    ASME Section VIII, Div.1

    Pressure Test ingand

    Code Stamp ing

  • 8/10/2019 Testing and Stamping

    2/32

    Topics

    Requirements for Pressure Testing

    Hydrostatic Testing

    Pneumatic Testing

    Test Gauge

    Stamping

  • 8/10/2019 Testing and Stamping

    3/32

    Requirements

    forPressure Testing

  • 8/10/2019 Testing and Stamping

    4/32

    Why Test?

    Detect gross defects in

    design and fabrication

  • 8/10/2019 Testing and Stamping

    5/32

    What Must Be Pressure Tested?

    Completed vessels, fabricated to the

    ASME Code, at the required pressureand temperature

  • 8/10/2019 Testing and Stamping

    6/32

    Hydrostatic Testing

  • 8/10/2019 Testing and Stamping

    7/32

    Test Temperature

    The recommended minimum metal

    temperature of 30 oF above the

    design minimum design metal

    temperature (MDMT) and not over

    120

    o

    F

  • 8/10/2019 Testing and Stamping

    8/32

    HydroTest Pressure

    d

    tp

    S

    SMAWPT )3.1(

    Tp = Test Pressure

    MAWP= Maximum Allowable Working Pressure

    St = Material stress value at test temperature

    Sd = Material stress value at design temperature

  • 8/10/2019 Testing and Stamping

    9/32

    Exceptions

    Vacuum Service

    Combination Units

    Enameled VesselsCast Iron Vessels

  • 8/10/2019 Testing and Stamping

    10/32

  • 8/10/2019 Testing and Stamping

    11/32

    Combination Units

    When operated independently test

    as separate vessel

    Example: Heat Exchangers

  • 8/10/2019 Testing and Stamping

    12/32

    Enameled Vessels

    Test pressure shall be equal to

    but need not be above the

    vessel MAWP

  • 8/10/2019 Testing and Stamping

    13/32

    Cast Iron Vessels

    MAWP < 30 psi:

    Test pressure must be 2.5 x MAWP

    and 30 psi:

    Test pressure must be 2 x MAWP

  • 8/10/2019 Testing and Stamping

    14/32

    Pneumatic Test Pressure

    d

    tp

    S

    Sx10.1MAWPxT

    Tp = Test Pressure

    MAWP= Maximum Allowable Working Pressure

    St = Material stress value at test temperature

    Sd = Material Stress value at Design temperature

  • 8/10/2019 Testing and Stamping

    15/32

    Test Procedure

    1. Gradually increase pressure to

    about test pressure

    2. Thereafter, increase the pressure atan interval equal to 1/10 of the test

    pressure until the test pressure has

    been reached

    Assure that UW-50 has been compliedpriorto

    pneumatic testing

  • 8/10/2019 Testing and Stamping

    16/32

  • 8/10/2019 Testing and Stamping

    17/32

    Witness Pressure Test

    Authorized Inspector shall

    witness pressure tests for all

    vessels being U stamped,except multiple vessels

    fabricated to UG-90(c)(2)

  • 8/10/2019 Testing and Stamping

    18/32

    UG-102: Test Gauges

    Connected directly to the vessel

    Visible to the Operator

    Graduated at a range double thetest pressure, but in no case morethan 4 times or less than 1-1/2 timesthe test pressure

    Calibrated against a deadweighttester or master gauge

  • 8/10/2019 Testing and Stamping

    19/32

    Stamping

  • 8/10/2019 Testing and Stamping

    20/32

    UG-118: Methods of Marking

    Marking may be directly on the vessel

    or on a nameplate

    Minimum letter size requirements for

    either direct stamping or nameplate

    A nameplate is required on

    Ferrous materials less than 1/4 thick

    Non-ferrous materials less than thick

  • 8/10/2019 Testing and Stamping

    21/32

    Symbol Stamping

    Code stamps may be applied on the

    vessel or on a nameplate attached to

    the vessel, prior to hydrostatic testTest procedure must be documented

    in the Manufacturers program

    The Authorized Inspector must haveaccepted the test procedure

  • 8/10/2019 Testing and Stamping

    22/32

  • 8/10/2019 Testing and Stamping

    23/32

    Type of Construction

    Arc/Gas Welded - W

    Brazed - B

    Pressure Welded - PResistance Welded - RES

  • 8/10/2019 Testing and Stamping

    24/32

    Special Services

    Lethal Services L

    Unfired Steam Boiler UB

    Direct Fired Vessels DFNon-stationary NPV

    Pressure Vessels

    Letters are located under the U Codesymbol stamp

  • 8/10/2019 Testing and Stamping

    25/32

    Degree of Radiography

    Full Radiography RT-1

    UW-11 (a)(5)(b) RT-2

    Spot Radiography RT-3When RT-1, RT-2 RT-4

    or RT-3 does not apply

  • 8/10/2019 Testing and Stamping

    26/32

    Postweld Heat Treatment

    Entire vessel heat treated HT

    Partial heat treatment PHT

  • 8/10/2019 Testing and Stamping

    27/32

    Vessel Parts

    The word part must be stamped

    under the U Code stamp symbol

    The Manufacturers name, precededby Certified by, and the serial

    numbers are the only identification

    required

  • 8/10/2019 Testing and Stamping

    28/32

    Code Stamp

    Code Symbol

    The U symbol stamp is for

    a Manufacturer who

    fabricates complete

    pressure vessels in the shop

    or field

    The holder of a U stampmay also make vessel parts

    U

  • 8/10/2019 Testing and Stamping

    29/32

    Code Stamping

  • 8/10/2019 Testing and Stamping

    30/32

    Code Stamp

    The UM Code

    Symbol is applied to

    pressure vessels thatare built to the

    requirements of U-1(j)

    UM

  • 8/10/2019 Testing and Stamping

    31/32

    Code Stamp

    The UV symbol is

    used for pressure

    relief devices thatmeet Section VIII,

    Div. 1 requirements.

    UV