4
TeroLab Application Report No. : IN_M1________/ 1 Workpiece : Flexible Shaft Machine : Sugar Mill Industry : Sugar Producer : Base Metal : Spring Steel Specification : As per drawing Dimensions : As per drawing Weight : 10 Kg Description : Flexible Shaft is a flexible spring whose one end connected to motors shaft & at the another end brush is attached. This Flexible shaft is used for cleaning of Boiler tube, evaporator tube, condenser tube. During cleaning of tubes(scale inside the tube), sometimes excessive load comes on the flexible shaft to remove hard scale., which leads to breakage of flexible shaft. Solution: - Joining of broken spring with Xuper 16 XFC. Advantages: - 1) Low co-efficient of friction. 2) Thin flowing 3) Superior wettability and bonding. 4) High tensile strength (1,00,000 PSI ) The life has been increased to 20 days from 2-3 days (frequently breaking). Preventive Maintenance : Joining : Repair : OEM OEM Fracture / Crack User Coating Production User Reconstitution Adhesion / Friction Thermal Fatigue Cavitation Abrasion : Mechanical Fatigue : Erosion : High pressure Impact gas medium Low pressure Compressive Load liquid medium Corrosion Temperature : o C Crevice Corrosion Pitting Corrosion Uniform Corrosion Stress Corrosion Cracking High Temperature Corrosion Intercrystalline Corrosion

Transcript of Terolink Flexible Shaft

Page 1: Terolink Flexible Shaft

TeroLab Application Report No. : IN_M1________/ 1

Alternative Industries : Power Industry

Workpiece : Flexible Shaft Machine : Sugar Mill

Industry : Sugar Producer :

Base Metal : Spring Steel Specification : As per drawing

Dimensions : As per drawing Weight : 10 Kg

Description : Flexible Shaft is a flexible spring whose one end connected to motors shaft & at the another end brush is attached. This Flexible shaft is used for cleaning of Boiler tube, evaporator tube, condenser tube. During cleaning of tubes(scale inside the tube), sometimes excessive load comes on the flexible shaft to remove hard scale., which leads to breakage of flexible shaft.

Solution: - Joining of broken spring with Xuper 16 XFC.

Advantages: - 1) Low co-efficient of friction. 2) Thin flowing

3) Superior wettability and bonding.4) High tensile strength (1,00,000 PSI )The life has been increased to 20 days from 2-3 days (frequently breaking).

Previous Solution : - Brazing of broken spring with local brass brazing rod .

Products : Xuper 16 XFC Processes : Brazing

Preventive Maintenance : Joining : Repair :

OEM OEM Fracture / Crack User Coating Production User

Reconstitution

Adhesion / Friction Thermal Fatigue Cavitation

Abrasion : Mechanical Fatigue : Erosion :

High pressure Impact gas medium

Low pressure Compressive Load liquid medium

Corrosion Temperature : oC

Crevice Corrosion Pitting Corrosion

Uniform Corrosion Stress Corrosion Cracking

High Temperature Corrosion Intercrystalline Corrosion

Page 2: Terolink Flexible Shaft

TeroLab Application Report No. : IN_M1________/ Copyright Eutectic + Castolin

2

Image 1

Flexible shaft View

Image 2

During Joining of Shaft with Xuper 16 XFC

Image 3

Final Brazed joint

Name : Anup Talpelliwar Date : 24/04/2011

Customer :

Address :

TeroLab application Local application Copyright Eutectic + Castolin

Page 3: Terolink Flexible Shaft

TeroLab Application Report No. : IN_M1________/ 3

Internal information : Purna SSK, Vasmat, Dist – Hingoli is our one of the major customer. This customer isone of the reputed customer in Marathwada & whenever we approach them with some new technology , they give us opportunity to implement it.

Procedure of reclaimation:-

1. Cleaning of surface. (Grease, oil & other extraneous material such as scale removed )

2. Using neutral flame , preheat the part & melt off drop of flux from end of rod onto beginning of joint area.

3. Continue heating until flux liquifies.4. Deposit alloy drop by drop,feeding into flame as reqd.5. Ensure that each drop bonds properly .6. Remove flux residues by washing with water .

Powder consumption:- Xuper 16 XFC – 100 gms

Customer : M/s PURNA SSK,.

Address : VASMAT, DIST :- HINGOLI

Downtime cost per hour: 400 /- No. of parts used

annual: 4

Price per new part 30,000/- Previous Service Life : 2-3 Days

Cost of E+C procedure 300 /- Actual Service Life : 20 days

Annual Customer Saving: 32,000 /- LPF % - 1000 %