![Page 1: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/1.jpg)
1
Termochemical biomass processing
Buenos Aires (2013)
Dr. Mariano Martín Assistant professor
University of Salamanca (Spain)
H2
H2
H2
H2
![Page 2: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/2.jpg)
Overview
2
Introduction Energy in the world Biomass as raw material Approach to process synthesis Gasification based Hydrogen from switchgrass Bioethanol from switchgrass (2nd generation) Via gasification FT diesel from switchgrass Pyrolysis based Conclusions
![Page 3: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/3.jpg)
Introduction
3
Energy in the world: Contribution of renewables[1]
[1] BP annual report
![Page 4: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/4.jpg)
4
Alternatives
Primary building blocks
BioOil
Gasification
Pyrolysis
![Page 5: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/5.jpg)
Gasification
GASIFICATION of
Lignocellulosic materials
5
Biomass (Energy) CO + H2
![Page 6: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/6.jpg)
Gasification
6
Gasification
Uses Air Two chambers Higher conc. HBC
Requires O2
One chamber High pressure Lower conc. HBC
Martín, M., Grossmann, I.E. (2011) AIChE J. DOI: 10.1002/aic.12544
CO2
CO H2
H2O CH4
C2H2
C2H4
![Page 7: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/7.jpg)
Reforming
7
Steam reforming Higher hydrogen production Endothermic reaction. Lower energy available within the process
Partial oxidation Lower hydrogen production Exothermic reaction. More energy within the process
Gasification
1) Steam reforming 2) Partial oxidation 3) Autoreforming 4) Dry reforming (CO2)
Martín, M., Grossmann, I.E. (2011) AIChE J. DOI: 10.1002/aic.12544
![Page 8: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/8.jpg)
Clean up
8
Water
Gasification
Solids Ammonia
Martín, M., Grossmann, I.E. (2011) AIChE J. DOI: 10.1002/aic.12544
![Page 9: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/9.jpg)
Water Gas Shift Reactor
9 Ji, P., Feng, W., & Chen, B. (2009a). Chem. Eng. Sci. 64, 582–592
H2O + CO H2+CO2
Production of HYDROGEN from Switchgrass
Gasification - Hydrogen
Martín, M., Grossmann, I.E. doi:10.1016/j.compchemeng.2011.03.002
![Page 10: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/10.jpg)
Gasification - Hydrogen
Optimal flowsheet for the production of HYDROGEN from Switchgrass
10
$0.68/kg, $148MM
Martín, M., Grossmann, I.E. doi:10.1016/j.compchemeng.2011.03.002
TARGET (DOE) $1.68/kg
Mathematical programming techniques Superstructure optimization
![Page 11: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/11.jpg)
CO/H2 Adj.
WGSR
H2 PSA
11
Water
Ratio H2/CO from 1:1 Ethanol 1.7-2: FT 2: Methanol
Gasification
H2
Martín, M., Grossmann, I.E. (2011) AIChE J. DOI: 10.1002/aic.12544
![Page 12: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/12.jpg)
Sour gases removal CO2 & H2S
MEA Removal of CO2 and H2S
PSA Removal of CO2
Membrane Porous to CO2
12
Gasification
Martín, M., Grossmann, I.E. (2011) AIChE J. DOI: 10.1002/aic.12544
Other methods -Rectisol (p>50bar) -CaO + CO2 CaCO3
![Page 13: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/13.jpg)
Fermentation
3CO+3H2 CH3CH2OH + CO2
13
Gasification- Bioethanol
Huge energy consumption
Production of BIOETHANOL via gasification of Switchgrass
Martín, M., Grossmann, I.E. (2011) AIChE J. DOI: 10.1002/aic.12544
![Page 14: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/14.jpg)
14
Production of BIOETHANOL via gasification of Switchgrass
Fermentation
Martín, M., Grossmann, I.E. (2011) AIChE J. DOI: 10.1002/aic.12544
Gasification- Bioethanol
![Page 15: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/15.jpg)
Rectification
Ads Corn Grit.
Molecular Sieves
Pervaporation
Ethanol dehydration
15 Martín, M., Grossmann, I.E. (2011) AIChE J. DOI: 10.1002/aic.12544
Gasification- Bioethanol Production of BIOETHANOL via gasification of Switchgrass
![Page 16: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/16.jpg)
To cleanup Catalysis
16
From sour gas removal
Martín, M., Grossmann, I.E. (2011) AIChE J. DOI: 10.1002/aic.12544
Gasification- Bioethanol
Production of BIOETHANOL via gasification of Switchgrass
![Page 17: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/17.jpg)
Optimal flowsheet for the production of BIOETHANOL via gasification of Switchgrass
17
$0.41/gal, $335MM
Martín, M., Grossmann, I.E. (2011) AIChE J. DOI: 10.1002/aic.12544
H2
Major savings due to income from excess of H2
TARGET (DOE) $1/gal
Gasification- Bioethanol
![Page 18: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/18.jpg)
18 Martín, M., Grossmann, I.E. (2011) AIChE J. DOI: 10.1002/aic.12544
Energy consumption: Bioethanol
Water consumption: Bioethanol
Martín, M.; Ahmetovic, E.; Grossmann, I.E. (2011) Ind. Eng. Chem Res DOI: doi: 10.1021/ie101175p
Gasification- Bioethanol
![Page 19: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/19.jpg)
FT reactor operating conditions to optimize Diesel production
( )( )( )2
0.2332* 0.633 * 1 0.0039* T _ Synthesis 273 533 CO
H CO
yy y
α = + − + − +
The product distribution depends on H2/CO ratio Operating temperature Operating Pressure
Song Hyun-Seob, S et al Korean J. Chem., 2004, 21, 308-317.
Production of FT DIESEL AND GREEN GASOLINE via gasification of Switchgrass
Gasification- FT liquids
![Page 20: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/20.jpg)
Hydrocracking operating conditions to optimize Diesel production
Hydrocracking in the FT- fuels production: Using the experimental values from an hydrocracking reactor we develop correlations to predict the conversion as function of the temperature
Bezergianni, S et al. Bioresour. Technol. 2009, 100, 3036–3042
Gasification- FT liquids
Production of FT DIESEL AND GREEN GASOLINE via gasification of Switchgrass
![Page 21: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/21.jpg)
Optimal flowsheet for the production of FT Diesel via gasification of Switchgrass
21
$0.72/gal, $212MM
Martín, M., Grossmann, I.E. (2011) Ind Eng. Chem Res. 50 (23),13485–13499
Gasification- FT liquids
$0.72/gal
![Page 22: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/22.jpg)
22
Gasification Summary
Trade-offs Investment vs operation cost
![Page 23: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/23.jpg)
Pyrolysis
Fast Pyrolysis of Lignocellulosic
23
We do not break down the biomass to syngas Lower operating temperature We obtain a wide range of products
![Page 24: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/24.jpg)
24 Bridgewater biomass and bioenergy 38 (2012) 68-94
Bubbling fluid bed reactor
Circulating fluid bed reactor
Pyrolysis
![Page 25: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/25.jpg)
25 Brown et al Biofuels. Bioprod. Biorefin. 2012, 6 (1), 73−87.
Pyrolysis
![Page 26: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/26.jpg)
26 Brown et al Biofuels. Bioprod. Biorefin. 2012, 6 (1), 73−87.
Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment is needed for a positive internal rate of return (IRR)
Pyrolysis
![Page 27: Termochemical 2 biomass processing · 2020. 11. 24. · Biorefin. 2012, 6 (1), 73−87. Capital costs from $99 MM to $112 MM and operating costs from $70 MM/yr to $90 MM /yr . Hydrotreatment](https://reader036.fdocuments.in/reader036/viewer/2022071604/613f4cdfa7a58608c268d5bd/html5/thumbnails/27.jpg)
Conclusions
--Biomass and waste are promising raw material for biofuels. --The range of biofuels is broad: hydrogen, bioethanol, biodiesel, green gasoline and diesel, biomethanol…. --It is feasible to produce second generation of biofuels but further development is required in purification and reaction technologies to increase water recycle and reuse and increase the yield of the processes.
27
Ackowledgement: Prof. Ignacio E. Grossmann