TI AM Tutorial
10/14/2014 8:30:00 AM
"Test Management for Large,
Multi-Project Programs"
Presented by:
Geoff Horne
NZ/OZ/USTester Magazine
Brought to you by:
340 Corporate Way, Suite 300, Orange Park, FL 32073
888-268-8770 ∙ 904-278-0524 ∙ [email protected] ∙ www.sqe.com
Geoff Horne
NZTester Magazine Geoff Horne has an extensive background in test program/project directorship and management, architecture, and
general consulting. In New Zealand Geoff established and ran ISQA as a testing consultancy which enjoys a local and international clientele in Australia, the United States, and the United Kingdom. He has held senior test management roles across a number of diverse industry sectors, and is editor and publisher of the recently launched NZTester magazine. Geoff has authored a variety of white papers on software testing and is a regular speaker at the STAR conferences. Married with four children, he enjoys writing and recording contemporary Christian music.
1
Programme-Level
Test ManagementGeoff Horne, NZTester Magazine
October 2014
NZTester
www.nztester.co.nz
2
• 39 years IT in various roles including development, sales, consulting, IT
management and testing.
• The last 20 years has been exclusively in test/QA management & consulting.
• Extensive background in programme/project test management, advisory services,
governance, architecture and general consulting.
• Established & ran ISQA as a testing consultancy and practice 2000-2007 (it now
runs as a vehicle for my contracting services).
• Founder & publisher of NZTester, OZTester and USTester Magazines for which I
also undertake writing, editing & analysis duties. As this is my first foray into
publishing & journalism, I'm on a steep learning curve however thoroughly
enjoying myself.
• Recently taken on my first assignment as a software testing industry analyst with
a large American IT technology company; speaking at conferences and delivering
white papers and webinars.
NZTester
About Me:
2
3
www.nztester.co.nz
NZTester
www.nztester.co.nz
Challenge | company
• Large distribution company
• Based in Los Angeles with distribution centres in San
Francisco and San Diego
• Retail outlets in 26 US regional centres
• Overseas distribution operations in Australia, EMEA,
South America and SouthEast Asia
4
www.nztester.co.nz
NZTester
www.nztester.co.nz
• Legacy centralised ERP system operated from Los Angeles
• Los Angeles, San Francisco and San Diego distribution
centres online running Sales, Ordering, Inventory,
Warehousing modules
• Retail outlets equipped in US regional centres equipped
with online POS/Inventory
• Overseas operations in Australia, EMEA, South America
and SouthEast Asia running similar implementations of
same or similar systems
Challenge | existing IT systems
3
5
www.nztester.co.nz
NZTester
www.nztester.co.nz
Challenge | new IT systems
• Smaller de-centralised ERP systems operating in each of
the Los Angeles, San Francisco and San Diego distribution
centres
• Retail outlets upgraded with web-based POS/Inventory
• New web-based online Ordering system to be developed
and implemented
• Overseas operations in Australia, EMEA, South America
and SouthEast Asia to roll out same solution once US
distribution and larger regional centres are implemented
6
www.nztester.co.nz
NZTester
www.nztester.co.nz
Challenge | proposed solution
• JDEdwards web-based ERP systems operating in each of
the Los Angeles, San Francisco and San Diego distribution
centres with custom configurations and industry-specific
modifications
• Retail outlets upgraded to web-based POS system
provided by JDEdwards business partner
• New web-based online Ordering system to be developed
by specialist web development company
4
7
www.nztester.co.nz
NZTester
www.nztester.co.nz
Challenge | activities
• JDEdwards ERP system configuration, modification and
implementation
• Retail outlets POS system implementation
• Online Ordering system software development (agile,
web-based)
• Configuration and implementation of middleware for
integration
• Migration of legacy ERP system data to JDEdwards
• Development of data warehouse, BI and reporting
• Appropriate level of security deployed across all systems
• Optimising all systems for peak performance
• Ongoing rollout of further modifications as required
8
www.nztester.co.nz
NZTester
www.nztester.co.nz
Challenge | you are the test architect!
• JDEdwards ERP system configuration, modification and
implementation
• Retail outlets POS system implementation
• Online Ordering system software development (agile,
web-based)
• Configuration and implementation of middleware for
integration
• Migration of legacy ERP system data to JDEdwards
• Development of data warehouse, BI and reporting
• Appropriate level of security deployed across all systems
• Optimising all systems for peak performance
• Ongoing rollout of further modifications as required
5
9
www.nztester.co.nz
NZTester
www.nztester.co.nz
Challenge | test approaches
• V-Model
• Scripted Testing
• Risk-Based Testing
• Exploratory Testing
• Test Automation
Key Software Testing Strategies
White Box
Testing
Black Box
Testing
• Based on the program code
• Explores internal structure of code
• Verifies the integrity of the code
• Performed by developers
• Based on specified requirements
• Explores software functions & processes
• Ignores internal code construction
• Performed by testers
10NZTester
www.nztester.co.nz
6
Key Software Testing Strategies
Gray Box
Testing
• Based on functional understanding
• Explores specific software functions
• Verifies software components
• Performed by more technical testers
• Close collaboration between testers &
developers
• Lends itself to test automation
• Better suited to investigative/exploratory
tesing approach
• Combines benefits of white & black box
testing wherever possible
• Not a complete substitute for either
however
11NZTester
www.nztester.co.nz
The Testing V-Model
User
Business
Requirements
Software
Specification
Software
Architecture
Technical
Specification
Unit
Testing
Integration
Testing
System
Testing
Acceptance
Testing
User
Code12
NZTester
www.nztester.co.nz
7
13
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | v-model process componentsUnit TestingUnit Testing
Integration Integration
TestingTesting
System
Testing
AcceptanceAcceptance
TestingTesting
Testing a single program or subsidiary componentTesting a single program or subsidiary component
of a program for compliance to program/componentof a program for compliance to program/component
specifications when executed in isolationspecifications when executed in isolation
Testing of preTesting of pre--tested programs/components, integratedtested programs/components, integrated
together to create subtogether to create sub--systemssystems
Testing of the entire system for compliance to the
software’s functional specification
Testing of the system for compliance to theTesting of the system for compliance to the
business requirements specificationbusiness requirements specification
Development
Testing
Business
did the product get built right?
did the right product get built?
14
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | scripted testing
Test ID: STK003b Description: Move stock where neither location is a Hold location
Step Action Expected Actual Pass/ Defect
Result Result Fail No.
1 Select Stock Control Menu displayed Pass
Menu
2 Select Stock Movement Stock Movement screen Pass
option displayed
3 Select stock item NGS002 details displayed Pass
NGS002 Check details are correct
4 Select stock transfer Drop down displayed Pass
5 Enter From location Location details displayed Hold denotation not Fail 234
Loc010 including Hold denotation present
6 Enter To location Location details displayed Hold denotation Fail 235
Loc023 including Hold denotation present but incorrect
7 Click on OK Stock should be moved
8
15
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | risk-based testing
Resources
Deadlines Test Coverage & Defects
$
16
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | risk-based testing
Time & cost Risk
Risk-based testing
9
17
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | risk-based testing
Where to draw the line of “good enough”?
Risk
Time & Cost
18
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | exploratory testing
10
19
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | Scripted vs Exploratory testing
What do we expect
it to do? What did it do?
same
What did it do?Is this what we
want it to do?
yes
no
not
same
Validatory (scripted)
Investigatory (exploratory)
Nexttestscript
Dependsoncurrenttest
20
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | test automation
1 - The user records an activity
in an application, the tool captures
the keystrokes and develops
a programmatical script as it goes
2 - Information about the state of
the application is captured by
inserting test “cases” during
recording which are stored
either in the script or in separate
files. The suite of automated
scripts becomes the baseline
3 - The automated scripts are played
back against a new version of the
application and the tool reports
on the differences between
that played back and that
originally captured
4 - The user then analyses each
difference to determine whether
it is an expected difference eg.
legitimate application change
or unexpected eg. defect. The
baseline can be updated
with legitimate changes and
reports logged for defects
11
21
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | test automation
Testing types:
• Regression
• Load
• Performance
• Volume
• Stress
• Installation
• Configuration
22
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | testing within agile
Traditional Waterfall Methodology
Requirements
Design
Build
Test
Implementation
12
23
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | testing within agile
Agile Methodology
User Stories
Design
Build
Test
Design
Build
Test
Design
Build
Test
Design
Build
Test
Implementation
24
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | testing within agile
Agile Methodology
Design
Build
Test
Design
Build
Test
Design
Build
Test
Design
Build
Test
Implementation
Time-boxed mini-waterfall-like iterations
(sprints)
Design
Build
Test
User Stories
13
25
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | testing within agile
Agile Methodology
Design
Build
Test
Design
Build
Test
Design
Build
Test
Design
Build
Test
Implementation
Time-boxed mini-waterfall-like iterations
(sprints)
Design
Build
Test
User Stories
26
www.nztester.co.nz
NZTester
www.nztester.co.nz
Approaches | testing within agile
Agile Methodology
Design
Build
Test
Design
Build
Test
Design
Build
Test
Design
Build
Test
Implementation
Time-boxed mini-waterfall-like iterations
(sprints)
Design
Build
Test
Design
Build
Test
User Stories
14
27
www.nztester.co.nz
NZTester
www.nztester.co.nz
Challenge | you are the test architect!
• Core - JDEdwards ERP system configuration etc
• Retail - Retail outlets POS system implementation
• Online Ordering - Online Ordering system software
development (agile, web-based)
• Integration - Middleware for integration
• Data Migration - Migration of legacy ERP system data
• Reporting - Data warehouse, BI and reporting
• Security - Appropriate level of security deployed
• Performance - Optimising all systems for peak
performance
• Mods - Ongoing rollout of further modifications as any
gaps in requirements are identified
28
www.nztester.co.nz
NZTester
www.nztester.co.nz
Challenge | simple schematic
Core JDEdwards
Middleware
Retail
Data Warehouse
Online Ordering
Retail
Retail
Retail
15
29
www.nztester.co.nz
NZTester
www.nztester.co.nz
Challenge | existing resources
• Single test environment for ERP and Retail testing before
release into Production
• Maintenance releases for all applications provided on a
quarterly basis by respective vendors with one major
version release per annum
• Internal IT team includes small team of permanent test
analysts who know the existing applications well and
perform mostly adhoc testing on new releases
• International sites received tested releases and check for
localisations before release into Production
• No automation of any sort
30
www.nztester.co.nz
NZTester
www.nztester.co.nz
Challenge | test scope
• Testing has to encompass the entire project cycle from
beginning to end of NZ system implementation included
additional modifications
• Running under project conditions
• Six months duration expected
• Test solution will determine level of resourcing
• Budget is available for additional test resources
• There is budget for test tools albeit restricted
• There are high-level business requirements available
however the detail-level will be worked on regular design
workshops
• There is an expectation that business SMEs and users will
be available to assist where needed
16
31
www.nztester.co.nz
NZTester
www.nztester.co.nz
Challenge | test solution design
• Which test approaches would you apply against which
stream of activities and why?
• What would be the test phases to make up the test
project?
• What tools would you recommend?
• How would you resource testing?
• How would you structure the test team?
• Which of the other project/IT teams would you be
interacting with the most and why?
• What sort of reporting would you put in place?
32
www.nztester.co.nz
NZTester
www.nztester.co.nz
Challenge | test solution design
• What testing processes would you put in place to support
testing?
• What and how many test environments will you need?
• How will you obtain test data and databases?
• Where will you deploy the business SMEs and users
17
Sticky Testing Questions:
• How much testing have we done?
• Is testing progressing as it should be?
• What has to be done to finish testing on time?
• How much testing is able to be progressed?
• How fast is testing going?
• How fast does testing need to go to finish on time?
33
www.nztester.co.nz
NZTester
Sticky Testing Questions (cont):
• Are defects being closed off fast enough to finish on time?
• Are we over the hump yet?
• Are we getting better with defects?
• How fast are we finding defects?
• How fast are we closing off defects?
• How fast do we need to close off defects to finish on time?
34
www.nztester.co.nz
NZTester
18
Asked By:
• Sponsors
• Steering Committees
• Business Owners
• Programme Managers
• Project Managers
• Peers & their teams
• Test Teams
• Business Partners
• CUSTOMERS!!
35
www.nztester.co.nz
NZTester
Sticky Testing Questions:
• Easy to provide rough, finger-in-the-wind answers
• Not so easy to provide based on real information
36
www.nztester.co.nz
NZTester
19
So What Information Do We Need To
Answer These:
37
www.nztester.co.nz
NZTester
Test Execution:
• The no. of test cases already passed
• The total no. test cases to be executed in the cycle
• The length of time the cycle has been active
So how do we use?
38
www.nztester.co.nz
NZTester
20
Test Execution:
• The no. of test cases already passed
• The total no. test cases to be executed in the cycle
• The length of time the cycle has been active
Example:
• Say 66 test cases have passed
• Cycle has been active for 8 working days
• = a pass rate of ~8.25 test cases per day
39
www.nztester.co.nz
NZTester
Test Execution:
• The no. of test cases already passed
• The total no. test cases to be executed in the cycle
• The length of time the cycle has been active
So:
• Say 178 test cases to execute in total
• = 112 still to be passed (178 - 66)
• @ ~8.25 test cases passing per day up to that point
• Remaining 112 = a further ~13.5 working days to complete
40
www.nztester.co.nz
NZTester
21
Defects:
• The no. of defects found
• The no. of defects closed off
• The length of time the cycle has been active
41
www.nztester.co.nz
NZTester
Defects:
• The no. of defects found
• The no. of defects closed off
• The length of time the cycle has been active
Example:
• Say 9 defects have been found
• Cycle has been active for 8 working days
• = a log rate of ~1.1 defects per day
• Say 5 defects have been fixed, retested & closed
• = a close rate of ~.06 defects per day
42
www.nztester.co.nz
NZTester
22
We now have 4 key pieces of
information:
• Test case pass rate of 8.25/day
• Defect log rate of 1.1/day
• Defect close rate of 0.6/day
• Estimated completion is ~13.5 days away
(if we started on 20 Jul then we’ll finish ~21 Aug)
Which can be plotted over time to see trends
43
www.nztester.co.nz
NZTester
44
Plot the trends over time
www.nztester.co.nz
NZTester
23
45
www.nztester.co.nz
NZTester
Plot the trends over time
46
www.nztester.co.nz
NZTester
Plot the trends over time
24
47
www.nztester.co.nz
NZTester
Plot the trends over time
We now have 4 key pieces of information:
• Test case pass rate of 8.25/day
• Defect log rate of 1.1/day
• Defect close rate of 0.6/day
• Expected completion is ~13.5 days away
However:
48
www.nztester.co.nz
NZTester
25
We now have 4 key pieces of information:
• Test case pass rate of 8.25/day
• Defect log rate of 1.1/day
• Defect close rate of 0.6/day
• Expected completion is ~13.5 days away
However:
What if we only have another 7 days of testing available before
the deadline?
In theory, we’ll only get to pass another ~58 test cases = 124
total passed, out of 178 = ~70%, not good. 49
www.nztester.co.nz
NZTester
And typically…
• More defects are found at the start of testing
• Less test cases are passed at the start of testing
• More defects are closed towards the end of testing
• No guarantee conditions will stay the same:
• Scope changes
• Lose test team members
• Leave requirements etc etc
• Test cases are variable in length eg. 66 short & quick v 112 long &
slow
• Snapshot in time only
50
www.nztester.co.nz
NZTester
26
51
What’s the solution?
www.nztester.co.nz
NZTester
52
Need to improve productivity & get
the rates up
• More testers?
• More developers to fix defects?
• Defer lower priority test cases?
• Fix fewer defects?
• Work longer hours/weekend?
• Introduce testing shifts if viable?
• Lobby to extend the deadline?
• Whatever your project management arsenal of skills & talents can
muster!
And….
www.nztester.co.nz
NZTester
27
53
Need to improve productivity & get
the rates up
• More testers?
• More developers to fix defects?
• Defer lower priority test cases?
• Fix fewer defects?
• Work longer hours/weekend?
• Introduce testing shifts if viable?
• Lobby to extend the deadline?
• Whatever your project management arsenal of skills & talents can
muster!
And need to work out what the rates need to be to meet the
deadline on a DAILY basis! NZTester
We now have 8 key pieces of information:
• Test case pass rate of 8.25/day, need 16/day (112 test
cases/7 days)
• Defect log rate of 1.1/day, will log another ~8 defects (1.1 x 7
days)
• Defect close rate of 0.6/day:
• 5 already closed
• close another ~4 defects (0.6 x 7 days)
• need to close the additional 8 = 12 total to close
• = required close rate of ~2/day
• Estimated completion is ~13.5 days away, needs to be done
in 7 days
Which again can be plotted over time to see trends:54
www.nztester.co.nz
NZTester
28
55
Manage & track daily….
www.nztester.co.nz
NZTester
56
www.nztester.co.nz
NZTester
Manage & track daily….
29
57
www.nztester.co.nz
NZTester
Manage & track daily….
58
www.nztester.co.nz
NZTester
Manage & track daily….
30
Not…..
59
www.nztester.co.nz
NZTester
60
Rather…..
www.nztester.co.nz
NZTester
31
61
Key…..
www.nztester.co.nz
NZTester
62
www.nztester.co.nz
NZTester
www.nztester.co.nz