WG2 Interim meeting summary Denise Warzel WG2 Convenor 32N2022.
Testing institutions for on-site treatment systems in the EU · 2013. 11. 27. · foto: CENTA 2010...
Transcript of Testing institutions for on-site treatment systems in the EU · 2013. 11. 27. · foto: CENTA 2010...
Testing institutions for on-site treatment systems in the EU
Dr.rer.nat. Martina DefrainPIA Germany
Workshop on On-site Domestic WastewaterDomestic Wastewater
Treatment in Asia
1
New Approach in Europe
break down of technical barriers
f t f d ithi th E U ifree movement of goods within the European Union
harmonised requirements for productsharmonised requirements for products placed on the European market
Testing institutions for on-site treatment systems in the EU, Tokyo November 2013 2Dr.rer.nat. Marina Defrain
European Economic AreaEuropean Economic AreaFounded: 1994Members: 30 states
3Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013
Small Wastewater Treatment Systems up to 50 PEAerated sludge reactor
Fixed film reactor
Small Wastewater Treatment Systems up to 50 PE
Moving bed reactor
SBR
Trickling filter
Membrane bioreactor
C t t d tl d
Concrete
Steel Constructed wetland
Filtration systems
Construction products
PE HDPE GRP
Construction Products RegulationPurpose of CPR
Construction Products Regulation
harmonising elements which previously led to barriersharmonised technical specifications 420 h i d t d d f t ti d tca. 420 harmonised standards for construction products
agreed system of attestation of conformity (AOC) +verification of constancy for each product familyverification of constancy for each product family system 3 for SWTS
framework for Notified Bodies mandatory CE marking of products
as a passport for the internal market
Requirements on application Member States
5Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013
CPR – Notifying Authorities Member States have to designate a Notifying Authority
CPR – Notifying Authorities
Notified Bodies authorised to carry out third-party tasks in the process of assessment and verification ofprocess of assessment and verification ofconstancy of performance for the purposesof the CPR
Notifying Authority responsible for setting up and carrying out thenecessary procedures for the assessment andnotification of the Notified Bodiesnotification of the Notified Bodies
responsible for the monitoring of NotifiedBodies, including their compliance with the
i i f h CPRprovisions of the CPR setting up NBs in NANDO
ec europa eu/enterprise/newapproach/nando/ec.europa.eu/enterprise/newapproach/nando/
6Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013
CPR Notified BodiesCPR - Notified BodiesNational Accreditation Bodies undertake accreditation + monitoring of notified bodies Germany y National Accreditation Body DAKKS
Application h ld b d t th ti l N tif i A th it should be made to the national Notifying Authority Germany DIBT G I tit t f DIBT German Institute for Construction Technology
7Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013
CPR - Notified BodiesCPR - Notified Bodies
RequirementsRequirements No involvement in the design, manufacturing, construction,
marketing, installation, use, maintenance of the products which the NB assesses
activities of subsidiaries or subcontractors do not affect the secrecy objectivity and impartiality of its assessment and/orsecrecy, objectivity and impartiality of its assessment and/or verification activities.
technical knowledge, appropriate experience technical knowledge, appropriate experience professional secrecy except in relation to the administrative authorities
of the Member State Participation in the Group of Notified Bodies
8Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013
CPR – Technical SpecificationsCPR – Technical Specifications
Harmonized Standards hENEuropean Technical approvals ETA
Specifications should include testing, calculation and other means
in relation to the essential characteristics
Declaration and CE- markingmandatory where there is a hEN
9Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013
CPR CEN/CENELECCPR - CEN/CENELEC
CENCEN European Committee for Standardisation
CENELEC European Committee for ElectrotechnicalSt d di tiStandardisation
recognised organisations by the European Commission forthe adoption of harmonised standards
10Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013
Notified Bodies - NBs
• over 440 NBs from 25 countries across the E E i AEuropean Economic Area
• Listed on Commission`s “NANDO” websiteListed on Commission s NANDO website
• organised in the Group of Notified Bodiesg
GNB CPD
11Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013
Group of Notified Bodies GNB
President
Group of Notified Bodies GNB
Advisory Group23 Sector Groups
21 product SG`s 2 horizontal SG`s
SG12 pipes, tanks and related engineering products
SG12 WG2 Small wastewater treatment systemsSG12 WG2 Small wastewater treatment systemsfounded 2008 EN 12566-3/EN 12566
12Dr.rer.nat. Marina DefrainTesting institutions for on-site treatment systems in the EU, Tokyo November 2013
EN 12566 S ll t t t t tEN 12566 Small wastewater treatment systems up to 50 PT
Standard UseEN 12566-1+A1 : 2003 Prefabricated septic tanks
CEN/TR 12566-2 : 2004 Soil infiltration systems
EN 12566-3+A1 : 2009 Packaged and/or site assembled domestic wastewater prEN12566-3+A2 : 2013 treatment plants
EN 12566-4 : 2007 Septic tanks assembled in situ from prefabricated kits
CEN/TR 12566 5 : 2004 P t t d ffl t filt ti tCEN/TR 12566-5 : 2004 Pre-treated effluent filtration systems
EN 12566-6 : 2013 Prefabricated treatment units for septic tank effluent
prEN 12566-7 : 2013 Prefabricated tertiary treatment unitsprEN 12566-7 : 2013 Prefabricated tertiary treatment units
13Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013
Arrangement of parts of EN 12566
EN 12566: part 1, 2, 3, 4, 5, 6, 7B
A B1 or 4 2
C
B
CD/E
5
A1 or 4 B
5C
7 E
D A InfluentB Pre-treated
wastewaterD/ED/E6
wastewaterC Infiltration into
the groundD + E Effluent
3A
D/E
E7D
14Dr.rer.nat. Marina Defrain
D + E Effluent
Testing institutions for on-site treatment systems in the EU, Tokyo November 2013
EN 12566-3: Tasks of Notified Bodies566 3 as s o ot ed od es
prEN 12566-3+A2 : 2013
Requirements for ITT Models to be tested
Overall dimensions, volume inlets, tl t d ti houtlets and connections,
accessibilityeach
Watertightness each
Structural behaviour biggest
Treatment efficiency smallest (38 weeks)
Durability one representative
Reaction to fire one representative
Release of dangerous substances one representative
15Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013
EN 12566EN 12566 –Notified Bodies in Europein Europe
27 NB‘s
21 EN 12566 121 EN 12566-1
26 EN 12566-3
8 EN 12566-4
1 EN 12566-6
O t b 2013
16Dr.rer.nat. Marina Defrain
October 2013
Testing institutions for on-site treatment systems in the EU, Tokyo November 2013
CPR - Notified BodiesCPR - Notified Bodies
Europe wide bodies
do not represent their country of notification
may work for ymanufacturer from any country
work equivalently according to common rules/guidance
17Dr.rer.nat. Marina Defrain Testing institutions for on-site treatment systems in the EU, Tokyo November 2013
SG12 WG2 - small wastewater treatment plants
objectives
p
Notified Bodies for EN 12566objectives
• discussion about problems arisingin practicein practice
• same interpretation of the standard • same testing procedures• clarification of the standardclarification of the standard
working on Position Papers
• cooperation with the CEN (TC165 WG41)
• contact to other NB`s
foto: CENTA 2010
SG12 WG2• confidence in the work of all NB`s
confidence in the product
SG12 WG2meetings 1-2/year14 NBs of 10 EU countries active
Testing institutions for on-site treatment plants in EUTokyo, November 2013
18Dr.rer.nat. Marina Defrain
EU CommissionCPR
technical specification notifying authorityaccreditation bodyaccreditation body
ETA hEN NB
CEN GNBCEN GNB
TC165 „waste water engineering“ SG12 „pipe, tanks, related products“secretary: Kropf/Germany chairman: Pappler/Austria
EN 12566
secretary: Kropf/Germany chairman: Pappler/Austria
WG41 „SWTS“ WG2 „SWTS“secretary: Chandellier/France chairwoman: Defrain/Germanysecretary: Chandellier/France chairwoman: Defrain/Germany
Defrain/WG2 liason Vignoles/WG41
guidance papers + position papers support for NBs
Thank you for your attention!
Dr rer nat Martina DefrainDr.rer.nat. Martina [email protected]