Test beam with Pixel modules
description
Transcript of Test beam with Pixel modules
![Page 1: Test beam with Pixel modules](https://reader036.fdocuments.in/reader036/viewer/2022062518/56814039550346895daba7cc/html5/thumbnails/1.jpg)
Test beam with Pixel modules
![Page 2: Test beam with Pixel modules](https://reader036.fdocuments.in/reader036/viewer/2022062518/56814039550346895daba7cc/html5/thumbnails/2.jpg)
2 Modules: • 3 GEMs with 8 Timepix chip• 8 InGridsReadout is SRS basedPossibly with water cooling
Production started in January, first parts were delivered in FebruaryBut central parts had to be diffusion welded at external workshop. This took longer than expected and there were some problems. We got the last part (for the InGrid module) only 3 days before the test beam.
Aims
![Page 3: Test beam with Pixel modules](https://reader036.fdocuments.in/reader036/viewer/2022062518/56814039550346895daba7cc/html5/thumbnails/3.jpg)
GEM-Module
2 Oktoboards with bare Timepix chips produced and tested Modules is assembledGEMs tested (500 V @ N2 -> 0.7 nA leakage current) 380 V @ Ar:iButane 95:5 stands for ~30 min.
![Page 4: Test beam with Pixel modules](https://reader036.fdocuments.in/reader036/viewer/2022062518/56814039550346895daba7cc/html5/thumbnails/4.jpg)
What happend to the InGrid Module
![Page 5: Test beam with Pixel modules](https://reader036.fdocuments.in/reader036/viewer/2022062518/56814039550346895daba7cc/html5/thumbnails/5.jpg)
Assembley of InGrid Module
![Page 6: Test beam with Pixel modules](https://reader036.fdocuments.in/reader036/viewer/2022062518/56814039550346895daba7cc/html5/thumbnails/6.jpg)
Inserting the module in LP
Everything went well, so we decided to leave the InGrid module in and test it first.
![Page 7: Test beam with Pixel modules](https://reader036.fdocuments.in/reader036/viewer/2022062518/56814039550346895daba7cc/html5/thumbnails/7.jpg)
Schedules sofar
21.4. Inserted InGrid module in LP, starting to flash gas (T2K)22.4. everything set up, started to learn how to handle beam/PCMAG -> killed power supply of readout electronics (too close to magnet)23.4. replaced power supply, saw first tracks24.4. equalizing the chips (problems with chip 7 and 8)25.4. finishing euqalization, adjusting beam, placing SRS at better position26.4. started data taking (voltage scan)
![Page 8: Test beam with Pixel modules](https://reader036.fdocuments.in/reader036/viewer/2022062518/56814039550346895daba7cc/html5/thumbnails/8.jpg)
Position of SRS
![Page 9: Test beam with Pixel modules](https://reader036.fdocuments.in/reader036/viewer/2022062518/56814039550346895daba7cc/html5/thumbnails/9.jpg)
Events
![Page 10: Test beam with Pixel modules](https://reader036.fdocuments.in/reader036/viewer/2022062518/56814039550346895daba7cc/html5/thumbnails/10.jpg)
Thanks to everyone who was helping!