San Francisco International AirportTerminal 2 BuildbackCDR Presentation - Phase 2May 21, 2018
Sense of Place Surprise & Delight Impactful Interventions
Design Drivers
-Connection to Airfield-Views to Mountains and Bay-Access to Fresh Air, Sunshine, Fog-Guest and Employee Hospitality
-Public Observation Deck Retreat-Opportunity for Enhanced Technology-Museum Collection and Storytelling
-Vertical Circulation-Airline Lounge Entry Experience-Meet and Greet Lounge-Observation Deck
T2
T3 T1
INTERNATIONAL TERMINAL
A Close Connection to The Airfield
A History of Public Observation and Engagement at SFO Site and Context
AIR TRAIN APPROACH
PEDESTRIAN VIEW
PASSENGER VIEW
DROP OFF APPROACH
AIR TRAIN APPROACH
Site and Context
Metal & Stucco: Arcadia SilverMatch T2 Metal Panels
Metal & Stucco: Silver StormSimilar to T3 and T1/T2 Connector
T1/T2 Connector
T2/T3 Connector
T2 Departure Hall T2/T3 Connector
T1/T2 Connector
T3 BA/E
T2 Airside
T2 Curbside
Previous ATCT
T2 Airtrain
Wood Look Accent: OakSimilar to T2 Entry Hall
01 02
02
01
03
03
01
02
02
01
01
01
01
03
Material Palette
Domestic Campus Precedent & Development
01
01
01
02
02
Previous / Existing Conditions
Previous Airtrain View Proposed Airtrain View
Previous / Existing Conditions
Curbside View after Tower Demolition Proposed View
Previous / Existing Conditions
Previous Aerial View Phase 2 Aerial View
Building color darkened to highlight the new building massing within the T2 light silver context.
Phase 1 / Phase 2 Comparison
Phase 1 Aerial View Phase 2 Aerial View
Roof profile revised to a thin painted metal edge to highlight the “Jewel Box” massing anchoring each end of the building where public visibility is highest.
Phase 1 / Phase 2 Comparison
Phase 1 AOA View Phase 2 AOA View
Building color darkened to match existing T2 accent color and to highlight the new building massing within the T2 light silver context.
Phase 1 / Phase 2 Comparison
Phase 1 Air Train View Phase 2 Air Train View
Plan
Level 2
Security Checkpoint
Curbside
Airside
Future T3 Connector Secure L4 Lounge AccessSecure L4 Lounge Access
Public Cafe & Observation Deck Access
Public L3 Unassigned Access
Secure ElevatorPublic Elevator
North
Plan
Level 3
Unassigned Space [13,375 sf]Cafe [3,000 sf]
Kitchen [900 sf]
Curbside
Airside
Secure ElevatorPublic Elevator
North
Plan
Level 4
Airline Lounge [14,000 sf]
Interior ObservationObservation Deck Potential Airline Deck [2,400 sf]
[1,600 sf]
[1,600 sf]
Secure ElevatorPublic Elevator
North
Curbside
Airside
Building Sections & Details
AT OBSERVATION DECK
Building Sections & Details
Building Elevations
North Elevation
South Elevation
West Elevation
East Elevation
Building Materials
Vision Glass Spandrel, Back
Painted Glass
Stucco: Dark Grey Ptd. Metal Panel: Dark Grey
3
4
1 2
5
Wood Look Metal Panel 4
2
3
1
Existing T2 Metal Panel and Stucco Existing T2 Accent Metal Panel & T3 Metal Panel
E1
E1
E2
Building Massing
View from Airside
Building Materials
4
Vision Glass Spandrel, Back
Painted Glass
Stucco: Dark Grey
3
4
1 2
5
2
4
1
Wood Look Metal Panel
Ptd. Metal Panel: Dark Grey
E2E1
Existing T2 Metal Panel and Stucco Existing T2 Accent Metal Panel & T3 Metal Panel
E1 E2
Building Massing
View from Air Train Red Line
MARCH 19, 2018
Building Massing
South East Airfield View
Building Massing
North East Aerial View