TENGKU SYAAREE BIN TENGKU ABU BAKARresume).doc · Web view2011/02/09 · qualified with Phase Array...
Transcript of TENGKU SYAAREE BIN TENGKU ABU BAKARresume).doc · Web view2011/02/09 · qualified with Phase Array...
TENGKU SYAAREE BIN TENGKU ABU BAKARMobile: +6 013 9341761 e-mail: [email protected]
PERSONAL DETAIL
NRIC: 850117-11-5401 Permanent Address: Lot 108,Kampung Bukit Gasing, Seberang Marang, 21600 Marang,Terengganu Date & Place of Birth: 17/01/1985 (Kuala Terengganu, Terengganu) Gender: Male Marital Status: Married Religion: Islam
Race: Melayu Citizenship: Malaysia Age: 26 years old PCN No. 303181
CSWIP Cert. No. 37596 (Visual Welding Inspectors 3.0)
CSWIP Cert No. 49360 (Manual & Encoded Phased Array Ultrasonic Level 2)
NIOSH Oil & Gas
Safety Passport No. OG004569N
International Passport No. A22769699
HIGHEST EDUCATION:
Foundation Course For HND In Engineering, Terengganu Advanced Technical Institute, TATI.(Final CGPA: 2.69)
Higher National Diploma In Electrical and Electronics, Terengganu Advanced Technical Institute, TATI. (Final CGPA: 3.16)
TECHNICAL COURSE / TECHNICAL COURSE:
PCN Level II in Dye Penentrant Testing (Ruane-TATI sdn.bhd, Kemaman, Terengganu).
PCN Level II in Magnetic Particle Testing, (Ruane-TATI sdn.bhd, Kemaman, Terengganu).
PCN Level II in Ultrasonic Testing, (Ruane-TATI sdn.bhd, Kemaman, Terengganu).
CWISP 3.0 Visual Welding Inspectors, (TWI sdn.bhd, Sungai Buloh, Selangor).
In-House Training Course for Phased Array Ultrasonic Testing (Harfang x32), conducted by SGS (M) sdn. Bhd.
Confined Space Entry conducted by Shell Refining Company,(FOM) Bhd.
In-House Training for Phased Array Ultrasonic Testing using Sonatest Veo.
Manual & Encoded Phased Array Ultrasonic Testing CWISP Level II, (TWI Sdn. Bhd,Sungai Buloh,Selangor)
1
COMPUTER SKILLS
Good knowledge and practical in Microsoft office. Good knowledge and practical in AutoCAD R14. Good knowledge and practical in Pro-Engineer. Good knowledge and practical in C++. Tomoview Software in Interpretion Phase Arrays.
OTHERS
Possess excellent verbal and written communication skills, Determine, dedicated, confident, and organized. Strong analytical mind, initiative and able to work independently.
Able to interpret Engineering Drawing
Language Proficiency B. Malaysia (Writing & Spoken) English (Writing & Spoken)
Willing to travel : Yes Willing to Relocate : Will Considered Possess Own Transport : Yes Expected Monthly Salary : Negotiable International Passport : Yes
SUMMARY OF EXPERIENCE
Application and exercise of QA/QC and welding and NDT in fabrication, piping, structure, vessel, skid,
refinery, power plant, onshore and engineering industries according to code & standard / specification
applied, familiars and ability to used all ASME Code, API (1104, 510. 570 and 5L).
Experience NDT in fabrication, piping, structure, vessel, skid, onshore before this I join PAUT and Tofd
inspection in refinery, Power Plant Shell, Petronas Cari Gali and ExxonMobil Malaysia and have
qualified with Phase Array Ultrasonic Testing (PAUT), familiar in PAUT
Machine (Omniscan, harfang,Veo Sonatest) also have experience in TOFD Inspection, as a Long Range
Guided Wave assistant. Ability to used all ASME Code and API (1104 and B31.3, A16).
STRENGTHS
Flexible and dedicated attitude, demonstrating the ability to communicate and relate comfortably with all level of
people, active, well disciplined, quick leaner, able to work in-group and accomplish task systematically, able to
work under pressure and willingness to work hard to achieve goals as well as to accept new challenges.
2
EMPLOYMENT HISTORY
1. Company : SGS Petrotechnical Inspection (M) Sdn Bhd
Position : Engineering Inspector
Period : March 2008 – March 2011
Project During This Period:
Project : Sand Monitoring Spool,3” 1502 5” Run
Owner : IICORR ASIA Sdn. Bhd,Subang Jaya.
Period : 14th March 2008 – 16th March 2008
Position : Engineering Inspector
Duties : Check/monitor and witness the hydrostatic test. (Third party Inspector),
Hydrostatic test in KSB (DJ Yard), Witness pump alignment and other
mechanical works,Come out with final report for final documentation and
certificate of Hydrostatic Test a Spool, Check material and NDT, Line check and
hydrotest.
Project : Major Turn Around 2008
Owner : SHELL Refining Company (FOM),Port Dickson
Period : June 2008 – July 2008
Position : Engineering Inspector
Duties : Carried out NDT task (DPI,MPI,UTTG,UT-Flaw & Visual Inspection) during
turnaround. Prepare final documentation, summary and filling of reports
accordance to client reporting and documentation system.
Project : Storage tank Inspections
Owner : Petronas Dagangan Berhad,Prai,Penang Terminal.
Period : August 2008
Position : NDT /Piping/Storage Tank Inspector
Duties : Tank settlement survey, Ultrasonic Thickness and Flow Roundness,Plumbness
and calibration, Writing of report and also liaising with the client for any further
requirement of inspections and come out the final document.
Project : Turn Around 2008
Owner : Petronas Gas Berhad (PGB), at GPP A, Terengganu.
Period : September 2008
Position : NDT Inspector
Duties : Carried out DPI, UTTG, and UT-Flaw on requested. Prepared final document
and report.
3
Project : Flare Structure Inspections.
Owner : Titan PetroChemical, Pasir Gudang
Period : September 2008
Position : NDT Inspector
Duties : Carried out UTTG on Flare profile structure and reporting.
Project : Underwater Pipe With Sabah Govenrment Project (Spiral Pipe)
Owner : Pipe Technology System Sdn. Bhd. Bentong,Pahang.
Period : November – December 2008
Position : Advanced UT (TOFD) / Phased Array (PAUT) Assistant & NDT Inspector.
Duties : Assist carried out Ultrasonic Time Flight Diffraction (TOFD) and
assist carried Phased Array (PAUT) for under seas pipes.
also carried out UT-Flaw for cross check pipes based on API 1104 and reporting.
Project : Side Shell Plate Of Tank Inspection.
Owner : Mammoet Salvage Marine Shipyard Linggi
Period : January 2009
Position : NDT Inspector.
Duties : Perform UT-Flaw Detection on side shell plate of tank no. 3 (ship)
Based on AWS D1.1 Code and reporting.
Owner : Terminal Sandakan, Malaysia
Period : February 2009
Position : UT-Phased Array Assistant.
Duties : Assist to carried out UT-Phased Array on repaired 8” piping based on
ASME B31.3 Code Case 181 and reporting.
Project : PSR-2 Revamp Project.
Owner : OGPP Sdn. Bhd.
Period : 25 February – 28 February 2009
Position : Third Party Inspector
Duties : As a Third Party Inspection, to review and witness Hydrotest for Heat Exchanger
and trace piping line as per ASME VIII for Petronas Penapisan Melaka
to updated in P & ID.
Project : Preventives Maintenances,Corrosion Under Insulation (CUI) & Project.
4
Owner : Shell Refinery Company (FOM), Port Dickson
Period : March – November 2009
Position : Engineering Inspector and LRUT Assistant.
Duties : To perform Die Penentrant Inspection (DPI), Magnetic Particle Inspection (MPI), UTTG,
UT-Flaw Detection and Visual at piping and equipment (Heat Exchanger,
Column, Vesssel, Furnace and Tank) as per request by monthly schedule & client.
find for identification prescription, corrosion loop description, prepare drawing and
others related documentation for site visit purpose.
Carried out UT C-scan, UT Grid and assist LRUT as per request by client.
Seek insulation and scaffolding parties for respective purpose.
Also carried out Ultrasonic Thickness Measurement on tank shell, roof, bottom plate
and nozzle.
Project : Visual Inspection per API 570
Owner : Tanjung Langsat Port.
Period : December 2009
Position : Phased Array & Piping Inspector Assistant.
Duties : Assist to scanning UT Phased Array on pipeline weld, condition pipieline as mark (Client).
Assist Piping Inspector to perform visual inspection on piping as per API 570, evaluate UTTM
Data, calculate piping remaining life as per API 570 and compiled reports.
Project : Boom Lift Structure Inspection.
Owner : Mammoet Romstar Marine Shipyard Linggi.
Period : December 2009
Position : NDT Inspectors.
Duties : To perform UT-Flaw Detection on boom lift structure as per AWS D1.1 Code and
prepared reporting.
Project : Riser Pipeline OD 21” Scanning.
Owner : Aker Kavinier PKFZ, Klang (Client DNV Singapore And Frontier).
Period : January 2010
Position : Assistant PAUT Inspector.
Duties : Assist to scanning Riser Pipeline OD 21” at female and male weld joint and
subsea riser product, final report comes out in image, Interpreted in Tomoview software,
acceptance criteria B13 Code case 181 and 16A.
Project : Economic Shutdown.
Owner : Shell Refinery Company (FOM), Port Dickson
5
Period : February 2010
Position : NDT Inspectors.
Duties : Perform UT-Flaw, Magnetic Particle Inspection and Dye Penentrant Inspection at Chiller,
Furnace (F-101A) and Piping. Prepared final reports.
Project : New Pipelines Scanning.
Owner : ExxonMobil Borneo, Terminal Tawau, Sabah
Period : March 2010
Position : PAUT & TOFD Inspectors.
Duties : Carried out Phased Array and Tofd on new 4” pipelines Based on ASME B31.3 Code Case 181
and prepared reporting.
Project : Tank Annular Plates Due To Repairs.
Owner : Shell Timur, Terminal Labuan, Sabah.
Period : March 2010
Position : PAUT Inspectors.
Duties : Perform Phased Array on Post-Repaired Annular Plates Tank No.1 based on
API 650 and prepared reporting.
Owner : City Gas, Senoko
Period : April 2010
Position : PAUT Inspectors Assistant.
Duties : Assist to carried out Phased Array on the spheres tank (T-joints with total 82 joints)
based on Code Case 2235 and prepared final reporting.
Project : Shut Down 2010
Owner : KLK Oleomas Sdn. Bhd., Klang.
Period : August 2010
Position : PAUT and TOFD Inspector.
Duties : To perform Phased Array Ultrasonic and Tofd testing on piping and prepared the final report.
Project : Preventives Maintenances,Corrosion Under Insulation (CUI) & Project.
Owner : Shell Refinery Company (FOM), Port Dickson
Period : April – October 2010.
Position : NDT Inspector and Visual Welding Inspector.
Duties : To perform Die Penentrant Inspection (DPI), Magnetic Particle Inspection (MPI), UTTG,
UT-Flaw Detection and Visual at piping and equipment (Heat Exchanger,
Column, Vessels, Furnace and Tank) as per request by monthly schedule & client.
find for identification prescription, corrosion loop description, prepare drawing and
others related documentation for site visit purpose.
Carried out UT C-scan, UT Grid and assist LRUT as per request by client.
Seek insulation and scaffolding parties for respective purpose.
6
Also carried out Ultrasonic Thickness Measurement on tank shell, roof, bottom plate
and nozzle. Visual the welding profile after welding was completed. And final report.
Project : Phased Array On 6” stainless steel nozzle Of Heat Exchanger.
Owner : Shell Refinery Company (FOM), Port Dickson
Period : October 2010
Position : Phased Array Inspectors and TOFD Asisstant.
Duties : To perform Phased Array and assist Tofd on 6” stainless steel nozzle via pad plate for
very limited area scanning as per code CC 22359 and the coating.
Project : Phased array On New Joint Of Annular Plates Tank No. 7.
Owner : Exxon Mobil Sdn. Bhd. Terminal Bagan Luar, Pulau Pinag
Period : October 2010.
Position : Phased Array Inspectors.
Duties : To perform phased array on 15 new joints of annular plates for tank no.7 during
post repair as per API 650.
Project : Tank Inspection For Tank No. 3
Owner : New Terminal Shell Sdn. Bhd. At WestPorts, Port Klang
Period : 10 November 2010.
Position : Phased Array Inspector.
Duties : To perform corrosion mapping at bottom to shell plate using GE Phasor Xs equipment.
Project : Tank Inspection For Tank No. 2
Owner : Terminal Shell Sdn. Bhd. At Bagan Luar, Pulau Pinang
Period : 20 December 2010.
Position : NDT Inspector.
Duties : To perform Dye Penetrant testing at shell plate joints and prepare final report.
Project : Stainless Steel of Bracket Roof for Doha Airport.
Owner : Sumber Khazanah Sdn. Bhd. At Balakong, Selangor
Period : 13 January 2011.
Position : NDT Inspector.
Duties : To perform Dye Penetrant testing at fillet weld of stainless steel bracket and prepare final report.
Project : 8” x 6” x 5” Pipe Line to Suction Pump.
Owner : ExxonMobil Terminal Sdn. Bhd. At Kuantan Port, Pahang.
Period : 18 January 2011.
Position : NDT Inspector.
7
Duties : To perform Dye Penetrant testing and UTTG at pipeline of suction pump and prepared final report
Project : Tank Inspection For Tank No. 0310
Owner : BASF Petronas Chemical Sdn. Bhd. At Kuatan Port, Pahang.
Period : 20 January 2011.
Position : NDT Inspector.
Duties : To perform UTTG at Roof, Bottom Plate and Nozzle of Stainless Steel Tank also perform Dye Penetrant testing at circumference joint Shell to Bottom and prepared final report.
Project : Frame Beam Inspection.
Owner : Mammoet Romstar (M) Sdn. Bhd.
Period : 9 February 2011.
Position : NDT Inspector.
Duties : To perform the Magnetic Particle testing on 8 joint of beam frame and prepared the final report.
2. Company : Protection Rigging Access (Malaysia) Sdn. Bhd.
Position : Advanced UT & NDT Inspector.
Period : March – Present 2011
Duties : To perform Advanced UT inspection (Phased Array/Tofd technician) and NDT inspection
(DPI, MPI and UT) on piping, pressure vessel equipments etc.
REFERENCES:
Mr. Mohd Faizal Anuar ( Lecturer – Ruane-TATI sdn.bhd) +6019-9468993
Mr. Mohd Ramaeh Paul ( Lecturer – Ruane-TATI sdn.bhd) +6012-3373408
Mr. Shahrul (Lecturer-TWI sdn. bhd.) +60196061178
8
Tengku Jamal Abdul Nassier ( Manager – Jariz Technologies sdn.bhd) +603-78451155
Mohd Asrul Bin Othman ( Advanced UT Inspector ) +6019-9214251
Shahrizan Shukor ( Advances UT Inspector) +6017-7158108
Muhammad Aizuddin Sulong ( Lead PAUT Inspector, SGS Sdn. Bhd. ) +6012-9093096
Hassan Kavarodi ( NDT Lecturer & Consultant, TWI Training & Cert.
S.E Asia Sdn. Bhd. Sungai Buloh, Malaysia ) +6013-9284547
9