SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 Transformer Feeder
MainContractor
Manufacturer ABB
Date 17.02.2013 Page 1 –2
CT Secondary Injection for HV REF Core
Transformer HV REF protection Core:-
In old system the existing T1 CT core1 common for HV REF and O/C&E/F protection
ABB installed new Ring type CT for REF through power cable under GIS basement
Secondary Current injected from Sverkar 650 to each phase of Ring CT directly
Test-1:- R-500mA, Y-500mA, B-500mA
Over Current and Earth fault CTcore
Tested by Witnessed by Approved byABB Transmission &
DistributionENERGO
Date 17.02.20132 17.02.2013Name R.Krishna Murthy Mohammad RasheedSignature
CT Details Phase
Injected
Sec
Current
(mA)
Secondary Current [mA] – Monitored at:
SWGR E03+S E03+R1, TB XA=
132kV Relay Panel
Test plug F64HV
X64HV(RTXP18)
T3
1S1-1S2
Tr.REF
300/1A
Injection from
Line CT S1,S2
R Y B N R Y B N R Y B N
575 577 579 581 21 22 23 24 3A 5A 7A 9A
R 508 506 0 0 508 512 0 0 514 504 0 0 502
Y 508 0 506 0 507 0 506 0 506 0 504 0 509
B 505 0 0 504 504 0 0 503 506 0 0 504 504
Secondary Current [mA] – Monitored at:
F64HV
(RET615)
(TB X120)
F64HV
Display
(A)
Stabilizing
Resistor
RSHV
Metrosil
RSMV
13 14 A82 A83 A82 A85
508 510 158 503 503 0 0
507 508 156 510 510 0 0
503 503 155.5 511 511 0 0
7/30/2019 Test Report REF CT and OC E03_NEW
http://slidepdf.com/reader/full/test-report-ref-ct-and-oc-e03new 2/2
SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 Transformer Feeder
MainContractor
Manufacturer ABB
Date 17.02.2013 Page 2 –2
Test-:- R-500mA, Y-500mA, B-500mA
Remarks:-
• Single Point Earthing confirmed before starting of current injection
Tested by Witnessed by Approved byABB Transmission &
DistributionENERGO
Date 17.02.20132 17.02.2013Name R.Krishna Murthy Mohammad RasheedSignature
CT Details Phase
Injected
Sec
Current
(mA)
Secondary Current [mA] – Monitored at:
SWGR E03+S E03+R1, TB XC=
132kV Relay Panel
X51/51NHV(RTXP18)
T1-CORE-2
1S1-1S2
O/C,E/F
300/1A
Injection from R Y B N R Y B N R Y B N
502 505 508 514 01 02 03 04 3A 5A 7A 9A
R 502 502 0 0 504 503 0 0 499 504 0 0 499
Y 502 0 503 0 503 0 513 0 510 0 510 0 508
B 501 0 0 501 501 0 0 505 505 0 0 498 501
Secondary Current [mA] – Monitored at:F51/51NHV-TB:X120 F51/51NHV Display
R Y B N R Y B N
504 0 0 502 155 0 0 155
0 509 0 510 0 158 0 158
0 0 500 499 0 0 155 155