYUP NONGHYUP 14,091 11.09~12.02

KOREA ARMY MILITARYFACILITY

BUKUKGANGBUNG CODONGYANG CONST.CO

- 11.09~12.01

AVIATION & UNIVERSEMUSEUM

JEJU FREEINTERNATIONAL CITYDEVELOPMENTCENTER

DEALIM INDUST. CO 29,987 11.06~12.12

PAJU LCD FACTORY LG DISPLAY CO LG DISPLAY CO 66,000 11.06~11.09

- 42 -

Page 45: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

PYUNGTEK MILITARYFACILITY

FED, USACE SK CONST. CO - 11.05~13.08

NAMYANGJU 19BLKAPARTMENT

KOREA LAND &HOUSING CO

HANWHA CONST. CO 112,580 11.05~12.10

SUSEO OFFICE BUILDING KUKJE TRUST CO HYOSUNG CO 51,516 11.05~12.04

BIOLAND OSONGPHARMACEUTICALINDUSTRY

BIOLAND CO KUKDONG CONST, CO 8,887 11.05~11.08

KIST R&D CENTER KIST DEALIM INDUST. CO 19,176 11.04~13.01

KOREA ARMYINTELLIGENCY ACADEMY

- KUMHO CONST. CO 27,004 11.04~12.07

GOYANG WATERTREATMENT CENTER

LH CORP. TAEYOUNG CO. - 11.04~12.03

INOTECH GUMI C/MFACTORY

LG INOTECH SERVEONE 3,102 11.04~11.06

SONGDO STREET MALLB-BLOCK

SONGDO TECHNOPARK

DAEWOO CONST. CO 203,085 11.03~12.08

BUKIL ACADEMY BUKIL ACADEMY HANWHA CONST. CO 13,669 11.02~11.12

CHUKHYUP BONGWHASHOPPING

CHUKHYUP - 5,940 11.02~11.12

OSONG LG BIOLOGYCANTER

LG BIOLOGY SERVEONE - 11.02~11.05

HANGI UNIVERSITYDOMITORY

HANGI UNIVERSITY ISU CONST. CO 22,770 11.01~11.12

ASIA CULTURAL CENTER KOREA GOV. DEALIM INDUST. CO 143,834 10.12~14.08

- 43 -

Page 46: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

DOOSAN ILSAN APT - DOOSAN CONST. CO - 10.12~13.04

SUBWAY STATIONBUNDANG LINE

KOREA GOV. ULTRA CONST. CO - 10.12~11.12

VALIDATION FOR OSONGBIOLOGY COMPLEX

KOREA GOV. HYUDAI CONST. CO - 10.12~11.03

LIG INSURANCE TRAININGCENTER

LIG INSURANCE GS CONST. CO 48,213 10.11~11.12

PAGODA TOWER JONGRO PAGODA TOWERHYUDAI INDUSTRYDEVELOP. CO

7,343 10.11~11.09

LGD GUMI FACTORY LG DISPLAY SERVEONE 166,538 10.11~11.05

LGE PYUNGTEAK CENTER LG ELECTRONIC SERVEONE 12,428 10.11~11.02

DAEGU SUBWAY STATIONNO.2 GYUNGSAN

DAEGU SUBWAY DAEWOO CONST. CO - 10.09~12.08

NONGHYUP GWANGJUSHOPPING

NH DEVELOP. - 8,250 10.09~11.12

EUNGAM #9 APT - HYUDAI CONST. CO - 10.09~11.12

DAUM OFFICE BUILDINGDAUMCOMMUNICATION

HYUDAI INDUSTRYDEVELOP. CO

9,029 10.09~11.07

NONGHYUP JUNNAMCENTER

NONGHYUP CENTER - 24,265 10.08~11.12

POST OFFICE WESTERNDISTRICT

KOREA MOCI HANWHA CONST. CO 20,312 10.07~11.12

00 HOSPITAL - DAEWOO CONST. CO 19,800 10.06~10.12

- 44 -

Page 47: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

CHUNGNAM PROVINCEOFFICE

CHUNGNAMPROVINCE

KYERYONG CONST.CO

104,983 10.05~12.12

SUNGSIL UNIVERSITYSTUDENT CENTER

SUNGSIL UNIVERSITYSSANGYONG CONST.CO

22,849 10.04~11.08

MIRAEASSET PANGYOVENTURE BUILDING

MIRAE BI CJ CONST. CO 23,918 10.04~11.06

PANGYO D-3-3 OFFICEBUILDING

- DAEWOO CONST. CO 111,896 10.03~11.10

SARANG COMMUNITYCHURCH

SARANG COMMUNITYCHURCH

SARANG COMMUNITYCHURCH

72,600 10.02~12.12

SONGDO HARBOR VIEWAPT

NSC LINKAGE JCHA GS CONST. CO 128,964 10.01~11.02

ULCHIRO OFFICEBUILDING

KIM'S I&DDOOSAN HEAVYINDUST. CO

129,984 09.12~11.10

P8E C/R & UTILITYCONSTRUCTION(J/V)

LG DISPLAY GS CONST. CO 114,840 09.12~10.08

YOIDO DULL GOSPELCHURCH

YOIDO DULL GOSPELCHURCH

YOIDO DULL GOSPELCHURCH

59,400 09.12~10.03

VIETNAM HABICO TOWERDOOSAN HEAVYINDUST. CO

HYUPJIN CONST. CO 92,400 09.10~12.07

INCHEON YONGHYEUNEXLLU TOWER

CONGIL CONST. CO POONGLIM INDUST. - 09.10~11.09

EAST SEOUL POSTOFFICE

KOREA POST OFFICEHYUDAI INDUSTRYDEVELOP. CO

15,345 09.10~11.07

INCHEON CHUNGLAEXLLU TOWER

ILJU CONST. CO POONGLIM INDUST. - 09.10.~12.01

KBS JEUNJUBROADCASTINGCENTERAL BLDG

KOREANBROADCASTINGSYSTEM

JINDUK INDUST. CO 14,167 09.09∼11.07

- 45 -

Page 48: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

LIG INSURANCE DAEGUBLDG

LIG INSURANCE CO. LIG ENSULTING CO 44,576 09.09∼09.12

THE #EXPO D9 BL APTCONST.

- POSCO CONST.CO - 09.09∼09.12

CHUNGANG UNIVERSITYCOLLEGE OF PHARMACY& R&D CENTER

CHUNGANGUNIVERSITY

DOOSAN CONST. CO 38,293 09.09~11.01

SOSA-NOGSA TUNNELCONSTRUCTION

KMOCSSANGYONG CONST.CO

- 09.09~10.12

GWANGMYEONG TECHNOPARK

SK CONST.CO SK CONST.CO 255,806 09.09~10.10

CHANGWON STATION K.R.N.A POONGLIM INDUST. 4,297 09.09~10.07

SUPYODONG BUSINESSSERVICE CONST.

DOOSAN AMCDOOSAN HEAVYINDUST. CO

99,818 09.08∼11.07

09 DEPT. COMMANDPOST SERVICE CONST.

NAVY CENTERALFINANCE CORP.

SSANGYONG CONST.CO

9,062 09.08∼11.03

ULSAN GARDENINGNONGHYUP CENTER ANDHANARO MARKET

ULSAN GARDENINGNONGHYUP

- 27,426 09.08∼10.02

GEUMGANG EXLLUTOWER

POONGAN CONST. CO POONGLIM INDUST. - 09.08~12.01

DAEJEON CT CENTER -SEJONG TECHNOLOGYENGINEERING

17,127 09.08~10.09

TUNNEL AND STATION(AIRPORT RAILROAD)

AIRPORT RAILROAD DONGBU CONST.CO 15,233 09.07∼11.12

TUNNEL AND STATION(KYOUNGEUI RAILROAD)

AIRPORT RAILROAD DONGBU CONST.CO 29,258 09.07∼11.12

INCHON KUMDANHILLSTATE 3RD 1STCOMPLEX

HANBAEK CNT HYUNDAI CONST.CO - 09.07∼10.11

- 46 -

Page 49: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

INCHON KUMDANHILLSTATE 3RD 2NDCOMPLEX

HANSYS HYUNDAI CONST.CO - 09.07∼10.11

HANSUNG BEAKJAEMUSEUM

PUBLICPROCUREMENTSERVICE

POSCO CONST.CO 18,952 09.07∼10.05

URBAN RAILROAD 6, 8LINE FLATFORM

URBAN RAILROADCONST.

HANSAN CPS CO - 09.07∼09.12

GUMI LGD '09 P13456PLANT

LG DISPLAY SERVEONE - 09.07~10.02

ASAN NEW CITY STX KANAPT (6BL)

- STX CONST.CO - 09.06∼10.12

KOREA SGI MEMORIALHALL

KOREA SGI HYUNDAI INDUST. 29,829 09.06∼10.08

SECHO DAELIM E-PYUNHAN SAESANG

KUMHO APTREMOEDLING UNION

DAELIM INDUST. - 09.06∼10.02

HONGJAEDONG HANSHINHYUPLUS MULTIPLUXLIVING

SANGWOO CONST.CO HANSHIN CONST.CO - 09.06∼09.11

WALSUNG 1STPOLLUTION SERVICEHVAC

KOREA ELECTRIC KPS - 990 09.05∼09.07

LIBS #3 PROJECT SK ENERGY SK CONST.CO 15,866 09.05∼09.07

PANKYO TECHNOVELLYSD2

- HANWAN CONST.CO 138,382 09.04∼11.03

DONGA BROADCASTINGART COLLEGE EXTENSIONCONST.

-AIRPORT FACILITYSERVICE

- 09.04∼09.08

PYOUNGTEAK YONGIN2ND PURGIO

- DAEWOO CONST.CO - 09.03∼10.07

SUYOURI HANSHIN UNIV. HANSHIN ACADEMY SEOHEE CONST.CO 15,695 09.03∼09.08

- 47 -

Page 50: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

GYOUNGGIDO GWANGJUTERMINAL

GWANGJU TERMINALSHINSAEGYECONST.CO

16,995 09.03∼09.08

NONGHYUP CENTERULJUGUN

NONGHYUP CENTER - 82,500 09.02∼09.08

SECHO KIM'S TOWER(B) KARAK CONST.CO DAELIM INDUST. 53,892 09.01∼10.12

HWASUNG DONGTANSHINYOUNGGWELLESTATE

SHINYOUNG HALLA CONST.CO 62,954 08.12∼11.04

SONGDO FISHERMENMULTI COMPLEX LIVINGCONST.

I.F.E.Z. DAEWOO CONST.CO 158,179 08.12∼11.01

OSONG LIFE SCIENCECOMPLEX NATIONALORGANIZATION

THE MINISTRY OFHEALTH & WELFARE

HYUNDAI CONST.CO 127,357 08.12∼10.11

SONGDO IFEZ U-CITYINFORMATION &EXPERIENCE CENTER

WAVE CITY DEVL. SK CONST.CO 45,009 08.12∼09.06

DAEWOO TRIPOLI HOTELPROJECT

- DAEWOO CONST.CO 44,999 08.11∼11.03

SK CHEMICAL INSTITUTEENERGY COMMISSIONING

SK CHEMICAL SK CONST.CO 47,540 08.11∼11.01

MOKDONG XI APT BUKWANG P&D GS CONST.CO 129,301 08.11∼10.12

LG DISPLAY P345 C/R &HOOK UP

LG DISPLAY SERVEONE 660 08.11∼09.06

YEOJU N/B CIVILCONST.T.A.B WORK

CJ CJ CONST.CO 22,424 08.11∼09.05

HOTEL INTERBULGOEXCO

HOTEL INTERBULGOINTERBULGOCONST.CO

54,856 08.10∼09.01

INCHUN ECO METRO 5BLAPT

HANWHA HANWHA CONST.CO - 08.09∼10.12

- 48 -

Page 51: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

INCHUN ECO METRO 6BLAPT

HANWHA HANWHA CONST.CO - 08.09∼10.12

SUWON SAMHO APT - SAMHO - 08.09∼10.05

MYOUNGDONG AVATABLDG REMODELING

- WOOLIM CONST.CO 23,595 08.09∼09.03

JEJU INTERNATIONALAIRPORT

JEJU INTERNATIONALAIRPORT

KUMHO INDUST. 127,476 08.08∼11.04

U-SQUARE CULTUREHALL EXTENSION WORK

KUMHO TERMINAL KUMHO INDUST. 134,752 08.08∼09.06

SHINSADONG EM-TOWER EUNTOP INDUST. SHINSUNG CONST.CO 12,398 08.08∼09.05

YEONCHUN SPRINGWATER FACTORY

ROKIN BEVERAGE KUMHO INDUST. 13,408 08.08∼09.02

SESAN BRANCH OFFICE KEPCO KEPCO 2,947 08.07∼09.09

LOCAL OFFICE OFJUGONG

JUGONG KUMHO INDUST. 24,750 08.06∼10.03

DONGDAEMOON MARKETREMODELING

DONGDAEMOONMARKET

DEAWOO CONST.CO 49,939 08.05∼10.01

CHENGJU JIWELL CITY 1BLK.

SHINYENG DELV. DOOSAN CONST.CO571,392(2,164UNITS)

08.05∼10.01

SSANGMOON DONGREMODELING

SSNAGMOON DONG KOLON CONST.CO. - 08.05∼09.01

HANWHA ASAN FACTORY HANWHA HANWHA CONST.CO 19,487 08.05∼08.12

HANSOL PARK APT HANSOL CONST.CO. HANSOL CONST.CO. - 08.05∼08.10

- 49 -

Page 52: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

CANCER HOSPITAL OFYENSEI MEDICAL

YENSEI MEDICAL DEAWOO CONST.CO - 08.05∼08.06

EXCELLU TOWER ININCHON

POONGLIM INDUST. EXCELLU TOWER - 08.04∼10.09

MECHATRONIX RESEARCHCENTER

MECHATRONIX DOOSAN CONST.CO 8,085 08.04∼09.11

FUNERAL CULTURECENTER

SK CONST.CO.CHOONGNAMPROVINCE

17,117 08.04∼09.11

SUNGNAM PANKYU TK4APT

SUNGNAM CITY DEAWOO CONST.CO - 08.04∼09.10

STX MOONKYUNGRESORT

STX CONST. STX CONST. 39,679 08.04∼08.11

HWASUNG POONGLIMAPT

POONGLIM INDUST. POONGLIM INDUST. - 08.04∼08.08

HWASUNG DONGTANCOMPLEX BLDG

SSNGYONGCONST.CO

SSNGYONG CONST.CO 34,079 08.03∼10.07

SANGJU DRIVEREXPERIENCE CENTER

SANGJU CITY YOONCHANG CONST. 2,079 08.03∼08.12

SUWON NONGHYUPMARKET

SUWON NONGHYUP SUWON NONGHYUP 2,082 08.03∼08.11

SHINYANG BUILDING SHINSUNG CONST. SHINYANG BLDG. 10,088 08.03∼08.07

SEOUL UNIVERSITYJANGHAK BLDG

SEOUL UNIVERSITY LIMKWANG CONST.CO 21,285 08.02∼10.11

SONG DO THE # APT POSCO CONST.CO. SAMWOO MECH - 08.02∼09.12

OFFICE BLDG KOREA GOVERNMENT DONGBU CONST.CO 19,800 08.02∼09.11

- 50 -

Page 53: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

SEOCHO XI APT - GS CONST. CO 68,977 08.02∼09.06

DAEJUN COMPLEXBUILDING

MEGA CITY SUNGWON CONST. 46,418 08.02∼09.01

POLICE OFFICE KOREA GOVERNMENT HYUNDAI CONST.CO 894 08.01∼08.08

SAMSUNG DONG OFFICEBLDG

- DEAWOO CONST.CO 14,850 07.12∼10.04

SONG DO THE # APT POSCO CONST.CO. KIM & LEE CO. - 07.12∼09.12

POHANG HYOJA DONG SKVIEW APT

SK CONST.CO. SK CONST.CO. - 07.12∼09.12

DANKUK UNIVERSITYDORMITORY

DANKUK UNIVERSITY DEAWOO CONST.CO - 07.12∼08.12

KONKUK UNIVERSITYNEUNG DONG BUILDING

KONKUK UNIVERSITY SAMWHAN CORP. 26,400 07.12∼08.12

NEW FCC UPGRADE SK CHEMICAL YENGWOO ENT. - 07.12∼08.04

GWANGJU CITYADMINISTRATIONCOMPLEX

GWANGJU CITY DONGBU CONST.CO 77,355 07.10∼09.04

L-5 RESEARCH CENTER KIST HYUNDAI CONST.CO 11,708 07.09∼08.08

CHONGJU APT DOUM ESTATE KUMHO INDUS.CO - 07.09∼08.02

MYUNGDONGREMODELING BUILDING

- DEAWOO CONST.CO 27,555 07.08∼08.07

SOUTH-NORTH TOURISTCENTER

HYUNDAI ASAN HYUNDAI CONST.CO 10,715 07.07∼08.08

- 51 -

Page 54: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

LG FASHION WEST BLDG LG FASHION GS CONST CO 8,260 07.06∼08.06

GANGRUNG ASANHOSPITAL

ASAN HOSPITAL HYUNDAI INUST.CO 3,567 07.06∼07.12

BUCHON JUNGDONG APTRE CONSTRUCTION

JUNGDONG APT HYUNDAI INUST.CO - 07.05∼08.12

SEOUL WOMEN'SUNIVERSITY DOMITORY

SEOUL WOMEN'SUNIVERSITY

HYUNDAI CONST. CO 15,302 07.05∼08.08

CITIZEN SAFTY PARK TEABEAK CITY GS CONST CO 26,733 07.05∼08.08

HWASUNG DONGTAN APT - POSCO CONST. CO - 07.03∼08.05

NONGHYUP CENTRALBUILDING

NONGHYUP GS CONST. CO 84,407 07.03∼08.03

NEW FCC -OBL SK CHEMICAL SK CONST. CO - 07.03∼07.12

SUWON E-BIS HOTEL MYUNGSUN DEVEL.SSNGYONG CONST.CO

39,643 07.03∼07.10

ZAWIA CENTRAL POWERPLANT

LIBYA HYUNDAI CONST.CO - 07.03∼07.08

LS TOWER OFFICE LS ELECTRIC GS CONST. CO 51,662 07.03∼07.07

PUSAN UNIVERSITYYANGSAN HOSPITAL

PUSAN UNIVERSITY DEAWOO CONST.CO 124,601 07.02∼11.02

SEOUL CENTRALPOSTOFFICE

KOREA MOCI GS CONST. CO 72,600 07.02∼08.08

JUNGSUN CONDOMINIUM CTI CONST. DAELIM INDUS. CO 26,400 07.02∼07.11

- 52 -

Page 55: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

SUNGNAM CITY WELFARECENTER

SUNGNAM CITYSSANGYONGCONST.CO

24,681 06.12∼08.04

KOREA DIGITAL LIBRARYKOREA DIGITALLIBRARY

HYUNDAI DEVEL.CO 96,327 06.11∼08.12

MANAN YOUTH CENTER MANAN GU OFFICE KOREA DEVEL.CO 13,523 06.11∼08.10

JEJU SAINTFOUR. GC EANIS CO. HANLLA CONST.CO. 12,121 06.11∼07.12

MAPO ADMINISTRATIONCOMPLEX

MAPOGU OFFICE POSCO CONST.CO. 48,454 06.10∼08.07

HWANGSEYENGHOSPITAL

HWANGSEYENGHOSPITAL

KUMHO INST.CO 18,167 06.10∼07.08

WALK-HILL HOTEL RE-MODELING

WALK-HILL HANSOL CONST.CO. 10,666 06.10∼07.08

IND COMPUTATIONOFFICE

KOREA MOCI HANSOL CONST.CO. 28,331 06.10∼07.06

BUNDANG-NEGOKTUNNEL

KOREA HOUSING CO. SAMHO CO. - 06.09∼06.12

JAMSIL APT RE-CONSTRUCTIOM

JAMSIL APT ASSO. KOLON CONST.CO. - 06.08∼08.08

SUWON POSTOFFICE KOREA MOCI PACIFIC DEVEL.CO 10,283 06.08∼08.01

BENGHAZI NORTH POWERPLANT

LIBYA DEAWOO CONST.CO - 06.08∼06.11

HWASUNG DONGTAN APT GYUNGGI PROVICE GYUNGNAM ENTER. - 06.07∼08.09

LG CHEMICAL TECHNICALRESEARCH CENTER

LG CHEMICAL GS CONST. CO. 11,418 06.07∼07.02

- 53 -

Page 56: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

ULSAN SAMSANOFFICETEL

HEAORUM CONST.SUNG WON CONST.CO.

70,844 06.06∼08.08

INCHON SANGOK APT HANYANG APT ASSO KUMHO INST.CO - 06.05∼07.11

RENAULT SAMSUNGAUTOMOBIL FACTORY

RENAULT AUTOSHINSUNG CONST.CO.

7,847 06.05∼06.10

ULJI HOSPITAL RE-MODELING

ULJI HOSPITAL - 41,999 06.04∼06.10

PUSAN CENTURM REDERSMARKER

MALESTONE DNC DEAWOO CONST.CO. 68,350 06.03∼08.11

JAMSIL APT RE-CONSTRUCTIOM

JAMSIL APT ASSO. DOOSAN CONST. CO. - 06.02∼08.08

DEAGU OFFICETEL - SHINSUNG CONST.CO. 74,900 06.02∼07.09

CHANGWONJUNGSUNGHALL

DOOSAN HEAVEY INS. DOOSAN HEAVEY INS. 25,209 06.02∼06.12

GWANGCHON TERMINALRE-MODELING

GWNGJU BUSTERMINAL

KUMHO INST. CO 29,568 06.02∼06.11

SEOGANG UNIVERSITYMULTI HALL

SEOGANG UNIVERSITY DEAWOO CONST.CO. 21,599 06.01∼06.12

NASALET ORIENTALHOSPITAL

NASALET ORIENTALHOSPITAL

SUNWON CONST.CO. 666,122 05.11∼07.12

PUSAN ORUKDO APT SK CONST. CO SUNGA GUNUP 63,146 05.11∼07.08

SEOCHO A PROJECTOFFICE BUILDING

SAMSUNG INSURANCE SAMSUNG CONST. CO. 110,695 05.09∼07.03

BUCHON JOONGDONGMULTI COMPLEX

KB REAL ESTATETRUST

DOOSAN CONST. CO. 372,837 05.09∼07.03

- 54 -

Page 57: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

ILSAN M-CITY KOREA LAND TRUST SK CONST. CO 123,014 05.07∼07.07

GANGWON LAND SKYCOMPLEX

GANGWON LAND DEALIM IND.CO 90,021 05.06∼06.11

AEGINEUNG SQUREBUILDING

KOREA UNIVERCITY DOOSAN CONST. CO 28,103 05.06∼06.08

LG INSURANCE GANAMOFFICE BUILDING

LG INSURANCE GS CONST.CO - 05.06∼05.12

GANGSEO GRACE HILL KHIND CO. SK CONST. CO. 26,667 05.05∼06.12

MAPO 1-47 REBUILDINGMAPO 1-47REBUILDING ORG.

DAEWOO CONST. CO 46,444 05.05∼05.09

034002 FACILITYCONSTRUCTION

MND FACILITYHEADQUATER

DEALIM INDUSTRY CO. 42,864 05.04∼07.03

BANGBAI SK LEADERSVIEW

SK CONST. CO. SK CONST. CO. 34,812 05.04∼06.06

NANO ELEMENT SPECIFICFAB CENTER

NANO ELEMENTSPECIFIC FAB CENTERFOUNDATION

SAMSUNG CONST. CO. 50,087 05.04∼06.06

PAJU ENGLISH CULTURECENTER

GYEONGGI ENGLISH HANJIN HEAVY IND. 36,475 05.04∼06.02

EUIJONGBU CULTURECENTER

SGI KUMSUNG CONST. CO. 2,828 05.04∼05.12

KVW & HC SUPPORTBLDG.

KVW & HCSSANGYONG CONST.CO.

10,758 05.04∼05.12

JONGNO-GU SAJIK 1STDIVISIONREDEVELOPMENTPROJECT

SAJIK 1ST DIVISIONREDEVELOPMENT

POONGLIM INDUST. 203,947 05.03∼07.12

HWASEONG-SI DONGTANPOSCO THE #

WORLDVIEW CO.POSCO ENG. & CONS.CO.

- 05.03∼06.11

- 55 -

Page 58: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

NONGHYUP INFORMATION& TECHNICAL INSTITUTE

N.A.C.F N.A.C.F 15,728 05.03∼06.06

INDUCTION CONTROLEXPERIMENT INSTITUTE

KARI DOOSAN CONST. CO. 9,884 05.03∼06.05

YONGSAN YOUTHTRAINING CENTER

YONGSAN-GU OFFICE HWANAM E&C 6,537 05.03∼06.05

YONGIN DONGBAEKKOARU APARTMENT

KOREA LAND CO. POONGLIM INDUST. - 05.03∼06.03

PUSAN SINHUNG BLD SINHUNG CO. SAMSUNG CONST. CO. 17,318 05.03∼06.01

KOREA YOKOGAWAELECTRONIC BLD

KOREA YOKOGAWAELECTRONIC CO.

PACIFIC ENGINEERING& CONSTRUCTION

10,250 05.03∼06.01

SUNGIN-DONGOFFICETEL

KYUNGIL OFFICETEL SAMHWAN Co., LTD. 12,388 05.03∼05.09

BUCHEON-SI KOREARESOURCES FACILITYPROJECT

INCHON SI DAEWOO CONST. CO 3,765 05.02∼6.06

LAWYER'S TOWER SI VISION CO. ISU CONST. CO 42,827 05.01∼6.03

ILSAN SIKSA SKAPARTMENT DIAGNOSIS

- SK CONST. CO. - 05.01.∼5.03

GAEBONGDONGHWAYOUNG PARTMENTHEATING DIAGNOSIS

- DOOSAN CONST. CO. - 04.12∼4.12

HWASEONG-SIDONGTAN, EULLIMAPARTMENT

M.M.A.A. KUMHO CONST. CO - 04.12∼07.02

GANARI APARTMENT 3RDGANARI APT 3RDORG.

DAEWOO CONST. CO - 04.12∼06.08

NONHYUN APTKOREA NATIONALHOUSING CO.

SHINSUNG CORP. - 04.12∼06.04

- 56 -

Page 59: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

DIGITAL MAGIC SPACEKOREANBROADCASTINGINSTITUTE

KUMHO CONST. CO 16,078 04.12∼06.04

OHMRON ELECTRIC OHMRON ELECTRIC LG CONST.CO 13,322 04.12∼05.03

SHINBUDONG POSVIL.OFFICETEL

POSCO ENG. &CONS.CO.

POSCO ENG. & CONS.CO.

66,581 04.11∼06.12

KYUNG HEE UNIVERSITYGUKSUNGWAN

KYUNG HEEUNIVERSITY

POONGLIM INDUST. 386 04.11∼05.10

TAB, COMMISSIONING &O&M MAUNAL

FED SUNGLIM CONST. CO - 04.11∼05.04

PAJU CITY STADIUM PAJU CITY DOOSAN CONST. CO. 22,315 04.11∼04.12

ANYANG INTERNATIONALDISTRIBUTION MARKET

SEOUL, GYEONGGIINDUSTRIAL

DAEWOO CONST. CO 65,439 04.10∼05.06

LG INSURANCE BLDG. INJEJU

LG INSURANCE LG CONST. CO 9,260 04.10∼05.02

INCHON AIRPORTRAILROAD STATION

- HYUNDAI CONST.CO. - 04.09∼06.03

CARGO TERMINAL "B" ININCHON AIRPORT

INCHON AIRPORT KUMHO INDUSTRY.CO. 22,919 04.09∼05.06

SEOUL FEMALE HOSPITAL SEOUL CITY HYUNDAI CONST.CO. 18,236 04.09∼05.06

SEOCHO OFFICETEL(Ⅱ) - DAEWOO CONST.CO. - 04.09∼04.12

GURO WOORIM E-BIZCENTER(Ⅱ)

WOORIM DEVEL. WOORIM INDUSTRY 54,585 04.07∼05.02

CLEANROOM FACILITY INSUNGNAM

SUNGNAM CITY KOLON CONST. CO. - 04.07∼04.12

- 57 -

Page 60: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

GANGBUK JEIL CHURCH JEIL CHURCHSSANGYONG CONST.CO.

5,547 04.06∼05.03

YONGDUNGPO PHYSICALTRAINING CENTER

YONGDUNGPO GU - - 04.06∼04.07

CENTRAL POSTALSERVICE OFFICE BLDG.

INFORMATION&TELECOMMUNICATIONMINISTRY

LG CONSOCIATIUM 72,600 04.05∼08.08

SINDAEBANG OFFICETEL - SUNGWON CONST. CO 32,522 04.05∼06.08

BUSAN CATHOLICHOSPITAL

CATHOLIC CHURCH SK CONST. CO. 59,882 04.05∼06.06

WONJU PHYSICALTRAINING CENTER

WONJU CITY - - 04.05∼06.05

KYUNGHEE DENTALCLINIC

KYUNGHEEUNIVERSITY

POONGLIM INDUST. 9,824 04.05∼05.12

SAMSAN APARTMENT - SINSUNG CONST.CO. - 04.05∼05.06

JUNGDONGOFFICETEL(Ⅱ)

WOORIM DEVEL. WOORIM INDUSTRY 18,289 04.05∼05.01

JUNGDONG OFFICETEL WOORIM DEVEL. WOORIM INDUSTRY - 04.05∼04.12

CHONAN KOREAMEDICINE HOSPITAL

DAEJON UNIVERSITY SAMYANG CONST. CO. 14,850 04.04∼06.04

DONHIL HIGHVILLE DONGIL HIGHVILL DONGIL HIGHVILL CO. 46,989 04.04∼05.11

DOOSAN WE‘V CENTIUMOFFICETEL

- DOOSAN CONST. CO. 36,076 04.04∼05.06

BUPYUNG LION'S VALLEYOFFICETEL

WOORIM DEVEL. WOORIM INDUSTRY 130,472 04.04∼05.03

- 58 -

Page 61: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

OCEANVIEW CLUB HOUSE OCEANVIEW CO. ULTRA CONST. CO. 10,161 04.04∼04.10

SK HUB BLUE OFFICETEL JEIL PLAZA CO. SK CONST. CO. 41,135 04.03∼05.08

YULCHON POWER PLANT KEPCO HYUNDAI CONST. CO. - 04.03∼05.06

GONEUNG DONGCHURCH

- SAMYANG CONST. CO. 5,412 04.02∼04.11

GCV THEATER INYONGSAN SATATION

HYUNDAI STATIONHYUNDAI DEVELOP.CO.

9,752 04.01∼04.12

CENTRAL LIBRARY INKOREA UNIVERSITY

KOREA UNIVERSITY KUMHO CONST. CO 9,669 04.01∼04.03

HQS-DETACHMENT INPOHANG

FED SHINIL ENG. CO. - 04.01∼04.02

WOORIM LIONS VALLEY WOORIM DEVEL. WOORIM INDUSTRY 190,667 03.12∼04.12

BYUCKSAN APRTMENT INSUJI

BYUCKSAN. CONST BYUCKSAN. CONST - 03.12∼04.03

CARGO TERMINAL C ININCHON AIRPORT

INCHON TERMINAL KUMHO INDUSTRY - 03.12∼04.02

GWANGMYUNG DOMESTATION

KOREA PHYSICALTRAINING PROMOTION

DAEWOO CONST. CO. 73,963 03.11∼05.12

SUNGSU DISTRIBUTIONCENTER

- SAMSUNG CONST. CO. 26,268 03.11∼05.01

GWANGWHAMOONOFFICETEL

DOOSAN CONST. DOOSAN CONST. CO. 51,308 03.11∼04.12

KOREA REDCROSSOFFICE

KOREA REDCROSS SK CONST. CO. - 03.10∼05.03

- 59 -

Page 62: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

SK TELECOM ULJIROBLDG.

SK TELECOM SK CONST.CO 92,750 03.09∼04.12

NONGHYUP HEAD OFFICEBLDG.

ONGHYUP HEADOFFICE

LG CONST.CO 47,550 03.09∼04.12

ILSAN OFFICETEL BLDG. SHINSUNG CORP. SHINSUNG CORP. 26,813 03.09∼04.04

LG INSURANCE SUWONBLDG.

LG INSURANCE CO. LG CONST. CO. 17,381 03.08∼04.02

LG INSURANCE RESERCHCENTER

LG INSURANCE CO. LG CONST. CO. 23,315 03.08∼03.11

KTF DAEGU OFFICEBLDG.

KTF DAEGU BRANCHOFFICE

HANLA CONST. CO 26,473 03.07∼05.05

GWANGJIN GU OFFICEBLDG.

GWANGJIN GU HYUNDAI CONST. CO. 18,827 03.07∼04.12

BOBO COUNTY Ⅱ MYHOME KOREA WOORIM NDUSTRY 15,543 03.07∼03.12

HEOHYUNUNDERGROUNDDEPARTMENT STORE

SEOUL CITY JUNWON E&G 9,029 03.07∼03.11

KOREA SGI JEJUTRAINING CENTER

SGI KOREA NASUNG T&S CO. - 03.07∼03.09

UNDERGROUND SPACE INDEAGU DUREW

DAEGU SUBWAY DAEWOO CONST. CO. 26,096 03.06∼04.12

APARTMENT IN YONGIN MYUNGJIN IND. CO. DAEWOO CONST. CO. - 03.06∼04.12

SUBWAY STATION INDEAGU SAMDUCK

DEAGU SUBWAY SAMWHAN CORP. 10,474 03.06∼04.12

JINRO FERMENTATIONOFFICE BLDG.

JINRO FERMENTATIONCO.

SAMSUNG CONST. CO. 20,955 03.06∼04.11

- 60 -

Page 63: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

SUWON SOCIAL WELFARECENTER

SUWON CITY SUWON CITY 11,369 03.06∼04.05

GYUNGGIDOGOVERNMENT OFFICETRAINING CENTER

GYUNGGI PROVINCE POONGLIM IND. CO. 16,952 03.06∼03.10

FESTO KOREA OFFICEBLDG.

FESTO KOREA CO.SSANGYONG CONST.CO.

12,811 03.06∼03.10

M-PROJECT - GANGWHA IND. CO 5,155 03.05∼04.06

MYUNGJI CAMPUS MYUNGJI ACADEMY TAESUNG ENG. CO. 17,031 03.05∼04.01

LG MART RENEWAL INPUSAN KUMJUNG

LG SHOPPING LG CONST. CO. 37,382 03.05∼03.07

CITY HALL YONGIN YONGIN CITY HYUNDAI CONST. CO 44,669 03.04∼05.06

SUBWAY STATION INDAEGU NEADANG,BANGOGE

DEAGU SUBWAY CO. BYUCSAN E&C CO. 14,850 03.04∼05.02

HAEUNDAE OFFICETEL JC CORP. DEALIM INDUSTRY CO. 44,286 03.04∼04.12

BUSINESS HOTEL ININCHON AIR PORT

HUBVILL CO. MISUK INDUSTRY CO. 20,790 03.04∼04.06

PAJU PUBLISHING BLDG PABEAK CORP. KUMHO INDUSTRY CO. 54,503 03.04∼04.03

OFFICE AREA INYONGSANSTATION

HYUNDAI YEOKSA CO.DAEWOO CONST.CORP.

37,293 03.04∼04.02

SEOHYUN OFFICETEL INBUNDANG

POONGLIM IND. CO. POONGLIM IND. CO. 240,369 03.04∼04.02

ALIANTS INSURANCEBLDG.

ALIANTS INSURANCE DONGBU CONST. CO 12,563 03.04∼04.01

- 61 -

Page 64: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

SWING SPACE IN CAMPCARROL

FED SHINIL CONST. CO. - 03.04∼03.06

BOBO-COUNTY ⅠOFFICETEL

MYHOME KOREA WOORIM IND. CO. 23,833 03.04∼03.06

SUBWAY STATION INWANGSIMRI

SEOUL CITYRAILROAD

SEOUL CITY RAILROAD - 03.04∼03.06

HIGH TECH. R&D CENTERSUNGNAM

SUNGNAM CITY KOLON CONST. CO. 26,116 03.03∼04.12

GIHEUNG CITY HALL YONGIN CITY SUNGJI IND.CO 9,382 03.03∼03.08

INSPECTION FORJUNLONG APT

SK CONST. CO SK CONST. CO - 03.03∼03.03

GOSPEL TRAININGCENTER

GOSPEL CHURCH HANUL E&G 13,609 03.02∼04.02

LG MART DUGSO LG SHOPPING LG CONST. CORP. 13,596 03.02∼03.08

VELESIUM SINMUNRO BOSCO INDUSTRY HANJIN HEAVY IND. 57,951 03.01∼04.12

POSVILLE SINDORIM POSCO CONST. CO. SAMSUNG CORP. 63,872 03.01∼04.07

SHINJUNGDONGOFFICETEL

MIREA E&C SAMSUNG CORP. 63,872 03.01∼04.07

HANSOL CENTRAL PARKTOWER

IDAM CORP. HANSOL CONST. CORP 23,493 03.01∼04.05

CENTRAL TOWER CENTRAL PARK HANSOL CONST. CORP 32,205 03.01∼03.12

FACILITY CONSTRUCTIONOF ○○ ARMY

REPUBLIC OF KOREAARMY

DAEWOO CONST.CORP.

37,293 02.12-03.12

- 62 -

Page 65: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

From 1996 to 2002, About480 projects have beencompleted.

-

YOUNGJONGDO AIRJOY SK CONST. CORP.SEBO M & ECONSULTANTS CORP.

62,895 02.12∼07.05

BUNDANG VILLAGETOWER

SK CONST. CORP.CHANG WHA CONST.CORP.

99,376 02.08∼03.10

NEW TOWER HOTEL WALKERHILL CORP. SK CONST. CORP. 58,981 02.07∼03.11

KIMPO KOREA AIRPORTSCORP. FACILTY RENO. &CONST.

KOREA AIRPORTSCORP.

DUKJIN CONST. CORP. 104,194 02.06∼02.12

LIBYA BENGGAJIHOSPITAL

DAEWOO CONST.CORP.

DAEWOO CONST.CORP.

170,000 02.03∼03.08

HUNGKUK LIFEINSURANCE BUILDING

HUNGKUK LIFEINSURANCE CORP.

BUMYANGAIRCONCORP.

75,042 02.02∼02.04

YOUNG-DUNG-POHOMEPLUS STORE

SAMSUNG TESCOCORP.

KUMHO IND. CORP. 217,724 01.04∼01.12

EULJI UNIVERSITYDUNSAN HOSPITAL

EULJI UNIVERSITYHOSPITAL

LG CONST. CORP. 91,578 01.03∼03.12

MYONGJI ASSEMBLY B/DMYONGJIFOUNDATION

MYONGJI CONST.CO 59,400 00.04∼02.08

HOME PLUS YOUNGTONGSTORE

SAMSUNG TESCO CO. SK CONST. CORP. 53,539 00.01∼00.09

ASEM GALLERIA CITY AIR TERMINAL KUMHO IND.CORP. 48,008 99.10∼01.03

PUSAN EXHIBITION NEWCONSTRUCTION

PUSAN EXHIBITIONCONVENTION CENTERCO.

HYUNDAICONSTRUCTION CO.

92,598 99.05∼01.03

MAIN-TERMINAL BLDG OFNEW AIR PORT

MINISTRY OFCONSTRUCTION

CONSTRUCTION J/V.CONST.

462,000 99.01∼00.01

- 63 -

Page 66: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

MILITARY MUTUAL AIDASSOCIATION ASSEMBLYHOUSE

MILITARY MUTUAL AIDASSOCIATION

MILITARY MUTUAL AIDASSOCIATION

82,899 98.10∼99.11

ASEM HOTEL HANMU DEVELOP. LG CONST. 113,015 98.06∼99.12

DOOSAN TOWER DOOSAN GROUP DOOSAN CONST. 122,371 98.01∼99.01

SEOUL ART CENTER SEOUL ART CENTER HANYONG CONST. 120,143 97.12∼98.09

KIHEONG RESORT BLDG. KIHEONG RESORT JUNHA CONST. 59,621 97.11∼97.11

HEUNGKUK INSU. BLDG. HEUNGKUK INSU. LG CONST. 74,910 97.11∼00.04

KWANGJU INTELLIGENCE& COMMUN. CENTER

THE KOREA ELEC. &COMMUN. CORP.

DOOSAN CONST. 46,200 97.07∼00.02

SK OFFICE BUILDING SK GROUP SK CONST. 85,335 97.06∼98.12

HWAJUNG ELECTRICLAND

KUMHO CONST. KUMHO CONST. 59,621 97.04∼98.08

LG KURI DEPT. STORE LG DEPT. STORE LG CONST. 77,227 97.02∼98.08

St. VINCENT HOSPITAL St. VINCENT HOSPITAL SAMYANG CONST. Co. 55,110 97.01∼98.10

HANKOOK COMMERCIALBANK BLDG.

HANKOOKCOMMERCIAL BANK

SAMHWAN Co., LTD. 99,000 96.11∼98.12

KORYU STOCK Co.EOEIDO BLDG.

KORYU STOCK Co JINHO Co., LTD. 46,200 96.11∼97.05

LG DEPARTMENT STORE LG DEPARTMENT LG CONST.Co. 89,100 95.07∼96.12

- 64 -

Page 67: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

PUSAN LOTTE WORLDHOTEL LOTTE PUSANLOTTE SHOPPING

LOTTE CONST. 329,984 95.06∼96.12

KOREA EXCHANGE BANKHEADOFFICE BLDG

KOREA EXCHANGEBANK

KOREA EXCHANGEBANK.

74,646 95.06∼96.04

VIETNAM HANOIBUSINESS CENTER

DAEHA INC. DAE WOO CORP. 81,180 95.01∼95.12

JAMSIL SIGMA TOWERBUILDING

HALLA GROUP HALLA CONST CO. 68,505 94.08∼96.12

PROSE CURATOR-GENERAL BUILDING

KOREA MINISTRY OFJUSTICE

SAMHWAN CORP. 44,550 93.07∼95.06

AJOO UNIVERSITYMEDICAL CENTER

DAEWOO INSTITUTE DAEWOO 100,373 93.05∼94.10

DONGSUNG CITYLANDOFFICETEL

DONGWOO DAEWOO 97,020 92.12∼94.01

DAEHAN INVESTMENTTRUST BUILDING.

DAEHAN INVESTMENTTRUST.

DONGBU CONST.CO 69,300 92.11∼94.08

KOREA INVESTMENTBUILDING

KOREA INVEST. TRUST KOREA INVEST. TRUST 61,707 92.05∼93.12

JINRO DEPARTMENTSTORE

JINRO DEPART. JINRO DEPART. 72,600 91.03∼91.04

ASIA CEMENT BUILDING ASIA CEMENT CO. ASIA CEMENT CO. 42,900 91.01∼91.10

KEPCO NEW OFFICEBLDG

KEPCO KEPCO 36,960 89.05∼89.08

CHAMPS ELYSEESOFFICETEL BLDG

NASAN CORP.SSANGYONG CONST.CO.

52,800 89.09∼90.11

LOTTE WORLDCOMPOUND

HOTEL LOTTE LOTTE CONST.CO. 146,850 88.05∼89.02

- 65 -

Page 68: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

PROJECT OWNERCONSTRUCTIONCONTRACTOR

BUILDING

AREA(m2)PERIOD

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L

KOTRA CENTER BLDG KOTRA DEA WOO CORP. 107,250 88.07∼88.12

KOREA AIR TERMINALBLDG

KOTRAKWANGJU HIGHWAYLINES

66,000 88.05∼88.12

HOTEL LOTTE MAINBUILDING

HOTEL LOTTE LOTTE CONST.CO. 90,420 88.01∼88.03

SWISS GRAND HOTELSWISSAIR NESTLESWISSOTEL LTD.,

POONGLIM IND. 52,140 87.11∼88.01

HOTEL LOTTE NEWBUILDING

HOTEL LOTTE LOTTE CONST. CO. 108,900 87.07∼88.05

ANKOOK INSURANCEBUILDING

ANKOOK INSURANCE SAMSUNG CONST .CO. 55,110 87.04∼87.10

SEOUL HILTON HOTEL DONGWOO DEV.CO. DAE WOO CORP. 82,500 86.09∼86.11

- 66 -

Page 69: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

Page 70: Testing,Adjusting&Balancing(TAB) and ...hanmitab.co.kr/wp-content/uploads/2016/11/PREQUALIFICATION... · Testing,Adjusting&Balancing(TAB) and ... (AABC,NEBB,SMACNA,ASHRAE,IES,CIBSE)aswell

HANMI C & E CO., LTD / TESTING & COMMISIONING W.L.L .

PQ-HM-201311 Ver 1.0c