Terry Stocks Ministry of Justice Estates Delivery Director ...
Transcript of Terry Stocks Ministry of Justice Estates Delivery Director ...
Working to deliver an effective, efficient and sustainable estate
BIM Expectations – What Can It Do
Terry Stocks
Ministry of Justice Estates
Delivery Director BIM Level 2
Working with Cabinet Office
Strategy to drive down central government project cost c20%
Promote Early Contractor Involvement
Improved Client Leadership
Govt imperative to use BIM (Building Information Modelling)
Why are we adopting BIM
(Expectations)
A Vision For 2025
30% Lower Cost
50% Faster Delivery
An Industry attracting “Top Talent”
Smart, Sustainable, Supporting Growth, Strong Leadership
Acknowledging importance of operation
Bringing in the end user early
Bringing in the asset operator early
Using Data To Find Our Way
BIM is about DATA –
The modelling is great to aid collaboration, stakeholder engagement and quick referencing
But the more accurate we are with our requirements the easier a solution can be found, the
quicker we can deliver it and the more effective we can be in operating / using / maintaining it.
BIM – Improving Delivery and Operation
BIM a Trojan Horse – Improving:
• The Delivery Process
• The Capex to Opex Handover
• The Operational Life cycle operation
BIM – Part of a Bigger Picture
Collaborative
Procurement
Intelligent
Client Early
Contractor
Engagement
Benchmarking
/ Use of Data
Continuous
Improvement
Govt Soft
Landings
DFMA, BOS,
Standardisation Lean Delivery
Benefits
Based on:
•Palace Exchange,
Enfield
•Festival Place,
Basingstoke
•Endeavour House,
Stansted
•Terminal 5, Heathrow
•Portcullis House, London
•St. Bart’s Hospital,
London
•Cookham Wood, Kent
In Summary
BIM Level 2 Expectations – What Can It Do
• Reduce project delivery costs
• Reduce asset operational costs
• Improve client skills – client pull
• Enable supply chains to create the push
• Act as a focal point for collaborative delivery
• Support increased use of Off Site Manufacture
• Provide the platform to Level 3 BIM
THANK YOU
Cost of Procurement,
Design, Management,
Contractors Site Set Up etc
%age of Investment actually
spent on the asset (cost of
materials and labour.)
Cost of Procurement,
Design, Management,
Contractors Site Set Up etc
%age of Investment actually
spent on the asset (cost of
materials and labour.)
Red
uce
M
ax
imis
e