Tennis Facility Planning Guide 1-4MB

52
Tennis Facility Planning Guide

Transcript of Tennis Facility Planning Guide 1-4MB

Page 1: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 1/52

Tennis FacilityPlanning Guide

Page 2: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 2/522

Index

Minister’s and Executive Director’s

forewords. . . . . . . . . . . . . . . . . . . . . . . 3

 About this guide . . . . . . . . . . . . . . . . . . 4

Context . . . . . . . . . . . . . . . . . . . . . . . . 5

Key resources and references . . . . . . . 6

Principles of facility provision . . . . . . . . 7

Effective planning . . . . . . . . . . . . . . . . . 7

Efficient management . . . . . . . . . . . . . . 7

Considered research and design . . . . . . 7

Financial management. . . . . . . . . . . . . . 7

Environmental sustainability . . . . . . . . . . 8

The facility planning process . . . . . . . . 9

Phase 1 – Club/community needs . . . . 10

Phase 2 – Feasibility and siteassessment. . . . . . . . . . . . . . . . . . . . . 11

Phase 3 – Design . . . . . . . . . . . . . . . . 13

Phase 4 – Construction process. . . . . . 15Phase 5 – Management. . . . . . . . . . . . 16

Facility development considerations. . 18

Site investigation . . . . . . . . . . . . . . . . . 18

Court layout and orientation . . . . . . . . . 19

Base construction . . . . . . . . . . . . . . . . 21

Court surface types . . . . . . . . . . . . . . . 24

Court surface selection . . . . . . . . . . . . 29

Multi-use courts . . . . . . . . . . . . . . . . . 29

Floodlighting . . . . . . . . . . . . . . . . . . . . 30

Fencing. . . . . . . . . . . . . . . . . . . . . . . . 33

Court equipment and accessories . . . . 34

Grounds and surrounds . . . . . . . . . . . . 34

Clubhouses. . . . . . . . . . . . . . . . . . . . . 35

 The environment . . . . . . . . . . . . . . . . . 37

Project funding . . . . . . . . . . . . . . . . . . 38

National Court Rebate Scheme . . . . . . 38

Facility Loan Scheme. . . . . . . . . . . . . . 38

Neale Fraser Foundation . . . . . . . . . . . 38

 Victorian government . . . . . . . . . . . . . . 38

Local government . . . . . . . . . . . . . . . .38

Local community . . . . . . . . . . . . . . . . .39

Education sector . . . . . . . . . . . . . . . . .39

Private sector . . . . . . . . . . . . . . . . . . .39

Other agencies and funding programs .39

Further resources and information . . .40

Glossary and definitions . . . . . . . . . . .41

 Appendix 1 – Club assessment tool

- court surface selection . . . . . . . . . . .43

 Appendix 2 – Case studies . . . . . . . . .44

Bundoora Tennis Club . . . . . . . . . . . . .44

Sale Tennis Club . . . . . . . . . . . . . . . . .46

Checklist . . . . . . . . . . . . . . . . . . . . . .48

 Acknowledgements . . . . . . . . . . . . . .49

Page 3: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 3/52

Minister’s foreword

3

 Tennis is a sport enjoyed by an estimated420,000 Victorians annually. More than

1,000 tennis clubs and centres areencouraging Victorians to play tennisand lead active lifestyles.

 The Victorian Government has been astrong supporter of community tennisfacility development. This support hasbeen aimed at providing quality facilitiesfor all Victorians to enjoy a sport that ispart of our nation’s sporting culture.

 That’s why the Victorian Government,through Sport and Recreation Victoria,is proud to have teamed up with Tennis Victoria to develop this Tennis Facility 

Planning Guide.

 The Tennis Facility Planning Guide

will help tennis clubs/organisationsand councils plan for, and developsustainable tennis facilities that canbe enjoyed by their local communities.

In this guide you’ll find tips on a widerange of facility development topics

from planning through to construction.

We are confident this guide will becomean invaluable tool when planning yourtennis facility and assist you to increaseparticipation in your club and community.

Working together we can improve moreof our sporting facilities across the state,encouraging more Victorians toget active through sports like tennis.

HUGH DELAHUNTY MP

Minister for Sport and Recreation

Minister for Veterans’ Affairs

 Tennis is a sport that can be accessedand enjoyed by all members of the

community. Tennis Victoria aims to buildupon our state’s strong participation intennis by making the sport a part of every Victorian’s life and advancing tennis as Victoria’s preferred game.

 A key factor for people’s ability to accesstennis is the quality of courts andassociated facilities. That’s why Tennis Victoria’s Strategic Plan includes the goalto “promote and support inclusive, qualityand sustainable tennis environments”.

 Thank you to the Victorian Governmentfor their support of tennis facilities andmaking this guide a reality. In partnershipwith Sport and Recreation Victoria, webelieve the Tennis Facility Planning Guide

will be an important resource for tennisclubs and councils to create an inclusive,quality and sustainable tennis environment.

 There are over 5,500 tennis courts in Victoria with a broad range of surfaces,

construction methods and maintenancetechniques. The Tennis Facility Planning

Guide will become a key tool for the tenniscommunity to use when planning anddeveloping tennis facilities.

We encourage tennis clubs/organisationsand councils to use the Guide, and alsoconsult Tennis Victoria, so that strongpartnerships are built for the benefit of increasing community participationthrough the sport of tennis.

MATTHEW KENNEDY

Executive Director

Tennis Victoria

Executive Director’sforeword

Page 4: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 4/52

About this guide

 This Tennis Facility Planning Guide (‘the

Guide’ ) has been prepared in partnership

by the Victorian Government (Sport andRecreation Victoria) and Tennis Victoriaand seeks to provide guidance to tennisclubs/organisations and local councilsregarding tennis facility developmentprojects.

Improving community facilities is a keyfocus area of the Government in orderto encourage more people to be activeand improve physical activity levels in Victoria.

In addition, providing welcoming,sustainable and quality tennisenvironments is one of Tennis Victoria’sfive strategic goals identified within itsStrategic Plan. Supporting clubs, facilityowners and managers to deliver theseenvironments is a key focus for Tennis Victoria’s operational team.

 The facility planning process is an essentialelement of providing quality tennis facilities

that can continually meet the needs of club members, participants,administrators, coaches, facility operators,local councils and communities.

Planning the development of a new orimproving an existing tennis facility is aninvolved process that will take time, effortand resources ‘to get it right’. Involvingstakeholders, communicating with localcouncils, combining club member skillsand engaging professional services are all

important steps to consider. This Guide provides an overview of thetennis facility planning process, and:

• identifies the key planning stages

• identifies facility provision principles

• highlights key resources available

• provides links to a range of industrysources

• identifies opportunities for project

funding.

 The purpose of the Guide is not to providedetailed technical information regarding

every step in the facility design andconstruction process, but to provide clubsand local councils with a common processand approach to tennis facilitydevelopment.

Typical tennis facility projects

 The Tennis Facility Planning Guide

provides information and processes for arange of typical local level tennis club andcentre facility projects.

 The Guide will assist projects such as:

• facility development

• court construction or redevelopment

• court resurfacing and surfaceconversion

• water and sustainability initiatives

• floodlighting installation

• fence replacement

• clubhouse refurbishment or extension.

Development of the Guide is a keyoutcome of the Victorian Government’sand Tennis Victoria’s commitment toprovide quality tennis facilities to Victorians.

4

Page 5: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 5/525

Facilities Planning Framework 

(FPF)

 Tennis Victoria’s Facilities Planning

Framework (FPF) is designed to ensurethat current and future tennis facilityprovision is delivered through aresponsible, collaborative and targetedapproach.

 The FPF has been developed by Tennis Victoria in conjunction with independentconsultants and local and stategovernment representatives.

Key objectives of the FPF in relation tofacility development and provision are to:

1. Plan and share information.

2. Identify demand, opportunities andgaps.

3. Improve environmental sustainability.

4. Improve club sustainability.

 The principles and objectives of theFPF will be used by Tennis Victoria to

collaborate with clubs, government andthe tennis industry.

Tennis 2020 – Facility 

Development and Management 

Framework 

 Tennis Australia’s Tennis 2020 clearlyidentifies two key foundations of tennissuccess: facilities and facility

management.

Tennis 2020 provides a facilitydevelopment and management framework for Australian tennis. The documentoutlines Tennis Australia’s Community 

Tennis vision and approach to nurturing

and advancing the prospects of tennis andits facilities in partnership with state andterritory member associations, clubs,government and other stakeholders.

Context

Page 6: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 6/52

Key resources and references

6

 The following documents and referencematerial have been reviewed in the

preparation of this guide.Information sources listed below willprovide an additional level of technicalinformation in the event that further detailis required.

Refer to the ‘Further resources and 

 information’ section for information onhow to access relevant resources.

Tennis QLD Technical Manual 

In 2007 the Tennis Queensland TechnicalServices Advisory Group and Tennis Australia produced a Technical Manual for 

the Design, Construction and Maintenance

of Tennis Facilities. This manual providestechnical level detail on a variety of tennisfacility development projects and isavailable via www.tennis.com.au/qld .

 Australian Standards

Many elements of tennis facilityconstruction have relevant AustralianStandards. Examples include lighting andfencing standards that guide design,construction processes, selection anduse of materials and various managementpractices.

Reference is made throughout the Guideto specific Australian Standards thatshould be used in tennis facilityconstruction projects.

More information on Australian Standardsis available via www.standards.org.au andspecific standards and documents areavailable for purchase viawww.saiglobal.com.

 Artificial Grass for Sport Guide

Sport and Recreation Victoria's Artificial 

Grass For Sport Guide targets the broadand differing needs of sporting clubs andassociations, the education sector andlocal government when installing artificialgrass.

Guide chapters are devoted to subjectareas such as planning, design, projectdelivery, management, maintenance andreplacement. The Guide outlines provenprocesses that deliver quality outcomes,

highlights case studies and provides 'toptips' to achieve the best outcome.

Page 7: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 7/527

 The preparation of Tennis Victoria’sFacilities Planning Framework identified a

number of key principles about tennisfacility provision and development acrossthe state. These principles include:

1. Effective planning.

2. Efficient management.

3. Considered research and design.

4. Financial management.

5. Environmental sustainability.

 An explanation of key elements of each

principle is provided below.

1. Effective planning

 All projects must be planned. Forplanning to be most effective, your projectmust align with the aspirations and overallstrategic direction of your club and bedefined within a club business plan orother relevant planning document.

 To maximise the effectiveness of planningand alignment with other organisations, itis advisable for your project to align withcurrent local government sport, recreationand community development plans.

Consultation with a range of individualsand organisations outside of your club willhelp to identify an agreed project plan,potential partners, opportunities andmutual benefits.

2. Efficient management

Consider the scale of your project andpotential development. It is likely that alarge redevelopment may require a changein facility and/or club managementstructure.

It is important to prepare a likely schedule

of use for your improved facility that

identifies all potential facility users (newand existing) and reflects managementrequirements needed to operate yourimproved facility.

3. Considered research and

design‘Do your homework’. In particular,consider all available options to firmlyidentify the preferred course of action. Your preferred option should bedocumented and be prepared with theassistance of appropriately qualifiedprofessionals.

If your project is to include the provisionof a new or different court surface, select

a range of suppliers and speak to otherclubs to find out the positives andnegatives of each surface. This will helpto test their characteristics and suitabilityfor your members.

4. Financial management

 The feasibility of all projects should beassessed for both the short and long-term. Lifecycle costs for key facilitycomponents should be considered inaddition to the initial capital investmentrequired. For larger scale projects suchas the development of a regional tenniscentre, this is generally done through afeasibility study.

Clubs should also be aware that as yourfacility grows, so will your requirementson management, administration andmaintenance items. This should be

factored into future club and facilitybudgeting.

Principles of facility provision

Page 8: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 8/528

5. Environmental

sustainability The continuation of drought conditionsand increasing scrutiny of the impact of human activities on the environment willfurther support the move towards moreenvironmentally friendly club operationsand enhance the need for waterconservation plans at tennis clubs.

 Tennis facility development projects shouldincorporate Environmentally Sustainable

Design (ESD) principles where practical.Being environmentally sustainable refersmostly to water, energy use and wastemanagement. ESD principles will beparticularly relevant for court constructionand clubhouse projects, where drainageand water capture opportunities may beprovided.

Principles of facility provision

Environmental Policy Tips

It is important to consider Tennis Australia’s Court Surface Policy and Tennis Victoria’s Court SurfacePosition Statement andEnvironmentally Friendly ClubsPolicy when assessing ESDprinciples.

Sport and Recreation Victoriarequires all facility fundingapplications to demonstrate

consideration of ESD principlesthrough facility design aspects.Sport and Recreation Victoria’s ESDInformation Sheet can be accessedvia www.grants.dpcd.vic.gov.au ,clicking on Grants Finder andselecting the Community FacilityFunding Program.

Page 9: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 9/52

In planning and delivering a successfulfacilities project, the following key phases

(detailed in the following pages) of thefacility planning process should beundertaken. Further explanation of eachphase is provided in Figure 1.

 The level of detail required in the planningand feasibility phases of your project willdepend on the type and scale of yourproject.

Figure 1: Facility Planning Process

The facility planning process

9

For instance, the replacement of courtenclosure fencing would require

significantly less planning than theinstallation of new courts. However, thekey principles and process remain thesame. For projects undertaken on councilland, often councils may manage projectdesign and construction phases as theyhave staff with appropriate skills andexpertise.

Phase 1

Phase 2

Phase 3

Phase 4

Phase 5

   P   R   O   J   E   C   T   P   L   A   N   N   I   N   GNeeds assessment

What do we want to achieve,why and who for?

Decision Point

Identify club and community valuesComplete a demographic analysisIdentify relevant trends

 Analyse the local tennis marketReview the adequacy of existing facilities

Consult with key tennis and community partnersDevelop a club business plan

1. Better utilise existing facilities OR

2. Upgrade existing facility OR

3. Develop new facility

   P   R   O   J   E   C   T   P   L   A   N   N   I   N   G

Feasibility and site

assessment

What, where, how much andhow do we make it work?

Decision Point

Prepare a detailed description of the proposed project

Consult with key tennis and community partners

Identify and assess preferred sites/locations

Prepare draft concept plans

Prepare a draft management plan

 Assess capital, operational and life-cycle costs

1. Proceed, modify, postpone or stage development OR

2. Abandon proposal

   P   R   O   J   E   C   T

   R   E   F   I   N   E   M   E   N   T

Design

What does it look like? –the technical elements

Identify goals for project developmentPrepare a project budget (seek/confirm funding)

Prepare a design brief 

Seek necessary approvals ie. planning and building permits

 Appoint design team and/or consultants

Prepare detailed designs and budget estimates

Engage contractors

   P   R   O   J   E

   C   T

   D   E   V   E   L   O   P

   M   E   N   T

Construction Facility construction and commissioning

ManagementProject evaluation

Facility operational

Page 10: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 10/5210

The facility planning process

Phase 1 – Club/community

needs The first phase in the facility planningprocess is to undertake a club/community

needs assessment. Undertaking thisprocess will assist stakeholders to verifyactual stakeholder and facility needs.

 The needs assessment should includediscussions with key tennis groups, localand state agencies (including Tennis Victoria), your local council, local schools,

community and other relevant agencies(such as Access for All Abilities providers)and other providers of tennis andrecreation programs.

If a facility development appearsnecessary, the needs assessment will alsoprovide clear direction regarding projectscope, scale and preferred mix of facilitiesto be provided. It will also help all partnersinvolved to develop key objectives around‘why you are undertaking the project and

what will it aim to achieve?’ The key elements of a facility needsassessment include:

• identification of club member andplayer aspirations

• schedule of existing court usage

• identification of any local trends thatmay influence a facility development

• consultation with your community and

people outside your club and ask whatthey may wish to see provided

• review of existing on and off-courtfacilities and services provided at theclub

• assessment of current court and facilitymaintenance practices

• assessment of other local clubs orsimilar facilities to identify competitorsand/or gaps in the market.

Business Planning Tip

 Tennis Australia and Tennis Victoriaeach provide various resources to

assist clubs in developing businessand club management plans. Contact

 Tennis Victoria on (03) 8420 8420 orvisit www.tennis.com.au/vic forthe latest information on businessplanning.

One effective way to conduct a needsassessment is to complete a club

business plan where all club needs,including programs, services, membership,communication, marketing and financialmanagement can all be addressed indetail.

Page 11: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 11/5211

The facility planning process

Phase 2 – Feasibility and site

assessment All facility development projects will requiresome level of site assessment andfeasibility to determine whether they areviable and practical.

 The primary purpose of preparing afeasibility assessment is to enable anobjective decision regarding the longer-term viability of your proposed project.

 The level of detail required in your

feasibility assessment will differ dependingon the scale of your project. For largescale projects, the appointment of anindependent consultant may be required.

 Your project feasibility should combine arange of input and advice from variousplanning and technical partners and mayinclude:

• analysis of the local market for tennis

• preparation of project success criteria

• a technical analysis of existing facilitiesand/or any proposed new location

• concept plans and options

• likely project and facility lifecycle costs

• impact of your project on the localenvironment

• a potential management and operationsplan, including projected facilityoperating costs, who will manage and

how

• identification of key partners to assist inproject support, resourcing, deliveryand future use and management.

Technical Tips

 A technical analysis of your facilityat this early stage may include ageotechnical assessment and sitesurvey plan of the proposed landarea. This will assist you to betterunderstand the existing soil typeand the implications it may haveon construction.

 Additionally, identifying anysubsurface issues and the exact

size and levels of the land areaavailable will help to ensure conceptoptions prepared are as accurate aspossible. Addressing these items ata later stage in the process mightincur additional costs and potentiallyrequire redesign if issues are notconsidered in advance.

Site services plans should berequested from your local counciland service suppliers (i.e. water,

drainage, sewerage, power, gasand telecommunications).N.B. Some or all of these plansmay be sourced via ‘Dial Before You Dig’. For more information goto www.dialbeforeyoudig.com.au .It is also advisable to undertake abuilding condition audit should anyredevelopment of clubhouse,pavilion, shed etc be part of yourproject.

 Tennis Victoria has technicaladvisors available to assist clubsin preparing concept plans, designoptions and project cost estimatesto help inform a feasibility analysis.

Page 12: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 12/5212

The facility planning process

Budgeting

Once the decision has been taken toproceed with your project, you will needto set a realistic budget for the proposedscope of works - one that is alsoachievable to fund.

Capital replacement and lifecycle costsassociated with your project will beconsidered in previous planning stages,but should be confirmed in your projectbudget. Allowance for cost escalationsand contingencies are an importantelement to project budgeting as materialsand labour costs can vary without notice.

Be mindful that from the time youcommence planning your project to‘turning soil’, it is likely that the cost of construction and materials will increase,particularly if your project planning spansa number of years.

Managing your project cash flow will beimportant to your success. Contractorswill expect to be paid as they complete

various stages of work and you will needto ensure that club or partner funding is

available to pay out upon satisfactorycompletion of work.

Technical Tip

 Tennis Victoria has produced alifecycle cost guide for tennis courtsurfaces and other associatedfacilities. This guide is available atwww.tennis.com.au/vic andconsiders the long-termreplacement and maintenancecosts associated with variouscomponents of tennis courtinfrastructure.

Sport and Recreation Victoria hasalso produced a Capital ReplacementProgram information sheet that willassist clubs to budget for the eventualreplacement of infrastructure. Theinformation sheet can be accessedvia www.grants.dpcd.vic.gov.au ,clicking on Grants Finder andselecting the Community FacilityFunding Program.

Budget Tip

Clubs should make allowances forGST within your project budget. Manyprices are often quoted exclusive of GST, creating an unbudgeted additional

10% on top of your project costs.

Page 13: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 13/5213

The facility planning process

Phase 3 – Design

Should your feasibility assessment andproject budget identify that your project isviable, the project then enters the designphase. This stage is critical to the overallsuccess of the project and in achieving itsobjectives.

During this stage, the club managementcommittee or facility manager should beinvolved in all facets of the facility designprocess. Any facility design shouldconsider two important facets:

1. Site and technical elements.

2. Future management and operational

requirements.

Site and technical elements to consider infacility design include:

• site details, topography and anyidentifiable constraints

• site plan showing the extent and scopeof land available and ownership details

• plans and details of existing buildings,main services and ground/soilconditions

• schematic diagram of proposeddevelopment

• schedule of specific development orconstruction requirements

• details of any planning conditions to beconsidered in development (eg. car

parking requirements, building heightrestrictions, floodlight spill)

• timeline for construction and projectdelivery and any climatic influences.

Most site and technical elements of projectdesign are generally incorporated intodrawings, layout plans and associateddocumentation. This collection of information is often referred to as atechnical specification.

Management and operational planning

will outline how the new or redeveloped

facility will be used and should considerthe following key components:

• key programs and services to bedelivered

• court and facility schedule of use

• marketing and promotional initiatives

• proposed facility management structure

• capital replacement program (see Technical Tip on page 12)

• risk management

• annual operating budget.

Even if your facility development provideslittle change to your existing operations,the above points should still beconsidered.

Disability Standards for Access to

Premises and Universal Design

 The Disability Standards for Access toPremises set out the requirements for newand refurbished buildings to allow accessby people with a disability. It is expectedthat all new facility developments complywith the Disability Standards for Access to

Premises as a minimum.

Please visit the ‘Disability Discrimination’section of www.ag.gov.au for copies of the Standards and incorporate them intoyour building planning.

In addition, clubs and councils are stronglyencouraged to consider universal design.Universal design is a philosophy thatencourages building development beyondwhat is required by the Disability 

Standards for Access to Premises. The intent of universal design is to createenvironments to be usable by everyone,to the greatest extent possible.

Page 14: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 14/5214

The facility planning process

Universal design encourages thedevelopment of facilities suitable for use by

everyone including people with vision andhearing impairments, families with pramsand young children, people with injuries,the elderly and people with mobilityimpairments.

Clubs and councils should considerways to ensure access in any facilitydevelopment, not just for people with adisability but for the whole community.

Facility developments should consider:

• The number of accessible sanitaryfacilities

• Circulation space in lifts and atdoorways

• Passing or turning spaces alonglong passageways

• Access to upper floors, either viaa ramp or lift

• Appropriate access to people withhearing or vision impairment

Design consultants

Whilst an additional cost to yourproject, design consultants are highlyrecommended and are a valued part of your design team, particularly for mediumto large scale projects. They bringspecialist skills in defined disciplines andcan ensure that independent design inputis provided to meet project needs. Theyalso ensure that appropriate designsolutions are recommended and meetrelevant industry standards, universaldesign principles and building codes, as

well as keep project costs within budget.

Key design consultants to consider include(NB. the number of consultants used islikely to depend on the scale of your project):

• architect

• geotechnical engineer

• civil and structural engineer

• building and land surveyor

• electrical engineer

• lighting designer

• quantity surveyor or cost planner

• landscape designer or architect

• arborist

• acoustics consultant

Page 15: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 15/5215

The facility planning process

Phase 4 – Construction

processFollowing the preparation of the designbrief and technical specification, contractorscan be sought to start building your facility.

 Your project manager or local council willbe able to provide advice on the mostrelevant process to undertake whenappointing contractors. Commonly,medium to large scale projects requireformal tenders to be submitted, with

smaller scale projects requiring a numberof contractors to provide quotations.Industry benchmarks usually specify aminimum of three quotes to assist withprice comparison.

 Technical specifications are commonlyused to define the project scope of worksand the standards or requirements bywhich the work is to be completed. You(or your project manager) will also usethe technical specification to apply for

planning and building permits, and toguide contractor tender processes.

 A construction timeline should also bedeveloped to help monitor progress and toensure your club can revise its operationsand maintain member services through theconstruction phase. Be aware that variousconstruction projects may be subject toweather conditions, which should befactored into the construction timelines.

Planning permits

 A planning permit may be specific to aperson or operator and it is always subjectto a time limit and expires under specifiedcircumstances. The issuing authority(usually your local council) may imposeconditions when granting a permit.

 The Building Commission of Victoriadefines a planning permit as ‘a legaldocument giving permission for landuse or development’.

Planning permit requirements may vary

between local councils. You should alwaysseek advice from your local councilplanning department regarding planningscheme provisions and planning permitsearly in your planning process.

Building permits

 You should seek clarification from yourlocal council planning department onwhether you require any building permits

as part of your facility planning process.Building permits relate to the method of construction of a building or development.If you have a planning permit you may stillneed to get a building permit.

 Australian Standards

Many elements of tennis facilityconstruction have relevant AustralianStandards that guide materials,

construction and installation methodologiesand various management practices.More information on applicable standardsis provided in the following chapter –Facility development considerations.

Technical Tip

When requesting quotations ortenders from contractors (for small,medium or large projects), alwaysprepare a brief (design brief and/ortechnical specification) forcontractors to base their price andscope of works on. This will helpyou to compare like for like prices

and evaluate which companies areproviding the best value for money.

Page 16: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 16/5216

The facility planning process

Project management 

If your project is not large enough to justifythe services of a project manager, yourlocal council may assist you in evaluatingand appointing various contractors. It isadvisable if clubs are managing their ownproject to appoint an internal club contactwho will provide communication andliaison services between all projectpartners, including club committee,members, contractors and local councilrepresentatives.

If your project is of a significant scale, youmay wish to engage a project manager toassist you in the coordination of designand construction phases.

 The project manager would be responsiblefor managing the activities anddeliverables of the project. They wouldalso prepare a project timeline thatconsiders a range of external factorsincluding, council budget cycles, grantfunding cycles and acquittal procedures,

lead time for ordering materials,implications of weather impacts andimpact on existing club operations andcourt use.

Phase 5 – Management

Club staff and/or volunteers should beconsulted to provide practical andoperational advice to ensure your facilitycan be managed efficiently. Thisconsultation should occur throughout theplanning, refinement and developmentphases of your project, and definitely priorto any construction.

Following the construction stages of yourproject, getting your facility operating to itsfull potential begins, as does regular

monitoring of its performance.

Risk management is a key factor in theoperation of your club and facility, andincludes addressing potential financialrisks, maintenance, safety and potentialinjury risks, resource availability etc. Allidentifiable risks should be documented,evaluated and addressed to assist inalleviating and/or managing them.

Project Management Tip

If you are managing your ownconstruction program, ensure arepresentative attends the site each

day the contractor(s) are working.Don’t be afraid to ask questions orcheck what they are doing againstyour technical specification. It’s yourproject and you should be incontrol.

Risk Management Tip

 Tennis Victoria has developed aRisk Management Manual for TennisClubs that will help you identify andevaluate risks and create a policy tomanage them within the tennis clubenvironment.

HB – 2004 Guidelines for

Managing Risk in Sport and

Recreation is a resource thatprovides those involved in sportand recreation with guidance onrisk management principles,process steps and applicationsbased on AS/NZS 4360:2004(Risk Management Standardand Guidelines). It offers anational framework to guide theunderstanding and managementof risk, and a common platform to

support strategies and resourcesdirected towards dealing with risk management issues.

Page 17: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 17/52

Management performance

 benchmarks

 Tennis Australia, in collaboration with TheUniversity of South Australia (CERM ©)have developed a series of tennis club andcentre performance benchmarks to assist Australian tennis facility operators toannually benchmark the performance of their tennis facility.

Providing benchmark indicators will assistclubs and facility operators in determiningwhere best to allocate resources and

regularly identify any operational issues toaddress them quickly.

Club management and performancebenchmarks can be accessed viawww.tennis.com.au.

17

The facility planning process

Page 18: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 18/5218

Facility development considerations

 The key facility developmentconsiderations included in this chapter

include:• site investigation

• court layout and orientation

• base construction

• court surface types

• court surface selection

• multi-use courts

• floodlighting

• fencing• court equipment and accessories

• grounds and surrounds

• clubhouses

• the environment.

 All elements of a tennis facility are linkedand often depend on each other tofunction effectively and be managedefficiently.

Careful consideration needs to be given tothe scale of each facility element to ensureit is aligned with its intended purpose anduse. It is also important to ensure that off-court amenities can adequately supportcourt related infrastructure.

Site investigation

 All site specific conditions should be

assessed prior to undertaking anyconstruction works and prior to anyquotes, tenders or contracts beingprepared.

Site investigation should be conducted aspart of your project planning, following thecompletion of your needs assessment. This phase is likely to require professionalservice contractors to undertake specialistor technical analysis tasks.

 Your site investigation should address thefollowing key elements:

• storm water flow

• condition of sub-grade base

• location of existing services (eg. power,water, sewerage, telecommunications

etc)• vegetation or remnants of tree roots

• site levels, orientation and windexposure

• site access for construction machinery

• residential or urban developmentconsiderations that may be impacted byyour development.

Soil conditionsIn tennis court construction, propergrading and consistent compaction oftendetermines the success of installation. Toachieve this, knowledge of sub-grade andsoil conditions are required.

Most sites will require an investigationof existing soil conditions, and it is

highly recommended that no major

construction commence without

first obtaining a soil report from an

appropriately qualified professional

(eg. geotechnical engineer).

Like many construction projects, tenniscourts are susceptible to variations in soiltype, the presence of moisture andchanging environmental conditions.

 A soil report will determine the stability of the proposed site and will informengineering decisions around the mostappropriate court base design,

construction and infrastructure installation.

Technical Tip

 A soil report prepared by a qualifiedgeotechnical engineer will be thesingle greatest investment you canmake into your project planning. The findings from this report willprovide recommendations on the

most appropriate design for courtbases, drainage, floodlighting,fencing and clubhouse footings.

Page 19: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 19/5219

Facility development considerations

Court layout and orientation

 Your court layout will be dependent uponthe configuration of your existing courts,buildings and available land area. ThisGuide infers that most clubs and facilitiesare undertaking redevelopment andrefurbishment projects rather thanconstructing new facilities on ‘greenfieldsites’, although the principles are stillrelevant for new sites.

Court dimensions

 The standard dimensions of a tennis court(Total Playing Area -TPA) are defined inthe International Tennis Federation’s (ITF)Rules of Tennis.

 Although the game is best played on a fullsized court enclosure (36.6m x 18.3m), theITF has a minimum recommended courtenclosure size (34.77m x 17.07m).

It is recommended that all new tenniscourts be built to full size requirements. This will assist in ensuring currentstandards are being met and may alsoreduce the likelihood of player injury.

 The following diagram provides a guidelinefor minimum and recommended courtdimensions for both recreational and club play.

Figure 2: Recommended tenniscourt and enclosure dimensions

Playing lines

 The width of all lines on a tennis courtshould be a minimum of 2.5cm in widthand a maximum of 5cm, except thebaseline which may be 10cm. Centreservices lines and centre marks shouldbe 5cm.

 The following diagram provides a planfor tennis court line markings. Allmeasurements are to the outside of the lines.

Figure 3: Line markings for astandard tennis court

Rec 3.66m (12ft)Min 3.05m (10ft)

   R  e  c   6 .   4   0  m   (   2   1   f   t   )

   M   i  n   5 .   4   8  m   (   1   8   f   t   )

PPA 10.97m (36ft)

TPA Rec 18.3m (60ft)Min 17.07m (56ft)

   P   P   A   2   3 .   7   7  m   (   7   6   f   t   )

   T   P   A   R  e  c   3   6 .   6  m   (   1   2   0   f   t   )

   M   i  n   3   4 .   7   7  m   (   1   1   4   f   t   )

     ➤

     ➤ ➤

➤Sidelines

     ➤

➤Sidelines

     ➤

➤Sidelines

     ➤

➤Sidelines

   B  a  s  e   l   i  n  e

B  a  s  el  i  n e

 S  er v i   c eL i  n e

   S  e  r  v   i  c  e   L   i  n  e

   C  e  n   t  r  e   M  a  r   k

 C  en t  r  eM a r k 

Centre Service Line

   N  e   t

   N  e   t

Net Post (Centre)       ➤

Net Post (Centre)       ➤

0.91m (3’0”)

10.97m

(36’0”)

0.91m (3’0”)

6.4m (21’0”) ➤       ➤

8.23m

(27’0”)

1.37m

(4’6”)

     ➤

1.37m

(4’6”)

     ➤

➤       ➤

 23.77m (78’0”)

     ➤

     ➤

Page 20: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 20/52

Orientation

 The optimum tennis court orientation isnorth–south. This is preferred to minimisethe effects of sun glare.

In some instances, depending on individualsite conditions, this orientation may not beachievable. If this is the case, consideration

should be given to sun rotation behind

buildings, wind conditions and/or the

provision of additional shade trees. If possible,

orientating courts north-south and east-west

at the one venue should be avoided,

particularly if courts run behind each other,creating a visual annoyance during play.

Facility footprint guidelines

Each tennis facility site provides its own unique

opportunities for design and layout based on

site conditions and available land area. As a

guide, the following table provides an estimate

of land area requirements to develop a

facility. The first column provides an estimate

of land area required for court enclosures

only and the second column provides an

estimate for court enclosures along with

spectator areas, clubhouses and car parking.

Table 1: Tennis facility land areaguide

Number of Estimated land Estimated

courts area required total land

for court area required

enclosures for full site

development2 courts 0.13 ha 0.32 ha

4 courts 0.25 ha 1.05 ha

6 courts 0.38 ha 1.20 ha

8 courts 0.51 ha 1.50 ha

12 courts 0.76 ha 2.20 ha

16 courts 1.02 ha 3.00 ha

20

Facility development considerations

Court run-off 

Suggested minimum dimensions andrun-off areas between the Principal Playing Area (PPA) of a tennis court for club andrecreational standard play is; 5.48m fromeach baseline to fence; 3.05m fromsidelines to fence and 3.66m betweencourts that do not have a fence or otherobstruction between them.

 The following diagram provides a guidelinefor minimum and recommended courtrun-off areas between courts and other

obstructions for both recreational andclub play.

Figure 4: Tennis court run-off

In case of 

 no obstructions

       ➤➤

Rec 4.27m (14ft)Min 3.66m (12ft)

       ➤➤

In case of 

 nets

Rec 3.05m(10ft)

Min 2.75m(9ft)

       ➤➤

In case of 

fixed obstructions

Rec 3.66m(12ft)

Min 3.05m(10ft)

Page 21: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 21/5221

Facility development considerations

Facility expansion

Where possible, consider future growthwhen planning and designing your courtand facility layout. A design that canaccommodate future growth will be morecost effective in the long term.

Base construction

 The most important factor in tennis courtdevelopment is undoubtedly its base andfoundations. Even though court bases are

generally not visible, they will have themost impact on the ultimate cost, playabilityand longevity of your tennis court.

Establishing the correct foundations andbase construction specific to your site isessential to ensure the integrity andstability of what is built on top. Poorfoundations and base construction willinevitably lead to court damage, surfaceimperfections, surface life reduction andultimately large and often unnecessary

rectification costs.

Selection of base and foundation materialswill also influence your court surfaceselection, as not all surfaces can be laidon all bases.

 The following typical base constructiontechniques are currently being used tosupport hard court, synthetic grass andsynthetic clay surfaces:

• reinforced concrete

• asphalt

• compacted earth.

 An overview of each base constructionmethod is provided in the followingsections.

Grass court and red porous courtconstruction requires more specialised andlayered base preparation and do notrequire concrete, asphalt or compacted

earth bases to be constructed. Moredetails on grass and red porous courts areprovided under court surface types onpages 24 and 25.

Concrete bases

 A reinforced concrete slab is a commonform of base, consisting of a layer of concrete reinforced with steel mesh. Thethickness of the slab will be determined bysite specific conditions and technicalspecifications.

 A well constructed concrete base (built toappropriate specification and siteconditions) is likely to provide the greatestlongevity of all base types. Concrete basesare generally expensive to construct in

comparison with asphalt and crushed rock materials and are the most costly to rectifyif not built correctly.

Ground and soil conditions play a greaterrole in the appropriateness of concretebases, in that they accommodate groundmovement by bridging low areas. Theyhave minimal flexibility.

Concrete bases are generally acceptablefor the application of asphalt and acrylicsurfaces, as well as sand filled artificial

grass and synthetic clay.

 Additional care through the concretecuring and preparation process must betaken if applying an acrylic surface to aconcrete base. Most acrylic surfacemanufacturers publish technicalinformation on court base constructionssuitable for their individual products.

 Additional technical information onconcrete construction and curing

processes is available in the Tennis QLDTechnical Manual for the Design,

Construction and Maintenance

of Tennis Facilities. The manual is availablevia www.tennis.com.au/qld .

Page 22: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 22/5222

Facility development considerations

 Asphalt bases

 An asphalt base consists of at least twoelements.

1. A structural layer (termed the ‘granular 

 layer’ ), which consists of a base of crushed rock. This layer provides thestrength of the structure.

2. An asphalt layer covers the base of crushed rock. It provides a smoothsurface for sound ball bounce, as wellas acting as a moisture barrier toprotect the structural layer from erosion

and water penetration.

 Asphalt bases are commonly referred toas a ‘more flexible base’ that allows someground movement without failure. Asphaltbases are generally acceptable for theapplication of acrylic surfaces (cushionedand non-cushioned), as well as sand filledartificial grass and synthetic clay.

 The introduction of porous asphalt hasbeen seen in many surface conversion

projects across metropolitan Melbourne,where red porous courts are beingconverted to synthetic surfaces. Porousasphalt is often used as a base layer (overred porous courts) in conjunction withneedle punched synthetic carpets. Thismethod allows for vertical draining, ratherthan reconstructing court bases to providenecessary drainage falls.

 This method of reconstruction is onlyeffective where both the underlying

existing drainage system is functioningproperly and the existing scoria pavementis sound enough to support the laying of porous asphalt.

Compacted earth bases

Compacted earth bases have traditionallybeen used in conjunction with the laying of sand filled artificial grass and synthetic claysurfaces. In some cases, the flexibility of the base has benefits where smallamounts of ground movement occur.

Whilst a cost effective practice, thetechnique can reflect any significant failurein, or movement of, the base constructionthrough the playing surface by creating anuneven surface.

Use and application of compacted earthbases should be dependent on the fullinvestigation of ground, soil and drainageconditions.

Compacted bases are not suitable foracrylic surface application.

Base construction considerations

Some important considerations in all formsof base construction include the following:

•  The investigation of soil, ground anddrainage conditions within and aroundthe site area should be conducted toinform the preferred base constructionmethod.

• Base construction design should bedeveloped and guided by court surfacechoice (refer Table 2 on page 23).

• Install a moisture barrier orwaterproofing membrane underneath

concrete pavements.

• Ensure court fall ratios follow pavementspecifications and are appropriate forthe court surface and site drainagerequirements.

• Ensure sub-surface and/or perimeterdrainage is included in any baseconstruction design.

• All bases will require ongoingmaintenance dependent upon site

specific conditions and expecteddesign life. For examples visitwww.tennis.com.au for the lifecycleand cost guide.

Technical Tip

It is preferable that acrylic surfacesare not applied to porous asphaltsurfaces, primarily due to theincompatibility of acrylic surfaceapplication techniques and porousasphalt materials.

Page 23: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 23/52

Table 2: Court surface and base construction matrix

Court surface Base Construction Method

 Asphalt Porous Concrete Compacted

asphalt earth

 Asphalt ✔ ✔ ✔ ●

Cushioned acrylic ✔ ✘ ✔ ✘

Non-cushioned acrylic ✔ ✘ ✔ ✘

Sand filled artificial grass ✔ ✔ ✔ ●

Synthetic clay ✔ ✔ ✔ ●

✔  refers to generally appropriate base construction method 

✘  refers to inappropriate base construction method 

●  refers to an acceptable method if site, ground and drainage conditions support this type of base construction

23

Facility development considerations

 The following table provides a comparisonof the suitability of base construction

methods with the range of suitable courtsurfaces.

Figure 5: Generic tennis courtcross section

 The following diagram provides a genericcross-section of the typical constructionlayers of a tennis court includingsub-grade, base construction/pavementand court surface layers.

Layers will differ depending onconstruction method, drainagerequirements and surface selection.

Not to scale

Note:

Recommended court slope –

Minimum 0.83%

Maximum 1.00%

Liquid appliedacrylic surfacesystem(cushioned ornon-cushioned)

Compactedasphalt surfacecourse

       ➤

 ➤

Compactedbase course

       ➤

Compactedsubgrade

       ➤

0.025m

MIN

0.1m

MIN

Page 24: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 24/52

Facility development considerations

Court surface types

 Tennis Australia classifies court surfacesaccording to type rather than brand. Thereare four surface type categories:

1. Clay/red porous.

2. Natural grass.

3. Acrylic hard court.

4. Other variations; including Sand Filled Artificial Grass (SFAG), carpet andsynthetic clay.

For each surface type category there aremultiple brands within the tennis andleisure industry.

Surface and playing

characteristics

It is difficult to generalise about the playingcharacteristics of surfaces, due to thenumber of variations available in themarket place. Playing characteristics varyaccording to type of product, age,condition, original construction methodetc.

Table 3 on page 28, provides a summaryof typical surface characteristics for arange of surface types available in Australia.

 The ITF also classifies specific surfacesinto various pace categories. The ITFwebsite – www.itftennis.com providesup-to-date information on individual

surface products and their pace rating. The lifespan of all surfaces referred to inthis Guide are influenced by levels of usage, maintenance regimes and weatherconditions. Budgeting for their ongoingmaintenance and eventual rejuvenationand/or replacement will be essential forall surface related projects.

24

Clay/red porous

 Across Australia clay courts are known bydiffering names. In Victoria clay courts arecommonly referred to as red porous oren-tout-cas courts.

For many years they have been thetraditional court surface for the majority of clubs in metropolitan Melbourne. It alsoremains a preferred player developmentsurface of Tennis Australia.

Clay is a generic term used to describe aplaying surface that has a clay-like natural

material look and feel about it. The playingsurface is made from a layer of materialwith cohesive properties, not unlike slightlymoist natural clay; it can be a combinationof natural and/or synthetic materials.

Clay surfaces are always permeable,allowing surface water to drain verticallydown through the court, facilitating playsoon after rain.

Prolonged drought conditions and the

availability of sustainable water resourceshave impacted the retention andmaintenance of red porous courts in Victoria. To ensure the longevity of redporous courts, it is essential that anongoing maintenance regime (includingregular watering) is adhered to.

Several recent examples in red porouscourt rebuilding have highlighted a varietyof new, more environmentally sustainabletechniques that will assist clubs to retain

and/or rebuild their red porous courts.Refer to Tennis Victoria’s Environmentally 

Friendly Tennis Clubs Guidelines for recentcase study examples.

Page 25: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 25/52

Facility development considerations

In addition, water treatment programs areavailable to assist in retaining moisture

within red porous courts, allowing theircontinued use through drought and stagedwater restrictions.

For more information on available researchand water sensitive red porous courtconstruction and maintenance, contact Tennis Victoria for up-to-date advice.

Natural grass

Natural grass courts remain prominent

across regional Victoria and are popular onthe local and regional tournament calendar. They also remain a preferred playerdevelopment surface of Tennis Australia.

Grass courts, when constructed properly,provide the fastest court surface available. The surface promotes a serve and volleygame, generally due to low, fast andvariable ball bounce.

 A variety of grass species are available and

suitable for tennis court surfaces, althoughthe success of certain species will bedependent on weather conditions.

 The quality and retention of natural grasscourts is heavily dependent on climatic andenvironmental conditions, in particular,access to a sustainable water source. Theuse of grass courts is generally limited tosummer season play due to climaticconditions affecting grass growth andusage must be managed to protect the

integrity of the surface.Much like red porous courts, many naturalgrass courts are slowly being converted toless water and maintenance intensivesurfaces that can also provide for year-round and floodlit use.

 Acrylic hard courts

Generally in Australia there are three typesof acrylic surfacing systems:

• non-cushioned

• liquid applied cushion

• mat laid cushion.

 Acrylic coated tennis court surfaces arepopular in Australia and can be either non-cushioned or cushioned. Acrylic courts aresuited to all levels of coaching, training andcompetition play.

 An acrylic surfaced tennis court is basicallyan application of multiple layers of acrylicmaterial (eg. resin, paint, etc) on a basesurface, commonly concrete or asphalt.

 There is a wide selection of proprietaryacrylic surface systems available in Australia. In very basic terms an acrylicsurface comprises of applying an initial(filler) coat(s) to the base surface thenapplying the final coloured coats. Thecomposition and application method of 

the acrylic material has a direct influenceon the playing characteristics of the court.

 The exact performance of acrylic surfacediffers from product to product and fromits usage, but they can generally bedescribed as being medium-pacedwith an extremely true ball bounce of medium-high height.

 The performance, aesthetics and longevityof acrylic surfaces are dependent on

conducting an appropriate maintenanceregime. The single most important factorin prolonging the useful life of an acrylictennis court surface is keeping them clean.

25

Page 26: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 26/52

Facility development considerations

 The lifespan of an acrylic surface is notforever. Budget provision should be made

for recoating every seven to ten years(depending on use, maintenance andsurface quality) at a cost of approximately80% of the original acrylic surface cost(just the surface, not the whole of courtcosts).

Both liquid applied and mat laid

cushioned acrylic surfaces requirethe same acrylic surface layers asnon-cushioned surfaces. The keydifferences in cushioned courts are the

layers of cushioned properties built into theconstruction process. Cushioned courtsare more likely to spin and also providea level of comfort for players underfoot.

Liquid applied cushioning is provided inlayers spread across the court area untilthe desired thickness is achieved. Thismethod has the advantage of being ableto adjust cushioning thickness based onpreference and budget constraints.

Mat laid cushioning systems differ in thatthe cushion layer is delivered in premanufactured rolls of a predeterminedthickness. Rolls are laid out, placed inposition and then adhered to the base.

Generally acrylic surfaces, particularlycushioned surfaces, are more expensive toconstruct than other surfaces,predominately due to more intensive baseconstruction and drainage requirements,and the cost of cushioning materials.

 Acrylic surfaces should only be appliedto concrete or asphalt bases (that haveundergone appropriate curing time andcleaning) and only be applied byexperienced professionals approved bythe product manufacturer.

Sand Filled Artificial Grass (SFAG)

Over recent years there has been anincreasing trend of installing artificial grasscourt surfaces, more correctly referred toas sand filled artificial grass.

 A SFAG surface is basically a tuftedsynthetic carpet laid on a base usuallyconstructed of concrete, asphalt orcrushed rock. The carpet is then filled withsand to occupy the space between thecarpet fibres to within about 2mm of thetop of the pile. The purpose of the sand is

to hold the carpet in place, to provide afirm playing surface and to facilitate thedrainage of surface water.

SFAG courts are a cost effective courtsurface that provide soft underfootproperties desired by many players. If laidcorrectly, their efficient drainage and abilityto be played on when damp make thempopular with commercial centres andcoaches.

 Their playing characteristics vary

significantly between products, butgenerally provide medium-to-very fast ballspeed and medium-to-low ball bounce. Their playability is dependent onmaintenance regimes, in particular theregular grooming of the surface and therejuvenation of sand particles.

Budget provision should be made forresurfacing SFAG surfaces every 10 to 12years (depending on use, maintenanceand manufacturer warranties).

26

Page 27: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 27/52

Facility development considerations

Synthetic clay 

Synthetic clay is the collective term givento a range of products available in themarket place.

Synthetic clay surfaces are SFAG carpetsthat are overfilled (by 1mm to 2mm) with ared coloured sand product to simulate theappearance and playing characteristics of a clay or red porous tennis court. Theoverfilling of the carpet requires sand to bebrushed from lines on a regular basis,much like red porous courts.

 The surface does not require watering andprovides similar cushioning and drainageproperties as SFAG courts.

Synthetic clay courts are generally a moreexpensive product than SFAG surfaces,placing them in the middle range of surface development costs.

 Their playing characteristics varysignificantly between products as well ason wet or dry conditions. Their playability

is dependent on maintenance regimes,in particular the regular maintenanceand management of sand particles.

Budget provision should be made forresurfacing synthetic clay surfacesevery 10 to 12 years (depending onuse, maintenance and manufacturerwarranties).

Contractors and suppliers

 There are many different court surfaceproducts manufactured in, and suppliedto, the Australian market. Contact Tennis Victoria for a list of suppliers, manufacturersand contractors known to operate within Victoria. Additionally, the SportsContractors Association can provide alisting of members that service the Victorian tennis industry via their websiteat www.sportscontractors.com.au.

27

Page 28: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 28/52

Facility development considerations

28

   T  a   b   l  e   3  :   C  o  m

  p  a  r   i  s  o  n  o   f  c  o  u  r   t  s  u  r   f  a  c  e  c

   h  a  r  a  c   t  e  r   i  s   t   i  c  s

   T   h  e   f  o   l   l  o  w   i  n  g

   t  a   b   l  e  p  r  o  v   i   d  e  s  a  s  u  m  m  a  r  y  o   f  c   h

  a  r  a  c   t  e  r   i  s   t   i  c  s  o   f  v  a  r   i  o  u  s  c  o  u  r   t  s  u

  r   f  a  c  e  s .

   T   h  e  p  e  r   f  o  r  m  a  n  c  e ,  a  e  s   t   h

  e   t   i  c  s  a  n   d   l  o  n  g  e  v   i   t  y  o   f  a  c  r  y   l   i  c

  s  u  r   f  a  c  e  s  a  r  e   d

  e  p  e  n   d  e  n   t  o  n  c  o  n   d  u  c   t   i  n  g  a  n  a  p

  p  r  o  p  r   i  a   t  e  m  a   i  n   t  e  n  a  n  c  e  r  e  g   i  m  e .

   I  n   d   i  c  a   t   i  v  e  c  o  s   t   i  n  g  s   f  o  r  v  a  r   i  o  u  s  c

  o  u  r   t  s  u  r   f  a  c  e  s  a  r  e  a  v  a   i   l  a   b   l  e  v   i  a

  w  w  w .   t  e  n  n   i  s .  c

  o  m .  a  u

   C  o  u  r   t  s  u  r   f  a  c  e

   S  p  e  e   d  o   f

   H  e   i  g   h   t  o   f

   T  r  u  e  n  e  s  s  o   f

   T  o  p  s  p   i  n

   S   l   i  c  e

   F  o  o   t   i  n  g

   S   h  o  c   k

  c  o  u  r   t

   b  o  u  n  c  e

   b  o  u  n  c  e

  –  s   l   i   d   i  n  g   /   f   i  r  m

  a   b  s  o  r  p   t   i  o  n

   R  e   d  p  o  r  o  u  s

   S   l  o  w

   M  e   d   i  u  m

   A   l  m  o  s   t

   Y  e  s

   Y  e  s

   S   l   i   d   i  n  g

   M  e   d   i  u  m  -  s

  o   f   t

  c  o  n  s   i  s   t  e  n   t

   N  a   t  u  r  a   l   g  r  a  s  s

   F  a  s   t

   L  o  w

   V  a  r   i  a   b   l  e

   L   i   t   t   l  e

   Y  e  s

   P  a  r   t   i  a   l   s   l   i   d  e

   S  o   f   t

   (  s  u  r   f  a  c  e  m  a  y

   b  e  s   l   i  p  p  e  r  y

  p  a  r   t   i  c  u   l  a  r   l  y   i   f

  w  e   t   )

   N  o  n  -  c  u  s   h   i  o  n  e   d  a  c  r  y   l   i  c

   V  a  r   i  a   b   l  e

   M  e   d   i  u  m  –   h   i  g   h

   C  o  n  s   i  s   t  e  n   t

   Y  e  s

   Y  e  s

   F   i  r  m

   M  e   d   i  u  m  -   h  a  r   d

   C  u  s   h   i  o  n  e   d  a  c

  r  y   l   i  c

   V  a  r   i  a   b   l  e

   M  e   d   i  u  m  –   h   i  g   h

   C  o  n  s   i  s   t  e  n   t

   Y  e  s

   Y  e  s

   F   i  r  m

   M  e   d   i  u  m  -  s

  o   f   t

   S  a  n   d   f   i   l   l  e   d  a  r   t

   i   f   i  c   i  a   l   g  r  a  s  s

   M  e   d   i  u  m  –   f  a  s   t

   M  e   d   i  u  m  –   l  o  w

   C  o  n  s   i  s   t  e  n   t

   L   i   t   t   l  e

   Y  e  s

   F   i  r  m

   M  e   d   i  u  m  -  s

  o   f   t

   S  y  n   t   h  e   t   i  c  c   l  a  y

   M  e   d   i  u  m  –   f  a  s   t

   M  e   d   i  u  m  –   h   i  g   h

   C  o  n  s   i  s   t  e  n   t

   L   i   t   t   l  e

   Y  e  s

   P  a  r   t   i  a   l   s   l   i   d  e

   M  e   d   i  u  m  -  s

  o   f   t

   0 S  o  u  r  c  e  :   T  e  n  n   i  s   A  u  s   t  r  a   l   i  a

Page 29: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 29/52

Facility development considerations

Court surface selection

Selecting a surface or surfaces that meetall member, player and stakeholder needsand objectives is difficult. However,engaging them and other users in theselection and decision making process willhelp to make a well researched choice.

 As it is difficult to generalise about theplaying characteristics of all court surfacesavailable, the best way to inform yourself and your members of different surfaces isto play on them. Tennis Victoria has a

growing list of clubs and their specificsurfaces provided and encourage all clubsto try a range of surfaces as part of theirdecision making process.

Other considerations that should be takeninto account when selecting the mostappropriate surface for your club include:

• member and user preferences

• intended use and level of play

• future club directions and management• coaching requirements

• tournament requirements

• any requirement for similar surfaces orreasons to provide a mix of differentsurfaces

• site conditions

• cost of installation and replacement

• surface lifespan and warranty

• maintenance obligations and cost

• access to funding opportunities

• affordability and value for money

• environmental impacts

• potential for vandalism.

 Appendix 1 provides a sample courtsurface assessment tool for clubs to adaptand use in their surface selection process.

Multi-use courts

Multi-use courts are a practical solution tosupporting a range of sports, includingtennis, and are more commonly used inschool and recreation reserveenvironments.

In all multi-use environments, somecompromise will be required by all sportsin surface and infrastructure provision, asit is difficult for one single surface to meetthe range of needs of all sports to beplayed on it.

Multi-use applications that includetennis courts are commonly providedwith netball (hard court acrylic surfaces),hockey (SFAG surfaces) or soccer (sandfilled/rubber crumbed surfaces). Variousproducts are available on the domesticmarket to suit multiple sports.

Some key considerations in providingmulti-use surfaces and facilities that caterfor tennis include:

• Use more dominant line markingcolours to suit the main intended use.For example, white lines for the mainuser sport, yellow lines for thesecondary user sport, etc.

• The appropriateness of sleeves andcaps for relevant goal and tennis netposts or the use of roll-away nets andgoals.

• Lighting requirements for tennis are

different to other sports. Floodlightingdesign should meet minimum AustralianStandards for all intended users. Ensureone lighting system serves the variety of users.

• Court dimensions and run-off areasvary between tennis and netball.

• Cushioned and non-cushioned acrylicsurfaces are suitable for netballcompetition.

• Drainage requirements of various users.

29

Page 30: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 30/52

• Electricity suppliers regarding existingservice capabilities and potential

upgrades required.• Qualified persons regarding lighting

design, installation options and materialselection.

• Other tennis clubs by visiting them togain an appreciation of lightingdemands and lux levels.

• Tennis Victoria to seek specialist lightingdesign and installation advice.

• Other sports to determine their lighting

requirements if it’s a multi-use court.

Lighting configurations

 Tennis court lighting systems generallyconsist of two main types.

1. Corner lighting systems are typicallyused for double court configurations,with high-tower lighting masts located just outside each corner of the courtenclosure. Towers are generally nohigher than 15m in club environments.

Figure 6: Standard 2-court corner lighting design provides a standard2-court light pole configuration forhigh tower corner lighting.

Facility development considerations

• The use of shock pads underneathhockey playing surfaces is not ideal for

tennis ball bounce, however there areexamples of this sharing in existence. A compromise position may be usinga thinner shock pad than is ideal forhockey.

• Carpet pile length for SFAG surfacesshould be investigated to ensure theyprovide a playable length for tennis(generally not longer than 19mm).

• Third-generation surfaces commonlyused on soccer pitches are not suitablefor tennis due to their longer pileheights (eg. often greater than 60mm).

Netball Victoria, Hockey Victoria andFootball Federation Victoria all providesurface information and technicalrequirements for their sports. It is advisableto contact the relevant peak bodies if implementing a multi-use surface project.

Floodlighting

Floodlighting is a highly desirable elementto any club or tennis facility. Lighting hasthe ability to maximise court use, creatediversity in club activities and allow yourclub to keep pace with the latest tennisparticipation trends.

 There are a number of considerations thatshould be addressed through planning andconsultation discussions with the followinggroups:

• Club members regarding potential uses,needs and costs.

• Your local council regarding planningrequirements, permission and impacton the local environment.

30

Page 31: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 31/52

Facility development considerations

Recent lighting trends have seen anincrease in the number of side-lighting

configurations. A vast range of poleconfigurations exist for side-lightingsystems, but they typically include four tosix lights and poles per court, ranging from8m to 12m in height.

Figure 7: 4 and 6 pole side lightingdesign options.

 The following diagram provides typical fourand six pole floodlighting configurations.

Both corner and side-lighting systems

should be designed and installed to meet Australian Standards AS2560 Guide to

Sports Lighting and AS2560.1 - Part 1

General Principles and AS2560.2.1 – Part 

 2.1 Lighting for Outdoor Tennis for design,luminaries, lux levels, uniformity and poleheights.

31

Option B 4-Pole scheme

Option A6-Pole scheme

Technical Tip

Generally, planning permission isrequired for the installation of newfloodlights. Early in your planning,seek advice from your local councilregarding your obligations,restrictions and the information thecouncil requires for a relevantplanning application. This mayinclude the provision of proposedlighting designs, engineereddrawings, lighting spill diagrams oran environmental impact study.

Light pole installations (over 8m inheight) may also require a building

permit, irrespective of whetherplanning permission is also required.

• 

• 

• 

    •

    •

     ➤

     ➤

12m 10m

LEGEND:

= Pole and luminaire• 

     ➤

     ➤

7m 9m

Page 32: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 32/52

Facility development considerations

Court lighting levels

While meeting the lux level standard isimportant, the consistency of light is criticaland is measured by uniformity. Whereuniformity is poor, the eye struggles tofollow the flight of the ball and predict itsspeed.

 Tennis court lighting levels should bedeveloped based on the intendedstandard of play. The following tablerecommends lighting levels suitable forvarious levels of play.

Table 4: Recommendedmaintained horizontalilluminance values (from

 AS2560.2.1)

Level of Minimum Horizontal

play Illuminance

PPA (Lux) TPA (Lux)

Recreational 250 150

Club competition 350 250International 1000 800& National

PPA – refers to the Principle Playing Area

TPA – refers to the Total Playing Area

Considerations of lighting

 provision

 A range of design, material selection andinstallation options and alternatives shouldbe considered in your floodlighting project.

• Assess the adequacy of your existingpower supply to accommodate new ormore court lighting. Budgeting forpower upgrades can significantly add toyour project costs.

• Future expansion. If you are notinstalling lights on all courts, consider

making an allowance for the wiring andpower supply for other courts if youwish to add more lights at a later date.

• Geotechnical assessment of groundconditions for pole installations andfootings is essential, and certification of lighting poles by a structural engineerwill be required for second hand poles.

• Risk management issues may result if lighting poles are placed within court

enclosures and this should bediscouraged whenever possible.

• Providing access to a secure lightcontrol system external to clubroomsmay help to maximise use and minimisefacility management requirements.

•  Various coin and key operatedmechanisms are available to ensure auser pays system is available.

• Provide adequate safety lighting to exit

courts when lights are switched off.• Consider how the power cost and

replacement of globes will be paid forand undertaken.

32

Page 33: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 33/52

Facility development considerations

Fencing

Fencing performs a number of functions,all of which should be considered in yourfacility design. Key functions include:

• the retaining of balls on court

• dividing courts

• providing access to courts

• safety and security

• windbreak support

• signage display.

Whilst fencing provides basic functionalityto the tennis court, it is important toconsider budget, environment and siterestrictions. Other considerations include:

• Top and bottom rails to providelongevity, stability, safety and visualenhancement.

•  Visual amenity can also be improved byusing black poles and mesh (ratherthan galvanized finishing) and alsoprovides good background contrast toball colour.

• Reduced side fencing heights toenhance spectator viewing.

• Ensuring gates are wide enough foraccessible entry and for maintenanceequipment.

• Proximity of trees and overhangingbranches.

• Windbreak planting in adjacent areas.• Wind and sight screening and signage

loads are incorporated into structuraldesign.

• Future court expansion.

 Australian Standard AS1725.2

 Australian Standard AS1725.2 TennisCourt Fencing – Commercial recommendsstandard tennis court enclosure fenceheights of 3.0m or 3.6m for club andpublic court environments. Tennis Victoriarecommends a height of 3.6m whereverpossible.

33

Technical Tip

Reduced side fencing heights

are fast becoming a trend in newfacility design and development,particularly where club and courtsecurity is provided by existingboundary fencing.

 The following diagram provides atypical alternative side fencing profilethat enhances spectator viewingand promotes visual appeal.

 Tennis court fencing should bedesigned and built considering localconditions. Fencing should bedesigned to support additionalweight loads that wind screeningand signage may require. This should be a particularconsideration in windy areas.

Chain

 mesh wire

Light pole

typically 

8 to 12m

 high

       ➤

Gate

1.2m

wide

     ➤

0.9m     ➤➤

3.6m

     ➤

Figure 8: Alternative side fencing

profile

Page 34: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 34/52

Facility development considerations

Grounds and surrounds

 The management of grounds andsurrounds, as well as court maintenance,should be considered in your project. Donot underestimate the power of visualappeal and atmosphere on current andprospective members.

Consider the following key items in yourplanning:

• Create a strong entry to your club andassociated clubhouse and accessible

thoroughfares between courtenclosures (including application of standards for accessibility).

• Cater for spectators and court viewing,through the provision of covered areas,seats, accessible toilets and access tofood and beverages.

• Landscape areas for visual appeal withmanageable and easy to maintainvegetation or other materials andproducts.

• Environmental benefits and potential forinclusion of water reuse and recyclinginitiatives.

• Ensure car parking is adequate to meetyour local council’s planning schemeguidelines, as well as cater for expectedvolumes. Parking within close proximityto courts and clubhouse isrecommended.

• Provide an outdoor area for social

gathering and functions and/or an areafor children to play safely.

• Venue security and potential forvandalism and graffiti.

34

Court equipment and

accessories The type and use of court equipment andaccessories will be dependent on the typeof facility you operate, the way in which itis managed and your choice of courtsurface.

 The most common need for courtequipment is for net posts, nets and

centre straps. These can make asignificant difference to the visual appeal

of your courts, functionality of play and useand safety to players.

 The ITF’s Rules of Tennis 2009 specifiesthe requirements for net posts. In the clubenvironment, two important net postconsiderations include:

1. The selection of internal or non-

obtrusive winding mechanisms.Winders that protrude present a safetyhazard for players rounding the netpost, particularly where they are athead height for children.

2. The use of sleeves in net postinstallation will allow for postreplacement without having to dig postsout of footings. This will prove helpfuland more cost effective where concreteor asphalt base constructions are usedand in multi-use applications.

Page 35: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 35/52

Facility development considerations

Clubhouses

 A clubhouse plays a vital role within thetennis club environment. The clubhouse isoften the visible face of the club and hasthe ability to create a lasting impression. Itis a factor in attracting and retainingmembers.

Player, participant and communityexpectations are continually increasing, asare building regulations and requirements.Keeping pace with expectations andchange can be challenging for clubs in

providing quality and welcoming facilities.

 The size, location and layout of yourclubhouse should be commensurate withthe number of members, the intended useof the facility and the preferred managementmodel of your club. Clubhouses that donot meet member and usage needs mayrestrict the viability of your facility, andthose that are too large becomecumbersome to manage and maintain.

Club members, your local council andlocal community groups and stakeholdersshould all be consulted to help determinethe most appropriate clubhouse facility.

If contemplating clubhouse refurbishment,improvement or replacement, theprinciples and processes highlighted in thisGuide will assist you to achieve your goals.

Clubhouse design considerations

Professional building and architecturalexpertise should be engaged if you areconsidering a clubhouse improvement ordevelopment project. The following shouldbe given specific consideration through thedesign phase of your project.

• Conduct a building condition audit tounderstand what areas of your existingclubhouse may be retained and whatareas must be changed.

• Any change to an existing buildingstructure must accommodate andpromote the Disability Standards for 

 Access to Premises and includeuniversal design principles.

• Consider future court, facility andclubhouse expansion plans in your

design.• Incorporation of ESD practices

including water recycling and reuse,energy efficient materials and products,use of natural light and insulation,building orientation etc.

• A central location close to courts andcar parking is preferable, maximisingviews across as many courts aspossible.

• Adequate storage areas for court,coaching and maintenance equipment.Storage areas away from the clubhousemay be required where fuel operatedequipment or chemicals are to bestored.

• Provision of an office if you intend toprovide on-site management,tournaments and events.

• Kiosk, canteen or café that providesboth an internal and external serveryalong with plenty of storage space.

• Open area large enough to cater forintended number of players andmembers. Providing this area as flexiblespace may increase your ability to use itfor a range of other tennis and non-tennis related activities.

• Opportunities for shared and/orcommunity use.

• Toilets, showers and change roomsthat meet Building Code requirements.

• Adequate heating and cooling tomaintain comfort levels.

• Shade and outdoor spaces to caterfor family friendly activity.

 The following concepts define theideal layout configurations however itis acknowledged that these configurationsmay not be possible in all circumstances.Please contact Tennis Victoria on(03) 8420 8420 for further detail ondesign guidelines.

35

Page 36: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 36/52

Facility development considerations

Figure 10: Medium community club

36

Figure 9: Small community club

Figure 11: Regional community centre

Facility layout  Facility layout 

Facility layout 

Page 37: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 37/52

Facility development considerations

The environment

 Tennis Victoria has produced guidelines toassist tennis clubs to be more aware of environmental impacts in the planning andmanagement of their facilities. In particular,the guidelines are designed to assist clubsto work towards being moreenvironmentally sustainable in relation towater and energy use and wastemanagement.

Sport and Recreation Victoria encouragethe inclusion of ESD elements in Sport and

Recreation Victoria funded projects.Environmental sustainability should beconsidered throughout all phases of facilitydevelopment. Alternative environmentallyfriendly options are often available in manyareas of design, operation andmanagement of your facility.

We all play a role in environmentalmanagement and in achieving

environmental sustainability and efficiency.Court surface choice, maintenancepractices, water reuse, plumbing fittingsand fixtures, floodlight use and design,waste recycling, building materials,mulching gardens etc all have an impacton the environment.

Please refer to Tennis Victoria’sEnvironmentally Friendly Tennis Clubs

Guidelines throughout the developmentof your project – available at

www.tennis.com.au/vic .

37

Page 38: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 38/52

Project funding

Funding for your facility project may comefrom a number of different sources,

including the tennis community,government and/or private sector.

Funding programs, guidelines and levelschange regularly, so research your optionsand opportunities for each project youundertake.

National Court Rebate

Scheme

 Tennis Australia’s National Court Rebate

Scheme is a national funding programaimed at stimulating court growth andimproving facilities around the country.

 Affiliated clubs are eligible to submitapplications via Tennis Victoria for fundingto develop or upgrade court surfaces(please confirm with Tennis Victoria whatsurfaces will be funded under this scheme)and associated infrastructure, including

base preparation and development,lighting, fencing, water saving initiativesand ancillary items.

Guidelines and application forms areavailable via www.tennis.com.au.

Facility Loan Scheme

 The Tennis Australia Facility Loan Scheme

is available to financially assist affiliated

clubs, centres and associations toupgrade, replace or improve their tennisfacilities, by providing low interest loans.

 A club, centre or association will oftenembark on a project utilising grant moniesfrom local and/or state government, aswell as their own funds. The Tennis

 Australia Facility Loan Scheme is designedto assist with shortfalls that applicants mayhave in project funding after other fundingavenues have been determined. Loans of 

up to $80,000 are available.Guidelines and application forms areavailable via www.tennis.com.au.

Neale Fraser Foundation

 The Neale Fraser Foundation is aregistered project with the AustralianSports Foundation Ltd (ASF). TheFoundation provides affiliated tennisclubs the opportunity to offer taxdeductible donations for potentialdonors towards facility developmentprojects. More information is availablevia www.tennis.com.au/vic.

 Victorian government The Victorian Government providesfunding assistance to support localcommunity clubs and organisationsthrough a range of grant programs.

Sport and Recreation Victoria’s CommunityFacility Funding Program contributes to theprovision of high quality and accessiblecommunity sport and recreation facilitiesacross Victoria.

Guidelines and application forms areavailable via www.grants.dpcd.vic.gov.au .

Local government

 Availability of funding varies betweenlocal councils and it often requires acontribution from the club, either afinancial commitment or contributionin-kind.

Local government commitment can berequired to attain Tennis Australia fundingand project support.

38

Page 39: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 39/52

Project funding

Local community

Community funding can be sourcedthrough a range of different avenues,including fundraising activities, throughvolunteer labour (supervised by qualifiedcontractors) and by donations and projectsponsorship activities.

Don’t underestimate the power of yourlocal community to support your project.It is likely that they may want to see itsucceed just as much as you do.

Education sector

If your facility is located with, on or neara school facility, opportunities for jointfunding through the school and educationdepartment may be available. Fundingopportunities are likely to be treated on acase-by-case basis and consultation withschool personnel would be essential.

Private sector

Private interests such as local businesses,developers, key users or major localemployers operating within your localcommunity may contribute financially or byproviding in-kind services and materialstowards your project. All levels of supportwill count towards getting your project upand running.

Other agencies and funding

programsGrants may also be available from time-to-time through other government agenciesand funding bodies. Organisations mayinclude state and federal governmentdepartments, regional agencies, serviceproviders (eg. water and power) and ad-hoc community development programs.

Stay in touch with Tennis Victoria, yourlocal council and/or regional sports

assembly for up to date information onavailable grant and funding programs.

39

Page 40: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 40/52

Further resources and information

40

Tennis Australia has a range of factsheets and technical information that

should be sourced throughout the variousphases of your project. Information can beprovided on the following topics and isavailable via www.tennis.com.au:

• court and enclosure dimensions

• court surfaces

• clubhouses

• floodlighting

• fencing

• foundations and bases

• funding

• maintenance and equipment

• management

• nets

• outside amenities.

Tennis Victoria can provide furtherinformation on the following topics:

• best practice guidelines for clubs• business plan and club development

template

• environmentally friendly tennis clubsguidelines

• local contract and supplier listings

• red porous court construction casestudies

• risk management guide for clubs.

 The above information can beaccessed via www.tennis.com.au/vic

or by contacting Tennis Victoria on(03) 8420 8420.

 American Tennis Court 

Construction and Maintenance

Manual (Fourth Edition 2006)

 The United States Tennis Association and American Sports Builders Associationhave collaborated to prepare acomprehensive guide and constructionprinciples used by contractors operating inthe Australian market. The publication isavailable – www.sportsbuilders.org.

 The Sports Contractors Association isan industry body that can offer advice

on design specifications and providemember and associate contacts –www.sportscontractors.com.au.

 The Victorian Government through Sport

and Recreation Victoria and its regionaloffices can provide advice regarding facilitydevelopment and funding opportunities –www.sport.vic.gov.au.

 The Municipal Association of Victoria

(MAV) provides contact details for

local government areas in Victoria –www.mav.asn.gov.au. It is recommendedthat all clubs discuss their project withtheir local council to ensure future plansmeet council objectives and communityexpectations. It is importantto have these discussions prior toseeking funding or resource support.

Page 41: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 41/52

Glossary and definitions

 The following definitions are provided forgeneric terms referred to throughout the

Guide.

 Acrylic

Material used for surfacing courts thatprovides colour and texture in the courtsurface.

Base

 The part of a court structure on which the

playing surface is applied.

Business Plan (Club)

 A formal statement of a set of club goalsand the plan for reaching those goals.

Capital replacement program

 A statement of all the required tasks,responsibilities and costs that should betaken into consideration for the futurereplacement of infrastructure.

Cushioned acrylic

 Acrylic surface that includes cushionproperties.

Geotechnical report/engineer 

 A ground condition report prepared by anappropriately qualified engineer for a

specific site. It reports such factors as soiltype, compaction, moisture levels, andpotential for ground movement andmoisture level change. A GeotechnicalEngineer is a specialist qualified to preparea geotechnical report.

Greenfield site

 An undeveloped site earmarked andsuitable for future facility development.

Illuminance

 The total amount of visible light illuminatinga point on a surface from all directionsabove the surface. The standard unit forilluminance is Lux.

Lifecycle cost 

 A comparison of not only the initial capitalcost for specific facility elements, but ananalysis of ongoing usage, maintenanceand replacement costs.

Luminaire

 The housing that contains a floodlightlamp. The term includes the lamp, reflectorand the lens.

Principle Playing Area (PPA)

 The area of the court bounded by thebaselines and the doubles side lines.

Project manager 

 A suitably qualified expert who is engagedby a client to oversee the design andconstruction phases of a project.

Pavement 

 A term used to describe an asphalt orconcrete court base.

Pile/pile height  The tufts or loops of yarn that form theplaying surface in synthetic grass andsynthetic clay courts. Fibres are availablein a range of colours. Pile height refers tothe length of the pile (standard pile heightis 19mm).

41

Page 42: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 42/52

Glossary and definitions

Red porous

Commonly referred to as en-tout-cas, redporous is the term given to clay courts thatare generally found across metropolitanMelbourne.

Schedule of Use

 A document that details the intended useof a facility and is sometimes compared tothe existing use of a facility.

SFAGSand filled artificial grass.

Standards Australia

 The nation’s peak non-governmentstandards organisation. It is charged bythe Commonwealth Government to meet Australia’s need for contemporary,internationally aligned standards andrelated services.

Synthetic clay 

Collective term applied to outdoor carpetproducts that provide similar playingproperties of red porous or clay courts.

Synthetic grass

Collective term applied to outdoor carpetproducts used in tennis court and othersports facility surfacing.

Top and bottom rails

Horizontal rail supporting the chain meshat the top and bottom of court enclosurefencing.

Total Playing Area (TPA)

 The total court area including the principleplaying area and the court surrounds tothe edge of the court surfaces (usually allthat is enclosed within the court enclosurefencing).

Uniformity 

 This is a measure of the uniformity of lighton a tennis court. It is important as itmeasures the difference (and consistency)

between the bright and dark areas.

42

Page 43: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 43/52

Appendix 1 –Club assessment tool – court surface selection

43

   C  o  u  r   t  s  u  r   f  a  c

  e

   R  e   d  p  o  r  o  u  s

   N  a   t  u  r  a   l   g  r  a  s  s

   N  o  n  -  c  u  s   h   i  o  n  e   d  a  c  r  y   l   i  c

   C  u  s   h   i  o  n  e   d  a  c  r  y   l   i  c

   S  a  n   d   f   i   l   l  e   d  a  r

   t   i   f   i  c   i  a   l   g  r  a  s  s

   S  y  n   t   h  e   t   i  c  c   l  a  y

   P  r  o  v   i   d  e   d  a   b  o

  v  e   i  s  a  s  a  m  p   l  e  m  a   t  r   i  x  o   f  w   h  a   t  c

   l  u   b  s  w  o  u   l   d  g  e  n  e  r  a   l   l  y  e  v  a   l  u  a   t  e  c

  o  u  r   t  s  u  r   f  a  c  e  c   h  o   i  c  e  a  g  a   i  n  s   t .   T   h

  e   h  e  a   d  e  r  s   i  n  e  a  c   h  c  o   l  u  m  n  a  r  e

   t  r  a  n  s   f  e  r  a   b   l  e   b  a  s  e   d  o  n  c   l  u   b  o   b   j   e  c   t   i  v  e  s  a  n   d   k  e  y  s  e   l  e  c   t   i  o  n  c  r   i   t  e  r   i  a .

   C  o  u  r   t  s  u  r   f  a  c  e  a  n   d  p  r  o   d  u  c   t  c   h  o   i  c  e  s  c  a  n   b  e   f  u  r   t   h  e  r  r  e   f   i  n  e   d  a  n   d  e  v  a   l  u  a   t  e   d   b  y

  a   d  a  p   t   i  n  g   t   h  e   ‘  c  o  u  r   t  s  u  r   f  a  c  e  c  o   l  u  m  n   ’  a  n   d  u  s   i  n  g  s  p  e  c   i   f   i  c  s  u  r   f  a  c  e

  s  o  r

  p  r  o   d  u  c   t  s  w   h  e  n  y  o  u   h  a  v  e   d  e  c   i   d  e   d  o  n   t   h  e   t  y  p

  e  o   f  s  u  r   f  a  c  e  y  o  u  r  c   l  u   b  m  a  y  w   i  s   h   t  o   i  n  s   t  a   l   l .

   F  o  r  e  a  c   h  c  o   l  u  m  n ,

   d  e  v  e   l  o  p  a  s  c  o  r   i  n  g  s  y  s   t  e  m    f  r

  o  m    1

   t  o   5   (   1   b  e   i  n  g   l  e  a  s   t  c  o  m  p  a   t   i   b   l  e  w   i   t   h  c   l  u   b  o   b   j   e  c   t   i  v  e  s  a  n   d

   5   b  e   i  n  g  m  o  s   t  c  o  m  p  a   t   i   b   l  e   )  a  n   d

  s  c  o  r  e  e  a  c   h  s

  u  r   f  a  c  e  w   i   t   h   i  n   t   h  e  m  a   t  r   i  x .

   T   h  e  s  u

  r   f  a  c  e  o  r  s  u  r   f  a  c  e  s  w   i   t   h   t   h  e  g  r  e  a   t

  e  s   t  s  c  o  r  e   (  s   )  w   i   l   l    b  e  e  a  s   i   l  y   i   d  e  n   t   i   f   i  a   b   l  e  a  n   d  y  o  u  r   d  e  c   i  s   i  o  n  q  u  a  n   t   i   f   i  e   d

  a  g  a   i  n  s   t  a  s  e   t

  o   f  a  g  r  e  e   d  s  e   l  e  c   t   i  o  n  c  r   i   t  e  r   i  a .

   T  e  n  n   i  s   V   i  c   t  o  r   i  a   h  a  s   d  e  v  e   l  o  p  e   d  a   C  o  u  r   t   S  u  r   f  a  c  e   S  e   l  e  c   t   i  o  n  m  a   t  r   i  x   t  o  o   l    i  n   M   i  c  r  o

  s  o   f   t   E  x  c  e   l    f  o  r  m  a   t   t  o  a  s  s   i  s   t  c   l  u   b

  s   i  n   d  e  v  e   l  o  p   i  n  g  a  s   i  m   i   l  a  r  m  o   d  e   l 

   t  o

  w   h  a   t   i  s  p  r  e  s  e

  n   t  e   d  a   b  o  v  e .

   P   l  e  a  s  e  c  o  n   t  a  c   t   T  e  n  n   i  s   V   i  c   t  o  r   i  a   ’  s   I  n   f  r  a  s   t  r  u  c   t  u  r  e  a  n   d

   E  n  v   i  r  o  n  m  e  n   t   M  a  n  a  g  e  r  o  n   t  e   l  e  p

   h  o  n  e   (   0   3   )   8   4   2   0   8   4   2   0  o  r  e  m  a   i   l

   t  v  r  e  c  e  p   t   i  o  n   @

   t  e  n  n   i  s .  c  o  m .  a  u   f  o  r  a  c  o  p  y .

    U   s   a   b   i   l   i   t   y   /

   f   u   n   c   t   i   o   n   a   l   i   t   y

    M   e   e   t   s

    M   e   m

   b   e   r

   n   e   e    d   s

    T   A   p   l   a   y   e   r

    d   e   v   e   l   o   p   m   e   n   t

   s   u   r   f   a   c   e

    M   a   i   n   t   e   n   a   n   c   e

   o   b   l   i   g   a   t   i   o   n   s

    E   n   v   i   r   o   n   m   e   n   t   a   l

   s   u   s   t   a   i   n   a   b   i   l   i   t   y

    C   a   p

   i   t   a   l

   c   o   s   t   s

    R   e   p   l   a   c   e   m   e   n   t

   c   o   s   t   s

    T   o   t   a   l s   c   o   r   e

Page 44: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 44/52

Appendix 2 – Case studies

Bundoora Tennis Club

“Hard work, but very rewarding” is howBundoora Tennis Club’s President, JamesCopes, described their facility developmentproject. With a total project cost in excessof $240,000, 18 months of research,meetings, budgeting and tenderevaluations has resulted in the Bundoora Tennis Club having two new Plexicushioncourts, new baselines on four red porouscourts, upgraded fencing and newfloodlighting across four courts (providing

the club with eight lit courts).“We saw our courts and infrastructureslowly deteriorating and for years weweren’t quite sure what we needed to doand how to do it,” said Copes.

“It was evident from talking to our localcouncil (Banyule City Council) and Tennis Victoria that without a plan or cleardirections and objectives, we weren’tgoing to develop into the future.”

 The first step for the club was to prepare astrategic plan that engaged with membersto identify the key issues and shortfallswith the club’s existing facilities. It alsohighlighted the areas where the club hadnot been successful previously in attractingfunds and support to develop theirfacilities.

“Through the development of a strategicplan we identified that memberpreferences were different, but this also

presented some different opportunities,”said Copes.

“We believe the Plexicushion surface willhelp attract a good body of coachingpupils and provide a surface to assistwith their future development.”

“We were also aware of the need to satisfyour older member preferences and toexpand the number and quality of our Victorian Pennant teams. By retaining ourred porous courts and improving them, wecould accommodate all the preferences.”

 The strategic plan became the catalyst forall future planning, and was the backboneto the development of successfulpartnerships with the Banyule City Counciland other funding bodies. The Council

contributed $60,000, Sport andRecreation Victoria $60,000 and Tennis Australia (via its court rebate scheme)$30,000 towards the project. Theremainder of project funding wascontributed by the club.

It was vital for the club to have earlycommunication with its local council at theplanning stage, prior to submitting fundingproposals. It was also important to makesure that any planned works aligned with

the Council’s strategic plan and projectpriorities. This was successfully achievedwith this project, as the Bundoora TennisClub had clearly communicated to theCouncil what they were aiming for early onand together, grant submissions werewritten to obtain additional funding andsupport.

 The club had a number of hurdles toovercome along the way, including treeroot invasion and a lack of power supplyfor additional floodlighting. Having adedicated and independent projectmanager helped the club through theseissues with little impact on overall projectbudgets and timing.

44

Page 45: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 45/52

Appendix 2 – Case studies

Mr Copes believes that a project managershould be considered by every club

undertaking a sizeable facility project.“It helped us greatly in liaising withcontractors and with the assessment of the various project tenders that werepresented,” said Copes.

Some further words of advice from theclub looking back on their project planninginclude:

1. Do your own research and homework –it is amazing what you can learn.

2. Use your available resources andpartners and work with them.

3. Get an independent project manager(Tennis Victoria can assist you in thisarea).

4. Communicate what you are doing toyour members through all projectphases.

One final thought from Bundoora TennisClub’s Vice-President, Matt Testolin, is to

understand the timeline for constructionand the impact it may have on yourexisting operations.

“Our courts were out of action forapproximately 15 weeks during which timewe hired courts from surrounding clubsand centres,” said Testolin.

 This may have an impact on your overallproject budget and needs to be wellcommunicated to your members.”

45

Page 46: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 46/52

Appendix 2 – Case studies

Sale Tennis Club

 The Sale Tennis Club was established in1951 and moved to its current site in1971. By 2004 the 30 year old facility wasstarting to age badly. There was much tobe done, but limited club funds to do itwith.

With a motivated committee, the Sale Tennis Club set about rebuilding the facility.

“Our objective was to create a facility thatcatered to the needs of coming

generations, a facility that would make ourmembers proud and to bring family andfriends together to enjoy tennis and socialinteraction in a quality clubhouse andsurrounds,” said Robin Lowe, Sale TennisClub’s President.

 The Sale facility originally consisted of 14en-tout-cas courts, four hard courts andsix grass courts. The committee wasaware of a number of issues, such as thecost of maintaining three different types of 

surfaces and the importance of differentsurfaces when developing well rounded junior players.

 The club’s first step in the facilitydevelopment process was to brainstorm awish list and order the list in terms of viability, importance, urgency and potentialcost. The outcome of this process was thedevelopment of a Facilities Upgrade Planfor the period 2004 - 2012. The planfocused on achievable goals under the

headings of ‘Project, Objective/Outcome, Timing and Budgeted Cost’.

“There were a total of 24 projects of varying size and cost,” said Lowe.

“Our first project under the plan wascompleted in February 2005 and was amajor shade structure.”

 The club decided to upgrade the en-tout-cas and hard courts and to forgo thegrass courts. The cost saving on the highmaintenance grass courts was used topartially fund the upgrades on the other

courts.“Another added incentive was that wewere able to implement very significantwater savings on the grass courts while atthe same time working with GippslandWater to use recycled water on our en-tout-cas courts,” said Lowe.

“Sale Tennis Club has since completed 22of the 24 projects at a cost of just over$500,000.”

 The partnership formed with GippslandWater is an example of a club gainingaccess to expertise and funding in areasvital to the upgrading of courts, lightingand club house.

“We recognised that our upgradeambitions would need to be funded andthat our internal resources would not besufficient,” said Lowe.

“Our starting point was to educateourselves as to what support was availableand nominate one of our committeemembers to champion the funding optionsand explore all the available possibilities.”

46

Page 47: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 47/52

Appendix 2 – Case studies

 The club has now submitted over 50 grantapplications.

In addition to applying for grants,important funding partnerships wereformed with Tennis Victoria, Tennis Australia, Wellington Shire Council, Victorian State Government and localbusinesses. The club made presentationsas often as possible and were not tooconcerned when grants were rejected asthey knew persistence would eventuallyreward the club.

“In some instances we applied for thesame grant three years in a row, improvingit each time until we were successful. Inshort, we were relentless in our pursuit of funding to progress our developmentplans,” said Lowe.

“We also registered our projects with the Australian Sports Foundation so that anydonations would be tax deductible.”

 The club’s objective was to build qualityfacilities that would last more than one

generation.Capital facilities are expensive but doublyso if they have to be upgraded soon afterif they aren’t constructed correctly to beginwith. All of the club’s upgrades were doneby quality contractors with quality materialsand no shortcuts.

 An added bonus for the club is that theongoing maintenance costs have alsoreduced. The new facilities have aided indeveloping community and juniorprograms to help develop and support thesport of tennis throughout the region.

“We are now an active, vibrant club whoparticipates fully in our local community,”said Lowe.

“With quality facilities we can cater for alltypes and levels of participation and wenow provide an exciting hub for ourcommunity.”

47

Page 48: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 48/52

Checklist

When undertaking your next tennis facilitydevelopment project, please ensure that

you have:

Conducted a needs assessmentand/or business plan for your projectin conjunction with club members.

Consulted with your local council, Tennis Victoria and other keystakeholders.

Conducted an assessment of your

site, soil and/or associated buildingconditions (depending on the type of project).

Fully budgeted for your project,including securing of grant moniesand provision for cost escalation andcontingencies.

Involved professional designers,technical experts and a project

manager (where applicable).

Evaluated your project to ensureyou have achieved your originalobjectives.

48

Page 49: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 49/52

Acknowledgements

49

 The Tennis Facility Planning Guide hasbeen developed in partnership between

Sport and Recreation Victoria and Tennis Victoria.

Special thanks is extended to Inside Edge

Sport and Leisure Planning for providingproject research, expert advice and guidepreparation, and to 2MH Consulting andWM Loud for contributions made to thetechnical content.

 Thanks to Andrew Gyopar of MouseMedia

for supplying photos on the followingpages of this guide: front cover, page 6,8, 10, 12, 14, 17, 27, 34 and 42.

 The contributions from the followingorganisations are gratefully acknowledged:

• Tennis Australia

• Tennis Queensland

• Ballarat City Council

• Banyule City Council

• Bundoora Tennis Club

• Sale Tennis Club

• Mitchell Shire Council

For further information regardingtennis facility development planning,please see Tennis Victoria’s websitewww.tennis.com.au/vic or contact Tennis Victoria on (03) 8420 8420.

Page 50: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 50/5250

Page 51: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 51/5251

 This resource contains comments of a general nature only and isnot intended to be relied upon as a substitute for professional

advice. No responsibility will be accepted by the Department of Planning and Community Development for loss occasioned to anyperson doing anything as a result of any material in this resource.

 Any opinions, findings, conclusions or recommendations expressedherein are guidelines only and should not be expressly relied on byproject proponents.

Published by Sport and Recreation VictoriaDepartment of Planning and Community Development1 Spring StreetMelbourne Victoria 3000

 Telephone (03) 9208 3333

December 2010

© Copyright State Government of Victoria 2010 This publication is copyright. No part may be reproducedby any process except in accordance with the provisionsof the Copyright Act 1968.

 Authorised by Hugh Delahunty MPMinister for Sport and Recreation

Minister for Veterans’ AffairsLonsdale Street, Melbourne.

 Accessibility

If you would like to receive this publication

in an accessible format, such as large print

or audio, please telephone (03) 9208 3333,or email [email protected]

 This publication is also published in PDF

and Word formats on www.dpcd.vic.gov.au and

www.tennis.com.au/vic

Page 52: Tennis Facility Planning Guide 1-4MB

7/29/2019 Tennis Facility Planning Guide 1-4MB

http://slidepdf.com/reader/full/tennis-facility-planning-guide-1-4mb 52/52