Test Architecture Design and Optimization for Three-Dimensional SoCs

Li Jiang, Lin Huang and Qiang XuCUhk Reliable Computing Laboratry

Department of Computer Science & Engineering

The Chinese University of Hong Kong

Outline

Introduction Motivation Proposed approach Experiments Conclusion

Introduction

3D technique• Vertically stack dices

• TSV as interconnect

Benefit of 3D IC• Interconnect

• Performance, Power, Area

• Memory bandwidth

• Heterogeneous technology• 3D SoCs

Device Layer

TSVCu

Bulk Si

Cu Bond Pad

TSV

DeviceLayer

Metal

Layer 1

Layer 2

Bonding Methods in 3D Technology

W2W bonding• Bond->Cut->Package Test

• Low yield

D2D/D2W bonding• Utilize pre-bond test

• Test->Cut->Bond

• Only stack KGD

TAM1

TAM2

TAM3

3D Chip

5

4 6

1 2 3

5

Layer 1 Layer 2

Idle Idle

Empty

Empty

Post-Bond Test Pre-Bond Test

4 6

1 2 3

After Move

Motivation

Traditional SoC test architecture optimization

3D SoC test architecture optimizationTAM1

TAM2

TAM3

3D Chip

5

4 6

1 2 3

5

Layer 1

3

Layer 2

Idle Idle

Empty

Empty

1 2

4 6

Post-Bond Test Pre-Bond TestMove 1 bit from TAM 3 to TAM 2

TAM1

TAM2

TAM3

5

4 6

1 2 3

Post-Bond Test

Problem Definition

• Given• Set of cores, Test Parameters, Position

• Available TAM width

• Determine• Number of TAM

• Core assignment

• Width of each TAM

• Objective• Minimize the total test cost

• CTotal = CTest-Time * α+ CWire-Length *(1- α)

• CTest-Time = C3DChip + Σ CLayer

• CWire-Length depends on routing model

Routing Model

TAM for post-bond test • TAM segments for pre-bond test

• Additional test pad

• TSV linking segments together

Routing cost model• Wire length:

• Manhattan distance between core centers

• Neglect length of TSV

• Wire length * TAM width

1 2

4 2'

3

5TSV

6

TAM1

TAM2

TAM3 TAM2

Wrapper

Layer 1

Layer 2

Approach Simulated annealing

• Appropriate for this scale

• Solution representation• Core assignment & TAM width

• Move• Move core

• Change TAM width

• Large solution space

Proposed approach• Outer SA-based core assignment

• Inner TAM width distribution heuristic

(Core1,Core2) ,(Core5,Core7,Core8)

TamWidth1,TamWidth2

(Core1,Core2,Core5) ,(Core7,Core8)

TamWidth1,TamWidth2

(Core1,Core2) ,(Core5,Core7,Core8)

(Core1,Core2,Core5) ,(Core7,Core8)

TamWidth1,TamWidth2

TamWidth1,TamWidth2

Heuristic

Heuristic

Approach

Overflow

Outer SA-based core assignment• Redundancy in representation

• Rules to eliminate redundancy• 1-to-1 corresponding betweenrepresentation and solution

• Prove of completeness

(C1,C3),(C2,C4,C5)

(C3,C1),(C2,C4,C5)

Initial Solution

Move

Inner TAM Width Distribution Heuristic

Record Cost

Check Temperature

Check Temperature

Approach

Greedy inner TAM width allocation procedure

Set b = 1

Find a TAM Brings the Min Cost

Record Test Cost

Whether can Reduce Test Cost?

b = b+1

No YesTAM Width=0?

YesStop

Assign 1 bit to each TAM

Experiment Setup Baseline algorithms

• TR-1:• Apply existing optimization algorithm to the 3D SoC layer by layer

• Adjust the TAM width among layers iteratively

• Optimize the pre-bond test architecture

• TR-2:• Apply existing optimization algorithm to the whole 3D chip

• Optimize the post-bond test architecture

Benchmark: ITC02 SoC benchmark Map to 3D SoC Previous wrapper optimization algorithm Testbus as TAM

Experimental Results

Testing Time on p22810

00.20.40.60.8

11.21.41.61.8

2

16 24 32 40 48 56 64

Mil

lion

s

TAM Width

Tes

t T

ime

0

10

20

30

40

50

Tho

usan

dsW

ile

Len

gth

Time,TR-1 Time,TR-2Time,SA WL,TR-1WL,TR-2 WL,SA

Experimental Results

a=0.6,t512505

0

10

20

30

40

50

60

70

80

16 24 32 40 48 56 64

Mil

lion

s

TAM Width

Tes

tin

g T

ime

-1500

500

2500

4500

6500

8500

10500

12500

Wir

e L

engt

h

Time,TR-2Time,SAWL,TR-2WL,SA

Experimental Results

a=0.4,t512505

0

10

20

30

40

50

60

70

80

16 24 32 40 48 56 64

Mil

lion

s

TAM Width

Tes

ting

Tim

e

-1500

500

2500

4500

6500

8500

10500

12500

Wir

e L

engt

h

Time,TR-2Time,SAWL,TR-2WL,SA

Conclusion

Focus on D2D/D2W Pre-bond test and post-bond test Proposed efficient and effective approach can

optimize the 3D Test Architecture To reduce the solution space, we split Simulated

Annealing based approach into two part Experimental results show the efficiency of proposed

approach